1 Strategy 1 Provide direct access to Route 1 from the NASB - We need to build a regional public transportation bus service like Western Maine has in the Sugarloaf area. We could pool the assets of Highlands, Thornton Oaks, the City of Bath, and Coastal Transportation to create a service for all residents of Brunswick, Topsham, and Bath. - As nice as it would be to have a new, improved, direct access to the Midcoast Regional Redevelopment Authority to foster redevelopment, this is simply too expensive. It would cost in excess of $25M. If we get our hands on $25M to spend on improving infrastructure, we could implement so many more things in the area to benefit all... - Why is a direct connection from Route 1 to the Base needed? The 8,000 military and civilian workers employed there are decreasing. More access and connections will disperse traffic. We can integrate local roads. This strategy is a white elephant from the Governor's Task Force. - If you connect the Route 1 Bypass directly to the Brunswick Naval Air Station, you should do it in a way that does not "shunt" more traffic towards the bike path. The bike path already suffers from too many nearby cars and too much exhaust in some sections (I still love it, though). -...This concept should be reserved for the very distant future after many other recommendations are implemented and there is a DEMONSTRABLE need such that without it, the Midcoast Regional Redevelopment Authority can't realize SIGNIFICANT redevelopment opportunities. - It must connect with the bike path. The path should connect with Bath in the future. - Improve the bike path connection into Cooks Corner. It is not currently viable as a connector for trips from downtown to Cooks. - Make the Base part of the Town of Brunswick by having more roads into the area with normal access as in other neighborhoods, and with rail or trolley / bus connections. - Improve bike and pedestrian access to, and especially within, Cooks Corner. Minimize traffic by allowing people to park once and walk to nearby destinations. - Provide alternative paths around and through the Base to minimize CC traffic from and to southern Route Route 1: New access to the Base must be on a separate level from Bath Road and the railroad. New access could bridge over the railroad. Access was blocked in the past and we don't want to make today's problems worse. - Provide access by utilizing overpasses from Route 1. - There is a need for cross-town access across the south end of the Base. This is imperative! - Provide Bus/Trolley connection between Downtown and the Base.

2 Strategy 2A - Improve mobility along Route 196 (Coastal Connector) from I-295 (Exit 31) to Route 1 including the Route 196/Route 201 intersection and along Route 201 north to Old August Road - We need to implement Topsham's Main St. plan in the 2A study area. We need separation between cars, pedestrians, and bikes. We need more turning lanes and stacking lanes in the area between Canam Drive and the Coastal Connector. - I'm not sure if Colgan and Reichert really have a handle on future conditions in 2A. - I expect that Annex housing will not end up as housing but rather a possible educational use, such as a community college. - We need to divert as much traffic as we can off of Route 201 and avoid having people drive to the Coastal Connector intersection. We must facilitate the ability to access Route 295, rather than forcing drivers to go through the Coastal Connector intersection. - I expect the new high school to be built on the Annex campus. - We need a traffic light at the intersection of Canam Drive and Route We must create options to drive through the Annex to get to the other side: Mountain Road and Tedford Road. - I expect more recreational uses, e.g. an ice rink. - Eliminate the left turn onto Winter St. from Route 201 across from Michaud's. It's redundant with the left turn at the light at the top of the hill. It is a bottleneck and a safety issue, with cars passing on the right. - We should take advantage of power lines to create access to playing fields on Fireside Road. Kids could run, bike, or walk to the playing fields. - The Federal Department of Education should give Annex land to School District 75. Land for playing fields means spectators, which means traffic, which means greater use of Route We need an overpass or pedestrian bridge at the intersection of Routes 201 and 196. We have 1300 students on the Topsham Campus walking or biking to school. Could a roundabout work here? - I expect greater community usage - a community center and programming for all ages. - I expect relocation of the Toyota dealership to the opposite intersection (Pine State Safety Lines property). - I expect a high use of the property along Route 295 where a sedimentation pond backs onto it. An entity, such as a healthcare services provider, that wants high visibility will locate here. - Possible Development (Health Care Ind.) and connector road between US 201 at Old Augusta Road and Route 196 at Topsham Fair Mall Road with a possible signal at US 201 and Old Augusta Road. Eliminate Exit 31 I-295 SB Off ramp to Route 196 west and provide a left-turn to 196 west from the SB Off loop ramp controlled by a new signal. Bike path planned along the south side of Route 196 between US 201 (Main St) and Elm St with a cross connection just east of Village Dr. - This area of 2A will grow significantly over time. - Lots of crashes at US 201 (Main St) at Monument Place - too many curb-cuts. - Need NB exclusive right-turn lane on US 201 (Main St) at Route 196.

