JLAB Target Group Procedure

Size: px
Start display at page:

Download "JLAB Target Group Procedure"

Transcription

1 JLAB Target Group Procedure Procedure Number TGT-PROC Tittle Argonne Bubble Chamber Test Author Dave Meekins Rev - Active Date 9/1/2015 Expiration Date 9/1/2016 Description: Procedures for test of ANL bubble chamber. The chamber is described in detail in PS folder PS-TGT This document includes FMEA and safety data. This document details the following procedures: System prestart Installation Filling Venting Power loss Fire Basic user operation Emergency Deenergizing

2 1 Description of Test The intent is to use the injector test area with a maximum total beam energy of 10 MeV (9.5 MeV kinetic) to test the operational characteristics of the Argonne Bubble Chamber. The electron beam will be fully stopped by a water cooled copper dump/radiator. The chamber was tested at Duke where a high energy bremsstrahlung background adversely affected the results. The purpose of the test at JLAB is to determine the photon detection effectiveness in a low neutron background environment. Operating parameters (e.g. pressure, temperature, fluid, event rate, buffer fluid level) shall be adjusted within a safety envelope to improve photon detection and chamber recovery times. The active fluids for the test are N2O and C2F Operational limits Parameter Limits Bubble Chamber Pressure 0 to 1000 psig Bubble Chamber Metal Temperature -15 to 30 C Total Beam Energy 4 to 10 MeV Beam Current 0 to 10 µa Detector Fluids C2F6 and N2O Active fluid temperature -30 to 30 C Bubble quenching pressure difference 500 psi max 1.2 Test Plan The detector shall be tested within the limits listed above. For a detailed test plan see Section Detailed procedures for operating the detector are given in Section 9.

3 2 Bubble Chamber Detector 2.1 General description The Argonne Bubble Chamber was developed and tested at Argonne National Lab (ANL) by Brad DiGiovine et. al. The Chamber may be adapted for use with various super-heated target fluids. These fluids are contained in a glass vessel with a fluid volume of ml depending on the fill configuration. There is an additional 150 ml of mercury (less than the 5 lbm Virginia state limit) that serves as a buffer fluid. The small bubble chamber vessel is contained in a larger (~7.5 liter) pressure vessel. The space between the two vessels is filled with a mineral oil based heat transfer liquid pressurized to a maximum of 1000 psi. The pressure in the glass vessel and the pressure vessel are commuted via a bellows assembly such that the differential pressure across the glass is very small. Should the inner vessel fail all fluids would be contained in the outer pressure vessel. See the figures below for more details. The system has two copper collimator/beam ports and two commercially supplied viewports. See Figure 1 below. COPPER WINDOW PRESSURE VESSEL BUBBLE CHAMBER Figure 1: Bubble chamber and pressure vessel cut away view

4 2.2 Basic Theory of Operation Figure 2: Basic Components This system is designed to prepare the active fluid of choice into a metastable superheated state to act as an active target for low energy nuclear astrophysics research. There are two main volumes, the first is a small clean volume containing the active fluid and buffer fluid. This volume is built of stainless steel and glass and is contained within the heavy wall stainless steel pressure vessel. An edge welded bellows is incorporated into this clean volume to facilitate volumetric changes due to changes in operating temperature, as well as to equalize pressure between this clean volume and the outer hydraulic volume. Surrounding this clean volume within the heavy wall vessel is a hydraulic working fluid. This fluid provides for thermal stability of the active fluid, and is directly connected to the pressure supply system external to the vessel. The pressure supply system is a hydraulic system which controls the system pressure by the actuation of solenoid valves allowing the system to cycle between superheat pressure (low) and recovery (high) pressure (points 3 and 2 in the Figure 3). The active volume is backlit and observed by a fast machine vision camera operating at 100Hz. The data acquisition and control computer analyzes these images, determines if an event has occurred, stores the event, logs instrumentation data, and signals the system to pressurize to the default recovery state from the active superheated state. Once the system recovers, the computer signals to decompress to the superheated state and the system goes live again. Temperature control is accomplished via an external chiller and

5 flow control system which is manually operated. This system feeds heat exchange coils within the hydraulic volume, this has replaced an existing heating system which is no longer present, but sometimes referenced in older documentation. Figure 3: Phase Diagram and Theory of Operation

6 3 Hazardous Materials 3.1 Mercury There is roughly 150 ml of mercury contained in the inner vessel. This fluid serves as a buffer fluid for the active target fluid. The mercury has been preloaded into the inner vessel at Argonne National Lab (ANL). Pump and purge cycles performed on this volume with small quantities of the target fluid are required to ensure a pure liquid sample. To prevent a mercury (droplets or vapor) release, two filters are installed (see P&ID). Filter F-001 is installed upstream of the vacuum pump and will prevent droplets from reaching the vacuum pump. Filter F-002 is installed on the outlet of the pump to prevent mercury vapor from escaping the system. While these safe guards are in place, mercury can still be released through human or mechanical failure. Mechanical failure is extremely unlikely given that the fluid systems have been designed and fabricated in excess of ASME Code requirements. Hazards associated with long term or acute mercury exposure are: Neurological symptoms: o Headache, short term memory loss, incoordination, weakness, tremors, etc. Kidneys may also be affected Intense exposure to vapors can lead to severe respiratory damage. The following mitigating steps shall be employed to limit exposure or loss of mercury: Only the system expert, Brad DiGiovine, shall be allowed to perform the filling and venting operations using the procedures given in Section 9. Fluid systems that are designed and fabricated in excess of ASME Code requirements. Documented TOSP including specific procedures for bubble chamber fluid handling operations. Perform leak tests of the system prior to introducing active fluid into the system piping. Monitor personnel/room air for mercury; SKC Elemental Mercury Passive Sampler Secondary spill containment under the bubble chamber. Limited amount of mercury 150 ml. Spill kit placed in injector The MSDS or MDS for Mercury is filed in the pressure system folder PS-TGT N2O Nitrous Oxide (N2O) may be used as an active fluid in the bubble chamber. If selected as the active fluid, the chamber shall contain 40 to 60 ml of liquid N2O. Note that the N2O is a liquid at the high operating pressure even at room temperature. At STP this quantity of N2O expands to roughly 17 liters. The occupational limit for N2O exposure (based on 2000 hour/year exposure) is 50 ppm. Should all of this gas escape the system, the concentration in the injector area would be 25 ppm which is below the limit (see TGT-CALC ). This limit could be exceeded if the contents of the supply bottle is released. This bottle shall be valved closed at all times other than when the filling procedure is being performed. While N2O is not flammable it does rapidly decompose to release oxygen which can accelerate or reignite fires.

