INSTRUCTION LEAFLET. Standard No , Sup. September, CODE OF TESTS FREIGHT BRAKE ABD, ABDT, ABDW, PORTIONS.

Size: px
Start display at page:

Download "INSTRUCTION LEAFLET. Standard No , Sup. September, CODE OF TESTS FREIGHT BRAKE ABD, ABDT, ABDW, PORTIONS."

Transcription

1 INSTRUCTION LEAFLET Standard No , Sup. September, CODE OF S FREIGHT BRAKE ABD, ABDT, ABDW, PORTIONS abtec

2

3 Quick Flowrator Mechanical Mechanical General Air Mechanical Mechanical Drawings Test Test Specification Function Final Completion Drawings Test Service SCOPE This leaflet is intended to cover only the testing. ABDT Service Portions and ABD. ABDS. ABDW, ABDWS Emergency Portions and Maintenance of the "ABH Test Rack, as approved by the Association of American Railroads for use by Certified Air Brake 0 TABLE OF The AB Test Rack General Description and Accessories General Description of Electronic Accessories Description of Cocks Opening Diaphragm Cock Meter Manometer Safety Procedures and Warning Test Rack Maintenance Manometer Quick Opening Diaphragm Cock Electronic Calibration Switch PSI Mechanical Pressure Switch Tuning Chokes Cleaning and Lubrication Testing The Rack Requirements Leakage Gauges Manometer Pressure Switch Calibration Code of Tests ABD and ABDT Service Portion Test Code and Other Information Equipment Requirements Procedure Requirements Compliance Capacity Set- Test Leakage and Capacity Leakage of Test ABD and ABDS Emergency Portion Test Code and Other Information Test Equipment Requirements Test Procedure Requirements Specification Compliance Set- Leakage Charging Stability Emergency Sensitivity High Pressure Valve and Inshot Valve 11 Emergency Accelerated Release Function Quick Action Blowdown, Service Inshot and Final Leakage Completion of Test

4 Drawings AA Service ABDW and ABDWS Emergency Portion Test Code and Other Information Test Equipment Requirements Test Procedure Requirements Specification Compliance Leakage Charging V Stability Stability Emergency Sensitivity 11 High Pressure Valve and Inshot Valve Emergency Accelerated Release Function Quick Action Blowdown, Service Inshot and Final Leakage Completion of Test Index of Plates Test Set- -4-

5 0 THE AB 1 General Description and Accessories To obtain the best results in air comprising the complete equipment be efficiency. The test rack is whether the valves are up to proper standard of workmanship and general condition and if not, where they deviate from the standard. The following standard accessories are 1. Blanking 2300-C). 2. Pipe, Pc (TA-1301). 3. A where required by law, Pc. 1264). ABD- 1 Test Plate Combination (Includes 4-7) Pc (TA-2972-D). 4. ABD- 1 Test Plate, Pc (TA-2972-C). 5., Pc (TA A). 6. AB-2 Test Plate, Pc (TA-1479-C). 7. Emergency, Pc (TA-1300). General Description of Electronic Accessories An emergency valve s response time to an emergency rate of brake pipe reduction is recorded in the emergency response test. The new cock 23, using the test rack devices as shown in sensitivity/stability for ABDX type and stabilized valves. Two are used in conjunction with a timer enclosed in a switch box and an external battery circuit for measurement of this response time. The switch box/timer allows the test rack operator to conveniently change the timer to a choke capacities during test rack emergency valve response time during valve testing and a connected to a foot switch, allowing the timer to function as a foot controlled that frees up the rack operators hands for other duties. The battery pull-up circuit has been added to enhance the timer response. The battery pull-up circuit has a battery test feature which must be checked periodically. Three AA alkaline batteries must be replaced as required. The following electronic accessories are illustrated in Figure Switch 3. Cock 23 bb1) and choke assembly. 4. (BARKSDALE Model bb1). 5. Foot 632D or equivalent.

6 AB Test Figure 1 Rack Equipped with Mechanical Manometer

7 ..... Description of Cocks Cock 1 Cock 2 Cock 3 Cock 4 Cock 5 Cock 6 Cock 7 Cock 8 Cock 9 Cock 11 Cock 12 Cock 13 Cock 14 Cock 15 Cock 16 Cock 17 Cock 18 Cock 19 Cock 20 Cock 21 Cock 22 Cock 23 %" Brake Pipe Cut-Out Cock %H Auxiliary Reservoir Cut- Out Cock %" Brake Cylinder Cut-Out Cock 3/&" %" Emergency Reservoir Cut-Out Cock 0/8" Emergency Reservoir 3/8" Aux. Res. Vent Cock with No. 63 Drill (.037") Choke 3/8 Exhaust Cock 3/&" By-Pass Cock, Main Res. to Emer. Res. 0/8" Brake Cylinder Res. Cut-Out Cock 3/8" Brake Cylinder Vent Cock 3/8" By-Pass Cock, Main Res. to Brake Cylinder By-Pass Cock with No. 50 Drill (.070") Choke, Main Reservoir to Auxiliary 3/&" Cock 3/&" By-Pass Cock, Brake Pipe Reservoir to Auxiliary Reservoir 0/8" By-Pass Cock, with 3/16" (. 1875") Choke Auxiliary Reservoir to Brake Cylinder 3/&" Aux. 0240") Choke 3/8" By-Pass Cock. Aux. Res. to Q.A. Cham. 3/8" Quick Action Chamber Cut-Out Cock W' Vent Valve 3/&", Pc /8 Choke Plug (No. 30 Drill), Pc. 3/8" BP Vent Cock Pc No. 29 Drill Choke (See Fig. 3 - Item 3) Figure 2 Accessories Used With AS Test Rack

8 Figure 3 Electronic Accessories with -AB" Test Rack

9 .! Quick Opening Diaphragm Cock The distinctive features of this improved diaphragm cock, as illustrated in Figure 4, are: (a) the quick opening lever type handle, the radial position of which is adjustable to any angle. and (b) regulates the amount of diaphragm. Flowrator Meter, be The FLOWRATOR Meter, as illustrated in Figure 5, is an instrument to provide a means of observing and determining quickly and accurately the brake devices. It tapered glass tube and the flow of air to be measured is admitted to the bottom of the tube. The rate of flow is then float to rise in the tube. A indicates this rate of flow in cubic-inches of free air per minute. By at which the float balances in a stationary position, the rate of flow can be instantly. The instrument is used in the same manner as the Leakage Indicator and the standard hose fittings, hose and hose nozzle attached to it. Also, the test rack in the same changes in fastening the L / Figure 4 Sectional View of the Quick Diaphragm Cock with lever Type Handle Figure 5 FlOWRATOR Meter for

10 Mechanical Manometer The mechanical manometer is a pressure differential readings. The manometer dial is graduated to read in pounds per square inch (psi). See Figure Alternate Standard Mechanical Manometer Standard Mechanical Manometer Figure 6 Manometer Valve "S" position. Cut- " Position (To Right for rotary valve type and Pulled-Out for spool valve type): connects manometer to auxiliary and brake pipe reservoir. Cut-Out" Position (To Left for rotary valve type and Pushed-In for spool valve type): connects manometer to atmosphere. Safety Procedures and Warnings: General shop specification instructions. The work area should be clean and free of debris. Before applying portion to be tested, a visual inspection should assure integrity of valve covers and castings, mounting hardware etc. of a damaged or partially assembled valve portion to the test personal injury. Due to the possibility of exhausting air and high decibel levels of noise associated with it from the device during eye protection be used. This injury to the operator or persons near the test rack. 10-

11 The following statements of warning apply all or in part wherever the symbol appears in the maintenance procedures. Failure to observe these performing the work and/or the bystanders. Before starting the test, make certain that all test equipment and the device to be tested are fastened and/or personal injury from parts that may be HBLOWW from the test arrangement when air is admitted to the test rack. Before starting the test, make certain that the cap screws and pipe plugs are fastened securely to minimize the possibility of personal injury from parts that may be "BLOWN" from the downstream of the leakage or capacity reservoir. Air will vent from specific cock openings or ports cocks are opened or valves operated. To injury from the effects of venting, make certain that all persons stand clear of the exhaust stream. As required during any of the following loosened before they are removed in order to minimize the possibility of personal injury from the, pressurized air that may be arrangement. Before continuing the test, make certain that all test equipment and the device to be tested are fastened and/or connected securely to minimize the possibility personal injury from parts that may be "BLOWW from the test arrangement when air is admitted to the test rack. To minimize the possibility of electrical shock and bodily injury, prior to making any electrical connections or disconnections, make certain that all electrical power switches are in the.off' position. Air will vent from the test rack during possibility of personal injury from the effects of venting pressurized air, make certain that all persons stand clear of the exhaust stream. The test equipment used to connect the device to the test rack must be carefully loosened before they are removed in order to minimize the injury from the effects of residual RACK MAINTENANCE To secure reliable and uniform results with the "AB" Test Rack, it must be tested as often as required but not less frequently than every 30 days to keep the rack accurate and free from leakage. Each test rack must be tagged, noting the most recent test date., valve " and diaphragm cocks and any leakage discovered must be corrected before valves are tested. Air gauges must be maintained in a condition to within ranges of pressure which they are used and must be sensitive to slight variations of pressure. Strainer and/or filter must be frequently than once each year. 11-

