JPB BOARD MEETING FEBRUARY 7, Correspondence Packet as of January 31, 2019, 1 p.m.

Size: px
Start display at page:

Download "JPB BOARD MEETING FEBRUARY 7, Correspondence Packet as of January 31, 2019, 1 p.m."

Transcription

1 JPB BOARD MEETING FEBRUARY 7, 2019 Correspondence Packet as of January 31, 2019, 1 p.m.

2 From: Berry, Annette Rene Sent: Thursday, September 06, :08 AM To: Board Cc: Berry, Annette Rene; Petito, Barbara Subject: "Operation Clear Track" Safety Detail In Your Community Good Day Caltrain Executive, This is Barbara Petito at Amtrak Police Headquarters in Washington DC. We are organizing a railroad safety detail later this month and wanted to invite Caltrain Transit Police to participate, especially those that have unfortunately responded to a train-related vehicle or trespasser strike. The information on the operation is below and includes the two attachments here. Would there be a way to get this out to all of your members? I have been contacting law enforcement officials one by one in each state, and I fear I will be long dead by the time I reach every department in the 46 states where Amtrak operates. Please advise if this is something that can be disseminated by your organization. Thank you Sir. Be safe. Respectfully, Barbara Petito Barbara A. Petito Amtrak Police Department Lead Program Specialist nd Street NE Suite 110 Washington, DC (202) Cell Phone: ATS: Petitob@amtrak.com Dear Caltrain Transit Police Official, This is your official invitation to participate in Operation Clear Track on Tuesday, September 25, 2018 hosted by Amtrak and Operation Lifesaver Inc. to mark National Rail Safety Week. If you can devote three hours to railroad safety on this day, we would be honored to have you as a member of our national railroad safety law enforcement team. As background, Operation Clear Track is a one-day safety initiative that brings police and sheriff s departments together nationwide to enforce state grade crossing and trespassing laws on America s railroad tracks.

3 Since its inception last year, we have enhanced the operation by allowing each department to set their own schedules and determine which railroad grade crossings they would like to cover during the requested three-hour enforcement period. On September 25 th, participants will be asked to report to at least two different railroad grade crossings in their communities to issue verbal/written warnings or citations to individuals trespassing on railroad property or failing to comply with state grade crossing safety laws. The three-hour commitment can be carried out all at once or spread out over different shifts throughout the day. Attached is a letter from our Police Chief with more information on the event and a link to register your department and request free pocket safety cards that Amtrak will ship to you for public distribution during the enforcement window. I have also provided the link here: If you agree to participate, please register today and put in your request for cards ASAP as we are trying to bring more than 400 law enforcement agencies on board as this year s goal. We hope you and your staff can dedicate this time to railroad safety to keep your community safe. We look forward to working with you on this critical safety initiative. Please contact me if you have any questions or concerns. Thank you and be safe. Respectfully, Barbara Petito Amtrak Police Department Lead Program Specialist nd Street NE Suite 110 Washington, DC (202) Cell Phone: Petitob@amtrak.com

4

5 Grade Crossing Safety Tips Never drive or walk around lowered grade crossing gates. Never attempt to outrun an approaching train. Never stop your vehicle on a grade crossing waiting for traffic to move. Never begin to drive across the tracks unless you can get all the way across. Always call the Emergency Notification System (ENS) number 24 hours a day to report problems or obstructions at the crossing. Look for the number on the blue sign near the crossing or on the crossbuck. Always remember a train can take a mile or more to stop. Always know that the average train is three feet wider than the track on each side. Always slow down and stop your vehicle prior to train tracks when lights begin to flash.

6 Railroad Trespassing Never walk, run, play or take pictures on the railroad rightof-way. If you are on or near the tracks, you are trespassing on private property and breaking the law. Never attempt to outrun an approaching train. It can take a train a mile or more to stop. If you re standing on the train tracks, you may not hear or feel an oncoming train in time to get away safely. Only cross the tracks at designated public crossings. For more safety tips, visit oli.org Amtrak is a registered service mark of the National Railroad Passenger Corporation.

