RIDE III PROPOSED PROJECTS. April 2015
|
|
- Beatrice Robertson
- 5 years ago
- Views:
Transcription
1 RIDE III PROPOSED PROJECTS April 2015
2 Resurface 100 Miles of Paved Roads RIDE III Pave 100 Miles of Dirt Roads 19 Hwy 9 East Hwy 701 N Widening Conway Perimeter Road Phase II 1 29 Forestbrook Rd SELL Hwy 17 Bus Intersection Improvements Hwy 501 Improvements SC 31/CBP Extension to NC Carolina Forest Blvd Realignment of Hwy 501 Palmetto Point Blvd. Ext. Design: Carolyn Wright, Public Works
3 Pave 100 Miles of the 645 Mile County Road Unpaved Network $60M
4 100 Miles of Resurfacing $15M PAVED MILEAGE WITHIN COUNTY/CITIES Total City/County maintained mileage Percentage of total paved mileage Prorated share of 100 miles of resurfacing % Myrtle Beach % North Myrtle Beach % 6.53 Conway % 6.70 Loris % 1.00 Aynor % 1.00 Surfside Beach % 3.00 Atlantic Beach % 1.00 Briarcliffe Acres % 1.00 TOTALS % *Mileage not available for the City of Loris, Aynor & Atlantic Beach ** Note - mileage has been reduced slightly to provide Loris, Aynor & Atlantic Beach with one mile each
5 Hwy 501 Improvements $50M Option #1 Complete six lanes widening from SC Hwy 31 to US Hwy 501/544 interchange (includes intersection improvements) Option #2 Extend Postal Way to east (to Waccamaw Pines) and related intersection Improvements (including CF Blvd/Renee Dr. area) Option #3 Extend Middle Ridge Dr. to east (to W. Perry Rd) - $3.8 M and to west (Singleton Ridge) Project Length: TBD by Design 3 (Foxworth), 4 (Loftus), 8 (Vaught), City of Conway, City of Myrtle Beach
6 Realignment of Hwy 501 $13.9M at the intersection with Broadway St. into 7 th Ave. North Project Length: TBD by Design 3 (Foxworth) City of Myrtle Beach
7 SELL $25M funding to complete the final studies and record of Decision and/or some initial land purchase of right of way Project Length: 27 Miles 4 (Loftus), 5 (Servant), 7 (Frazier), 11 (Allen)
8 Conway Perimeter Road Phase II $18.4M Construct new road with multi use trail from US 378 to US 701 South Project Length: 1.9 Miles 7 (Frazier)
9 Forestbrook Road $89.1M widening and/or turn lane additions on Forestbrook Road from Rt. 501 to Dick Pond Road (project includes installation of bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 4.5 Miles 6 (Vacant), 8 (Vaught)
10 Carolina Forest Blvd. $54.7M widen and add a series of traffic lights (project includes installation of a multi-use trail). Project Length: 4.8 Miles 2 (Howard), 3 (Foxworth)
11 Hwy. 9 East $21.7M from the end of the existing four lane pavement to intersection of Hwy expand to 4 lanes with curb/gutter and sidewalks. Project Length: 1.2 Miles 9 (P Prince), City of Loris
12 Hwy. 701 N widening from Hwy. 319 to Hwy. 22 $65.1M (project includes bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 4 Miles 7 (Frazier), 11 (Allen)
13 Hwy. 17 Business in Garden City Intersection Improvements $19.8M (project includes Inlet Square Dr., Atlantic Ave. and Garden City Connector) Project Length: TBD by Design 5 (Servant)
14 Palmetto Pointe Blvd. Ext. to SC Hwy. 544 $7.5M (project includes bike and pedestrian accomodations such as sidewalks and wider travel lanes) Project Length: 0.8 Miles 6 (Vacant)
15 SC 31/Carolina Bays Parkway Extension to NC line. $89.8M Project Length: 4.8 Miles 1 (Worley), 9 (P Prince)
TABLE OF CONTENTS. Transportation Element 1
TABLE OF CONTENTS INTRODUCTION... 2 EXISTING PLANS... 2 REGIONAL PLANNING EFFORTS... 2 SPECIALIZED STUDIES AND PLANS... 2 EXISTING PLANS FINDINGS... 3 EXISTING ROAD NETWORK... 4 ROAD CLASSIFICATION...
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationMORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL WORK SESSION AUGUST 8, 2017
TOWN COUNCIL WORK SESSION AUGUST 8, 2017 ENGAGEMENT SUMMARY OPEN HOUSE #2 OPEN HOUSE #2 31 ATTENDEES! TRANSPORTATION RECOMMENDATIONS 2040 E+C MODELED CONGESTION Committed Projects Aviation Parkway Widening
More informationPedestrian Walkways and Bikeways
Appendix F Pedestrian Walkways and Bikeways Table of Contents 1. Introduction... 1 1.1 Types of Bicycle and Pedestrian Facilities... 2 1.2 Bicycle and Pedestrian Facility Standards... 4 1.3 Categories
More informationThank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan!