3 Strategy 2B - Identify mobility improvements along Route 1/ Pleasant Street to Route Since Pleasant Street carries heavy-duty trucks, could more be done with trees or sound barriers to protect the homes and businesses nearby from the noise? - Could we have an alternate / parallel road along the railroad tracks instead of the Paul and Turner connection? It seems it would be less intrusive to residents and businesses and would maybe cost less in construction and environmental impact. - Consider a roundabout at Cumberland Farms. - Consider a center turn lane on Pleasant Street. - I say no left turns on Pleasant Street. We need a turnaround at each end. - Resign Pleasant Street as Business Route 1 and the Coastal Connector in Topsham as Route 1 - Have fewer curb cuts into businesses. Instead, have a road behind the buildings to provide access with limited entrances from Pleasant Street. - Raised median along Pleasant Street to eliminate left-turns from through lanes, use side streets for U- turns and access across Pleasant Street. - Access management: we have too many entrances and exits. Business owners are amenable to cross access on the back of properties. It is difficult to get in and out, or to make left turns. - Maine Street. / Bath Road.: Pedestrian safety and bicycle safety at the church triangle are concerns. Historic preservation is a factor. - I have a feeling that a direct access to Route 1 from Bath Road. would alleviate some of the traffic through the Maine Street / Bath Road intersection.

4 Strategy 2C Improve mobility along Mill Street from Pleasant Street to Route Free flow at Cumberland Farms: extend the slip lane (removing Cumberland Farms) to push the merge further away from Stanwood Street. - The traffic light at Mason Street and Maine Street is not working properly. It is blinking instead of changing red/yellow/green. - River access - consider providing crossing along Mill Street: (bike\ped) structure over. The river is "CLEAN" - we need to have access. The River Walk is being developed (see Overview Plan). Cushing Street may be a good location for this crossing - with connection to River Walk. - Allow for southbound traffic to flow through Stanwood and Pleasant without stopping or yielding. Adding lanes will not help; fixing the bottleneck at Stanwood and Pleasant will (and will be cheaper, too!). - Close off access to Cushing and Cumberland. - Correct the omitted areas on Oak, High, Swett, et al from the Historic District. - Continue considering lowering Mill Street to reconnect Brunswick's downtown to its waterfront and its Mill. This could allow for underground parking and better traffic flow beneath the Mill area, and aboveground parking and green space. This would be great for tourism and lifestyle. - Allow access southbound from Route 1 to Maine Street. - I would like to see the signs along Route 1, the ones that direct people down Cushing Street, removed, and traffic redirected to the Stanwood/Pleasant Street intersection. - We need better access to Brunswick coming from Bath on Route 1, perhaps directly to Maine Street. - Change existing Route designations. Provide signage at the Route 196 / Route 201 intersection to redirect traffic south (along Route 196 to Route 295 South) and north along Route 196 to Route 1 North. - Terry DeWan developed landscaping along the river's edge of Mill Street near Cushing Street. - Consider a half-interchange (northbound only) at 295 and River Road.

5 BIG PICTURE Station Comments - Brunswick is already overpopulated, with a dangerous traffic congestion problem that is most likely irreversible due to the limitations of the Atlantic coast and the Androscoggin River on either side. Even trying to band-aid these problems won't work. There are numerous intersections that have become very dangerous with increasing traffic. - We need to change Route 24's designation. It should not go down Maine and Main Streets and up Bath Road and down to Orrs and Baileys Islands. It should also be on Elm Street in Topsham and up to Gardiner. - Removing the fences around Brunswick Naval Air Station would be an inexpensive way to significantly improve transportation by bicycling and walking. I second the idea! - People who move to Maine are looking for peace, quiet, and nature since most people want to leave high congestion and overpopulated areas. - Route 24 should go on Route 196 over the Coastal Connector to Cooks Corner. - Restore roads across the south end of the Base. - Parents looking for good schools will be put off by the traffic congestion and crowded aspect and a community that appears dependent on constantly raising taxes. Also, Maine Street in Brunswick has too many businesses that rely on alcohol sales for profits. - Bowdoin College has certainly outstretched itself and has surely contributed to traffic problems from all directions of the campus. Maine Street traffic is a horror by any measure. - People are totally confused. People end up in Richmond when they want to be in Harpswell. No one on Maine Street or Bath Road says "we are located on Route 24 in Brunswick." - If you put in a freight line to the Brunswick Naval Air Station (a good idea, by the way), you should also make it usable for passengers. Why have a singlepurpose track? - We need passenger rail service to and from Freeport / Portland. - We need to build a regional public transportation bus service. Pool all available assets: school systems, Highlands, Thornton Oaks, Coastal Transportation. Model it after the Western Maine Sugarloaf area. - The overcrowding and traffic congestion problem will also be a turn-off to tourists. Add this to a complete lack of convenient parking. Public transportation would most likely become a frustration for most people. - Forget rail to the Base. - Build a downtown parking garage. - Brunswick cannot function like a mini-manhattan. During peak hours, the town actually looks very "ugly," with thousands of cars and trucks filling Maine Street as well as other roads. - Remove as many fences as possible to make the Base a part of the town again! - Maintain Federal Street's historic character as-is (or as close as possible).