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40 BIKES ONboard Project Bikes on Caltrain Alternative designs for seats within view of bikes December 2018

41 BIKES ONboard Project We re asking for a re-design of EMU bike cars to allow seats within view of bikes 2

42 BIKES ONboard Project Today s bike cars Gallery bike cars to 32 Bombardier bike cars to 15 3

43 BIKES ONboard Project Current bike car design for EMU trains Mezzanine level Space for 4 bikes, shared with wheelchair Mezzanine level No fixed seats within view of bikes 4

44 BIKES ONboard Project Current EMU design Seats within view of bikes (deters bike theft) Trains on time (fast on-off boarding) Emergency exits accessible Ease of operations (similar layout for all cars) 5

45 BIKES ONboard Project Possible alternative car designs Current 6-car setup B Engine C D E F Powered - Toilets- Unpowered Bike car Powered No Toilets Unpowered Bike car A Engine Options for 7-car and 8-car EMU trains Option 1: Swap seats and bikes in powered (E) and unpowered (D/F) cars Option 2: Swap seats and bikes to distribute bikes to all cars (12 bikes per car)

46 BIKES ONboard Project Alternative design Option 1 Swap seats and bikes in powered and unpowered cars 7

47 BIKES ONboard Project Current bike car design (85 ft. long, unpowered) D car, same as F car Proposed unpowered bike car design: 24 bikes in view of 16 fixed seats

48 BIKES ONboard Project Current trailer car design (82 ft. long, powered) E car Proposed powered bike car design: 20 bikes in view of 12 fixed seats 20 bikes

49 BIKES ONboard Project Option 1: Car re-design summary Current EMU design Distributed bike design Seats within view of bikes (deters bike theft) Trains on time (fast on-off boarding) Emergency exits accessible Ease of operations (similar layout for all cars) 10

50 BIKES ONboard Project Alternative design Option 2 Swap seats and bikes to distribute bikes to all cars 11

51 BIKES ONboard Project B car same as A car (90 ft long) 12 bikes + 18

52 BIKES ONboard Project D car same as F car (85 ft long) 42 12

53 BIKES ONboard Project E car (82 ft long) 12 bikes

54 BIKES ONboard Project C car (82 ft long) 12 bikes

55 BIKES ONboard Project Option 2: Car re-design summary Current EMU design Distributed bike design Seats within view of bikes (deters bike theft) Trains on time (fast on-off boarding) Emergency exits accessible Ease of operations (similar layout for all cars) 16

56 BIKES ONboard Project Our recommendations: Eight-car EMU trains with 756 seats and 96 bike spaces, meeting the 8:1 board-approved ratio Full transparency with public on train design blueprints Act now, while there s still time

57 BIKES ONboard Project Caltrain is key to the region Bay Area congestion on the rise, now of Americas most congested cities Caltrain ridership +70% since 2009 No space to grow freeways 101 & 280: Caltrain capacity is vital for the Peninsula corridor

58 BIKES ONboard Project 1 bike less = 1 car more Bikes on board is an economical, environmentally friendly way to resolve the first/last-mile problem Bike commuters alternative is driving Caltrain is part of a transportation ecosystem

59 BIKES ONboard Project EMU: Harder for bikes Bikes grouped in two bike cars with bike riders unable to see their bikes Increased thefts (cameras are not a deterrent) Congestion for cyclists leading to train delays How to access windows in case of emergency? 20

60 BIKES ONboard Project How Caltrain can win Find funding to launch with eight-car EMU trains Distribute bikes along the train Save money now instead of a costly train retrofit in the future Work collaboratively with users of the system and bike organizations to find a solution

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 February 4, 2010 Prepared by: BIKES ONboard Project San Francisco Bicycle Coalition Prepared by the San Francisco Bicycle Coalition

More information

RAILWAY SAFETY. Please click on any of the links below to go directly to your specified topic within this document.

RAILWAY SAFETY. Please click on any of the links below to go directly to your specified topic within this document. RAILWAY SAFETY Please click on any of the links below to go directly to your specified topic within this document. Facts about Railway Property and Trains Railway Signs, Devices, and Warnings Railway Safety

More information

Railroad Safety Information for CCIB Conference

Railroad Safety Information for CCIB Conference Railroad Safety Information for CCIB Conference Trying to beat the train back in 1917 and still today Walking on RR Tracks in 1926 and still today Riding the side of the train in 1930 and still today

