SPAD and TPWS activity report Quarter /14

Size: px
Start display at page:

Download "SPAD and TPWS activity report Quarter /14"

Transcription

1 SPAD and TPWS activity report Quarter /14 Alexander Moor Mail to: spad@rssb.co.uk The report may be downloaded from the RSSB website: Rail Safety and Standards Board Limited 2013

2 Contents Executive summary 3 1 SPAD risk Precursor Indicator Model The risk from SPADs 6 2 SPAD numbers June Quarter 1 1 April to 30 June Changes in SPAD numbers over time Monthly SPAD numbers SPADs risk ranked 16+ and SPAD sub-categories SPAD Provisional status 12 4 SPAD performance by route SPAD numbers by route 14 5 SPAD performance by railway undertaking Railway undertakings passenger Railway undertakings freight SPADs associated with engineering operations 15 6 Further analysis of SPAD occurrence SAS and SOY SPADs 18 Multi-SPAD signals 20 7 Train Protection and Warning System TPWS brake demands at signals Brake demand numbers associated with SPADs Brake demand numbers at signals at danger TPWS reset and continue (at SPADs) TPWS brake demands at PSRs TPWS brake demands approaching buffer stops 26 8 SPADs: an international perspective 27 New Look We have been looking at making some changes to the report, with the aim of: Making the key points easier to see at a glance Simplifying some of the more complicated items that were easy to misinterpret Adding useful information that was previously not included The Executive Summary and Context sections are an example of this, and we would welcome any feedback on these to spad@rssb.co.uk Within the report last quarter is used to refer to the end of 2012/13 Q4, and last year to the end of 2012/13 Q1. 2 SPAD/TPWS Report, Q1-2013/14

3 Executive summary Key statistics All SPADs annual moving total (AMT) % Last quarter: 250 Last year: 257 Multi-SPAD signals (two or more SPADs in five years) 126 Last quarter: 122 Last year: 136 Quarterly performance SPAD numbers 16+ SPADs AMT 72 Last quarter: 70 Last year: SPADs AMT 13 Last quarter: 16 Last year: and 20+ SPADs SPAD risk relative to September 2006 benchmark 58% Last quarter: 60% Last year: 36% AM percentage of TPWS brake demands which were interventions 58% Last quarter: 56% Last year: 43% SPAD risk relative to September 2006 benchmark % 44% 66% 60% 58% Q1 Q2 Q3 Q4 Q / /14 5 The 68 SPADs in Q1 was above the Q1 average of 64.7 for the previous three years. The annual moving total has seen an increase both compared to the last quarter and the same time last year. Q1 Q2 Q3 Q4 Q1 Q1 Q212/13 Q3 Q4 13/14 Q1 Due to the small numbers involved, there is large variation in the number of 16+ and 20+ SPADs between quarters. Note that the 16+ category also includes 20+ SPADs Q1 Q2 Q3 Q4 Q1 12/13 13/14 Q1 13/14 included seven passenger train SPADs which passed the conflict point, which is the main reason for the increase from a year ago, when this figure was four. SAS & SOY SPAD numbers SAS SOY TPWS reset & continue There was one suspected post SPAD TPWS reset & continue incident during the quarter, which occurred on 9 June 2013 at Shoeburyness. Multi-SPAD signals Of the 126 multi-spad signals, 77 (61%) have TPWS fitted. These signals carry a lower risk, as TPWS is designed to stop the train before it reaches the conflict point. 9% of SPADs in the last five years have been at Multi-SPAD signals. Q1 Q2 Q3 Q4 Q1 12/13 13/14 Analysis of the AMTs shows Q1-Q3 12/13 were a peak for SOY SPADs, which are now returning to their prepeak level. Similar analysis on SAS SPADs shows they been consistent in recent quarters, following a large decrease between 11/12 and 12/13. SPAD/TPWS Report, Q1-2013/14 3

4 Context Most recent notable incidents resulting from SPADs Passenger train derailment Passenger train collision TPWS reset and continue 28 Aug 2010 Guildford Non-passenger train derailment 7 Nov 2011 Healey Mills Yard 3 Oct 2009 Darlington Non-passenger train collision 16 Oct 2003 Norton Bridge Last three SPADs resulting in fatalities 9 Jun 2013 Shoeburyness Ladbroke Grove Southall Watford Junction 5 Oct 1999 Collision: 31 fatalities (29 passengers and 2 workforce) 19 Sep 1997 Collision: 7 passenger fatalities 8 Aug 1996 Collision: 1 passenger fatality Historic performance SPAD numbers (AMT) 879 SPAD risk relative to September 2006 benchmark Seasonality (10 year average) 500% % Since 1990 annual SPAD numbers have decreased by almost 70%, with the long term trend continuing to show a decrease Between March 2003 and September 2006 there was a significant reduction in SPAD risk following the installation of TPWS. J F M A M J J A S O N D In the last 10 years, average monthly SPADs numbers have seen peaks in April and July/August. Contribution to total accidental system risk Total accidental system risk Train accident risk 10 year moving total SPAD fatalities for last 50 years Non-Movement Movement Train Accident Non-SPAD SPAD SPAD risk contributes 10.0% of train accident risk, and 0.6% of total system risk. While this is a relatively small level of risk, SPADs are an important precursor due to their ability to cause a multi-fatality accident There have been no fatalities as a result of SPADs in almost 14 years, with Ladbroke Grove having the highest number of fatalities since St John's Lewisham in SPAD/TPWS Report, Q1-2013/14

5 SPAD Risk 1 SPAD risk 1.1 Precursor Indicator Model Chart 1 shows the precursor indicator model (PIM) for train accident risk. In September 2006, SPADs contributed 14.1 of the 100 total risk benchmark, relative to this benchmark, May 2013 shows SPADs contributing 8.38 to a total risk of the Chart 1. PIM SPAD/TPWS Report, Q1-2013/14 5

6 SPAD Risk 1.2 The risk from SPADs SPAD risk is calculated across the network using a consistent and objective measure applied by the SPAD risk ranking tool (SRRT). The risk ranking score assigned to each SPAD is then used to track changes in SPAD risk over time (see Appendix 1 for a definition and Appendix 2 for the methodology). Chart 2 shows the annual moving total number of SPADs (red line), along with SPAD risk (green line). This is modelled using the individual components of SPAD risk ranking scores, based on a rolling 12-month period. It indicates that, at the end of the year, the risk from SPADs is 58% of the 2006 benchmark level. Chart 2. Change in SPAD risk since September SPAD/TPWS Report, Q1-2013/14

7 SPAD Risk Chart 3. SPADs where the train reached the conflict point Details of high risk SPADs There were two SPADs with a risk ranking of 20+ during the quarter. The details are as follows: SPAD risk ranking 23 On 11 April a passenger train passed SE7022 signal at danger on the Up Ashton Line line at Stalybridge (LNW Route) by approximately 1400 yards. The main reasons for the high risk ranking of this SPAD are that: (a) the train passed the potential conflict point, and (b) the consequences had a collision occurred, could have been relatively high due to the possibility of a rear-end collision involving two peak loaded passenger trains, where the potential collision speed is 22.5 mph. SPAD risk ranking 22 On 20 April a passenger train passed WH72 signal at danger on the Up Fast line at West Hampstead (EM Route) by approximately 328 yards. The main reasons for the high risk ranking of this SPAD are that: (a) this is a plain line signal and so not required to be fitted with TPWS, and (b) the consequences had a collision occurred, could have been relatively high due to the possibility of a rear-end collision involving two peak loaded passenger trains, where the potential collision speed is 50 mph. As the information is taken from initial reports, it is subject to change pending the findings of investigations. SPAD/TPWS Report, Q1-2013/14 7

