1 Comprehensive dismantlement of the Lepse technical floating base M. Kashka, Deputy Technical Director of the Nuclear Icebreaker Fleet, Murmansk Shipping Company, Russia 1. General specifications of the Lepse service ship Lepse is a service ship of the civilian atomic fleet which building began in 1934 but was not completed. Initially Lepse ship was intended to be used as a dry cargo boat. However, the ship had never been used as formerly designed. In 1961 the ship was taken into service by the Murmansk Shipping Company as a floating service base. From 1963 to 1981 Lepse provided refuelling on the Lenin, Arktika and Sibir ice-breakers. Since the Imandra service ship was commissioned the Lepse has been used for storing spent nuclear fuel, radioactive waste, tooling and equipment. Lepse is equipped with special-purpose storage facility for spent nuclear fuel (SNF), tanks for collection and interim storage of liquid radioactive waste (LWR) and the rooms intended to carry out service operations with reactor equipment. In 1988 Lepse was taken out of service and in 1990 was categorised as a laid-up ship, with the main engine kept operational. In 1999 a docking survey and repair of the ship was conducted. The survey showed that the wear of the hull did not exceed 16% with exception of the ship`s keel strake in the aft end of the ship and the bilge strake which are worn down to 29% at most (maximum allowable wear of the hull being 35%). Currently Lepse is moored at the Atomflot facility (a nuclear-powered ice-breakers fleet base) located outside the city of Murmansk. Safe architecture of the storage compartment and administrative and engineering arrangements ensure its safe and radiation safety. The ship is equipped with radiation monitoring sensors which transmit a generalized signal to the landbased radiation monitoring site (Lepse village). A shift team keeps watch over the ship by going hourly round the ship to monitor her overall safety. 2. Lepse spent fuel storage specifications The main nuclear and radiation hazard on Lepse is the storage of spent nuclear fuel. Storage dimensions are: - length m, - width m, - height m. The storage facility of Lepse consists of two compartments of 3.6 meters in diameter and 3.4 meters high. Each compartment has 366 canisters 67 mm in diameter and 4 caissons 500 mm in diameter (circuit A). From the outside the canisters and the caissons are cooled by water (circuit B). 1 Kashka-eng
2 The compartments for storing spent fuel assemblies are arranged in the room equipped with biological shielding. This room is a hollow parallelepiped, made of carbon steel covered on both sides with stainless steel plates. The wall of the biological shielding is mm thick. The capacity of the space between the compartments is 115 m 3. In 1991 it was encased in concrete mix for testing the method and building an extra engineering barrier. 3. Spent nuclear fuel The storage facility holds 639 spent fuel assemblies (SFA). As for the terms of storage, the SFA are distributed in the following way: - 37 years -- 34%, - 26 years -- 8%, - 23 years -- 58%. As for uranium-235 enrichment, the SFA are divided into two groups: - SFA of OK-150 (the first reactor plant on the Lenin icebreaker) with initial fuel enrichment of 6,5 % at most, - SFA of OK-900 with initial fuel enrichment of % at most. Average power generation: - 1 SFA of OK MWh, - 1 SFA of OK MWh. Parameters of the stored fuel Table 1 Characteristics Left Compartment Right Compartment SFA (639 pcs) OK OK canister caisson 5 13 Uranium-235, kg Plutonium-239, kg 8 - Fission products, kg β-activity, ТBq α-activity, TBq Residual power, kw It is necessary to check possibility of SFA movement the in the canisters in order to define whether SFA could be extracted using the standard technique. 2 Kashka-eng
3 Figure 1. Lepse service ship Basic specifications: Length, max - about 88.0 m Width, max - about 17.1 m Height, max - about 9.9 m Draught - about 6.5 m Water displacement, max - about 6100 t 3 Kashka-eng
4 Figure 2. Spent fuel storage Spent fuel storage facility Canistered SFA Biological shielding (steel) Storage compartment Concrete 4 Kashka-eng
5 Figure 3. Storage compartment with rotating plate Caisson Rotating plate Canister plug Circuit A Tube plate Biological shielding Circuit B Concrete Storage compartment Caisson Caisson Water discharge from circuit A Water drain from circuit B Inner Canistered SFA Tube plate Water Water feed to circuit 5 Kashka-eng
6 4. Radioactive waste 639 canisters of the right and the left storage compartments (circuit A) hold about 0.4 m 3 of liquid radwaste, total estimated activity of which is no less than TBq. The overtopping tank of the storage compartments holds 3 м 3 of liquid radwaste, total estimated activity of which is about TBq. The secondary circuit (circuit B) holds 48 m 3 of water (each tank containing 24.0 м 3 of water), with total activity of 2.0TBq. Tanks for collection and storage of liquid radwaste have been taken out of service. Radioactive sediments and contamination have been immobilized with special-purpose film coatings under the method provided by the ASPEKT Association. The sediment at the bottom of the tanks has been encased in concrete. The spent fuel storage contains 24 containers with solid radwaste (capacity is 36 m 3 ). 5. Radiation environment Gamma-radiation dose rate: - inside the storage compartment µsv/h at a distance of one meter from deck; - inside the rooms adjacent to the storage compartment µsv/h; - inside the controlled area at the aft µsv/h; - inside the process tanks rooms µsv/h - on the open decks in the controlled area µsv/h; - on the open decks in the monitored area µsv/h; - in the working area of the monitored area µsv/h; - inside the cabins µsv/h. In 2002 the ASPEKT Association carried out film decontamination and coating immobilization of the surfaces of the storage compartment and its equipment. As a result, radioactive contamination has reduced times and now is kbq/ m 2, and in other rooms of the controlled area does not exceed 15 kbq/m Background of the international project In 1994 on the initiative of the Norwegian environmental organization Bellona a pilot project for the overall remediation of the Lepse service ship was included in the Euro-Arctic Barents Region Working Programme, and in 1995 it was included in the programmes of the European Commission, thus, the Project was given an international standing. In within the TACIS Programme the Consortium of the French company SGN, and British AEA Technology prepared two reports describing an engineering concept of the Lepse 6 Kashka-eng