More information

Glenwood High School Drivers Education. April 23, 2014

Glenwood High School Drivers Education. April 23, 2014 Glenwood High School Drivers Education April 23, 2014 1 Illinois High-Speed Rail Chicago to St. Louis Program 2 Illinois High-Speed Rail Chicago to St. Louis Program 3 Chicago-St. Louis Corridor» IDOT

More information

In the Interest of Safety: Transit Safety Slide Reference Guide

In the Interest of Safety: Transit Safety Slide Reference Guide In the Interest of Safety: Transit Safety Slide Reference Guide Slide T-1: In the Interest of Safety: Transit Safety Welcome to In the Interest of Safety: Transit Safety. Suggested Opening: Thank you for

More information

How to Drive Near Trains

How to Drive Near Trains How to Drive Near Trains Approximate facilitation time: 20-30 minutes Materials How to Drive Safely Near Trains Video Test Your Train Safety Savvy Worksheets - enough copies for all students (& Master

More information

Here is an outline of this presentation.

Here is an outline of this presentation. The BIKES ONboard project started in early 2008. Shirley Johnson leads the project as a volunteer. Our objective is to work with Caltrain to improve its onboard bicycle service. There are many volunteers

More information

Monthly Safety and Security Report January 2016

Monthly Safety and Security Report January 2016 At Caltrain, safety is job number one for everyone. The Martin Luther King Celebration train offered a new opportunity to share the agency s rail safety message and ensure the event participants observed

More information

Monthly Safety and Security Report August 2016

Monthly Safety and Security Report August 2016 Safety Highlights TASI Maintenance of Way (MOW) employees completed their annual refresher training for On-Track Safety (OTS), Standard Procedures for Track Maintenance & Construction (SPTMC) and several

More information

Caltrain Bicycle Parking Management Plan

Caltrain Bicycle Parking Management Plan Caltrain Bicycle Parking Management Plan Board of Directors October 5, 2017 Agenda Item 11 Context for Plan Capacity and Access Issues Modernization program with Electrification Complimenting limited on-board

More information

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad.

Glossary of Terms. ABANDONMENT The permanent cessation of rail activity on a given line of railroad. Glossary of Terms AAR/DOT CROSSING NUMBER A uniform numbering system in which a unique designation is assigned to every highway-rail grade crossing in the nation. It consists of a six digit number followed

More information

EMU Procurement Seats/Standees/Bikes/Bathroom

EMU Procurement Seats/Standees/Bikes/Bathroom EMU Procurement Seats/Standees/Bikes/Bathroom Board of Directors June 4, 2015 Agenda Item 7b Purpose Seats / standees / bikes / bathroom balance Develop framework for Draft EMU RFP Feedback on car configuration

More information

MINUTES OF JANUARY 18, J. Alba, C. Bargar, J. Brazil, G. Buckley, M. Guevara, D. Provence, N. Rodia, D. Thoe

MINUTES OF JANUARY 18, J. Alba, C. Bargar, J. Brazil, G. Buckley, M. Guevara, D. Provence, N. Rodia, D. Thoe BICYCLE ADVISORY COMMITTEE (BAC) SAN MATEO COUNTY TRANSIT DISTRICT ADMINISTRATIVE BUILDING Bacciocco Auditorium, 2nd Floor 1250 San Carlos Avenue, San Carlos CA 94070 MINUTES OF JANUARY 18, 2018 MEMBERS

More information

ADVANCED TRANSIT OPERATIONS AND MODELING

ADVANCED TRANSIT OPERATIONS AND MODELING SOUTHERN DISTRICT OF INSTITUTE OF TRANSPORTATION ENGINEERS (SDITE) 2017 ADVANCED TRANSIT OPERATIONS AND MODELING SURESH KARRE, PE, PTOE ROBERT DUBNICKA, PE, TE, PTOE AGENDA Background Transit operations

More information

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04

FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PLANNING AND COMMUNITY ENVIRONMENT DATE: OCTOBER 4, 2004 CMR:432:04 SUBJECT: FINANCE COMMITTEE RECOMMENDATION TO ADOPT TRANSPORTATION STRATEGIC

More information

Addressing Bicycle Capacity Issues on Public Transportation

Addressing Bicycle Capacity Issues on Public Transportation Addressing Bicycle Capacity Issues on Public Transportation Advanced Transportation Technologies Clean Transportation Solutions SM Whitney Pitkanen Project Manager MISSION STATEMENT CALSTART is dedicated