8 SPAD Numbers 2 SPAD numbers 2.1 June 2013 Table 1. SPAD numbers: June 2013 June SPADs during June, which is seven greater than June The number of SPADs in June 2013 was 1% lower than the three prior years average of Risk ranking TPWS Multi-SPADs Eight SPADs were risk ranked 16 or above (none of which were risk ranked 20+). This compares to six in June 2012 (four of which were risk ranked 20+). Six TPWS interventions (TPWS applied the brakes before, or in the absence of, driver action). Eight TPWS activations (the driver initiated braking before the system). None where the TPWS brake demand type is currently unknown. Six SPADs at multi-spad signals [two or more within the current five-year period]. 2.2 Quarter 1 1 April to 30 June 2013 Table 2. SPAD numbers: Quarter /14 Quarter 1 68 SPADs during the quarter, which is 18 more than the same quarter last year (36% more). Q1 also had 5% more SPADs than the average for the three prior Q1s of Risk ranking TPWS Multi-SPADs 21 SPADs were risk ranked 16 or above (two of which were risk ranked 20+). This compares to 18 in Q1-2012/13 (of which five were risk ranked 20+). 26 TPWS interventions (TPWS applied the brakes before, or in the absence of, driver action). 19 TPWS activations (the driver initiated braking before the system). None where the TPWS brake demand type is currently unknown. 19 SPADs at multi-spad signals [two or more within the current five-year period]. 8 SPAD/TPWS Report, Q1-2013/14

9 2.3 Changes in SPAD numbers over time SPAD Numbers As Chart 4 shows, the current annual moving total (AMT) for all SPADs is 268, which is 12% higher than the all-time low of 239 in September The AMT for 16+ is currently 70, while the AMT for 20+ SPADs is currently 13. Given the low number of 20+ SPADs, you would expect the 20+ AMT to be subject to more statistical uncertainty than the 16+ or total figures. Chart 4. All SPADs annual moving totals Table 3 presents a summary of the change in SPAD numbers, comparing end Q1 2013/14 with Q1 2012/13. It shows an increase in the All SPADs AMT, the 16+ SPADs AMT and the 20+ SPADs AMT. None of these are statistically significant at the 90% confidence level. 1 Table 3. All SPADs annual moving totals 1 Statistical significance testing can help to indicate whether a genuine change has occurred or whether the data could be the result of chance fluctuations. Throughout this report, the term statistically significant refers to a change that is significant at the 90% confidence level; that is, we can be reasonably confident that there has been a real improvement or deterioration. SPAD/TPWS Report, Q1-2013/14 9

10 SPAD Numbers 2.4 Monthly SPAD numbers Chart 5 compares monthly SPAD numbers in 2013/14 with those during 2012/13 along with the three-year average. See Appendix 6 for tables. Chart 5. All SPADs monthly variation Chart 5 shows there is no clear pattern in the seasonality of SPADs. 2.5 SPADs risk ranked 16+ and SPADs risk ranked 16+ Chart 6 compares monthly 16+ SPAD numbers in 2013/14 with those during 2012/13. Chart 6. SPADs risk ranked 16+ monthly variation In the last 3 years about 28% of SPADs have been risk ranked 16+, although there is large variation in this percentage between months. There were a particularly high number of 16+ SPADs during November 2012/13; of which four can be attributed to environmental conditions. 10 SPAD/TPWS Report, Q1-2013/14

11 2.5.2 SPADs risk ranked 20+ SPAD Numbers There were two SPAD with a risk ranking score of 20+ during the quarter, which compares to five in the same quarter in 2012/13. Details of these incidents are in section SPADs risk ranked 20+ are taken forward to Operations Focus Group (OFG) and individual Operational Safety Reduction and Mitigation (OPSRAM) group meetings, and are also reported to the RSSB Board. SPAD/TPWS Report, Q1-2013/14 11

12 SPAD Trends 3 SPAD sub-categories 3.1 SPAD Provisional status Chart 7 shows the breakdown of SPADs by provisional or confirmed status. SPADs are provisional until they have a completed investigation. Chart 7. SPADs by provisional/confirmed SPADs are subdivided into four different types: A1, A2, A3 and A4. These differing sub-categories cover, in that order, the scenario of a classic SPAD; that of a signal being imperfectly displayed/part obscured; an incorrect authority being given and a train experiencing compromised braking performance. Full descriptions are given in Appendix 2. Chart 8 shows the distribution of the different SPAD classifications, in respect of the SPADs which have occurred since the changes were introduced. Chart 8. SPADs by sub-category 12 SPAD/TPWS Report, Q1-2013/14

13 SPAD Trends Of those which have this field completed in SMIS, 64% are A1, 26% are A2, 6% A-3 and 4% A4. Incidents for which a sub-category has not been entered have been categorised as A1 SPADs. Chart 9 shows the contribution to SPAD risk of each SPAD sub-category, with the risk for each month modelled using the individual components of SPAD risk ranking scores, based on a rolling 12-month period. Chart 9. SPAD risk by sub-category Since the middle of 2012, the modelled risk from A2 classified SPADs has increased significantly. Over the same period, the annual moving total of A2 SPADs has remained relatively stable, indicating an increased risk per event for these types of SPADs. A2 classified SPADs are those for which, according to available evidence, the stop aspect, indication or end of in-cab signalled movement authority concerned was not displayed or given correctly, but was preceded by the correct aspects or indications. SPAD/TPWS Report, Q1-2013/14 13

14 SPAD Performance by Route 4 SPAD performance by route 4.1 SPAD numbers by route Table 4 presents performance by route for all SPADs and those risk ranked 16+. The percentage changes are based on a comparison between the annual moving totals at the end of June 2012 and If any of the changes in SPAD numbers are statistically significant (at the 90% confidence level), this is indicated in the right-hand column. Table 4. Route performance comparison of moving annual totals The only changes in the SPAD numbers which are statistically significant are the 16+ numbers for Anglia. During the last 12 months, Anglia has seen the number of 16+ SPADs decrease from 13 to 5, which is statistically significant at the 90% confidence level. Table 5 shows the percentage of these annual totals which have a SPAD risk ranking of 16 or higher, both nationally and by route. In the 12 months to June 2012, 28% of all SPADs had a risk ranking score of 16 or more; while in the 12 months to June 2013, this was 26%. Table 5. Route performance comparison 16+ percentages Routes where the number of 16+ SPADs has increased from June 2012 to June 2013 have their 16+ percentages highlighted in red. 14 SPAD/TPWS Report, Q1-2013/14

15 SPAD Performance by Railway Undertaking 5 SPAD performance by railway undertaking 5.1 Railway undertakings passenger The table in Appendix 10 shows the current annual total, and the annual total 12 months previously, classified by railway undertaking (RU). Appendix 7 presents SPAD data for each RU, by calendar year, which has been normalised by millions of train miles run, and compares this with the national average for all RUs. 5.2 Railway undertakings freight Chart 10 shows the monthly numbers of SPADs by freight RUs from July This chart presents raw SPAD numbers which have not been normalised against train miles run. There were 13 freight train SPADs during the quarter compared with 8 in Q1 of 2012/13. Chart 10. SPADs by freight railway undertakings 5.3 SPADs associated with engineering operations Chart 11 shows the number of SPADs involving engineering machines. During the quarter, there were two such SPADs, both on-track machines. Chart 11. SPADs by engineering machines SPAD/TPWS Report, Q1-2013/14 15

16 SPAD Performance by Railway Undertaking Chart 12 indicates the number of possession-related SPADs, broken down by whether the movement concerned was entering, leaving or within a possession at the time of the SPAD. Chart 12. Possession-related SPADs SPADs normalised by millions of train miles Appendix 7 shows the SPAD performance of individual RUs, normalised by millions of train miles (MTM) run. This is calculated from SPAD numbers and their SPAD risk rankings, along with train mileage data. This table compares the performance of each RU, in terms of the numbers of SPADs per million train miles run, to the national rate. It highlights those which have achieved SPAD rates better than the appropriate national rate in respect of All SPADs and 16+ SPADs, as well as those which have exceeded the national rate in either one, or both of these categories. The main part of the table is divided into two. Passenger train operators are shown separately from freight train operators. This allows separate group rates to be shown for these two types of operators and should enable more meaningful comparisons to be made. 16 SPAD/TPWS Report, Q1-2013/14