7 SNF management. This concept does not cover all technical issues concerning the unloading of all fuel from Lepse and her overall remediation. The Consortium should have prepared the «Safety Report and Environmental Impact Assessment Report of the Lepse Defuelling Project». However, only one «Basic Data» section was completed. Further financing of the work was terminated because of the Consortium's failure to carry out the «Environmental Impact Assessment Report of the Lepse Defuelling Project» to the required scope. In October 2000 a bilateral agreement was signed between l`agence Francaise de Development and Murmansk Shipping Company on financing the international defuelling project, and the same agreement was signed in July 2003 between the MSCO and the Nordic Environmental Financial Corporation (NEFCO). European Commission made a declaration on financing the Project in However, the funds have not been allocated. Estimated budget of the Project is Euro. It is broken down between the following international contributors: Norway NOK The Netherlands Euro European Commission Euro Agence Francaise de Development Euro MFA of France Euro NEFCO Euro In 2002 the Ministry of Transportation of the Russian Federation made a contribution of 50 million rubles to maintain the ship in environmentally safe condition. On October, 6, 2003 an agreement between SGN and MSCO was signed to develop a technical assignment (TZ) (for the preliminary design of the Lepse defuelling project), Investment Justification Report (OBIN) and Baseline Report. TZ and OBIN are the Project documents which must be produced prior to development of the preliminary design. These documents are to be developed in compliance with requirements of the Russian rules and regulations. SGN intended to involve Russian subcontractors to perform Technical Assignment and Investment Justification Report. But it failed to do that. The agreement came into force on March, 2, SGN failed to deliver the documents specified in the Agreement. The Agreement expired on November 2, The international contributors have allocated Euro for SGN`s services. Apart from the above-mentioned documents, a methodology is created under international financing to develop Russian regulatory documentation limited to the Lepse only. Expediency of development of a document concerning only one ship is in doubt. In our opinion, a common regulatory base regulating all the operations related to service ships remediation should be established. From experience of foreign companies in the Lepse project it comes clear that the organization of work used now is a deadlock that leads to waste of funds allotted for the project. Moreover, the Project documentation developed by a company without a Russian license cannot be submitted to Regulators for approval. On the instructions of Minatom of Russia in 2004 the ASPEKT Association established a consortium of Russian design and research organizations (VNIIPIET, AISBERG, RRC Kurchatov Institute, IBRAE, TsNIITS, EKOATOM and other). The Consortium is capable to 7 Kashka-eng
8 perform design work on the Lepse overall remediation in full compliance with Russian laws and regulations of Rostechnadzor of the Russian Federation. Successful experience of spent fuel unloading from PM-32 and PM-80 storage compartments similar to the Lepse ones in the Russian Far-East would be used. In order to work efficiently it is necessary to fund Russian organizations directly. That would exempt the Financing Contributors` funds from taxes in Russia. In order to make examination of project documentation it is necessary to involve foreign engineering companies. Several international projects are being implemented in such a way. 7. Proposals on the Project implementation At present, the most hazardous facilities for the environment of the Euro-Arctic region are the Northern Navy`s and civilian fleet service ships. There are 72 service ships both active and laid-up, including floating tanks for LWR storage. More than 50 ships have retired and are awaiting dismantlement. 28 of them are in emergency condition, sunken or half-sunken. At present, there is no technology approved and practically implemented that would enable dismantlement of such vessels. There is no long-term radwaste storage either capable to store radwaste generated after the ships dismantlement. Therefore, it is needed to solve a new task - arrange a safe storage afloat of service ships and their further dismantlement. The Russian design and research organizations (VNIIPIET, AISBERG, RRC Kurchatov Institute, TsNIITS, EKOATOM and other) have carried out preliminary study on the overall remediation of Lepse. Two options have been considered: - Option 1: spent fuel unloading, followed by cutting the ship into blocks and their disposal, - Option 2: cutting the ship into blocks, their disposal and spent fuel unloading. Two locations have been examined for conducting these operations: the Atomflot facility and the Nerpa Shipyard. Considering submarine decommissioning experience and a well-developed infrastructure to provide support for these operations, the Nerpa Shipyard has become the most preferable location. The second option to the Lepse handling is preferable. Its implementation would enable to eliminate the environmentally hazardous ship in a shortest possible time and defuel it with the storage compartment being in safe conditions ashore. 8 Kashka-eng