More information

Passenger Rail in Virginia

Passenger Rail in Virginia Passenger Rail in Virginia Executive Summary! In 2011, Washington DC-VA-MD ranked 1st in the U.S. per auto commuter in the following categories:1 o Yearly Delay; 67 hours o Excess Fuel; 32 gallons o Congestion

More information

MINUTES OF SEPTEMBER 20, C. Chang, L. Fernandez, B. Shaw (Chair), C. Tucker, R. Valenciana

MINUTES OF SEPTEMBER 20, C. Chang, L. Fernandez, B. Shaw (Chair), C. Tucker, R. Valenciana CITIZENS ADVISORY COMMITTEE (CAC) PENINSULA CORRIDOR JOINT POWERS BOARD (JPB) SAN MATEO COUNTY TRANSIT DISTRICT ADMINISTRATIVE BUILDING Bacciocco Auditorium, 2 nd Floor 1250 San Carlos Avenue, San Carlos

More information

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service

More information

Monthly Safety and Security Report March 2018

Monthly Safety and Security Report March 2018 Safety Highlight The Sunnyvale Station Rehabilitation project commenced March of 2018. This project is designed to make the station safer by removing pavers which have become uneven on some parts of both

More information

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018

The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018 The Vine: Mill Plain Bus Rapid Transit Project Open House Summary August 2018 Page 2 Table of Contents Background 3 Public involvement 4 Open house overview 5 Notification 6 Comment summary 7 Next steps

More information

Monthly Safety and Security Report November 2016

Monthly Safety and Security Report November 2016 Safety Highlights Caltrain commenced survey drilling to assess soil and terrain along the Caltrain corridor as part of the Peninsula Corridor Electrification Project (PCEP). The equipment used to conduct

More information

Forging Bicycle/Transit Connections at King County Metro. Eileen Kadesh Senior Market Development Planner King County Metro Transit October 2, 2012

Forging Bicycle/Transit Connections at King County Metro. Eileen Kadesh Senior Market Development Planner King County Metro Transit October 2, 2012 Forging Bicycle/Transit Connections at King County Metro Eileen Kadesh Senior Market Development Planner King County Metro Transit October 2, 2012 Highlights Background Bike program evolution Best practices/metro

More information

3/10/2016 VIA th Street, Suite 203 Sacramento, CA

3/10/2016 VIA th Street, Suite 203 Sacramento, CA 3/10/2016 VIA EMAIL Arwen Wacht, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Natomas Fountains (P16-012) Dear Ms. Wacht:

More information

June 29, Dear Mr. Walter:

June 29, Dear Mr. Walter: From: CountyBoard@arlingtonva.us To: chickandsandy@msn.com Subject: County Board Response Regarding the Arlington Ridge Road Improvement Project (Intranet Quorum IMA00252707) Date: Wed, 29 Jun 2011 08:09:53-0400

More information

Highway-Rail Grade Crossing Training for School Bus Drivers

Highway-Rail Grade Crossing Training for School Bus Drivers D E C I D E S M A R T, A R R I V E S A F E Highway-Rail Grade Crossing Training for School Bus Drivers Presented by Operation Lifesaver, Inc. in cooperation with the National Association of State Directors

More information

Types of Crossings. Passive Crossings.

Types of Crossings. Passive Crossings. Railroad-highway Crossings Railroad-highway grade crossings are a special kind of intersection where the roadway crosses train tracks. These crossings are always dangerous. Every such crossing must be

More information

Focused Topic: What To Do At a Crossing

Focused Topic: What To Do At a Crossing Focused Topic: What To Do At a Crossing SHORT LESSON APPROPRIATE FOR IN-CAR OR CLASSROOM Learning Objectives Explain how to safely drive across train tracks At an active crossing At a passive crossing

More information

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives

Capital and Strategic Planning Committee. Item III - B. April 12, WMATA s Transit-Oriented Development Objectives Capital and Strategic Planning Committee Item III - B April 12, 2018 WMATA s Transit-Oriented Development Objectives Page 24 of 76 Washington Metropolitan Area Transit Authority Board Action/Information

More information

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

6/22/2018 VIA  . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 6/22/2018 VIA EMAIL Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 RE: Quick Quack Car Wash (DD9801) Dear Ms. Goulart: WALKSacramento

