1 Lifting Gears Q-1, as chief officer what are the checking s that you should carry out before using lifting gear? (Risk assessment and risk management) Make sure that ship s lifting gear and associate equipments which involving loading and discharging activities are 100% operational and free of defects and all the valid certificates are readily available on board All the maintenances are carried out as per the PMS and records are readily available. Pre-checks to be carried out before commence the operation, such as, 1-any hydraulic oil leak and correct oil levels are maintained in the equipments. 2-any worn or damage wires are existing 3-any places with excessive corrosion 4-any cracking at welded areas present 5-any markings which supposed to display is missing from the cargo gears. 6-All control units Joysticks, Alarms, Limit switches, must be checked prior to use and all control must be operated before attaching the slings or grabs to the crane or derrick. Do the Risk Assessment (RA): it is the process of evaluating the probability and consequences of an injury or illness from exposure to an identified hazard and determining the appropriate measures for risk control. As such, there are three basic steps to RA. Step 1 - Hazard Identification Identifying the hazards associated with each work activity and the type of potential accidents/ incidents that can result from the hazards is the first step to RA. Some of the hazards associated with lifting operations such as poorly maintained wire ropes ECT... Step 2 - Risk Evaluation Risk evaluation is the process of estimating the severity of an injury or damage and the likelihood of the occurrence. For example, the risk level of workers working underneath a suspended pre-cast component should be assessed as a high risk hazard as the consequences of the load dropping can result in killing the workers underneath. Step 3 - Risk Control and Management This is a critical last step as it identifies appropriate risk control measures to reduce the risk level to an acceptable level. Following from the previous example of a suspended pre-cast component, an appropriate 1

2 risk control measure will be to prohibit workers from working directly underneath a suspended load. The lifting zone should also be demarcated to prevent any unauthorized entry. Q-2, what are the precautions that you should take before using lifting gears? Risk assessment was done with all crew who engaging in works well understood about the particular operations and permit to work forms filled and all are signed. Relevant cargo gears checked and all in order and all document proofs are readily available. All rigging plan requirements and cargo appliances are inspected. Ensure that lifting plan is made and discuss with the dock workers authority and acknowledge. Keep one copy for your reference Make sure that stability conditions are perfectly all right for cargo operation Ensure that UKC is well enough for cargo operation with heeling moment. Engine room was informed regarding cargo operation and power is available. Communication between ships personal who engaging in cargo work are tested. Q-3, what is the rigging plan and what is the purpose of it? A booklet from official document, which gives detail of cargo gear and lifting alliances. Every vessel with derrick and creams must have a rigging plan. The rigging plan consist of following information Position and size of the deep eye plate Position of in bound and out bound booms Maximum head room ( the permissible height of cargo hook above hatch coaming) Maximum angle between runners Position, size and SWL of blocks Length, size, and SWL of runners, topping lifts, guys and preventers SWL of s hackles Position of derricks producing maximum forces Optimum position for guys and preventers to resist such maximum forces Combined load diagram showing forces for load of 1 ton 2

3 Guidelines on the maintenance of the derrick rig Q-4, why lifting gear have to be tested? Certification of a vessels lifting appliances is enforced by the national authorities, i.e. port state and frequently also the vessels flag state. The certification has to comply with the ILO Convention No.152 which covers safety in lifting operations. The convention requires the certifications to be carried out by a competent person/body. An increasing number of national authorities now require that this commission is performed by classification societies. (Ships deck cranes, engine room cranes, and lifting equipment are examined in accordance with: - The Merchant Shipping Regulations - Flag state requirements - International Labour Organization (ILO) Convention 152, where it applies) Q-5, Describe the testing frequency of lifting gears. Before new equipment is taken into service At set periods as required by national regulations, typically every five years After structural modification and repair. Q-6, what is the proof load and why proof load test is done? Tests should be done using a weight, sufficient to ensure that when it is loaded to SWL. It will safely hold the load. As a gear cannot test for its breaking stresses, it is tested for weight above SWL, but less than breaking stress. That Load is called Proof load. Q-7, what are the factors governing proof load? (How do you determine what proof load to be used?) The Proof load depends on the component and its size. Every lifting appliance shall be tested with a test load which shall exceed the SWL. It is given in the ILO Convention 152. SWL up to 20t SWL 20t 50t SWL greater than 50t : 25% in excess of the SWL : add 5t to SWL : 10% to SWL 3

4 Q-8, Explain how to carry out proof test on your cargo gear. Let Assume... A crane on board with SWL 20 tons and need to carry out a proof test. As per the regulation, (ILO Convention 152) if the SWL of the crane is 20tons the excess amount to add is 25% of the SWL. So it needs to suspend a weight of 25tons to check the proof load. Let s do it with the water bags. Initially fill the water up to the required amount here 25 tons measured by dynamometer or from rate of flow of the water to the bag. Then crane will hang it for the 5min time period as per the regulation. Once the crane is capable of hanging the weight (SWL+25% of SWL) for the 5 min period, crane is pass the proof load test. Q-9, Compare the Dynamic test, Static test and Proof load test. Dynamic test Static test Proof load test By lifting the proof load By using a dynamometer When weight is hanging and swinging the load secured to the lifting point the boom shall be test for through the derrick or cranes operating arc as per the ship s rigging plan. of the rig and the anchored position on the deck. Increase the pull by using lifting point until the proof load is reached. Resetting can be done by this method. minimum, maximum and intermediate radius. 4

