EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017

Size: px
Start display at page:

Download "EP WELLS DAILY OPERATIONS REPORT Report 1 02/02/2017"

Transcription

1 Report 2/2/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location.94 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud.48 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth,525. Engineer POWER CHARLES TVD,59. Other Supervisor JOHNNY BRASSELL 24 Hr Progress,525. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 2.25 THF Datum Daily NPT(hr/%).5/2.22 Days Ahd(-) Bhnd(+)(5/5) Last Casing MD 2.in@45.65ft Next Casing MD 9.625in@4,5.ft Current Fluid Density(ppg) 8.45 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 2 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure 5 5 Safety Comments: H2S SAFETY, USE OF PERSONAL MONITORS HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 5 24 Hour Summary Operations Summary READY & WALK, PRE-SPUD & DROPS INSP.,N/U CONDUCTOR, DRESS OUT FLOOR EQUIP TO SPUD(BELLS,ELEV,ETC), SER, M/U BHA, DRLG F/ 34' T/ 69',RE-TORQ, CONDUCTOR LEAKING, DRLG & SLIDE F/ 69' T/ 7', INST ROT-HEAD, DRLG F/ 7' T/ 525' Update Since Report Time 244' 24 Hour Forecast CONT DRLG 2.25 SEC AS PER PLAN 2/3/27 9:39:9 Report Version: 4..6R4

2 Report 2/2/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description :3 6. SRF WLK PULL MOUSE HOLES, LAY OVER V-DOOR, DOWN BACK YARD,MOVE CROWN STAND,WALK CATWALK & 2', RAISE V-DOOR & ADJUST 7:3. SRF SSD PRE-SPUD & DROPS INSP. 8:3. SRF RUP N/U CONDUCTOR 9:3.5 SRF RUP DRESS OUT FLOOR EQUIP TO SPUD(BELLS,ELEV,ETC) :.5 SRF SVC SERVICE :3 2. SRF BHA M/U BHA 2:3.5 SRF DRL 69. ROTATE F/ 45.65' T/ 69' ( 7 FPH ) 3:.5 SRF DRL 69. WOB : K RPM : SURFACE 3 MOTOR 5 BIT 8 PRESSURE/FLOW : 3 35 GPM TORQUE : ON BOT 5-6K OFF BOT 2K STRING WEIGHT : P/U 45K S/O 45K ROT 45K MW : 8.8 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE NPT-RE-TORQ, CONDUCTOR LEAKING 3:3 4: 5:.5 SRF DRL 25. ROTATE F/ 69' T/ 25' ( 72 FPH ) WOB : K RPM : SURFACE 3 MOTOR 5 BIT 8 PRESSURE/FLOW : 3 35 GPM TORQUE : ON BOT 5-6K OFF BOT 2K STRING WEIGHT : P/U 45K S/O 45K ROT 45K MW : 8.8 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE. SRF DRL 328. SLIDE F/ 25' T/ 328' ( 23 FPH ) WOB : -2K RPM : SURFACE MOTOR 64 BIT 85 PRESSURE/FLOW : 9 4 GPM STRING WEIGHT : P/U 55K S/O 55K ROT K MW : 9. PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE 6. SRF DRL,7. ROTATE F/ 328' T/ 7' ( 23 FPH ) 2:.5 SRF DRL,7. WOB : 3K RPM : SURFACE 8 MOTOR 3 BIT 2 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 5K S/O 5K ROT K MW : 9. PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE INST ROT-HEAD 2:3 2.5 SRF DRL,525. ROTATE F/ 7' T/ 525' ( 8 FPH ) WOB : 3K RPM : SURFACE 8 MOTOR 3 BIT 2 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 5K S/O 5K ROT K MW : 9. PPG 2/3/27 9:39:9 Report Version: 4..6R4 2

3 Report 2/2/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description MOTOR :.6 RPG GAS : NONE FLARE : NONE Total 22.5 NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status 2/2/27 3: SHELL BOP & Pressure Control Equipment 69. DRL EN Conductor.5 OPEN Description: RE-TORQ, CONDUCTOR LEAKING Title: RE-TORQ, CONDUCTOR LEAKING Total.5 MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) PTW UNKNOWN_ PTW UNKNOWN_ PTW UNKNOWN_26, , PTW UNKNOWN_26, , PTW UNKNOWN_26 Fluid Details Mud type Spud Mud Oil/Water (%)./99. ph/pm (cc) 8./. MD,525. TS/HGS/LGS (%).4// Pf/Mf (cc)./.2 Mud Density (ppg) 8.45 Sand (%). Ca+ (ppm) Vis (s/qt) 28. Cl- (ppm) 76 PV/YP (cp/lbf/ft²)./3. MBT (lbm/bbl) Gels s/m (lbf/ft²)./. LCM (lbm/bbl) API/HTHP WL (cc/3min)./ ECD (ppg) 8.45 R6/3 FC/HTHP FC (32nd")./ H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade 2.25 NATIONAL OILWE SK69M A2337 3x4, 6x Tool MD ,7.,525. WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit Operations Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum../ / / / , / , , ROP cum. (ft/hr) Item description 5" DRILL PIPE 5" HWDP # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 IF /2 IF-B 2/3/27 9:39:9 Report Version: 4..6R4 3

4 Report 2/2/27 Item description 6.5" DCS FILTER SUB STEEL STABILIZER NMDC NON-MAG STABILIZER GAP SUB CARRIER LANDING SUB NMDC STEEL STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 IF-B DR /2 XH-B /2 XH-B DR /8 REG-B MR /8 REG-B DR /8 REG-B DR /8 REG-B DR /8 REG-B G /8 REG-B C /8 REG-B L /8 REG-B X /8 REG-B DR /8 REG-B DR7388 8" BICO MUD MOTOR, 7/8 LOBE, 4. STG,.5 FBH, RPG:.6 SN: BIT # RUN # 2.25" NOV SK69M, 3X4's, 6X5'S SN: /8 REG-B G /8 REG-P A2337 Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/2/27 2: DRILL 2.25" SURFACE SECTION MD 69. SW Up (kip) 45. SW Down (kip) 45. SW Rotn (kip) 45. Drag (kip). Tq On Btm (ft-lbf) 6,. Tq Off Btm (ft-lbf) 2,. Footage ,7., ,. 2, ,. 5, ,. 5, PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 737 GAL DIESEL USED : 85 GAL DIESEL RECEIVED : GAL LNG USED : 44.5 MCF 2/3/27 9:39:9 Report Version: 4..6R4 4

5 Report 2 2/3/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location.94 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud.48 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth 4,8. Engineer POWER CHARLES TVD 4, Other Supervisor JOHNNY BRASSELL 24 Hr Progress 3,275. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 2.25 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 2.in@45.65ft 9.625in@4,5.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 3 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure 3 8 Safety Comments: CLOSING OUT OF CAR REPORT HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill 3 24 Hour Summary Operations Summary DRLG & SLIDE F/ 525' T/ 245', SERVICE, DRLG & SLIDE F/ 245' T/ 3843', SERVICE, DRLG F/ 3843' T/ 48', SERVICE Update Since Report Time TOH TO RUN CSG. 24 Hour Forecast COMPLETE TOH, N/D CONDUCTOR, R/U & RUN 9.5/8s CSG 2/4/27 5:2:7 Report Version: 4..6R4

6 Report 2 2/3/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description : 4. SRF DRL 2,325. ROTATE F/ 525' T/ 2325' ( 2 FPH ) 4: 4:3 WOB : 3K RPM : SURFACE 8 MOTOR 3 BIT 2 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 5K S/O 5K ROT K MW : 9. PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE.5 SRF DRL 2,365. SLIDE F/ 2325' T/ 2365' ( 8 FPH ) WOB : 2-4K RPM : SURFACE MOTOR 3 BIT 3 PRESSURE/FLOW : 9 82 GPM STRING WEIGHT : P/U 5K S/O 5K ROT K MW : 9. PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE.5 SRF DRL 2,45. ROTATE F/ 2365' T/ 245' ( FPH ) 5:.5 SRF SVC 2,45. WOB : 4K RPM : SURFACE 8 MOTOR 3 BIT 2 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 5K S/O 5K ROT K MW : 9.6 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE SERVICE 5:3 8: 9: 2.5 SRF DRL 2,862. ROTATE F/ 245' T/ 2862' ( 78 FPH ) WOB : 4K RPM : SURFACE 8 MOTOR 3 BIT 2 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 3K S/O 2K ROT 25K MW : 9.6 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE. SRF DRL 2,897. SLIDE F/ 2862' T/ 2897' ( 35 FPH ) WOB : 2-4K RPM : SURFACE MOTOR 3 BIT 3 PRESSURE/FLOW : GPM STRING WEIGHT : P/U 35K S/O 25K ROT K MW : 9.6 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE 6.5 SRF DRL 3,843. ROTATE F/ 2897' T/ 3843' ( 45 FPH ) WOB : 4K RPM : SURFACE 8 MOTOR 38 BIT 28 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 4K S/O 3K ROT 35K MW : 9.6 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE 2/4/27 5:2:7 Report Version: 4..6R4 2