12 Mechanical Manometer A calibration check on the mechanical manometer, as described in Section 5. 5, must be made as often as necessary to assure proper calibration but not less frequently than once every six months. Once each year, or as often as necessary, the mechanical manometer must be removed from the "AS" Test Rack, cleaned and calibrated by traceable to the national standard or accepted industrial Quick Opening Diaphragm Cock To adjust the diaphragm tension (or deflection), loosen the cap screw which serves to clamp the split coupling on the threaded portion of the cover and screw down or back off the imparted to the diaphragm by the cam portion of the handle plunger and disc) is just handle in closed position. The clamping screw should be tightened when the desired tension on the diaphragm is obtained. The handle position can then be adjusted to the desired angle by loosening three set screws in the handle fulcrum and rotating clamped coupling. The three set screws must be place and to permit operation of the diaphragm. Care should be exercised in operating the diaphragm type cocks in order to realize the benefits to be derived from the use of this, that is, eliminating leakage (thereby giving consistent and dependable test results) and obviating the delay and annoyance incident to res When the test rack is not in use, all diaphragm cocks should be open. This practice will prolong the life of the diaphragm by preventing permanent set as the diaphragm is in normal position with the cock open. Electronic Calibration Pressure Switch The electronic pressure switch, lit Model800P 4S9, is used in the This device is a highly accurate, field adjustable pressure switch/pressure gauge. Its digital LE.D. display facilitates exact control over the switching circuitry and displays a gauge pressure to one tenth of a psi. This level of performance and accuracy is required Substitutions for this device shall meet or exceed specifications of this model although substitutions are not recommended by WABCO. Calibration of this pressure switch must be checked to 1 psi, annually or as frequently as necessary in order to traceability to a national standard. instructions supplied with the unit. 3 PSI Mechanical Pressure Switches In the mode, two mechanical cock 23 and a special vent valve leakage test fitting for emergency portion qualification in Sections 8.0 and 9.0. These mechanical pressure switches are bb1 or equivalent and are factory set at 3 psi on increasing pressure. Calibration of these pressure switches must be checked annually or as frequently as necessary as described in Section 5.6 in order to maintain proper operation. 12-

13 Tuning Chokes Due to the tolerance variations in the actual necessary to accurately size certain chokes according to each individual test rack. This is done by blowing down the particular choke and comparing the blowdown times as performed in Section 5.0. If necessary, the choke may need to be cleaned, peened or reamed to provide the correct flow capacity. In order to obtain the accuracy in capacity the IIT800P electronic pressure switch as outlined in 1. This switch must be set to a window mode with pressure settings as described in paragraph 5.4. Cleaning and Lubrication The greatest freedom from wear and leakage in the operating parts of the rack will be obtained by keeping them properly lubricated at time of testing rack disassembled, cleaned and lubricated more often, leakage test should be made when this is done. Spool valve type valve HBH requires no case, the spool valve stem and O-rings must be removed, cleaned, and O-rings replaced if necessary, then lubricated and reassembled into the valve " SH body. then be tested for leakage according to paragraph ING THE RACK General Requirements When preparing to test the rack for leakage, secure the (T A-2300-C) furnished with the rack, to the rack pipe bracket. & 5. In order to avoid the necessity of frequently a new gauge fitting connection is racks. This connection permits a master test gauge and a comparison to be made manipulation of the proper vent cock. limit specified in the air gauge test when necessary. Since only one master or room, this master gauge is not avarable as an incorporated digital pressure readout, can be substituted for the master gauge. All test plate(s) used on the racks must be soap, grease. etc. which may have plates. Test plates must be dry before performed whenever rack is tested. Leakage The internal passages of the test rack manifold must be wiped clean with a dry, clean rag (as far in the passages as possible). rack is tested. Initial Conditions: -13-

14 Commence test with all cocks closed except the FLOWRATOR Meter, if used, which must remain position NO. 8 and valve "BH in "Cut-Out" position. A" handle in Drain residual air from rack by opening cocks 15, 19, 20, 1, 16, 2, 12, 3, 5 and 6. When air has drained, close cocks and adjust test rack feed valve to close at 100 VALVE "A" ROTARY VALVE Coat the exhaust port of valve ua" with soap suds with valve "A" handle in position Nos. 8, 7, 6, 5 and 4. respective position. Move valve "A- handle in position NO. 1 and charge B. P. VOL GAUGE to 100 psi, then repeat the soap suds test at valve "A" exhaust port with valve "A" handle in position Nos. 1, 2 and 3. A 1/2" bubble in not position. Move valve HA" handle to position NO. 5 and reduce B. P. VOL GAUGE pressure to 78 psi, then return valve HA" handle to position No. 3. Allow 2 minutes effect, then observe B.P. VOL pressure. No pressure rise or drop is At completion of test move valve "N handle to position DIAPHRAGM COCKS - CASTING AND DIAPHRAGM In the subsequent tests of cocks,, 5. 3, 5. 5 and 12 may also be caused by valve "B" rotary valve and for these four tests, a 1/2H bubble in not less than 10 seconds is permitted at the opening coated with soap suds. No leakage is permitted for the remaining cock tests. Cock 16 (also cock 24, if so equipped) - Open cocks 8 and with soap suds. Cock 14 - Open cock 2. Repeat the soap suds test at cock 8 opening. Cock 19 - Close cocks 8 and 19 and open cocks 14, 15 and 16 and charge AUX. GAUGE to 100 psi. Cock 2 - Close cocks 2, 15 and 16 and open cocks 8 and test at cock 8 opening. Cock 13 - Open cocks 3 and 4. Coat cock 4 opening 2.3. Cock 17 - Open cock Repeat the soap suds test at cock 4 Cock 11 - Close cock opening. Cock 3 - Close cock 3 and open cock Coat the opening of cock 4 with soap suds. Close cock 4 and open cock 3. Cock 9 - Open cocks 5 and 6. Coat cock 6 14-

15 Cock 5 - Close cock 6, then open cock 9 and charge Close cock 5 and open cock 6. Coat cock 6 opening with soap and open cock 5. Cock 20 - Close cocks 2, 16 and 20 and open cock 8. suds. Cock 1 (also Cock 25, If so cover from the test rack pipe bracket and note: Pipe Bracket Opening - Soap Test - no leakage. Replace the yoke cover and tighten to seal over the pipe bracket opening. Vent cocks - close cock 8 and open cocks 1, 2, 11, 16 and 20. Coat the openings of all vent cocks Nos. 4, 6, 7, 8, 12, 15, VALVE M Manometer Line Test To check Aux. to Close all cocks except 2, 16 and the supply cock. 1, charge AUX. AM handle in Cut-in valve "BM handle. N handle into position No. 3. Close cocks 16 and Air Gauges Partly open cock 7 to generate approximately 3 psi differential. Close cock 7. Wait seconds and then note manometer reading. No change in indication in 30 seconds. IF FAILURE: P. LINE, B.P. VOL ASSOCIATED. ALSO CHECK Cut-out valve "BM handle and, 13, 14, 16, 17, 19 and 20. Move valve MA" handle into position No. RESERVOIRS, PIPE FITTINGS AND COCK CONNECTIONS Commence test with cocks 1 11, 13, 14, 16, 17, 19 and 20 open, all others closed and valve loa- handle in position NO. 1. With all close cocks 9,, 19 and supply cock, then move valve "A. handle to position No. 3. Allow one minute for temperature effect, then observe the hands of all gauges for one minute to detect any drop in pressure. No pressure drop is permitted. If leakage Is indicated, coat all pipe fittings, cock connections and reservoir fittings with soap suds to locate source of Close cocks 1, 2, 3, 5, 11 and 20 and again observe the hands of all gauges for one minute to detect a drop in pressure. No pressure drop is permitted. Commence test with all cocks closed, valve loa" handle in position No. 3 and valve " in MCut-Out. position. 15-

16 Move valve nap handle to position No. 8, then, open cocks 12 and 13 and drain brake pipe and connection. Close cock 12 and open the A" handle to position No. 1 and open cocks 1, 2, 3, 5, 9, 11, 14, 16, 17, 19 and 20 and charge entire test rack to 100 psi. Note that each test rack gauge Close the supply cock. Partly open cock of 10 psi, and note after each step that the gauge hand registers within 1/2 psi master gauge hand between 100 and 10 psi, and Capacity Note also if there is any excessive friction in the gauge as pressure is being reduced, which will be indicated by the gauge hand At completion of test drain air from rack by opening cocks 12 and 15 and then the master gauge. Commence test with feed valve set at 80 psi, cocks 1, 2, 3, 5, 9, 11, 12, 13, 14, 15, 16, 17, 19 and 20 open, all other cocks closed, valve "A" handle in position No. 1, valve H in "Cut-OutH position and test rack drained of VALVE "An ROTARY VALVE Move valve "A" handle to position No. 3. Close cocks 1, 12, 15 and 16, then open the supply cock. The A" rotary valve must be checked to insure that they are within the limits specified for each respective position. Be sure that pressures do not change for at least one minute before starting any of the following calibration tests. Position No. 1-1/4H Drill Port (.25" Move valve "AH handle to position No. 1 and charge B. P. VOL GAUGE to 55 psi. Then move valve "A" handle to position No. 3 lap. Note that B.P. VOL charged at a rapid rate. Position NO. 2-1/32H Drill Port (.03125" Move valve "A" handle to position No. 2 and note, B.P. VOL charge from 60 to 70 psi in 10 to 12 seconds. Then move NO. 3 Lap. A" handle to position Position No. 3 - Lap Note that B.P. VOL GAUGE pressure does not increase or decrease from 70 psi. Position No. 4-1/32H Drill Port (.03125" Move valve -A" handle to position No. 4 and note; B.P. VOL reduce from 70 to 50 psi in 20 to 25 seconds. Move A" handle to position No. 1 and charge B.P. VOL A" handle to position No. 3 lap. Position No. 5 - No. 45 Drill Port (.082H 16-

