Completion or Recompletion Date: 11/17/2014 Date. Multiple completion? No

Size: px
Start display at page:

Download "Completion or Recompletion Date: 11/17/2014 Date. Multiple completion? No"

Transcription

1 RAILROAD COMMISSION OF TEXAS Form VU-2 J 1701 N. Congress $tetus: Submtted P.O. Box Date: os2o5 Austn, Texas Trackng No.: z5s7a OIL WELL POTEfVTIAL TEST, COMPLETION OR 12EGOMPLETIOR9 REPORT, AND LOG OperatoP Name: DEVON ENERGY PRODUCTION CO,.P. Operator No.: Op0C8tOr Add'eSS: ATTN VICTORIA SANCHEZ 333 WEST SHERIDAN AVE OKLAHOMA CITY, OK API No.: County: IRION Well IVo.: 8H RRC Dstrct No.: 7C Lease Name: UNIVERSITY Feld Name: SIN (WOLFCAMP) RRC Lease No.: Feld No.: LOCaton: Secton: 13, Block: 43, Survey: UNIVERSITY LANDS, Abstract: U34 Lattude: Longtude: Ths well s located mles n a sw drecton from MERTZON, whch s the nearest town n the county. Purpose of flng: Intal Potental Type of completon: New Well Well Type: Producng Type of Permt Permt to Drll, Plug hack, or Deepen Rule 37 Excepton Flud Injecton Permt O&G Waste Dsposal Permt Other: Completon or Recompleton Date: 11/17/2014 Date Permt No. 08/27/ Spud date: 08/29/2014 Date of frst producton after rg released: 11/17/2014 Date plug back, deepenng, recompleton, or Date plug back, deepenng, recompleton, or drllng operaton commenced: 08/29/2014 drllng operaton ended: 09/21/2014 Number of producng wells on ths lease n Dstance to nearest well n lease & ths feld (reservor) ncludng ths well: 8 reservor (ft.): 10.0 Total number of acres n lease: Elevaton (ft.): 2629 GL Total depth TVD (ft.): 6676 Total depth MD (ft.): Plug back depth TVD (ft.): 6676 Plug back depth ND (ft.): Was drectonal survey made other than Rotaton tme wthn surface casng (hours): 57.3 nclnaton (Form VV-12)? Yes Is Cementng Affdavt (Form W-15) attached? Yes Recompleton or reclass? No Types) of electrc or other logs) run: Electrc Log Other Descrpton: None Multple completon? No Locaton of well, relatve to nearest lease boundares Off Lease : No of lease on whch ths well s located: 500.o Feet from the south Lne and 20.o Feet from the East Lne of the UNIVERSITY Lease. PACKET: N/A FORIVlt FlEL (WITH tesefvohr) a GAS ID O OIL LEASE [V. Fe{d &Reservor Gas fd or Ol Lease No. WeH No. Pror Servce Type Page 1 of3

2 W2: N/A FOR NEW DEFILE R R-EN'fd`, SUF2FAE A{NG DEPTH DETERM{FIED BY: GAU Groundwater Protecton Determnaton Depth (ft.): Date: 08/01/2014 SWR 13 Excepton Depth (ft.): Date of test: 11 /28/2014 Number of hours tested: 24 Was swab used durng ths test? Ol (BBLSj: Gas -Ol Rato: 864 1Nater (BBLS): 669 Ol (BBLS): Ol Gravty -API - 60.: 39.0 Water (BBLS): 669 Producton method: Gas Lft Choke sze: 64/64 No Ol produced pror to test: PR(JCTIOfV DURIRIG TEST PEt29t7: Gas (MCF): 318 L',4LCflJLe'aT'D 24--I(.IJR RATE Flowng Tubng Pressure: Gas (fvicf): 318 Casng Pressure: Casng Hole Settng Mult - Mult - Cement Slurry Top of TOC Type of Sze Sze Depth Stage Tool Stage Shoe Cement Amount Volume Cement Determned Row Casng (n.) (n.) (ft.) Depth (ft.) Depth (ft.) Class (sacks) (cu. ft.) (ft.) By 1 Surface 9 5/8 12 1/4 924 CLASS C Crculated to Surface 2 Conventonal Producton 5 1/2 8 3/ CLASS H Crculated to Surface Lner Hole Lner Lner Row Sae (n.) Sze (n.) Top (ft.) Bottom (ft.) Cement Slurry Top of Cement Amount Volume Cement TOC Class (sacks) (cu. ft.) (ft.) Determned By N/A Row Sze (n.) 1 2 7/8 Depth Sze (ft.) 6747 Packer Depth (ft.)/type, l'v'";-' rs%.^:'c';a3va?6 ; - tf 3 k /qry; cs{,.!,..!,.. '=s'" j<' 'T'C 'S L+` l yy b F VYS 1\, `f '-.{nyat'"a3 3a" -.u...'3<xs; '`a vy& r,!xabr, Ztaxwass.3,.. '.3a.EYwx:,5,. 1 Gk.. Was hydraulc fracturng treatment performed? Yes Is well equpped wth a downhole actuaton sleeve? No Producton casng test pressure (PSIG) pror to hydraulc fracturng treatment: 6700 Has the hydraulc fracturng flud dsclosure been reported to FracFocus dsclosure regstry (S1ItZ29)? If yes, actuaton pressure (PSIG): Actual maxmum pressure (PSIG) durng hydraulc fracturng: 8410 Yes Row Type of Operaton 1 Fracture Amount and Knd of Materal Used FRAC WITH 163,945 BBL. SLICKWATEER + 6,664,845 LBS. SAND Depth Interval (ft.) Page 2 of3

3 Is formaton Formatons Encountered Depth TVD (ft.) Depth MD (ft.) solated? Remarks GRAYBURG Yes Yes ESTIMATE SAN ANDRES Yes Yes ESTIMATE CLEARFORK Yes Yes ESTIMATE SPRABERRY Yes Yes DEAN Yes Yes WOLFCAMP Yes Yes CANYON No No DID NOT DRILL TO CANYON FORMATION FUSSELMAN No No DID NOT DRILL TO FUSSELMAN FORMATION )o the producng nferval of ths well produce H2S wth a concentraton n excess of 100 ppm (S1NR 36)? No s the completon beng downhole commngled (SWR 10)? No P 5,502'. DISTANCE TO THE NEAREST WELL HAS CHANGED FROM 38' TO 10'. (PUBLIC COMMENTS: CASING RECORD TUBING RECORD: I PRODUCING/INJECTION/DISPOSAL INTERVAL ACID, FRACTURE, CEMENT SQUEEZE, C,4ST IRON BRIDGE PLUG, RETAINER, ETC. POTENTIAL TEST D,4TA: ranted Vame: Annette Ran es ' Ttle: Regulatory Specalst telephone No.: (405) Date Certfed: 01/19/2015 Page 3 of3

4 Cementer: Fll n shaded areas. td erator: Fll n other tems. II.laOtI) C()1VIlVIISSIOIT Off+' TEXAS Ol and Gas Dvson Form 3'-15 Cementng 32eport Rev. 4!1/83 1. Operator's Name (4s shown on Torm P-5, Organzateon Report) 2. RRC Operator Into. 3. RRC Dstrct No. 4. County of Well Sete 5. Feld Name (Wldcat or exactly as shown on trc Records) + 6. API No.. Y.ease Name 9. Rule 37 Case Na 10.O LeaseJGas ID No. ITTIVERSITI' ` 7. Drllng Permt 1\'0. 11, 'ela No. III CrSN CEMN'I'IIG DA'A: SUIFAC`E II''ER- PIdODUCT0I0T M3I.T-S`fAGE CASTING MEDIATE CASING CEMEIITI1\G PROCESS CASIITG SIITGLE Llultple STRING Parallel Strngs Too Shoe 2. (:ementn«uatc 13. IDrlled Hole Sze a Est. %wash or hole entar ement 1l. sze of casn n. O.D. ' 15. Top of lner (ft.) 16. 5ettn de th ff. 17. Number of centralaer used A R, Frs. Watng on cement before drll-out ` ' - r? s. [ L'CIIDCI 1JtC(: ISO. OSBI':,a :, Il M4 D 656y99 ' c dtves >, r> o'.a.s ('lass n ;,ddtve 1U Ut SdCS ,fltt D ddteves 2(9. ;lr-y rarapcd> oesn (say. flt.3 7D 9c;+ht (fl.). ^s'azeot {toy. tt.) Sc1Ilt (t.) 'olumc (cu. ft.) 731 (f`t. - - _ 31. N 5 cmcnl uulatd t ound surface (ur bouont nl c 11 r) ulsde calm '? Remarb S I.l ; R fzy- CLASS C + 4%UEL + 2%CaC PPS CELLOFLAKE %STATIC FREE,

