1 Memo To: David Wise From: Robert Vastag, RPP City of Ottawa 110 Laurier Avenue West Ottawa, Ontario K1A 1A1 Stantec Consulting Ltd Clyde Avenue, Suite 400 Ottawa, Ontario K2C 3G4 File: Fairwinds West Date: March 10, 2016 Reference: Johnwoods Street Repurposing PLANNING CONTEXT The Johnwoods Street corridor has been the subject of community concern over the past 10 to 15 years. Historic community complaints were largely centered on a perception of high traffic volumes as well as perceived speeding issues on Johnwoods Street. These issues were symptomatic of larger transportation network issues primarily attributed to an underdeveloped arterial road network between Stittsville and Kanata. As population growth outpaced the development of the arterial road network, Johnwoods Street became a very attractive route for cut-through traffic. The construction of the Huntmar Drive extension and the Hazeldean Road widening introduced much needed additional capacity to the transportation system. These alternative travel corridors significantly reduced the dependence and attractiveness for Johnwoods Street to function as an infiltration route. The future extension of the Stittsville Main Street collector as well as the future North-South Arterial road east of Huntmar Drive will introduce additional capacity to the transportation network which will accommodate future growth and is expected to further reduce the attractiveness of Johnwoods Street as an infiltration route. Attachment 1 illustrates the evolution of the boundary road network. JOHNWOODS STREET REPURPOSING Through the development of the Fairwinds West subdivision the Rosehill Avenue collector will be extended through Poole Creek Village. The extension of Rosehill Avenue, from west of Huntmar Drive to Johnwoods Street, and its designation as a collector road, have been contemplated in past planning for the Kanata West development area. In addition, the future Mattamy and Tamarack subdivisions will include at least two new north-south roads connecting Maple Grove Road to Rosehill Avenue. Given the above, and through the plan of subdivision process for Mattamy s Fairwinds West development, the section of Johnwoods Street between the Rosehill Avenue extension and Maple Grove Road was determined to be redundant in terms of its function as a collector road in the Kanata-Stittsville transportation network. ml w:\active\ _fairwindswesttrafficimpactstudy\johnwoods study\march 2016\fairwinds west memo - march 2016_rv.docx
2 March 10, 2016 David Wise Page 2 of 3 Reference: Johnwoods Street Repurposing As a condition of the subdivision agreement for their Fairwinds West community, Mattamy is required to repurpose the portion of Johnwoods Street between Rosehill Avenue and Maple Grove Road into a multi-use pathway. COMMUNITY CONCERNS We are aware of three primary community concerns associated with the closure of Johnwoods Street. These issues were brought forward at a recent February 26 th, 2016 meeting and are summarized as follows: 1. The Rosehill Avenue extension to Johnwoods Street will increase traffic on existing portions of Rosehill Avenue. It is important to note that the extension and designation of Rosehill Drive as a collector road are independent of, and unrelated to, the closure of Johnwoods Street. Rosehill Avenue, from Huntmar Drive to Johnwoods Street, has been planned since the beginning of the Fairwinds Community. It is designated as a collector road and this designation suggests that it could accommodate upwards of 1200 to 1600 vehicles (twoway) per hour. Based on the traffic forecasts for the Fairwinds West and Poole Creek communities, Rosehill Avenue is projected to carry approximately 450 vehicles (two-way) per hour once both communities are fully built and occupied. These traffic forecasts are well within the carrying capacity and intended role of Rosehill Avenue as a collector road. Figure 1 illustrates the projected traffic volumes along Rosehill Avenue with the Fairwinds / Poole Creek communities fully built and occupied. The Johnwoods Street closure is anticipated to contribute roughly 50 additional vehicles per hour (two-way) to Rosehill Avenue, which represents roughly a 15% increase. As the volumes along Rosehill Avenue are projected to remain below the carrying capacity of 1200 to 1600 vehicles per hour (two-way), Rosehill Avenue is expected to operate as intended. Figure 2 illustrates the projected traffic volumes along Rosehill Avenue with the Fairwinds / Poole Creek communities fully built and occupied and with the Johnwoods Street closure. 