17 5.3.2 SPAD Performance by Railway Undertaking SPADs normalised by driver population Chart 13 shows the average number of SPADs per driver (x1000), normalised by the number of drivers in each age band. Age band data has been collected from industry surveys. Chart 13. Normalised SPADs per driver by age band, 10 year average Chart 14 shows the average number of SPADs per driver (x1000), normalised by the number of drivers in each experience band. Experience band data has been collected from industry surveys. Chart 14. Normalised SPADs per driver by experience, 10 year average The experience data in many cases refers only to experience at the drivers current company, and so in cases where a driver has moved between train companies, they may fall into a lower experience band than their actual experience. Normalisation data for age and experience is collected separately, so it is not currently possible to do analysis on whether one of these is a more dominant factor. This is something we will try to collect in future. Normalisation data has only been collected from about 80% of the industry; if companies have different age and experience profiles, the SPAD rates shown in Chart 13 and Chart 14 may change slightly. SPAD/TPWS Report, Q1-2013/14 17

18 Further Analysis of SPAD Occurrence 6 Further analysis of SPAD occurrence 6.1 SAS and SOY SPADs A SAS SPAD is one where a stationary train starts against a signal at danger. This may be at a platform starting signal, or at any other signal at which a train is stopped. A SOY SPAD is one which occurs when a train starts away from a yellow signal, but then fails to stop at the next (danger) signal. Chart 15 shows the annual moving total number of SAS and SOY SPADs. Chart 15. SAS and SOY SPADs (annual moving total) SAS SPADs Chart 16 shows SAS SPADs, by time of day, using data from the last three years. The types of trains involved are differentiated by the colour-coded sections of the bars. Chart 16. SAS SPADs by time of day 18 SPAD/TPWS Report, Q1-2013/14

19 Further Analysis of SPAD Occurrence Passenger trains, which are shown in blue, constitute 40 of the 120 SPADs indicated (33%), while empty coaching stock constitute 37 (31%). As could be expected, passenger trains are shown as having had no SAS SPADs during the period between midnight and 06:00, as there are few such trains running during these hours. During the morning and evening peak periods, trains tend to be more numerous, especially on urban commuter routes; this increases the number of occasions when trains are exposed to red signals, and therefore the opportunities for trains to SPAD SOY SPADs Chart 17 shows SOY SPADs, by time of day, using data from the last three years, again differentiated by train type. Chart 17. SOY SPADs by time of day It is apparent that the incidence of SOY SPADs decreases after the evening peak, becoming very low during the early hours of the morning, before increasing during the morning peak. The pattern on this chart is more in line with what would be expected bearing in mind the changes in exposure to red signals during the peak hours mentioned above. There are a greater proportion of passenger trains represented in Chart 17, than in Chart 16. These amount to 83 of the 116 SPADs, which equates to 72%. SPAD/TPWS Report, Q1-2013/14 19

20 Further Analysis of SPAD Occurrence Multi-SPAD signals The multi-spad signal population signal numbers A multi-spad signal is defined as one which has had two or more SPADs in the preceding five years. Chart 18 plots the number of signals classified as multi-spad throughout the last year, along with the annual moving average. This shows that the number of listed signals has been as high as 136. There were 136 such signals listed as of a year ago and 126 as at 29 June Prioritisation of SPAD mitigation measures can be difficult when there are a large number of signals on the weekly multi-spad list. Whilst all multi-spad signals require attention, there is a degree of random chance that a signal will be subject to a second SPAD within five years. However, there is less likelihood that a third SPAD will occur at random within five years at a given signal. Analysis is therefore undertaken to identify signals that have had three or more SPADs in the last five years, in order to determine those that require more immediate attention. Those multi-spad signals which have accrued three or more SPADs within five years currently number 25 (18% of the multi-spad signal population), which is a decrease of two on a year ago. These signals are listed in Appendix 5. Chart 18. Multi-SPAD signals 52 weeks up to week ending 30 June 2013 A current list of multi-spad signals may be found at This is updated every Monday. 20 SPAD/TPWS Report, Q1-2013/14

21 TPWS 7 Train Protection and Warning System 7.1 TPWS brake demands at signals Brake demand numbers associated with SPADs A TPWS brake demand (BD) which occurs in connection with a SPAD may be classed as either an activation or an intervention. Although these terms are sometimes considered to be interchangeable, they do have their own distinct meanings. Definitions of activation and intervention may be found in Appendix 2. Chart 19 shows the breakdown of TPWS involvement at SPADs by month. All SPADs are shown, grouped by their TPWS involvement, broken down as follows: Activations (The driver applied the brakes before TPWS) Interventions (TPWS applied the brakes in the absence of (or prior to) the driver) Unknown (Although TPWS applied the brakes, it is unknown whether it was an activation or an intervention.) Reset and continue (The driver reset the TPWS without the signaller s permission and continued forwards.) No brake demand This was either because: o TPWS is not fitted to either the train or the signal (or both) o The length of overrun was so short that that the TPWS did not initiate a brake demand, but it would have done so if the train had gone slightly further. o The Train Stop Override or the temporary isolation switch had been operated. Failure No TPWS BD (The TPWS did not initiate a BD because of a failure (such as a power supply outage). Chart 19 shows, as of the end of June 2013, the most recent suspected reset and continue incident occurred on 9 June at Shoeburyness. Chart 19. TPWS brake demands at SPADs Chart 20 shows the contribution to SPAD risk for each type TPWS brake demand, with the risk for each month modelled using the individual components of SPAD risk ranking scores, based on a rolling 12-month period. SPAD/TPWS Report, Q1-2013/14 21

22 TPWS Chart 20. SPAD risk by TPWS brake demand At the end of Q1 2013/14, the majority of risk was from SPADs were there was no TPWS brake demand, with 78% of the total modelled SPAD risk. The majority of these SPADs will be at plain line signals. Chart 21 shows the breakdown of TPWS activity at SPADs; the blue line indicates the annual trend in the percentage of SPADs which involved a TPWS brake demand, and the orange line the percentage of these SPADs which were interventions. At the end of the current quarter, 60% of the SPADs in the previous year involved a TPWS brake demand, and of these 58% were interventions, a 15% increase from the same time last year. The percentage of all signals which are fitted with TPWS is approximately 28%. This indicates that TPWS-fitted signals are overrepresented in the SPAD data, which highlights that TPWS has been fitted where SPADs are more likely to occur. Chart 21. TPWS activity at SPADs 22 SPAD/TPWS Report, Q1-2013/14

23 7.1.2 Brake demand numbers at signals at danger TPWS Chart 22 shows monthly brake demand figures in respect of trains activating the overspeed sensor (OSS) for a signal at danger. The bars also indicate those which occurred at the TPWS+ loop (where fitted). The chart shows that brake demands decrease around the end of each year and into the following year, then increase towards a peak each summer. TPWS brake demands, especially those on the approach to signals at danger, are considered to be precursors to SPADs. It would be reasonable to expect there to be a similarity between the seasonal pattern shown in Chart 22, and that for SPADs. The black line on this chart shows the number of SPADs each month. However, there does not seem to be any correlation between this line and the numbers of TPWS brake demands at OSSs approaching signals at danger. Chart 22. TPWS brake demands approaching signals at danger (no SPAD) One possible reason for this marked seasonal variation is that drivers alter their braking technique when approaching signals at danger according to the prevailing conditions, and that slowing down earlier would reduce the numbers of overspeed trips approaching signals at danger. The increase in numbers for 2012 against previous years is primarily the result of moving to SMIS as the data source, resulting in a greater number of events being captured than with the previous process. SPAD/TPWS Report, Q1-2013/14 23