More information

VIRGINIA RAILWAY EXPRESS

VIRGINIA RAILWAY EXPRESS PREPARING FOR THE NEXT QUARTER-CENTURY Arlington County Board Work Session June 28, 2017 1 TODAY S PRESENTATION VRE Overview VRE in Arlington County VRE System 2040 Plan Future Vision for Crystal City

More information

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project

Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, Ravenswood Avenue Railroad Crossing Project Ravenswood Avenue Railroad Crossing Project Community Outreach Meeting Presentation May 2, 2016 Agenda Welcome & Introduction Project Background & Purpose Project Overview Small Group Breakouts / Reporting

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

TRANSBAY JOINT POWERS AUTHORITY

TRANSBAY JOINT POWERS AUTHORITY THIS STAFF REPORT COVERS CALENDAR ITEM NO.: 8 FOR THE MEETING OF: April 19, 2007 TRANSBAY JOINT POWERS AUTHORITY BRIEF DESCRIPTION: This staff report provides the status of a planning feasibility study

More information

Service Business Plan

Service Business Plan Service Business Plan Service Name Transportation Planning Service Type Public Service Owner Name Kaylan Edgcumbe Budget Year 2019 Service Owner Title Service Description Manager of Transportation Planning

More information

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background

2017 The first stage of the DFS was completed and Interim Public Consultation is launched Study Background 7 June 2017 Study Background 2012-2014 Public Consultation for PFS Public generally agreed that there was a need to enhance the connectivity in KE. However, there were diversified views on the proposed

More information

Implementing the Three Es of School Zone Traffic Calming

Implementing the Three Es of School Zone Traffic Calming Implementing the Three Es of School Zone Traffic Calming Use this evaluation tool as a guide to analyze the specific safety needs of your school. SCHOOL PROFILE School Name: School District: Address: Phone

More information

10/8/2014 VIA . RE: CVS Pharmacy (P13-002) Revised August 2014

10/8/2014 VIA  . RE: CVS Pharmacy (P13-002) Revised August 2014 10/8/2014 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: CVS Pharmacy

More information

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects

Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Railroad-Highway Grade Crossing Analysis for Corridor Planning Projects Word Count: 4,305 Submission Date: August 1, 2015 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 1420 South

More information

I-10 Bypass Project Banning to Cabazon

I-10 Bypass Project Banning to Cabazon I-10 Bypass Project Banning to Cabazon Presentation to City of Banning Town Hall Meeting April 11, 2018 June 17 th, 2005 Emergency Action Plan Conceptual Project Purpose Summary Construct a new roadway

More information

Item B1 November 19, 2009

Item B1 November 19, 2009 November 19, 2009 Planning and Development Department Land Use Planning Division DATE: November 19, 2009 STAFF REPORT TO: FROM: SUBJECT: Members of the Transportation Commission Elizabeth Greene Senior

More information

Monthly Safety and Security Report August 2015

Monthly Safety and Security Report August 2015 Safety Highlights Safety starts with serious preparation at Caltrain. Before construction gets underway along the tracks, the Caltrain Employee In Charge (EIC) provides a Job Safety Briefing and then sets

More information

Caltrain Bike Parking Management Plan

Caltrain Bike Parking Management Plan Caltrain Bike Parking Management Plan Bicycle Advisory Committee May 19th, 2016 Context 1 Capacity and Access Challenges Between 11% and 19% of customers make bike-based trips to and/or from system Majority

More information

Focused Topic: Railroad Crossing Safety Signs

Focused Topic: Railroad Crossing Safety Signs Focused Topic: Railroad Crossing Safety Signs SHORT LESSON APPROPRIATE FOR IN-CAR OR CLASSROOM Learning Objectives Identify and know the meaning of the signs and signals around railroad tracks: Crossbuck

More information

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update

Crystal City Potomac Yard Transitway. Enforcement Ordinance & Construction Update Enforcement Ordinance & Construction Update December 2015 Project Purpose Provide high-capacity, high-quality transit service Support redevelopment in Crystal City and in Potomac Yard in Alexandria and

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other: Memorandum Date: November 20, 2017 To: Transportation Authority Board From: Eric Cordoba Deputy Director Capital Projects Subject: 12/5/17 Board Meeting: San Francisco Freeway Corridor Management Study