5 Q-10, during the proof load test of your cargo gear, what are the areas that the surveyor is expected to examine in addition to carry out dynamic test or static test. The maximum lifting and the minimum lowering angles settings. Q-11, after proof load test the surveyor will issue a test certificate. What is the validity period of test certificate and describe the content of it? The certificate will issue for the period of five years. The contents are, Equipment name/quantity Load applied Rated load Date Place Official stamp Signature of the surveyor Q-12, Describe what is the annual thorough examination of a cargo gear. Thorough Examination by a competent person once in every 12 month after any substantial alteration or renewal or after repair of any stress bearing part before being brought into use for the first time, unless it has been accompanied by valid regulatory documentation or report of thorough examination; where a regulatory requirement was received more than six months before the lifting equipment is put into service, or as the relevant regulator requires; where the equipment is involved in an accident or dangerous occurrence; after a significant change in conditions of use for example after installation/assembly/relocation/modification/repair; after long periods out of use; in the case of lifting equipment for lifting persons at intervals not exceeding six (6) months; Each time that an exceptional circumstance (such as overload) is liable to jeopardize the safety of the lifting equipment. The following items/areas will be thoroughly checked Visual inspection of the crane structure for deformation, excessive wear, corrosion, damage or fractures as necessary. The boom is lowered for this examination. 5

6 Visual inspection of crane hooks for deformation, excessive wear or fractures. For cranes intended for transfer of personal, non destructive testing of crane hooks for fractures. Visual external examination and operational test of crane machinery including prime mover, clutches, brakes, hoisting, slewing, and luffing machinery. Visual inspection of wire rope and end attachment Functional test of including mail and auxiliary load hoisting and lowering, boom rising and lowering, safety protective and limiting devices and angle or radius indicators. Q-13, how do you know if annual thorough examination has been done if you a new chief officer of the vessel. By inspecting the chin register as last inspection report and certificates shall be filled in the chain register. Q-14, what are the parts that you are going to inspect during your annual thorough examination? Visual inspection of the crane structure for deformation, excessive wear, corrosion, damage or fractures as necessary. The boom is lowered for this examination Visual inspection of crane hooks for deformation, excessive wear or fractures. For cranes intended for transfer of personal, non destructive testing of crane hooks for fractures. Visual external examination and operational test of crane machinery including prime mover, clutches, brakes, hoisting, slewing, and luffing machinery. Visual inspection of wire rope and end attachment Functional test of including mail and auxiliary load hoisting and lowering, boom rising and lowering, safety protective and limiting devices and angle or radius indicators. 6

7 Q-15, describe cargo gear booklet sometime known as register of lifting appliances That is the official document carrying onboard regarding lifting gears on board. It contains all the certificates and relevant document which readily available for inspections for authorities. 12 month thorough inspection, 5 year inspection also damages, repairs, alterations and replacements will be recorded here. Q-16, as chief officer you are to follow a planned maintenance system on board a ship. Describe how you carry out your planned maintenance system. Follow the maintained of equipments as per the manufactures instruction and as instructed by Company SMS system. So maintain all the monthly checks and maintenance reports in PMS system. These includes monthly greasing and lubrication of equipments also trying out of various equipments, bilges and inspection of tanks ect, at the end of the month a cop of PMS records shall be send to the office. Q-17, (a)-under ILO labor safety requirement what care would take on your cargo handling gear before same is utilizes for the purpose. (b)-what are the documental records you will provisional with regard to the lifting appliances on board for inspection by safety officer. (c)-a gun tackle reeves to disadvantage is used to lift a weight of 45T. The hauling part of the purchase is secured to the block of a single whip rigged to advantage. The velocity ratio of the system is equal to the product of the individual velocity ratio. Find the effort required to lift the weight and the efficiency of the system. Consider the rig is frictionless and weightless. (d)-a gun tackle reeves to Disadvantage is used to lift a 10T.The hauling part of the purchases secured to another gun tackle rigged to Advantage. The velocity of the ratio of the system is equal to the product of the individual velocity ratio. Find the effort required to lift this weight and efficiency of the system. Consider the rig is frictionless and weightless. A-(a), All the lifting gears and attachments must be checked before and during and after use All attachments gears must be inspected thoroughly and recorded every 12 months. 7

8 (b)- The entry must be made in the chain register or cargo gear book of lifting appliances. This should be done by the class surveyor. In addition chief officer must enter inspection detail in the cargo maintain booklet. All wire ropes must be inspected throughout the length. Of any length of 8 times its diameter has more than 10% of visible broken wires from the total number of wires in the rope. No person under 18 years of age and no person who is not competent should not be allowed to drive or operate lifting gear. No wire ropes should be used for hoisting or lowering unless it has a test certificate. The test certificated and reports shall be kept on board for inspection by any authorized person. 12 month thorough examination shall be recorded in the lifting appliances book (chain register) All list of certificated of wire and ropes also loose gears shall be attached to the back cover of chain registry. Cargo gear plan maintenance system (PMS) shall be up dated and available for inspection. Updated rigging plan shall be available for inspections. (c)- Gun tackles rig to disadvantage Standing block VR=2 D advantage Advantage Moving block Load 45T VR=1+1 hauling part Single whip rig to advantage 8

9 V.R. = distance travelled by effort/corresponding distance travelled by load Velocity Ratio = number of parts of the moving block M.A.=load/effort, (W/S) Efficiency = M.A. / V.R. Rig to advantage: when the load move in the same direction as the effort moves, In this case hauling part comes away from the moving block. Velocity Ratio = n+1 (n is the no: of sleeves in the purchase) Rig to disadvantage: when the load moves in the opposite direction to the effort. In this case the hauling part comes away from the fixed or standing block. Velocity Ratio = n (n is the no: of sleeves in the purchase) In above calculation, VR of the gun tackle which rig to disadvantage = 2 VR of the single whip rig to advantage (n+1) = 1+1 Total VR of the system = 4 Effort(S) = weight+ (nwf %) /VR (n-number of sleeves, w-weight, f-friction) (Consider weightless and frictionless) (Effort) S M.A. =45+(0)/2x2 =11.25t =W/S, =45/11.25 =4t Efficiency = (M.A./V.R.)x100 = 4/4x100 9 = 100%