24 TPWS 7.2 TPWS reset and continue (at SPADs) TPWS is designed to initiate an emergency brake application on a train which either passes a TPWS fitted signal at danger, or approaches one at a speed such that a SPAD is likely to occur. A TPWS reset & continue incident occurs when a train SPADs a signal, is stopped by TPWS, but the driver then resets the TPWS and continues forwards without the signaller s authority. When this happens, the protection which was provided by TPWS is reduced. The consequences of this type of event are still mitigated to some extent, because of the train having been brought to a stand prior to moving off, as well as by the interlocking, which resets conflicting signals to danger. Thus, if a collision and/or derailment were to occur, following a TPWS reset & continue incident, the speed of the train(s) involved would be lower than if there had been no TPWS involvement. Since the installation of TPWS was completed in early 2004, there have been 27 reset & continue incidents. None of these have resulted in either a collision or a derailment, although in one instance the SPAD train did damage some points by running through them. During the quarter there was one suspected post-spad TPWS reset & continue incident, which occurred 9 June at Shoeburyness. Chart 23 looks at the frequency of TPWS reset and continue incidents. The red line represents the proportion of TPWS interventions that are reset & continue events. This has been based on a measure of the previous 50 TPWS interventions, on a shifting scale. The blue peaks and troughs represent the number of days between each intervention. This measure now stands at 0%. Chart 23. TPWS reset and continue Although the frequency of reset and continue events is low, the industry must remain vigilant to the risk from such events. 24 SPAD/TPWS Report, Q1-2013/14

25 7.3 TPWS brake demands at PSRs TPWS Chart 24 shows the monthly number of TPWS brake demands at the OSS approaching permanent speed reductions (PSRs). This shows that these have been occurring at the rate of about 30 to 40 per month, with no noticeable trend over time. Chart 24. TPWS brake demands approaching PSRs Prior to 2012, all TPWS brake demand data was collected from control logs, with details added from SMIS. Following the changes which were made to SMIS recently, whereby more information is collected by SMIS, the data is now collected directly from SMIS. The increase in unwarranted brake demands shown since January is likely to have come about as a result of there now being more comprehensive data in SMIS that was previously collected from the control logs. The number of unwarranted events will be monitored to ensure that SMIS captures train protection demands and not AWS brake demands or events that only involve a power-up test. SPAD/TPWS Report, Q1-2013/14 25

26 TPWS 7.4 TPWS brake demands approaching buffer stops Chart 25 shows the monthly number of TPWS brake demands at OSS loops approaching buffer stops since mid The annual moving average indicates that the number of these brake demands had levelled out at between five and six per month. However, a slight increase has been evident from March 2010, with the moving average showing around eight. Chart 25. TPWS brake demands approaching buffer stops 26 SPAD/TPWS Report, Q1-2013/14

27 Appendices 8 SPADs: an international perspective Argentina: Trains collide, 3 dead, hundreds injured, 11 June 2013 At 07:00 (local time) on 11 June 2013, a commuter train struck the rear of another which was standing at signal near Castelar station, killing three and injuring over 300 others. A SPAD is suspected. Australia: Collision between two freight trains at Dry Creek, SA, 11 October 2011 At 01:05 (local time) on 11 October 2011, an empty ore train operated by Specialised Bulk Rail Pty Ltd (SBR) passed a signal at danger near Dry Creek Junction, South Australia. It subsequently struck a loaded grain train, operated by Genesee and Wyoming Australia Pty Ltd, which was travelling in the opposite direction and traversing the points at Dry Creek Junction, in order to enter Dry Creek North Yard. The collision was at low speed and there was no injury to the crew of either train. However, there was significant damage to the cab of the ore train s leading locomotive and to the grain wagons involved in the collision. The Australian Transport Safety Bureau (ATSB) found that the collision occurred because the ore train passed Signal 13 at danger. The SPAD was a result of the trainee driver and supervising driver of the ore train becoming distracted on the approach to the preceding signal, which was displaying a caution aspect, indicating that Signal 13 ahead was red. SPAD/TPWS Report, Q1-2013/14 27

28 Appendices Report scope The information in this report covers SPADs which occurred on Network Rail managed infrastructure (NRMI) during the first quarter of 2013/14, comparing it with previous quarters and years. Note: Following the recent reissue of Railway Group Standard GO/RT3119, the term SPAD now refers to those events which were previously labelled as a category A SPAD. Appendix 1 and 2 Appendix 1 and 2 can be found as a separate file on the website, alongside this report. Appendix 3 - Potentially significant cat A SPADs (risk ranked 16-19) Q1-2013/14 Table 6. Potentially significant cat A SPADs (risk ranked 16-19) Q1-2013/14 Appendix 4 - Potentially severe cat A SPADs (risk ranked 20+) Q1-2013/14 Table 7. Potentially severe cat A SPADs (risk ranked 20+) Q1-2013/14 Full details of all SPADs for the review period, plus historic data from January 1998, is available at 28 SPAD/TPWS Report, Q1-2013/14

29 Appendices Appendix 5 - Signals with 3 or more SPADs during last 5 yrs. (at 29 June 2013) Table 8. Signals with 3 or more SPADs during last 5 yrs. (at 31 March 2013) This appendix lists those signals which have been passed at danger three (or more) times during the five-year period ending 29 June Lists of those signals which fall within the standard definition of a multi-spad signal (2 or more occasions in five years) are produced every week and posted at SPAD/TPWS Report, Q1-2013/14 29

30 Appendices Appendix 6 Monthly SPAD tables Table 9. All SPADs : monthly totals Table 10. SPADs risk ranked 16+ : monthly totals Table 11. SPADs risk ranked 20+ : monthly totals 30 SPAD/TPWS Report, Q1-2013/14

31 Appendix 7 SPADs per million train miles, by RU Table 12. SPADs risk ranked 20+ : monthly totals Appendices This table is divided into three sections: All SPADs, 16+ SPADs and 20+ SPADs. The national SPAD rates for each risk ranking band are also shown, highlighted in yellow. Those RUs which have a SPAD rate which is lower than the national rate for both all SPADs and for 16+ SPADs are coloured green. Those with one such rate lower than the national rate, and one higher are coloured orange, whereas those with both rates higher than the national rate are coloured red. The 20+ SPAD rates are not reflected in the colour coding, due to the small number of events per company. The infrastructure companies SPADs are not normalised as it would be inappropriate to do so in view of the limited number of miles accrued by these undertakings. Instead, raw SPAD SPAD/TPWS Report, Q1-2013/14 31

32 Appendices numbers are given. Alstom s SPAD figures are also raw SPAD numbers, as the miles accrued are small. In accommodating franchise changes, RSSB has measured relevant RUs past performance, where possible (by considering the current RU s predecessors SPADs), in order to provide a benchmark reference for future comparison. This estimation is considered to be realistic; it is based on SMIS data since January However, it has not been possible to allocate train miles data accurately prior to the franchise changes in respect of the some of the present RUs. This means that some of the figures are shown as blanks. In addition, there is currently no mileage data available for Heathrow Connect, hence their 2012 data is also blank. Appendix 8 T22 and IN signals The signals listed below are those which were cited in the two post-ladbroke Grove Improvement Notices, and which remain classified as multi-spad as at the end of March Table 13. Improvement notices signals remaining multi-spad 32 SPAD/TPWS Report, Q1-2013/14

33 Appendix 9 SPADs normalised by driver population Table 14. Annual SPAD rate per 100 drivers per month Appendices The colour codings indicate whether an individual company s SPAD rate is significantly better (green) than the average group rate, or significantly worse (red), at the 90% confidence level. SPAD/TPWS Report, Q1-2013/14 33

34 Appendices Appendix 10 RU SPADs year-on-year comparison Table 15. Company performance year-on-year All SPADs 34 SPAD/TPWS Report, Q1-2013/14

SPAD and TPWS activity report Quarter /14

SPAD and TPWS activity report Quarter /14 SPAD and TPWS activity report Quarter 3-2013/14 Alexander Moor 020 3142 5487 Mail to: spad@rssb.co.uk The report may be downloaded from the RSSB website: www.rssb.co.uk Rail Safety and Standards Board

More information

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls

Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls Recommendations for the Risk Assessment of Buffer Stops and End Synopsis This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops

More information

Level crossing safety performance report June 2006

Level crossing safety performance report June 2006 Level crossing safety performance report June 2006 If you would like to give feedback on any of the material contained in this report, or if you have any suggestions for future editions, please contact:

More information

Accident Precursor Monitoring in Metro Railways

Accident Precursor Monitoring in Metro Railways Accident Precursor Monitoring in Metro Railways Workshop on accident/ incident precursor analysis in air transport and railways Imperial College, 9 February 2006 The data and sponsors: the and Nova groups

More information

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D

Withdrawn Document Uncontrolled When Printed. Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D Railway Group Standard : GO/RT3000 Title of Rule Book : Master SECTION D PASSING SIGNALS AT DANGER AND MAKING MOVEMENTS IN THE WRONG DIRECTION Page Date Index Page No. Latest Issue D.1/D.2 June 2003 D.3/D.4

More information

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk

Forewarned is Forearmed Highways Agency approach to quantifying network safety risk Forewarned is Forearmed Highways Agency approach to quantifying network safety risk The Highways Agency Safety Risk Model 17 th May 2012 Elizabeth Mathie, Safety Risk Modelling Manager The Highways Agency

More information

A review of 2015 fatal collision statistics as of 31 December 2015

A review of 2015 fatal collision statistics as of 31 December 2015 A review of fatal collision statistics as of 31 December This report summarises the main trends in road fatalities that have emerged in. This has been prepared by the Road Safety Authority following analysis

More information

Annual Safety Performance Report

Annual Safety Performance Report Annual Safety Performance Report 13/14 A reference guide to safety trends on GB railways Annual Safety Performance Report 13/14 If you would like to give feedback on any of the material contained in this

More information

Crash Patterns in Western Australia. Kidd B., Main Roads Western Australia Willett P., Traffic Research Services

Crash Patterns in Western Australia. Kidd B., Main Roads Western Australia Willett P., Traffic Research Services Crash Patterns in Western Australia Kidd B., Main Roads Western Australia Willett P., Traffic Research Services Abstract Examination of crash patterns is one way of identifying key factors on which focus

More information

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book

Issue 8. Module S5. Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) GERT8000-S5 Rule Book GERT8000-S5 Rule Book Passing a signal at danger or an end of authority (EoA) without a movement authority (MA) Issue 8 Module S5 September 2018 Comes into force 01 December 2018 Conventions used in the

More information

Danish gambling market statistics Third quarter, 2017

Danish gambling market statistics Third quarter, 2017 Danish gambling market statistics Third quarter, Third Quarter, 7. december Third Quarter, Danish gambling market statistics 1 Indhold A. Introduction... 2 B. Quarterly market statistics for the Danish

More information

Safety Monitor Requirements. September 2012

Safety Monitor Requirements. September 2012 Introduction This document sets out Safety Monitors for the 2012/13 winter, pursuant to National Grid s obligations under the Uniform Network Code (UNC), Section Q. Safety Monitors were introduced in 2004

More information

New Zealand Fisheries Assessment Research Document 98/21. Not to be cited without permission of the authork) Malcolm Clark

New Zealand Fisheries Assessment Research Document 98/21. Not to be cited without permission of the authork) Malcolm Clark Not to be cited without permission of the authork) New Zealand Fisheries Assessment Research Document 98/21 A summary of commercial catch and effort information for orange roughy (Hoplostethus atlanticus)

More information

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd

Reduction of Speed Limit at Approaches to Railway Level Crossings in WA. Main Roads WA. Presenter - Brian Kidd Australasian College of Road Safety Conference A Safe System: Making it Happen! Melbourne 1-2 September 2011 Reduction of Speed Limit at Approaches to Railway Level Crossings in WA Radalj T 1, Kidd B 1

More information

Cycle journeys on the Anderston-Argyle Street footbridge: a descriptive analysis. Karen McPherson. Glasgow Centre for Population Health

Cycle journeys on the Anderston-Argyle Street footbridge: a descriptive analysis. Karen McPherson. Glasgow Centre for Population Health Cycle journeys on the Anderston-Argyle Street footbridge: a descriptive analysis Karen McPherson Glasgow Centre for Population Health March 2017 Key points: There were 116,334 cycle journeys made using

More information

STATISTICAL SUMMARY RAILWAY OCCURRENCES 2015

STATISTICAL SUMMARY RAILWAY OCCURRENCES 2015 STATISTICAL SUMMARY RAILWAY OCCURRENCES 215 April 216 Transportation Safety Board of Canada Place du Centre 2 Promenade du Portage, 4th floor Gatineau QC K1A 1K8 819-994-3741 1-8-387-3557 www.tsb.gc.ca

More information

Summary Safety Investigation Report

Summary Safety Investigation Report Investigation Body for Railway Accidents and Incidents Summary Safety Investigation Report Collision between a work train and the rear of a passenger train Linkebeek, Monday 3 November 2014 December 2015

More information

ATOC Guidance Note- Investigation of Station Stopping Incidents

ATOC Guidance Note- Investigation of Station Stopping Incidents Date: February 2013 Submitted by ATOC Guidance Note- Investigation of Station Stopping Incidents Gary Cooper Head of Operations, ATOC Authorised by Synopsis This Guidance Note provides advice on the investigation

More information

SUMMARY OF SAFETY INVESTIGATION REPORT

SUMMARY OF SAFETY INVESTIGATION REPORT Investigation Body for Railway Accidents and Incidents SUMMARY OF SAFETY INVESTIGATION REPORT COLLISION OF TWO PASSENGER TRAINS IN BUIZINGEN ON 15 FEBRUARY 2010 May 2012 On Monday 15 February 2010 at 08:28:19,

More information

Guidance Note: Prevention and Mitigation of Overruns Risk Assessment

Guidance Note: Prevention and Mitigation of Overruns Risk Assessment Guidance Note: Prevention and Mitigation of Overruns Risk Assessment Synopsis This document provides guidance on meeting the requirements of Railway Group Standard GI/RT7006. Signatures removed from electronic

More information

Review of Fatal Collisions

Review of Fatal Collisions Review of Fatal Collisions January to July 1 st 16 Review of 16 fatal collision statistics as of 1st July 16 Overview This report summarises the main trends in road fatalities that have emerged up to the

More information

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book

Issue 3. Module TS11. Failure of, or work on, signalling equipment signallers regulations. GERT8000-TS11 Rule Book Uncontrolled when printed GERT8000-TS11 Rule Book Failure of, or work on, signalling equipment signallers s Module TS11 Issue 3 September 2017 Comes into force 02 December 2017 Conventions used in the

More information

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years).

Bicycle Crashes. Number of Bike Crashes. Total Bike Crashes. are down 21% and severe bike crashes down 8% since 2013 (5 years). Bicycle Crashes The City of Fort Collins is well known for its bike culture, and there is a strong focus on encouraging increased riding. Bike safety is an important component of supporting these efforts.

More information

HS2 Ltd HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis. January 2012

HS2 Ltd HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis. January 2012 HS2 Ltd HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis January 2012 High Speed 2 Limited HS2 London to West Midlands Route Corridor Reviews Journey Time Analysis Contents 1 Introduction

More information

ANNUAL REVIEW OF INDUSTRY EXPERIENCE - FINAL REPORT AS OF DECEMBER 31, 2016 COMMERCIAL VEHICLES ALBERTA AUTO INSURANCE RATE BOARD 29 SEPTEMBER 2017

ANNUAL REVIEW OF INDUSTRY EXPERIENCE - FINAL REPORT AS OF DECEMBER 31, 2016 COMMERCIAL VEHICLES ALBERTA AUTO INSURANCE RATE BOARD 29 SEPTEMBER 2017 ANNUAL REVIEW OF INDUSTRY EXPERIENCE - FINAL REPORT AS OF DECEMBER 31, 2016 COMMERCIAL VEHICLES ALBERTA AUTO INSURANCE RATE BOARD 29 SEPTEMBER 2017 ANNUAL REVIEW OF INDUSTRY EXPERIENCE AS OF DECEMBER 31,

More information

Stabling Point Risk Assessments Wakefield Kirkgate sidings

Stabling Point Risk Assessments Wakefield Kirkgate sidings Stabling Point Risk Assessments Wakefield Kirkgate sidings This document is the property of Harsco Track Technologies Ltd. It shall only be used for the purpose for which it is supplied and shall not be