Welcome Thank you for attending the first Public Open House for the Thunder Bay Transportation Master Plan! Please take this opportunity to learn about the study and to tell us your ideas and vision for
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationCincinnati Dayton Rd Widening
Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge
More informationHighway 56 Traffic Study Rymal Road to Cemetery Road
January 31, 2018 6:00 pm 8:00 pm Highway 56 Traffic Study Rymal Road to Cemetery Road City of Hamilton Public Meeting 2 2 Purpose of Public Meeting To review and obtain public input and comments on the
More informationThe Burgess Community Bicycle and Pedestrian Plan
Horry County Bicycle and Pedestrian Plan Bicycle and Pedestrian Plan 1 Horry County Planning and Zoning Department INTRODUCTION Located on the coastal plain of northeastern South Carolina, Horry County
More informationParks, Open Space, Trails and Recreation Master Plan
5.3 DEFINITIONS AND VOCABULARY In order to fully understand the range of trails that have been developed, and should be developed, throughout the community, a vocabulary needs to be established for the
More informationI-40 Maumelle New Interchange and new 2-lane facility 48 $10.4 $29.8 Highest. Full ITS Implementation 55 $63.3 $144.5 Highest
PROJECT PRIORITIES: FREEWAYS 92 Freeway System ITS 60 $2.3 $2.3 Highest 94 Freeway System ITS 60 $7.9 $10.2 Highest 65 North Cabot Interchange - Hwy 38 State Hwy 367 and State Hwy 38 US Hwy 67 / 167 New
More informationSTUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More informationLIST OF PRIORITY PROJECTS 2020/ /35
LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationSTAGE #3 TRANSITION 1 at Camp Keystone
STAGE #3 SWIM STAGE #3 TRANSITION 1 at Camp Keystone Mount bike AFTER bump T1 Changing Tent STAGE #3 Camp Keystone to Marineland 68 MILE BIKE STAGE #3 68 MILE BIKE Mile 0-10 SAG 0.0 Turn RIGHT out of T1.
More informationDRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES
DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases
More informationWest End Connectivity Master Plan
West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity
More informationStakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads
1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule
More informationIf a person walks within this focus area, these are examples of the places he or she could walk to or from:
Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationCITY OF PORTSMOUTH PLANNING DEPARTMENT
CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationPlanned Improvements from Sector & Area Plans that have been added to the MTP
Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle
More informationMONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN
MONTGOMERY METROPOLITAN PLANNING ORGANIZATION (MPO) BICYCLE AND PEDESTRIAN PLAN May 22, 2012 TIMELINE May 1 May 15: Bicycle and Pedestrian Subcommittee Review of Draft Bicycle and Pedestrian Plan May 24:
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationArkansas State Highway and Transportation Department. Hot Springs Village Kiwanis Club
Arkansas State Highway and Transportation Department Hot Springs Village Kiwanis Club July 11, 2013 The Facts: 12 th Largest System in USA 43 rd Highway Revenue Per Mile How We Compare State Mileage Arkansas
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationTo Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)
nt Name Rank B150857 Bike and Ped improvement s to include Signal and Crossing treatments US 25 US 25/70 SR 1601 Deringer Drive/US 25/US70/Stu dent Dropoff Way improvements to include Signal - Crosswalk
More informationROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)
ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P. 6.30 to M.P. 1.95) SWNI Meeting November July 18, 2016 19, 2015 Portland, Oregon BARBUR ROAD SAFETY AUDIT FHWA RSA Process
More information8 Bicycle and Pedestrian Facilities
8 Bicycle and Pedestrian Facilities 8.1 Existing Facilities The facilities available to walkers and bikers are diverse in the rural ACOG area. Walking and biking are, by their nature, localized modes of
More informationThe Richland County Transportation Penny Program. September 21, 2015
The Richland County Transportation Penny Program September 21, 2015 Program Funding Categories Bike / Ped./ Greenway, $80,888,356 Administration, $32,100,000 Bus Service, $300,991,000 Roadway Projects,
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationTrans-Canada Highway 1 RW Bruhn Bridge Replacement
Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationProject Fact Sheet. August 1,
Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationFDOT Bicycle/Pedestrian Focused Initiative & Complete Streets
Florida Department of TRANSPORTATION FDOT Bicycle/Pedestrian Focused Initiative & Complete Streets Billy L. Hattaway, PE District One Secretary Secretary s Pedestrian Safety Initiative Dangerous by Design
More informationColumbia Pike Implementation Team (CPIT) Meeting
Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal
More informationSC 41/Joe Rouse Intersection Improvements
SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost
More informationSouthwestern RPO Prioritization Local Input Points for Division Needs Funding
H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern
More information!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!
MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions
More informationIt would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.