5 I CEMENTING TO PLUG E1ND ABANDON PLUG #1 PLUG #2 PLUG #3 PLUG #4 PLUG #5 - _ CctIlCIlllfl'r'; dc L 24. Sze of hole or p e plugged (n.) 25. Depth to bottom of tubng or drll ppe (8.) '6 Sacl., of cement t,cd ( h_plugl St,t tlt" tl) t fmpcd(ut. 29 1a5urd top,t pluz, r(t _>e t)t.l `- cntonh,al [ p _ E _--- _.. -- _, t _-- 1 PLUG #6 PLUG #7 PLUG #8 -.. CEMEN'I'ER'S CERTIFICATE: I declare under penaltes n Sec , Texas Natural Resources Code, that I am authorzed to make ths Certfcaton, that the cementng of casng and/or the placng of cement plugs n ths well as shown n the report was performed by me or under my Supervson, and that the cementng data and facts presented on both sdes of ths form are true, correct, and complete, to the best of my knowledge. Ths certfcaton covers cementng data only. _ I, ' Vgchael Bogner, Feld Speefalst Name and ttle of cementer's representatve Baker Hughes Olfeld Operatons Inc. Cementng Company Sgnatu e P.O. Box 1135 Address Eldorado Texas Cty, State, Zp Code (325} X x/30/2014 Tel: Area Code Number Date: mo. day yr. OPERATOR'S CERTIFICATE: I declare under penaltes prescrbed n Sec , Texas Natural Resources Code, that I am authorzed to make ths certf caton, that I have knowledge of the well data and nformaton presented n ths report, and that data and facts presented on both sdes of ths form Are true orrect, and complete, to the best of my knowledge. Ths certfcaton covers all well data. ' Typed or prnted name of operator's representatve Ttle gnature Address Cty, State, Zp Code Tel.: Area Code Number Date: mo. day yr. Instructons to Form W-15, Cementng Report IMPORTANT: Operators an3 cementng companes must comply wth the requrements of the Commsson's Statewde Rules S (Water Proteeton),13 (C'asng, Ceroenrng, Drllng, and Completon), and 14 (Well Pluggng}. For offshore operatons, see the requrements of Rule 13 (c). A. What to fle. An operator should fle an orgnal and one copy of the completed Form W-15 for each cementng company used on a well. The cementng of dfferent casng strngs on a well by one cementng company may be reported on one form. Form W-15 should be fled wth the followng. An ntal ol or gas completon report, Form W-2 or G-1, as requred by Statewde orspecal feld rates; Form W-4, Applcaton for Multple Completon, f the well s a multple pazallel casng completon; and Form W-3, Pluggng Record, unless the W-3 s sgned by the cementng company representatve. When reportng dry holes, operators must complete Form W-15, n addton to Form W-3, to show any casng cemented n the hole. B. Where to fle. The approprate Commsson Dstrct Offce for the county n whch the well s located C. Surface Casng. An operator must set and cement suffcent surface casng to protect all usable-qualty water strata, as defned by the Texas Department of Water Resources, Austn. Before drllng a well n any feld or area n whch no feld rules are n effect or n whch surface casng requrements are not specfed n the applcable rules, an operator must obtan a letter from the Department of Water Resources statng the protecton depth. Surface casng should not be set deeper than 200 feet below the specfed depth wthout pror approval from the CommtCee. D. Centralzers. Surface Casng must be centralzed at the shoe, above and below a stage collar or dvertng tool, f run, and through usable-qualty water zones. In Non-devated holes, a centralzer must be placed every fourth jont from the cement shoe to the ground surface or to the bottom of the cellar. All centralzers must meet API specfcatons. E. Exceptons and alternatve casng programs. The Dstrct Drector may grant an excepton to the requrements of Statewde Rule 13. In a wrtten applcaton, an operator must state the reason for the requested excepton and outlne an alternate program for casng and cementng through the protecton depth for strata contanng usable-qualty water. The Dstrct Drector may approve, modfy, or reject a proposed program. An operator must obtan approval of any excepton before begnnng casng and cementng operatons. F. Intermedate and producton casng. For specfc techncal requrements, operators should consult Statewde Rute 13 (3) and (4). G. Pluggng and abandonng. Cement plugs must be placed n the wellbore as requred by Statewde Rule 14. The Dstrct Drector may requre addtonal cement plugs. For onshore ar nland wells, a 10-foot cement plug must be placed n the top of the well; and the casng must be cut off three foot below the ground surface. All cement plugs, except the top plug, must have suffcent slurry volume to fll 100 feet of hole, plus ten percent for each 1,000: feet of depth from the ground surface to the bottom of the plug To plug and abandon a well, operators must use only cementers approved by the Drector of Feld Operatons, Cementng companes, servce companes or operators can qualfy as approved cementers by demonstratng that they are able to mx and pump cement n complance wth Commsson Hles and regulatons.

6 I Cementer: Fll n shaded are jj,qj) QlyjjyjISSI01 OI+' T'+ XLS Form W-15 Operator: Fll n other tems. 011 td Gds I)VlO Cementng Report '-y Operator's Name (As shown an Form P-5, Organzafon Report) 2. R1C Operator Ato. 3. IBItC IDstrct I9o. 4. County of `Nell Ste L r -, fvccbc1e.3 'o.. ' C ' IRIOI1 5. Feld Ptame (3'ldcat actly as shown n tibc 13ecords) 6. API PIa 7. Drllng Permt IVo. I. Lease Name 9. IBule 37 Case No. 1@ Ol Lease/Gas ID No. 11. Well!'o. L7ITIIZSITY `7 `- SCI CASING CE11'dF.IV3'IIe'G 1DATA: Surfaee I"I"Ib- I'ROI)7CT'IOI MU.T'I-5'I'AGF, Casng 1VIEIDIA'E C'ASIG CEIVIENTIIVG PROCESS C'AS31VG Sngle 1[ultple Strng Parallel Strngs "fool Shoe 2. :cas: nta 9att: I m 79r11ed Bole See, 9 Est. %wash or hole enlar ement ].4. Sze of casn (n. O.D.} p--,!, 15. T'o of Iner (Ft. 16. Settn de th (ft.} ; 17. Numker off centralzers used j; 1. Irs. 3atng on cement before drll-out - - "'!1; Y.A!o bb L j :a (j latlt':'t - _. 1' ' I O. U' tii!'ss H.B..-.- _'e855 D _ ra 9 (31N _.. 'f' ' c6d'atsee ds. lue r passsnt: q'laaarr (say. 'r.) % ' - _ l ' - 'omc cu. t'f. eof SYJ P I, Ul [Bl C ll, fq. ' Vy.t} e "df 'C3B3C ds SI CSC Y3'I t3gpu ll7 r,f"oa 93U 4111't.fL' 3 +'. _ os _ a u taus a clas utsc asse F -. _ 1 St _- - _- --_ Cff$PLS: 1. E.S. r9q /.5p POD+10%G+I.+0.8%FL-52+0.%ASA-30fl+Q.7"/oSl/S+3#ICOLSI+;E1I,+0.25#CEI.I,OFI,A.I+.Ol%S'ATIC FR+E+2% SE4d,'{bwOw} 2" CLASS $ SO/50 POZ+0.5%FL %'Y %CID %SI04S+0.15%R %ST'ATIC FREE+S%SAI.'{bsvow} CIBCUL'I'I'E 150 L A'I' 11.8 PI'G 349 SI{S vv