6 - Have we considered putting a recycling facility on the base? There aren't many in the state. It would help create jobs and reduce emissions from trucking our recyclables out and we could gain some income from it. - The early installation of a railroad spur across Bath Road and into the Base is critical. To delay a spur until a business asks for it may be too late. The cost for a railroad spur. - My interest concerns the impact on Harpswell, which gets ignored in the planning. The prime issue is reopening Coombs road across the base golf course for Harpswell residents to travel from route 24 across to route 123, without having to negotiate Cook's Corner. I hope there is Harpswell representation at your meetings... - Should through- traffic exiting into Brunswick to points east on Route 1 proceed directly onto Route 1, or is it desirable to have them proceed down Pleasant to Maine Street? It's traffic flow vs. improved business. It's easy for traffic to miss the heart of Brunswick. - System continuity: the main vehicle arterials (I-295, US 1, Route 24) are shown on the map as the framework of the existing transportation infrastructure, as well as railroads. The East Coast Greenway converges in the study area. The 2.4- mile bike path is part of the system. A mapped and cued on-road road through Topsham and Brunswick exists (see for Google Maps). Also, the American Association of State Highway and Transportation Officials recently endorsed the US National Bike Route Corridor Plan, which has Route 1 coming through Brunswick... installation will be less now that Post Road and highway work. A railroad spur may create demand for tenant prospects, while the main line is owned by the state. It is imperative to include and use Maine Eastern Railroad as an industry resource during research and review.... Your list should include Harpswell's Town Administrator, Kristi Eiane -- keiane@town.harpswell.me.us...can we show these elements of the "active transportation" framework on maps and plans? Contact me - Tony Barrett - if you want routing and turn-by-turn directions. There is more background on the US Bike Route System I can point you to. Strategy 3 Extend the existing rail spur to the NASB - No Comments

Transportation Feasibility Study

Transportation Feasibility Study Transportation Feasibility Study Redevelopment of the Naval Air Station Brunswick (NASB) Prepared for Prepared by Bedford, New Hampshire In partnership with Office of the Governor Maine Office of Redevelopment

More information

Transportation Feasibility Study

Transportation Feasibility Study Transportation Feasibility Study Redevelopment of the Naval Air Station Brunswick (NASB) Prepared for Prepared by Bedford, New Hampshire In partnership with Office of the Governor Maine Office of Redevelopment

More information

Route 79/Davol Street Corridor Study

Route 79/Davol Street Corridor Study Route 79/Davol Street Corridor Study Fall River, MA Public Information Meeting #2 November 21, 2013 Fall River Heritage State Park Fall River, MA Agenda Welcome and Introductions Overview of Study Process

More information

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders.

1. Operate along freeways, either in regular traffic lanes, in high-occupancy vehicle (HOV) lanes, or along the shoulders. Most decisions about whether or not to use transit involve time and cost, and most transit services are slower than travel by private vehicle. However, when transit is faster or nearly as fast as travel

More information

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS

Exit 13/Golden Triangle Study FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS How will you improve traffic in the Golden Triangle? One main goal of this study is to examine the current traffic patterns of the area and propose ways to improve the traffic.

More information

Highway 217 Corridor Study. Phase I Overview Report

Highway 217 Corridor Study. Phase I Overview Report Highway 217 Corridor Study Phase I Overview Report November 3, 24 BACKGROUND AND OVERVIEW Study purpose The Highway 217 Corridor Study is developing multi-modal transportation solutions for traffic problems

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

PEDESTRIAN ACTION PLAN

PEDESTRIAN ACTION PLAN ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage

More information

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016

Colchester/Riverside/Barrett/ Mill Intersection Study. PAC Meeting #3 September 22, 2016 Colchester/Riverside/Barrett/ Mill Intersection Study PAC Meeting #3 September 22, 2016 Tonight s Agenda Review Project Purpose and Need Describe short term and long improvements and changes since public

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project.