17 Move valve. handle to position No. 5 and note; B.P. VOL reduce from 70 to 40 psi in 3% to 4% A. handle to position No. 1 and charge B.P. VOL. GAUGE to 80 psi. Then move A" handle to position No. 3 lap. Position No. 6 - No. 37 Drill Port (. 104 H Move valve "A. handle to position No. 6 and note; B.P. VOL reduce from 80 to 10 psi in 9~ to 10~ AH handle to position No. 1 and charge B. P. VOL A" to position No. 3 lap. Position NO. 7 - No. 27 Drill Port (. 1440" Move valve "A" handle to position No. 7 and note; B.P. VOL reduce from 80 to 10 psi in 5.2 to 5.6 seconds. Move valve "A" handle to position No. 1 and charge B. P. VOL. GAUGE pressure to 80 psi. AH handle to position No. 3 lap. Position No. 8-9/32" Drill Port (.2812H Move valve "A" handle to position NO. 8 and note; B.P. VOL reduce from 80 to 10 psi in,. 5. At the completion of test move valve nah handle to position No. AUXIUARY RESERVOIR COCKS WITH CHOKES Close cocks 14 and 17. Partly open cock then close cocks 15 and 19. Allow one Cock 7 (No. 63 Drill Choke) (for test rack without Ring Leakage Open cock 7 and note that seconds. Close cock 7, open cock 16 and minutes. Close cock Cock 7 choke plug capacity (for test rack with Ring Leakage Open Cock 7 and note that seconds. Close cock 7, open cock 16 and minutes. Then close cock Cock 18 (No. 73 Drill Choke) - Open cock 18 and note that AUX. from psi in 26 to 30 seconds. Close cock 18. Open cock 15 reducing AUX. RES. minute for temperature effect. Cock 14 (No. 50 Drill Choke) - Open cock 14 and note that AUX. from 45 to 55 psi in 9 to Cock 22 (No. 30 Drill Choke used for Service Stability Test). Commence test with cocks 2, 3, 5, 9,, 14 and 20 closed, valve -A" handle in position No. 1 and valve.b" in.cut-out" Position. Close cocks 3, 5, 9, 11, 13 and 14, then open cocks 1, 16 and 19 and charge B. P. VOL, AUX. RES and a.a. CH. GAUGES to 80 psi. 17-

18 Allow two minutes for temperature effect, then move valve HA" handle to position NO. Quickly open cock 22 and note that the P. VOL. GAUGE reduces from 80 to 30 psi in 31 to 32 seconds. Close cock 22. NOTE: This test is based on a predetermined rate of brake pipe be obtained if the recommended standard choke is used. If however, due to tolerance variation in reservoir volumes, deviation from the above blowdown time is encountered, it can and must be corrected by carefully increasing or decreasing as the case may be. In all cases, the orifice face of the choke plug should be lapped smooth to produce a sharp leading edge. Cock 23 (No. 29 Drill Choke used for Emergency Close all cocks except CALIBRATION mode and electronic pressure switch vertically, directly to and as close as GAUGE fitting. P. VOL. To insure that the ITT 800P is in the WINDOW mode, the default code must be checked. This is done by going into the The display should show "DEFS". Then press the should be displayed is "0010H. If this is not correct, change the code by pressing the ENTER button until the digit blinking is the one to be altered. arrow keys to change the digit to the correct ENTER until "DEFS" is displayed. Then press the LOCK button twice to return to the OPERATING mode. The test rack operator qualifying the choke capacity for the test rack be required to set the switch's pressure setpoints to that specified in Section 5.0. The setpoints are changed by pressing the UNLOCK button once. The display should PR06". Then press the upper row INCR button to display the high NOTE: This high setpoint must be 1.0 psi higher than the actual switching pressure specified. This is due to a trigger window of 70 to 50 psi is called for, the actual high setpoint entered should be 71.0 psi and the lower setpoint should be entered as 50.0 psi. If the high setpoint needs to be changed, press the changed is blinking. Then press the UP or DOWN arrow keys to enter the correct digit. After the high setpoint is correct, repeat the procedure for the lower setpoint by pressing the changed in the same fashion by using the setpoints are corrected, press the LOCK button to return to the choke qualification. For more detailed instructions refer to the installation and operation manual supplied with the ITT 800P pressure switch. To check electronic switch operation, close all cocks except supply and cock 1. Set time switch to P. VOL. GAUGE to a pressure at least 2 psi above the upper setpoint using valve -A" handle in position NO. 1. Move valve U handle to position No. 4 and slowly decrease B. P. VOL GAUGE. As the digital pressure readout on the electronic switch passes the upper setpoint limit, the timer should start. As the readout passes the lower inconsistent with this, inspect wiring, switch box/timer or electronic pressure switch for possible defects. Move valve "AU handle to position No. 1 and charge B. P. VOL minutes. Move valve "A" handle between positions 2 and 4 until the digital gauge reads 80 psi 10 psi, then place valve "A" handle into position No. 3 and reset timer. 18-

19 I TT r 1 r 1 r 1 r 1 L J L J L J L J TO FOOT SI./ITCH PSIG JUMPER 1,/IRE BRN/VIO RED/VIO BP VOL GAGE TO BP VOL BATTERY PLl..L -UP CIRCUIT CALIS. ""'I"" S\JITCH BOX/TIMER CALIB. r 1 r 1 FOOT L J L J L J L J FOOT C!=UB. LO~ BATTERY LIGHT ~/ BUTTON TO SP VOLUME 1/4 X 3/8 BUSH PURPLE BLUE RED S\JITCH I'D 5/16 CHOKE TO EXHAUST SPECIAL 3/8 UNION TAPPED TO ACCEPT 1/4" NO. 29 DRILL SENSITIVITY CHOKE 3/8 DIAPH. COCK NO. 22 BLUE RED NEW VENT VALVE LKG. FITTING PURPLE C 1/4 X NIPPLE OPEN EXHAUST COCK NO. 21 LEAKAGE POINT Figure 7 Addition of Electronic Accessories to AB Test Rack 19-

20 Quickly open cock 23 and hold handle P. VOL below 50 psi. The clock must record a psi 06 and 1. seconds. Repeat and four times. The average of the last three recorded times should fall between 1.06 and 1.08 seconds. If this time these limits, clean, ream or peen the No. 29 drill choke at cock 23 to match the choke to the B.P. VOL reassembly to reassure no leakage. Mechanical Manometer Apply the AB-160 test plate, Pc (T A-2942-C) to the face of the rack pipe bracket. Open cocks 3, 16 and 13 and move valve "A" handle to position No. 1. Move valve li to "Cut- " position and close cock manometer indicates between 1.8 and 2.2 psi on its dial. If it does not, the manometer must be removed for recalibration. At completion of this test open cock 16 and move valve "B" to "Cut-Out" Position. Then close cock 13, open cock 4, and move valve "AH handle to position No. 8. Then close all cocks and remove the test plate. Mechanical Pressure Switch Calibration Disconnect wiring and unscrew both 3 psi special vent valve test fitting and cock 23 assembly. Install switches into a regulated low pressure supply. switches while monitoring the continuity with a continuity tester. 1 - The vent valve switch should show continuity between the purple (common) and blue (normally closed) wires until a nominal 3 psi (2 * continuity should be broken. The cock 23 pressure switch should show no continuity at the purple (common) and red (normally open) wires below the nominal 3 psi (2 to show continuity as pressure rises above the CODE OF S 1 General Requirements The following is a Code of Tests and Instructions for operating the "AB" Test Rack. The instructions are complete for each specified test without reference to any other test. The sequence of the tests, however, should be followed as given, in order that defects may be disclosed and corrected before making subsequent tests, which may be adversely affected by the defects. Valves must be within the limits of all tests prescribed in the code, to insure proper service operation. All tests which require time limits must be timed with an approved timing device, or its equivalent, and be clearly visible for ease of observation. 0 ABC AND ABCT Drawings and Other Information Diagrammatic view and arrangement of the AB Test Rack. - Section 10, Plate

21 The following can be tested according to this DESIGNATION ABD SERVICE PORTION ABDT SERVICE PORTION PC. NO IMPORTANT: MAKE CERTAIN that the piece covered by this Test Specification. If the procedure number of the device being tested, the results obtained WILL NOT BE CORRECT and the device WILL NOT BE SATISFACTORY for service. IMPORTANT: This document may be revised at any time by the Westinghouse Air Brake Company to include changes in the test procedure or values covered by this test specification to be satisfactory for the service responsibility of the owner/user of this product and the company/person making the necessary tests covering the operation of this device to see to it that the latest issue of this test specification is being Company representative or the offices at Wilmerding, PA, before using this document to assure that you have the latest revision. Test Equipment Requirements IMPORTANT: The test rack requirements in the current issue of Section 5 of Instruction Pamphlet No , Sup. ABD-1 Test Plate Complete (Cock "C" must have No. 44 drill choke for 100 psi testing - Pc ) One Gasket Pc Three 5/8" Special Hex. Nuts Pc Test Procedure Requirements Do not deviate from Test Specification. Throughout this Specification the ABD or ABDT Control Valve referred to as the "portion When testing leakage with flowmeter, press the hose nozzle of the flowmeter against the opening specified and note that the float does not rise higher than specified for each respective test. IMPORTANT: Throughout this specification, valve "BH handle Cut-Out" position unless otherwise specified. If in the following tests, it becomes necessary to remove any service portion cover due to leakage or other defects, it will be necessary to again coat the cover seal with soap suds after the valve is reassembled and the pressure restored to detect any leakage that may have occurred. Specification Compliance IMPORTANT: The ABD or ABDT Control Valve Service Portion being tested ALL the requirements of this specification before being 21-

22 CAUTION: BEFORE STARTING, MAKE CERTAIN THAT AIR UNE PLATE AND DEVICE TO BE ED ARE FASTENED SECURELY TO PREVENT POSSIBLE PERSONAL INJURY. WARNING: AIR WILL VENT VALVE DURING OPERATIONS. CARE SHOULD BE EXERCISED SO MATERIAL AND OR PERSONNEL ARE OPERATIONS. Supply pressure must be maintained at 120 Using the gasket and the three 5/8" special hex. to the ABD- 1 Test Plate. Move valve "A" handle to position No. Close all test rack and test plate cocks except the test rack supply cock. & 7. Leakage Set the test rack feed valve such that the All test rack and test plate cocks closed except the test rack supply cock. Valve "A" handle in position NO. Open cocks 1, 2, 5. 8 and 9. Move valve "A" handle to position No. Open cock 16, allow the AUX. RES. GAUGE indication to increase to 100 psi, then close cock 16. Operate the portion by moving valve "A" handle slowly from position No. 1 to position No. 8 and then back to position No., four times. Finally No. 8. On each cycle B.C. RES. GAUGE should increase in pressure and exhaust. Open cock 3. SERVICE POSITION. Slide Valve and Retaining Check Valve. COCK 8 OPENING - FLOWRATOR Meter - 13 cu. in./min. maximum. Slide Valve. Close cock 5. Open cock 6, allow the note: Test Set- 22-