9 Towing of Lepse ship from Atomflot site to the Nerpa Shipyard Transfer of the ship up to a slipway Dismantlement of the ship's superstructure Cutting the ship into blocks followed by dismantlement of the engine and boiler compartment and superstructure Preparation of the SNF storage and the stern compartments of the ship for their transportation to the interim storage facility Transportation of the SNF storage and the stern compartments of the ship up to the slipway at the interim storage facility Storing the ship's SNF storage compartment and the stern compartment at the interim storage facility Remediation activities prior to SFA unloading from the ship Figure 4. Cutting Lepse into blocks at Nerpa Shipyard without preliminary unloading of spent fuel 9 Kashka-eng
10 Block 1 Block 2 Block 3 Block 4 Figure 5. Cutting the ship on to blocks 10 Kashka-eng
11 Weight and dimensions specifications of blocks Table 2 Block # Appellation Arrangement, Frame # Length, m Weight less ballast, tons 1 Superstructure (cabins, domestic compartments) 2 Stem block (SNF storage, controlled area) 3 Engine and Boiler Room Stern block with storage compartment Notes 1. Blocks # 2,3,4 maintain positive buoyancy 2. Blocks are to be dismantled if the immobilized radioactive contamination is below the regulatory requirements. Now it is proposed that: 1. Russian design and research organizations should develop: - a concept for Organisation of a safe storage afloat of naval and civilian service ships and their subsequent dismantlement, - Lepse remediation design documentation (to be implemented till 2009). 2. Assistance is to be requested from the GEG to involve foreign companies to conduct international peer review of the Lepse concept and the design documentation. 11 Kashka-eng
ROSATOMFLOT. The Navigation on the Northern Sea Route Today & in the Future
ROSATOMFLOT The Navigation on the Northern Sea Route Today & in the Future FSUE Atomflot The Fleet On-shore Infrastructure 1278 employees 799 employees Atomic Fleet Special Vessels Atomic Container Carrier
More informationExperience and Future Potential of the Oblique Icebreaker
SHIP Design & Engineering CONSULTING & Project Development ICE MODEL & Full Scale Testing OFFSHORE Development Experience and Future Potential of the Oblique Icebreaker Mika Hovilainen Project Manager
More informationTHE LOVIISA NUCLEAR POWER PLANT DECOMMISSIONING PLAN UPDATE Matti Kaisanlahti NKS-R Decommissioning Seminar, Halden, Norway, November 2013
THE LOVIISA NUCLEAR POWER PLANT DECOMMISSIONING PLAN UPDATE 2012 Matti Kaisanlahti NKS-R Decommissioning Seminar, Halden, Norway, November 2013 Agenda Background Licensing Decommissioning schedule Decommissioning
More informationWM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Treatment of G1 Baskets at the CEA Marcoule Site 12027
Treatment of G1 Baskets at the CEA Marcoule Site 12027 Line Fourquet, Didier Boya CEA Marcoule, France ABSTRACT In the dismantling program for the first-generation French reactors in accordance with the
More informationGermany s program in the frame of the Global Partnership with Russia
Energiewerke Nord GmbH A company of the EWN-Group Germany s program in the frame of the Global Partnership with Russia CEG workshop on topical issues of legacy RW and SNF management in North West and Far
More informationCONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION
PAGE : 1 / 8 CONTENTS OF THE PCSR CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION SUB-CHAPTER 1.1 INTRODUCTION SUB-CHAPTER 1.2 GENERAL DESCRIPTION OF THE UNIT SUB-CHAPTER 1.3 COMPARISON WITH REACTORS
More informationIt has almost been a hundred
C O N C R E T E C A S E S Dock s Owners Turn to CSDA Member for Precision Cutting It has almost been a hundred years since civil engineers Easton, Gibb and Son started construction of Rosyth Dockyard in
More information«Alternate options of nuclear-powered submarine B-159 salvaging».
«Alternate options of nuclear-powered submarine B-159 salvaging». Dorofeev V. Yu., Deputy of General Designer, Chief Engineer PC «St-Petersburg Marine Design Bureau Malachite», Russia 1. Introduction In
More informationPART 1 GENERAL REQUIREMENTS
PART 1 GENERAL REQUIREMENTS SECTION SUBJECT 1.1 Standards 1.2 Compliance procedures and certification 1.3 Building premises 1.4 Testing of structures 1.5 Materials 1.6 Definitions of expressions GENERAL
More informationThe Regulatory Framework Improvement for Safe Decommissioning of Nuclear Power Plants in Korea
The Regulatory Framework Improvement for Safe Decommissioning of Nuclear Power Plants in Korea Sangmyeon Ahn 17th February 2016 Title ~ February 2016 ~ 1 Major Nuclear Facilities Nuclear Power Plants (NPP)
More informationIAEA-TECDOC-1105 XA
IAEA-TECDOC-1105 XA9952138 Inventory The originating Section of this publication in the IAEA was: Waste Safety Section International Atomic Energy Agency Wagramer Strasse 5 P.O. Box 100 A-1400 Vienna,
More informationDevelopment of Atomic Icebreaking Fleet and Support for Arctic Projects ROSATOMFLOT
Development of Atomic Icebreaking Fleet and Support for Arctic Projects ROSATOMFLOT Plans for Atomic Icebreaking Fleet Development Taimyr Type Leader Atomic Icebreaker Universal Atomic Icebreaker Arktika
More informationCompletion of the German project in Russia Sayda Bay
НИЦ КИ Completion of the German project in Russia Sayda Bay 28th Plenary Meeting of the IAEA Contact Expert Group (CEG) Rome, 19-20 November 2014 Location of the complex LTSF RC / RCSC in the Sayda Bay
More informationREGULATION on life boats operated from land, No 123/1999 CHAPTER I. General provisions Article 1
REGULATION on life boats operated from land, No 123/1999 CHAPTER I General provisions Article 1 Scope These rules apply to lifeboats, the construction of which has begun or which have arrived in the country
More informationOIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7. [22nd April, 1968] [Comrnencernent.]