TRAVEL PLAN: CENTRAL EUROPEAN UNIVERSITY CAMPUS REDEVELOPMENT PROJECT TRAVEL PLAN. Central European University Campus Redevelopment Project. TRAVEL PLAN Central European University Campus Redevelopment Project Page 1 Table of Contents Introduction... 3 Background... 7 Building Users... 7 Transportation in Community Consultation... 7 Summary

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES

INNER LOOP EAST. AIA Rochester Annual Meeting November 13, 2013 TRANSFORMATION PROJECT. Bret Garwood, NBD Erik Frisch, DES INNER LOOP EAST TRANSFORMATION PROJECT AIA Rochester Annual Meeting November 13, 2013 Bret Garwood, NBD Erik Frisch, DES Why? We are building a city that encourages walking, biking and enjoying the outdoor

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

INNOVATIVE INTERSECTION DESIGN

INNOVATIVE INTERSECTION DESIGN INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and

More information

8/31/2016 VIA . RE: Freeport Arco Fuel Station (P16-039)

8/31/2016 VIA  . RE: Freeport Arco Fuel Station (P16-039) 8/31/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: Freeport Arco Fuel Station (P16-039)

More information

Giles Run Connector Road

Giles Run Connector Road Giles Run Connector Road Laurel Hill Adaptive Reuse Area to Laurel Crest Drive South County Federation Meeting June 14, 2016 History Connector road included in the Laurel Hill Comprehensive Plan amendment

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

City of Novi Non-Motorized Master Plan 2011 Executive Summary

City of Novi Non-Motorized Master Plan 2011 Executive Summary City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus

More information

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event

50 Avenue S.W. Corridor Study Glenmore Aquatic Centre Drop-In Event Project overview The City of Calgary is conducting a transportation corridor study of 5 Avenue S.W., between Crowchild Trail and 4A Street S.W. In 29, it was reclassified as a Parkway under the Calgary

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

4 Goals, Objectives & Actions

4 Goals, Objectives & Actions Chapter4 4 This chapter presents goals, objectives, and recommended actions to support the vision of making Overland Park a safer and easier place to ride a bicycle. 35 4.1 Recommendations Structure The

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

Fitting Light Rail through Well-established Communities

Fitting Light Rail through Well-established Communities Fitting Light Rail through Well-established Communities San Francisco 2008 Michael D. Madden Chief, Project Development, Maryland Transit Administration Project Setting Located inside the Capital Beltway

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

9/21/2016 VIA . RE: The Knot (DR16-270)

9/21/2016 VIA  . RE: The Knot (DR16-270) 9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

Blair/Williamson Intersection Expressed Needs

Blair/Williamson Intersection Expressed Needs Blair/Williamson Intersection Expressed Needs NORTH Blair Street is a barrier for pedestrians and bicycles Relocate Capitol City Trail crossing from Blair Street and John Nolen Drive intersection to Williamson

More information

RICHMOND BICYCLE AND PEDESTRIAN PLAN. September 2014 Prepared by the Midcoast Council of Governments

RICHMOND BICYCLE AND PEDESTRIAN PLAN. September 2014 Prepared by the Midcoast Council of Governments 2578 RICHMOND BICYCLE AND PEDESTRIAN PLAN September 2014 Prepared by the Midcoast Council of Governments Introduction Bicycle and pedestrian activity is an important factor of a successful village center.

More information

Governor s Transportation Vision Panel

Governor s Transportation Vision Panel Office of Governor Kate Brown Governor s Transportation Vision Panel JLA Public Involvement Project Overview The is a yearlong effort to develop a series of recommendations for the Governor that address

More information

Kingwood Area Mobility Study. Lake Houston Redevelopment Authority (TIRZ #10)

Kingwood Area Mobility Study. Lake Houston Redevelopment Authority (TIRZ #10) Kingwood Area Mobility Study Lake Houston Redevelopment Authority (TIRZ #10) Steering Committee Meeting #3 Date: May 27, 2014 Introductions/Remarks Steering Committee Project/Consultant Team GOALS & MOE