7 Report 2 2/3/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Description 5:3.5 SRF SVC 3,843. SERVICE 6: 7.5 SRF DRL 4,8. ROTATE F/ 3843' T/ 48' ( 27 FPH ) 23:3.5 SRF SVC 4,8. WOB : 4K RPM : SURFACE 8 MOTOR 38 BIT 28 PRESSURE/FLOW : GPM TORQUE : ON BOT 5-K OFF BOT 5K STRING WEIGHT : P/U 4K S/O 3K ROT 35K MW : 9.6 PPG MOTOR :.6 RPG GAS : NONE FLARE : NONE SERVICE Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 3, , PTW UNKNOWN_26 3, , PTW UNKNOWN_26 3, , PTW UNKNOWN_26 3, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 Fluid Details Mud type Spud Mud Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade 2.25 NATIONAL OILWE SK69M A2337 3x4, 6x Tool Bit Operations MD WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. ROP cum. (ft/hr) Item description 5" DRILL PIPE 5" HWDP 6.5" DCS # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 22 3, /2 IF /2 IF-B /2 IF-B DR /2 XH-B /2 XH-B DR /4/27 5:2:7 Report Version: 4..6R4 3

8 Report 2 2/3/27 Item description FILTER SUB STEEL STABILIZER NMDC NON-MAG STABILIZER GAP SUB CARRIER LANDING SUB NMDC STEEL STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /8 REG-B MR /8 REG-B DR /8 REG-B DR /8 REG-B DR /8 REG-B G /8 REG-B C /8 REG-B L /8 REG-B X /8 REG-B DR /8 REG-B DR7388 8" BICO MUD MOTOR, 7/8 LOBE, 4. STG,.5 FBH, RPG:.6 SN: BIT # RUN # 2.25" NOV SK69M, 3X4's, 6X5'S SN: /8 REG-B G /8 REG-P A2337 Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/2/27 2: DRILL 2.25" SURFACE SECTION PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 227 GAL DIESEL USED : 2598 GAL DIESEL RECEIVED : 758 GAL LNG USED :.3 MCF 2/4/27 5:2:7 Report Version: 4..6R4 4

9 2/6/27 8:8:58 Report Version: 4..6R8 Report 4 2/5/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 3.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 2.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth 4,854. Engineer POWER CHARLES TVD 4,84.75 Other Supervisor JOHNNY BRASSELL 24 Hr Progress. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 2.25 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 452,959/2,985,39..5,55 Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 2.in@45.65ft 9.625in@4,854.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 25 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure 5 Safety Comments: PD PRE-SPUD CHECK LIST & DROPS BEING DONE Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test HSE Drills JSA's/Toolbox Talks Days Since Last Drill 3 24 Hour Summary Operations Summary GING DOWN & PREP TO WALK TO 54H., WALK F/ 55H T/ 54H, LEVEL & SQ, R/U ON 54H, NOTE: HELD PAUSE, OVER HOISTING OPERATIONS & SECUREMENT OF HOIST WHLIE NOT IN USE, LOOK UP AT TDS INSURE CABLE IS CLEAR, AND ALL PTW s ARE REVIEWED FOR EVERY TASK Update Since Report Time R/U ON 54H 24 Hour Forecast COMP R/U ON 54H, M/U 8.3/4 VERT BHA, TIH, DRILL DV-TOOL, TIH, DRILL SHOE TRACK, & NEW FORMATION.

10 2/6/27 8:8:58 Report Version: 4..6R8 2 Report 4 2/5/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description 6: 6.5 SRF RCC 4,854. GING DOWN & PREP TO WALK TO 54H. 22:3.5 INT WLK 4,854. WALK F/ 55H T/ 54H, LEVEL & SQ, R/U ON 54H, NOTE: HELD PAUSE, OVER HOISTING OPERATIONS & SECUREMENT OF HOIST WHLIE NOT IN USE, LOOK UP AT TDS INSURE CABLE IS CLEAR, AND ALL PTW s ARE REVIEWED FOR EVERY TASK Total 8. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 3, , PTW UNKNOWN_26 3, , PTW UNKNOWN_26 3, , PTW UNKNOWN_26 3, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Tool PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 2634 GAL DIESEL USED : 67 GAL DIESEL RECEIVED : GAL LNG USED : 2.4 MCF

11 2/7/27 7:22: Report Version: 4..6R8 Report 5 2/6/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 4.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 3.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth 4,854. Engineer POWER CHARLES TVD 4,84.27 Other Supervisor ROSS GRAHAM 24 Hr Progress. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 8.75 THF Datum Daily NPT(hr/%).5/6.25 Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 493,849/2,985, ,89 Last Casing MD 9.625in@4,848.ft Next Casing MD 7.in@2,2.ft Current Fluid Density(ppg) 9.55 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 26 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure Safety Comments: PIN THAT HELD ONE OF THE PULLEYS ON FOR THE CLIMB ASSIST WEIGHT BUCKET CAME OUT, CAUSING THE PULLEY TO DESCEND TO THE FLOOR. NO ONE WAS ON THE FLOOR AT THE TIME. INVESTIGATION IN PROGRESS. Drills/Tests Date Days Since Last HSE Drills Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary FINISH R/U. M/U BHA AND TIH, DRILL DV TOOL, TIH TO FLOAT COLLAR, SLIP AND CUT DRILL LINE. Update Since Report 4: - DRILLING AHEAD AT 5446'. 24 Hour Forecast DRILL AHEAD IN 8 3/4'' HOLE.

12 2/7/27 7:22: Report Version: 4..6R8 2 Report 5 2/6/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description : 6. INT WLK 4,854. ADJUST SUITCASES. MOVE MATTING AROUND TO CLOSE GAPS. ELECTRICIAN WORKING ON SHAKER #3. WORK THROUGH PRE-SPUD CHECKLIST. R/U CLIMB ASSIST AND GERONIMO LINE. LOWER BOP ONTO WELLHEAD. N/U FLOWLINE, F/U LINE, AND CATCH CAN DRAIN HOSES. R/U 4'' AND 2'' LINES ON FLARE SUITCASES. 6: 2: 3: 5: 6: 7:3 8: 8:3 9: 9:3 22: 23:3 HAD SAFETY STANDDOWN FROM 33 TO 4 ON WEIGHT BUCKET INCIDENT. AFTER WALKING AND GOING BACK UP TO FLOOR, CREW NOTICED PULLEY FROM WEIGHT BUCKET ON THE FLOOR. 6. INT WLK 4,854. R/U PVC FROM SHAKER PIT. FINISH R/U 2'' FLARE LINE, FABRICATE 4'' PANIC LINE. CENTER STACK AND TIGHTEN TURNBUCKLES. CHANGE OUT SHAKER SCREENS. REMOVE WEIGHT BUCKETS FOR CLIMB ASSIST.. INT PUP 4,854. L/O BHA. INSTALL WEAR BUSHING. 2. INT BHA 4,854. M/U BHA. INSTALL NEW WEIGHT BUCKET FOR CLIMB ASSIST.. INT TIH 4,854. TIH WITH DC'S FROM 24' TO 59'..5 INT TIH 4,854. NPT - REMOVE FLOWLINE AND INSTALL NEW GASKET DUE TO LEAK..5 INT TIH 4,854. TIH FROM 59' TO 97'..5 INT TIH 4,854. TIH FROM 97' TO DV TOOL AT 24'..5 INT TIH 4,854. FILL PIPE AND BREAK CIRCULATION, CHECK ALL LINES FOR LEAKS..5 INT DCM 4,854. DRILL OUT DV TOOL. 2.5 INT TIH 4,854. TIH FROM 24' TO 4726'..5 INT CUT 4,854. SLIP AND CUT 9'. PERFORM BRAKE CAPACITY TEST..5 INT DCM 4,854. FILLL PIPE, BREAK CIRCULATION, TAG FLOAT COLLAR AT 4759'. Total 24. NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status 2/6/27 6: PRECISION Rig/Work DRILLING Unit Misc COMPANY LP 4,854. TIH N.5 OPEN Description: REMOVE FLOWLINE AND INSTALL NEW GASKET DUE TO LEAK Title: REMOVE FLOWLINE AND INSTALL NEW GASKET DUE TO LEAK MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec Total DLeg ( /ft) 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 4, , PTW UNKNOWN_26 Tool.5

13 2/7/27 7:22: Report Version: 4..6R8 3 Report 5 2/6/27 Fluid Details Mud type NaCl Brine Oil/Water (%)./92. ph/pm (cc) 8.5/. MD 4,825. TS/HGS/LGS (%).6/./.5 Pf/Mf (cc)./.5 Mud Density (ppg) 9.55 Sand (%). Ca+ (ppm) Vis (s/qt) 28. Cl- (ppm) 28, PV/YP (cp/lbf/ft²)./3. MBT (lbm/bbl) Gels s/m (lbf/ft²)./. LCM (lbm/bbl) API/HTHP WL (cc/3min)./ ECD (ppg) R6/3 FC/HTHP FC (32nd")./ H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 E x6 4, Bit Operations MD WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. ROP cum. (ft/hr) Item description 5" DRILL PIPE # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 23 3, (4) STANDS HWDP /2 IF-B (5) STANDS DCS FILTER SUB STEEL STABILIZER NMDC GAP SUB CARRIER LANDING SUB NM STABILIZER NMPC STEEL STABILIZER /2 IF-B DR /2 XH-B /2 XH-P MR /2 XH-B DR /2 XH-B DR /2 XH-B G /2 XH-B C /2 XH-B L /2 XH-B X /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 XH-B DR /4" SCIENTIFIC MUD MOTOR, 7/8 LOBE, 9.4 STG,.5 FXD, BIT #2 RUN # 8.75" NOV TK76 7X6'S SN: E /2 FH-B SP /2 REG-P E Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/6/27 5: DRILL 8.75" INTERMEDIATE SECTION PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2.