7 CEMEN'T`ING TO PLUG AND ABANDON PLUG #1 PLUG #2 PLUG #3 PLUG #4 PLUG #5 PLUG #6 PLUG #7 PLUG #8 ). CGIIIC:llL1Ilt; [1 AlC ' 24. Sze of hole or e plu ged n.) 25. Depth to bottom of tubng or drll ppe (ft.) _b > dl. S UZ 337(ll tltc (dfl Ill _ 1 _?7 51uu nluue }xtmped (cu. t.) ' calut tea to or,, (ft E e urd top cat,lu. t t _.,. d It 3Q. S(w «[. (Ib fat) -,1. TYPE emant _- 1 --T E- -- -, _. t h f CEMENTER'S CERTIFICATE: I declare under penaltes n Sec , Texas Natural Resources Code, that I am authorzed to make ths Certfcaton, that the cementng of casng and/or the placng of cement plugs n ths well as shown n the report was performed by me or under my Supervson, and that the cementng data and facts presented on both sdes of ths form are true, correct, and complete, to the best of zny knowledge. Ths certfcaton covers cementng data only. r 1 j SITS,IE` Z9 Se`'flC 5913'vflsop ;faker I3ughes Olfeld Operatons Inc., Name and ttle of cementer's representatve Cementng Company S 'ur 1'.O. Box 1135 Eldorado "Texas (325) $ Cty, State, Zp Code TeL Area Code Number 4/20/14 Date: mo. day yr. OPERATOR'S CF,RTIFICATE: I declare under penaltes prescrbed n Sec , Texas Natural Resources Code, that I am authorzed to make ths certfcaton, that I have knowledge of the well data and nformaton presented n ths report, and that data and facts presented on both sdes of ths form Are true, correct, and complete, to the best of my knowledge. 'Phs certfcaton covers all well data. m y ` t"" = $ Typed ar prnted name of operator's representatve Ttle 3 nature s j.,r'...'.`,.. t ('`, C ta -: - 1 ' Address Cty, State, Zp Code Tel.: Area Code Number Date: mo. day yr. Instructons to Form W-15, Cementng Report I1IPOI8T1V'': Operators and cementng eompanes must comply wth the requrements off the Commsson's Statewde Mules 8 (93'aler Pratecon),13 (Casag, Cementng, I)rHlng, and Compleron), and 14 (V5'ell I'lugg g). For offshore operatons, see the requrements of lule 13 (c). A. What to fle. An operator should fle an orgnal and one copy of the completed Form W-15 for each cementng company used on a well. The cementng of dfferent casng strngs on a well by one cementng company may be reported on one form. Form W-15 should be fled wth the followng. An ntal ol or gas completon report, Form W,2 or G-1, as requred by Statewde or specal feld rates; Form W-4, Applcaton for Multple Completon, f the well s a multple parallel casng completon; and Form W-3, Pluggng Record, unless the W-3 s sgned by the cementng company representatve. When reportng dry holes, operators must complete Form W-15, n addton to Form W-3, to show any casng cemented n the hole. B. Where to fle. The approprate Commsson Dstrct Offce for the county n whch the well s located. C. Surface Casng. An operator must set and cement suffcent surface casng to protect al usable-qualty water strata, as defned by the Texas Department of Water Resources, Austn. Before drllng a well n any feld or azea n whch no feld rules are n effect or n whch surface casng requrements are not specfed n the applcable rules, an operator must obtan a letter from the Department of Water Resources statng the protecton depth. Surface casng should not be set deeper than 200 feet below the specfed depth wthout pror approval from the Commttee. D. Centralzers. Surface Casng must be centralzed at the shoe, above and below a stage collar or dvertng tool, f nn, and through usable-qualty water zones. In Non-devated holes, a centralzer must be placed every fourth jont from the cement shoe to the ground surface ox to the bottom of Cte cellar. All centralzers must meet API specfcatons. E. Exceptons and alternatve casng programs. The Dstrct Drector may grant an excepton to the requrements of Statewde Rule 13. In a wrtten applcaton, an operator must state the reason for the requested excepton and outlne an alternate program for casng and cementng through the protecton depth for strata contanng usable-qualty water. The Dstrct Drector may approve, modfy, or reject a proposed program. An operator must obtan approval of any excepton before begnnng casng and cementng operatons. F. Intermedate and producton casng. For specfc techncal requrements, operators should consult Statewde Rule 13 (3) and (4). G. Pluggng and abandonng. Cement plugs must be placed n the wellbore as requred by Statewde Rule 14. The Dstrct Drector may requre addtonal cement plugs. For onshore or nland wells, a 10-foot cement plug must be placed n the top of the well, and the casng trust be cut offthree foot below the ground surface. All cement plugs, except the top plug, must have suffcent slurry volume to fll 100 feet of hole, plas ten percent for each 1,000 feet of depth from the ground surface to the bottom of the plug To plug and abandon a well, operators must use only cementers approved by the Drector of Feld Operatons, Cementng companes, servce companes or operators can qualfy as approved cementers by demonstratng that they are able to mx and pump cement n complance wth Commsson rules and regulatons.

8 RAILROAD COMMISSION OF TEXAS ELECTRIC LOG FORM L-I Ol and Gas Dvson STATUS PR'r T'1CIClrg IVO.: Ths facsmte L-1 was generated electroncally from data submtced to Cle RRC. Instructons When to Fle Form L-1: wth Forms G-1, W-2, and GT-1 for new and deepened gas, ol, and geothermal wells wth Form W-3 for plugged dry holes when sendng n a log whch was held under a request for confdentalty and the perod for confdentalty has not yet expred. When s Form L-1 NOT requred: wth Forms W-2, G-1, and GT-'1 fled for njecton wells, dsposal wells, water supply wells, servce wells, re-test wells, reclassfcatons, and plugbacks of ol, gas or geothermal wells m wth Form W-3 for pluggng of other than a dry hole Where to Fle Form L-1: wth the approprate Commsson dstrct offce Fllng out Form L-1: Secton I and the sgnature secton must be flled out for all wells a complete only the approprate part of Secton II Type of log rye ured: a any wrelne survey run for the purpose of obtanng lthology, porosty, or resstvty nformaton m no more than one such log s requred but t must be of the subject well s f such log s NOT run on the subject well, do NOT substtute any other type of log; just select Secton II, Part A below SECTION I. IDENTIFICATION Operator Dstrct Completon Name: DEVON ENERGY PRODUCTION CO, L.P. No. C Date: 11/17/2014 Feld Drllng Permt Name LW (WOLFCAMP) No Lease Lease/ID Well Name UNIVERSITY No No. 8H County API IRION No X A. BASIC ELECTRIC LOG NOT RUN B. BASIC ELECTRIC LOG RIJN. (Select one) SECTION IL LOG STATUS (Com lete ether A ar B) 1. Confdentalty s requested and a copy of the header for each log that has been run on the well s attached. 2. Confdentalty already granted on basc electrc log coverng ths nterval (applcable to deepened wells only). 3. Basc electrc log coverng ths nterval already on fle wth Commsson (applcable to deepened wells only). 4. Log attached to (select one): (a) Form L-1 (ths form). If the company/lease name on log s dfferent from that shown n Secton I, please enter name on log here: Check here f attached log s beng submtted after beng held confdental. (b) Form P-7, Applcaton for Dscovery Allowable and New Feld Desgnaton. (e) Form W-4, Applcaton for Multple Completon: Lease or ID No(s). Well No(s). Annette Ranes Regulatory Specalst Sgnature Ttle DEVON ENERGY PRODUCTION CO, L.P. (405) /19/2015 Name (prnt) Phone -FOR RAILROAD COMMISSION USE ONLY- Date

9 Trackng No.: STATEMENT OF PRODUCTIVITY OF ACREAGE ASSIGNED TO PRORATION UNITS Form P-15 Ths facsmle P-l5 was generated electroncally from data submcced eo the RRC. The undersgned states that he s authorzed to make ths statement; that he has knowledge of the facts concernng the DEVON ENERGY PRODUCTION CO, L.P. OPERATOR UNIVERSITY No $H ;that such well s LEASE WELL completed n the LIN (WOLFCAMP) Feld, RION County, Texas and that the acreage clamed, and assgned to such well for proraton purposes as authorzed by specal rule and as shown on the attached certfed plat embraces oo.o acres whch can reasonably be consdered to be productve of hydrocarbons. - CERTIFICATE I declare under penaltes prescrbed n Sec , Texas Natural Resources Code, that I am authorzed to make ths report, that ths report was prepared by me or under my supervson and drecton, Dat e 01/19/2015 Sgnature Annette Ranes Telephone (405) AREA CODE Ttle Regulatory Specalst