More information

Toronto Police Services Board: Request for Increased Police Enforcement of Parking Regulations on Bicycle Lanes in Toronto

Toronto Police Services Board: Request for Increased Police Enforcement of Parking Regulations on Bicycle Lanes in Toronto STAFF REPORT INFORMATION ONLY Toronto Police Services Board: Request for Increased Police Enforcement of Parking Regulations on Bicycle Lanes in Toronto Date: December 15, 2009 To: From: Executive Committee,

More information

Will Kempton, Chief Executive Officer. Update on Proposed Implementation of a Wayside Horn System Along the San Clemente Beach Trail

Will Kempton, Chief Executive Officer. Update on Proposed Implementation of a Wayside Horn System Along the San Clemente Beach Trail May 27, 2010 To: From: Subject: Transit Committee Will Kempton, Chief Executive Officer System Along the San Clemente Beach Trail Overview The Orange County Transportation Authority and City of San Clemente

More information

Dear City Council Members,

Dear City Council Members, From: Bob Kenyon [mailto: ] Sent: Monday, February 08, 2016 10:20 AM To: City Clerk Subject: Please prioritize Caltrain and a complete transit network Thank you for prioritizing bringing BART to San Jose

More information

Caltrain Bike Parking Management Plan

Caltrain Bike Parking Management Plan Caltrain Bike Parking Management Plan Citizens Advisory Committee June 15th, 2016 Context Capacity and Access Challenges Between 11% and 19% of customers make bike-based trips to and/or from system Majority

More information

COMMUNITY MEETING August 23, 2018

COMMUNITY MEETING August 23, 2018 COMMUNITY MEETING August 23, 2018.. 1 Agenda Welcome & Introduction Project Background & Purpose Project Overview Q & A Stations Charleston / Meadow Palo Alto City-Wide Tunnel Ideas No Longer Considered

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

We believe the following comments and suggestions can help the department meet those goals.

We believe the following comments and suggestions can help the department meet those goals. The Honorable Secretary Anthony Foxx The Secretary of Transportation United States Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 August 30, 2013 Dear Secretary Foxx, Thank

More information

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets

ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets ITS-NY ANNUAL MEETING Bus Rapid Transit in New York City: Bus Lane Operations on One-Way Arterial Streets June 9, 2011 Ted Orosz AICP, Director Long Range Bus Planning MTA New York City Transit 1 Overview

More information

Governance and Priorities Committee Report For the July 2, 2015 Meeting

Governance and Priorities Committee Report For the July 2, 2015 Meeting CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The

More information

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Eliminate on-street parking where it will allow for a dedicated bus only lane % Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136

More information

2. Context. Existing framework. The context. The challenge. Transport Strategy

2. Context. Existing framework. The context. The challenge. Transport Strategy Transport Strategy Providing quality connections Contents 1. Introduction 2. Context 3. Long-term direction 4. Three-year priorities 5. Strategy tree Wellington City Council July 2006 1. Introduction Wellington

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA

David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.

More information

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014

Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014 Caltrain Bicycle Parking Management Plan DRAFT PROJECT SCOPE SUBMITTED TO CALTRANS FALL 2014 NOTE: The following draft scope of work was developed by Caltrain in the fall of 2014 as part of a Caltrans

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

WELCOME Public Information Centre

WELCOME Public Information Centre WELCOME Public Information Centre Fernforest Drive Brampton Soccer Centre Community Room #2 Tuesday January 19, 2016 6:30 p.m.to 9:00 p.m. Please sign in Neighbourhood Traffic Calming Guide Background

More information

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006

Corporate. Report COUNCIL DATE: June 26, 2006 NO: C012 COUNCIL-IN-COMMITTEE. TO: Mayor & Council DATE: June 22, 2006 Corporate NO: C012 Report COUNCIL DATE: June 26, 2006 COUNCIL-IN-COMMITTEE TO: Mayor & Council DATE: June 22, 2006 FROM: General Manager, Engineering FILE: 0410-20(MoT/Gate) SUBJECT: Surrey Response on

More information

Thank you for attending

Thank you for attending Improving mobility safety comfort WELCOME Thank you for attending The purpose of this meeting is to: Learn about the project Prioritize potential walking and biking improvements on Snelling Ave Gather