14 2/7/27 7:22: Report Version: 4..6R8 4 Report 5 2/6/27 DIESEL ON HAND : 27 GAL DIESEL USED : 627 GAL DIESEL RECEIVED : GAL LNG USED : MCF Remarks

15 2/8/27 6:5:34 Report Version: 4..6R8 Report 6 2/7/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 5.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 4.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth 7,64. Engineer POWER CHARLES TVD 7,59.4 Other Supervisor ROSS GRAHAM 24 Hr Progress 2,75. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 8.75 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 55,92/2,985, ,42 Last Casing MD 9.625in@4,848.ft Next Casing MD 7.in@2,2.ft Current Fluid Density(ppg) 9.2 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 27 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure Safety Comments: HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary DRILLED SHOE TRACK. DRILL IN 8 3/4'' HOLE FROM 4854' TO 764' WITH LOSSES. Update Since Report 3:3 - DRILLING AHEAD AT 826'. 24 Hour Forecast DRILL AHEAD IN 8 3/4'' HOLE TO KOP.

16 2/8/27 6:5:34 Report Version: 4..6R8 2 Report 6 2/7/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description :. INT DCM 4,854. DRILL SHOE TRACK FROM 4759' TO 4854'. : 2:. INT DRL 4,995. ROTATE F/ 4854' T/ 4995' ( 4 FPH ) WOB: 3-4K RPM: SURFACE 2 MOTOR 2 BIT 22 PRESSURE & FLOW: 36 7 GPM TORQUE:.3K ON BOT 6.5K OFF BOT WEIGHTS: P/U 235K S/O 92K ROT 2K MW: 9.3 PPG MOTOR:.28 RPG GAS: BG 35 CG 5 FLARE: NONE. INT DRL 5,25. ROTATE F/ 4995' T/ 525' ( 22 FPH ) WOB: 4-45K RPM: SURFACE 8 MOTOR 65 BIT 245 PRESSURE & FLOW: GPM TORQUE: ON BOT.3K OFF BOT 6.5K WEIGHTS: P/U 237K S/O 94K ROT 25K MW: 9.3 PPG MOTOR:.28 RPG GAS: BG 35 CG 5 FLARE: NONE 3: 5: *ENCOUNTERED FULL 5', CUT PUMP RATE BACK AND PUMPED FRESH WATER, REGAINED 59'. 2. INT DRL 5,65. ROTATE F/ 525' T/ 565' ( 28 FPH ) WOB: 4-45K RPM: SURFACE 8 MOTOR 2 BIT 28 PRESSURE & FLOW: 34 7 GPM TORQUE: ON BOT.3K OFF BOT 6.5K WEIGHTS: P/U XXXK S/O XXXK ROT XXXK MW: 9.3 PPG MOTOR:.28 RPG GAS: BG 35 CG 5 FLARE: NONE 4. INT DRL 6,99. ROTATE F/ 565' T/ 699' ( 96 FPH ) WOB: 2-4K RPM: SURFACE 8 MOTOR 4 BIT 22 PRESSURE & FLOW: 2 5 GPM TORQUE: ON BOT 2K OFF BOT 8K WEIGHTS: P/U 264K S/O 28K ROT 223K MW: 9. PPG MOTOR:.28 RPG GAS: BG 7 CG 85 FLARE: NONE 9: 2: *ENCOUNTERED FULL 565', CUT PUMP RATE BACK AND PUMPED FRESH WATER, REGAINED PARTIAL 64'.. INT DRL 6,99. PICK UP OFF BOTTOM AND PUMP FRESH WATER AT REDUCED RATE TO TRY AND ESTABLISH FULL RETURNS. MW DOWN TO 8.9 PPG, 75% RETURNS. 4. INT DRL 7,64. ROTATE F/ 699' T/ 764' ( 54 FPH ) WOB: 4-45K RPM: SURFACE 2 MOTOR 4 BIT 6 PRESSURE & FLOW: 26 5 GPM TORQUE: ON BOT 3.7K OFF BOT 8.5K WEIGHTS: P/U 278K S/O 228K ROT 234K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG CG

17 2/8/27 6:5:34 Report Version: 4..6R8 3 Report 6 2/7/27 Time Summary Start Hours PH OPN Detail Drilled NPT Rig Description Depth level Rate FLARE: NONE Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 6, , PTW UNKNOWN_26 6, , PTW UNKNOWN_26 7, , PTW UNKNOWN_26 7, , PTW UNKNOWN_26 7, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%)./95.5 ph/pm (cc) 7./.5 MD 6,785. TS/HGS/LGS (%) 3./.7/.3 Pf/Mf (cc)./.5 Mud Density (ppg) 9.2 Sand (%). Ca+ (ppm) Vis (s/qt) 28. Cl- (ppm) 26, PV/YP (cp/lbf/ft²)./3. MBT (lbm/bbl) Gels s/m (lbf/ft²)./. LCM (lbm/bbl) API/HTHP WL (cc/3min)./ ECD (ppg) 9.33 R6/3 FC/HTHP FC (32nd")./ H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 E x6 4, Tool MD 4,995. 5,25. 5,65. 6,99. 7,64. WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit Operations Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. 3./ , / , / , / , , , / , , ROP cum. (ft/hr) Item description 5" DRILL PIPE # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 2 6, (4) STANDS HWDP /2 IF-B (5) STANDS DCS FILTER SUB STEEL STABILIZER NMDC GAP SUB CARRIER LANDING SUB /2 IF-B DR /2 XH-B /2 XH-P MR /2 XH-B DR /2 XH-B DR /2 XH-B G /2 XH-B C /2 XH-B L65-8

18 2/8/27 6:5:34 Report Version: 4..6R8 4 Report 6 2/7/27 Item description NM STABILIZER NMPC STEEL STABILIZER # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no /2 XH-B X /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 XH-B DR /4" SCIENTIFIC MUD MOTOR, 7/8 LOBE, 9.4 STG,.5 FXD, BIT #2 RUN # 8.75" NOV TK76 7X6'S SN: E /2 FH-B SP /2 REG-P E Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/6/27 5: DRILL 8.75" INTERMEDIATE SECTION MD 4,995. SW Up (kip) 235. SW Down (kip) 92. SW Rotn (kip) 2. Drag (kip) 25. Tq On Btm (ft-lbf),3. Tq Off Btm (ft-lbf) 6,5. Footage 4. 5,25. 5,65. 6,99. 7, ,3. 6, ,3. 6, ,. 8,., ,7. 8, PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 9 GAL DIESEL USED : 97 GAL DIESEL RECEIVED : GAL LNG USED : 2.65 MCF

19 2/9/27 6:2:45 Report Version: 4..6R8 Report 7 2/8/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 6.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 5.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth 9,647. Engineer POWER CHARLES TVD 9,632.4 Other Supervisor ROSS GRAHAM 24 Hr Progress 2,43. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 8.75 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 59,375/2,985, ,283 Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 9.625in@4,848.ft 7.in@2,2.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 28 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure Safety Comments: Drill Category Drill Type Detection (sec) Drills Complete (sec) Crew drilled Pass / Fail PIC Comments Control Crew BOP. 45. Day/Night Pass KEVIN BERGERON GOOD DRILL HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test JSA's/Toolbox Talks Days Since Last Drill Hour Summary DRILLED IN 8 3/4'' HOLE FROM 764' TO 9647'. Update Since Report Time Operations 4:3 - DRILLED TO 98' WHERE ROP FELL OFF TO 2-3 FPH. CURRENTLY TOOH AT 8'. 24 Hour Forecast DRILL AHEAD TO KOP AT 96'.

20 2/9/27 6:2:45 Report Version: 4..6R8 2 Report 7 2/8/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description : 4.5 INT DRL 8,24. ROTATE F/ 764' T/ 824' ( 6 FPH ) 4:3 5: 8:3 WOB: 4-45K RPM: SURFACE 2 MOTOR 4 BIT 6 PRESSURE & FLOW: 26 5 GPM TORQUE: ON BOT 3.5K OFF BOT 8.5K WEIGHTS: P/U 278K S/O 228K ROT 234K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG CG FLARE: NONE.5 INT SVC 8,24. SERVICE 3.5 INT DRL 9,2. ROTATE F/ 824' T/ 92' ( 8 FPH ) WOB: 4-45K RPM: SURFACE 2 MOTOR 4 BIT 6 PRESSURE & FLOW: 29 5 GPM TORQUE: ON BOT 3.5K OFF BOT 8.5K WEIGHTS: P/U 32K S/O 26K ROT 27K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG CG FLARE: NONE 5.5 INT DRL 9,647. ROTATE F/ 92' T/ 9647' ( 82 FPH ) WOB: 4-45K RPM: SURFACE 6 MOTOR 82 BIT 242 PRESSURE & FLOW: GPM TORQUE: ON BOT 4K OFF BOT 8.5K WEIGHTS: P/U 32K S/O 274K ROT 28K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG CG FLARE: NONE Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 8, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 E x6 4, Tool

21 2/9/27 6:2:45 Report Version: 4..6R8 3 Report 7 2/8/27 Bit Operations MD WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. ROP cum. (ft/hr) Item description 5" DRILL PIPE # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no , (4) STANDS HWDP /2 IF-B (5) STANDS DCS FILTER SUB STEEL STABILIZER NMDC GAP SUB CARRIER LANDING SUB NM STABILIZER NMPC STEEL STABILIZER /2 IF-B DR /2 XH-B /2 XH-P MR /2 XH-B DR /2 XH-B DR /2 XH-B G /2 XH-B C /2 XH-B L /2 XH-B X /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 XH-B DR /4" SCIENTIFIC MUD MOTOR, 7/8 LOBE, 9.4 STG,.5 FXD, BIT #2 RUN # 8.75" NOV TK76 7X6'S SN: E /2 FH-B SP /2 REG-P E Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/6/27 5: DRILL 8.75" INTERMEDIATE SECTION PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 9445 GAL DIESEL USED : 645 GAL DIESEL RECEIVED : GAL LNG USED :.94 MCF