2. The closure of Johnwoods Street will create cut-through traffic in the Bryanston Gate community. This is a highly unlikely situation as motorists tend to take the path of least resistance, which would be to infiltrate through the Fairwinds community to travel between Maple Grove Road and Hazeldean Road. The shortest travel path between Maple Grove Road and Hazeldean Road will be via Huntmar Drive or through the Fairwinds / Poole Creek communities. Furthermore, given that Rosehill Avenue will function as a collector street ml w:\active\ _fairwindswesttrafficimpactstudy\johnwoods study\march 2016\fairwinds west memo - march 2016_rv.docx
3 March 10, 2016 David Wise Page 3 of 3 Reference: Johnwoods Street Repurposing between Johnwoods Street and Huntmar Drive, this will be the most attractive route for motorists to use if they intend to cut-through the Fairwinds / Poole Creek communities. 3. If Maple Grove Road is ever extended west to Stittsville Main Street, the closure of Johnwoods Street will create cut-through traffic in the Bryanston Gate community. The extension of Maple Grove Road to Stittsville Main Street is not currently planned as part of the City of Ottawa s 2013 Transportation Master Plan. The extension of Maple Grove Road should not be considered as part of the Johnwoods Street closure. The transportation implications of this hypothetical road extension should be addressed during the Stittsville Main Street Extension Environmental Assessment or any planning application which calls for the extension of Maple Grove Road. The extension of Maple Grove Road, therefore, is unrelated to the Johnwoods Street closure. IMPLICATIONS TO TRANSIT SERVICE Public transit is currently provided along Johnwoods Street via route 162, which connects the Stittsville community to Terry Fox Station. When Johnwoods Street is closed between Rosehill Avenue and Maple Grove Road, route 162 will need to be rerouted. As part of Mattamy s subdivision agreement for their Fairwinds West community, Santolina Street and Rosehill Avenue have been identified as potential transit service routes. A logical rerouting of route 162 would follow Rosehill Avenue to Santolina Street and connect to its existing route at Maple Grove Road. See attached Figure 2 which illustrates the potential rerouting of OC-Transpo route 162. STANTEC CONSULTING LTD. Robert Vastag, RPP Senior Transportation Planner Phone: (613) Robert.Vastag@stantec.com Attachments: Attachment 1 Evolution of the Boundary Road Network Figure 1 Future (Build-Out) Traffic Volumes Johnwoods Open Figure 2 Future (Build-Out) Traffic Volumes Johnwoods Closed ml w:\active\ _fairwindswesttrafficimpactstudy\johnwoods study\march 2016\fairwinds west memo - march 2016_rv.docx
4 Attachment 1 Evolution of the Boundary Road Network
5
6
7
8 Figure 1 - Future (Build-Out) Traffic Volumes Johnwoods Open 23 (98) 71 (119) 71 (57) 7 (7) 4 (10) 121 (80) 43 (150) 276 (480) 9 (10) 4 (2) Neg. (10) 23 (81) 186 (109) 109 (135) Neg. Neg. 84 (275) 284 (176) 2 (Neg.) 96 (67) 41 (115) 364 (394) 23 (33) 11 (13) 0 (0) 39 (26) 159 (101) Format: AM (PM) Neg: Negligible Figure 2 - Future (Build-Out) Traffic Volumes Johnwoods Closed 23 (98) 71 (57) 54 (178) 299 (537) 9 (10) 4 (2) Neg. (10) 23 (81) 208 (128) 23 (57) 95 (303) 306 (195) 2 (Neg.) 96 (67) 41 (115) 364 (394) 23 (33) 84 (64) Format: AM (PM) Neg: Negligible
Johnwoods Street Closure Summary Response
Johnwoods Street Closure Summary Response The following provides a summary of the major questions asked at the Public Information Meeting on May 4 th, 2016 and the responses. 1. What was the Approval Process
More informationBuilding a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville
Building a Liveable Ottawa 2031 Backgrounder 4: Kanata/Stittsville Wards 4, 6 and 23 Official Plan Transportation Master Plan Cycling Plan Pedestrian Plan October 2013 ottawa.ca/liveableottawa Building
More information9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief. Prepared By: Stantec Consulting Ltd.