10 f R,4ILROAD COIVIISS60IV OF TE1(AS 1701 N. Congress ` I P.O. Box r-' Austn, Texas J Acreage Desgnaton P-16 Data Sheet (Optonal) Page 1 Rev. 09/2014 Operator Name: Devon Energy Producton co.,.p. Operator P-5 No.: zsse Op2CdCOY AfICIYE'.55: 333 W. Sherdan Ave., Oklahoma Cty, OK Dstrct No.: c County: Tron Purpose of Flng: Well No.: sh Qp) X0.: Drllng Permt Applcaton TOLaI 1.805e ACY85: 1, DCIIIItIg P8C1'Tllt N0.: (Form W-1) L2852 N8Y112: Unversty L085e NO.: FIEICI IVdltO: Ln (Wolfcamp) FIeICI N0.: Q COmplOtOn Report (Form G-1/W-2) Fler s the owner or lessee, or has been authorzed by the owner or lessee, of all or an undvded porton of the mneral estate under each tract far whch fler s lsted as operator below. For all leases operated by other enttes, the number of assgned acres shown are reflected on current Commsson records or the fler has been authorzed by the current operator to change the assgned acreage of that ouerator as shown below. RRC ID No. or Lease No. Well yo H-Horzontal D-Drectonal V-Vertcal Lease Name API No. Acres gssgned H H Unversty N SWR 38 Except. (Y/N) Operator Name and Operator No. (f dfferent from flng operator) H H Unversty N H H Unversty N H H Unversty N H H Unversty N H H Unversty N H H Unversty N H H Unversty N Total Well Count > g < A. Total Assgned Hora. Acreage < C. Total Assgned Acreage o < Total Remanng Horz. Acreage o < Total Remanng Acreage < B. Total Assgned Vert./Dr. Acreage < Total Remanng Vert./Dr, Acreage To show completon of Well No. 8H and revson of acreage for Well No. 6H Attach Addtonal Pages As Needed. Q No addtonal pages Addtonal Pages: (No. of addtonal pages) CERTIFICATION: 1 declare under penaltes prescrbed n Sec , Texas Natural Resources Code, that ths report was prepared by me or under my supervson or drecton, that I am authord o make ths report, and that the nformaton contaned n ths report s true, correct, and complete to the best of my knowledge. e,,,.,,,,; Annette Ranes annette.ranes@dvn.com Sg ature Name and ttle (type or prnt) Emal (nclude emal address only f you affrmatvely consent to ts publc release) 333 W. Sherdan Ave., Oklahoma Cty, OK /19/2015 Address Cty, State, Zp Code Tel: Area Code Number Oate: mo. day yr.

11 ;rtnjgnar Al,sra-y 7t GFtOUNbNtATFZ FRTECTI+t ETE911NA'ldN Date ;August 1, 2014 ***** EXPEDITED APPLICATION ***** FOPSTI GVtI-2 GQ1D Fle Na._ ' PI dumhr 2350x000 ttenton.; ETTE RtI1QE5 3C ,pdf RRC Lse N. I DEVON ENERGY PRaDUCTION CO LP 333 W SHERIDAN AVE OECLAHONIA CITX flk '73102 P-5# Measured ft FEL 3 ft FSI, T, : sczx!gtal u1ap Locaton: X-cor/Long Y-carrJlLat 1.1tJ9 Datum 83 Zee l 1 County } IRIOb2 Lease c del +. IJNIVERST2'Y #7FT&RAD 'u"fj sp (ND acarar 1 SUR UL,A U3,BLK-43,SEC-13,--jTD-6900, jrrc 7C, To pry#ecf sablc_taa#fr raandvvaterat ths locatarr; the Croundtrter;,cvstry Unt of the Rarcad Commsson of Teas rcammends: The nterval. from the land surface to the base o the SANT1 I20SA, rhch s estmated to oacaar at a depth o 750 feet, must be pretected, Ths recommendaton applcable to all we11 wthn a radus f 200 feet of ths locaton. Note l#nie, -t-d :;tfpr+rrsp, tf.s rec,rrrr, rrttan 4 ntende `u a.l, :rd=p tq the,utjec' rll aro-1 not, r arr vdf use Thls reomrnendaton 5s 3 n tended #o r zoo rma I r r ng, prod uc#ian, an I v gg I n g ope rata o ro s + n Pg. 1t saes n of a pply ao sa water c spos a ape rats on Sn4o e n on praductve zone (RR Form UV-7 tj. 5, IP tou h,e ary quesons, pease onat s at 51-:G+3-r 74'!, aurrro.state.t.as or ny mal a r. ' Dgtally sgned by George Dunfeld / d'\ on:=us,sc=texas,unsc.o=raoaa George DunePd Commsson of Texas,cn=George Dunfeld, GErL Sjc^,! rot---- t _ emal=george.dunfeld@rrestate[x.us v2fltof"jf U oace:zota.oa.ot nsz:a-os'ao',3 ;. Georges Dun eld, P. G. x f="- ''Op(IS OU(1'V",51IS0(} ll C GaS D,956 7hggdlpB:rlrJnn';:loct_r'rrr,lrsaUtho;ed:yeoryeDunred?n 8l11201A N,te:'Iteratcn frftselc,ccloc r,.rv,.llna-,te-tom u:r3sgrture. Form 1nJ ' a n. Sox 1X96?.ustn_ Texas '%1'. X96;' nrnet address. w,rus ;c sate.tx_as Rev 022G14

12 hereby certfy that ths plat s true and correct to the best of my belef and knowledge ' 'L,/j SECTION 8 Annette Ranes BLOCK 43 UNIVERSITY LAND SURVEY SECTION 7 N SECTION 9 BLOCK a.._..o BLOCK 43 UNIVERSITY LAND X88$ UNIVERSITY LAND SURVEY 1881 SURVEY T: N V cp V V N N SECTION 12 SECTION 14 BLOCK 43 BLOCK 43 UNIVERSITY LAND UNIVERSITY LAND SURVEY SURVEY SECTION 13 BLOCK 43 UNIVERSITY 8H - SHL LAND Lat: SURVEY Lon: Elev: 2629 NAD 83. Central TX. Nearest Well n o 0 n m SECTION 17 BLOCK 43 UNIVERSITY LAND SURVEY SECTION 19 BLOCK 43 UNIVERSITY LAND L@@f1 C0 SECTION 18 BLOCK 43 SURVEY 8H - SNL ITY LAND SU V Y O 8H - PP O 8H - 1 TP U 8H - LTP 8H - BHL H - WELLPATH -- 8H -DIMS - Addtonal Wells Survey_Lnes s Lease_Boundary Well Locaton s mles W of the Courthouse n Mertzon, Iron County, Texas. Total Depth: 6676' (Elev 2629) Surface Hole Locaton: 500' FSL & 1270' FEL of the Unversty Land Survey 500' FSL & 1270' FEL of the lease. Penetraton Pont: 551' FSL & 1847' FEL of the Unversty Land Survey 551' FSL & 1847' FEL of the Iease. Frst Take Pont: 908' FSL & 1846' FEL of the Unversty Land Survey 908' FSL & 1846' FEL of the lease. Last Take Pont: 2449' FSL & 1881' FEL of the Unversty Land Survey 218' FNL & 1881' FEL of the lease. Bottom Hole locaton: 2482' FSL & 1888' FEL of the Unversty Land Survey 186' FNL & 1888' FEL of the lease ,000 SCALE 1 "=1000' Feet 2,000 Devon Energy Producton Company L.P. I 333 WSherdan -Oklahoma Cty Unversty #8H Acres n Lease Ln (Wolfcamp) Feld Unversty Land Survey Tron County, Texas DATE: 01/15/2015 by AC

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Date: Tracking No.: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Submitted

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 06/29/2015

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 10/13/2015

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking No.: Approved 03/16/2016

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 03/11/2015

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporaton Commsson Ol & Gas Conservaton Dvson Post Offce Box 52000 Oklahoma Cty, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35149215290000 OTC Prod. Unt No.: 149-205146 Completon

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporaton Commsson Ol & Gas Conservaton Dvson Post Offce Box 52000 Oklahoma Cty, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35043231380001 OTC Prod. Unt No.: 043-205416 Completon

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 16947 Status: Submitted RAILROAD COMMISSION OF TEAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 15871 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Oil Well Potential Test, Completion or Recompletion Report, and Log

Oil Well Potential Test, Completion or Recompletion Report, and Log Tracking No.: 102948 Status: Submitted RAILROAD COMMISSION OF TEXAS Oil and Gas Division API No. 42- Oil Well Potential Test, Completion or Recompletion Report, and Log 1. FIELD NAME (as per RRC Records

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35051235810000 OTC Prod. Unit No.: 051-207824