22 2/2/27 6:23:4 Report Version: 4..6R8 Report 8 2/9/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 7.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 6.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth 9,8. Engineer POWER CHARLES TVD 9,785.2 Other Supervisor ROSS GRAHAM 24 Hr Progress 53. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 8.75 THF Datum Daily NPT(hr/%) / Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 628,366/2,985, ,37 Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 9.625in@4,848.ft 7.in@2,2.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 29 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure Safety Comments: PERFORMED HAZZARD HUNT. HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test 2/8/27 2/8/27 3//27 JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary DRILL FROM 9647' TO 98' WHERE ROP FELL OFF. PUMP SLUG AND TOOH. R/B BHA AND BREAK BIT. CHANGE SLIDES AND SAVER SUB ON TOPDRIVE. Update Since Report 4: - TIH AT 27'. 24 Hour Forecast TIH, DRILL TO KOP AT 96', TOOH AND P/U CURVE ASSEMBLY.

23 2/2/27 6:23:4 Report Version: 4..6R8 2 Report 8 2/9/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description : 3. INT DRL 9,8. ROTATE F/ 9647' T/ 98' ( 5 FPH ) 3: 3:3 : :3 4:3 23:3 WOB: 4-45K RPM: SURFACE 6 MOTOR 82 BIT 242 PRESSURE & FLOW: GPM TORQUE: ON BOT 4K OFF BOT 8.5K WEIGHTS: P/U 32K S/O 274K ROT 28K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG CG FLARE: NONE.5 INT CDM 9,8. NPT - PUMP SLUG. 6.5 INT TOH 9,8. NPT - TOOH FROM 98' TO 47'..5 INT TOH 9,8. NPT - RACK BACK DIRECTIONAL TOOLS, BREAK BIT. BIT GRADE 2-8-BT-A-X-I-RO-ROP. 4. INT BOP 9,8. NPT - CLEAN AND CLEAR FLOOR. FUNCTION TEST ALL BOP EQUIPMENT. CHECK SAVER SUB. PERFORM HAZZARD HUNT AND MITIGATE FINDINGS. 9. INT TOH 9,8. NPT - PRECISION - CHANGE OUT SLIDES ON TOPDRIIVE. ALL ALLEN BOLTS FROZE UP. HAD TO CUT SLIDES AWAY WITH SAWZALL AND REMOVE BOLTS WITH PIPE WRENCH. INSTALL NEW SLIDES AND SHIM TOPDRIVE..5 INT BHA 9,8. NPT - CHANGE OUT SAVER SUB. Total 24. MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft) 8, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 9, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 E x6 4,854. 9, BT-A--I-RO-PR Tool Bit Operations MD WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. ROP cum. (ft/hr)

24 2/2/27 6:23:4 Report Version: 4..6R8 3 Report 8 2/9/27 Item description 5" DRILL PIPE # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 28 8, (4) STANDS HWDP /2 IF-B (5) STANDS DCS FILTER SUB STEEL STABILIZER NMDC GAP SUB CARRIER LANDING SUB NM STABILIZER NMPC STEEL STABILIZER /2 IF-B DR /2 XH-B /2 XH-P MR /2 XH-B DR /2 XH-B DR /2 XH-B G /2 XH-B C /2 XH-B L /2 XH-B X /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 XH-B DR /4" SCIENTIFIC MUD MOTOR, 7/8 LOBE, 9.4 STG,.5 FXD, BIT #2 RUN # 8.75" NOV TK76 7X6'S SN: E /2 FH-B SP /2 REG-P E Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/6/27 5: 2/9/27 : DRILL 8.75" INTERMEDIATE SECTION PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 88 GAL DIESEL USED : 44 GAL DIESEL RECEIVED : GAL LNG USED :. MCF

25 2/2/27 7:46:28 Report Version: 4..6R8 Report 9 2/2/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 8.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 7.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth,935. Engineer POWER CHARLES TVD,99.25 Other Supervisor ROSS GRAHAM 24 Hr Progress,35. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 8.75 THF Datum Daily NPT(hr/%) 8.5/35.42 Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 695,272/2,985, ,752 Last Casing MD 9.625in@4,848.ft Next Casing MD 7.in@2,2.ft Current Fluid Density(ppg) 8.8 LOT/FIT EMW(ppg) Lithology Formation/MD Top Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 3 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure 5 Safety Comments: HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test 2/9/27 2/8/27 3//27 2 JSA's/Toolbox Talks Days Since Last Drill 8 24 Hour Summary Operations Summary FINISH CHANGING SAVER SUB, TIH AND DRILL FROM 98' TO KOP AT 935'. TOOH TO P/U CURVE ASSEMBLY. Update Since Report 4: - M/U CURVE BHA. 24 Hour Forecast FINISH TOOH, P/U CURVE ASSEMBLY, TIH AND DRILL CURVE.

26 2/2/27 7:46:28 Report Version: 4..6R8 2 Report 9 2/2/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description :. INT BHA 9,8. NPT - CHANGE OUT SAVER SUB. : 2: 8: 8:3 : 8: 2: 2:45. INT BHA 9,8. NPT - P/U MOTOR AND NEW BIT. 6. INT TIH 9,8. NPT - TIH TO 98' WITH NO RETURNS..5 INT TIH 9,8. NPT - WASH AND REAM DOWN TO BOTTOM..5 INT DRL 9,96. ROTATE F/ 98' T/ 996' ( 77 FPH ) WOB: 2-25K RPM: SURFACE 5 MOTOR 4 BIT 9 PRESSURE & FLOW: 23 5 GPM TORQUE: ON BOT 4.5K OFF BOT 8.5K WEIGHTS: P/U 352K S/O 275K ROT 29K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG 3 CG 25 FLARE: NONE 8. INT DRL,643. ROTATE F/ 996' T/ 643' ( 9 FPH ) WOB: 35-4K RPM: SURFACE 7 MOTOR 68 BIT 238 PRESSURE & FLOW: 29 6 GPM TORQUE: ON BOT 5K OFF BOT 8.5K WEIGHTS: P/U 356K S/O 277K ROT 3K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG 3 CG 27 FLARE: NONE 3. INT DRL,935. ROTATE F/ 643' T/ 935' ( 98 FPH ) WOB: 35-4K RPM: SURFACE 7 MOTOR 68 BIT 238 PRESSURE & FLOW: 29 6 GPM TORQUE: ON BOT 5K OFF BOT 8.5K WEIGHTS: P/U 356K S/O 277K ROT 3K MW: 8.8 PPG MOTOR:.28 RPG GAS: BG 3 CG 27 FLARE: NONE.75 INT CDM,935. PUMP SWEEPS, PUMP SLUG INT TOH,935. TOOH FROM 935' TO 5237'. HOLE TAKING SLIGHTLY MORE THAN CALCULATED FILL. Total 24. NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status 2/9/27 4:3 PRECISION Rig/Work DRILLING Unit Misc COMPANY LP 9,8. TOH EN Top Drive/Power Swivel OPEN Description: CHANGE SLIDES, SHIM TOPDRIVE, CHANGE SAVER SUB. Title: TOPDRIVE REPAIR Total.5.5 MD Inc. Azi. TVD N/S Deepest 5 Surveys E/W V.Sec DLeg ( /ft), , PTW UNKNOWN_26, , PTW UNKNOWN_26 Tool

27 2/2/27 7:46:28 Report Version: 4..6R8 3 Report 9 2/2/27 Deepest 5 Surveys MD Inc. Azi. TVD N/S E/W V.Sec DLeg Tool ( /ft), , PTW UNKNOWN_26, , PTW UNKNOWN_26, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%)./97.3 ph/pm (cc)./.5 MD,275. TS/HGS/LGS (%).8// Pf/Mf (cc)./.2 Mud Density (ppg) 8.8 Sand (%).5 Ca+ (ppm) Vis (s/qt) 28. Cl- (ppm) 35, PV/YP (cp/lbf/ft²)./3. MBT (lbm/bbl) Gels s/m (lbf/ft²)./. LCM (lbm/bbl) API/HTHP WL (cc/3min)./ ECD (ppg) 8.96 R6/3 FC/HTHP FC (32nd")./ H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 A x6 9, MD 9,96.,643.,935. WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit Operations Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. 2./ , / , / , , ROP cum. (ft/hr) Item description 5" DRILL PIPE # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 37 9, (4) STANDS HWDP /2 IF-B (5) STANDS DCS FILTER SUB STEEL STABILIZER NMDC GAP SUB CARRIER LANDING SUB NM STABILIZER NMPC STEEL STABILIZER 6-3/4" SCIENTIFIC MUD MOTOR, 7/8 LOBE, 9.4 STG,.5 FXD, BIT #3 RUN # 8.75" NOV TK76 7X6'S SN: A /2 IF-B DR /2 XH-B /2 XH-P MR /2 XH-B DR /2 XH-B DR /2 XH-B G /2 XH-B C /2 XH-B L /2 XH-B X /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 FH-B SP A23467