9 Leeming Drive Redevelopment Ottawa, ON Transportation Brief Prepared By: Stantec Consulting Ltd. TIA GUIDELINES CHECKLIST Report Context Municipal Address Comment: Section 1.1 Location relative to major
More informationEXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY
EXECUTIVE SUMMARY OF CALEDON TRANSPORTATION NEEDS STUDY The Caledon Transportation Needs Study has been undertaken as a joint project by the Town of Caledon and the Region of Peel to determine the existing
More informationAlta Planning + Design
Alta Planning + Design Gavin Davidson, MCIP, RPP Principal, Senior Planner Vancouver Kate Whitfield, P.Eng., MCIP, RPP Senior Associate Engineer/Planner Ottawa Ottawa, Ontario, Canada Ottawa Toronto Syracuse
More informationSixth Line Development - Transit Facilities Plan
Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit
More informationFebruary 10, 2015 Project: P
Project: 142110P Transportation Planning Transit Planning Traffic Engineering Parking Planning Chris Corosky Armel Corporation Commerce Court West, 199 Bay Street, Suite 2900 P.O. Box 459, Toronto, Ontario
More informationANNEX A: Rapid Transit, Transit Priority, and Road Projects
ANNEX A: Rapid Transit, Transit Priority, and Projects Table A1 Rapid Transit Projects Light Rail Transit Projects North-South LRT (Network O-train Extension (Affordable Network) Eastern LRT Western LRT
More informationCPC Parking Lot Riverside Drive. Transportation Rationale
CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...
More informationVIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY
VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates
More informationPrepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9.
Prepared For: Shieldbay Developments Inc. c/o Matson, McConnell Ltd. 2430A Bloor Street West Toronto, Ontario M6S 1P9 Prepared By: URS Canada Inc. 4 th Floor, 30 Leek Crescent Richmond Hill, Ontario L4B
More informationThe proposed development is located within 800m of an existing Transit Station where infill developments and intensification are encouraged.
Stantec Consulting Ltd. 1331 Clyde Avenue, Suite 4 Ottawa ON K2C 3G4 Tel: (613) 722-442 Fax: (613) 722-2799 May 14, 213 File: 1638823 Robinson Park Development Corp. 5699 Power Road Ottawa, ON, K1G 3N4
More informationCastleGlenn Consultants Inc.
February 1 st, 2010 CastleGlenn Consultants Inc. Engineers, Project Managers & Planners Mr. Kevin Yemm Planning and Land Development Richraft Ltd. 2280 St. Laurent Boulevard Suite 201 Ottawa, Ontario (Tel:
More informationBuilding a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim
Building a Liveable Ottawa 2031 Backgrounder 5: Barrhaven/Riverside South/Leitrim Wards 3 and 22 Official Plan Transportation Master Plan Cycling Plan Pedestrian Plan October 2013 ottawa.ca/liveableottawa
More informationGeneral Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701
General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.
More informationBLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT. Prepared for: Ontario Limited.
BLUE SEA VILLAGE MER BLEUE 2159 MER BLEUE ROAD OTTAWA, ONTARIO TRANSPORTATION IMPACT ASSESSMENT Prepared for: 2534189 Ontario Limited April 6, 2018 117-668 TIA Report_2.doc D. J. Halpenny & Associates
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationComments The Plan for Port Whitby
Comments The Plan for Port Whitby April 24th, 2013 Community Meeting #2 Summary Report Prepared by GLPi April 29th, 2013 1 Introduction The purpose of the Port Whitby Secondary Plan Update, Community Improvement
More informationRZC Appendix 8A Marymoor Subarea Street Requirements
RZC Appendix 8A Marymoor Subarea Street Requirements For additional design details for Marymoor Subarea infrastructure, refer to the 2017 Marymoor Subarea Infrastructure Planning Report. STREET REQUIREMENTS
More informationAPPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS
APPENDIX H EXISTING TRAFFIC CONDITIONS ANALYSIS MEMO : Peter Steacy, P.Eng. Date: December 3, 2014 : Ian Borsuk, P.Eng. Job No.: 3414015-000 Subject: City of Ottawa O-Train Extension Planning & EA Study
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationBarrhaven South Urban Expansion Study Area Community Design Plan
Barrhaven South Urban Expansion Study Area Community Design Plan FINAL Transportation Master Study Ottawa, Ontario Prepared for: Minto Communities Prepared by: Stantec Consulting Ltd. February 2018 Project
More information2 BOLTON COMMUTER RAIL SERVICE FEASIBILITY STUDY
2 BOLTON COMMUTER RAIL SERVICE FEASIBILITY STUDY The Planning and Economic Development Committee recommends the adoption of the recommendations contained in the following report dated April 15, 2011 from