23 1 COCK 6 OPENING - /min. maximum. Close cock 6. Open cock 5 and allow the Slide Valve. QUICK SERVICE EXHAUST PORT - /min. maximum. Quick Service Umiting Valve Diaphragm. QUICK SERVICE LIMITING seconds. Auxiliary and Emergency Valve and Pusher Pin, Service Piston Diaphragm, Release Valve Seal and O-Ring, Retaining Check Valve and Limiting Valve O-Ring and Diaphragm. Close cocks 2, 3 and 5 and note: 1 EMER. RES. AND AUX. seconds. 2 RELEASE VALVE EXHAUST PORT - Soap Test - Release Valve Diaphragm and O-Ring and Reset Valve O-Ring. Open cocks 2, 3 and 5. Pull the Release Valve handle through its full travel, hold the handle in this position for 1 to 2 seconds, then release the When the B.C. RES. GAUGE indication has decreased to zero psi, close cocks 2, 3 and 5 and note: 1 EMER. RES. AND AUX. seconds. Move valve "A" handle to position No. Open cocks 2, 5 and 16. RELEASE POSITION. Cocks 1, 2, 5. 8, 9, 16 and the test rack supply cock open. Valve "A" handle in position No. 1 and wait 5 seconds. 23-

24 Slide Valve. COCK 8 OPENING - Slide Valve and Graduating Valve. Close cock 8. Open cock 19 and note: /min. maximum. 1 QUICK SERVICE EXHAUST PORT - FLOWRATOR Meter - 13 cu. in./min. maximum. Slide Valve. Close cocks 16 and 19. Open cocks 4 and 15. When the B.C. RES. GAUGE indication has decreased to zero psi, open cock 8. Partly open cock 19, allow the AUX. close cocks 19, 15 and 4 and immediately note:, then 1 QUICK SERVICE EXHAUST PORT - FLOWRATOR Meter - 13 cu. in./min. maximum. 2 COCK 8 OPENING. /min. maximum. Open cocks 3, 12 and 16. SERVICE LAP POSITION. Cocks 1, 2. 3, 5, 8, 9, 12, 16 and the test rack supply cock open. Valve "A" handle in position NO. Graduating Valve and Slide Valve, Accelerated Service Release Check Valve, Umiting Valve O-Ring and Retaining Check Valve. Close cocks 12 and 16. Move valve -A" handle to position No. 5, allow the B. P. VOL. GAUGE indication to decrease to 88 psi, then move valve "AD handle to position No. Partly open cock 4, allow the B.C. RES. GAUGE indication to decrease to 30 psi, then close cocks 3, 4 and 5 and note: 1 B.C. RES. GAUGE - indication 1 psi 1 B.C. RES. GAUGE - indication no decrease 24-

25 2 EMER. RES. GAUGE - indication 1 psi maximum decrease in 20 seconds. 3 QUICK SERVICE EXHAUST PORT - FLOWRATOR Meter - 13 cu. Return Flow Check Valve Plug, Reset Check Valve, Reset Valve O-Ring and Back Flow Check Valve Port. Close cocks 1 and 2 and note: 1 B.P. LINE GAUGE - indication 1 psi maximum decrease in 10 Open cocks 2 and 6 and note: 1 B.P. LINE GAUGE - Between 8 and 2 psi drop in 5 seconds Close cocks 6 and 8. Open cocks 1 and 5. GASKETS. Move valve "N handle to 1 and wait 5 seconds. Open cocks 16 and Indications (except, and then note: 1 AROUND ALL Close cocks 11, 13, 16 and Open cock 12 and allow the B.C. RES. GAUGE indication to open cock 8. Function and Capacity Cocks 1, 2, 3, 5, 8, 9, 12 and the test rack supply cock open. Valve HA" handle in position No. SERVICE PISTON BODY AND SLIDE VALVE. Brake Cylinder Application. Close cock Move valve "A" handle to position No. Move valve "A" handle to, allow the B.P. VOL decrease to 70 psi, then move valve HA" handle to position No. 3 and note: 25-

26 1 B.C. RES. GAUGE - indication must increase from zero to 60 psi in 4 Service Piston Release and Brake Cylinder Release Port. Open cock Close cock 5. 1 Open cock 6. Wait for, then close cock 6. Move valve DAD handle to position No. 2 and note: 1 B.P. VOL and AUX. RES. pressure exhausts. 2 B.C. RES. GAUGE - indication must decrease from 40 to 20 psi in 8 Open cock 5. Move valve HA" handle to position No. Open cocks 12 and increase to 100 psi, then close When the B.C. RES. GAUGE indication has decreased to zero psi, then close cock Preliminary Quick Service Choke and Volume. 1 Cocks 1, 2, 3, 5, 8, 9 and test rack supply cock open. 2 Valve "A" handle in position NO. Move valve "A" handle to position No. 4 and note: 1 QUICK SERVICE EXHAUST PORT - a light blow by feel) and continue for 5 to 16 seconds. When the B.P. VOL GAUGE indication has decreased to 78 to 79 psi, move valve " handle to position NO. Stability Port. Wait 5 seconds, then open cock 16. Move valve "A" handle to position 5 and reduce the B.P. VOL GAUGE to 61 to 62 psi then move valve "A" handle to position No. H position Adjust the B.P. VOL. and AUX. RES. GAUGES indications to 64 Wait 45 seconds, then move valve "B" handle to the.cut- 26-

27 1 If the gauge indications are greater than 64 to 65 psi, move valve "AN handle to position No., allow the B.P. VOL and AUX. psi, then move valve HA" handle to position NO. 2 If the gauge indications are less than 64 to 65 psi, move valve "A" handle to position No. 2, allow the B.P. VOL. and AUX. then move valve "A" handle to position No. Press the hose nozzle of the and then adjust cock "B" such that the flowmeter indicates 13~ to 141h cu. in./min. Close cocks 2 and 16 and note: B" opening 1 MANOMETER - indication 2 to 0.7 psi. Move valve " B" handle to the HCut-Out" position. Close cock " Open cock Move N handle to 11 Open cock, then close cock Open cock 12, allow the B. C. RES. GAUGE indication to decrease to, then close cock 2nd Quick Service Umiting Valve Port, Spring and a-ring. 1 Cocks 1, 2, 3, 5, 8, 9 and the test rack supply cock open. 2 Valve "A" handle in position No. Move valve "A" handle to position No. 4, allow the B. P. VOL. GAUGE indication to decrease to 98 psi (such that the B.C. RES. GAUGE indication move valve "A" handle to position No. Wait until the blow at quick service volume exhaust cock 16, then open cock 12, allow the B.C. RES. GAUGE indication psi. then close cock 12 and note: 1 B.C. RES. GAUGE - indication must increase 2 B.C. RES. GAUGE - must cease to obtained for reference in 7. Partly open cock 4, allow the B.C. RES. GAUGE indication to decrease to 4 psi, then close cock 4 and note: 27-

28 1 B.C. RES. GAUGE - indication must increase to the value obtained in Close cock 3 and note: 1 B.C. RES. GAUGE - indication Close cock 16. Move valve "A" handle to position No. Open cocks 3, 12 and 16 and allow the AUX. RES. GAUGE indication to increase to 100 psi. Accelerated Service Release. 1 Cocks 1, 12, 16 and the test rack supply cock open. 2 Valve HAH handle in When the B. C. RES. GAUGE indication has decreased to zero psi, close cocks 12 and Move valve HA" handle to position No. 5, allow the B.P. VOL decrease to 92 psi, then move valve "A" handle to position No. Move valve US" handle to the HCut- " position. Adjust the AUX. 1 If the AUX. RES., move valve "A" handle to position No. 4, allow the AUX. RES. GAUGE indication to decrease, then move valve "A" handle to position NO. 2 If the AUX. RES. GAUGE indication is less than 92 psi, move valve UA" handle to position No., allow the AUX. RES. GAUGE indication to, then move valve " handle to position No. Close cock 16. IMPORTANT: In item 7. 1, when cocks 5 and "CU are opened, the B. P. VOL GAUGE indication begins to immediately read and valve -S" handle moved to the "Cut-OutH position. Open cocks 5 and "C" and when the B.P. VOL GAUGE indication begins to increase at a faster rate, note: 1 MANOMETER - indication must be 1. 6 to 2.0 psi. 2 Immediately move valve " B" handle to the HCut-OutH position P. VOL. GAUGE - indication must have increased to 28-

29 Close cock " 10 Move A" handle to position No Open cock 16 and allow the Close cocks 3. 5 and 16. Port 5 to Port 2. 1 Cocks 1, 2, 8, 9 and the test rack supply 2 Valve "AM handle in position No. Open cock 6 and note: 1 AUX. RES. GAUGE - and must continue to decrease. 3. Close cocks 6 and Open cock 5. Move valve "A" handle to position No. Auxiliary and Emergency Reservoir Release Pull the Release Valve handle s full travel, hold the handle in this position for 8 seconds, then release the handle and note: 1 AUX. RES. GAUGE - 2 EMER. RES. GAUGE - indication Close cock 5. Open cocks 4, 6 and 16, allow the B.C. RES., EMER. RES. and AUX. RES. GAUGE indications to decrease to zero psi. complete drain, then close cocks 4, 6 and Auxiliary Charging Port. Move valve "A" handle to position No. 1 and note: 1 AUX. RES. GAUGE - Close cock 8. Open cocks 3, 5, 9, increase to 100 psi, then close cocks C. RES. GAUGE indication to 29-