28 2/2/27 7:46:28 Report Version: 4..6R8 4 Report 9 2/2/27 Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/2/27 4: DRILL 8.75" INTERMEDIATE SECTION MD 9,96. SW Up (kip) 352. SW Down (kip) 275. SW Rotn (kip) 29. Drag (kip) 62. Tq On Btm (ft-lbf) 4,5. Tq Off Btm (ft-lbf) 8,5. Footage 6.,643., ,. 8, ,. 8, PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 487 GAL DIESEL USED : 429 GAL DIESEL RECEIVED : 7499 GAL LNG USED : MCF

29 2/22/27 5:38:6 Report Version: 4..6R8 Report 2/2/27 Company Type WBS No/API No PERMIAN Development / Event Summary Event Type Drilling only Event Start Date 2/2/27 Days on Location 9.4 Objective Drill - Wolfcamp Shale Original Spud Date 2/2/27 Days Since Spud 8.58 Est. Days 23. Contractor PRECISION Work Unit PRECISION 563 Days To Release Rig Phone/FAX No. Status Supervisor KEVIN BERGERON Measured Depth,649. Engineer POWER CHARLES TVD,478. Other Supervisor ROSS GRAHAM 24 Hr Progress 74. Depth Ref/Grd Elev/Water Depth DFE: 2,76.75 / 2,736. Hole size 8.75 THF Datum Daily NPT(hr/%)./4.7 Days Ahd(-) Bhnd(+)(5/5) Actual cost to date/afe Actual divided by AFE Daily Cost 732,694/2,985, ,743 Last Casing MD Next Casing MD Current Fluid Density(ppg) LOT/FIT EMW(ppg) Lithology Formation/MD Top 9.625in@4,848.ft 7.in@2,2.ft Last Incident HSE Summary Date Days Last Incident Date Days KPI's LWC RWC MTC FAC Last casing pressure test 2/5/27 PSI NII HPI GOAL ZERO DAYS PS BARRIER EVENT PS barrier bowtie review /3/26 3 TRCF LWCF Safety Cards - Safe Safety Card - Unsafe SSE% Last casing pressure Safety Comments: HSE Drills Drills/Tests Date Days Since Last Last Derrick Inspection Last BOP function test Last BOP Test Next BOP Test 2/9/27 2/8/27 3// JSA's/Toolbox Talks Days Since Last Drill Hour Summary Operations Summary TOOH, P/U CURVE ASSEMBLY, TIH, DRILL 8 3/4'' CURVE FROM 935' TO 649'. WORK AND FREE STUCK PIPE AT 649'. Update Since Report 4: - PERFORMING C/U CYCLES AT TD PREPARING TO TOOH. 24 Hour Forecast TD CURVE, PUMP C/U CYLES AND TOOH, R/U AND RUN 7'' CASING.

30 2/22/27 5:38:6 Report Version: 4..6R8 2 Report 2/2/27 Time Summary Start Hours PH OPN Detail Drilled Depth NPT level Rig Rate Description :.5 INT TOH,935. TOOH FROM 5237' TO 986'. HOLE TAKING SLIGHTLY MORE THAN CALCULATED FILL. :3.5 INT TOH,935. REMOVE ROTATING HEAD. 2: 3: 5: 3:. INT TOH,935. TOOH WITH HWDP AND DC'S FROM 986' TO BHA. 2. INT BHA,935. HANDLE BHA. L/D STABILIZERS, P/U NMFC, RACK BACK BHA, BREAK BIT, L/D BIT AND MOTOR. P/U NEW MOTOR, M/U FLOAT SUB AND BIT. 8. INT TIH,935. TIH FROM BHA TO 935'. HOLE GIVING PROPER DISPLACMENT.. INT DRL,649. SLIDE DRILLING PARAMETERS : WOB: 3-6K RPM: SURFACE MOTOR 3 BIT 3 PRESSURE & FLOW: GPM MW: 9. PPG MOTOR:.5 RPG GAS: BG CG 27 FLARE: NONE ROTATE DRILLING PARAMETERS : WOB: 2K RPM: SURFACE 2 MOTOR 3 BIT 32 PRESSURE & FLOW: 29 6 GPM TORQUE: ON BOT 3-5K OFF BOT 8-K WEIGHTS: P/U 32K S/O 23K ROT 27K MW: 9. PPG MOTOR:.5 RPG GAS: BG CG 27 FLARE: NONE 23: SLIDE FROM 935' TO 55' 44 FPH) ROTATE TO 95' 8 FPH) SLIDE TO 245' FPH) ROTATE TO 35' 2 FPH) SLIDE TO 334' 6 FPH) ROTATE TO 379' 9 FPH) SLIDE TO 424' 8 FPH) ROTATE TO 464' 8 FPH) SLIDE TO 54' FPH) ROTATE TO 558' 88 FPH) SLIDE TO 64' 92 FPH) ROTATE TO 633' 6 FPH) SLIDE TO 649' 64 FPH). INT DRL,649. NPT-GOT STUCK AT 649' WHILE ON BOTTOM DRILLING. WORK PIPE WITH 2K TORQUE AND PULL 75K OVER TO FREE. Total 24. NPT Summary Start Date/Time Responsible Company NPT Code Failure MD Ops Code Type* Equipment Type Net time Gross time Severity Status 2/2/27 23: SHELL BH Stuck Pipe,649. DRL N.. OPEN Description: GOT STUCK AT 649' WHILE ON BOTTOM DRILLING. WORK PIPE WITH 2K TORQUE AND PULL 75K OVER TO FREE Title: WORK STUCK PIPE Total.. Deepest 5 Surveys MD Inc. Azi. TVD N/S E/W V.Sec DLeg ( /ft), , PTW UNKNOWN_26, , PTW UNKNOWN_26 Tool

31 2/22/27 5:38:6 Report Version: 4..6R8 3 Report 2/2/27 Deepest 5 Surveys MD Inc. Azi. TVD N/S E/W V.Sec DLeg ( /ft), , PTW UNKNOWN_26, , PTW UNKNOWN_26, , PTW UNKNOWN_26 Fluid Details Mud type NaCl Brine Oil/Water (%) ph/pm (cc) MD TS/HGS/LGS (%) Pf/Mf (cc) Mud Density (ppg) Sand (%) Ca+ (ppm) Vis (s/qt) Cl- (ppm) PV/YP (cp/lbf/ft²) MBT (lbm/bbl) Gels s/m (lbf/ft²) LCM (lbm/bbl) API/HTHP WL (cc/3min) ECD (ppg) R6/3 FC/HTHP FC (32nd") H2S (gas unit) R2/ KCl (%) R6/3 FL temp. ( F) Ditch Magnet in Last 24hrs/Cum. (gm) Bit Details Bit no. Size Manufacturer Model no. Class IADC code Serial no. Size (32nd") MD in MD out IADC Dull Grade NATIONAL OILWE TK76 A x6 9,8., Tool Bit Operations MD WOB Min/Max (kip) Current RPM (rpm) Flow rate (gpm) SPP P bit Bit HHP (hp) Hours Footage ROP (ft/hr) Hours cum Footage cum. ROP cum. (ft/hr) Item description 5" DRILL PIPE # Jts Length Drillstring Components OD Max OD ID Connection Name Weight (ppf) Grade Serial no. 37 9, (4) STANDS HWDP /2 IF-B (5) STANDS DCS FILTER SUB STEEL STABILIZER NMDC GAP SUB CARRIER LANDING SUB NM STABILIZER NMPC STEEL STABILIZER 6-3/4" SCIENTIFIC MUD MOTOR, 7/8 LOBE, 9.4 STG,.5 FXD, BIT #3 RUN # 8.75" NOV TK76 7X6'S SN: A /2 IF-B DR /2 XH-B /2 XH-P MR /2 XH-B DR /2 XH-B DR /2 XH-B G /2 XH-B C /2 XH-B L /2 XH-B X /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 XH-B DR /2 FH-B SP A23467

32 2/22/27 5:38:6 Report Version: 4..6R8 4 Report 2/2/27 Drillstring Details Date/Time in Date/Time out BHA no. BHA Length Min. ID Purpose 2/2/27 8:3 2/2/27 3: DRILL 8.75" INTERMEDIATE SECTION PUMP/HYDRAULIC DATA Pump Type Make/Model Stroke No. JJMMC / F-6 2. Liner size Efficiency (%) Pressure SPM (spm) Output (gpm) Kill SPM/Pressure/Depth (spm/psi/ft) 2 JJMMC / F-6 2. Remarks DIESEL ON HAND : 3575 GAL DIESEL USED : 296 GAL DIESEL RECEIVED : GAL LNG USED : MCF

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 04/21/2017 4/22/217 8:23:32 Report Version: 4.1.16R9 Generated from data in EDM/Opens/PROFILE 1 RESTRICTED Report 29 4/21/217 Company Type bore WBS No/API No PERMIAN Development 3256997 / 42313354. Event Summary

More information

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016

EP WELLS DAILY OPERATIONS REPORT Report 19 05/26/2016 Report 19 5/26/216 Company Type WBS No/API No PERMIAN Exploration 324861 / 423132849. Event Summary Event Type Drilling only Event Start Date 4/24/216 Days on Location 18.67 Objective Drill - Wolfcamp

More information

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017

EP WELLS DAILY OPERATIONS REPORT Report 29 05/19/2017 5/2/27 5:23:5 Report Version: 4..6R9 Generated from data in EDM/Opens/PROFILE Report 29 5/9/27 Company Type WBS No/API No PERMIAN Development UNIVERSITY 9 PW UNIT 56H UNIVERSITY 9 PW UNIT 56H 32656 / 4233326.