OIL IN NAVIGABLE WATERS REGULATIONS [L.N. 101 of 1968.] under sections 5 and 7 [Comrnencernent.] [22nd April, 1968] 1. Short title and interpretation (1) These Regulations may be cited as the Oil in Navigable
More informationMarine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe
Marine Kit 4 Marine Kit 4 Sail Smooth, Sail Safe Includes Basic ship Terminologies and Investigation Check list Index 1. Ship Terminology 03 2. Motions of a Floating Body...09 3. Ship Stability.10 4. Free
More informationCERTIFICATE OF COMPLIANCE FOR RADIOACTIVE MATERIAL PACKAGES
9319 1 71-9319 USA/9319/B(U)F-96 1 OF 6 2. PREAMBLE a. This certificate is issued to certify that the package (packaging and contents) described in Item 5 below meets the applicable safety standards set
More informationEnergiewerke Nord GmbH
Energiewerke Nord GmbH CEG-Meeting Speaker Venue : Workshop JAEA : Holger Schmidt : Oxford, England Date : 05 th -07 th March 2008 1 Visualisation 2 Regional centre at Sayda Bay for conditioning and long-term
More informationNational Marine Manufacturers Association Product Compliance Specialist Examination Ladders, Handholds & Rails (2015 MY) ABYC H-41 (09)
1. Which of the following are within the scope of H-41: a. Manual propelled boats b. Pontoon boats c. Canoes & kayaks d. All of the above 2. Static Float Position is determined by: a. including permanently
More informationMSC Guidelines for Vents, Fills and Sounds
S. J. Kelly, CDR, Chief of Engineering Division References: a. 46 CFR 56.50-85 & 56.50-90 (Subchapter F) b. 46 CFR 32.55, 36.20-1 & 38.20 (Subchapter D) c. 46 CFR 119.445 & 119.450 (Subchapter K) d. 46
More informationLow Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development
Low Cost Flexible Production System for Remote Ultra-Deepwater Gulf of Mexico Field Development 10121-4404-03 Jelena Vidic-Perunovic, Doris, Inc. Lars Ødeskaug, Sevan Marine ASA RPSEA Ultra-Deepwater Technology
More informationREVOLUTIONIZING HULL CLEANING... The robot for fast in-water hull cleaning
REVOLUTIONIZING HULL CLEANING... The robot for fast in-water hull cleaning A CLEAN HULL AT ALL TIMES WHY REGULAR HULL MAINTENANCE IS IMPORTANT? As most boat owners know, a boat s hull becomes dirty very
More informationRISKAUDIT GRS - IRSN Safety assessment of the BELENE NPP
RISKAUDIT GRS - IRSN Safety assessment of the BELENE NPP Bulatom Conference 2010 Bulgarian Nuclear Energy National, Regional and World Energy Safety 9th -11th June 2010, Riviera complex, Varna Système
More informationIn Vessel Composter Installation & Commissioning Manual
In Vessel Composter Installation & Commissioning Manual Contents Customer responsibilities Transportation Lifting Delivery Pre-installation requirements Installation Drainage Ventilation Levelling Unpacking
More informationD.B. Wilson Station CCR Landfill
D.B. Wilson Station CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule Closure and Post-closure Care Plan October 11, 2016 Prepared By: Project ID: 160030A Big
More informationSafety and efficiency go hand in hand at MVM Paks NPP
International Forum Atomexpo 2018 Safety and efficiency go hand in hand at MVM Paks NPP József Elter MVM Paks Nuclear Power Plant Ltd. Hungary Start up Four of the VVER-440/V213 unit Power units up-rate
More informationPart 7 Fleet in service Chapter 2 Inclining test and light weight check
RULES FOR CLASSIFICATION Inland navigation vessels Edition December 2015 Part 7 Fleet in service Chapter 2 Inclining test and light weight check The content of this service document is the subject of intellectual
More informationIMPACT OF DOCKING METHOD ON LOADS IN ELEMENTS FLOATING DOCK VESSEL UNIT
IMPACT OF DOCKING METHOD ON LOADS IN ELEMENTS FLOATING DOCK VESSEL UNIT Przemysław RAJEWSKI 1, Oleh KLYUS 2 1,2 Institute of Marine Propulsion Plants Operations, Maritime University of Szczecin, Poland
More informationDevelopment of Self-Installing Deepwater Spar. Ashit Jadav February 2017
Development of Self-Installing Deepwater Spar Ashit Jadav February 2017 Contents Introduction & Background ACE Spar breakdown Installation Sequence Main particulars, Hull design and Weight control Stability
More informationROSATOMFLOT. The Navigation on the Northern Sea Route Today & in the Future
ROSATOMFLOT The Navigation on the Northern Sea Route Today & in the Future Atomic Icebreaking Fleet of Russia Atomic icebreakers of Arktika type: Propulsion Capacity 54 MW; Water displacement 23000 t;
More informationUpdate on Canadian Research Vessels Ship Procurement Projects
Update on Canadian Research Vessels Ship Procurement Projects 28 th International Research Ship Operators Meeting (IRSO) La Jolla, California October 2012 Jennifer Vollrath 1 Outline National Ship Building
More informationSECOND ENGINEER REG III/2 NAVAL ARCHITECTURE
SECOND ENGINEER REG III/2 NAVAL ARCHITECTURE LIST OF TOPICS A B C D E F G H I J Hydrostatics Simpson's Rule Ship Stability Ship Resistance Admiralty Coefficients Fuel Consumption Ship Terminology Ship