30 RELEASE VALVE. Cocks 1, 2, 3, 5, 9 and the test rack supply cock open. Valve "AH handle in Release Valve Lock-Up Brake Cylinder Port. Move valve "AH handle to position No. 8 and allow the B. P. VOL. GAUGE indication to decrease to zero psi. Pull the Release Valve handle through it' s full travel, hold the handle in this position for 1 to 2 seconds, then release the handle and note: C. RES. GAUGE - indication must decrease from 100 to 10 psi in Move valve HAH handle to position No. Open cock 4, allow the B.C. RES. GAUGE indication to decrease to zero psi, then close cock 4. Port 10 to EX. and Retaining Check Valve Spring. Close cock 3. Open cock 20 and note: QA A. CH. GAUGE - indication must cease to decrease at 4 psi, or less but greater than 1 psi. Reset Spool Valve Differential and Port, and Reset Check Valve Spring. Close cock 20. Move valve.a" handle partly into 1, allow the B.P. VOL. indication to increase to 30 psi, and then move valve HA" handle to position No. and when the B.P. VOL. GAUGE indication begins to charge at a faster rate, note: BP. VOL GAUGE - indication must be 35 to 50 psi. Immediately move valve "A" handle to position No. 3 and note: 1 B.P. VOL seconds. When the B.P. VOL. GAUGE indication has stabilized, note: 30-

31 1 B. P. VOL GAUGE - indication must be 3 to 8 psi lower than the AUX. indication. Release Valve Spring. Open cock 16. Move valve "A" handle to position No. 8 and when the B. C. RES. GAUGE indication starts to increase, note: AUX. RES. GAUGE - indication Final Leakage Close cock 16, move "A" handle to position No. 1 and wait 3 seconds, then open cocks 8 and 16 and charge AUX. RES. Slide Valve and Graduating Valve. Commence test with cocks 1, 2, 5, 8, 9 and 16 open and valve "A. handle in position No. COCK 8 LEAKAGE FITTING - FLOWRATOR Meter - 13 cu. in. /min. maximum. Close cock 8. Open cock QUICK SERVICE EXHAUST PORT - FLOWRATOR Meter - 13 cu. in./min. maximum. Completion of Test Close cocks 16 and 19. Open cocks 8, 4 and AUX. RES. GAUGE to 80 psi, then close cocks 19, 15 and 4. QUICK SERVICE EXHAUST PORT - FLOWRATOR Meter - 13 cu. in. /min. maximum. COCK 8 LEAKAGE FITTING - FLOWRATOR Meter - 13 cu. in. /min. maximum. Close cocks 2 and 5. Move "A" handle to position No. Open cocks 3, 4, 6, 8, GAUGE indications to decrease to zero psi. C. RES. and EMER. RES. After all test rack gauge indications (except MAIN zero psi, close all test rack and test plate cocks except the test rack supply cock. WARNING: THE PLATE, REMOVED. Remove the tested portion from the Test Plate. 31-

32 If the device just removed from the test rack is the last of a series (or is the only device) being tested, proceed to item If Section 7. Test Rack Shutdown. Close test rack supply cock. Open cocks 3, 2, 16 and drain the B., B. AUX., EM., and Main Open all cocks except the test rack supply cock. FOR ABD AND ABDS Drawings and Other Information Diagrammatic view and arrangement of AB test rack - Section 10, Plate 2. The following devices can be tested according to this DESIGNATION ABD EMERGENCY ABDS EMERGENCY PORTION PC. NO IMPORTANT: Make certain that the piece number of the device being covered by this piece number of the CORRECT and the device WILL NOT BE SATISFACTORY for IMPORTANT: This document may be revised at any time by the Westinghouse Air Brake Company to include changes in the test procedure or values required for the device covered by this test specification to be satisfactory for the service intended. It is the responsibility of the owner juser of this product and making the necessary tests covering the operation of this device to see to it that the latest issue of this test specification is being used. Consult your local Westinghouse Air Brake Company representative or the offices at Wilmerding, PA, before using this document to assure that you have the Test Equipment Requirements IMPORTANT: The test rack used in requirements in the current issue of Section 5 of Instruction Pamphlet No Sup. 1. AB-2 Test Plate Complete Pc Gasket Pc A special plunger to hold the vent valve test standard plunger in the AB-2 test plate. See Figure Test Procedure Requirements Do not deviate from test specification. 32-

33 When testing leakage with the FLOWRATOR Meter against the exhaust opening specified and does not rise higher than IMPORTANT: Throughout this specification, valve HB" handle must be in the "Cut- Out: position unless otherwise 8REA~ CORNER 1/32 x 4' PRESS fit 11j --L. 2.!.. Materia" Stainless Steel Note: Finish All Over Figure 8 Special Plunger for AB - 2 Test Plate If in the following tests, it cover due to leakage or other defects, it will be necessary to again coat the cover seal with soap suds after the valve is detect any leakage that may have occurred. Specification Compliance IMPORTANT: The ABD or ABDS Control Valve MUST meet ALL the requirements of this specification before shipment. CAUTION: BEFORE STARTING DEVICE TO BE ED ARE PERSONAL INJURY. WARNING: VENT VALVE DURING OPERATIONS. CARE SHOULD BE ALL LOOSE MATERIAL AND OR PERSONNEL ARE CLEAR OF VENTING. Supply pressure must be maintained Secure the emergency portion, less vent protector, to the test rack. Put valve "AH handle in Close all cocks except 1, 2 and the rack supply cock. Test Set- 33-

34 Set test rack feed valve so that MAIN leakage Cocks 1, 2 and 9 open. Valve MAM handle in position No. Move valve -AM handle to position No. Open cocks 5, 16, 19 and 20. Allow the B.P. VOL and Close cocks 16 and 19. Move valve MAM handle to position No. Operate the portion by A" handle slowly from position No. 3 to position No. 5 and then back to position No., a minimum of four times. move the handle to position No. 8. An emergency should Open cock Move valve MA" handle to position NO. Close cock 15. Open cocks 4, 16 and 19. RELEASE POSITION. Cocks 1, 2, 4, 5, and 20 open. Valve MAM handle in position No. WARNING: KEEP FITTING INTO PLACE. Close cock 5. pressure switch (See Figure 3, Item 4) in place and secure by closing cock 6 and opening cock 5. High Pressure Valve O-Ring and Emergency Accelerated Release COCK 4 LEAKAGE FITTING - FLOWRATOR Meter - No Close cock 4. Ring. Move valve MA" handle to position No. 3. Open cocks 3 and 13 and C. RES. GAUGE to build up to 100 psi. then move valve "A- handle to position No. Slide Valve, Vent Valve Seal, and High Pressure Valve O-Ring. 34-

35 For ABDS Portion Only - Soap the added volume fitting and gasket - No permitted during Test VENT VALVE FITTING - FLOWRATOR Meter - 14 cu. in./min. maximum. EMERGENCY ACCELERATED RELEASE POSITION. Cocks 1, 2, 3, 5, 9, 13, 16, 19 and 20 open. Valve "A" handle in position No. Close cocks 13 and 16. Partly open cock 15, and allow AUX. then close cock 15. Slide Valve. VENT VALVE FITTING - FLOWRATOR Meter - 14 cu. in./min. maximum. Emergency Accelerated Release Check Valve and O-Ring on Dump Spool. Close cock 3. Open cock 4. COCK 4 LEAKAGE FITTING - Close cocks 4 and 19. Open cocks 3 and 15. Emergency Accelerated Release Ring. Partly open cock 4, allow the B.C. RES. GAUGE indication to decrease to 80 psi, then close cock 4. Close cock 3. C. RES. GAUGE - No decrease of indication in 10 seconds. Close cock 15. Open cocks 16 and 19. EMERGENCY POSITION. Initial conditions. Cocks 1, 2, 5, 9, 16, 19 and 20 open. 35-

36 Valve "A" handle in position No. Emergency Accelerated Release Close cocks 16 and 19. Move valve "A- handle to position No. Ring and Spillover Check Valve Plug. Allow a.a. CH. GAUGE to reduce to 80 psi. Close cock 5. EMER. RES. GAUGE - No decrease Open cock 3 B.C. RES. GAUGE - No psi drop in High Pressure Valve O-Ring, Emergency Valve O-Ring, Accelerated Release Valve Ring and Spillover Check Valve Plug. Close cocks 1, 15 and 20. VENT VALVE FITTING - FLOWRATOR Meter - 8 cu. in./min. maximum. Vent Valve. Open cock 1. Move valve "A" handle to position NO. 2 and allow B. P. VOL GAUGE indication to increase to 5 psi, then 3. Wait 5 seconds. VENT VALVE FITTING - FLOWRATOR Meter - 10 cu. in./min. maximum. CASTING AND GASKETS Cocks 1, 2 and 9 open. Valve "A- handle in position No. Move valve -A" handle to position No. Open cocks 3, 5. 13, 16, 19 and 20 and allow all gauge indications to increase to 100 psi. ENTIRE PORTION - Soap Test - No Close cocks

37 14. Open cock 6, remove Open cocks 12 and 15 and allow Q.A. C. RES. decrease to zero, then move valve "N handle to position NO. Charging Cocks 1, 2, 3, 6, 9. 12, 15 and 20 open. Valve "N handle in Close cocks 3, 9 and 15. Quick Action Chamber. Move valve -A" handle to position No. 1 and note: Q.A. CH. GAUGE - indication most increase from 0 to 20 psi in 12 to 16 EMER. RES. GAUGE - indication must NOT increase. Open cocks 3, and 19. Service application. Cocks 1, 2, 3. 5, 12, Valve "A" handle in position NO. Close cock Open cock 17 and note: C. RES. maximum and no inshot delay (slow down of B.C. RES. Close cock 17. Open cocks 9 and Service Stability Cocks 1, 2, 3, 5, 9, 12, 16, 19 and 20 open. Valve "A" handle in position No. Move valve -A" handle to position No. Partly open cock, B.P. VOL and Q.A. CH. indications to decrease to 90 psi, then close cocks 15, 12, 16 and

TEST SPECIFICATION NYT-909-C

TEST SPECIFICATION NYT-909-C 748 Starbuck Ave, Watertown, NY 13601 Phone: +1-315-786-5200 Engineering Fax: +1-315-786-5673 TEST SPECIFICATION NYT-909-C CODE OF TESTS FOR TESTING "AB" TEST RACK P/N 702546 & 702612 ISSUE NO. 5 1.0 THE

More information

TEST SPECIFICATION NYT-677-C

TEST SPECIFICATION NYT-677-C TEST SPECIFICATION NYT-677-C CODE OF TESTS FOR TESTING KM-2 VENT VALVE PORTION, PC. 748715 (DWG. VV-389) (AB TEST RACK) ISSUE NO. 2 WARNING: HIGH PRESSURE AIR IS PRESENT IN THE TEST RACK AND ASSEMBLY BEING