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A AP No.: 35129235130000 OTC Prod. Unit No.: 129-206450

More information

Contractor's Material and Test Certificate for Underground Piping

Contractor's Material and Test Certificate for Underground Piping UNDERGROUND PPNG 13-97 Contractors Materal and Test Certfcate for Underground Ppng PROCEDURE Upon completon of work, nspecton and tests shall be made by the contractors representatve and wtnessed by an

More information

THE STATE OIL AND GAS BOARD OF MISSISSIPPI ORDER. This day this cause came on to be heard on the petition

THE STATE OIL AND GAS BOARD OF MISSISSIPPI ORDER. This day this cause came on to be heard on the petition BLED FOR RECORD J Jf\H 6 1978 OIL AND GAS BOARD Clyde R. Davs, State Ol & Gas Supervsor THE STATE OIL AND GAS BOARD OF MISSISSIPPI ^ DOCKET NO. 251-77-56 ORDER NO. ORDER Ths day ths cause came on to be

More information

'!' CORDOVA BRANDON GREEN

'!' CORDOVA BRANDON GREEN STERLNG HWY FOREST SERVCE- REGON TEN CHUGACH NATONAL FOREST CORDOVA RANGER DSTRCT PLANS FOR PROPOSED CONSTRUCTON SAND ROAD TRAL PARKNG AREA LEGAL DESCRPTON T. 16 S., R. 2 W., COPPER RVER MERDAN SHEET NDEX

More information

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165:

Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box Oklahoma City, Oklahoma Rule 165: Oklahoma Corporation Commission Oil & Gas Conservation Division Post Office Box 52000 Oklahoma City, Oklahoma 73152-2000 Rule 165: 10-3-25 Form 1002A API No.: 35073254870000 OTC Prod. Unit No.: 073-218559

More information

Gripping force, O.D. gripping. MPZ 20 / 4 bar MPZ 20 / 6 bar. MPZ 20-AS / 4 bar MPZ 20-AS / 6 bar. Gripping force, I.D. gripping

Gripping force, O.D. gripping. MPZ 20 / 4 bar MPZ 20 / 6 bar. MPZ 20-AS / 4 bar MPZ 20-AS / 6 bar. Gripping force, I.D. gripping SCHUNK Grppers pneumatc 3-Fnger Centrc Grppers Small Components Grpper Grppng force, O.D. grppng Fnger load Grppng force 50 MPZ 20 / 4 bar MPZ 20 / 6 bar MPZ 20-AS / 4 bar MPZ 20-AS / 6 bar 40 30 20 10

More information

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE 2018 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2018 grls

More information

Railroad Commission of Texas

Railroad Commission of Texas Workshop Railroad Commission of Texas Casing, Cementing, Drilling Well Control, and Completion Requirements Chairman Houston, Barry Texas T. Smitherman Commissioner David J. Porter Commissioner December

More information

2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE

2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE 2017 GIRLS DISTRICT-SPECIFIC PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2017 grls

More information

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE

2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE 2017 GIRLS CENTRAL DISTRICT PLAYER DEVELOPMENT GUIDE GENERAL OVERVIEW USA Hockey Grls Player Development Dstrct-Specfc Gude The USA Hockey Grls Player Development Dstrct-Specfc Gude outlnes the 2017 grls

More information

Terminating Head

Terminating Head Termnatng Head 58246-1 Instructon Sheet for MTA- 100 Receptacle Connectors 408-6929 Usng Dscrete Wre 07 APR 11 Locatng Pawl Feed Slde Tool Base Wre Inserter Adjuster (Inserton Rod) Mass Termnaton Assembly

More information

Chapter 3 Reserve Estimation. Lecture notes for PET 370 Spring 2012 Prepared by: Thomas W. Engler, Ph.D., P.E.

Chapter 3 Reserve Estimation. Lecture notes for PET 370 Spring 2012 Prepared by: Thomas W. Engler, Ph.D., P.E. Chapter 3 Reserve Estmaton Lecture notes for PET 370 prng 2012 Prepared by: Thomas W. Engler, Ph.D., P.E. Volumetrc N ol n 7758A B o place, n h f (1 1 ) here, N = ol n place, stb A = dranage area, acres

More information

NWP of 14 Enclosure

NWP of 14 Enclosure NWP-215-391 1 of 14 Enclosre NWP-215-391 2 of 14 Enclosre NWP-215-391 3 of 14 Enclosre NWP-215-391 4 of 14 Enclosre NWP-215-391 5 of 14 Enclosre NWP-215-391 6 of 14 Enclosre NWP-215-391 7 of 14 Enclosre

More information

Bourdon tube pressure gauges for chemical applications with electrical contact

Bourdon tube pressure gauges for chemical applications with electrical contact Electrcal contacts chemcal applcatons wth electrcal contact Measurng system fully welded to housng Robust mechatroncal pressure gauge Up to three contacts Tghtness-tested wth helum GOSSTNDRT-certfed Page

More information

Product Information. Long-stroke gripper PFH-mini

Product Information. Long-stroke gripper PFH-mini Product Informaton PFH-mn PFH-mn Loadable. Flexble. Relable. PFH-klen long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton clean

More information

Colorado Oil and Gas Conservation Commission

Colorado Oil and Gas Conservation Commission Colorado Oil and Gas Conservation Commission http://cogcc.state.co.us/ FORM 5A Completed Interval Report INDUSTRY TRAINING Denver, Colorado November 27, 2012 Form 5A Completed Interval Report Introduction

More information

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions

Colorado Oil and Gas Conservation Commission (COGCC) Completed Interval Report, Form 5A Data Field Definitions NOTE: Changes to the Form 5A, effective June 1, 2012, to accommodate the disclosure requirements are indicated by a preceding asterisk (*) and bold italics. All other fields are unchanged. FORM 5A HEADING

More information

ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS

ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS A ADDITIONAL INSTRUCTIONS FOR ISU SYNCHRONIZED SKATING TECHNICAL CONTROLLERS AND TECHNICAL SPECIALISTS DIFFICULTY GROUPS OF FEATURES 1 DEFINITIONS: Change of Rotaton: Refers to TURNS or LINKING STEPS rotatng

More information

SPECIAL USE PERMIT APPLICATION AN APPLICATION TO AMEND THE OFFICIAL ZONING MAP OF GWINNETT COUNTY, GA. NAME: New Bridge Church

SPECIAL USE PERMIT APPLICATION AN APPLICATION TO AMEND THE OFFICIAL ZONING MAP OF GWINNETT COUNTY, GA. NAME: New Bridge Church Gwinnett County Planning Division Special Use Permit Application Last Updated 12/20 S SPECAL USE PERMT APPLCATON AN APPLCATON TO AMEND THE OFFCAL ZONNG MAP OF GWNNETT COUNTY, GA. APPLCANT NFORMATON NAME:

More information

OIL AND GAS DOCKET NO

OIL AND GAS DOCKET NO OIL AND GAS DOCKET NO. 09-0239466 THE APPLICATION OF KEY ENERGY SERVICES, INC. - NTD FOR COMMERCIAL DISPOSAL AUTHORITY FOR ITS JEFF MOSER LEASE, WELL NOS. 1 AND 2, CHICO, WEST (CONGLOMERATE 5700) FIELD

More information

Evaluation of a Center Pivot Variable Rate Irrigation System

Evaluation of a Center Pivot Variable Rate Irrigation System Evaluaton of a Center Pvot Varable Rate Irrgaton System Ruxu Su Danel K. Fsher USDA-ARS Crop Producton Systems Research Unt, Stonevlle, Msssspp Abstrat: Unformty of water dstrbuton of a varable rate center

More information

Mobeetie Resource Dev LLC EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Mobeetie Resource Dev LLC EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 10-0262937 THE APPLICATION OF MOBEETIE RESOURCE DEV LLC FOR A PERMIT TO DISPOSE OF FLUID CONTAINING HYDROGEN SULFIDE INTO A RESERVOIR NOT PRODUCTIVE OF OIL OR GAS, BUD HOGAN SWD

More information

Texas Administrative Code

Texas Administrative Code TITLE 16 PART 1 CHAPTER 3 RULE 3.13 Texas Administrative Code ECONOMIC REGULATION RAILROAD COMMISSION OF TEXAS OIL AND GAS DIVISION Casing, Cementing, Drilling, Well Control, and Completion Requirements