More information

Appendices. Atkins SBL Forecasting Report 54

Appendices. Atkins SBL Forecasting Report 54 Appendices Atkins 5103087 SBL 54 Atkins 5103087 SBL 55 Appendix A. Local Trip End Generation Rates A.1. A.1.1. Trip Rates The trip rates calculated from TRICS v6.8.1 are presented below for each of the

More information

Cambridgeshire and Peterborough Road Safety Partnership Handbook

Cambridgeshire and Peterborough Road Safety Partnership Handbook and Peterborough Road Safety Partnership Handbook ANNUAL STATISTICS SUMMARY 2015 3941 CCC_Road Safety HBook.indd 1 19/08/2016 14:59 Contents Introduction 2 Key points 3 Summary table 4 Overall trends 4

More information

A Trial of Vehicle Activated Signs to Prevent Road Vehicles Blocking Back

A Trial of Vehicle Activated Signs to Prevent Road Vehicles Blocking Back A Trial of Vehicle Activated Signs to Prevent Road Vehicles Blocking Back Over Level Crossings Claire Turner 1 Marcus Beard 2 Dr Alastair Mckenzie-Kerr 1 John McMorrow 3 1 Human Engineering Limited, Bristol,

More information

People killed and injured per million hours spent travelling, Motorcyclist Cyclist Driver Car / van passenger

People killed and injured per million hours spent travelling, Motorcyclist Cyclist Driver Car / van passenger Cyclists CRASH FACTSHEET 27 CRASH STATISTICS FOR THE YEAR ENDED 31 DEC 26 Prepared by Strategy and Sustainability, Ministry of Transport Cyclists have a number of risk factors that do not affect car drivers.

More information

Child Road Safety in Great Britain,

Child Road Safety in Great Britain, Child Road Safety in Great Britain, 21-214 Bhavin Makwana March 216 Summary This short report looks at child road casualties in Great Britain between 21 and 214. It looks at how children travel, the geographical

More information

Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain

Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain 1 Level Crossing Facts (Great Britain) Over 7000 in active use

More information

TECHNICAL STUDY 2 with ProZone

TECHNICAL STUDY 2 with ProZone A comparative performance analysis of games played on artificial (Football Turf) and grass from the evaluation of UEFA Champions League and UEFA Cup. Introduction Following on from our initial technical

More information

Rail Safety and Standards Board

Rail Safety and Standards Board Rail Safety and Standards Board Certificate of Derogation from a Railway Group Standard (under 8.3 of the Railway Group Standards Code) Derogation Number: Applicant: Subject Matter of Derogation: RGS Number:

More information

To: The results of these surveys have been analysed and are summarised within this Technical Note.

To: The results of these surveys have been analysed and are summarised within this Technical Note. Technical Note Project: Histon Road / Milton Road, Cambridge Parking Surveys To: Andy Harrison Subject: Survey Report v1.6 From: Jonathan Barlow Date: 18 th February 2016 cc: Richard Jones / Dave Boddy

More information

Cambridgeshire floating bus stops interaction analysis

Cambridgeshire floating bus stops interaction analysis Cambridgeshire floating bus stops interaction analysis Final report December 2015 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling

More information

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK

PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK PERSONALISED TRAVEL PLANNING IN MIDLETON, COUNTY CORK Elaine Brick Principal Transport Planner AECOM Abstract Smarter Travel funding was awarded to the Chartered Institute of Highways and Transportation

More information

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner

PUBLISHED PROJECT REPORT PPR850. Optimisation of water flow depth for SCRIM. S Brittain, P Sanders and H Viner PUBLISHED PROJECT REPORT PPR850 Optimisation of water flow depth for SCRIM S Brittain, P Sanders and H Viner Report details Report prepared for: Project/customer reference: Copyright: Highways England,

More information

Loughborough University Travel Planning

Loughborough University Travel Planning Document Ti tle Client Name Loughborough University Travel Planning Loughborough University Travel Plan Executive Summary 2015-2020 23 December 2015 Loughborough University Travel Planning Project no:

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study

M9/A90/M90 Edinburgh to Fraserburgh Trunk Road. A90 Tealing. Moving Cursor Programme Junction Study A90 Tealing Moving Cursor Programme Junction Study This is an unpublished report prepared for the Transport Scotland, Trunk Road and Bus Operations Division (TRBO) and must not be referred to in any publication

More information

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018

Handbook RS521. Signals, Handsignals, Indicators and Signs. Issue 5 RS521. December 2018 Handbook RS521 Signals, Handsignals, Indicators and Signs Issue 5 RS521 December 2018 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved by Traffic

More information

1999 On-Board Sacramento Regional Transit District Survey

1999 On-Board Sacramento Regional Transit District Survey SACOG-00-009 1999 On-Board Sacramento Regional Transit District Survey June 2000 Sacramento Area Council of Governments 1999 On-Board Sacramento Regional Transit District Survey June 2000 Table of Contents

More information

Safety Monitor Requirements Revised. February 2018

Safety Monitor Requirements Revised. February 2018 This report is an update of the Safety Monitor Report published in September 2017. We are updating the report due to changes with Rough Storage, and Non Storage Supply (NSS) flows observed so far this

More information

QUANTITATIVE ANALYSIS OF FACTORS AFFECTING RAILROAD ACCIDENT PROBABILITY AND SEVERITY ROBERT THOMAS ANDERSON

QUANTITATIVE ANALYSIS OF FACTORS AFFECTING RAILROAD ACCIDENT PROBABILITY AND SEVERITY ROBERT THOMAS ANDERSON QUANTITATIVE ANALYSIS OF FACTORS AFFECTING RAILROAD ACCIDENT PROBABILITY AND SEVERITY BY ROBERT THOMAS ANDERSON B.A., DePauw University, 2001 B.S., University of Illinois at Urbana-Champaign, 2003 THESIS

More information

French Road Safety Observatory - ONISR

French Road Safety Observatory - ONISR Road Safety in 2017 Estimated as of January 25, 2018 Summary of road traffic fatalities in France (mainland and overseas areas): Nearly 3 700 people are estimated to have died on French roads (mainland

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009

Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 Increased Onboard Bicycle Capacity Improved Caltrain s Performance in 2009 February 4, 2010 Prepared by: BIKES ONboard Project San Francisco Bicycle Coalition Prepared by the San Francisco Bicycle Coalition

More information

2015 Victorian Road Trauma. Analysis of Fatalities and Serious Injuries. Updated 5 May Page 1 of 28. Commercial in Confidence

2015 Victorian Road Trauma. Analysis of Fatalities and Serious Injuries. Updated 5 May Page 1 of 28. Commercial in Confidence 2015 Victorian Road Trauma Analysis of Fatalities and Serious Injuries Updated 5 May 2016 Page 1 of 28 Commercial in Confidence VICROADS_n3445896_2015_Victorian_Trauma_Report_- _updated_may_2016.docx 2015

More information

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Document supersedes Iss 1 (to correct formatting) and supersedes in part GERT8071 Iss 2, Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for

More information

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65%

TYPES OF CYCLING. Figure 1: Types of Cycling by Gender (Actual) Figure 2: Types of Cycling by Gender (%) 65% Chi-squared significance test results 65% TYPES OF CYCLING 1,980 responses were received to this question (multiple answers were allowed), 727 female (41%) and 1,242 (71%) from male respondents. The most common responses for both genders were

More information

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016

For Information Only. Pedestrian Collisions (2011 to 2015) Resolution. Presented: Monday, Apr 18, Report Date Tuesday, Apr 05, 2016 Presented To: Operations Committee For Information Only Pedestrian Collisions (0 to 0) Presented: Monday, Apr 8, 06 Report Date Tuesday, Apr 0, 06 Type: Correspondence for Information Only Resolution For

More information

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals

INTERIM ADVICE NOTE 171/12. Risk Based Principal Inspection Intervals INTERIM ADVICE NOTE 171/12 Risk Based Principal Inspection Intervals Summary This Interim Advice Note sets out the requirements and guidance for service providers using risk based inspection intervals.