More information

Model 130M Pneumatic Controller

Model 130M Pneumatic Controller Instruction MI 017-450 May 1978 Model 130M Pneumatic Controller Installation and Operation Manual Control Unit Controller Model 130M Controller is a pneumatic, shelf-mounted instrument with a separate

More information

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual

Type S301 & S302 Gas Regulators INTRODUCTION INSTALLATION. Scope of Manual. Description. Specifications. Type S301 and S302. Instruction Manual Fisher Controls Instruction Manual Type S301 & S302 Gas Regulators October 1981 Form 5180 WARNING Fisher regulators must be installed, operated, and maintained in accordance with federal, state, and local

More information

Index Table. Model 794. Installation, Operating and Maintenance Instructions

Index Table. Model 794. Installation, Operating and Maintenance Instructions CLOCKWISE MANUAL MAKING INTO CCW TABLE Index Table Model 794 Installation, Operating and Maintenance Instructions Black & Webster Products Division 545 Hupp Ave. P.O. Box 831, Jackson, Michigan 49204 2009

More information

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual

Welker Sampler. Model GSS-1. Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Sampler Model GSS-1 The information in this manual has been carefully checked for accuracy and is intended to be used as a guide to operations. Correct

More information

TECHNICAL DATA CAUTION

TECHNICAL DATA CAUTION Page 1 of 6 1. DESCRIPTION The Viking Model D-2 Accelerator is a quick-opening device, with an integral anti-flood assembly, used to increase the operating speed of a differential type dry pipe valve.

More information

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems.

CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD. 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. Page 1 of 7 CLASS D - SENSITIVE LEAK TEST GAS AND BUBBLE METHOD 1. SCOPE 1.1 To provide definitive requirements for PNEUMATIC pressure testing of piping systems. 1.2 The piping system as used herein is

More information

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS

ANDERSON GREENWOOD SERIES 9000 POSRV INSTALLATION AND MAINTENANCE INSTRUCTIONS Procedure-assembly-functional test and performance requirements 1 SCOPE 1.1 This document establishes the general procedure for assembly, functional testing and normal performance requirements of low Series

More information

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM.

Installation Operation Maintenance. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow IOM. Bermad Level Control Valve with Modulating Horizontal Float Pilot valve One Way Flow Model: FP 450-80 Installation Operation Maintenance PAGE 1 OF 5 1. Safety First BERMAD believes that the safety of personnel

More information

INSTALLATION OPERATION MAINTENANCE

INSTALLATION OPERATION MAINTENANCE Bermad Electrically Controlled On-Off Deluge Valve Model: 400E-3D INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working

More information

1200B2 Series Service Regulators. Instruction Manual

1200B2 Series Service Regulators. Instruction Manual 00B Series Service Regulators Instruction Manual 00B Series Service Regulators 0 Elster American Meter 00B Series Service Regulators General Information The 00B Series Service Regulators are available

More information

Pressure Dump Valve Service Kit for Series 2300 Units

Pressure Dump Valve Service Kit for Series 2300 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 00 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00 applicator tanks when the unit

More information

Anti-flood device Model B-1

Anti-flood device Model B-1 December 4, 2009 Dry Systems 123a 1. DESCRIPTION The Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET

More information

DS05C,D,G Dial Set Pressure Regulating Valves

DS05C,D,G Dial Set Pressure Regulating Valves DS05C,D,G Dial Set Pressure Regulating Valves APPLICATION The Honeywell DS05C,D,G Dial Set Pressure Regulating Valve is a high quality pressure regulating valve that maintains a constant outlet pressure

More information

1800C and 1800C-HC Series Service Regulators

1800C and 1800C-HC Series Service Regulators 1800C and 1800C-HC Series Service Regulators Installation Instructions www.elster-americanmeter.com General Information: The 1800C and 1800C-HC Regulators are available as Full Capacity Internal Relief

More information

Regulator from 1800 B series

Regulator from 1800 B series Regulator from 1800 B series Regulator from 1800 B series Measuring of industrial gases frequently requests a precise pressure regulation for the purpose of dosage and proccesing. UNIS FAGAS has two kinds

More information

256 Pneumatic Pressure Indicator

256 Pneumatic Pressure Indicator 256 Pneumatic Pressure Indicator 51425699 Copyright 2002 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any

More information

Powers Controls D Day-Night Thermostats

Powers Controls D Day-Night Thermostats Powers Controls D Day-Night Thermostats Technical Instructions Document No. 155-073P25 TH 832-2 Description The D Day-Night or Two Temperature Thermostat is available as a room-type instrument. It is essentially

More information

Installation, Operation and Maintenance Manual for Back Pressure Regulator

Installation, Operation and Maintenance Manual for Back Pressure Regulator Installation, Operation and Maintenance Manual for Back Pressure Regulator Model 8860 2009 Groth Corporation IOM-8860 Rev. B 12541 Ref. ID: 95565 Page 2 of 13 Table of Contents I. INTRODUCTION 3 II. DESIGN

More information

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION

TECHNICAL DATA ANTI-FLOOD DEVICE MODEL B-1 1. DESCRIPTION Page 1 of 6 1. DESCRIPTION The Model B-1 Anti-flood Device is required when Viking accelerators are installed on dry systems according to Viking Model E-1 Accelerator Trim Charts. In the SET condition,

More information

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves.

Discontinued. Powers Controls. Technical Instructions Document No P25 RV Rev. 1, May, RV 201 Pressure Reducing Valves. Powers Controls RV 201 Pressure Reducing Valves Description Features Product Numbers Dual Pressure PRV Technical Instructions Document No. 155-049P25 RV 201-1 Single Pressure PRV The RV 201 Pressure Reducing

More information

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1*

INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1* INSTRUCTIONS FOR CONVERTING CONDENSING GAS MOBILE HOME FURNACES MODEL SERIES: CMA3*, CMC1*, VMA3*, VMC1* THIS KIT CONTAINS: AOPS7741 (NATURAL TO PROPANE CONVERSION PARTS FOR MODEL SIZE, 50) AOPS7742(NATURAL

More information

Fisher DVI Desuperheater Venturi Inline

Fisher DVI Desuperheater Venturi Inline Instruction Manual DVI Desuperheater Fisher DVI Desuperheater Venturi Inline Contents Introduction... 1 Scope of Manual... 1 Description... 1 Principle of Operation... 2 Installation... 3 Operating Instructions...

More information

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF

SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED 36RB 36IRB VULCAN C36RB C36IRB WOLF SERVICE MANUAL SALAMANDER BROILERS RADIANT AND INFRARED VULCAN 36RB 36IRB WOLF C36RB C36IRB This Manual is prepared for the use of trained Vulcan Service Technicians and should not be used by those not

More information

PAPR Flow Tester. instructions. part no WARNING

PAPR Flow Tester. instructions. part no WARNING PAPR Flow Tester part no. 488903 instructions WARNING This manual, including warnings and cautions inside, must be carefully read and followed by all persons who use or maintain the product, including

More information

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below.

Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below. Page 1 of 15 Summary of Accumulators These operating instructions apply to the accumulators listed in the table shown below. Model Number A25-XXXX-3.6K Series A40-XXXX-3K Series A40X-XXXX-3.6K Series A60-XXXX-3K

More information

TECHNICAL DATA. Page 1 of 12

TECHNICAL DATA. Page 1 of 12 Page 1 of 12 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking Model H or J Flow Control

More information

Hydraulic Punch Drivers

Hydraulic Punch Drivers SERVICE MANUAL 7804SB / 7806SB Quick Draw 7704SB / 7706SB Quick Draw Flex Quick Draw Hydraulic Punch Drivers Serial Codes AHJ and YZ Read and understand all of the instructions and safety information in

More information

S300 Series. Valve Link. Features. Fisher Controls

S300 Series. Valve Link. Features. Fisher Controls S0 Series Self-Operated Type VL FIELDVUE Regulators Valve Link Fisher Controls May 198 Bulletin 71.1:S0 The S0 Series self-operated, spring-loaded regulators are used for pressure-reducing control in a

More information

GM Series Dual-Block Multi-Function Gas Control Valves

GM Series Dual-Block Multi-Function Gas Control Valves Installation Sheets Manual 121 Gas Combustion Combination Controls and Systems Section G Technical Bulletin GM Issue Date 0297 GM Series Dual-Block Multi-Function Gas Control Valves Figure 1: GM Series

More information

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG)

CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) Page 1 of 10 CLASS DH - PNEUMATIC TESTING - GREATER THAN 1 BAR (15 PSIG) 1. SCOPE 1.1 To provide definitive requirements for HIGH PRESSURE PNEUMATIC testing of piping systems according to ASME B31.3. This

More information

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C

Exercise 2-3. Flow Rate and Velocity EXERCISE OBJECTIVE C C C Exercise 2-3 EXERCISE OBJECTIVE C C C To describe the operation of a flow control valve; To establish the relationship between flow rate and velocity; To operate meter-in, meter-out, and bypass flow control

More information

DelVal Flow Controls Private limited

DelVal Flow Controls Private limited DelVal Flow Controls Private limited (A DIVISION OF DelTech CONTROLS LLC, USA) DelVal Series 50/5, 5A/5B Butterfly Valves INSTALLATION, OPERATION AND MAINTENANCE MANUAL ENGINEERING DATA SHEET E.D.S. NO

More information

Installation Instructions

Installation Instructions Page 5750-S-1 Installation Instructions General These mounting instructions for Circular INCINO- PAK Burners are in addition to the specific instructions offered for other Maxon component items: Shut-Off

More information

Model VR6 System. Installation, Operation & Maintenance

Model VR6 System. Installation, Operation & Maintenance Model VR6 System Installation, Operation & Maintenance General: All Archer Instruments chlorination systems are carefully designed and tested for years of safe, accurate field service. All Archer Instruments

More information

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION.