10 Note: How to rig a gun tackle for advantage Hauling part VR=2+1 W (d) Here gun tackle reeves to disadvantages and another gun tackle is rigged to advantages Standing block Disadvantage VR=2 Moving Block Moving block Advantage 10 VR=2+1 Standing block 10

11 Effort (S) = W+(nwf%) / V.R. = 10(0) / 2+ (2+1) = 1.67 M.A. = 10/ = 6 Efficiency = 6/6x100 = 100% Q-18, (a) Sketch and label a common union purchase used on general cargo vessel. (b)-describe in numerical order the rigging procedure of union purchase. (c)-what are the precautions officers of the ship should observe when using union purchase system for cargo operation. (d) What are the advantages and disadvantages of this system compare to crane and a single swing derrick. A= (a) see the below picture 11

12 1.portal mast (or portal derrick post), 2.cross tree (or upper transverse beam), 3.derrick boom positioned over the hatch (inboard boom), 4.derrick boom positioned outside the ship (outboard boom), 5.derrick heel gooseneck fitting, 6.derrick head fitting, 7.cargo winches, 8.cargo runners (or married falls), 9.cargo triangle plate, 10.cargo hook, 11.slings, 12. fixed (or standing) span ropes, 13.mast head span fitting,), 14.schooner guy tackle (or boom head guy tackle 15.preventer (or standing) guys, 16.slewing guy tackles (or vang tackles), 17.upper slewing guy pendants, 18.lower slewing guy pendants 19.belaying (or horn) cleat, 20.deck eyeplates 12

13 (b)-the most common derrick system in use on general cargo ships. In this method, Two derricks are joined by a union hook and worked in unison with each other. At the bottom end each derrick is joined to the vertical mast by a swivel fitting known as a gooseneck The up and down movement or luffing movement of the derrick is carried out by topping/span tackle The athwartship moment is control by a slewing guy attached to the out board side of the boom head. A guy called schooner guy (centre guy) which runs from the inboard side of one boom head to the other and then to the deck via a lead block on the mast, link the two booms. This guy is always clear of the cargo working area. The derricks are kept at required positions by using the guy and tackles. One boom is positioned over the hatch and other boom is position over the ship s side. The singled length of wires called preventer guys that lead from the out board side of the boom to the deck. Which have the function of taking the guy weight, are fitted When the booms are set up in the position the preventer guys (standing guys) are set up tight A three way swivel, known as a union hook, join a cargo wire or runner from each boom During the un loading process the boom centered over the hold lift the load by its runner Once the load has been lifted to sufficient height clear of any obstruction from the deck, the cargo runner from the other derrick is used to move the load over the ships side to the quay. 13

14 (c)- maximum angle of derrick to the horizontal no less than 15dig maximum angle between cargo runners not less than 120dig the out reach beyond the mid ship breath should not be less than 4m The tension should be taken off the slewing guys when the rig is set up and the tension should be on the preventer guys. If the derricks are not mark with the SWL for union purchases they should not be used for loads in excess of one third of the SWL of the derrick. Ensure to consult load diagram for union purchases The maximum SWL of the rig should not exceed the SWL of the cargo runner Do not allow stevedores to unduly long slings The preventer guy should not secure for the same eye plate on the spider band to which the slewing guy is secured The preventer guy of the boom over the side should not be rigged too far away o too close to the derrick. Use the union hook to the cargo runner to prevent twisting on the runners 14

15 Runners should not be allowed to rub against hatch coming or other structural members A competent person should be supervise the rigging of derrick The persons involved in the operation should wear protective equipments (d)-advantages and disadvantages of union purchase Advantages Fasted method for discharging break Bulk cargo and general cargo Disadvantages Can only be used for light weights The winch man highly skilled The derrick cannot be used for spot loading Re-position and rigging is time consuming Some time need two winch operators Too many wires and ropes on deck Q-19, (a)-sketch and label a Stuelcken derrick use for a heavy lift handling on cargo vessels (b)-describe the common features of a Stuelcken derrick (c)-what are the advantages having Stuelcken derrick on board (d)-stuelcken derrick can be use on the adjacent hatches for cargo handling. Describe step by step rigging procedure for working on adjacent hatches. (a) See attaché sketch (b) The ability of swing through the vertical The twin V masts give a large distances between the bases of the topping lift span The twin span system Consist of a portable remote control device All blocks swivels and goosenecks are equipped with anti-friction bearing and sealed To reduce top weight low alloy high strength steels are used 15

16 (c)- (d) 1. The working area is doubled as one derrick can serve the hatches forward and aft of its location 2. A large horizontal arc of operation is achieved due to the large distance between the bases of the topping lifts spans 3. Due to twin span system slewing guys do not obstruct the cargo working area 4. Due to portable control device the view of the operator is never obstruct 5. Not required to re-rig the derrick at any stage of the operation 6. As the moving parts are equipped with anti friction bearing and sealed very less maintenance required 7. The derrick can be secured in a short period 8. Capable of accurate spot loading 1. Release any weight from the derrick 2. Bring the derrick to the mid ship position 3. Bring it to vertical position as much as possible 4. Lower rams horn hook to holding basket at the bottom of the derrick 5. Disconnect union table from the lower blocks by unscrewing two nuts and bolts located at the union table 6. Now cargo falls can be connected to the rams horn hook on the adjacent Side of the hatch and can be used. 16

SOP GEN-007X Crane and Winch Operations

SOP GEN-007X Crane and Winch Operations Page 1 of 7 SOP GEN-007X 1.0 Introduction 2.0 Responsibility 3.0 References 4.0 Training and Qualifications 5.0 Operational Inspections 6.0 Maintenance and Load Tests 7.0 Cranes 8.0 Winches 9.0 Mobile

More information

Premium PowerPoint Presentation. Rigging Review

Premium PowerPoint Presentation. Rigging Review Premium PowerPoint Presentation Rigging Review Chapter 1 Hoisting Safety Review: What about the CG Symmetrical vs. Asymmetrical Balanced and Unbalanced Lifting Lug Hooks Angle Deformation Safety Gates

More information

6000SLX HYDRAULIC CRAWLER CRANE

6000SLX HYDRAULIC CRAWLER CRANE HYDRAULIC CRAWLER CRANE HYDRAULIC CRAWLER CRANE Contents Specifications 3-4 Symbols 4 Outline Winch Assingment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications : Luffing

More information

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30.

OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part , , , , , & ANSI B30.5, ANSI B30. OMG Southeast & Southwest RIGGING SAFETY PROGRAM (29 CFR Part 1926.251, 1926.550, 1910.180, 1910.184, 1910.330, & ANSI B30.5, ANSI B30.8) Nearly every project is required to perform some type of rigging

More information

Manual winch MANISTOR 100 and 200

Manual winch MANISTOR 100 and 200 Manual wall winch Manual winch MANISTOR 100 and 200 Instruction manual UK 173-192.10-3 PRODUCT DEVELOPED AND MANUFACTURED ACCORDING TO NF EN 13157 STANDARD REGISTERED DESIGN To ensure the constant improvement

More information

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines

IMO INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION LADDERS. Proposal for an amendment to SOLAS and associated guidelines INTERNATIONAL MARITIME ORGANIZATION E IMO SUB-COMMITTEE ON SHIP DESIGN AND EQUIPMENT 50th session Agenda item 5 DE 50/WP.8 7 March 2007 Original: ENGLISH INSPECTION AND SURVEY REQUIREMENTS FOR ACCOMMODATION

More information

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline?

BANKSMAN / SLINGER. 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline? BANKSMAN / SLINGER 1. What is the smallest size diameter of synthetic rope allowed for use as a hand held tagline? A. 16mm B. 10mm C. 12mm 2. What is the maximum temperature that a webbing sling can be

More information

User Instruction Manual For Davit Rescue System

User Instruction Manual For Davit Rescue System Instructions for the following series products: Rescue Davit System Model numbers 8004000 and 8302500 User Instruction Manual For Davit Rescue System This manual should be used as part of an employee training

More information

6000SLX SL-N HYDRAULIC CRAWLER CRANE

6000SLX SL-N HYDRAULIC CRAWLER CRANE SL-N SL-N HYDRAULIC CRAWLER CRANE 1804 05H.EA292 SL-N Specifications Contents Specifications 3-4 Symbols 4 Outline Winch Assignment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications

More information

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER

LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER LOAD CHARTS RT540E 85% STABILITY ON OUTRIGGERS 75% STABILITY ON RUBBER SERIAL NUMBER 1 2 TABLE OF CONTENTS GENERAL NOTES... 4 WT. REDUCTIONS / LINE PULLS & REEVING INFO / HOIST PERFORMANCE. 5 LIFTING AREA

More information

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM Title: Material Handling - Rigging Effective Date: 12/4/2014 Control Number: THG_0049 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 MATERIAL HANDLING - FIELD RIGGING SAFETY PROGRAM

More information

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck

OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE. Ratings: Able Seafarer Deck Page 1 of 7 Compiled by Approved by Chief Examiner Syllabus Committee:22 November 2011 OPERATIONS SEAFARER CERTIFICATION GUIDANCE NOTE SA MARITIME QUALIFICATIONS CODE Ratings: Page 2 of 7 1. Contribute

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN

OPERATIONS MANUAL RIGHT ANGLE CAPSTAN OPERATIONS MANUAL RIGHT ANGLE CAPSTAN TABLE OF CONTENTS Patterson Heritage... 3 ISO 9001 Certification and Affiliates... 4 Warranty and Return Policy... 5 Important Operations Manual Instructions, Basic

More information

"RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS"

RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS PRESENTER'S GUIDE "RIGGING SAFETY IN CONSTRUCTION ENVIRONMENTS" Part of the "CONSTRUCTION SAFETY KIT" Series Quality Safety and Health Products, for Today...and Tomorrow OUTLINE OF MAJOR PROGRAM POINTS

More information

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts:

Managing Mobile Crane Hazards. Paul Satti Construction Safety Council. Hazards of Working Around Cranes. Key Concepts: Managing Mobile Crane Hazards Paul Satti Construction Safety Council Hazards of Working Around Cranes Key Concepts: Electrocution Hazards Caught-In, Compressed or Crushing Hazards Struck-By Hazards Other

More information

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment

1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment Orignal Issue Date : 28-10-10 Date of Revision: Page- - 1-1.0 Purpose: To provide guidelines for selection, usage, inspection and rejection of rigging equipment (Slings & Ropes) 2.0 Reference: 3.0 Associated

More information

MANITOWOC MODEL TON CAPACITY

MANITOWOC MODEL TON CAPACITY LIFTING CHARTS - Crawler Cranes ANITOWOC ODEL - TON CAPACITY BOO RIGGING GUIDE ODEL # HEAVY LIFT BOO Table of Contents General... Assist Crane Requirements... Accessing Parts... Installation and Removal

More information

DBI SALA Confined Space Rescue Davit System

DBI SALA Confined Space Rescue Davit System Instructions for the following series products: Rescue Davit System (See back page for specific model numbers.) User Instruction Manual For Davit Rescue System This manual should be used as part of an

More information

NEVER EXCEED WORKING LOAD LIMITS PAGE

NEVER EXCEED WORKING LOAD LIMITS PAGE WIRE ROPE All wire rope is manufactured with three basic components: Wires, Strand and Core. Following is a description on the essential information required for ordering wire rope. DIAMETER Nominal Diameter

More information

LOAD CHARTS RT890E METRIC DIN / ISO / 75%

LOAD CHARTS RT890E METRIC DIN / ISO / 75% LOAD CHARTS RT89E METRIC DIN / ISO / 75% 232729 SERIAL NUMBER RT89E - S/N 232729 1 RT89E - S/N 232729 2 TABLE OF CONTENTS GENERAL NOTES...4 WEIGHT REDUCTIONS / LINE PULLS & REEVING INFO / RIGGING CHART

More information

MA MARINE ACCIDENT INVESTIGATION REPORT

MA MARINE ACCIDENT INVESTIGATION REPORT MA2014-2 MARINE ACCIDENT INVESTIGATION REPORT February 28, 2014 The objective of the investigation conducted by the Japan Transport Safety Board in accordance with the Act for Establishment of the Japan

More information

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet.

Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet. Appointed person Note: It is recommended that you read the Supporting Information page before you read this factsheet. Planning and regulatory requirements (Regulatory requirements) The role or duties

More information

Blohm + Voss Oil Tools

Blohm + Voss Oil Tools Blohm+Voss Pipe Handling Equipment Elevator Links Technical Documentation Original instructions 1.3/4 (150 sh tons/set) 2.1/4 (250 sh tons/set) 2.3/4 (350 sh tons/set) 3.1/2 (500 sh tons/set) 4.3/4 (750

More information

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings

Buckingham Mfg. Co., Inc. OX BLOCK TM Instructions and Warnings OVERVIEW The Buckingham OX BLOCK is a rope snatch block with an integrated friction bar used for lowering loads, snubbing loads, and raising loads. It allows the rigging professional to handle loads with

More information

6000SLX SL-T HYDRAULIC CRAWLER CRANE

6000SLX SL-T HYDRAULIC CRAWLER CRANE SL-T SL-T HYDRAULIC CRAWLER CRANE 1804 05H.EA293 SL-T Specifications Contents Specifications 3-4 Symbols 4 Outline Winch Assignment 5 Dimensions & Main Specifications : Liftcrane 6 Dimensions & Main Specifications

More information

X-03 EMERGENCY TOWING ARRANGEMENTS

X-03 EMERGENCY TOWING ARRANGEMENTS Guideline No.: X-03(201510) X-03 EMERGENCY TOWING ARRANGEMENTS Issued date: October 20,2015 China Classification Society Foreword: This Guide is a part of CCS Rules, which contains technical requirements,

More information

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1.

Receipt By Jurong Port Representative -To be filled by Jurong Port Representative No Item Yes No Remark 1. Part 1-General Information -To be filled up by the Applicant (Company Representative) Description of work / Type of Cargo Operation Location Max. Dimension of Cargo Heaviest Cargo Wt. Start Date / Time

More information

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM

USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN TEMPORARY HORIZONTAL LIFELINE SYSTEM USER S INSTRUCTION MANUAL FOR THE INSTALLATION, OPERATION & MAINTENANCE OF THE GUARDIAN 04630 TEMPORARY HORIZONTAL LIFELINE SYSTEM 1 WARNING This is a design compatible component for a comprehensive Guardian

More information

PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS

PROCEDURE. Revision: 1. Operative Date: 10/04/2018 Department: HSEC. Author: D Steel CONTENTS Title: Lifting Equipment - Inspection and Maintenance PROCEDURE Procedure No: P314.420 Issue: 1 Revision: 1 Operative Date: 10/04/2018 Department: HSEC Sect./Classification: Safety/Gear & Equipment Author:

More information

OPERATING INSTRUCTIONS (Translation) Rope Winch Type , , ,75

OPERATING INSTRUCTIONS (Translation) Rope Winch Type , , ,75 OPERATING INSTRUCTIONS (Translation) Rope Winch Type 4202.0,5 4585.0,5 4585.0,75 GB The length of the rope is correct if: 1. User groups Duties Operator Operation, visual inspection Specialist Assembly,

More information

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03

CRANE WITH WINCH USE AND MAINTENANCE MANUAL. Code Rev. Release MD /03 CRANE WITH WINCH Code Rev. Release MD.0.097 0 06/03 USE AND MAINTENANCE MANUAL CONTENTS 1 FOREWORD page 3 1.1 Description of the crane with winch page 3 2 USE OF THE CRANE WITH WINCH page 3 2.1 General

More information

Function: Navigation at the support level

Function: Navigation at the support level STCW Code Table A-II/5 Specification of Minimum Standards of Competence of Ratings as Able Seafarer Deck Ref: https://www.edumaritime.net/stcw-code Source: IMO Function: Navigation at the support level

More information

M S I C R A N E S C A L E

M S I C R A N E S C A L E 2 M E A S U R E M E N T S Y S T E M S I N T E R N A T I O N A L Table of Contents Forward...3 Safe Operating Guidelines...4 Operating Suggestions...4 Handling Hoist Motion...4 Safe Loading and Rigging

More information

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance

GUIDANCE NOTICE. Unpowered Barges. Definition. General. Risk assessment. Application. Safety Management. Compliance GUIDANCE NOTICE Unpowered Barges Definition Unpowered Barge - a vessel that is not propelled by mechanical means and is navigated by a powered vessel that moves it by pushing or towing. General This notice

More information

Roughneck TM Mesh Slings

Roughneck TM Mesh Slings Roughneck TM Slings ROUGHNECK WIRE MESH SLINGS Widely used in metalworking shops and steel warehouses where loads are abrasive, hot or tend to cut web slings Features and Benefits Promotes Safety Steel

More information

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS

September 27, DOE-RL-92-36, Hanford Site Hoisting and Rigging Manual. Wire Rope. Page 1 CONTENTS Page 1 CONTENTS 8.0 WIRE ROPE...2 8.1 SCOPE...2 8.2 GENERAL REQUIREMENTS...2 8.2.1 Design Factors For s... 2 8.2.2 Rotation-Resistant Rope...3 8.2.3 Requirement for Independent Core...3 8.3 INSPECTION

More information

Hangt de baggerindustrie aan een (zijden) draadje

Hangt de baggerindustrie aan een (zijden) draadje Lloyd s Register: Business unit Marine Hangt de bagger industrie aan een (zijden) draadje Door: Cor Dekker Senior Specialist Marine Equipment & Lifting Components The Group at a glance 278 offices delivering

More information

Moor, Tend Mooring And Unmoor Ship - Supervisor Level -

Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Marine Terminal Operations Competency Standard Moor, Tend Mooring And Unmoor Ship - Supervisor Level - Industry : Oil, Chemical and Gas Industry Competency Category : 2.0 Moor, tend mooring and unmoor

More information

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA

GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA GENERAL GUIDELINES FOR PROPER RIGGING PRACTICES AND INSPECTION & REMOVAL CRITERIA FOR SLINGS PER OSHA 1910.184 SAFE OPERATING PRACTICES -.Whenever any sling is used, the following practices shall be observed:

More information

You may order this publication from WCB Publications and Videos, Please quote ordering number BK60.