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

Danish gambling market statistics First quarter 2017

Danish gambling market statistics First quarter 2017 Danish gambling market statistics First quarter 2017 6. juni 2017 Danish gambling market statistics 1 Introduction The Danish gambling market underwent a partial liberalisation in 2012, with the markets

More information

Speed Data Analysis. Monk Fryston Parish Council. Traffic Speed data Statistical Analysis 30th. November 2017 to 6th December 2017.

Speed Data Analysis. Monk Fryston Parish Council. Traffic Speed data Statistical Analysis 30th. November 2017 to 6th December 2017. Traffic Speed data Statistical Analysis 30th November 2017 to 6th December 2017 and 14th December 2017 to 21st December 2017 Monk Fryston Parish Council December 2017 Speed Data Analysis Monk Fryston Parish

More information

SUBJECT: I-82 Existing Conditions I-84 Boardman to Ontario Corridor Management Plan P

SUBJECT: I-82 Existing Conditions I-84 Boardman to Ontario Corridor Management Plan P 720 SW Washington St. Suite 500 Portland, OR 97205 503.243.3500 www.dksassociates.com MEMORANDUM DATE: March 30, 2017 TO: FROM: Laura Slater (ODOT Project Manager) ODOT PMT Group for I-84 Region 5 Corridor

More information

Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April Q1 2019

Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April Q1 2019 Quarterly report of the marine Safety Management System (SMS) performance and incident statistics April 9 - Q 9 Serious and very serious incidents There has been serious incident so far in 9 which is below

More information

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor ISBN 978-93-84468-19-4 Proceedings of International Conference on Transportation and Civil Engineering (ICTCE'15) London, March 21-22, 2015, pp. 43-47 Planning Daily Work Trip under Congested Abuja Keffi

More information

Road Safety Audits of Traffic Signal Schemes

Road Safety Audits of Traffic Signal Schemes Road Safety Audits of Traffic Signal Schemes David Prior Waterman Infrastructure & Environment Abstract This paper examines the following elements of Road Safety Audits (RSAs) of traffic signal schemes:

More information

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING

MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING NOVEMBER 216 MILTON ROAD ~ MITCHAM'S CORNER PARAMICS MODEL INITIAL OPTION TESTING Cambridgeshire County Council Type of document (version)

More information

School Bus Safety in Australia Newman, Shannon L., & Tziotis, Michael, (ARRB Transport Research Ltd).

School Bus Safety in Australia Newman, Shannon L., & Tziotis, Michael, (ARRB Transport Research Ltd). School Bus Safety in Australia Newman, Shannon L., & Tziotis, Michael, (ARRB Transport Research Ltd). Abstract In 1999 ARRB Transport Research was commissioned by Austroads to undertake a review current

More information

EVects of seasonal change in rugby league on the incidence of injury

EVects of seasonal change in rugby league on the incidence of injury 144 Department of Orthopaedic and Accident Surgery, Centre, University Hospital, Nottingham NG7 2UH, United Kingdom L Hodgson Phillips Department of Learning Disabilities, University Hospital, Centre,

More information

Controlling the Speed of Tilting Trains through Curves

Controlling the Speed of Tilting Trains through Curves Rail Industry Standard RIS-8012-CCS Date September 2017 Controlling the Speed of Tilting Trains through Curves Synopsis This document sets out the means by which tilting trains may be operated at higher

More information

Frequently asked questions

Frequently asked questions Frequently asked questions Improving recreational boating safety Who will be most affected by these reforms? The primary focus of the reforms is the estimated 676 000 recreational marine licence holders

More information

Modal Shift in the Boulder Valley 1990 to 2009

Modal Shift in the Boulder Valley 1990 to 2009 Modal Shift in the Boulder Valley 1990 to 2009 May 2010 Prepared for the City of Boulder by National Research Center, Inc. 3005 30th Street Boulder, CO 80301 (303) 444-7863 www.n-r-c.com Table of Contents

More information

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability

Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability (http://mobility.tamu.edu/mmp) Office of Operations, Federal Highway Administration Appendix ELP El Paso, Texas 2003 Annual Report on Freeway Mobility and Reliability This report is a supplement to: Monitoring

More information

Lineside Signalling Layout Driveability Assessment Requirements

Lineside Signalling Layout Driveability Assessment Requirements Superseded by Iss 1.1 (to correct formatting) Lineside Signalling Layout Driveability Assessment Requirements Synopsis This document sets out requirements for assessing the driveability of lineside signalling

More information

An atc-induced runway incursion

An atc-induced runway incursion An atc-induced runway incursion Editorial note: This situational example is not a real occurrence and neither is it intended to be a full description. It has been created to allow a focus on operational

More information

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07

TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 TRACK CIRCUIT BLOCK REGULATIONS ISSUE 11/07 I, the undersigned, acknowledge receipt of this publication. I undertake to familiarise myself with any alterations which apply to me. FULL NAME (CAPITALS) STAFF

More information

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book

Issue Module TS1. General signalling regulations. GERT8000-TS1 Rule Book GERT8000-TS1 Rule Book Uncontrolled when printed General signalling regulations Issue 12.1 Module TS1 March 2018 Comes into force 03 March 2018 Conventions used in the Rule Book A black line in the margin

More information

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book

Issue 4. Module TS10. ERTMS level 2 train signalling regulations. GERT8000-TS10 Rule Book GERT8000-TS10 Rule Book ERTMS level 2 train signalling s Issue 4 Module TS10 September 2018 Comes into force 01 December 2018 Conventions used in the Rule Book A black line in the margin indicates a change

More information

Chapter 5: Methods and Philosophy of Statistical Process Control

Chapter 5: Methods and Philosophy of Statistical Process Control Chapter 5: Methods and Philosophy of Statistical Process Control Learning Outcomes After careful study of this chapter You should be able to: Understand chance and assignable causes of variation, Explain

More information

THE MAGICAL PROPERTY OF 60 KM/H AS A SPEED LIMIT? JOHN LAMBERT,

THE MAGICAL PROPERTY OF 60 KM/H AS A SPEED LIMIT? JOHN LAMBERT, THE MAGICAL PROPERTY OF 60 KM/H AS A SPEED LIMIT? JOHN LAMBERT, MIEAust, CPENG 180 785, B.Eng (Agric), ARMIT (Mech). John Lambert and Associates Pty Ltd ABSTRACT Kloeden et al (1997) found that in a 60

More information

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018.

Indicators and Signs ANSG 604. Applicability NSW SMS. Publication Requirement. External Only. Document Status September 2018. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 5.1 16 September 2018 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Emerging Crash Trend Analysis. Mark Logan Department of Main Roads, Queensland. Patrick McShane Queensland Transport

Emerging Crash Trend Analysis. Mark Logan Department of Main Roads, Queensland. Patrick McShane Queensland Transport Emerging Crash Trend Analysis Mark Logan Department of Main Roads, Queensland Patrick McShane Queensland Transport The authors would like to acknowledge the assistance of Queensland Transport's Data Analysis

More information

At each type of conflict location, the risk is affected by certain parameters:

At each type of conflict location, the risk is affected by certain parameters: TN001 April 2016 The separated cycleway options tool (SCOT) was developed to partially address some of the gaps identified in Stage 1 of the Cycling Network Guidance project relating to separated cycleways.