More information

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017

EP WELLS DAILY OPERATIONS REPORT Report 38 07/18/2017 1 Company Type bore WBS No/API No PERMIAN Development 30265014 / 4230133171.00 Event Summary Event Type Completion only Event Start Date 04/28/2017 Days on Location 37.00 Objective Install Completion Original

More information

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas

Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas Terrace Petroleum Corporation Cunning Wolf UL No. 602H, 1980 FNL and 467 FWL Section 6, Block 23, ULS Pecos County, Texas 3-29-13 DAY 1 Previously built location, roads, built and lined reserve pits. Move

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover:

University 31E 4. Ward County, TX. Rig: Union Drlg Rig 229. AFE: $1,393, DHC: $761, WI: Notes: Workover: Zone: War-Wink Cherry Canyon TD: 7250' Rig: Union Drlg Rig 229 Status: WOC Spud Date: 1/26/2013 RR Date: 2/12/2013 First Sales: AFE: $1,393,293.00 DHC: $761,963.00 WI: Notes: Date Activity 11/14/2012 11/14/12

More information

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016

EP WELLS DAILY OPERATIONS REPORT Report 1 08/03/2016 Report 1 8/3/216 Company Type bore WBS No/API No PERMIAN Exploration / 424953375. Event Summary Event Type Completion only Event Start Date 8/3/216 Days on Location 1. Objective Install Completion Original

More information

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary

AMERICAN ENERGY - PERMIAN BASIN, LLC UL Daily Drilling Partner Summary AEPB WELL NO. Report End Date: Report Number: 1 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : 70 : 0 Planned VS (ft): Current VS (ft): 42383383570000 MIRU MIRU INTEGRITY 3. 70 Longitude Orig

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 49 #0808H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern Project AFE: DV02151 AFE's Associated:

More information

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary

PERMIAN RESOURCES, LLC UL Daily Drilling Partner Summary PRES WELL NO. Report End Date: 5/19/2016 Report Number: 3 Rig: INTEGRITY, 3 Projected Days (days): 0 Drilling Days: : : 0 Planned VS (ft): Current VS (ft): WOC WOC, CONTACTED TRRC, SPOKE TO ABRAHAM, ADVISED

More information

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent

Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent Niko Deepwater Weatherford MPD DODI Ocean Monarch Nelson Emery Niko Indonesia Drilling Superintendent 26 Feb - 2014 SPE Thailand 1 Outline Drivers for MPD: 1. Safety of personnel in remote operations 2.

More information

SUBSEA KILL SHEET EXERCISE No. 5

SUBSEA KILL SHEET EXERCISE No. 5 Subsea Kill Sheet Exercise No. 5 SUBSEA KILL SHEET EXERCISE No. 5 Name: Date: Complete the Subsea vertical kill sheet provided on pages 2 and 3. Then answer questions 1 to 12. Please round calculations

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

Chapter 5 HORIZONTAL DRILLING

Chapter 5 HORIZONTAL DRILLING Chapter 5 HORIZONTAL DRILLING Chapter 5 How much money am I about to put on the table for a horizontal well? Did I do sufficient planning? Keys to Successful Horizontal Wells Multi-disciplined teams working

More information

BP SIT Testing Franks Facility Lafayette

BP SIT Testing Franks Facility Lafayette BP SIT Testing Franks Facility Lafayette General Information Status: Franks test well Lafayette La. Rig: Franks Test Rig Casing: 13 3/8, 0 to 4,600 Workstring: 4 ½ IF Brine: Fresh Water Directional: Straight

More information

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800

Final Well Report. Revision: Version 0. Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Final Well Report Revision: Version 0 Operating Company: Vulcan Minerals Inc. (Investcan Energy Corp) Hole Name: Flat Bay Test Hole # 5 Rig: Duralite 800 Field: Flat Bay Location: Western Newfoundland,

More information

RIH intermediate section casing in Bazian-1 exploration oil well

RIH intermediate section casing in Bazian-1 exploration oil well Energy and Sustainability V 559 RIH intermediate section casing in Bazian-1 exploration oil well A. K. Darwesh Petroleum Engineering Department, Engineering Faculty, Koya University, Kurdistan Abstract

More information

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS

BENEDUM (DEVONIAN, GAS) API # UPTON COUNTY, TX DRILLING PERMIT # DAILY REPORTS 11/17/2011 11/18/2011 11/19/2011 AFE dated 11/18/2011 - pull tbg out of hole and make a mill run. Run packer on tbg and attempt to reestablish production from Devonian Formation. MIRU Great Basin Pulling

More information

ENDEAVOR ENERGY RESOURCES

ENDEAVOR ENERGY RESOURCES ENDEAVOR ENERGY RESOURCES Lease WELL NO FIELD PBTD PERFORATIONS FOREMAN TOOLPUSHER API NUMBER DATE University 5-20-21 #1H 14,223' Tony Cody 07/02/13 OART WEATHER FLUID SUMMARY W/O UNIT DATA W/L UNIT DATA

More information

Daily Drilling Report

Daily Drilling Report Daily Drilling Report Well Name UTL 38-17-1H Report Date 05/05/2014 Field University Lands Supervisor Nate Baxter Report No. 97 Location 990' FNL & 300' FEL Supervisor 2 Kevin Evans DFS 94 County Ward

More information

Horizontal Marmaton Wells in Beaver County, OK

Horizontal Marmaton Wells in Beaver County, OK Horizontal Marmaton Wells in Beaver County, OK Drilling Improvements & Lessons Learned Presented by: Michael Dunn Drilling Engineer Unit Petroleum Forward Looking Statement DISCLAIMER It is understood

More information

Rig Math. Page 1.

Rig Math. Page 1. Page 1 The Calculator and Main Keyboard Display Numerical 10-key pad used for entering numerical values Trigonometric Functions These keys will be used where wellbore angle is an issue These are the keys

More information

FORGE Energy UL 21 Freedom 1 API Number:

FORGE Energy UL 21 Freedom 1 API Number: FORGE Energy UL 21 Freedom 1 API Number: 42-371-39061 07/13/2013 RU E&P WL Open well RIH correlate GR log to get on depth. Run BL found cement to surface. Tag 7566' PBTD. RU Rising Star test lines to 5000

More information

HydroPull. Extended-Reach Tool. Applications

HydroPull. Extended-Reach Tool. Applications Extended-Reach Tool HydroPull This tool incorporates a cycling valve that momentarily interrupts the flow to create water-hammer pressure pulses inside coiled or jointed tubing used in horizontal well

More information

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement

PowerDrive X6. Rotary Steerable System for high-performance drilling and accurate wellbore placement Rotary Steerable System for high-performance drilling and accurate wellbore placement The PowerDrive X6 RSS maintains control under the most difficult conditions, bringing the benefits of rotary steerable

More information

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL

W I L D W E L L C O N T R O L CIRCULATION & WELL CONTROL CIRCULATION & WELL CONTROL Learning Objectives You will learn: The importance of pump rates and pressures during well control operations Pressure relationships Basic calculations necessary in well control

More information

Study Guide IADC WellSharp Driller and Supervisor

Study Guide IADC WellSharp Driller and Supervisor Times to Flow Check: Before pulling out of the hole Before pulling BHA into the BOP When bit is pulled into the casing Increase in cuttings at shakers with same ROP On connections Upon abnormal trip tank

More information

and and Norton J. Lapeyrouse CONTENTS

and and Norton J. Lapeyrouse CONTENTS and and Norton J. Lapeyrouse CONTENTS Chapter 1 Basic Formulas P. 3 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. Pressure Gradient Hydrostatic Pressure Converting Pressure into Mud

More information

DRILLSCENE PROACTIVE DRILLING DECISIONS

DRILLSCENE PROACTIVE DRILLING DECISIONS DRILLSCENE PROACTIVE DRILLING DECISIONS RISE TO THE CHALLENGE OF REAL-TIME DRILLING CONTROL Today s oil and gas drilling operations present significant technical challenges in remote locations and increasingly

More information

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve

MOCS. Multiple Opening Circulation Sub. Fluid Bypass Valve MOCS Multiple Opening Circulation Sub Fluid Bypass Valve 1 Applications BHA Protection o o Pumping LCM Spotting Acid Work-over and completions o o o Well bore cleanout Fluid displacements Bottoms-up circulation

More information

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION

PROPOSED NEW SUB- CODE 1 RIG UP AND TEAR. Possibly Fits into Existing Code. 7/26/2018 Review PROPOSED NEW CODE EXISTING OPERATION NW NW 1 RIG UP AND TAR 1 no sub-code RIG UP AND TAR DOWN Start: Rig released from previous well, nd: Rig fully rigged up, acceptance tests successfully completed, and signed off. DOWN 1 1 Rig Under Tow

More information

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure?