WARNING: READ THE GENERAL INFORMATION MANUAL INCLUDED FOR OPERATING AND SAFETY PRECAUTIONS AND OTHER IMPORTANT INFORMATION. GSR500 Ram Assembly General Description The GSR500 single post lift / ram uses a 3-1/4 air powered cylinder, which is welded to a heavy gauge base. It is normally used to raise and lower a fluid handling

More information

ACCESSORY KIT INSTALLATION INSTRUCTIONS

ACCESSORY KIT INSTALLATION INSTRUCTIONS ACCESSORY KIT INSTALLATION INSTRUCTIONS 1NP0680 - PROPANE CONVERSION FOR USE WITH MODELS: PM8, PC8, PM9, PC9, FL9M, FL9C, FC9M, FC9C This conversion kit is to be installed by a qualified service agency

More information

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , &

Assembly Drawing: W-311B-A01, or as applicable Parts List: W-311B-A01-1, or as applicable Special Tools: , , & REDQ Regulators Model 411B Barstock Design Powreactor Dome Regulator OPERATION AND MAINTENANCE Contents Scope..............................1 Installation..........................1 General Description....................1

More information

Model Series 62 Constant Differential Relay

Model Series 62 Constant Differential Relay Siemens Industry, Inc. INSTALLATION AND SERVICE INSTRUCTION INTRODUCTION Model Series 62 Constant Differential Relay Rev 11 March 2011 Supersedes Rev 10 The Constant Differential Relay maintains a constant

More information

Types S100K and S102K Pressure Regulators

Types S100K and S102K Pressure Regulators Instruction Manual Form 5624 Types S0K and S2K 01/01 Types S0K and S2K Pressure Regulators W7478-1 Figure 1. Types S0K and S2K Pressure Regulator Introduction Scope of Manual This manual provides instructions

More information

400C & 450C DUAL PERFORMANCE VALUE PACKS

400C & 450C DUAL PERFORMANCE VALUE PACKS (Chrome) PART NO. 40013 (Silver) PART NO. 45012 (Chrome) PART NO. 45013 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before

More information

444C DUAL PERFORMANCE VALUE PACK

444C DUAL PERFORMANCE VALUE PACK (Chrome) PART NO. 44432 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using this product. SAVE THIS MANUAL

More information

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2"-12" BERMAD. Application Engineering

Model: 720-UL INSTALLATION OPERATION MAINTENANCE. Bermad Pressure Reducing Valve IOM. Model: FP -720-UL Sizes: 2-12 BERMAD. Application Engineering Bermad Pressure Reducing Valve Model: 720-UL INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 1. Safety First BERMAD believes that the safety of personnel working with and around our equipment

More information

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions

Anderson Greenwood Series 93 Positive Pressure POSRV Installation and Maintenance Instructions Before installation these instructions must be fully read and understood Installation and maintenance instructions for Series 93 Positive Pressure Pilot Operated Safety Relief Valves (POSRV). The intent

More information

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS

accidents which arise due to non-observance of these instructions and the safety information herein. SPECIFICATIONS 18 GAUGE 1-1/4 INCH BRAD NAILER Model: 7611 CALIFORNIA PROPOSITION 65 WARNING: You can create dust when you cut, sand, drill or grind materials such as wood, paint, metal, concrete, cement, or other masonry.

More information

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot.

P5513. Users Manual. Pneumatic Comparison Test Pump. Test Equipment Depot Washington Street Melrose, MA TestEquipmentDepot. Test Equipment Depot - 800.517.8431-99 Washington Street Melrose, MA 02176 TestEquipmentDepot.com P5513 Pneumatic Comparison Test Pump Users Manual PN 3963372 November 2010 2010 Fluke Corporation. All

More information

Installation Instructions

Installation Instructions 48011HW NATURAL GAS TO PROPANE CONVERSION KIT 58HDX, 359AAV, PG9YAB, PG9YAA Installation Instructions SAFETY REQUIREMENTS Installing and servicing heating equipment can be hazardous due to gas and electrical

More information

North American Orifice Metering System

North American Orifice Metering System Combustion North American Orifice Metering System 8697 and M8697 Metering Orifices accurately measure gas flows to industrial burners. They are compact, inexpensive, and can be installed in individual

More information

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL

SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL www.modsafe.com SERVICE MANUAL MODEL BA050BMST BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device.

More information

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm

SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation. Size: inch / mm SUBMITTAL NOTES PROJECT: Ross Model 50RWR-A Pilot Operated Surge Relief Valve with Hydraulic Anticipation Size: inch / mm Every Ross Valve shall be hydrostatically tested for body integrity and tight seating

More information

Bermad Pressure Reducing. Model: 42T

Bermad Pressure Reducing. Model: 42T Bermad Pressure Reducing Pilot Operated Pressure Control Valve Model: 42T Installation Operation Maintenance Manual (IOM) REV. 27.7.17 Page 1 of 12 Safety First BERMAD believes that the safety of personnel

More information

OPERATING AND MAINTENANCE MANUAL

OPERATING AND MAINTENANCE MANUAL Series 4300 Engineered Performance TABLE OF CONTENTS 0 INTRODUCTION 1 1 Scope 1 2 Description 1 3 Specifications 1 0 INSTALLATION 1 1 Mounting 1 2 Piping 1 1 Connecting Process Pressure 2 2 Vent Connections

More information

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132

Paintball Marker. User s Manual. 530 South Springbrook Road Newberg, OR 97132 Paintball Marker User s Manual 530 South Springbrook Road Newberg, OR 97132 Component Concepts, Inc., 530 South Springbrook Road, Newberg, OR 97132 Phone: (503) 554-8095 Fax: (503) 554-9370 www.phantomonline.com

More information

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES 450P- RV AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES PART NO. 45053 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing

More information

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions

Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions Wilo Triple Duty Valve / Triple Service Valve Installation and operating instructions WIL-IO-SD-001-10 1 Description The Triple Duty Valve (TDV) / Triple Service Valve (TSV) is a quiet operating heavy-duty

More information

SERIES 500 VARIABLE RANGE PNEUMATIC DIFFERENTIAL PRESSURE TRANSMITTER

SERIES 500 VARIABLE RANGE PNEUMATIC DIFFERENTIAL PRESSURE TRANSMITTER Man500e 09/2006 Installation Operation and Maintenance Instructions SERIES 500 VARIABLE RANGE PNEUMATIC DIFFERENTIAL PRESSURE TRANSMITTER INDEX 1. INSTALLATION 2. COMPRESSED AIR SUPPLY 3. FLOW MEASURE

More information

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION

Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Blue River Technologies Port-A-Poly Mixer w/2.5 GPH LMI Pump And Secondary Water Dilution Line INSTALLATION AND OPERATION Install your Blue River Technologies Port-A-Poly mixing system in a clean dry area.

More information

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009

TECHNICAL DATA. Pressure Regulation 531a. April 24, 2009 April 24, 29 Pressure Regulation 531a 1. DESCRIPTION The Viking Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking

More information

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES

450P AUTOMATIC PORTABLE COMPRESSOR EXTREME SERIES EXTREME SERIES PART NO. 45043 IMPORTANT: It is essential that you and any other operator of this product read and understand the contents of this manual before installing and using this product. SAVE THIS

More information

Pressure Dump Valve Service Kit for Series 3000 Units

Pressure Dump Valve Service Kit for Series 3000 Units Instruction Sheet Pressure Dump Valve Service Kit for Series 000 Units. Overview The Nordson pressure dump valve is used to relieve hydraulic pressure instantly in Series 00, 400, 500, and 700 applicator

More information

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS

ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS ACCUMULATOR OPERATING & MAINTENANCE INSTRUCTIONS READ ALL INSTRUCTIONS PRIOR TO INSTALLATION AND OPERATION TO AVOID POSSIBLE INJURY Warning: Always consider any accumulator to contain pressure until proven

More information

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax:

EASTERN ENERGY SERVICES PTE LTD. 60 Kaki Bukit Place #02-19 Eunos Tech Park Singapore, SG Singapore Telephone: Fax: 2 Table Of Contents 1. Introduction 3 2. About this Manual 3 3. Contacting YZ Systems 3 4. Vessel Components 4 5. Specifications 5 6. Application 6 7. Theory of Operation 7 8. DuraSite Installation & Use

More information

RAM 4021 Operation Manual

RAM 4021 Operation Manual RAM 4021 Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021 For your safety...3 Description...3 Set-up mode...4 Annunciator lights/alarms...4 Operation...5 Calibration...6

More information

TECHNICAL DATA ACCELERATOR MODEL E-1

TECHNICAL DATA ACCELERATOR MODEL E-1 Page 1 of 10 1. PRODUCT DESCRIPTION The Viking Model E-1 Accelerator is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating

More information

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator.

RHPS Series RD(H)F40 User Manual. Read the complete manual before installing and using the regulator. RHPS Series RD(H)F40 User Manual Read the complete manual before installing and using the regulator. 2 WARNING Before removing a regulator from the system for service, you must depressurize system purge

More information

Installation, Operation, and Maintenance Manual

Installation, Operation, and Maintenance Manual Installation, Operation, and Maintenance Manual Welker Probe Instrument Regulator Model The information in this manual has been carefully checked for accuracy and is intended to be used as a guide for

More information

ACCESSORY KIT INSTALLATION MANUAL

ACCESSORY KIT INSTALLATION MANUAL ACCESSORY KIT INSTALLATION MANUAL LP (PROPANE) CONVERSION KIT 1NP0366 FOR USE WITH MODELS: G8C & GF8 This conversion kit shall be installed by a qualified service agency in accordance with these instructions

More information

Types 749B and R130 Changeover Manifolds

Types 749B and R130 Changeover Manifolds Instruction Manual MCK-1179 Types 749B and R130 June 2012 Types 749B and R130 Changeover Manifolds TYPE HSRL-749B TYPE 64SR/122 TYPE R130/21 TYPE 749B/21 Figure 1. Changeover Manifolds and Regulator Assemblies

More information

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM 4021-PR. Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021-PR Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021-PR For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4

More information

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021 Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021 For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4 Calibration....

More information

Discharge Relief Valve Operation & Maint.