More information

Active Transportation on the Rise

Active Transportation on the Rise Integrated Approaches to Shared-Use Paths Doug Sarkkinen, PE Windi Shapley, PE Mandi Roberts, AICP, PLA Why? Biking and walking are important active transportation options. Shared-use paths are critical

More information

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Thesis Proposal By James A. Robertson Submitted to the Office of Graduate Studies Texas A&M University in partial fulfillment

More information

PUNECE Level Crossing Expert Group Enforcement Sub-group

PUNECE Level Crossing Expert Group Enforcement Sub-group PUNECE Level Crossing Expert Group Enforcement Sub-group Informal Document No. 7 (Enforcement) - Update Fourth meeting of the expert group Geneva, January 29 th 30 th 2015 1 At the 3 rd Session GE.1 requested

More information

City of Davenport CitiBus Public Transportation Study. April 2015

City of Davenport CitiBus Public Transportation Study. April 2015 City of Davenport CitiBus Public Transportation Study April 2015 Overview Project Background Key Findings CitiBus Service Allocation Policy Discussion 2 Project Background 3 About CitiBus Operates 17 routes

More information

KING STREET TRANSIT PILOT

KING STREET TRANSIT PILOT STREET TRANSIT PILOT Update toronto.ca/kingstreetpilot #kingstreetpilot HIGHLIGHTS PREVIOUS HIGHLIGHTS TRANSIT RELIABILITY TRANSIT TRAVEL TIMES 85% of streetcars arriving within 4 minutes westbound during

More information

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE

POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE POTENTIAL SANTA CLARA COUNTY TRANSPORTATION MEASURE OVERALL DRAFT EXPENDITURE PLAN TRANSIT/Mode Shift Millions % BART to Downtown San Jose/Santa Clara* 1,400 23% Caltrain Capacity & Safety 1,014 17% Mass

More information

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report

Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report Public Comment Meeting Geary BRT Project Draft Environmental Impact Statement/Report Open House and Opportunity to Provide Comments Public comments can be submitted to the court reporter stationed in the

More information

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing

SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing REPORT To the Honorable Mayor and City Council From the City Manager October 1, 2018 SUBJECT Memorandum of Understanding to Complete a Caltrain Grade Separation Study for the Whipple Avenue Crossing RECOMMENDATION

More information

Key objectives of the survey were to gain a better understanding of:

Key objectives of the survey were to gain a better understanding of: 3 COMMUNITY INPUT Community input is an essential part of corridor studies. For the SR 87 corridor study, VTA staff conducted an extensive online survey of people living and commuting along the corridor.

More information

Draft Railway Crossing Safety Strategy. RAA feedback on the Draft Railway Crossing Safety Strategy

Draft Railway Crossing Safety Strategy. RAA feedback on the Draft Railway Crossing Safety Strategy Draft Railway Crossing Safety Strategy RAA feedback on the Draft Railway Crossing Safety Strategy September 2016 CONTENTS... 2 EXECUTIVE SUMMARY... 3 RECOMMENDATION... 3 DISCUSSION... 3 Background/Overview...

More information

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid

Short-Term Enhancements Improvements to keep Austin moving. MetroRapid Short-Term Enhancements Improvements to keep Austin moving Long-Term Investments Projects to support our future Mobility Hubs MetroRapid MetroRail MetroExpress Commuters Connectors Circulators Project

More information

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project

More information

BICYCLE RULES OF THE ROAD

BICYCLE RULES OF THE ROAD ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS ILLINOIS BICYCLE RULES OF THE ROAD Jesse White Secretary of State Bicycle riding is a great way to get into shape and enjoy the outdoors.

More information

The I-85 Express Lanes Project NASCIO Recognition Award Nomination

The I-85 Express Lanes Project NASCIO Recognition Award Nomination The I-85 Express Lanes Project 2012 NASCIO Recognition Award Nomination Submitting Agency: State Road and Tollway Authority Nomination Category: Information Communications Technology Contact: Malika Reed

More information

Vision to Action Community Coalition February 14, 2014 Briefing

Vision to Action Community Coalition February 14, 2014 Briefing Vision to Action Community Coalition February 14, 2014 Briefing Transportation and Transit Planning & Mass Transit Operations Strategic Growth Area Office Brian S. Solis Transportation & Transit Manager

More information

Mission Bay Loop (MBL) Public Meeting

Mission Bay Loop (MBL) Public Meeting Mission Bay Loop (MBL) Public Meeting La Scuola Internazionale di San Francisco, November 18, 2014 Frequently Asked Questions 1. When would construction have to start before the SFMTA loses TIGER funds?