DAY ONE. 2. Referring to the last question, what mud weight would be required to BALANCE normal formation pressure? DAY ONE 1. Normal formation pressure gradient is generally assumed to be: A..496 psi/ft B..564 psi/ft C..376 psi/ft D..465 psi/ft 2. Referring to the last question, what mud weight would be required to

More information

Greystone Oil & Gas Rig Telephone 832-380-6698 Daily Summary Information Daily Cost Information Rig Information Well Name & No Report # Date MD TVD AFE AFE Amount Company Rep University AZ #1 7 4/26/2010

More information

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation

Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation Bridge Plugs, Ball Drop & Caged Ball Plugs For Zone Isolation ADVANTAGE composite bridge plug, caged ball and ball drop (flow thru) frac plug provide a means to isolate multiple zones during high pressure

More information

Wellwork Chronological Regulatory Report

Wellwork Chronological Regulatory Report Well Name: UNIVERSITY 09A #1003H Field: Lin (Wolfcamp) S/T/R: / / County, State: Location Desc: Operator: Enduring Resources, LLC Project Type: Completion District: Southern - ERPBU Project AFE: DV02251

More information

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011

IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 IMPLEMENTATION DSIW-System ELDFISK ALPHA MARS 2011 Report: Wiping performance Pressure drop-rupture disc function-gas kick circulation Ketil Botnmark, Kjell Mikalsen 20.05.2011 This report resumes the

More information

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0

Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 Hydraulic Optimization Worksheet for MS Excel All Versions subsequent to 5.0 1. Introduction. 2. Data Input. Header. Bit Information. Mud Information. Casing Program. P.D.M./Turbine. Drill String Design.

More information

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS)

A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) AADE-07-NTCE-41 A New and Simplified Method for Determination of Conductor Surface Casing Setting Depths in Shallow Marine Sediments (SMS) Paknejad, A., Texas A&M University; Schubert, J., Texas A&M University

More information

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT

BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT BANDAR PANJI-1 WELL CONTROL INCIDENT REPORT EXECUTIVE SUMMARY I was requested by management to review the Banjar Panji-1 drilling operations from the conception of the Integrated Drilling Management approach

More information

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also)

6-3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes 6-1/4 & 6-1/2 also) RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for -3/4 PBL -3/4 DUAL PORTED PBL BYPASS SYSTEM (Applicable to sizes -1/4 & -1/2 also) OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at

More information

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug

North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug North American sealing solutions Bridge Plug Ball Drop Frac Plug Caged Ball Frac Plug The North American Sealing Solutions composite bridge plug, caged ball and ball drop (flow thru) frac plug provide

More information

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing

ECD Reduction Tool. R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing ECD Reduction Tool R. K. Bansal, Brian Grayson, Jim Stanley Control Pressure Drilling & Testing Drilling Engineering Association, Fourth Quarter Meeting November 20, 2008 1 Presentation outline Description

More information

IADC/SPE Innovative Tubular, Hoisting, and Deepwater Rig Designs Extend Hook Load Envelope to 2,000,000 Pounds

IADC/SPE Innovative Tubular, Hoisting, and Deepwater Rig Designs Extend Hook Load Envelope to 2,000,000 Pounds IADC/SPE151140 Innovative Tubular, Hoisting, and Deepwater Rig Designs Extend Hook Load Envelope to 2,000,000 Pounds J. N. Brock, R. B. Chandler, NOV Grant Prideco; C. Selen, Maersk Drilling USA; J. Dugas,

More information

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures

DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures BAROID DUO-SQUEEZE H LCM Mixing Tables and Operating Procedures Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton January 2014 1 Copyright

More information

W I L D W E L L C O N T R O L AIR DRILLING

W I L D W E L L C O N T R O L AIR DRILLING AIR DRILLING Air Drilling Learning Objectives You will learn the basics of: Air drilling equipment Types of air drilling Differences between mud and air drilling You will learn how to apply well control

More information

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM

2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM RECEIVING PBL AT RIG SITE TITLE: Operating Instructions for 2-7/8 Triple Port PBL 1-10-201 2-7/8 TRIPLE PORTED PBL BYPASS SYSTEM OPERATING INSTRUCTIONS 1. On receipt of PBL Bypass Tools at Rig site, the

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD

Blowout during Workover Operation A case study Narration by: Tarsem Singh & Arvind Jain, OISD 1. Introduction An incident of gas leakage from a well took place during workover operations. Subsequently, the gas caught fire on the fourth day in which twelve persons were injured. Two contract workers,

More information

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph:

NeoProducts, LLC 1201 Dealers Ave. Harahan, LA Ph: Please read this entire document. It concerns all 9⅝ Vented Thru-tubing Bridge Plugs Read this document before proceeding to NeoProducts Recommended Best Practices for 9⅝ vented T- TBPs. Whenever running

More information

PHE KE30-A8 WORKOVER PROGRAM

PHE KE30-A8 WORKOVER PROGRAM PHE WMO KE30-A8 WORKOVER PROGRAM PHE KE30-A8 WORKOVER PROGRAM Prepared by: Ross Webber. Hendra Wahyudi. Chandra Maulana. George Lattimore Adi Benanjaya Achmad Soendaroe. Tri Wiyono DRILLING ENGINEER SR.

More information

FORGE Energy UL 21 Pahaska 1H API Number:

FORGE Energy UL 21 Pahaska 1H API Number: FORGE Energy UL 21 Pahaska 1H API Number: 42-495-33740 10/26/2016 07:00 HPJM 07:15 Install 1502 Adapter Flanges to Well Head. RU Pump Truck test lines to 1000 PSI no leaks. Load hole w/ 15 bbls fresh water.

More information

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top

Elevation Resources DAILY OPERATIONS. Clean and prep location, MIRU pulling unit to mill liner top DAYS FROM SPUD: 35 DAYS ON 0 Mar 1 2016 RIG SUPERVISOR: Tyler Clean and prep location, MIRU pulling unit to mill liner top Blade location, set anchors. Bring surface and int CSG valves to surface and fill

More information

1. The well has been shut in on a kick and the kill operation has not started.

1. The well has been shut in on a kick and the kill operation has not started. Well Control Methods Day 2 1. The well has been shut in on a kick and the kill operation has not started. Shut in drill pipe pressure Shut in casing pressure 500 psi 700 psi After stabilization, both pressures

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW

DRILLING MANAGED PRESSURE REGIONAL OUTLOOK: EAST AFRICA REDUCED EMISSION COMPLETIONS SHALE TECHNOLOGY REVIEW MARCH 2014 / DEFINING TECHNOLOGY FOR EXPLORATION, DRILLING AND PRODUCTION / WorldOil.com MANAGED PRESSURE DRILLING How automated MPD enables drilling of an impossible well in Mexico REGIONAL OUTLOOK: EAST

More information

E NGINEERED C EMENTING S OLUTIONS

E NGINEERED C EMENTING S OLUTIONS DART CATCHER TOOL Blackhawk s Dart Catcher Tool provides indication of the exact location of downhole fluids during inner string cement jobs, cementing squeezes, or balanced cement plugs for temporary/permanent

More information

SPE/IADC Abstract

SPE/IADC Abstract SPE/IADC 125311 Pressurized Mud Cap Drilling Drastically Reduces Non-Productive Time in Soka Field, South Sumatera Michael Runtuwene, Sanny Suprihono, and Dany Rizka, SPE, Medco E&P Indonesia, Andi Eka

More information

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach

Optimising Hydraulic Energy to Dramatically Improve Lateral Reach Optimising Hydraulic Energy to Dramatically Improve Lateral Reach What Affects Reach? Build angle Size of completion CT size Drag Mechanical Fluid Debris in well BHA size End load CT size End load Buoyancy

More information

Debris Management Drilling Tools

Debris Management Drilling Tools Debris Management Drilling Tools Protecting BHA components during well construction Remove drilling debris from the wellbore before it creates expensive problems. Debris commonly causes downhole tool failure,

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Lic. No Magellan North Hargrave (WPM)

Lic. No Magellan North Hargrave (WPM) Lic. No. 8596 Magellan North Hargrave 2-27-2-27 (WPM) A licence to drill a well known as Magellan North Hargrave 2-27-2-27 (WPM) is hereby granted to Magellan Resources Ltd.. The Licensee shall comply

More information

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment

float equipment OPERATING MANUAL TYPE 505/506 Float Equipment 1. INFORMATION & RECOMMENDATIONS Float Equipment Contents 1. GENERAL INFORMATION & RECOMMENDATIONS 1 2. INSTALLATION FLOAT EQUIPMENT 2 2.1 PRE-USE FIELD INSPECTION 2 2.2 POSITION FLOAT ON CASING STRING 3 3. RUNNING OF FLOAT EQUIPMENT 3 3.1 CIRCULATION

More information

Post Job Summary Cement Intermediate Casing

Post Job Summary Cement Intermediate Casing EXXONMOBIL CORPORATION HOUSTON, Texas PCU 197-36A6 H&P 326 Post Job Summary Cement Intermediate Casing Prepared for: George McNary Date Prepared: November 16, 2010 Version: 1 Service Supervisor: ANDERSON,

More information

Along-string pressure, temperature measurements hold revolutionary promise for downhole management

Along-string pressure, temperature measurements hold revolutionary promise for downhole management Along-string pressure, temperature measurements hold revolutionary promise for downhole management IT S WIDELY KNOWN that the majority of stuck pipe incidents occur while pulling out of hole. If we can

More information

Operations planning for optimal hole cleaning

Operations planning for optimal hole cleaning Operations planning for optimal hole cleaning Rev 1.0 14 th March 2004. Technical comments? info@kingdomdrilling.co.uk Page 1 Table of contents Operations planning for optimal hole cleaning... 1 Table

More information

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS

SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS SCORPION HIGH-QUALITY, FULLY COMPOSITE PLUGS A DIFFERENT KIND OF ENERGY COMPANY Nine Energy Service isn t your typical oilfield services company. Our success stems from a culture driven by performance

More information

22.30 hrs. DrillSafe Forum Presentations - Perth Western Australia 5 th Mar 09

22.30 hrs. DrillSafe Forum Presentations - Perth Western Australia 5 th Mar 09 Near Miss Dropped 13 3/8 inch Casing 6 th November 2008 22.30 hrs What Happened A joint of 13 3/8 inch casing came out of the single joint elevator at floor level and travelled down the vdoor, along the

More information

Deepwater Horizon Incident Internal Investigation

Deepwater Horizon Incident Internal Investigation Not all Information has been verified or corroborated. Subject to review based on additional information or analysis. Deepwater Horizon Incident Internal Investigation 1 Areas of Discussion Investigation

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures GlassBore and GlassLine EUE 8RD Tubular Goods Composite Lining Systems Focus on Safety and Quality COMPOSITE LINING SYSTEMS Table of Contents Section 1 page 3 Arrival on Production

More information

Practice Exam IADC WellSharp Driller and Supervisor

Practice Exam IADC WellSharp Driller and Supervisor Workover & Completion Day 4 1. In a workover operation of a shut in well a Lubricator is being used together with a Wireline BOP / Wireline Valve. Which Barrier is classified as the Primary Barrier? A.

