1 Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities for transportation improvements derived adopted the County s Comprehensive Plan (CP), Master Plans () and allied documents, the O s 00 Long Range Transportation Plan (LRTP) and TJPDC s 0 Rural Long Range Transportation Plan (RLRP), or otherwise identified by VDOT, County staff, other public agencies. RANK NAME LOCATION DESCRIPTION I and Rt. (Exit ) I and Rt. 0 (Exit ) US /0 Widening, Prel. Engineering Only Rt. 0 East Widening East of Pantops Rt. 0 West Intersection 0 Rt. 0 North Widening and intersection improvement of Rt. 0/Rt. 0 Rt. 0 South Rt. 0 Widening, Pantops Rt/Greenbrier Dr. Rt. /Woodrook Dr. Rt. 0 Intersections in Scottsville Rt. and Rt. Safety Existing I/Rt. interchange and nearby Fontaine Ave. Existing I interchange From I to Barracks Rd. From I interchange to Rivanna Village a. Owensville Rd. b. Three Notch d Rd c. Crozet Ave d. Rt. e. Tilman Rd. From Rt. 0 to Elks/Fontana Drive in Pantops From Rt. to Mill Creek Drive From I to City Limits Rt. north corridor Rt. north corridor Valley St. and Warren St. From Gordonsville/Co. line to Rt.0 Full replacement of the existing interchange, including related improvements to Fontaine Ave. interchange (not full replacement of Fontaine) Increase capacity and rebuild the interchange to be safer for higher volumes of traffic. Widen to lanes with median and includes replacement of the RR Bridge, other bridge improvements. Widen to lanes w/bike & ped. facilities Safety/operation/capacity improvements (traffic light, roundabout, lengthen turn lanes, and/or other) Widen to lanes, with sidewalk and bike lanes. Safety/ operation/capacity improvements at Rt. 0/Rt. 0 intersection Alignment improvements, widening, C & G, bike lanes and sidewalk/multiuse path Widening to lanes, section not done with development; sidewalk, bike lanes, crosswalks, landscaping improvements Add southbound left turn lane, And westbound right turn lane Extend northbound left turn and right turn storage & possible channelizing of lanes Improve alignment / operation/capacity Full lane width, intersection, shoulder and other spot safety improvements ROAD S Primary and Interstate Roads LRTP; Western LRTP; Pantops LRTP; Pantops & Rivanna s LRTP, RLTP, Crozet Pantops Pantops Places Places Scottsville RLRP Fully. New to Co. list SECOND POTENTIAL SOURCES ) Not fully due to limited funding availability Funded for preliminary engineering only in LRTP Funded for preliminary engineering only in LRTP

2 Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc Rt. 0/Rt., Plank Rd. intersection Rt. /Rt., Plank Rd. intersection Keene area Reconstruct west bound lane to address safety issue RLRP New to Co. list. North Garden area Lengthen west bound left turn lane RLRP New to Co. list. 0 Proffit Road Sunset Road and County Green Rd. (secondary) Eastern Ave. Construction Old Lynchburg spot safety improvements Old Ivy Road Ashwood Blvd. Extension Fifth St. Extended C&G, Bike Lanes & Sidewalks Avon St., Curb & Gutter and Bike Lanes Library Avenue Polo Grounds Rd safety improvements James River Rd. (), Scottsville Blenheim Rd () Intersection Improvement From Leake Ln./Worth Crossing to Baker Butler Ele. School From Fifth St. to City Limits/Moore s Crk. And from Old Lynchburg Rd to Sunset Rd. From Rt. 0 to north of Lickinghole Crk. (Crozet) From lane section to Red Hill Rd. (0) From Ivy road to /0 Bypass western ramp Extend Ashwood Blvd. from Rt. to Berkmar Dr. Extended From City limits to old Lynchburg Rd From City limits to Rt. 0 From Library east to Eastern Avenue Spot improvements west of RR underpass From Rt. to Rt. 0 Blenheim Rd. () and Pine Rd. (0) Improve alignment, install lanes and sidewalks Improve alignment, install lanes and sidewalks. C & G, bike C & G, bike New road segment to improvement local road network capacity and accessibility Improve alignment, install C & G, bike lanes and sidewalk/multiuse path. on intersection improvement at Ivy Rd. and pedestrian improvements Alignment at Ivy Road intersection to RR underpass, and sidewalk and bike lanes or multiuse path along length of road New road segment to improvement accessibility and capacity (of Rt. ). Would include intersection improvements at Rt. Provide curb & gutter for stormwater control, bike lanes, and sidewalks (and sidewalk repair). Includes sidewalk & bike lanes on I overpass Provide curb & gutter for stormwater control and bike lanes. Includes sidewalk & bike lanes on I overpass Construct sections that will not be built as part of approved or future developments Address travelway width, shoulder, sight distance, drainage Spot safety improvements Improve safety /operation of intersection Secondary Roads Places, Western Neigh Crozet Neighborhood Western Neigh Places Western neigh. Crozet Master Plan VDOT, public Scottsville Scottsville The Sunset Fontaine Connector (new road segment) has been removed from Plan based on Draft Comp Plan recommendation New to Co. list. New to Co. list New to Co. list