More informationRussian NSR Transit Rules & Regulations. Mr. Sergey Balmasov Head of CHNL s Arctic Logistics Information Office
Russian NSR Transit Rules & Regulations Mr. Sergey Balmasov Head of CHNL s Arctic Logistics Information Office Current legislation structure United Nations Convention on the Law of the Sea 1982 Article
More informationManagement of Reactor Decommissioning
Management of Reactor Decommissioning Tom McCool Project Manager Sellafield Ltd 9/24/2008 1 Introduction/ Background Managed the decommissioning of two research reactors in the UK Scottish Universities
More informationR2D2P. Working group report
R2D2P Working group report Working group members: Clédola Cassia Oliveira de Tello (Brazil), Farouk Abdel-Rahman (Egypt), Ibrahim Muhamad (Malaysia), Milan Vujovic (Serbia), Quang Huy Pham (Vietnam) Team
More informationAPPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL
APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METRE SAILING CANOE (JANUARY 2008) 1 GENERAL Class and measurement rules measurement forms may be obtained from the I.C.F.
More informationRULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS
CHINA CLASSIFICATION SOCIETYY Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNIT S 2012 Version: December, 2015,RCN No.1 Effective date: 1 January, 20162 Beijing Contents PART ONE
More informationUSS ALABAMA BATTLESHIP MEMORIAL PARK. Vocabulary
USS ALABAMA BATTLESHIP MEMORIAL PARK Vocabulary The following terms are common vocabulary for ships including battleships and submarines, like the USS ALABAMA and USS DRUM. ACOUSTIC - Means "sound" as
More informationSERIES: "FALCON" MODELS: F400, F450, F500. User's manual
SERIES: "FALCON" 2383.01-2004 MODELS: F400, F450, F500 Design category (94/25/EC): C ISO6185-3: Category VII User's manual PURPOSE The inflatable motor boat of the "FALCON" series relates to the category
More informationSafety of Decommissioning: International Cooperation under the IAEA Coordination
Safety of Decommissioning: International Cooperation under the IAEA Coordination Vladan Ljubenov WM 09, Session 68 - Panel discussion IAEA Mission The IAEA serves as an intergovernmental forum for scientific
More informationIAEA Regional Workshop Legal and Regulatory Aspects of Decommissioning of Research Reactors June Manila, Philippines
IAEA Regional Workshop Legal and Regulatory Aspects of Decommissioning of Research Reactors 26 30 June 2006 Manila, Philippines Monday, 26 June 2006 09:00 09:45 Opening (A. Dela Rosa, B. Batandjieva) Welcoming
More informationSpecial Considerations for Structural design and Fabrication for. tankers or similar vessels with Large Size (150m or more in length) in.
Special Considerations for Structural design and Fabrication for tankers or similar vessels with Large Size (150m or more in length) in polar waters He. Guangwei Guangwei_ho@chinagsi.com Mai. Rongzhi MRZ@chinagsi.com
More informationSLOP RECEPTION AND PROCESSING FACILITIES
RULES FOR CLASSIFICATION OF SHIPS NEWBUILDINGS SPECIAL SERVICE AND TYPE ADDITIONAL CLASS PART 5 CHAPTER 8 SLOP RECEPTION AND PROCESSING FACILITIES JANUARY 2011 CONTENTS PAGE Sec. 1 General Requirements...
More informationStability Information Booklet. Priority Pontoon
Stability Information Booklet Priority Pontoon Lightship Index General Particulars...3 General Details...4 Plan - GA...5 Plan - Frames...6 General Precautions against capsizing...7 Special Notes Regarding
More informationAPPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE
APPENDIX IV Development Canoe Rules APPENDIX IV DEVELOPMENT AND MEASUREMENT RULES OF THE INTERNATIONAL TEN SQUARE METER SAILING CANOE 1 GENERAL Class and measurement rules measurement forms may be obtained
More informationSUMMARY APPROACH. xiii
SUMMARY The U.S. Navy and the U.S. Maritime Administration (MARAD) together preside over a fleet of some 450 retired naval vessels and merchant ships that grows each month as ship retirements continue.
More informationQuestions and answers
1. Publication reference 2. Procedure Open 3. Programme IPA Questions and answers Blue Border Surveillance - Phase II 4. Financing National Programme for Croatia under the IPA Transition Assistance and
More informationMitsubishi Heavy Industries Technical Review Vol. 53 No. 4 (December 2016)
Completion of Joyo Experimental Fast Reactor Upper Core Structure Replacement - Development of Fast Reactor Core Internal Equipment Replacement method - 65 MASAHIDE HARA *1 JUNYA TANAKA *2 HIROYOSHI OKAZAKI
More informationRèglement pour la navigation pour la zone arctique. Alexey DUDAL Marine Division Bureau VERITAS
Règlement pour la navigation pour la zone arctique Alexey DUDAL Marine Division Bureau VERITAS 1 Contents 1. Introduction 2. BV Rules and Guidelines for Ice-Going Vessels 3. Direct Calculation Tool 4.