More information

"Sharing To Be Better. Influx through failed cement in shoetrack during completion operations

Sharing To Be Better. Influx through failed cement in shoetrack during completion operations "Sharing To Be Better Influx through failed cement in shoetrack during completion operations 2 Well status completion operations Seabed @ 364m 7" liner cemented across reservoir Well filled with 1.54 SG

More information

Abandonment Program for Paramount Fort Liard F 36

Abandonment Program for Paramount Fort Liard F 36 Abandonment Program for Paramount Fort Liard F 36 Well Name: Paramount et al Liard F 36 Area: 60 0 10 N, 123 0 15 W Location: Latitude: 60 0 05 27 Longitude: 123 0 22 00 UWI: 300F366010123150 WID: 1841

More information

Float Equipment TYPE 925/926

Float Equipment TYPE 925/926 Type 925 Float Collar Plunger Valve Float Equipment For less demanding well conditions, such as shallower depths or lower pressures, Top- Co offers economical float equipment certified to API RP 10F category

More information

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC

Dilution-Based Dual Gradient Well Control. Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC Dilution-Based Dual Gradient Well Control Presented at the 2011 IADC Dual Gradient Workshop, 5 May 2011 by Paul Boudreau, Dual Gradient Systems LLC In this very short presentation, we will Review Dilution-based

More information

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE

OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Page 1 of 8 OPERATING MANUAL DOUBLE ACTING DRILLING INTENSIFIER HYDRAULIC TYPE Size Series 6.50" 478 Reviewed And Approved By: Signature: Initials: Date: Page 2 of 8 Section OPERATING MANUAL DOUBLE ACTING

More information

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA

JULY AUG 2010 INNOVATING WHILE DRILLING REGIONAL FOCUS: EUROPE & THE NORTH SEA DRILLING C O N T R A C T O R OFFICIAL MAGAZINE OF THE INTERNATIONAL ASSOCIATION OF DRILLING S C O N T R A C T O R Multi-zone, expandable completions JULY AUG 2010 New technologies provide more options

More information

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management Service MMS 0MB Approval Expires 08/31/2008 Form MMS 123A1123S Electronic Version Lease Area/Block Well Name ST 01 BP 00

More information

Extreme Drill Rate Performance

Extreme Drill Rate Performance Extreme Drill Rate Performance Fred E. Dupriest P.E. Texas A&M University Petroleum Engineering Running over the same old ground What have we found, the same old fears Pink Floyd Wish You Where Here, 1975

More information

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells.

MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells. AADE-11-NTCE-55 MPD Technique in Haynesville Shale Delivers Significant Value in Over Pressured Zones, A Case Study on Four Wells. Serkan Cenberlitas, Jim Crenshaw, and Ferhat Gumus, Weatherford International;

More information

Extended leak off testing

Extended leak off testing Extended leak off testing Rev: 1.0 03/01/01 Purpose To ensure minimal operational time and risk exposure to personnel, process, production and equipment. The following extended leak off test procedures

More information

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE

INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE INTERMEDIATE CASING SELECTION FOR COLLAPSE, BURST AND AXIAL DESIGN FACTOR LOADS EXERCISE Instructions Use the example well data from this document or the powerpoint notes handout to complete the following

More information

RPSEA UDW Forum June 22 & 23, Secure Energy for America

RPSEA UDW Forum June 22 & 23, Secure Energy for America RPSEA UDW Forum June 22 & 23, 2010 Secure Energy for America PROJECT TEAM RPSEA Operator Advisory Committee Anadarko Chevron Shell ConocoPhillips Subcontractors IntecSea NOV CTES General Marine Contractors

More information

WILD WELL CONTROL WARNING SIGNS OF KICKS

WILD WELL CONTROL WARNING SIGNS OF KICKS WARNING SIGNS OF KICKS Warning Signs of Kicks Learning Objectives You will learn the warning signs that indicate the well may be kicking: Warning signs of kicks False kick indicators You will also learn

More information

Right-Angle Tube Roller Model

Right-Angle Tube Roller Model SPECIFICATIONS Model no. Free Speed (RPM) Throttle Rotation Max. Torque Ft-Lb Air Pressure psi Air Inlet Hose Air Flow @Free Speed Spindle Weight 909-1700 95 Lever type Reversible 240 90 1/2 NPT 1/2 I.D.

More information

5k Slickline Lightweight Pressure Control Equipment 4 ID

5k Slickline Lightweight Pressure Control Equipment 4 ID 5k Slickline Lightweight Pressure Control Equipment 4 ID Table of Contents 5k Slickline Lightweight Pressure Control Equipment 4 ID... 1 Hydraulic Slickline Stuffing Box... 3 Wireline Lubricators... 4

More information

OCEAN DRILLING PROGRAM

OCEAN DRILLING PROGRAM BIH OCEAN DRILLING PROGRAM www.oceandrilling.org Scientifi c Application Packers A packer is an inflatable rubber element that inflates to seal the annular space between the drill string and the borehole

More information

IWCF Equipment Sample Questions (Surface Stack)

IWCF Equipment Sample Questions (Surface Stack) IWCF Equipment Sample Questions (Surface Stack) 1. During a well control operation 4000 psi was shut in below the middle pipe rams. Ram type BOP data: Model: Cameron U type Rated Working Pressure: 15000

More information

Live well deployment of long perforating gun system using combined CT technologies

Live well deployment of long perforating gun system using combined CT technologies Live well deployment of long perforating gun system using combined CT technologies SPE ICoTA European Well Intervention Conference Aberdeen - 12 November, 2014 Simon Smith, Technical Support Manager Baker

More information

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment

A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment A Novel Approach to Capitalize WITSML Data in Geospatial Platform for Realtime Monitoring and Risk Assessment Dr. Sethupathi Arumugam PhD Principal Consultant Biswa Ranjan Patra Principal Consultant Shebi

More information

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford

R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford AADE-07-NTCE-69 A Downhole Tool for Reducing ECD R.K. Bansal, Weatherford; P.A. Bern, BP Exploration; Rick Todd, Weatherford; R.V. Baker, BP America; Tom Bailey, Weatherford Copyright 2007, AADE This paper

More information

Book 3 - Well Control Calculations

Book 3 - Well Control Calculations Welltrain Distance Learning Programme - DRILLING CALCULATIONS www.welltrain.com.au Welltrain Distance Learning Programme Book 3 - Well Control Calculations 162 Colin Street, West Perth, WA 6005 Tel: +61

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Shell Castor & Pollux Rig Equipment Primary Items

Shell Castor & Pollux Rig Equipment Primary Items Shell Castor & Pollux Rig Equipment Primary Items DRAW WORKS WITH SKID Lift Type: Non-Routine Complex Tandem Lift 2 Cranes Total Weight: 39,000 lbs Estimated construction Weight 21,800kg Crane #1: Sub

More information

Hydrostatic Pressure Testing

Hydrostatic Pressure Testing General An experienced or qualified person will be put in charge of hydro and should meet with the supervisor in charge of the job prior to test. Customer expectations should be clarified prior to beginning

More information

Understanding pressure and pressure

Understanding pressure and pressure CHAPTER 1 1-1 PRESSURE BASICS Remember to think downhole. The concepts provided in this section cover the foundations for good well control. Understanding pressure and pressure relationships is important

More information

Safety and Risk Engineering. HSE Case Implementation Clive Rawson

Safety and Risk Engineering. HSE Case Implementation Clive Rawson Safety and Risk Engineering HSE Case Implementation Clive Rawson Purpose ALARP Risk Assessment Major Accident Events Bowties Safety Critical Systems Performance Standards Implementation Getting HSE Case

More information

BaraBlend -665 LCM Standard Field Application Procedure

BaraBlend -665 LCM Standard Field Application Procedure BAROID BaraBlend -665 LCM Standard Field Application Procedure Prepared for: Prepared by: Submitted by: Submittal Date: All Customers Sharath Savari, Donald L. Whitfill Halliburton Apr 2016 1 Copyright

More information

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency

Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Solid Expandable Tubular Technology: The Value of Planned Installation vs. Contingency Chris Carstens Unocal Corporation 14141 Southwest Freeway Sugar Land, Texas 77478 Mike Breaux Unocal Corporation 14141

More information

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing

Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Successful Deployment of a Long Gun String Via Intelligent Coiled Tubing Parry Hillis: Technical Manager BakerHughes David Ayre: BP Well Perforation Specialist Jim Gilliat: TCP/DST Business Development

More information