Lake Ave, Lakewood 2018-2019 West Shoreway Lakefront Path 2017 Lake Ave, Cleveland Clifton Blvd Extension 2017 Neighborhood street bike boulevards Proposed Lake Connector Existing Bike Trails Trails -
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationR2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects
Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements
More information10A. DATE: October 5, Pedestrian and Bicycle Advisory Committee. Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer
10A DATE: October 5, 2016 TO: PREPARED BY: SUBJECT: Pedestrian and Bicycle Advisory Committee Kevin Colin, Deputy Planning Manager Curt Bates, City Engineer Discussion and Provide Comments, Associated
More informationChapter 3.6 Elementary School Z. Volusia County MPO. March Page 13.0
Chapter 3.6 Elementary School Z DeLand, FL Volusia County MPO March 2008 Page 13.0 Volusia County MPO Bicycle and Pedestrian School Safety Review Study Introduction Elementary School Z is a planned elementary
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationWELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary
WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationTransportation Committee Project Priority List
Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationCITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved
CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationTOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN
TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More information2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR
2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR Project Location N N Connecting South Delray Beach Existing
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More information2016 TELL THE TPO SURVEY
RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 TELL THE TPO SURVEY CAMPAIGN SUMMARY August 2016 Introduction The River to Sea Transportation Planning Organization (TPO) conducted its second Tell
More informationDES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017
DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities
More informationLIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018
LIST OF PRIORITY PROJECTS FY 2020-2024 TPA Committee Meetings & Board Review September 2018 MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May
More informationREGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012
WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationSecondary Road Program
Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved
More informationFOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)
FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More information4. Mobility and Transportation Element. Page Bikes and Pedestrians
Below are the specific General Plan text changes proposed for A-16-015 and the proposed changes to Figure MT-2 Paths and Trails. In general changes consist of removing references to the Bicycle, Pedestrian
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving
More informationA COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA
A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA Overview The Atlanta Braves strategically selected the location for SunTrust Park to provide an environment rich in transportation
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationTigard Tigard Transit Center
Tigard Tigard Transit Center Tigard Transit Center Tigard The Tigard Transit Center focus area is located in the City of Tigard. It is situated in the City of Tigard s downtown and is 4.5 miles from the
More informationThe Year Ahead: Virginia Department of Transportation Northern Virginia District
The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov
More informationROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP
Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities
More informationDiamond Springs Parkway Project
Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of
More informationITEM 3 ATTACHMENT A RESOLUTION NO
ITEM 3 ATTACHMENT A RESOLUTION NO. 2018-1575 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CALABASAS, CALIFORNIA, ADOPTING THE FISCAL YEAR 2017-18 LIST OF PROJECTS FUNDED BY SB 1: THE ROAD REPAIR AND
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More informationEmergency Response Support Signage on Multi-Use Trails Plan
DRAFT ( ) Emergency Response Support Signage on Multi-Use Trails Plan Prepared for: SATS Multi-Use Trails Jurisdictions Committee Table of Contents Introduction... 3 Mileage Markers... 4 Rest Stop Identifiers...
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationHealthy Built Environments Cowlitz-Wahkiakum County, Washington
Healthy Built Environments Cowlitz-Wahkiakum County, Washington Bringing Back Active Transportation and Health Presented By Dan Burden, Blue Zones, LLC Livability/Health and the role of Place, Walkability
More information3.0 Future Conditions
3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected
More informationPortland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements
Portland International Airport Bicycle and Pedestrian Plan (October 2003) Staff Acknowledgements Scott King, Senior Aviation Planner Jason Gately, Senior Aviation Planner Preston Beck, Associate Planner
More informationPolk Streetscape Project
What is this project? The Polk Streetscape Project is an effort to improve safety for everyone traveling on Polk Street between Union and McAllister streets. Also included in this project are paving, sewer
More informationSPRINGFIELD REVITALIZATION REPORT
SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization
More informationOcean Park Boulevard Green Street Project Community Workshop
Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,
More informationMunicipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018
Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge
More informationEXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP
EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492
More informationTABLE OF CONTENTS. Executive Summary
Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting
More informationKeep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents
Keep Placer Moving Placer is Growing Keep Placer Moving POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents 30% of the total housing market growth in the Sacramento region.
More informationFlorida Redevelopment Association 2015 Annual Conference
Florida Redevelopment Association 2015 Annual Conference Reimagining State Arterials Jeff Costello, Delray Beach CRA Executive Director I-95 Fed. Hwy Pairs Two blocks west of Intracoastal Waterway One-way
More informationAbout the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability
About the study Key goals of this study are to: North Milwaukee Avenue is a local and regional street for multiple modes of transportation. It is officially zoned and functions as a pedestrian street southeast
More informationISSUE 1. Geography challenge. Geography funnels traffic from several key corridors onto I-5.
ISSUE 1 Geography challenge Geography funnels traffic from several key corridors onto I-. ISSUE 2 Less redundancy Northern OC has a dense network of roadways for traffic to shift to during unexpected incidents.
More informationHigh Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey
High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,
More informationCMAQ DETAILED PROJECT LISTING REPORT ( FY 2002 )
Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' 7/16/2003 $40,173,660 $40,575,179 101 $1,245,000 Demand Management Trip Reduction Prog Travel Reduction Pro Telwork Outreach
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationAppendix 1. Public Participation
Appendix 1 Public Participation Norfolk Transportation Plan 2030 Short-, Mid-, and Long-Term Roadway Improvements (Preliminary Recommendations) Roadway Limits Scope of Improvements Estimated Cost (2006
More information