3 Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc Berkmar Drive extended to Airport Rd. From Hollymead Town Center to Airport Continue Berkmar Dr. extended to Airport Rd and to Innovation Dr. in UVA Research Park Unpaved Roads Various Use minimum yearly allocation of State Road paving funds Places New to Co. list Unpaved Road project list under development RANK NAME LOCATION DESCRIPTION 0 Dickerson Road Bridge ment Just south and west of Briarwood Subdivision Lengthen/widen bridge over North Fork Rivanna River Creek to accommodate paving of Dickerson Rd BRIDGE S Old Ivy Rd. (0) US /US0 Bypass Bridge Construction, Primary Road: LRTP; VDOT Richmond Rd (US Shadwell Creek Bridge Construction, Primary Road: LRTP; VDOT 0) Crozet Avenue Lickinghole Creek Bridge Construction, Primary Road: LRTP; VDOT (0) Louisa Rd () Branch Carroll Creek Bridge Construction, Primary Road: LRTP; VDOT Red Hill Rd. (0) North Fork Hardware Bridge Construction, Secondary Road: LRTP; VDOT River Browns Gap Rd. Lickinghole Creek Bridge Construction, Secondary Road: LRTP; VDOT (0) Watts Passage Rd. Preddy Creek Bridge Construction, Secondary Road: LRTP; VDOT (00) Frays Mills Rd. Marsh Run Bridge Construction, Secondary Road: LRTP; VDOT () Fontaine Ave. Ext. (0) Morey Creek Bridge Construction, Secondary Road: Proffit Rd. () Norfolk RR Maintain adequate sufficiency rating for level of traffic and emergency access SECOND POTENTIAL SOURCES FEDERAL BRIDGE LRTP; VDOT LRTP; VDOT ) RANK NAME LOCATION DESCRIPTION Regional Transit Authority New Service to Avon St./Mill Crk. Dr. area N/A Urban Neighborhood, along Avon and Mill Creek Dr. Funding to establish and operate a regional authority providing expanded transit service to Co. and City New service to developing Urban Neighborhood, regional public facilities and service areas AND RAIL S LRTP SECOND POTENTIAL SOURCES )