More information

Product Information. Long-stroke gripper PSH 42

Product Information. Long-stroke gripper PSH 42 Product Informaton PSH 42 PSH Compact. Flexble. Fully encapsulated. PSH long-stroke grpper 2-fnger parallel grpper wth long jaw stroke and drt-resstant round gudance Feld of applcaton n contamnated work

More information

Product Information. Gripper for small components MPG-plus

Product Information. Gripper for small components MPG-plus Product Informaton Grpper for small components MPG-plus MPG-plus Grpper for small components More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth

More information

BLACK HILLS PLATEAU PRODUCTION COMPANY

BLACK HILLS PLATEAU PRODUCTION COMPANY BLACK HILLS PLATEAU PRODUCTION COMPANY DRILLING PROGRAM Homer Deep Unit 9 11CH SHL: 300 FNL, 200 FWL, NWNW Sect. 9 T8S R98W BHL: 1350 FSL, 2100 FEL NWSE Sect. 15 T8S R98W Garfield & Mesa Counties, Colorado

More information

Product Information. Gripper for small components MPG 32

Product Information. Gripper for small components MPG 32 Product Informaton MPG 32 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Kerry A. Pollard Texstar Midstream Utility, LP Gallon E. Gray Phillip Zamzow EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 01-0271975 THE APPLICATION OF TEXSTAR MIDSTREAM UTILITY, LP FOR AUTHORITY PURSUANT TO STATEWIDE RULES 9 AND 36 TO DISPOSE OF OIL AND GAS WASTE CONTAINING HYDROGEN SULFIDE INTO THE

More information

ST70+ User Reference Manual. Document reference: Date: January 2009

ST70+ User Reference Manual. Document reference: Date: January 2009 ST70+ User Reference Manual Document reference: 85024-1 Date: January 2009 Autohelm, HSB, RayTech Navgator, Sal Plot, SeaTalk and Sportplot are UK regstered trademarks of Raymarne UK Lmted. Pathfnder and

More information

Fully encapsulated. Reliable. Precise. DPZ-plus Sealed Gripper

Fully encapsulated. Reliable. Precise. DPZ-plus Sealed Gripper DPZ-plus Fully encapsulated. Relable. Precse. DPZ-plus Sealed Grpper Despte the hgh moment load of the base jaws, ths sealed 3-fnger centrc grpper satsfes the requrements of IP67 and does not permt any

More information

High Cost Gas Statewide Rule 101 (Tight Formations)

High Cost Gas Statewide Rule 101 (Tight Formations) RAILROAD COMMISSION OF TEXAS High Cost Gas Statewide Rule 101 (Tight Formations) Stephan Paetzold, Engineering Unit Overview What is High Cost Incentive and Statewide Rule (SWR) 101 Background How to Obtain

More information

FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS

FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS FK240 FLAT SOLAR COLLECTORS ROOF-TOP INSTALLATION FOR WORCESTER SOLAR SYSTEMS G INSTALLATION INSTRUCTIONS About ths manual Ths nstallaton manual contans mportant nformaton for the safe and approprate nstallaton

More information

Product Information. Gripper for small components MPG 50

Product Information. Gripper for small components MPG 50 Product Informaton MPG 50 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

DRAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIDIROKASTRO DEFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT

DRAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIDIROKASTRO DEFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT RAFT FOR PUBLIC CONSULTATION INTERCONNECTION AGREEMENT v.2.0 FOR IP KULATA/SIIROKASTRO EFINITIONS, BUSINESS RULES, EXCEPTIONAL EVENT ARTICLE 1: EFINITIONS All terms of the INTERCONNECTION AGREEMENT shall

More information

Product Information. Long-stroke gripper PHL

Product Information. Long-stroke gripper PHL Product Informaton PHL PHL Flexble. Precse. Powerful. PHL long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton Optmum standard

More information

EXHIBIT D. From: Office of the Mayor. FOR IMMEDIATE RELEASE: May 25, 2016

EXHIBIT D. From: Office of the Mayor. FOR IMMEDIATE RELEASE: May 25, 2016 EXHIBIT D From: Offce of the Mayor Danel Wllams, Drector of Meda Relatons Offce of the Mayor (216) 664-4011 Danel Ball, Assstant Drector of Meda Relatons Offce of the Mayor (216) 664-3691 FOR IMMEDIATE

More information

Drilling Morning Report

Drilling Morning Report REPORT DATE 5/0/200 Report # AFE # Casing OD(in) WT(lbs/ft) Grade Btm MD(ft) Btm TVD(ft) DCRB04 TVD: 32 MD: 32 Progress: 32 Planned TD:,500 Current Hole Size: Days From Spud: Spud Date: 5//0 Days on Well:

More information

Availability assessment of a raw gas re-injection plant for the production of oil and gas. Carlo Michelassi, Giacomo Monaci

Availability assessment of a raw gas re-injection plant for the production of oil and gas. Carlo Michelassi, Giacomo Monaci 16 th IMEKO TC4 Symposum Explorng New Fronters of Instrumentaton and Methods for Electrcal and Electronc Measurements Avalablty assessment of a raw gas re-njecton plant for the producton of ol and gas

More information

Product Information. Gripper for small components MPG 80

Product Information. Gripper for small components MPG 80 Product Informaton MPG 80 MPG Precse. Compact. Relable. MPG grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng and movng of small to medum-szed

More information

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we

Form MMS 123A1123S Electronic Version. Application. We have incorrect pressure tests for the annulars on subject ABP The ABP shows we U.S Department of the Interior 0MB Control Number 1010-0141 Minerals Management Service MMS 0MB Approval Expires 08/31/2008 Form MMS 123A1123S Electronic Version Lease Area/Block Well Name ST 01 BP 00

More information

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE

INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE INSTRUCTIONS FOR COMPLETING FORM H-9 STATEWIDE RULE 36 CERTIFICATE OF COMPLIANCE 1. The certificate of compliance shall certify that operator has complied, or will comply, with applicable provisions of

More information

For models: 660 EF/EFO

For models: 660 EF/EFO Installaton Instructons Gas converson kts For models: 660 EF/EFO Part no. 660NGKIT/660LPKIT Warnng: Ths kt must be nstalled by a qualfed nstaller n accordance wth these nstructons and all applcable codes

More information

Bourdon tube pressure gauges for chemical applications with glycerine filling

Bourdon tube pressure gauges for chemical applications with glycerine filling Bourdon tube Bourdon tube pressure gauges for chemcal applcatons wth glycerne fllng EN 837- For chemcal and process engneerng applcatons Measurng system fully welded to housng Extremely robust desgn Can

More information

BETHANY TAX INCREMENT FINANCING DISTRICT NO. 1 NOTICE OF TWO PUBLIC HEARINGS

BETHANY TAX INCREMENT FINANCING DISTRICT NO. 1 NOTICE OF TWO PUBLIC HEARINGS BETHANY TAX NCREMENT FNANCNG DSTRCT NO. 1 NOTCE OF TWO PUBLC HEARNGS On December 12, 2017 at 7:00 P.M., at Bethany Cty Hall, 6700 N.W. 36th Street, Bethany, Oklahoma, the Cty Councl of the Cty of Bethany

More information

VOLUME TRENDS NOVEMBER 1988 TRAVEL ON ALL ROADS AND STREETS IS FOR NOVEMBER 1988 AS COMPARED UP BY 3.4 PERCENT TO NOVEMBER 1987.

VOLUME TRENDS NOVEMBER 1988 TRAVEL ON ALL ROADS AND STREETS IS FOR NOVEMBER 1988 AS COMPARED UP BY 3.4 PERCENT TO NOVEMBER 1987. VOLUME U.S. Department of Transportation Federal Highway TRENDS NOVEMBER 1988 TRAVEL ON ALL ROADS AND STREETS S FOR NOVEMBER 1988 AS COMPARED UP BY 3.4 PERCENT TO NOVEMBER 1987. rr ALL DATA FOR THS MONTH

More information

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity :

D & V Oil Co. LP. Daily Completion Report - University CN A #6 API # /23/2016. Perfs ' ' Activity : Daily Completion Report - University CN A #6 API # 42-105-42334 12/23/2016 Activity at Report Time: Perfs - 2512' - 2632' Depth at Report Time Put Well on Production 2655' - PBTD Activity : Arrive Location.