7 This material presents the following hazards from an acute overexposure: Dizziness Drowsiness Poor coordination Oxidizer can accelerate or reignite fire. The following mitigating steps shall be employed: Limited quantities do not present ODH/asphyxiant hazard. Only the system expert, Brad DiGiovine, shall be allowed to perform the filling and venting operations using the procedures given in Section 9. Fluid systems that are designed and fabricated in excess of ASME Code requirements. Documented TOSP including specific procedures for bubble chamber fluid handling operations. Perform leak tests of the system prior to introducing N2O into the system piping. Monitor personnel/room air for N2O exposure using Assay Technology 575 N2O sampler N2O is an oxidizer; therefore all flammable gases in the CEBAF Injector shall be stored at least 20 ft from the N2O bottle. This is typically not an issue in the Injector. Removal of N2O bottle when not in use. Store bottle in locked storage area. The MSDS or SDS for N2O is filed in the pressure system folder PS-TGT C2F6 Hexaflouroethane (C2F6) may be used as an active fluid in the bubble chamber. If selected as the active fluid, the chamber shall contain 40 to 60 ml of liquid C2F6. Note that the C2F6 is a liquid at the high operating pressure even at room temperature (see Section 5). At STP this quantity of C2F6 expands to roughly 1 liter. The occupational limit for C2F6 exposure (based on 2000 hour/year exposure) is 1000 ppm. Should all of this gas escape the system, the concentration in the injector area would be much less than the limit (14 liters at STP or 20 ppm) (see TGT-CALC ). This limit could be exceeded if the contents of the supply bottle are released. This bottle shall be valved closed at all times other than when the filling procedure is being performed. The hazards associated with C2F6 over exposure: Difficulty breathing Does not pose ODH risk with the limited quantities needed for the bubble chamber. The following mitigating steps shall be employed: Only the system expert, Brad DiGiovine, shall be allowed to perform the filling and venting operations using the procedures given in Section 9. Fluid systems that are designed and fabricated in excess of ASME Code requirements. Documented TOSP including specific procedures for bubble chamber fluid handling operations. Perform leak tests of the system prior to introducing C2F6 into the system piping. Removal of C2F6 bottle when not in use. The MSDS or SDS for C2F6 is filed in the pressure system folder PS-TGT

8 3.4 Duratherm 450 The hydraulic fluid in the space between the inner and outer vessels is a mineral oil based heat transfer fluid. This fluid is not considered hazardous material. An MSDS/SDS is filed in the pressure system folder. The fluid is considered non-toxic and environmentally friendly. It poses no ill effects to worker safety. Duratherm 450 is flammable with a flash point slightly above 290 F. The MSDS or SDS for Duratherm 450 is filed in the pressure system folder PS-TGT

9 4 Required Training The following training is required for operation of the detector and for installation and removal activities. Filling and relief procedures shall only be performed by the system expert Brad DiGiovine who is considered fully trained. All users, prior to operating the DAQ system require a short briefing, given by B. DiGiovine. The following is a list of additional general training required for users: SAF 801 Rad worker I SAF 103 ODH SAF 130 Oil Spill Training (not required for all personnel and only if needed) SAF 132 Tunnel worker safety SAF 801kd RWP for tunnel access SAF 100 General safety

10 5 Electrical Safety The detector and all ancillary equipment was developed and assembled at Argonne National Lab. Detailed schematics can be found in the pressure systems folder (PS-TGT ). The system was inspected by both Argonne and JLAB SMEs and found to be sound. 5.1 Maintenance Procedures Maintenance shall only be performed by Brad DiGiovine (ANL) after disconnecting the power source (at the plug) obviating lock tag and try procedures. Work shall not be performed on exposed equipment when energized.

11 6 Radiation Safety The electron beam has a maximum total energy of 10 MeV for the test. No radiation hazards are expected when the beam is off. In August 2015, one of the rapid access probes in the Injector was relocated above the copper radiator/dump in the bubble chamber beamline. This ensures that rapid access will function as intended in this configuration and operation of the bubble chamber will not require RadCon surveys as the electron beam energy is gradually raised. If the radiator/dump gets activated, the probe will alarm at 1.4 mrem/h at 1 foot, i.e. a safety factor of ~3.5 below the radiation area limit. Therefore, as long as the Rapid Access beacon activates when the button is depressed, no survey is required for Controlled Accesses or prior to going to Restricted Access. See procedure TGT- PROC for other administrative controls.

12 7 Material Handling The chamber has engineered lift points that are centered over the center of gravity. The weight of the chamber is less than 500 lbm and shall be lifted by trained (crane and rigging) JLAB staff under the direct supervision of Brad DiGiovine (ANL). There is no lift procedure required for these operations. The chamber must be lifted about 3 ft. off the floor to be installed onto and removed from the cart. Note that the flanges are heavy and caution must be taken when removing and installing them.

13 8 Pressure Safety The pressure systems documentation is filed in the pressure system folder PS-TGT on DocuShare. There is extensive documentation for the original ANL system including reviews performed at ANL. This includes the review alteration of the system to operate with N2O and C2F6 with mercury as a buffer fluid. ANL documentation requirements for low stored energy systems is not as extensive as JLAB requirements. The total stored energy of the system is less than 1000 ft-lbf (1300 J) and is therefore considered low risk. Additional calculations confirming the design of the system have been performed by the JLAB DA for the system (Dave Meekins). These calculations indicate the system is safe to operate within the following parameters. Parameter Limits Operating pressure 1000 psi Operating Temperature -30C to 30C Cycle depth for quench 500 psi max Hydraulic pump 1 GPM Design Pressure 1100 psi Applicable Code ASME B Note that care must be taken when filling and relieving to prevent damage to the glass bubble chamber. Should the chamber rupture, the glass would be contained in the outer vessel but the detector assembly would need to be returned to ANL for repair. For this reason, only the system expert Brad DiGiovine may perform the fill or relief procedures. See Section 9 for details. 8.1 Major Subsystems The system consists of the following subsystems Hydraulic fluid system o Outer vessel and beam ports o Hydac hydraulic pump o Gas and hydraulic fluid handling control panel. o Ancillary piping for hydraulic and nitrogen gas fluids (nitrogen is used to charge the accumulators) o Camera with Canty glass windows. Target fluid system o Inner vessel (actual bubble chamber) o Ancillary piping for gas handling Refrigerator system o Commercially supplied refrigerator and insulated flex lines DAQ and control system 8.2 Component list The following is a general list of components for the entire system. These components are rated by the manufacturer to have working pressure limits in excess of the operating pressures for the system.

14 1. Commercially supplied a. Hydraulic pump 1 gpm b. Low, high and supply accumulators Hydac SB 200 and SB 210 series. c. Hand and solenoid actuated valves d. Relief valves. e and nominal tubing; SST wall. f. Pressure regulators g. Various relief valves (hydraulic and pneumatic) h. Phase separator i. Pressure gauges and transducers j. Flow controller/valves k. Filter, strainer, and check valves l. Camera and high pressure window 2. The following components are custom a. Beam ports (copper subject to compression loading). b. Bubble chamber (glass vessel fully contained in the larger pressure vessel). c. Pressure vessel (because of limited size <6 inch bore this component is not required to meet the ASME BPVC). The most applicable ASME Pressure Code is ASME B The commercially supplied components have maximum working pressure ratings of 1500 psi or higher. Fittings are Swagelok with non-welded connections (i.e. there are no welded joints outside of the commercial components boundaries). Commercially supplied components are accepted without further calculations. The fully assembled (without camera) system is shown in Figure 4.

15 8.3 Canty Camera and Glass Windows Figure 4: Fully assembled system The camera and window are commercially supplied and have operating pressure ratings of 1300 psi as indicated in the drawing below (see Figure 5). These components have technology considered proprietary by the manufacturer and do not have additional documentation beyond this certification. This drawing can be found in the pressure system folder. These components are accepted without further analysis. See Figure Vessel and chamber

16 The vessel is machined from a single forged block of SST 304. The design pressure is 1700 psi (1100 psi for beam ports). The maximum operating pressure is 1000 psi. This is determined by the relief valve PSV- 4. This valve is not an ASME valve but does have a capacity higher than the pump can deliver. The vessel is protected by a Flow Safe ASME liquid relief set at 1100 psi with a capacity far greater than the pump can supply. It is JLAB policy that piping less than 6 inch in diameter need not be protected from fire. The relief device is a Flow Safe S8L2P-05FN-05FN-SS-SS-KVN. 8.5 Piping All piping components are commercially available from the following suppliers. Swagelok: Fittings, valves, flex lines, and tubing Parker: small hand valves Hydac: hydraulic pump, fittings, relief/check valves, and accumulators Kunkle relief valves Wika pressure gauges All components have a working pressure rating (with the exception of the lower range pressure gauges) in excess of the relief device set points. The N2 piping is protected by an AMSE relief valve: Kunkle 1000 psi 207 SCFM. 8.6 Vacuum System The vacuum system is temporarily connected when filling and venting (relieving) the system. There is a vacuum pop-off installed on the vacuum line that will prevent an accidental overpressure of the vacuum system due to operator error. Note that only the system expert is allowed to perform procedures requiring the vacuum subsystem.