Discharge Relief Valve Operation & Maint. Relief Valve Operation & Maint. CZ Series Centrifugal Fire Relief svalve Operation and Maintenance Instructions 1410 Operation and Maintenance Form No. F-1031 Section 2302.6 2111 Issue Date 04/90 11/95

More information

D05 Pressure Regulating Valves

D05 Pressure Regulating Valves D05 Pressure Regulating Valves FEATURES PRODUCT DATA Noncorroding unitized cartridge contains all working parts and is easily replaceable. Includes built-in strainer and thermal bypass. Balanced seat construction

More information

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven

4 IN. BALL LAUNCHER Engine Mounted / PTO Driven 4 IN. BALL LAUNCHER Engine Mounted / PTO Driven OPERATOR S PARTS and MAINTENANCE MANUAL 2006 EDITION BL-MAN-4EN Creation Revision date: 10MAR06 date: by: Ivon LeBlanc by: Table of Contents Table of Contents...

More information

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions

L 100. Bubble-Tube Level System. Installation, Operation and Maintenance Instructions L 100 Bubble-Tube Level System Installation, Operation and Maintenance Instructions Figure 1 Contents Section Description Page 1.0 Introduction 2 2.0 Specifications 3 3.0 Installation 3 4.0 Warranty 6

More information

64 Series Pressure Reducing Regulators

64 Series Pressure Reducing Regulators Instruction Manual Form 1245 64 Series March 2006 64 Series Pressure Reducing Regulators W1943 Figure 1. 64 Series Regulator Introduction Scope of Manual This manual provides instructions for the installation,

More information

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL

SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL Product Manual MST Portable Air Filtration System SERVICE MANUAL MODEL BA100BMST 100 SCFM PORTABLE AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the

More information

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM

FOR INSTALLING CO 2 BLENDER KIT (P/N IN BEER SYSTEM IMI CORNELIUS INC One Cornelius Place Anoka, MN 55303-623 Telephone (800) 238-3600 Facsimile (612) 22-326 INSTALLATION INSTRUCTIONS FOR INSTALLING CO 2 BLENDER KIT (P/N 111612000 IN BEER SYSTEM SECONDARY

More information

Freedom8 ShoeBox Compressor Manual

Freedom8 ShoeBox Compressor Manual Freedom8 ShoeBox Compressor Manual Warning!! This product is not a toy! Use or misuse can cause severe injury or death! Use only with adult supervision. This unit is only to be used with tanks, hoses and

More information

200 PSI COMPRESSORS - MODEL NUMBERS

200 PSI COMPRESSORS - MODEL NUMBERS 200 PSI COMPRESSORS - MODEL NUMBERS 380C AIR COMPRESSOR KIT PART NO. 38033 480C AIR COMPRESSOR KIT PART NO. 48043 380C 480C IMPORTANT: It is essential that you and any other operator of this product read

More information

TECHNICAL DATA Q= C. Table 1 - Specifications

TECHNICAL DATA Q= C. Table 1 - Specifications September 25, 2013 Pressure Regulation 537a 1. Description The Model B-3 Pilot Operated Pressure Control Valve is a factory assembled unit. The unit consists of a Model J-2 Halar coated Flow Control Valve,

More information

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly.

Components for air preparation and pressure adjustment. OUT port position ( ) connected Rear side. of IN port. Air tank. directly. Components preparation and pressure adjustment ABP Overview ABP is a component that enables boosting by s only up to twice primary pressure (.0MPa max.) in combination with using air tank but not using

More information

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B

! WARNING. Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls INSTRUCTION MANUAL MM-110B INSTRUCTION MANUAL MM-110B Model PFC-1-G (direct acting) PFC-1-GR (reverse acting) Modulating Pneumatic Liquid Level Controls APPLICATIONS: Use with other pneumatic devices, for liquid level sensing in

More information

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference.

OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference. English Lubrication Free Air Turbine Handpiece with Water Spray OPERATION MANUAL Please read this Operation Manual carefully before use, and file for future reference. OM-T0286E 001 Thank you for purchasing

More information

Design DSA Steam-Atomized Desuperheater

Design DSA Steam-Atomized Desuperheater Instruction Manual DSA Desuperheater Design DSA Steam-Atomized Desuperheater Contents Introduction............................... 1 Scope of Manual......................... 1 Description..............................

More information

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions

RAM Operation Manual. Worldwide Manufacturer of Gas Detection Solutions RAM 4021 Operation Manual Worldwide Manufacturer of Gas Detection Solutions TABLE OF CONTENTS RAM 4021 For Your Safety... 2 Description.... 2 Setup Mode.... 2 Lights/Alarms.... 3 Operation.... 4 Calibration....

More information

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs

Un-Pressurized Orefice Fittings FIO EZ. Parts List and Operation Instructions TECHNICAL MANUAL. Dn 2-6 Class Lbs Un-Pressurized Orefice Fittings FIO EZ Parts List and Operation Instructions TECHNICAL MANUAL Dn 2-6 Class 150-600 Lbs US US 2 FIO EZ - MT 108-US - 05-2016 FIO EZ Important Instructions US Pietro Fiorentini

More information

WIKA INSTRUMENT CORPORATION

WIKA INSTRUMENT CORPORATION WIKA INSTRUMENT CORPORATION Instruction Manual DIFFERENTIAL PRESSURE GAUGE Series 1500 Series 1000 Series 300 WIKA Instrument Corporation 1000 Wiegand Boulevard Lawrenceville, GA 30043 1-888-945-2872 http://www.wika.com

More information

INSTALLATION & MAINTENANCE INSTRUCTION

INSTALLATION & MAINTENANCE INSTRUCTION ARCHON Industries, Inc Liquid Level Gauges Models: BT-LLG ND-LLG INSTALLATION & MAINTENANCE INSTRUCTION Instruction No.: 1014.2 Revision Issued: 3/01/03 Approved: Engineering Manager Warning ONLY QUALIFIED

More information

TECHNICAL DATA CAUTION

TECHNICAL DATA CAUTION Page 1 of 12 1. DESCRIPTION The Viking Model C-2 Pilot Pressure Regulating Valve is a direct-acting, single-seated, spring-loaded diaphragm valve. When installed as a pilot regulating valve on a Viking

More information

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE

DESIGN DATA A WET PIPE BLADDER TANK FOAM/WATER SYSTEM WITH HYDRAULICALLY ACTUATED DELUGE CONCENTRATE CONTROL VALVE February 9, 1998 Foam 101a A BLADDER TANK WITH 1. DESCRIPTION A Wet Pipe Bladder Tank Foam/Water System is a standard wet pipe automatic sprinkler system capable of discharging a foam/water solution automatically

More information

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002

Type ACE97. Introduction. Installation. P.E.D. Categories. Specifications. Overpressure Protection. Installation Guide English May 2002 Installation Guide English May 2002 Type ACE97 Introduction This installation guide provides instructions for installation, startup, and adjustment. To receive a copy of the instruction manual, contact

More information

SERVICE MANUAL MODEL BA020AMST BREATHING AIR PANEL

SERVICE MANUAL MODEL BA020AMST BREATHING AIR PANEL SERVICE MANUAL MODEL BA020AMST BREATHING AIR PANEL WARNING: Do not attempt to operate this equipment without first reading and understanding the service manual enclosed with this device. 5/08 2 GENERAL

More information

Smooth Vent Valve. Series XVD XL XL Q D- XVD XGT CYV

Smooth Vent Valve. Series XVD XL XL Q D- XVD XGT CYV Smooth Vent Valve Series Valve / needle valve integrated construction requires only 1/4 the piping space of previous models. Particulates significantly reduced through the use of a metal diaphragm in the

More information

SERVICE MANUAL No. I-0043

SERVICE MANUAL No. I-0043 Bettis Canada Ltd. 4112 91A Street Edmonton, Alberta, Canada T6E 5V2 Tel: (403) 450-3600 Fax: (403) 450-1400 SERVICE MANUAL No. I-0043 Edmonton GAS/HYDRAULIC ADDITIONAL COMPONENTS CUSTOMER: P.O.#: W.O.#:

More information

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION

INSTALLATION INSTRUCTIONS. CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION INSTALLATION INSTRUCTIONS CVS 67CFR Pressure Reducing Instrument Supply Regulator INTRODUCTION The CVS Controls 67CFR Filter regulator is a pressure reducing supply regulator typically used for pneumatic

More information

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE

NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE NB/NBR NITROGEN BOOSTER FOR AVIATION SERVICE INSTALLATION, OPERATION & MAINTENANCE MANUAL INTERFACE DEVICES, INC. 230 Depot Road, Milford, CT 06460 Ph: (203) 878-4648, Fx: (203) 882-0885, E-mail: info@interfacedevices.com

More information

GILMONT ACCUCAL FLOWMETERS

GILMONT ACCUCAL FLOWMETERS OPERATING MANUAL GILMONT ACCUCAL FLOWMETERS 28W092 Commercial Ave. Barrington, IL U.S.A. 60010-2392 (847) 381-4888 (847) 381-7053 (Fax) 800-962-7142 www.barnant.com e-mail: barnant@barnant.com A-1299-0766

More information

INSTRUCTION MANUAL MP4AR Remote Convection Gauge Range: 1 x 10-3 Torr to 1 x 10+3 Torr

INSTRUCTION MANUAL MP4AR Remote Convection Gauge Range: 1 x 10-3 Torr to 1 x 10+3 Torr INSTRUCTION MANUAL MP4AR Remote Convection Gauge Range: 1 x 10-3 Torr to 1 x 10+3 Torr A DIVISION OF THE FREDERICKS COMPANY 2400 PHILMONT AVE. HUNTINGDONVALLEY, PA 19006 PARTS LIST 1 3 4 2 # QTY ITEM DESCRIPTION

More information

100C Air Compressor Kit

100C Air Compressor Kit 10010 100C Air Compressor (standard mounting bracket, CE Spec) 10014 100C Air Compressor (no leader hose or check valve, CE Spec) 10016 100C Air Compressor (with Omega Bracket, CE Spec) IMPORTANT: It is

More information