More information

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL

OIL/GAS WELL COMPLETION REPORT. Well Name and Number Surveyed elevation (feet): KB GL 1800 Washingn Blvd. Baltimore Maryland 21230 OIL/GAS WELL COMPLETION REPORT Permit No. Name of Operar Address Well Name and Number Surveyed elevation (feet): KB GL Well Location Field (If wildcat, so state)

More information

NSPAA SLOW PITCH SOFTBALL POLICY AND PROCEDURES HANDBOOK

NSPAA SLOW PITCH SOFTBALL POLICY AND PROCEDURES HANDBOOK NSPAA SLOW PITCH SOFTBALL POLICY AND PROCEDURES HANDBOOK Revsed January 1, 2017 The Slow Ptch Softball Board (upon approval by the NSPAA Board) reserves the rght to edt, modfy, or change any polcy and/or

More information

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE

Enbridge G & P (East Texas) LP EXAMINER S REPORT AND PROPOSAL FOR DECISION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 05-0263914 THE APPLICATION OF ENBRIDGE G & P (EAST TEXAS) LP FOR AUTHORITY PURSUANT TO STATEWIDE RULES 9 AND 36 TO DISPOSE OF OIL AND GAS WASTE CONTAINING HYDROGEN SULFIDE INTO ITS

More information

Disposal/Injection Well Pressure Test Report (H-5)

Disposal/Injection Well Pressure Test Report (H-5) RAILROAD COMMISSION OF TEXAS Disposal/Injection Well Pressure Test Report (H-5) Lauryn McFarland Engineering Technician Summary When Mechanical Integrity Test (MIT) is required How to file MIT How to perform

More information

Friday 14 th September, 2012

Friday 14 th September, 2012 Friday 14 th September, 2012 Target Energy oil flow success as predicted in Darwin-1 well in Texas, USA In our previous coverage of Target Energy (ASX: TEX, Share Price: $0.098, Market Cap: $34m) in early

More information

Product Information. Radial gripper PRG 52

Product Information. Radial gripper PRG 52 Product Informaton PRG More flexble More powerful. Slm. PRG unversal grpper 180 radal grpper wth powerful 1-shft slotted lnk gear and oval pston. Feld of applcaton For areas of applcaton whch, n addton

More information

No TRINIDAD AND TOBAGO.

No TRINIDAD AND TOBAGO. r)( /6 / 2 TRNDAD AND TOBAGO. General Loan and nscrbed Stock. No. 25.-1912. 6th May. AN ORDNANCE to declare the terms and condtons applcable to Loans authorsed to be rased by the Government of Trndad and

More information

Coastal Engineering Technical Note

Coastal Engineering Technical Note Coastal Engneerng Techncal Note CETN V-10 Even-Odd Functon Analyss of Shorelne Poston and Volume Change by Jule Dean RoSllt and Nchollls C. Kraus Purpose: To present the background and methodology for

More information

MODEL : LDF7810WW/ LDF7810BB/ LDF7810ST LDF7811WW/LDF7811BB / LDF7811ST LDS5811WW/ LDS5811BB/ LDS5811ST LDF6810WW/LDF6810BB / LDF6810ST

MODEL : LDF7810WW/ LDF7810BB/ LDF7810ST LDF7811WW/LDF7811BB / LDF7811ST LDS5811WW/ LDS5811BB/ LDS5811ST LDF6810WW/LDF6810BB / LDF6810ST _/ / _ III IRL III" Dshwasher MODEL : LDF7810WW/ LDF7810BB/ LDF7810ST LDF7811WW/LDF7811BB / LDF7811ST LDS5811WW/ LDS5811BB/ LDS5811ST LDF6810WW/LDF6810BB / LDF6810ST Please read ths manual carefully Retan

More information

Bourdon tube pressure gauges for chemical applications (glycerine filling) EN 837-1

Bourdon tube pressure gauges for chemical applications (glycerine filling) EN 837-1 Bourdon tube Pressure gauges Bourdon tube pressure gauges for chemcal applcatons (glycerne fllng) EN 837-1 For chemcal and process engneerng applcatons Measurng system fully welded to housng Extremely

More information

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick

Railroad Commission of Texas. Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick Railroad Commission of Texas Chairman Barry T. Smitherman Commissioner David Porter Commissioner Christi Craddick 1 RRC Regulations Primary directives: - Prevent Waste - Promote Conservation - Protect

More information

M.H.Ahn, K.J.Lee Korea Advance Institute of Science and Technology 335 Gwahak-ro, Yuseong-gu, Daejeon , Republic of Korea

M.H.Ahn, K.J.Lee Korea Advance Institute of Science and Technology 335 Gwahak-ro, Yuseong-gu, Daejeon , Republic of Korea The Methodology on Exposure Dose Evaluaton Modelng Related to Arbtrary Accdent n the Temporary Storage Faclty for Low and Intermedate Level Waste - 9133 M.H.Ahn, K.J.Lee Korea Advance Insttute of Scence

More information

Summary and Cruise Statistics 8

Summary and Cruise Statistics 8 Suary and Cruse Statstcs 8 July 1, 014 8-1 Cruse Colaton Manual Mnstry of Forests, Lands and NRO 8.1 Plot Suary Reort Overvew The Plot Suary reorts nuber of stes, daeter, and erchantable volue nforaton

More information

RCBC Newsletter. August Richmond County Baseball Club. Inside this issue: 2016 College Showcase Camp. Tournament Update.

RCBC Newsletter. August Richmond County Baseball Club. Inside this issue: 2016 College Showcase Camp. Tournament Update. August 2016 Rchmond County Baseball Club 1400 Travs Ave. Staten Island, NY 10314 RCBC Newsletter If you have any nterestng nfo or news you would lke ncluded n a future newsletter, please emal to jm@rcbclub.com.

More information

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE OIL AND GAS DO0KET NO. 01-0249550 THE APPLICATION OF REGENCY FS LP UNDER RULE 36 AND RULE 46 TO DISPOSE OF OIL AND WASTE CONTAINING HYDROGEN SULFIDE GAS INTO ITS TILDEN GPI WELL NO. 1, TILDEN, S. (WILCOX

More information

ST70+ Installation Guide

ST70+ Installation Guide 87099_1.book Page Tuesday, January 27, 2009 12:45 PM ST70+ Installaton Gude Document reference: 87099-1 Date: January 2009 87099_1.book Page Tuesday, January 27, 2009 12:45 PM Autohelm, HSB, RayTech Navgator,

More information

Product Information. Gripper for small components MPG-plus 40

Product Information. Gripper for small components MPG-plus 40 Product Informaton MPG-plus 40 MPG-plus More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng

More information

Product Information. Universal gripper PZN-plus 40

Product Information. Universal gripper PZN-plus 40 Product Informaton PZN-plus 40 PZN-plus Relable. Robust. Flexble. PZN-plus unversal grpper Unversal 3-Fnger Centrc Grpper wth hgh grppng force and maxmum moments due to mult-tooth gudance Feld of applcaton

More information

Product Information. Universal gripper PZN-plus

Product Information. Universal gripper PZN-plus Product Informaton Unversal grpper PZN-plus PZN-plus Unversal grpper Relable. Robust. Flexble. PZN-plus unversal grpper Unversal 3-Fnger Centrc Grpper wth hgh grppng force and maxmum moments due to mult-tooth

More information

PLAYERS AGENT REGISTRATION REGULATIONS

PLAYERS AGENT REGISTRATION REGULATIONS PLAYERS AGENT REGISTRATION REGULATIONS 1 DEFINITIONS 1.1 In these Players Agent Regstraton Regulatons, the followng terms shall have the followng meanngs: Agency Actvty means actng n any way and at any

More information

it500 Internet Thermostat

it500 Internet Thermostat T500 User Manual 16pp 025_Layout 1 03/09/2013 12:00 Page 1 T500 Internet Thermostat U S E R M A N U A L T500 User Manual 16pp 025_Layout 1 03/09/2013 12:00 Page 2 Product complance & safety nformaton These

More information

Bourdon tube pressure gauges for industrial applications EN 837-1

Bourdon tube pressure gauges for industrial applications EN 837-1 Pressure gauges Bourdon tube for ndustral applcatons EN 837-1 For machne and plant engneerng Robust steel or stanless steel housng Many customsed versons avalable A Page 386 Applcaton For gaseous and lqud

More information

Bourdon tube pressure gauges for industrial applications

Bourdon tube pressure gauges for industrial applications Pressure gauges Bourdon tube for ndustral applcatons EN 837- For machne and plant engneerng Robust steel or stanless steel housng Many customsed versons avalable A Page 54 Applcaton For gaseous and lqud