More informationGENERAL LIMITATIONS AND RESTRICTIONS. LNGC Temporary Exemption (Effective August 21, 2018)
RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 AMENDED EFFECTIVE JANUARY
More informationALARA in Practice Reactor internal parts repair at the Temelín NPP
ALARA in Practice Reactor internal parts repair at the Temelín NPP Milan Hort 1, Josef Koc 2, Ondřej Kvasnička 2, Petr Zapletal 3 1 State Office for Nuclear Safety 2 ČEZ, a. s., Temelín NPP 3 ŠKODA JS,
More informationMonaco Energy Class. Technical Rules August 2019
Monaco Energy Class Technical Rules August 2019 The Monaco Energy Class has been designed to compare the efficiency of the propulsion systems using sustainable energy. To achieve this aim, a catamaran
More informationInstitute for Science and International Security
Institute for Science and International Security Guidelines for the Management of Plutonium (INFCIRC/49): Background and Declarations April 1, 2004, Revised August 16, 200, September 16, 2010 In 1998,
More informationGUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE
GUIDANCE NOTES GD03-2017 CHINA CLASSIFICATION SOCIETY GUIDELINES FOR SURVEY OF OIL FLOATING STORAGE VESSELS FIXED AT ANCHORAGE 2017 Effective from 1 March 2017 BEIJING Chapter 1 GENERAL 1.1 Application
More informationSample of A Proposal to Research the Storage Facility. Roger Bloom October Introduction
Sample of A Proposal to Research the Storage Facility Roger Bloom October 2010 Introduction Nuclear power plants produce more than 20 percent of the electricity used in the United States [Murray, 1989].
More informationSERIES: "FALCON" User's manual
2381.01-2003 SERIES: "FALCON" MODELS: F275, F300, F330, F360 ISO6185-3: Category VII User's manual PURPOSE The inflatable motor boat of the "FALCON" series relates to the category of pleasure boats and
More informationSamoa National Tuna Fishery Report. Dan Su a, Peter Watt, and Roseti Imo
SCTB15 Working Paper NFR-20 Samoa National Tuna Fishery Report Dan Su a, Peter Watt, and Roseti Imo Fisheries Division Ministry of Agriculture, Forests, Fisheries and Meteorology Apia, Samoa Samoa National
More informationAll TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU)
All TSOs of the Nordic Capacity Calculation Region Proposal for fallback procedures in accordance with Article 44 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing a guideline on capacity
More informationSTRUCTURAL MEMBERS OF A SHIP. compartment stem frame beam bracket girder stern post hull angle bar stiffener
Unit 2 SHIPS AND SHIPS TERMS STRUCTURAL MEMBERS OF A SHIP Basic terms shell plating strake keel deck tank top floor stringer buoyancy strength stability bulkhead compartment stem frame beam bracket girder
More informationHAZARDOUS MATERIALS TECHNICIAN NFPA 472, 2008 Edition
7.4.3 PERFORMING CONTROL FUNCTIONS IDENTIFIED JPR - HMT #1a IN INCIDENT ACTION PLAN Revised 8/13/2010 STANDARD: 7-4.3(1) and 7-4.3.(2) TASK: 7-4.3(1) The candidate shall select the appropriate material
More informationWORK-REST REQUIREMENTS FOR PILOTS
AN ORDER OF THE BOARD OF PILOT COMMISSIONERS FOR THE PORT OF CORPUS CHRISTI AUTHORITY REGARDING WORK-REST REQUIREMENTS FOR PILOTS AND COMBINED BEAM RESTRICTION Whereas, the current Rules and Regulations
More informationANNEX 5 IMO MARINE CASULATY AND INCIDENT REPORT DAMAGE CARDS* AND INTACT STABILITY CASUALTY RECORDS
ANNEX 5 IMO MARINE CASUATY AND INCIDENT REPORT DAMAGE CARDS* AND INTACT STABIITY CASUATY RECORDS Statistics of damaged ships and of intact stability casualties are important to the work of the Organization
More informationGas Transportation Planning System in the Department of Economy of Gazprom
Gas Transportation Planning System in the Department of Economy of Gazprom Victor Dochin Deputy head of the Department, Head of gas balance section Gazprom! The company is the world's largest gas company,
More informationANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS
Annex 3, page 2 ANNEX AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) CHAPTER 15 INERT GAS SYSTEMS The text of existing chapter 15 is replaced by the following: "1 Application This
More informationPRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction
PRESTIGE OIL RECOVERY FROM THE SUNKEN PART OF THE WRECK Massimo Fontolan, Sonsub Ltd., Robin Galletti, SATE srl. Introduction This lecture deals with the equipment developed and the experience gained during
More informationNew Norwegian icegoing reseach vessel ERVO 2009
New Norwegian icegoing reseach vessel ERVO 2009 First and only Norwegian purpose built icegoing research vessel Feasibility study Develop a proposal for a replacement vessel for Lance and Jan Mayen Renewal-plan
More informationTHE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS
THE CANDU 9 DISTRffiUTED CONTROL SYSTEM DESIGN PROCESS J.E. HARBER, M.K. KATTAN Atomic Energy of Canada Limited 2251 Speakman Drive, Mississauga, Ont., L5K 1B2 CA9900006 and M.J. MACBETH Institute for
More informationEnhanced Discussion of Requirements for Commercial Fishing Vessels
Update on U.S. Commercial Fishing Industry Vessel Requirements Based On Section 604 of the Coast Guard Authorization Act of 2010 (Public Law 111-281) And Section 305 of the Coast Guard and Maritime Transportation
More informationالاسكندريه مصر Tel Fax: (+2) Mob: (+2)
Project Upgrading Alexandria Shipyard Client Alexandria Shipyard Company Date 2010 Present Value 1.2 Billion Egyptian Pounds Role Design and Supervision Location Alexandria Harbor Project Timeline Design
More informationMulti-Purpose Workboats and Vessels. Marine Engineering and Construction. Salvage and Wreck Removal. Marine Consultancy Services
Multi-Purpose Workboats and Vessels Marine Engineering and Construction Salvage and Wreck Removal Marine Consultancy Services Marine Expertise and Support We are a progressive company with more than 50
More informationSHIP FORM DEFINITION The Shape of a Ship
SHIP FORM DEFINITION The Shape of a Ship The Traditional Way to Represent the Hull Form A ship's hull is a very complicated three dimensional shape. With few exceptions an equation cannot be written that
More informationIPSWICH. Port Safety Notice
IPSWICH Port Safety Notice 19th October 2018 1 Associated British Ports Ipswich Port Safety Notice to Masters Introduction: This Port Safety Notice has been developed and communicated to provide general
More informationENERGY BLADE 3K4. Energy Blade Installation Instructions
ENERGY BLADE 3K4 Energy Blade Installation Instructions 1 Contents General information 2 Scope of these instructions 2 Product information 2 Designated use 3 Warranty 3 Safety instructions 4 Assembly and
More informationHOT TOPIC REPORT OF BOTTOM HEADER DEFECTED,YGN PLANT 5 IN 2003 KOREA HYDRO AND NUCLEAR POWER COMPANY
HOT TOPIC REPORT OF BOTTOM HEADER DEFECTED,YGN PLANT 5 IN 2003 KOREA HYDRO AND NUCLEAR POWER COMPANY ꌙꌙꌙ Table of Contents ꌙꌙꌙ Ⅰ. General Description Ⅱ. The Concept of Rx Vessel and Position of
More informationYucca Mountain. Los Alamos National Laboratory. Presented to: DOE-EM Performance Assessment Community of Practice Technical Exchange Meeting
Status of the Repository at Yucca Mountain Presented to: DOE-EM Performance Assessment Community of Practice Technical Exchange Meeting Presented by: Dr. Paul R. Dixon Nuclear Waste Program Manager Los
More informationNational Maritime Center
National Maritime Center Providing Credentials to Mariners (Sample Examination) Page 1 of 7 Choose the best answer to the following Multiple Choice Questions. 1. The sailing drafts are: FWD 14'-08", AFT
More informationRESOLUTION A.567(14) adopted on 20 November 1985 REGULATION FOR INERT GAS SYSTEMS ON CHEMICAL TANKERS
INTERNATIONAL MARITIME ORGANIZATION A 14/Res.567 16 January 1986 Original: ENGLISH ASSEMBLY - 14th session Agenda item lo(b) IMO RESOLUTION A.567(14) adopted on 20 November 1985 THE ASSEMBLY, RECALLING
More information1.818J/2.65J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY 2.650J/10.291J/22.081J INTRODUCTION TO SUSTAINABLE ENERGY
1.818J/2.65J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY 2.650J/10.291J/22.081J INTRODUCTION TO SUSTAINABLE ENERGY Prof. Michael W. Golay Nuclear Engineering Dept. NUCLEAR WASTES AND YUCCA MOUNTAIN
More informationOFFSHORE RACING CONGRESS World Leader in Rating Technology
OFFSHORE RACING CONGRESS World Leader in Rating Technology ORC SY MEASUREMENT GUIDANCE 2017 1. INTRODUCTION This paper must be taken as guidance for the process of boat measurement to allow for the issuance
More informationMOBILAIR M 235. Portable Compressor With the world-renowned SIGMA PROFILE Flow rate 18.1 to 23.3 m³/min ( cfm)
MOBILAIR M 235 Portable Compressor With the world-renowned SIGMA PROFILE Flow rate 18.1 to 23.3 m³/min (640 825 cfm) www.kaeser.com MOBILAIR M 235 Efficient and durable The powerful combination of the
More informationClassic Ketch Shindilla
Classic Ketch Shindilla Make: Model: Length: Classic Ketch 11.44 m Price: EUR 24,950 Year: 1958 Condition: Used Boat Name: Hull Material: Draft: Number of Engines: 1 Fuel Type: Shindilla Steel 1.37 m Diesel,
More informationDESIGN COMMENTS #35-95 Submarine support ocean passagemaker
w: www.bury.com.au e: info@bury.com.au PO Box 17 Metung VIC 3904 Australia t: +61 (0) 3 9005 6301 : +61 (0) 3 8648 6891 Project: Design 35 95 submarine support Task: Preliminary design comments By: pb
More informationITER_D_R8752R v.1.1. IDM UID D_R8752R v.1.1
IDM UID D_R8752R v.1.1 Technical Specifications: Supply of Elastomer sealed Ultra High Vacuum Valves for the ITER Project. Technical Specifications: Supply of Elastomer sealed Ultra High Vacuum Valves