You may order this publication from WCB Publications and Videos,  Please quote ordering number BK60. The following material is the property of the Workers Compensation Board of British Columbia and may not be reproduced by those outside of B.C. For those within British Columbia, this material may only

More information

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc.

Figure 1 - Parts Identification. Copyright 2002, DB Industries, Inc. User Instruction Manual Zorbit Energy Absorber Kits for Horizontal Lifeline Systems This manual is provided as the Maunfacturer s Instructions, and should be used as part of an employee training program

More information

User Instructions 1790 Rail Anchor

User Instructions 1790 Rail Anchor User Instructions 1790 Rail Anchor This document is intended to meet the Manufacturer s Instruction requirements as stated by ANSI Z359.1, and should be used as part of an employee training program as

More information

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener

STRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener Unit 2 SHIPS AND SHIPS TERMS STRUCTURAL MEMBERS OF A SHIP Basic terms shell plating strake keel deck tank top floor stringer buoyancy strength stability bulkhead compartment stem frame beam bracket girder

More information

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device

BC Shackle. Made in the China. Alloy Steel Anchor Shackle. Instructions for handling and use - Please read in full before using this device BC Shackle Made in the China Alloy Steel Anchor Shackle Instructions for handling and use - Please read in full before using this device Index 1.) Introduction 2.) Warnings / General Use Guidelines 3.)

More information

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS CHINA CLASSIFICATION SOCIETY Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS Version: December, 2016,RCN No.2 Effective date: 03 January, 2017 Beijing Contents PART ONE PROVISIONS

More information

OPERATION and MAINTENANCE Guide

OPERATION and MAINTENANCE Guide Catalog No. AIR1000 Winch and Hoist OPERATION and MAINTENANCE Guide Cat. No. AIR1000 1250 Lb. Single Line Pull READ THIS BEFORE OPERATING UNIT INSTALLATION: Mount on clean, flat surface. Use 1/2" mounting

More information

2000 lb manual winch

2000 lb manual winch 2000 lb manual winch Model 41694 Operation Instructions Due to continuing improvements, actual product may differ slightly from the product described herein. 3491 Mission Oaks Blvd., Camarillo, CA 93011

More information

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys

PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys (Feb 2010) PASSENGER SHIPS Guidelines for preparation of Hull Structural Surveys Contents 1 Introduction 2 Preparations for Survey 2.1 General 2.2 Conditions for survey 2.3 Access to structures 2.4 Survey

More information

Equipment Operation Procedures

Equipment Operation Procedures Procedures Purpose It is the policy of this company to permit only trained and authorized personnel to operate construction equipment. These procedures are applicable to both daily operators, and those

More information

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32

Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32 Instructions for Use Wire Rope Hoist SAT 08 / SAT 16 / SAT 32 Item no. Load-carrying capacity (payload) Rope diameter Weight without rope Device dimensions SAT 08 800 kg SAT 16 SAT 32 Rope advance per

More information

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM

Safe Work Practices (SWP) SWP (6) FALL PROTECTION PROGRAM SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the

More information

An introduction to Rigging for Trail Work

An introduction to Rigging for Trail Work An introduction to Rigging for Trail Work Give me a lever long enough and a prop strong enough, I can single handed move the world. Archimedes The purpose of this seminar is to provide a hands-on introduction

More information

OPERATIONS and SAFETY MANUAL

OPERATIONS and SAFETY MANUAL OPERATIONS and SAFETY MANUAL LIFETIME WARRANTY SPECIAL SAFETY FEATURES: 1. Hook starts to open when device exceeds weight limit. 2. Latch Pops when weight is exceeded. At this point remove the load from

More information

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT! Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS

ARM 6.4 R/V ARMSTRONG SMALL BOAT OPERATIONS 1. Purpose The purpose of this procedure is to set forth the standards for small boat operations and the qualifications for a small boat operator. These guidelines shall be used while operating the small

More information

WIRE ROPE PULLING MACHINE

WIRE ROPE PULLING MACHINE WIRE ROPE PULLING MACHINE Spare parts list and exploded view Specifications Dimensions Item No. 0.8T 1.6T 3.2T 5.4T Rated Capacity kg 800 1600 3200 Rated Forward Handpower N 343 441 441 Rated Forward Travel

More information

User Instruction Manual Fixed Beam Anchor

User Instruction Manual Fixed Beam Anchor User Instruction Manual Fixed Beam Anchor This manual is intended to meet the Manufacturer s Instructions as required by ANSI Z359.1 and ANSI A10.14, and should be used as part of an employee training

More information

User Instructions 1789 Parapet Wall Anchor

User Instructions 1789 Parapet Wall Anchor User Instructions 1789 Parapet Wall Anchor This manual is intended to meet the Manufacturer Instructions as required by ANSI Z359.1 and should be used as part of an employee training program as required

More information

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT!