17 Figure 5: Canty camera and window assembly.

18 9 Procedures for bubble chamber operations Installation Mercury (Hg) was preloaded into the bubble chamber space at ANL in a clean room environment. There shall be no handling of Hg at JLAB outside of extreme emergency situations. If necessary, the chamber shall be shipped back to ANL for any and all Hg handling. Installation shall proceed under the direct supervision of B. DiGiovine and D. Meekins. An electrical inspection shall be performed by Todd Kujawa Prestart Checklist Perform the following prestart checklist prior to filling and operating the detector for the first time or after down period exceeding 1 month: 1. Post area as Test in Progress: Keep Out 2. Visually inspect all mechanical supports and ensure that the position of the chamber is acceptable. 3. Ensure that shielding is in place for beam dump 4. Ensure that electrical inspection has been performed 5. Visually inspect all mechanical connections on flex lines and tubing 6. Ensure that the fill level of the hydraulic reservoir is acceptable 7. Ensure that power is supplied to equipment rack 8. Visually inspect insulation Filling Procedure The following procedure shall be used for all filling operations. Only Brad DiGiovine from ANL shall perform this procedure. 1. Notify Industrial Hygiene prior to proceeding. Operate a 1000 cfm fan to recirculate air in the injector and provide mixing. 2. Ensure that the correct personnel monitoring equipment for exposure to the target fluid (Assay Technology 575 N2O sampler) and mercury (SKC Elemental Mercury Passive Sampler) is in place. 3. Make sure LabVIEW is online and temperature/pressure data is available and accurate 4. Connect filling manifold to detector fill port with new VCR gasket, connect dry pump, connect gas supply bottle. 5. Perform a leak down vacuum test of filling manifold 6. Open the bottle supply valve and bleed a small amount of gas from supply into filling manifold and pump out, several times to purge system. 7. Pump out filling manifold and open valve to detector phase separator to pump. 8. Open valve to detector upper fill line to pump active volume of detector. 9. Connect hydraulic fluid reservoir to fill port on the heavy wall vessel, connect vacuum pump to pump port on top of vessel. 10. Pump and fill hydraulic volume of vessel 11. Turn on chiller system, adjust temperature and flow control valves to appropriate values based on active fluid and threshold calculations. 12. Once fluid temperature has reached operating conditions filling can begin

19 13. Close detector upper fill valve and use regulator on filling manifold to set fill pressure to 3 atm 14. Open valve to detector lower fill and fill upper volume with appropriate amount of mercury 15. Close valve to lower detector fill and open valve to upper detector fill to begin letting gas into inner volume, constantly check the pressure differential across glass. 16. Once the pressure differential is close to 1atm, begin to increase hydraulic pressure to equalize the pressure differential. 17. Repeat 13 and 14, increasing gas and hydraulic pressure until vapor pressure is reached at temperature, gas will begin to liquefy. Continue to fill with liquid active fluid until there is no remaining gas volume and the mercury meniscus has been displaced down several millimeters. 18. Close valve to upper detector fill, close valve to detector phase separator, close valve to gas bottle 19. Let system sit and settle for some time to allow thermal equilibrium to be reached. 20. Ensure that the bottle valve is fully closed. Disconnect from system. 21. Verify proper setup and operation of LabVIEW system, verify proper operating pressures and temperatures. 22. Set system into standby for users to take over operation Venting The following procedure shall be used for venting. Only Brad DiGiovine shall perform this procedure. 1. Notify Industrial Hygiene prior to proceeding. Operate a 1000 cfm fan to recirculate air in the injector and provide mixing. 2. Ensure that the correct personnel monitoring equipment for exposure to the target fluid (Assay Technology 575 N2O sampler) and mercury (SKC Elemental Mercury Passive Sampler) is in place. 3. Verify filling manifold is still properly setup, if not, install manifold and pump. 4. Turn on pump, pump out manifold 5. Open valve to detector phase separator and pump 6. Begin lowering hydraulic pressure slowly to vapor pressure at temperature 7. Wait for gas bubble to form in active volume, leave pressure so little change in gas bubble volume occurs 8. Slowly open detector upper fill valve and begin bleeding liquid into phase separator 9. Once all liquid is gone continue bleeding until differential pressure across glass is close to 1atm, close detector upper fill valve 10. Lower pressure in hydraulic system to equalize differential pressure 11. Open detector upper fill valve and repeat 7&8 until system is completely vented and pumped, hydraulic system pressure should be 1atm, inner volume FV. 12. Close detector upper fill valve, close detector phase separator valve; turn off pump. 13. Power down chiller, and shut down hydraulic system, electronics and DAQ can now be powered down if necessary Power loss In the event of a power loss, place the remote override box into its default position as described in the general user section. The system automatically switches to recovery (high) pressure to prevent any active fluid boiling. The chiller system will of course fail due to loss of power so the system will begin

20 warming up. The bellows in the active volume will provide the necessary expansion volume for the possible excursion to room temperature, and the hydraulic system relieving regulators (and backup relief valve) will provide the necessary relief for the inevitable expansion of the hydraulic fluid. The hydraulic supply system also has a large supply accumulator which will provide the necessary hydraulic supply pressure for weeks in system standby. A system expert must inspect and determine the proper course of action once power is available again, ideally the system will be able to be cooled back down to operating temperature and returned to service with minimal disruption Fire In the case of a fire, place the remote override box into its default position as described in the general user section. Do not approach the system, it is designed to relieve excess pressure in events like this, but due to the chemical hazards present from operating fluids, and possible thermal decomposition, the composition of the venting material will likely be hazardous. Stay away Basic User Operation Any user not considered an expert is limited to the start/stop of runs, and the placement of the system into and out of standby. The main interface of the system for standard user is a LabVIEW interface and control panel. This panel allows for the naming of runs, specifying data storage locations, and the start/stop function. The system will be available for users once it is prepared and placed into standby by an expert. This means that the system will be at operating temperature and pressurized to its recovery (high) pressure. The LabVIEW system will be online but not running Start Run Step 1. Enter (or verify) the storage location of data files in the path textbox Step 2. Enter run number in the appropriate textbox Step 3. Click the run (arrow) button The system will decompress to the active pressure and become live, the acquisition and control system will automatically recognize events, log data, pressurize the system to recover, and decompress to the active pressure to go live again End Run To end a run and place the system in standby Step 1. Click the red STOP button on the LabVIEW interface Step 2. Verify system pressure has increased to recovery (high) as indicated by LabVIEW DAQ Failure A remote override box is available to users, this is only necessary in the event of acquisition failure, emergency, or as a redundant backup for standby mode. A user must verify proper position of override switches before enabling the box with the toggle switch in the upper left corner. The switches should be left in this orientation to facilitate a fast enabling of override. The default standby positions are:

21 Heater Power: Disabled Hydraulic Supply Pump: Enabled Valve High: Open (Green) Valve Low: Closed (Green) Valve Bleed: Closed (Green) Valve Inner: Closed (Green) These switches are found on the System Override Box shown in Figure 6. Figure 6: System Override Box Control System Alarms The user interface is simple to use as there are few functions for the interface to perform. The following is a list of the control functions: There is an alarm on the temperature which indicates possible failure of the refrigerator. This will stop the DAQ Run and return the system to the high pressure (stable) condition. Backlight failure alarm. The alarm and interlock Stops the DAQ Run and returns the system to the high pressure condition. Differential pressure alarm: this alarm indicates that the DP limit between the inner and outer vessel has been exceeded. The interlock with stop the DAQ Run and return the system to the high pressure condition. This limit is adjustable however B. DiGiovine is the only authorized person for setting this limit Emergency Deenergizing This procedure shall only be performed in cases of emergency. Performing this procedure will likely cause damage to the bubble chamber glass vessel. Damage to this vessel does not pose a personnel risk but, will require that the chamber is shipped back to Argonne National Lab for repair. 1. Turn off hydraulic pump. 2. Turn off refrigerator.

22 3. Open HA-18 bypass valve. 4. Close PRV/RV 1 This is a pressure relieving regulator that will relieve pressure as the setpoint is lowered. 5. Close PRV/RV 2 This is a pressure relieving regulator that will relieve pressure as the setpoint is lowered. 6. Close PRV/RV 3 This is a pressure relieving regulator that will relieve pressure as the setpoint is lowered. 7. After pressure is relieved (verify on gauges PI 8. Power down chiller, and shut down hydraulic system, electronics and DAQ can now be powered down if necessary. 9. Do not attempt to open vessel or valves or disconnect lines on the system. The system expert shall disassemble the system for shipment to ANL for repair and inspection.

23 10 Failure Modes and Effects This section details the possible credible failure modes and their effects as well as mitigations to reduce risk to personnel and equipment Failure of glass bubble chamber Failure of the glass vessel will be detected with the camera during operations mode. At all other times manual observation is required to detect the failure. This failure mode released N2O/C2F6 and mercury into the hydraulic fluid. The integrity of the system is still maintained and is safe as long as the system is not disassembled. The system must be shipped back to ANL for repair. Industrial Hygiene shall be required to cover the disassembly of system for shipment back to ANL. Procedures to perform the disassembly shall be agreed upon by IH and the system expert Failure of pump cut off switch The pump is controlled by the pressure switch PS-1. Should this switch fail the pump would run continuously and supply a steady flow of 1 gpm. Multiple Hydac relief devices and control regulators should ensure that the pressure in the vessel and piping do not exceed the design pressures. However these devices are not ASME. Should these all fail, relief valve PSV-8 with a set pressure of 1100 psi ensures that the pressure in the vessel does not exceed the design pressures beyond Code limits Accumulator failure Should the accumulator fail and allow N2 into the hydraulic system, there will be no effect aside from the system DAQ and control issues. The amount of N2 stored in the accumulators is negligible. The N2 bottle is disconnected after the charging procedure is complete. This event is considered extremely unlikely as these devices have a working pressure rating of 3000 psi Regulator failure Should the N2 regulator fail on the accumulator charging line, an ASME relief valve will protect the system from overpressure. The orifice at the bottle connection ensures that the Cv is known and that the valve has adequate capacity. See TGT-CALC for more details Refrigerator failure Should the refrigerator fail without a full power failure while in operation or standby mode, the DAQ system will alarm and interlocks will open CV-1 and close CV-4. This returns the chamber and vessel to the stable condition. The active fluid will stay in the liquid state at room temperature and no damage to the bubble chamber will occur. The system may then be manually relieved in a safe and controlled manner with no damage to the bubble chamber and no additional risk to personnel. The consequences of this failure mode are minimal Power failure Should a power failure occur while the detector is in operation or standby mode, the solenoid valves will go to the normal state with control valve CV-1 open and CV-4 closed. The bubble chamber and outer vessel are then set to the high pressure which is the stable condition for the fluid. This will prevent

24 boiling of the fluid even with a full warm up to room temperature. The refrigerator will also fail during a full power failure. The system may then be manually relieved in a safe and controlled manner with no damage to the bubble chamber and no additional risk to personnel. The consequences of this failure mode are minimal.

25 11 Beam Operations 11.1 General The chamber will be operated remotely from the MCC control room. The control shall be separate from the beam control. Beam operations shall be limited to the following: Beam current shall be varied up to 10 µa The total beam energy shall be varied up to 10 MeV Vary bubble chamber operating parameters as required inside limit envelop given in Section 1.1. Note that the beamline with the dump was commissioned in It is approved for a total beam energy of 10 MeV and 10 µa D Beamline The 5D beamline is in the injector region and was used for the PePpo experiment. The line was modified in 2014 to accommodate the future experiment E O(γ,α) 12 C. The beamline is formally described in the Song Sheet ACC The line currently has an operational limit of 10 µa and 10 MeV total energy (9.5 MeV kinetic). The dump on this line shall also serve as a radiator to produce photons for the test of the bubble chamber detector. A Schematic of the beamline is shown in the figure below. Cu Collimator New Dipole Magnet Beam Dump Radiator Bubble Chamber Figure 7: 5D Beamline Schematic

26 A new fast acting gate valve has been added to the beamline upstream of the 5D line. This valve closes when pressure is high in the downstream line thus protecting the ¼ cryomodule in the injector. This provides a layer of protection in the unlikely event that the copper dump fails Beam Dump/Radiator The beam dump for the 5D line shall also serve as the radiator (source of photons) for the test. A thermal analysis using conservative assumptions was performed by J. Matalevich. This analysis can be found in the pressure system folder PS-ACC A summary of the analysis is given in Figure 8. For the input power of 100 W the temperature rise on the beam dump is acceptable, about 100 C. This dump was commissioned in A GEANT4 simulation indicates that electrons from the beam will not penetrate the radiator/dump but knock on electrons produced by the incident photon shower will escape at much lower energies. These electrons are not expected to have any measurable effect on the detector General Test Plan Figure 8: Beam dump/radiator temperature rise The test plan shall consist of two phases. The first where the chamber is filled with N2O as the active fluid and the second where this fluid is C2F6. The following is an outline plan for the test: Phase 1: o Ensure that the DAQ and hydraulic systems are functioning properly. o With beam on the dump operate the detector. Check counting rates especially multiple bubble production o Measure bubble distribution in the chamber.

27 o Background measurements: Measure beam off background Measure beam on background by examining outside the fiducial volume Measure background with beam on Faraday Cup. Measure neutron events in chamber when beam energy is above kinetic 8.5 MeV. Use neutron detectors in Injector area to measure neutron production rate. Phase 2: o Ensure that the DAQ and hydraulic systems are functioning properly. o Measure rate to calibrate detector using Penfold-Leiss unfolding analysis. This can be compared to the neutron rich data from Duke.