More information

Evaluating and Preventing Capacity Loss when Designing Train Control to Enforce NFPA 130 Compliance

Evaluating and Preventing Capacity Loss when Designing Train Control to Enforce NFPA 130 Compliance Evaluating and Preventing Capacity Loss when Designing Train Control to Enforce NFPA 130 Compliance Davis Dure SYSTRA Engineering, Inc. New York, NY ABSTRACT Many rail operators are wrestling with how

More information

MYTH-BUSTING IN MELBOURNE Left-turn Vehicle vs. Pedestrian Crashes At Signalised Intersections

MYTH-BUSTING IN MELBOURNE Left-turn Vehicle vs. Pedestrian Crashes At Signalised Intersections MYTH-BUSTING IN MELBOURNE Left-turn Vehicle vs. Pedestrian Crashes At Signalised Intersections Presentation by Mark O Brien AITPM Thursday 21 September 2017 Assumed Common Wisdom Our study commenced over

More information

TRAFFIC CRASHES involving BICYCLISTS

TRAFFIC CRASHES involving BICYCLISTS The Office of the Chief of Police in Berlin BERLIN TRAFFIC CRASHES involving BICYCLISTS A special research project concerning bicycle crashes in West Berlin in the years 1981 through 1985 Police Analyst

More information

SECTION 1. The current state of global road safety

SECTION 1. The current state of global road safety SECTION 1 The current state of global road safety The number of road traffic deaths each year has not increased but remains unacceptably high at 1.24 million per year. Many countries have successfully

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

Speed Limit Policy Isle of Wight Council

Speed Limit Policy Isle of Wight Council APPENDIX B Speed Limit Policy Isle of Wight Council 2009 Contents Section 1 Introduction 1.1 Links with the Local Transport Plan Section 2 Speed Limits on Urban Roads and Residential Areas 2.1 20mph Limits

More information

Travel and Rider Characteristics for Metrobus

Travel and Rider Characteristics for Metrobus Travel and Rider Characteristics for Metrobus 040829040.15 Travel and Rider Characteristics for Metrobus: 2012-2015 Overview The Miami Dade County Metropolitan Planning Organization (MPO) conducted a series

More information

Cambridgeshire and Peterborough Road Safety Partnership Handbook

Cambridgeshire and Peterborough Road Safety Partnership Handbook and Peterborough Road Safety Partnership Handbook ANNUAL STATISTICS SUMMARY- 2016 Contents Introductions 1 Key points 2 Summary table 3 Overall trends 3 Casualties by prevailing speed limit 4 Casualties

More information

UPDATE AND IMPROVEMENT OF THE TRAFFIC ACCIDENT DATA COLLECTION PROCEDURES IN SPAIN. THE METRAS METHOD OF SEQUENCING ACCIDENT EVENTS

UPDATE AND IMPROVEMENT OF THE TRAFFIC ACCIDENT DATA COLLECTION PROCEDURES IN SPAIN. THE METRAS METHOD OF SEQUENCING ACCIDENT EVENTS UPDATE AND IMPROVEMENT OF THE TRAFFIC ACCIDENT DATA COLLECTION PROCEDURES IN SPAIN. THE METRAS METHOD OF SEQUENCING ACCIDENT EVENTS Mª Teresa eesatormo, o,jaime esanmartin a yj J.F. Pace. Spain 4 th IRTAD

More information

2014 QUICK FACTS ILLINOIS CRASH INFORMATION. Illinois Emergency Medical Services for Children February 2016 Edition

2014 QUICK FACTS ILLINOIS CRASH INFORMATION. Illinois Emergency Medical Services for Children   February 2016 Edition 2014 QUICK FACTS ILLINOIS CRASH INFORMATION February 2016 Edition Illinois Emergency Medical Services for Children www.luhs.org/emsc Illinois Emergency Medical Services for Children TABLE OF CONTENTS

More information

Briefing Paper #1. An Overview of Regional Demand and Mode Share

Briefing Paper #1. An Overview of Regional Demand and Mode Share 2011 Metro Vancouver Regional Trip Diary Survey Briefing Paper #1 An Overview of Regional Demand and Mode Share Introduction The 2011 Metro Vancouver Regional Trip Diary Survey is the latest survey conducted

More information

2012 QUICK FACTS ILLINOIS CRASH INFORMATION. Illinois Emergency Medical Services for Children September 2014 Edition

2012 QUICK FACTS ILLINOIS CRASH INFORMATION. Illinois Emergency Medical Services for Children   September 2014 Edition 2012 QUICK FACTS ILLINOIS CRASH INFORMATION September 2014 Edition Illinois Emergency Medical Services for Children www.luhs.org/emsc Illinois Emergency Medical Services for Children TABLE OF CONTENTS

More information

1 Monash University Accident Research Centre, Monash University, Victoria, RACV, 550 Princes Highway Noble Park, Victoria, 3174.

1 Monash University Accident Research Centre, Monash University, Victoria, RACV, 550 Princes Highway Noble Park, Victoria, 3174. Roadside Environment Safety: a statistical analysis of collisions with fixed roadside objects in Victoria Amanda Delaney 1, Stuart Newstead 1, Bruce Corben 1, Jim Langford 1 and Peter Daly 2 1 Monash University

More information

6 NATIONS 2004 STATISTICAL REVIEW AND MATCH ANALYSIS

6 NATIONS 2004 STATISTICAL REVIEW AND MATCH ANALYSIS 6 NATIONS 2004 STATISTICAL REVIEW AND MATCH ANALYSIS IRB Game Analysis 6 Nations 2004 April 2004 6 NATIONS 2004 STATISTICAL REVIEW AND MATCH ANALYSIS contents pages: COMMENTARY 1-2 SUMMARY 3 CHAMPIONSHIP

More information

Signals, Handsignals, Indicators and Signs Handbook

Signals, Handsignals, Indicators and Signs Handbook Handbook RS521 Signals, Handsignals, Indicators and Signs Handbook Issue 4 RS521 December 2016 Published by: RSSB The authoritative version of this document is available at www.rssb.co.uk Contents approved

More information

95 Express Annual Operations Report: Fiscal Year

95 Express Annual Operations Report: Fiscal Year 95 Express Annual Operations Report: Fiscal Year 2014-2015 General The 95 Express Program completed its sixth full Fiscal Year of operations in June 2015. For the FDOT, its Fiscal Year (FY) is from July

More information

COLLISION AVOIDANCE SYSTEM FOR BUSES, MANAGING PEDESTRIAN DETECTION AND ALERTS NEAR BUS STOPS

COLLISION AVOIDANCE SYSTEM FOR BUSES, MANAGING PEDESTRIAN DETECTION AND ALERTS NEAR BUS STOPS COLLISION AVOIDANCE SYSTEM FOR BUSES, MANAGING PEDESTRIAN DETECTION AND ALERTS NEAR BUS STOPS Benjamin Englander Michael Cacic Cheikh Diop Rosco Collision Avoidance, Inc. United States of America Yaniv

More information

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2007 June 2011 (All ages) Mode of travel

Deaths/injuries in motor vehicle crashes per million hours spent travelling, July 2007 June 2011 (All ages) Mode of travel Cyclists CRASH STATISTICS FOR THE YEAR ENDED 31 DECEMBER 211 Prepared by the Ministry of Transport CRASH FACTSHEET 212 Cyclists have a number of risk factors that do not affect car drivers. The main risk

More information

Road design and Safety philosophy, 1 st Draft

Road design and Safety philosophy, 1 st Draft Head Office SWEDEN www.vv.se Textphone: +46 243-750 90 Roger Johansson International Secretariat roger.johansson@vv.se Direct: +46 243 75880 Mobile: +46 70 6327373 Date: 2006-08-17 Reference: Road design

More information

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans

Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans Cycling and Walking Investment Strategy & Local Cycling and Walking Infrastructure Plans 1 Investing in cycling and walking contributes to a broad range of cross-cutting policy objectives Cycling and walking

More information

Low Level Cycle Signals with an early release Appendices

Low Level Cycle Signals with an early release Appendices Low Level Cycle Signals with an early release Appendices Track trial report This document contains the appendices to accompany the report from the second subtrial of a larger track trial investigating

More information

PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT

PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT Sean Rainsford Chris Parkman MWH NZ Ltd Transit New Zealand PREDICTING TEXTURE DEFICIENCY IN PAVEMENT MANAGEMENT Inadequate texture is one of the key

More information

Analysis of Factors Affecting Train Derailments at Highway-Rail Grade Crossings

Analysis of Factors Affecting Train Derailments at Highway-Rail Grade Crossings Chadwick et al TRB 12-4396 1 1 2 3 Analysis of Factors Affecting Train Derailments at Highway-Rail Grade Crossings 4 5 TRB 12-4396 6 7 8 9 Submitted for consideration for presentation and publication at

More information