More informationAPPENDIX M FOR THE JEFFERSON COUNTY PORTION OF THE VISION 2050 PLAN RECOMMENDATIONS MILWAUKEE URBANIZED AREA INTRODUCTION
INTRODUCTION Following the 2010 U.S. Census, 70 the Milwaukee urbanized area boundary extends beyond the Southeastern Wisconsin Region across the boundary line between Waukesha and Jefferson Counties,
More informationOTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:
OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012
More informationAnniedale - Tynehead NCP. Transportation Highway 15 & Golden Ears Way Analysis
Highway 15 & Golden Ears Way Analysis Stage 1 Conclusions Analysis indicated capacity constraints at Highway 15 & Golden Ears Way Grade Separation required for safe and efficient traffic movement Supports
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationSNCC Demographic Trends
Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population
More informationINTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS
INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with
More informationChapter 2 Current and Future Conditions
Chapter 2 Current and Future Conditions 2.1 An Overview of Ottawa s Transportation System The City of Ottawa is home to about 870,700 people. The city covers an area of 2,760 square kilometres of which
More informationMain-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation
Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional
More informationDUNBOW ROAD FUNCTIONAL PLANNING
DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report
More information4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL
4 DISRUPTION MANAGEMENT PLAN HIGHWAY 7 RAPIDWAY CONSTRUCTION BETWEEN BAYVIEW AVENUE AND WARDEN AVENUE TOWNS OF MARKHAM AND RICHMOND HILL The Transportation Services Committee recommends the adoption of
More informationDecember 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1
December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More information2. Transportation in Ottawa Today and Tomorrow
2. Transportation in Ottawa Today and Tomorrow 2.1 Transportation System Overview The City. The City of Ottawa is the largest municipality in the National Capital Region (NCR). Urban development covers
More informationChapter 3 DESIGN SPECIFICATIONS
Brampton PathWays Planning and Design Guidelines 27 Chapter 3 DESIGN SPECIFICATIONS 3.1 CLASS 1 MULTI-USE PATH Off-road multi-use trails are the backbone of the Brampton PathWays Network. They are typically
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationCity of Homewood Transportation Plan
City of Homewood Transportation Plan Prepared for: City of Homewood, Alabama Prepared by: Skipper Consulting, Inc. May 2007 TABLE OF CONTENTS INTRODUCTION... 1 BACKGROUND INFORMATION... 1 EXISTING TRANSPORTATION
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationCouncillor s Column KEEPING YOU INFORMED
Councillor s Column KEEPING YOU INFORMED SHAD QADRI WARD 6 - STITTSVILLE A Sad Farewell to Our Friends and Family at the Stittsville News On Monday November 27 th, the community was given the very sad
More informationHospital Link Project Project Update September 2017
Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationLARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)
LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationIn station areas, new pedestrian links can increase network connectivity and provide direct access to stations.
The Last Mile Planning for Pedestrians Planning around stations will put pedestrians first. Making walking to stations safe and easy is important; walking will be a part of every rapid transit Accessible
More informationCOMMITTEE RECOMMENDATIONS. That Council approve:
4. MODIFICATIONS TO INNES ROAD (REGIONAL ROAD 30) AND TENTH LINE ROAD (REGIONAL ROAD 47) TO ACCOMMODATE THE DEVELOPMENT OF THE TRINITY COMMONS SHOPPING CENTRE COMMITTEE RECOMMENDATIONS That Council approve:
More informationCorporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006
Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on
More informationMETHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)
Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic
More informationShockoe Bottom Preliminary Traffic and Parking Analysis
Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA
More informationSeptember Fernbank Road. TIA Strategy Report, Revision 2
September 218 5969 Fernbank Road TIA Strategy Report, Revision 2 5969 Fernbank Road TIA Strategy Report prepared for: Thomas Cavanaugh Construction Limited 994 Cavanaugh Road Ashton, ON KA 1B prepared
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationPeterborough Council on Aging
Peterborough Council on Aging Discussion paper series #4, 2015 Transportation Transportation, including accessible and affordable public transport is a key factor influencing active aging. in particular,