28 12 Conduct of Operations for Test 12.1 Organization and Administration: Accelerator Program Deputy: Steve Cooper (cell: (757) ) Accelerator Physics Experiment Liaison: Daniel Moser (phone: 5089) Accelerator Work Coordinator: Steve Suhring (phone: 7670) Bubble Chamber Shift Crew: a. Riad Suleiman (cell: (757) ) b. David Meekins (cell: (757) ) c. Roy Holt d. Brad DiGiovine (cell: (815) ) e. Claudio Ugalde f. Ernst Rehm The Bubble chamber will be operated from the Injector Service Building. The phone number to reach the bubble chamber shift crew is We will us a computer electronic logbook, which serves as the record of the experiment. All relevant activities are to be recorded, including all changes of experiment conditions and equipment failures. The log book assigned to this experiment is: The bubble chamber proposal, detailed test plan, and all other documents and references are available online at: Beam Operations All beam operations will be conducted from the MCC. To contact the Crew Chief please dial The phone number to reach the MCC Operator is There will be one long shift: 9:00 am to 10:00 pm. The MCC will sweep the injector from 8:00-9:00 am. The Injector will be in Beam Permit and ready to deliver beam to the bubble chamber in the 5D line at 9:00 am. The beam operations will stop at 10:00 pm. For any issue related to the bubble chamber, please contact Riad Suleiman (cell: (757) ) or Brad DiGiovine (cell: (815) ). To limit access to the bubble chamber when Injector in Restricted Access, an exclusion zone will be marked with a ribbon and cones. The area shall be posted TEST IN PROGRESS PLEASE DO NOT DISTURB.

29 Riad Suleiman will represent the collaboration at the 8:00 am meetings in the MCC during the work week. Daily work planning will occur at this time Injector Segment Access: Access to the injector segment will be governed by the JLab beam containment policy, and work in designated radiation areas will be carried out in accordance with the JLab RadCon Manual. The injector segment is not a posted Radioactive Materials Area. During bubble chamber test, the injector segment will normally be in Beam Permit. When temporary access to the area is needed the shift crew can ask the MCC to bring the injector segment to Controlled Access. If long term access to the injector segment is required, the shift crew may request the injector segment be brought to Restricted Access. Restricted Access is a state where delivery of beam and/or accelerating RF power is not permitted, and entry to and exit from the injector segment is not controlled by the Personnel Safety System (phone 7050). This is the normal state of the area when the accelerator is off and no experiments are running. Access is restricted only in the sense that the injector segment is not open to the general public. Welldefined check-list procedures are to be followed whenever the injector segment is brought to and from Restricted Access.

Procedure. Argonne Bubble Chamber Operations for Engineering Runs Description:

Procedure. Argonne Bubble Chamber Operations for Engineering Runs Description: Procedure Procedure Number TGT-PROC-18-001 Revision 1 Active Date 5/1/2018 Expiration Date N/A Author David Meekins Checked Riad Suleiman Approved Ed Folts Tittle Argonne Bubble Chamber Operations for

More information

Bubble Chamber Detector System

Bubble Chamber Detector System Bubble Chamber Detector System 1 ANL Bubble Chamber Lead designer and fabricator Brad DiGiovine (ANL) April 2009 Chamber Received Full Operation Authorization for (C 4 F 10 ) February 2010 First Bubble

More information

Click for OSP/TOSP Procedure Form Click for LOSP Procedure Form. Test of ANL Bubble Chamber Detector

Click for OSP/TOSP Procedure Form Click for LOSP Procedure Form. Test of ANL Bubble Chamber Detector Person: Meekins, Dave (meekins@jlab.org) Org: TARGET Status: PROCESSED Saved: 8/28/2015 3:52:02 PM Submitted: 8/28/2015 3:52:02 PM Operational Safety Procedure Review and Approval Form # 52757 (See ES&H

More information

ANL Bubble Chamber Superheated Active Target System

ANL Bubble Chamber Superheated Active Target System ANL Bubble Chamber Superheated Active Target System N 2 O and C 2 F 6 as Active Fluids B. DiGiovine Physics Division and Bubble Chambers April 2009 First Bubble Chamber Received Full Operation Authorization

More information

H 2 O Bubble Chamber Superheated Active Target System. Safety and Systems Overview B. DiGiovine

H 2 O Bubble Chamber Superheated Active Target System. Safety and Systems Overview B. DiGiovine H 2 O Bubble Chamber Superheated Active Target System Safety and Systems Overview B. DiGiovine Physics Division and Bubble Chambers April 2009 First Bubble Chamber Received Full Operation Authorization

More information

Jefferson Lab Bubble Chamber Experiment Update and Future Plans. C(a,g) 16 O. Claudio Ugalde

Jefferson Lab Bubble Chamber Experiment Update and Future Plans. C(a,g) 16 O. Claudio Ugalde Jefferson Lab Bubble Chamber Experiment Update and Future Plans 12 C(a,g) 16 O Claudio Ugalde Collaboration Whitney Armstrong Melina Avila Kevin Bailey Tom O Connor Ernst Rehm Seamus Riordan Brad DiGiovine

More information

HYDROSTATIC LEAK TEST PROCEDURE

HYDROSTATIC LEAK TEST PROCEDURE This information is proprietary and shall not be disclosed outside your organization, nor shall it be duplicated, used or disclosed for purposes other than as permitted under the agreement with Kinetics

More information

Inert Air (N2) Systems Manual

Inert Air (N2) Systems Manual INSTRUCTION MANUAL Inert Air (N2) Systems Manual N2-MANUAL 2.10 READ AND UNDERSTAND THIS MANUAL PRIOR TO OPERATING OR SERVICING THIS PRODUCT. GENERAL INFORMATION Positive pressure nitrogen gas pressurizing

More information

PRad Target. Chris Keith JLab Target Group

PRad Target. Chris Keith JLab Target Group PRad Target Chris Keith JLab Target Group Target Overview & Components Target Software Hazard Analysis and Mitigation Target Status, Performance& Remaining Work Installation Schedule Nov. 12, 2015 PRad

More information

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler.

Exercise 5-2. Bubblers EXERCISE OBJECTIVE DISCUSSION OUTLINE. Bubblers DISCUSSION. Learn to measure the level in a vessel using a bubbler. Exercise 5-2 Bubblers EXERCISE OBJECTIVE Learn to measure the level in a vessel using a bubbler. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Bubblers How to measure

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 333a 1. Description Viking supervised Surefire Preaction Systems Utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated Viking G-3000P Valve comes complete

More information

RD(H)20/25 Pressure-Reducing Regulator User Manual

RD(H)20/25 Pressure-Reducing Regulator User Manual RD(H)20/25 Pressure-Reducing Regulator User Manual Read the complete manual before installing and using the regulator. 2 Safe Product Selection When selecting a product, the total system design must be

More information

TABLE OF CONTENTS PART 2 - CONFINED SPACES

TABLE OF CONTENTS PART 2 - CONFINED SPACES May 11, 2006 TABLE OF CONTENTS PART 2 - CONFINED SPACES Page DEFINITIONS... 2-1 GENERAL... 2-2 RESPONSIBILITIES... 2-2 HAZARD ASSESSMENT AND WORK PROCEDURES... 2-3 IDENTIFICATION AND ENTRY PERMITS... 2-3

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 348a 1. Description Viking supervised Surefire Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated Viking G-6000P Valve comes complete

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

The Discussion of this exercise covers the following points:

The Discussion of this exercise covers the following points: Exercise 5-3 Wet Reference Leg EXERCISE OBJECTIVE Learn to measure the level in a vessel using a wet reference leg. DISCUSSION OUTLINE The Discussion of this exercise covers the following points: Measuring

More information

Armfield Distillation Column Operation Guidelines

Armfield Distillation Column Operation Guidelines Armfield Distillation Column Operation Guidelines 11-2016 R.Cox Safety SAFETY GLASSES ARE REQUIRED WHEN OPERATING THE DISTILLATION COLUMN Wear gloves when mixing alcohol feedstock The column will become

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 331a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-3000P Valve. The small profile, lightweight, pilot-operated

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

TECHNICAL DATA. Q= Cv S

TECHNICAL DATA. Q= Cv S Page 1 of 13 1. DESCRIPTION The Viking 4 inch Model G-4000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S January 6, 2012 Preaction 347a 1. Description Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilize the Viking G-6000P Valve. The small profile, lightweight, pilot operated

More information

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1 Project: Novel Electron Bubble Particle Detector Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat Version 5.1 (Using side filling line) Hand Processed Changes HPC No. Date

More information

Review of the Hall B Gas System Hardware. George Jacobs

Review of the Hall B Gas System Hardware. George Jacobs of the Hardware George Jacobs DSG Staff 2 Hall B Gas Utilities for detectors Drift Chamber (DC) Low Threshold Cherenkov Counter (LTCC) Micromegas Vertex Tracker (MVT) Forward Tagger (FT) Ring Imaging Cherenkov

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Page 1 of 13 1. DESCRIPTION The Viking 6 Model G-6000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

NO SMOKING WHEN OXYGEN IS IN USE.