More information

Hydro-Mech Bridge Plug

Hydro-Mech Bridge Plug Manual No: 0620000303 Revision: F Approved By: Quality Engineer Date: 2014-9-9 Hydro-Mech Bridge Plug DESCRIPTION: Map Hydro-Mech Bridge Plug is hydraulically actuated and mechanically set. Compact, with

More information

Enbridge Pipelines (NE Texas) LP EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE

Enbridge Pipelines (NE Texas) LP EXAMINER S REPORT AND RECOMMENDATION STATEMENT OF THE CASE OIL AND GAS DOCKET NO. 06-0262611 THE APPLICATION OF ENBRIDGE PIPELINES (NE TEXAS) LP FOR A PERMIT TO INJECT ACID GAS INTO ITS PITTSBURG GAS INJECTION LEASE WELL NO. 1 IN THE PROPOSED PITTSBURG (PALUXY

More information

Product Information. Long-stroke gripper PHL 50

Product Information. Long-stroke gripper PHL 50 Product Informaton PHL 50 PHL Flexble. Precse. Powerful. PHL long-stroke grpper 2-fnger parallel grpper wth large jaw stroke for large parts and / or a broad range of parts Feld of applcaton Optmum standard

More information

STATE OF MICHIGAN DEPARTMENT OF NATURAL RESOURCES LANSING. 16 April 2013

STATE OF MICHIGAN DEPARTMENT OF NATURAL RESOURCES LANSING. 16 April 2013 STATE OF MICHIGAN DEPARTMENT OF NATURAL RESOURCES LANSING DNR DEPARTMENT OF NATURAL RESOURCES MICHIG AN April 0 Allegan County Board of Commissioners Chestnut Street Allegan, MI 4900 Dear Allegan County

More information

Nonlinear Risk Optimization Approach to Gas Lift Allocation Optimization

Nonlinear Risk Optimization Approach to Gas Lift Allocation Optimization pubs.acs.org/iecr Nonlnear Rsk Optmzaton Approach to Gas Lft Allocaton Optmzaton Mahd Khshvand and Ehsan Khamehch* Faculty of Petroleum Engneerng, Amrkabr Unversty of Technology, Tehran, Iran ABSTRACT:

More information

Service Manual 3014 / Front-Side Applicator. Made in Germany

Service Manual 3014 / Front-Side Applicator. Made in Germany Servce Manual Front-Sde Applcator 3014 / 3016 Made n Germany 2 Servce Manual 2 for the followng products Famly Type Front-Sde Applcator 3014 3016 Edton: 05/2018 - Part No. 9009529 Copyrght Ths documentaton

More information

Product Information. Universal gripper PGN-plus 40

Product Information. Universal gripper PGN-plus 40 Product Informaton PGN-plus Relable. Robust. Flexble. PGN-plus unversal grpper Unversal 2-Fnger Parallel Grpper wth large grppng force and hgh maxmum moments due to mult-tooth gudance. Feld of applcaton

More information

AMP-O-MATIC* Side-Feed Stripper-Crimper III Machine No [ ] customer manual TOOLING ASSISTANCE CENTER

AMP-O-MATIC* Side-Feed Stripper-Crimper III Machine No [ ] customer manual TOOLING ASSISTANCE CENTER AMP-O-MATIC* Sde-Feed Strpper-Crmper III Machne No. 1320895-[ ] Customer Manual 409-10012 28 DEC 11 SAFETY A. PRECAUTIONS READ THIS FIRST!............................ 2 customer manual 1. INTRODUCTION.......................................................

More information

ASSEMBLY INSTRUCTIONS. TECHART roof spoiler

ASSEMBLY INSTRUCTIONS. TECHART roof spoiler Part no. 070.100.650.009 Roof spoler Contents I Important safety nformaton...3 II Preparaton...5 III Installaton...6 1 Preparng the vehcle...6 2 Fttng the...6 3 Fnal nspecton...6 TECHART Verson 01 Page

More information

Product Information. Gripper for small components MPG-plus 32

Product Information. Gripper for small components MPG-plus 32 Product Informaton MPG-plus 32 MPG-plus More powerful. Faster. Longer fngers. MPG-plus grpper for small components 2-fnger parallel grpper wth smooth roller gudes of the base jaws Feld of applcaton Grppng

More information

OIL AND GAS DOCKET NO

OIL AND GAS DOCKET NO OIL AND GAS DOCKET NO. 09-0241077 THE APPLICATION OF GILBOW TANK TRUCK SERVICE, INC., TO DISPOSE OF OIL AND GAS WASTE BY INJECTION INTO A POROUS FORMATION NOT PRODUCTIVE OF OIL OR GAS, GILBOW WELL NO.

More information

Casing and Cementing Requirements

Casing and Cementing Requirements Directive PNG005 May 2018 Revision 2.0 Governing Legislation: Act: The Oil and Gas Conservation Act Regulation: The Oil and Gas Conservation Regulations, 2012 Order: 148/18 Record of Change Revision Date

More information

h at p.;ge 1 15 Floracraft" Corporation P.O. Box 400 One Longfellow Place

h at p.;ge 1 15 Floracraft Corporation P.O. Box 400 One Longfellow Place h at Stablty 0 Revson Date 22-Mar-2012 Revson Number 1 Product Name 1510 Synonyms StyroGlue (R) lljanufaewred bll: Floracraft" Corporaton P.O. Box 400 One Longfellow Place Ludngton, M 49431 Emergency Contact

More information

Bridge Plugs Operations

Bridge Plugs Operations LAST UPDATED 030618 INTERNATIONAL UNITED STATES Adelaide, Australia..... 61.8.8152.0244 Bakersfield, CA... 661.637.1380 Red Deer, AB..... (403) 340.1017 Fruita, CO... 970.858.1850 Calgary, AB... (403)

More information

Casing Design. Casing Design. By Dr. Khaled El-shreef

Casing Design. Casing Design. By Dr. Khaled El-shreef Casing Design By Dr. Khaled El-shreef 1 Casing Design CONTENTS Function of Casing Casing Types & Tools Strength Properties Casing Specification Casing Design 2 1 RUNNING AND CEMENTING CASING Reasons for

More information

Nonvoting. A.J. Bartosic, Rohm & Haas Go., PA Herman H. Spaeth, Novato, CA (Member Emeritus) Staff Liaison: Waiter P. Sterling

Nonvoting. A.J. Bartosic, Rohm & Haas Go., PA Herman H. Spaeth, Novato, CA (Member Emeritus) Staff Liaison: Waiter P. Sterling Report of the Commtte on Fre Tests jessej. Betel, Char Hughes Assocates nc., MD PeterJ. Barbadoro, Westnghouse Savannah Rver Co., SC Aprl L. Berkol, TT Sheraton Corp., MA Rep. Amercan Hotel & Motel Assn.

More information

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer

Reduced drift, high accuracy stable carbon isotope ratio measurements using a reference gas with the Picarro 13 CO 2 G2101-i gas analyzer Reduced drft, hgh accuracy stable carbon sotope rato measurements usng a reference gas wth the Pcarro 13 CO 2 G2101- gas analyzer Chrs Rella, Ph.D. Drector of Research & Development Pcarro, Inc., Sunnyvale,

More information

Product Information. Long-stroke gripper PHL 63

Product Information. Long-stroke gripper PHL 63 Product Informaton PHL Flexble. Precse. Powerful. PHL 2-fnger parallel grpper wth long jaw stroke for large parts and/or a broad range of parts Feld of applcaton Optmum standard soluton for many felds

More information

RCBC Newsletter. September Richmond County Baseball Club. Inside this issue: Johnny Ray Memorial Classic. RCBC on You Tube

RCBC Newsletter. September Richmond County Baseball Club. Inside this issue: Johnny Ray Memorial Classic. RCBC on You Tube September 2016 Rchmond County Baseball Club 1400 Travs Ave. Staten Island, NY 10314 RCBC Newsletter If you have any nterestng nfo or news you would lke ncluded n a future newsletter, please emal to jm@rcbclub.com.

More information

Product Information. Long-stroke gripper PHL 40

Product Information. Long-stroke gripper PHL 40 Product Informaton PHL Flexble. Precse. Powerful. PHL 2-fnger parallel grpper wth long jaw stroke for large parts and/or a broad range of parts Feld of applcaton Optmum standard soluton for many felds

More information