WARNING! DO NOT THROW AWAY THESE INSTRUCTIONS! READ AND UNDERSTAND BEFORE USING EQUIPMENT! Guardian Fall Protection Kent, WA 800-466-6385 www.guardianfall.com GENERAL SYSTEM SELECTION CRITERIA: Selection of fall protection shall be made by a Competent Person. All fall protection equipment shall

More information

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE APPENDIX IV Development Canoe Rules APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE 1 GENERAL Class and measurement rules measurement forms may be obtained

More information

5. Requirements for Lifting Operation

5. Requirements for Lifting Operation 1. Purpose 2. Scope 3. References 4. Definition 4.1. Load 4.2. Lifting Equipment 4.3. Lifting Appliances 4.4. Lifting Accessories or Loose Gear 4.5. Competent persons 4.6. Inspection 4.7. Periodic Inspection

More information

OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION

OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION OPERATIONS MANUAL IMPORTANT SAFETY INFORMATION Please read, understand and follow all safety information contained in these instructions prior to the use of this tool. Retain these instructions for further

More information

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000

C Crane. Installation & Operation Manual. SWL 120kg. The Hansa CRANE ID#: Davit ISO/DIS June 2000 Sling AS Sept 2000 The Hansa C Crane CRANE ID#: Installation & Operation Manual Ideal for the safe and dignified transference of sailors with disabilities from a wharf to the boat. The crane is also suited to many other

More information

Fall Protection Checklist. Guardrail System

Fall Protection Checklist. Guardrail System Fall Protection Checklist Location/Department: Date of Inspection: Inspectors: Corrective Actions: Work order/memos were issued: Yes No Date issued: In accordance with the MIOSHA and OSHA standards the

More information

Accident Report. Failure of No. 2 Crane Tasman Mariner. 20 September 2005 Class B

Accident Report. Failure of No. 2 Crane Tasman Mariner. 20 September 2005 Class B Accident Report Failure of No. 2 Crane Tasman Mariner 20 September 2005 Class B REPORT NO.: 05 3847 TASMAN MARINER CRANE FAILURE On 20 September 2005, Tasman Mariner was moored port side to No. 6 berth,

More information

Safety Flash. IMCA Safety Flash 10/09 July Compact Fluorescent Lights Interfering with Communications Equipment

Safety Flash. IMCA Safety Flash 10/09 July Compact Fluorescent Lights Interfering with Communications Equipment AB Safety Flash IMCA Safety Flash 10/09 July 2009 These flashes summarise key safety matters and incidents, allowing wider dissemination of lessons learnt from them. The information below has been provided

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Basic Rigging And Wire Rope

Basic Rigging And Wire Rope Basic Rigging And Wire Rope Presented By Master Builders of Iowa Basic Rigging and Wire Rope Topics Four Commandments of Rigging Sling Angles Types Of Hitches Types Of Slings Types Of Rigging Devices OSHA

More information

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control

7 Hazard assessment 8 Worker participation 9 Hazard elimination and control This document is a guideline only. Employers have a responsibility of assessing all applicable occupational health and safety legislation, for the tasks they are performing. Businesses in this industry

More information

Care, Use and Inspection

Care, Use and Inspection Care, Use and Inspection of Synthetic Web Slings Safety is the paramount consideration involved in the use of any web sling. This standard does not purport to address all safety concerns, if any, associated

More information

Essential Rig Tuning Guide The Ins and Outs of tuning your mast.

Essential Rig Tuning Guide The Ins and Outs of tuning your mast. Essential Rig Tuning Guide The Ins and Outs of tuning your mast. Tuning Your Rig The main goal in tuning your mast is to achieve a spar that s straight. By doing this it will help you gain control of sail

More information

HOW TO RIG A CORMORANT

HOW TO RIG A CORMORANT HOW TO RIG A CORMORANT Page 1 of 6 Instructions adapted from Cormorant Owner s Handbook 1 Ensure that peak halyard, throat halyard and topping lift are attached to the mast as shown in Fig. 1. 2 Set-up

More information

Dangerous Occurrence: Collapse of mobile crane

Dangerous Occurrence: Collapse of mobile crane Accident Case Studies Dangerous Occurrence: Collapse of mobile crane Crane Operator had hoisted up a bag of sand (780 Kg) over the rooftop. While doing so, the Overload Radius Indicator (ORI) alarm sounded

More information

Powered Platform Safety

Powered Platform Safety Powered Platform Safety Session Objectives You will be able to: Identify powered platform components Recognize platform safety features Understand inspection requirements Use personal fall arrest systems

More information

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely.

PURPOSE: The purpose of this Operating Policy/Procedure (OP) is to ensure that material handling devices are used correctly and safely. [Date changed posted 10/3/17 (replaces 10/31/12 edition)] Operating Policy and Procedure : Material Handling Devices DATE: October 3, 2017 PURPOSE: The purpose of this Operating Policy/Procedure (OP) is

More information

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL

APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL Class and measurement rules measurement forms may be obtained from the I.C.F.

More information

Puyuan. QUY 160 Crawler Crane Technical Manual

Puyuan. QUY 160 Crawler Crane Technical Manual Puyuan QUY 160 Crawler Crane Technical Manual 5 Pictures and technical parameters in sample books may not accord with the delivery goods because of the improvement in design. Please understand and make

More information

Slings Steel Chain, Wire Rope and Metal Mesh

Slings Steel Chain, Wire Rope and Metal Mesh Optional Information Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Slings Steel Chain, Wire Rope and Metal Mesh Self Inspection Checklist Guidelines: This

More information

REQUIREMENTS FOR ONBOARD LIFTING APPLIANCES AND ANCHOR HANDLING WINCHES

REQUIREMENTS FOR ONBOARD LIFTING APPLIANCES AND ANCHOR HANDLING WINCHES E SUB-COMMITTEE ON SHIP SYSTEMS AND EQUIPMENT 5th session Agenda item 10 SSE 5/10/3 18 January 2018 Original: ENGLISH REQUIREMENTS FOR ONBOARD LIFTING APPLIANCES AND ANCHOR HANDLING WINCHES Comments on

More information

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016

Lifting Equipment Procedure. Committees / Group Date Consultation: Health and Safety Sub Committee Nov 2016 Title of Standard Operation Procedure: Lifting Equipment Procedure ocedure: Person(s) responsible for the Health and Safety Manager production of report e Reference Number: H&S Procedure 16 Version No:

More information

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls.