NO SMOKING WHEN OXYGEN IS IN USE. GENERAL NO SMOKING WHEN OXYGEN IS IN USE. The oxygen system provides oxygen as required for up to 19 passengers and 2 cockpit crew members. Therapeutic oxygen outlets are also available in the cabin. OXYGEN

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures

TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Operations & Service Manual TESCOM 50-4X Series Safety, Installation & Start-Up Procedures Do not attempt to select, install, use or maintain this product until you have read and fully understood this

More information

TECHNICAL DATA. Q = C v P S

TECHNICAL DATA. Q = C v P S Preaction 346a 1. Description The 6 Model G-6000P Electric Release Preaction System Riser Assembly can be used as a Single Interlock Preaction System with Electric Release, or as a Double Interlock Preaction

More information

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor)

1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1 Exam Prep NFPA 99 Health Care Facilities Questions and Answers (Plumbing Contractor) 1. According to NFPA 99, SCFM is an acronym for. a) Surface Conditions at Fahrenheit Mercury b) Standard Conditions

More information

Bermad Pressure Reducing. Model: 42T

Bermad Pressure Reducing. Model: 42T Bermad Pressure Reducing Pilot Operated Pressure Control Valve Model: 42T Installation Operation Maintenance Manual (IOM) REV. 27.7.17 Page 1 of 12 Safety First BERMAD believes that the safety of personnel

More information

ES&H Manual Pressure and Vacuum Systems Safety Supplement

ES&H Manual Pressure and Vacuum Systems Safety Supplement Part 6: Pressure and Leak Testing QA/CI Dept. PS Committee/Chair 11/06/15 11/06/20 1.0 6:1 of 6 1 Pressure and Leak Testing The primary reason for pressure testing is to confirm the integrity of a pressure

More information

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS

ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This

More information

TECHNICAL DATA OBSOLETE

TECHNICAL DATA OBSOLETE April 9, 2009 Preaction 326a 1. DESCRIPTION Viking supervised Double-Interlocked Electric/Pneumatic Release Preaction Systems utilizing the Viking G-4000P Deluge Valve. The small profi le, lightweight,

More information

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA Q= C. Table 1 - Specifications September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,

More information

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure PPMS Service Note 1099-412 In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure Introduction: Loss of electricity to the PPMS EverCool II should not cause damage to

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This

More information

Unit 24: Applications of Pneumatics and Hydraulics

Unit 24: Applications of Pneumatics and Hydraulics Unit 24: Applications of Pneumatics and Hydraulics Unit code: J/601/1496 QCF level: 4 Credit value: 15 OUTCOME 2 TUTORIAL 9 ACCUMULATORS The material needed for outcome 2 is very extensive so there are

More information

Interface Devices, Inc. Hydraulic Mini Mule

Interface Devices, Inc. Hydraulic Mini Mule Interface Devices, Inc. Hydraulic Mini Mule INSTALLATION, OPERATION & MAINTENANCE MANUAL IMPORTANT! FILE THIS MANUAL IN A SAFE PLACE FOR FUTURE SERVICE & PARTS NEEDS ALWAYS REFERENCE THE SERIAL NUMBER

More information

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS INTRODUCTION The Janis Research Company's Superconducting Magnet/Cryostat System is one of the most versatile tools available to the scientist

More information

OPERATION MANUAL NTF-15

OPERATION MANUAL NTF-15 OPERATION MANUAL NTF-15 Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81235-00 (Rev B) TABLE

More information

STANDARD OPERATING PROCEDURES

STANDARD OPERATING PROCEDURES PAGE: 1 of 14 CONTENTS 1.0 SCOPE AND APPLICATION 2.0 METHOD SUMMARY 3.0 SAMPLE PRESERVATION, CONTAINERS, HANDLING AND STORAGE 4.0 INTERFERENCE AND POTENTIAL PROBLEMS 5.0 EQUIPMENT/APPARATUS 6.0 REAGENTS

More information

APPS-160 Gen 2 User Manual

APPS-160 Gen 2 User Manual APPS-160 Gen 2 User Manual Applicable Products: PN 11914406 - APPS-160 10 to 50 PSIG operating pressure PN 11918618 - APPS-160 40 to 85 PSIG operating pressure Rev 9/16/2004 Chart Ind. www-chart-ind.com

More information

Standard Pneumatic Test Procedure Requirements for Piping Systems

Standard Pneumatic Test Procedure Requirements for Piping Systems the pressure equipment safety authority Standard Pneumatic Test Procedure Requirements for Piping Systems AB-522 Edition 2, Rev. 1 Issued 2016-10-24 Table of Contents FOREWORD... 1 1.0 INTRODUCTION...

More information

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL

WATER MADE EASY MARINE ENERGY MUNICIPAL INDUSTRIAL Capital Controls Series 71V3000 The Series 71V3000 electrically-heated vaporizer automatically vaporizes and superheats liquid chlorine, sulfur dioxide or ammonia at a rate controlled by the gas feed system.

More information

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER

SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SAFETY MANUAL FOR FLAMMABLE PRODUCT TRANSFER SUPPLIMENT TO eom IMPORTANT READ THIS MANUAL BEFORE PRODUCT INSTALLATION, OPERATION, INSPECTION & MAINTENANCE Tougher and more rigid guidelines are being established

More information

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13

TECHNICAL DATA Q = C. v P S. 2 Model G-2000 Dry valve. Page 1 of 13 Page 1 of 13 1. Description The Viking 2 Model G-2000 Dry Valve Riser Assembly consists of a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry sprinkler

More information

OPERATION MANUAL NTF-60 Plus

OPERATION MANUAL NTF-60 Plus OPERATION MANUAL NTF-60 Plus Nitrogen Tire Filling Valve Stem Caps (Qty=200) Order P/N 436075 RTI Technologies, Inc 10 Innovation Drive York, PA 17402 800-468-2321 www.rtitech.com 035-81264-00 (Rev A)

More information

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary?