4 Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc Service to Hollymead Community Hollymead Crozet Transit Link Along Rt. 0 connecting Crozet to downtown C ville Route 0: Transit Only Link TransitFocused US and US BRT/Express Pantops area, with improvements along High St. in City Rt. North corridor (between Downtown C ville and Hollymad/Piney Mtn.) New service to Hollymead DA, regional public facilities and service areas New transit service connecting Crozet and Downtown C ville. Service would only occur during peak hrs (am to 0 am) and (pm to pm). Service would run on 0minute headways. a. Increase headways on existing CAT Route 0 to minutes during the peak hour and 0 minute offpeak. b. Construct transitonly link on US 0 and existing Free Bridge (adding a lane) allowing buses to avoid transit congestion in this location. Reshape US to allow BRT rapid transit infrastructure, Bus Rapid Transit Service (between Downtown C ville and the NGIC); increased bike, ped., busstop infrastructure. also include new signal preference technology to facilitate BRT or express bus. Places LRTP; Crozet LRTP; Pantops LRTP (T) PEDESTRIAN, BIKE AND ENHANCEMENT S RANK NAME LOCATION DESCRIPTION Pedestrian Crossings of Rt. 0 East Pedestrian Crossings of Rt. North Pedestrian Crossings, Rio Rd. East North Town Trail Rivanna River Trail Biscuit Run & Moore s Creek Trail Between Free Bridge and State Farm Blvd. Strategic locations between City limits and Timberwood Blvd. Between Fashion Sq. Mall western entrance and Old Brook Rd From downtown C ville to Hollymead Town Center From North Town Trail at Rivanna River to existing trail at Darden Towe Park Biscuit Run from Mill Creek area to Moore s Crk., along Moore s Crk. east and west to existing trails. Crosswalks, pedestrian signals, associated sidewalks/ramps/safety islands. Eval. grade separation options Grade separated and at grade options; associated pedestrian signals, sidewalks/ramps/safety islands. Pursue crosswalk(s) in multiple locations including at Putt Putt Place or Rio East Ct. safety improvement Construction unbuilt sections of multiuse trail between new Berkmar Drive extended and Belvedere development. Construct multiuse trail for commuting and rec. purposes Construct multiuse trail for commuting and rec. purposes; includes walkway along Parkway reservation [Note: most of the Road Projects noted above will include pedestrian and bike facility improvements] POTENTIAL SOURCES Pantops Places Places ; O adopted study LRTP, New to Co. list SECOND )

5 Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc Route 0 West sidewalk and bike lanes, Ivy Road Rt 0 West in Crozet Landscaping of Rt.0 South AND Fifth St. From City limits to Bypass Cory Farms to Cloverlwan/Harris Teeter SC From City limits to Rt. and from city to Old Lynchburg Rd. Install sidewalk, crosswalks, and bike lanes Install sidewalk, crosswalks, and bike lanes Install street trees to improve visual quality Crozet (REC D) (REC D) NAME LOCATION DESCRIPTION Rt. North Widening Rt. /Rt. 0 Bypass (Best Buy Ramp) Hillsdale Drive Extended (Rt.) Hillsdale Drive Extended (South) Berkmar Drive Extended South Rt./Rio Road Grade Separated Rt/Hydraulic Road Grade Separated Seminole Trail Signals/Traffic Services Broomley Road Bridge ment (rt. ) Black Cat Road Bridge ment (Rt. ) Polo Grounds Rd to Town Center Drive Existing Emmet Street and Rt. 0 Bypass (City) New Road from existing Hillsdale Dr. to Hydraulic Road From Hillsdale Dr. /Hydraulic Rd. intersection south to Holiday Dr. (City) From current northern terminus at Hilton Heights Road to Town Center Drive Intersection of Rio Rd. and Rt. Intersection of Hydraulic Rd. and Rt. From Ivy Rd. (City) to Airport Rd. Broomley Road, just north of its intersection with Ivy Road (Rt. 0) Black Cat Road, north of its intersection with Rt. 0 FULLY FUNDED S IN THE STATE SI YEAR IROVEMENT PLAN (SYIP) Widen to lanes, with sidewalk and multiuse path Add third lane south bound and an additional ramp lane New lane road with sidewalks and bike lanes PRELIMIN ENGINEERING ONLY to add new roadway Extend existing roadway from current northern terminus over the South Fork of the Rivanna River to Town Center Drive. Includes bike and pedestrian facilities. Construct a gradeseparated interchange to replace the current signalized intersection. Includes Bicycle and Pedestrian facilities. PRELIMIN ENGINEERING ONLY to Construct a gradeseparated interchange to replace the current signalized intersection. Includes Bicycle and Pedestrian facilities. Adaptive signal improvements bridge over CS/Buckingham Branch RR bridge over CS/Buckingham Branch RR LRTP; Co. List LRTP; Co. List In designbuild phase Under construction Design completed, in ROW and construction phase (managed by City) To be studied in concert with the Hydraulic Road In designbuild phase In designbuild phase To be studied in concert with the Hillsdale Drive Extended South project In designbuild phase Funded, designed and bid for construction Under construction SECOND )