More informationEvolution of the Projected World Nuclear Capacity for the Year 2000 and of the Installed Capacity, , in GWe
NUCLEAR ENERGY World GWe 45 4 35 Evolution of the Projected World Nuclear Capacity for the Year 2 and of the Installed Capacity, 196-22, in GWe Projected world nuclear capacity for the year 2 World installed
More information2-1- Shipping Receiving Lifting Location on Site Installation Stages 6
NEUTRAL GROUNDING RESISTORS INSTALLATION, OPERATION & MAINTENANCE MANUAL Contents 1- SAFETY INSTRUCTIONS... 3 1-1- Compliance with Instructions in this Manual. 3 1-2- Guidance Notes Installation.... 3
More informationGENERAL LIMITATIONS AND RESTRICTIONS. Draft Restrictions
RULES AND REGULATIONS GOVERNING PILOTS AND PILOTAGE ON THE CORPUS CHRISTI SHIP CHANNEL EFFECTIVE AUGUST 1, 2013 AMENDED EFFECTIVE MAY 13, 2014 AMENDED EFFECTIVE OCTOBER 1, 2014 I GENERAL The Rules and
More informationMANUFACTURED BY VANGUARD MARINE LDA. Vanguard boats and all their components are made in the European Union. ADVANCED TOUGH RELIABLE
Vanguard boats and all their components are made in the European Union. ADVANCED TOUGH RELIABLE With manufacturing facilities in Portugal, the international Vanguard Marine group designs and manufactures
More informationRule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS
CHINA CLASSIFICATION SOCIETY Rule Change Notice For: RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS Version: December, 2016,RCN No.2 Effective date: 03 January, 2017 Beijing Contents PART ONE PROVISIONS
More informationReview and Assessment of Engineering Factors
Review and Assessment of Engineering Factors 2013 Learning Objectives After going through this presentation the participants are expected to be familiar with: Engineering factors as follows; Defense in
More informationBob Halstead Office of the Governor Nevada Agency for Nuclear Projects
Update State of Nevada Agency for Nuclear Projects Presentation to Nevada Legislative Committee on High-Level Radioactive Waste Las Vegas, Nevada August 21, 2012 Bob Halstead Office of the Governor Nevada
More informationUIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors
1130050/4 IM-P113-02 ST Issue 4 UIB30 and UIB30H Sealed Inverted Bucket Steam Traps for use with Pipeline Connectors Installation and Maintenance Instructions 1. Safety information 2. General product information
More informationin84061.txt at Page 1 of 6 2/25/00
in84061.txt at www.nrc.gov Page 1 of 6 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C. 20555 SSINS No.: 6835 IE INFORMATION NOTICE NO. 84-61: OVEREXPOSURE
More informationClassic Yacht Brokerage
Particulars of Vessel For Sale (Please complete form ) Name of the vessel: Asking Price including commission: Owners Name: Address: Tel Day: Tel Eve: Mobile: Where the vessel is lying: Ashore Afloat Type
More informationAUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE
AUSTRALIAN ARROW AND ARAFURA CADET ASSOCIATION ARROW CATAMARAN RESTRICTIONS AND MEASUREMENT CERTIFICATE 1 NOTE: The object of these restrictions is to provide uniform specifications and restrictions for
More informationRULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS
RULES PUBLICATION NO. 20/P SHIP SIDE STRENGTHENING OF FISHING VESSELS MOORING AT SEA ALONGSIDE OTHER VESSELS 1995 Publications P (Additional Rule Requirements), issued by Polski Rejestr Statków, complete
More informationQUALITY ASSURANCE SPECIFICATION NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7
QUALITY ASSURANCE SPECIFICATION REVISION: 0 DATE: 08/29/14 NONDESTRUCTIVE EXAMINATION PAGE 1 OF 7 1.0 Purpose The purpose of this specification is to establish the minimum quality assurance requirements
More informationESSENTIAL FUNCTIONS ANALYSIS of Decontamination/Radwaste Technician
ESSENTIAL FUNCTIONS ANALYSIS of Decontamination/Radwaste Technician Introduction The decontamination technician position may be referred to by several job titles, including: o Radwaste Technician o Utility
More informationDri-Line Mk3 Monnier Compressed Air Drain Trap
5044050/2 IM-P504-24 CH Issue 2 Dri-Line Mk3 Monnier Compressed Air Drain Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation and Operation
More informationCharlottetown Marine Terminal Pipeline Decommissioning Project Description
Charlottetown Marine Terminal Pipeline Decommissioning Project Description 69 Marr Road Unit B Rothesay NB, E2E 3J9 Tel (506) 848-1920 Fax (506) 848-1929 Charlottetown Marine Terminal Pipeline Decommissioning
More informationGeneral Inspection Guidance for Waste Management Units Requiring Air Emission Controls Under RCRA Air Standard Subpart CC
United States Environmental Protection Agency RCRA Programs Branch Region IV Atlanta, GA CAA/RCRA Air Rules 27 November 2000 General Inspection Guidance for Waste Management Units Requiring Air Emission
More information