Lockout. HealthandSafetyOntario.ca. What is Lockout? How is a Lockout Done? Why is a Lockout Necessary? What is Lockout? Lockout means to physically neutralize all energies in a piece of equipment before beginning any maintenance or repair work. Lockouts generally involve: Stopping all energy flows (for

More information

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel

TANK MANAGER FOR TWO TANKS OPERATING MANUAL. 10/31/11 C-More T6C L color touch panel TANK MANAGER FOR TWO TANKS OPERATING MANUAL 10/31/11 C-More T6C L color touch panel 1 TABLE OF CONTENTS GENERAL...3 INSTALLATION...4 STONE TEST PROCEDURE...7 OPERATIONAL SUMMARY...7 AUTO CARBONATION...10

More information

2 Sentry MCL Installation, Operation & Maintenance

2 Sentry MCL Installation, Operation & Maintenance Gas Liquid & Slurry Solid & Powder Steam & Water Installation, Operation & Maintenance Manual Original Instructions Liquid Sampling Manual Low-Emission Samplers S-GA-IOM-00249-7 11-17 Sentry MCL 966 Blue

More information

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels

product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels 12.09 product manual HM-4140, HM-4150, HM-4160 HM-4160A HM-4150 Humboldt FlexPanels Introduction: This manual covers the installation and operation of Humboldt FlexPanels for Triaxial and Permeability

More information

AUTOMATIC HOSE TEST UNIT, TYPE SPU

AUTOMATIC HOSE TEST UNIT, TYPE SPU VALVES AND FITTINGS UP TO 14,000 BAR TEST AND CONTROL EQUIPMENT H IGH PRESSURE TECHNOLOGY AUTOMATIC HOSE TEST UNIT, TYPE SPU Pressure range from 1 up to 10,000 bar User-friendly touch panel operation HIGH-PRESSURE

More information

Copyright, 2005 GPM Hydraulic Consulting, Inc.

Copyright, 2005 GPM Hydraulic Consulting, Inc. Troubleshooting and Preventive Maintenance of Hydraulic Systems Learning to Read the Signs of Future System Failures Instructed by: Al Smiley & Alan Dellinger Copyright, 2005 GPM Hydraulic Consulting,

More information

SERIES 30. Spring Operated Tank Blanketing Valve PROTECTOSEAL.

SERIES 30. Spring Operated Tank Blanketing Valve PROTECTOSEAL. SERIES 30 PROTECTOSEAL 1 2" NPT inlet and outlet standard Direct acting valve mechanism Optional flanged or threaded inlet and outlet connections available Inlet gas pressures from 10 PSIG to 200 PSIG

More information

FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM

FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM FAILURE AND HAZARD ANALYSIS OF THE NPDGAMMA LH2 TARGET SYSTEM Revision: 0.00 Edited by: Seppo Penttila, November 10, 2010 1. General The RSS 8305.0 Installation, Commissioning, and Operation of the NPDGamma

More information

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000

Pressure and/or Temperature Pilot Operated Steam Regulators Series 2000 Hoffman Specialty Regulators Regulators Pressure and/or Temperature Operated Regulators Series 2000 The Hoffman Specialty Series 2000 consists of main valves, pilot valves, wells and hardware kits. They

More information

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) 1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures

More information

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY

TECHNICAL DATA 3 MODEL G-3000 DRY VALVE RISER ASSEMBLY Page 1 of 13 1. DESCRIPTION The Viking 3 Model G-3000 Dry Valve Riser Assembly is equipped with a small profile, light weight, pilot operated valve that is used to separate the water supply from the dry

More information

Installation Operation Maintenance

Installation Operation Maintenance 682 Seal Cooler New generation seal cooler to meet and exceed the seal cooler requirements stated in the 4th Edition of API Standard 682 Installation Operation Maintenance Experience In Motion Description

More information

Oxygen Deficiency Hazard Safety Booklet

Oxygen Deficiency Hazard Safety Booklet Oxygen Deficiency Hazard Safety Booklet Central Helium Liquefier Complex Last Revision: July 2008 Many work areas at Jefferson Lab store or use compressed gasses, liquefied gasses, and volatile liquids.

More information

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA

INTERNAL LEAKAGE CHECK OF THE FLIGHT GMA SU/GP-B P0931 Rev A STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 INTERNAL LEAKAGE CHECK OF THE FLIGHT

More information

Operating Instructions

Operating Instructions Operating Instructions Before operating the thin film evaporator, please be aware of all safety concerns associated with this experiment: Burn hazard from the column and steam lines, Chemical hazards associated

More information

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1

TECHNICAL DATA. the Viking Pilot Pressure Regulating Valve 1 Model A-1 Speed Control Assembly: OBSOLETE. the Viking Speed Control Assembly 1 November 30, 1994 534 a 1. PRODUCT NAME VIKING 2" (50mm), 3" (75mm), 4" (100mm), 6" (150mm) 2. MANUFACTURER THE VIKING CORPORATION 210 N. Industrial Park Road Hastings, Michigan 49058 U.S.A. Telephone:

More information

v. Size shall be specified on drawings.

v. Size shall be specified on drawings. SPECIFICATION FOR VACUUM INSULATED PIPING Part 1 General 1. Submittals a. After award of contract and before executing any manufacturing, shop drawings and specifications shall be submitted to the customer

More information

GM Series Dual-Block Multi-Function Gas Control Valves

GM Series Dual-Block Multi-Function Gas Control Valves Installation Sheets Manual 121 Gas Combustion Combination Controls and Systems Section G Technical Bulletin GM Issue Date 0297 GM Series Dual-Block Multi-Function Gas Control Valves Figure 1: GM Series

More information

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment

Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment Gas Cabinets and Valve Manifold Boxes: Applying CGA G13- Rev 2015 to Gas Delivery Equipment The Standard Governing the Storage & Use of Silane: Compressed Gas Association s Publication CGA G-13 2015: Storage

More information

INSTALLATION OPERATION MAINTENANCE

INSTALLATION OPERATION MAINTENANCE Bermad Electrically Controlled On-Off Deluge Valve Model: 400E-3D INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working

More information

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL

I T T Pressure Reducing Valve WARNING INSTALLATION, OPERATION, AND MAINTENANCE MANUAL INSTALLATION, OPERATION, AND MAINTENANCE MANUAL I-867-4T 867-4T Pressure Reducing Valve HANG THESE INSTRUCTIONS ON THE INSTALLED VALVE FOR FUTURE REFERENCE WARNING Read and understand all instructions

More information

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel:

INSTRUCTION MANUAL. FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model Version Perma Pure LLC Tel: PERMA PURE INSTRUCTION MANUAL FLOW CONTROL DRAWERS MANUAL / PLC CONTROL SERIES Model 3300 Version 4.06 Perma Pure LLC Tel: 732-244-0010 P.O. Box 2105, 8 Executive Drive Tel: 800-337-3762 (toll free US)

More information

Cover Page for Lab Report Group Portion. Pump Performance

Cover Page for Lab Report Group Portion. Pump Performance Cover Page for Lab Report Group Portion Pump Performance Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 March 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section number:

More information

Spirax Compact FREME Flash Recovery Energy Management Equipment

Spirax Compact FREME Flash Recovery Energy Management Equipment IM-UK-cFREME UK Issue 1 Spirax Compact FREME Flash Recovery Energy Management Equipment Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4.