6 Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc Dick Woods Bridge ment (Rt. ) Ivy Road Bridge ment (Rt. 0) Dickerson Rd Bridge over North Fork Rivanna River (Rt. 0) Additional Regional Rail Service (AMTRAK) Dick Wood Road between Rt. 0 and I interchange Just east of the intersection of Dick Woods Rd. and Rt. 0, in Ivy South and west of Briarwood development NS Railroad bridge over Ivy Creek LRTP; SYIP In design bridge over Little Ivy Creek LRTP; SYIP Preliminary design Bridge replacement over North Fork Rivanna River in Albemarle County. Provide a second train from Lynchburg to Washington, D.C. Rt. Solutions Preliminary design funded

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Memorandum. From: Jakob zumfelde, Transportation Planner Date: November 7, 2018 Reference: Long Range Transportation Plan

Memorandum. From: Jakob zumfelde, Transportation Planner Date: November 7, 2018 Reference: Long Range Transportation Plan Charlottesville-Albemarle Metropolitan Planning Organization POB 1505, 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 phone info@tjpdc.org email Memorum To: MPO CTAC From: Jakob

More information

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process. Charlottesville-Albemarle Metropolitan Planning Organization POB 1505, 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 phone info@tjpdc.org email Memorandum To: MPO CTAC From: Wood

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS 2004-05 Through 2009-10 [SOME PROJECTS MAY NOT BE COMPLETED AS PRIORITIZED DUE TO PROJECT COMPLEXITY AND/OR AVAILABLE FUNDING] APPROVED BY

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

5 th & Avon Community Brainstorm

5 th & Avon Community Brainstorm 5 th & Avon Community Brainstorm $ Projects 1. Toddler playground in Scottsville 2. Plantings/trees in front of jail and armory along Avon St. 3. Landscaping of Avon Extended from City limits to Mill Creek

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Rio Mills Rd/Berkmar Dr Extended Connection

Rio Mills Rd/Berkmar Dr Extended Connection SMART SCALE Application Rio Mills Rd/Berkmar Dr Extended Connection Status: Scored ID: F2-0000001408-R02 General Point of Contact Information Point of Contact Name Kevin McDermott Point of Contact Phone

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

! " Land Use/Green Infrastructure Questions:

!  Land Use/Green Infrastructure Questions: February 26, 2007 6:30 PM to 9:30 PM Agnor Hurt Elementary School Cafeteria! " " The following is a summary of input provided by participants during the small group session at the Places29 Workshop #6

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017) Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017) In September 2015, the City Council adopted the Bicycle and Pedestrian Master Plan as an amendment to the City s Comprehensive Plan (2013).

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Transportation Committee Project Priority List

Transportation Committee Project Priority List Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

CHAPTER 5 TRANSPORTATION GOAL

CHAPTER 5 TRANSPORTATION GOAL CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

Appendix A: Grouped Projects Projects by Grouping (FHWA Format) Appendix A: Grouped Projects Projects by Grouping (FHWA Format) MPO TIP Report 5/22/28 5:18:43 PM Appendix A Projects by Grouping MPO Construction : Bridge Rehabilitation/Replacement/Reconstruction GRP-1

More information

Route 15 Congestion Report Findings

Route 15 Congestion Report Findings Route 15 Congestion Report Findings Briefing To Loudoun County Board of Supervisors May 18, 2016 1 Overview: Previous Studies: Route 15 Corridor, Leesburg to Maryland Route 15 Congestion Report: Between

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Cascade Bicycle Club Recommendations

Cascade Bicycle Club Recommendations Cascade Bicycle Club Recommendations The following recommendations are focused on improving bicycle commuting in the Duwamish (South Park, South Downtown, Georgetown and North Tukwila). The recommendations

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary

WELCOME! Please complete a comment sheet as we value your feedback. 4 pm to 8 pm. September 15, Hosted by: AECOM on behalf of City of Calgary WELCOME! Thank you for attending our open house. There will be no formal presentation today so please take the time to read the boards. If you have any questions, please do not hesitate to approach one

More information

TRANSPORTATIO N. Albemarle s transportation network will be increasingly multimodal, environmentally sound, well maintained, safe, and reliable.