More informationHaving held a public hearing, that Council approve:
3. MODIFICATIONS TO MERIVALE ROAD FROM FALLOWFIELD ROAD TO OLD HIGHWAY 16 TO ACCOMMODATE THE GROWTH WITHIN THE SOUTH MERIVALE BUSINESS PARK - PUBLIC HEARING COMMITTEE RECOMMENDATIONS Having held a public
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationYork Region Population and Employment Growth
March 1, 2016 1 York Region Population and Employment Growth York Region needs to comply with The Provincial Growth Plan and new forecasts introduced to 2036 and 2041 2 Regional Official Plan Review York
More informationONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT
One Size Doesn t Fit All S Corbett, C Chenery Page 1 ONE SIZE DOESN T FIT ALL RECONCILING OVERLAPPING TRANSPORT NETWORKS IN A CONSTRAINED URBAN ENVIRONMENT Authors/Presenters: Sam Corbett, Principal Transport
More informationClackamas County Comprehensive Plan
ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More information5.0 Roadway System Plan
Southwest Boise Transportation Study Page 16 5.0 Roadway System Plan The Roadway System Plan outlines roadway improvements in the Initial Study Area. It forecasts future deficiencies on the arterial system,
More informationMONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION
MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION MCPB Item No. 3 Date: 01-19-12 Worksession: Countywide Transit Corridors Functional Master Plan Larry Cole,
More informationHighway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County
More information455 Via Verona Avenue
TRANSPORTATION Transportation Brief 455 Via Verona Avenue Submitted to Multifaith Housing Initiative by IBI Group March 2015 Table of Contents 1.0 INTRODUCTION... 1 2.0 PROPOSED DEVELOPMENT... 1 2.1 Site
More informationALTERNATIVES ANALYSIS EXECUTIVE SUMMARY
West Valley Connector Corridor ALTERNATIVES ANALYSIS EXECUTIVE SUMMARY FINAL September 2014 Ontario International Airport Ontario Mills Rancho Cucamonga Metrolink Station Kaiser Permanente PARSONS EXECUTIVE
More informationCITY OF SAINT JOHN TRAFFIC CALMING POLICY
CITY OF SAINT JOHN TRAFFIC CALMING POLICY VERSION: 1.0 April 10, 2012 Pedestrians, Cyclists and Motorists Sharing Street Spaces CONTENTS INTRODUCTION... 3 POLICY GOAL... 3 POLICY OBJECTIVES... 3 GUIDING
More informationLeBreton Flats. National Capital Commission. Pedestrian and Cyclist Plan. Prepared for: By:
LeBreton Flats Pedestrian and Cyclist Plan Prepared for: National Capital Commission By: July 2002 TABLE OF CONTENTS 1.0 INTRODUCTION...1 1.1 Background...1 1.2 Study Objectives...2 2.0 POLICY REVIEW...2
More informationAppendix B Transportation Report
Project File Report Appendix B Transportation Report Town of Whitby HMM Project No. 327878 Final Report October 2014 Revision and Version Tracking CP Rail Crossing at New Coronation Road Class EA Study
More informationKanata North Catholic Elementary School
December 216 Kanata North Catholic Elementary School Transportation Brief SITE Potential Future Development Trillium Woods Prepared for: Bryden Martel Architects Inc Prepared by: KANATA NORTH CATHOLIC
More informationChapter 4 Traffic Analysis
Chapter 4 Traffic Analysis PURPOSE The traffic analysis component of the K-68 Corridor Management Plan incorporates information on the existing transportation network, such as traffic volumes and intersection
More informationRoad Network Development Report
Final Draft Network Development Report Submitted to the City of Ottawa by IBI Group September 2013 Table of Contents 1. Introduction... 1 1.1 Objectives... 1 1.2 Approach... 1 1.3 Report Structure... 3
More informationHighway 111 Corridor Study
Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More information4005 Strandherd Drive, City of Ottawa
Strandherd Drive, City of Ottawa Community Transportation Study Revision # prepared for: Minto Communities -8 Kent St. Ottawa, ON KP B prepared by: - Michael Street Ottawa, ON KJ T December WBS Michael
More informationBAYVIEW DRIVE & BIG BAY POINT ROAD
BAYVIEW DRIVE & BIG BAY POINT ROAD City of Barrie DRAFT FINAL prepared by: C.C. Tatham & Associates Ltd. 41 King Street, Unit 4 Barrie, ON L4N 6B5 Tel: (705) 733-9037 Fax: (705) 733-1520 info@cctatham.com
More informationNORTH TURNAROUND. Recommended Design: Expand the existing transit terminal
NORTH TURNAROUND Recommended Design: Expand the existing transit terminal Feedback from stakeholders and the public: Make it easy to transfer between local and Rapid Transit service Why is this design
More informationWesbrook Place Traffic Analysis of Redistributed Dwelling Units
Wesbrook Place Traffic Analysis of Redistributed Dwelling Units 1 Summary This report presents an analysis of the changes in traffic volumes in the Wesbrook Place neighbourhood associated with a redistribution
More informationCottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement
Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,
More informationNorthwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a
More informationJONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY
JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More information7 June 2018 OUR REF:
7 June 2018 OUR REF: 476729-01000 Mirtillo Estates Inc. 1681 Langstaff Road, Unit 1 Vaughan, Ontario, L4K 5T3 Attention: Joran Weiner Vice-President Dear Mr. Weiner: Re: Mirtillo Estates Sales Office Transportation
More informationUniversity Hill Transportation Study Technical Memorandum Alternatives Modeling and Analysis May 2007
Technical Memorandum May 2007 Syracuse Metropolitan Transportation Council Edwards and Kelcey with Wallace Roberts and Todd Alta Planning and Design CONTENTS SECTION ONE- INTRODUCTION...1 SECTION TWO-
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationPOLICY: TRAFFIC CALMING
2006 MAY REFERENCE: COUNCIL APPROVED BY COUNCIL MAY 23, 2006 CITY OPERATIONS - NO. 608 POLICY: TRAFFIC CALMING A. All requests for traffic calming within the City shall be considered in accordance with
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationContents. Champaign-Urbana Mass Transit District Stop Placement Guidelines
Contents Champaign-Urbana Mass Transit District Introduction... 1 Stop Spacing... 2 Rural... 2 Low Density Suburban... 2 General Urban... 2 Urban Core... 2 Operational Safety... 3 Stop Placement... 4 Nearside
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationOverview. Existing Conditions. Corridor Description. Assessment
Overview A study of the 23 rd Street corridor was undertaken to document the existing conditions, analyze traffic operations, and recommend remedies for deficient situations Although 23 rd Street is frequently
More informationTRAFFIC IMPACT STUDY. Creekside Thornton, Colorado. For. August 2015 November 2015 Revised: August Prepared for:
TRAFFIC IMPACT STUDY For Creekside Thornton, Colorado August 215 November 215 Revised: August 216 Prepared for: Jansen Strawn Consulting Engineers 45 West 2 nd Avenue Denver, Colorado 8223 Prepared by:
More informationAPPENDIX D LEVEL OF TRAFFIC STRESS METHODOLOGY
APPENDIX D LEVEL OF TRAFFIC STRESS METHODOLOGY 01 WHAT IS LEVEL OF TRAFFIC STRESS? When people bicycle on roadways, they encounter varying levels of stress from traffic. A quiet residential street with
More informationExecutive Summary June 2015
Executive Summary June 2015 Highway 112 Corridor Study Benton and Washington Counties Executive Summary June 2015 Prepared by Transportation Planning and Policy Division Arkansas State Highway and Transportation
More informationThird Street Bridge & Corridor Project
Third Street Bridge & Corridor Project Preparation for the FY2018 budget to commence October 1, 2017, includes funding to address a project that has been considered since 1994. The Third Street bridge
More information2. Executing a legal agreement with respect to the above.
2. PRESTON STREET - PROPOSED PORTAL ARCH COMMITTEE RECOMMENDATIONS That Council approve the construction of a portal arch across Preston Street at a point 9 m south of Sydney Street as illustrated in Annex
More informationWelcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.
Welcome The Town of Whitby is undertaking a study to prepare a Secondary Plan and Transportation Master Plan to guide and manage growth in the Brooklin area. The Brooklin Secondary Plan and Transportation
More informationLyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study
Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301
More informationChapter 5 FUNCTIONAL CLASSIFICATION
Chapter 5 FUNCTIONAL CLASSIFICATION Functional classification is a system by which streets and roadways may be distinguished by types according to their function within the entire transportation network.
More informationTraffic Assessment for Woodhaven Redevelopment. City of Rome Oneida County, New York. March 2, 2018
March 2, 2018 Traffic Assessment for Woodhaven Redevelopment City of Rome Oneida County, New York Prepared for: City of Rome 198 N. Washington Street Rome, NY 13440 Prepared by: C.T. MALE ASSOCIATES 50
More informationTonight is an opportunity to learn about the Study and ask questions of the Study Team members.
Exhibit 1 Welcome Second Open House Tonight is an opportunity to learn about the Study and ask questions of the Study Team members. A first Public Open House was held on September 18th, 2013 which presented
More information8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN
8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report