More information

23.1 Functions, Basic Configuration, and Interfaces

23.1 Functions, Basic Configuration, and Interfaces 23 (6.6.D) SF 6 and Other Special Gases 23.1 Functions, Basic Configuration, and Interfaces 23.1.1 Functions The primary function performed by the SF 6 and other special gases system is to provide SF 6

More information

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE

GMA FUNCTIONAL TEST SETTING & TESTING OF SPIN UP PARAMETERS. P0586 REV -- 20, June 2000 GPB SCIENCE MISSION PROCEDURE P0586 Rev. June 20, 2000 STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 GMA FUNCTIONAL TEST SETTING & TESTING

More information

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors

UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors 1130050/4 IM-P113-02 ST Issue 4 UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. General product information

More information

Lockout/Tagout - Energy Control Program

Lockout/Tagout - Energy Control Program Lockout/Tagout - Energy Control Program Lockout and Tagging of ELECTRICAL Circuits This portion of the K.R. Miller Contractors, Inc. safety program has been created to maintain a written copy of procedures

More information

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance

CVI Valve Line. Exceeds the industry s highest standards for reliability and performance CVI Valve Line Exceeds the industry s highest standards for reliability and performance Available in the most standard models with the shortest lead times in the industry Exceptional quality every CVI

More information

Nanofabrication Facility: PECVD SOP Rev. 00, April 24

Nanofabrication Facility: PECVD SOP Rev. 00, April 24 Author: Charlie Yao & Mario Beaudoin Email: charlieyao@gmail.com; Beaudoin@physics.ubc.ca Phone: 604-822-1853(MB). Purpose This document outlines the standard operation for the Trion Plasma Enhanced Chemical

More information

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES

INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES INSTRUCTIONS FOR MODELS SG3897 AND SG3898 CROSS PURGE ASSEMBLIES THIS BOOKLET CONTAINS PROPRIETARY INFORMATION OF ADVANCED SPECIALTY GAS EQUIPMENT CORP. AND IS PROVIDED TO THE PURCHASER SOLELY FOR USE

More information

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS

R I T. Title: STS ASE Semiconductor & Microsystems Fabrication Laboratory Revision: Original Rev Date: 01/21/ SCOPE 2 REFERENCE DOCUMENTS Approved by: Process Engineer / / / / Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the STS ASE. All users are expected to have read and understood this document. It is

More information

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE INSTALLATION, OPERATION & MAINTENANCE MANUAL INTERFACE DEVICES, INC. 230 Depot Road, Milford, CT 06460 Ph: (203) 878-4648, Fx: (203) 882-0885, E-mail: info@interfacedevices.com

More information

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger

Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger OM008 Installation, Operation and Maintenance Instructions for Pacific PA Non-Storage Heat Exchanger The operating and maintenance instructions contained within this package are for Pacific water/water

More information

Cover Page for Lab Report Group Portion. Head Losses in Pipes

Cover Page for Lab Report Group Portion. Head Losses in Pipes Cover Page for Lab Report Group Portion Head Losses in Pipes Prepared by Professor J. M. Cimbala, Penn State University Latest revision: 02 February 2012 Name 1: Name 2: Name 3: [Name 4: ] Date: Section

More information

SB AXIAL FLOW VALVES

SB AXIAL FLOW VALVES SB9509.3 AXIAL FLOW VALVES The improved technology for pressure regulation The American Axial Flow Valve provides pressure and flow control in high capacity pipelines. It can be used for pressure regulation,

More information

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module:

FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS. This work covers part of outcome 2 of the Edexcel standard module: FLUID POWER FLUID POWER EQUIPMENT TUTORIAL ACCUMULATORS This work covers part of outcome 2 of the Edexcel standard module: UNIT 21746P APPLIED PNEUMATICS AND HYDRAULICS The material needed for outcome

More information

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION

ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION Application Note Doc. G8108-001 Rev. A - 23-Jul-02 ACCURACY, PERFORMANCE, AND HANDLING OF OIL-FILLED DIGIQUARTZ PRESSURE INSTRUMENTATION For more information regarding Digiquartz products contact: Paroscientific,

More information

Pressure Regulators. Operating Instructions. Instrumentation

Pressure Regulators. Operating Instructions. Instrumentation Pressure Regulators Operating Instructions FAILURE OR IMPROPER SELECTION OR IMPROPER USE OF THIS PRODUCT CAN CAUSE DEATH, PERSONAL INJURY AND PROPERTY DAMAGE. This document and other information from the

More information

Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety. Eric Sun. October 12, Experiment Readiness Review of Physics Division.

Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety. Eric Sun. October 12, Experiment Readiness Review of Physics Division. Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety Eric Sun 1 Outline Cryogenic Control Reservoir Relief Valves Rupture Discs Parallel Relief Plates Independent Sizing Calculation Pressure Safety of

More information

Time-Delay Electropneumatic Applications

Time-Delay Electropneumatic Applications Exercise 3-4 EXERCISE OBJECTIVE & & & To introduce time delays; To describe the operation of a time-delay valve; To describe the operation of a time-delay relay. DISCUSSION Time-Delays Time delays are

More information

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website:

Hi-Force Limited Prospect Way Daventry Northants NN11 8PL United Kingdom Tel: +44(0) : Fax: +44(0) : Website: 1.0 Inspection of the product upon receipt: On receipt of the product, visually inspect the item for any evidence of shipping damage. Please note shipping damage is not covered by warranty. If shipping

More information

PART 1 GENERAL..2 Components of the gas chlorination system include, but are not limited to the following:

PART 1 GENERAL..2 Components of the gas chlorination system include, but are not limited to the following: PART 1 GENERAL 1.1 DESCRIPTION.1 This section includes the supply, delivery and installation, testing and placement into operation of a gas chlorination system, and appurtenances as specified herein and

More information

Float Operated Level Controllers

Float Operated Level Controllers CONTENTS Float Operated Level Controllers IM0015 Nov. 2014 PAGE Introduction 1 Scope 1 Description 1 Specification 1 Control Installation 2 INTRODUCTION Side Mount Back Mount Prior to installing, the instructions

More information

General Lockout Training Briefing

General Lockout Training Briefing Page 1 of 5 Introduction What is Lockout? Lockout protects your personnel and plant from injury or accident by ensuring that equipment and machinery is properly isolated during scheduled maintenance, shutdown,

More information

NORMAL OPERATING PROCEDURES Operating Parameter Information

NORMAL OPERATING PROCEDURES Operating Parameter Information Operating Parameter Information Each operator performing the normal operating procedures (routine checks) of the facility should be familiar with the current normal operating parameters of all systems

More information

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply

OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply OIL SUPPLY SYSTEMS ABOVE 45kW OUTPUT 4.1 Oil Supply 4.1.1 General The primary function of a system for handling fuel oil is to transfer oil from the storage tank to the oil burner at specified conditions

More information

Standard Operating and Maintenance Instructions for Pumping System Model PS-90

Standard Operating and Maintenance Instructions for Pumping System Model PS-90 Standard Operating and Maintenance Instructions for Pumping System Model PS-90 High Pressure Equipment Company 2955 West 17th Street, Suite 6 PO Box 8248 Erie, PA 16505 USA 814-838-2028 (phone) 814-838-6075

More information

NGP-250/500 Nitrogen Generator Quick Start Guide

NGP-250/500 Nitrogen Generator Quick Start Guide NGP-250/500 Nitrogen Generator Quick Start Guide Version: A July 2013 Potter Electric Signal Company, LLC 5757 Phantom Dr., Suite 125 P. O. Box 42037 Hazelwood, MO 63042 Phone: (314) 595-6900 Document

More information

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412)

HEAT EXCHANGE AND TRANSFER, INC. 500 Superior Street Carnegie, PA (412) Fax: (412) SECTION Bypass Oil Sampling Station (B.O.S.S 1000) GENERAL.......................... SAFETY........................... Hazards............................... Personal Protective Equipment........... PRODUCT

More information

Air Eliminators and Combination Air Eliminators Strainers

Air Eliminators and Combination Air Eliminators Strainers Description Air Eliminators and Combination Air Eliminator Strainers are designed to provide separation, elimination and prevention of air in piping systems for a variety of installations and conditions.

More information