TRANSPORTATIO N. Albemarle s transportation network will be increasingly multimodal, environmentally sound, well maintained, safe, and reliable. Source: Albemarle County Community Develop- TRANSPORTATIO N GOAL: Albemarle s transportation network will be increasingly multimodal, environmentally sound, well maintained, safe, and reliable. 10.1 [This

More information

Safe Routes to School Action Plan Aberdeen, Idaho

Safe Routes to School Action Plan Aberdeen, Idaho Background Aberdeen, Idaho is a largely agricultural community of nearly 2,000 people and is located in the southeast portion of the state on the western edge of American Falls Reservoir. The community

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

ARRENTON RANSPORTATION

ARRENTON RANSPORTATION ARRENTON RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Bridges and Arizona Crossings

Bridges and Arizona Crossings Circulation and Transportation 5-11 Discovery Street/Barham Drive. Discovery Street is planned 5.4.3 Specific Plan Circulation Improvements to be extended eastward from its terminus at Craven Road Circulation

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

FOLSOM-HOWARD STREETSCAPE OVERVIEW

FOLSOM-HOWARD STREETSCAPE OVERVIEW FOLSOM-HOWARD STREETSCAPE OVERVIEW SoMa residents should have the same kinds of amenities that other neighborhoods have. The Folsom- Howard Streetscape Project will make SoMa more livable by making it

More information

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

If a person walks within this focus area, these are examples of the places he or she could walk to or from: Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City

More information

Sixth Line Development - Transit Facilities Plan

Sixth Line Development - Transit Facilities Plan Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Creating the Future Bruce B Downs Blvd

Creating the Future Bruce B Downs Blvd Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

The Bike Buzz in Richland. November 2017 Carl Berkowitz

The Bike Buzz in Richland. November 2017 Carl Berkowitz The Bike Buzz in Richland November 2017 Carl Berkowitz Richland has been growing by leaps and bounds with lots of new homes and roads throughout the community. Recognizing all the growth in the Queensgate

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Finksburg Planning and Citizens Council March 22, 2018 Overview Progress Citizen Outreach Vision Chapter 3 - Existing Conditions Chapter 4

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

McLEAN CITIZENS ASSOCIATION

McLEAN CITIZENS ASSOCIATION McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by

More information

State Highway 44/State Street High Capacity Corridor

State Highway 44/State Street High Capacity Corridor Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations.

In station areas, new pedestrian links can increase network connectivity and provide direct access to stations. The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services

Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services To: CC: From: Alexander Ikefuna City of Charlottesville Director of Neighborhood and Development Services Jeanette Janiczek, City of Charlottesville UCI Program Manager, NDS Tony Edwards, City of Charlottesville

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.

Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9. Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9 Prepared By: URS Canada Inc. 4 th Floor, 30 Leek Crescent Richmond Hill, Ontario L4B

More information

Highway 56 Traffic Study Rymal Road to Cemetery Road

Highway 56 Traffic Study Rymal Road to Cemetery Road January 31, 2018 6:00 pm 8:00 pm Highway 56 Traffic Study Rymal Road to Cemetery Road City of Hamilton Public Meeting 2 2 Purpose of Public Meeting To review and obtain public input and comments on the

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

Comprehensive Collection of Stakeholder Alternatives by Mode

Comprehensive Collection of Stakeholder Alternatives by Mode 2011 Illinois Department of Transportation Comprehensive Collection of Stakeholder Alternatives by Mode October 2009 January 2011 www.dot.il.gov www.eisenhowerexpressway.com FILEY RD FILEY RD IHB RR 2

More information

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation

Staunton. Transportation Plan. Transportation Planning Division. Virginia Department of Transportation 2020 Transportation Plan Developed for the Transportation Planning Division of the Virginia Department of Transportation in cooperation with the U.S. Department of Transportation, Federal Highway Administration

More information

Viewing SMART SCALE Application

Viewing SMART SCALE Application Viewing SMART SCALE Application Route 15 Whites Ferry Road to Points of Rock Bridge Project Status: Submitted Organization: Loudoun County Project ID: 3593 Submitted: 08/06/2018 @ 3:18PM by Bob Brown Created:

More information

RZC Appendix 8A Marymoor Subarea Street Requirements

RZC Appendix 8A Marymoor Subarea Street Requirements RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

RE: Park Plaza Walgreens (P12-016)

RE: Park Plaza Walgreens (P12-016) 12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:

More information

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event Project overview The City of Calgary is conducting a transportation corridor study of 5 Avenue S.W., between Crowchild Trail and 4A Street S.W. In 29, it was reclassified as a Parkway under the Calgary

More information

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service

More information