More information

Providing an Efficient and Multi-modal Transportation System

Providing an Efficient and Multi-modal Transportation System Providing an Efficient and Multi-modal Transportation System Welcome and Introductions The Plan Process Transportation Overview Workshop Discussions Report Out and Next Steps AGENDA Comprehensive Plan

More information

ECONOMY PEOPLE ENVIRONMENT

ECONOMY PEOPLE ENVIRONMENT Report Back on Local Transit Improvements May 29, 2013 ECONOMY PEOPLE ENVIRONMENT Intro Council Requested Report Back Topics Progress on Planning for Broadway Subway False Creek Bridges Local Transit Improvements

More information

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS

SETTINGS AND OPPORTUNITIES MOBILITY & ACCESS 7 mobility & access how do people use el camino what is it like to drive on el camino/to park along el camino what is the pedestrian experience like what is the role of transit along the corridor what

More information

Parental Responsibilities

Parental Responsibilities Bicycle riding is a fun way to exercise and enjoy the outdoors. To remain safe on Illinois roads, bicyclists must obey the same traffic safety laws that govern vehicle drivers. No amount of bicycle safety

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

Beaverton Police Department Traffic Safety Team

Beaverton Police Department Traffic Safety Team Traffic Safety Team November 1, 2010 Executive Summary The Beaverton Police Department takes pride in the distinction as being one of the safest cities in the northwest. Being a safe city is more than

More information

JPB Citizens Advisory Committee 1250 San Carlos Avenue, San Carlos, CA Bacciocco Auditorium, 2 nd Floor. September 21, Wednesday

JPB Citizens Advisory Committee 1250 San Carlos Avenue, San Carlos, CA Bacciocco Auditorium, 2 nd Floor. September 21, Wednesday BOARD OF DIRECTORS 2011 SEAN ELSBERND, CHAIR ADRIENNE TISSIER, VICE CHAIR JOSÉ CISNEROS JERRY DEAL ASH KALRA LIZ KNISS ARTHUR L. LLOYD TOM NOLAN KEN YEAGER MICHAEL J. SCANLON EXECUTIVE DIRECTOR JPB Citizens

More information

4/14/2017 VIA . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811

4/14/2017 VIA  . Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811 4/14/2017 VIA EMAIL Miriam Lim, Junior Planner City of Sacramento Community Development Department 300 Richards, 3 rd Floor Sacramento, CA 95811 RE: Mack & Franklin Development (P17-016) Dear Ms. Lim:

More information

Local Government Road Safety Summit - 9 April 2018

Local Government Road Safety Summit - 9 April 2018 Local Government Road Safety Summit - 9 April 2018 Report on outcomes The Associate Minister of Transport, Hon Julie Anne Genter held the Local Government Road Safety Summit in Wellington on 9 April 2018.

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

Edit to Action 4.7:.to provide DIRECT AND improved access on all bridges connecting to San Francisco.

Edit to Action 4.7:.to provide DIRECT AND improved access on all bridges connecting to San Francisco. Josh Hart Comments on Bike Plan 2004 Policy Document June 30, 2004 431-2453 ext. 23 Joshua@sfbike.org Executive Summary Eliminate the word alternative from this first sentence- replace with mode. In general,

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

Hennepin County Bicycle and Pedestrian Planning

Hennepin County Bicycle and Pedestrian Planning Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion

More information

UNABRIDGED SUMMARY OF NORAC 8 TH EDITION CHANGES

UNABRIDGED SUMMARY OF NORAC 8 TH EDITION CHANGES The following is a description of the changes approved for the NORAC Operating Rules, Eighth Edition, effective January, 2003. A much shorter Summary of Changes will be handed out to employees with the

More information

LINCOLNWOOD POLICE DEPARTMENT

LINCOLNWOOD POLICE DEPARTMENT LINCOLNWOOD POLICE DEPARTMENT 6900 N. Lincoln Avenue, Lincolnwood, IL 60712 (847) 673-2167 Robert LaMantia Chief of Police September 19, 2017 Illinois Department of Transportation Traffic Operations Bureau

More information