??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Intent??????? is committed to providing a safe work environment for its employees and preventing occupational injuries due to falls. Fall Protection is an integral part of our commitment to a safe work

More information

Floor Mount Socket. T: +44 (0) F: +44 (0)

Floor Mount Socket. T: +44 (0) F: +44 (0) G-Davit : Floor Mount Socket USER INSTRUCTION MANUAL A davit socket for installation bolted to a high strength flooring material. Suitable for both fall arrest use and lifting. EN795 Class B, PPE Anchor

More information

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER)

SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) SUBJECT: LIFTING OPERATIONS AND LIFTING EQUIPMENT (LOLER) 1.0 INTRODUCTION The purpose of this procedure is to give direction on the responsibilities and requirements related to UK legislation covering

More information

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT

HOW TO PREPARE FOR THE LEVEL A CRANESAFE CERTIFICATION ASSESSMENT HOW TO PREPARE FOR THE LEVEL A CRANESAFE ASSESSMENT Prepare for your assessment! Our website contains all the information you need for a successful assessment. Our goal is to find you competent on the

More information

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT

LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT Code of Practice on Safe Lifting Operations at Workplaces LIFTING PLAN PERMIT TO WORK RISK ASSESSMENT Yeo Kim Hock 13 th December 2012 Introduction-Objectives of Lifting Plan/ PTW/ RA Fundamental Contents-

More information

Suitability of Work Equipment

Suitability of Work Equipment These regulations came into effect on the 5th December 1998 and replace PUWER 1992. They cover almost all equipment used at work, including tool box tools such as hammers, knives etc. They also cover machinery

More information

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT

Health & Safety Policy and Procedures Manual SECTION 25 RIGGING AND HOISTING EQUIPMENT SECTION 25 RIGGING AND HOISTING EQUIPMENT 1. RIGGING AND HOISTING: These rules apply to all Maul Electric, Inc. employees and subcontractors. Note: Maul Electric, Inc. employees will utilize mechanical

More information

8. Fall Protection Procedures WAC

8. Fall Protection Procedures WAC 1.0 Fall Protection Introduction 8. Fall Protection Procedures WAC 296-155-245 If an employee is exposed to a fall hazard of ten (10) feet or more in height, the employee must use a fall restraint, fall

More information

1 2 CONTENTS INTRODUCTION Owner Information 4 Warranty Registration 5 Safety Instructions Safety 6 Safety Decals 7 Safety Identification Labels 8 Safety Notice 10 Safety Standards 11 Risk Assessment 13

More information

CORPORATE SAFETY MANUAL

CORPORATE SAFETY MANUAL CORPORATE SAFETY MANUAL Procedure No. 32-0 Revision: Date: May 2005 Total Pages: 10 PURPOSE To provide general guidelines for the inspection of all ropes, chains, cables, slings, etc. used for personnel

More information

BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx

BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS. AT 053-[T/BT] xx Reference number: BRAKE WINCH RUP 503-[T/BT] EQUIPMENT FOR LIFTING LOADS DESIGNATED USE The brake winch RUP 503-[...]T series is a load lifting / lowering device. Device is equipped with safety brake for

More information

Overspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1)

Overspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1) Overspeed governors (113 OG Моment 250 MR, 114 OG Moment 250 A3, 115 OG Moment 250 MRL, 119 OG Moment 250 MRL/1) Instructions for installation and operation 113 OG Моment 250 MR 115 OG Moment 250 MRL Overspeed

More information

User Instruction Manual Fixed Beam Anchor

User Instruction Manual Fixed Beam Anchor Instructions for the following series products: FIXED BEAM ANCHOR Model Numbers: The Ultimate in Fall Protection 2108406 2108407 2108408 2108409 2108410 2108411 User Instruction Manual Fixed Beam Anchor

More information

Wilkins Safety Group

Wilkins Safety Group H & S Guidance - Lifting Operations and Equipment Health and Safety Information (See also: Management of Health & Safety ; Fork Lift Trucks ; Warehousing ; Work Equipment ) INTRODUCTION The Lifting Operations

More information

Operating instructions. Skyline Beam Clamp

Operating instructions. Skyline Beam Clamp Operating instructions for Skyline Beam Clamp Model # 3093 Reliance Industries, LLC PO Box 140008 Denver, CO 80214 Ph. (800) 488-5751 Ph. (303) 424-8650 Fax (303) 424-8670 User Instructions 3093 Skyline

More information

1. Outline of the newly developed control technologies

1. Outline of the newly developed control technologies This paper describes a vertical lifting control and level luffing control design for newly developed, fully hydraulicdriven floating cranes. Unlike lattice boom crawler cranes for land use, the floating

More information

Surface exploration drilling

Surface exploration drilling Checklist Surface exploration drilling This checklist is intended to assist employers to identify common hazards and manage risks associated with surface exploration drilling. June 2017 Background In surface

More information

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum

Chapter 2 Rigging. Cutting Wire Rope. Anchoring Wire Rope to Drum. Winding Wire Rope Onto Drum Chapter 2 Rigging Cutting Wire Rope The wire rope must be tightly seized on both sides of the point where the wire rope will be cut, as shown in Figure 2-1. Seize the wire rope with either seizing wire

More information

Crane & Rigging Brain Teasers

Crane & Rigging Brain Teasers Crane & Rigging Brain Teasers Host: Mike Parnell President/CEO, ITI ASME B30 Vice Chair (Cranes & Rigging) ASME P30 Chair (Lift Planning) The views expressed in this presentation are that of ITI and are

More information