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Traffic Signs and Signals

Traffic Signs and Signals CHAPTER FOUR Traffic Signs and Signals Traffic signs control traffic flow, making streets and highways safer for drivers, bicyclists and pedestrians. These signs, which are posted by the Indiana Department

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

Sherwood Drive Traffic Circle

Sherwood Drive Traffic Circle Strathcona County Sherwood Drive Traffic Circle Online Survey Results April 7, 215 I. Executive Summary The Sherwood Drive Traffic Circle Survey was administered in March 215. In total, 2,263 residents

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards

Pattullo Bridge Replacement Project Community Connections Phase 2 Consultation. Appendix 3: Open House Display Boards Replacement Project Community Connections Phase 2 Consultation Appendix 3: Open House Display Boards November 2016 Welcome! Welcome to the Replacement Project Public Open House We Want to Hear from You

More information

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives

EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1

More information

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN

8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN 8 PROPOSED ROUNDABOUT DUFFERIN STREET AND KING VAUGHAN ROAD INTERSECTION CITY OF VAUGHAN The Transportation Services Committee recommends the adoption of the recommendation contained in the following report

More information

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary

Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary Cherry Creek Transportation and Land Use Forum September 25, 2013 Meeting Summary I. LEAD-IN TO SMALL GROUP DISCUSSION, POLLING AND STEERING COMMITTEE/TECHNICAL TASK FORCE DISCUSSION The meeting began

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

6/14/2013 VIA . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814

6/14/2013 VIA  . Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd Sacramento, CA 95814 6/14/2013 VIA EMAIL Evan Compton, Associate Planner Community Development Department City of Sacramento 300 Richards Blvd RE: Sacramento Natural Foods Co-Op (P13-025) Dear Mr. Compton: WALKSacramento appreciates

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

CONTENTS INTRODUCTION... 1 PURPOSE AND SCOPE... 1 MOBILITY ELEMENT TRANSPORTATION REPORT... 2 ROADWAY COMPONENT... 3 OPPORTUNITY AREAS...

CONTENTS INTRODUCTION... 1 PURPOSE AND SCOPE... 1 MOBILITY ELEMENT TRANSPORTATION REPORT... 2 ROADWAY COMPONENT... 3 OPPORTUNITY AREAS... CONTENTS INTRODUCTION... 1 PURPOSE AND SCOPE... 1 TRANSPORTATION REPORT... 2 ROADWAY COMPONENT... 3 OPPORTUNITY AREAS... 7 OTHER TRANSPORTATION MODES... 9 GOALS, POLICIES AND IMPLEMENTING ACTIONS... 13

More information

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.

o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns

Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns Seattle Department of Transportation (SDOT) Preliminary Responses to Madison-Miller Community List of Site-Specific Concerns Background In July 2002 SDOT staff met with a small group of community residents

More information

North Coast Corridor:

North Coast Corridor: North Coast Corridor: Connecting People, Transportation & Environment Legislative Hearing: 11.8.10 1 North Coast Corridor Region s Lifeline A Regional Strategy Mobility, Economy & Environment North Coast

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;

More information

NEWMARKET UPHAM S CORNER

NEWMARKET UPHAM S CORNER SOUTH STATION Planning Initiative NEWMARKET UPHAM S CORNER COLUMBIA ROAD (P) FOUR CORNERS/GENEVA Working Advisory Group (WAG) Meeting #5 TALBOT AVENUE MORTON STREET BLUE HILL AVE/CUMMINS HWY (P) RIVER

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)

5/7/2013 VIA  . RE: University Village Safeway Expansion (P13-019) 5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village

More information

Perryville TOD and Greenway Plan

Perryville TOD and Greenway Plan Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

8/1/2018 VIA . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

8/1/2018 VIA  . Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 8/1/2018 VIA EMAIL Darcy Goulart City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 RE: Towne Place Suites by Marriott Hotel (DD9806) Dear Ms. Goulart: WALKSacramento

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Sandwich Pedestrian/Bicycle Planning

Sandwich Pedestrian/Bicycle Planning Sandwich Pedestrian/Bicycle Planning Improved Pedestrian and Bicycle Connections with the Cape Cod Canal Multi-use Path February 2014 Table of Contents Introduction... 1 Background... 1 Study Goals...

More information

APPENDIX F SUPPLEMENTAL TRAFFIC DATA

APPENDIX F SUPPLEMENTAL TRAFFIC DATA APPENDIX F SUPPLEMENTAL TRAFFIC DATA Environmental and Planning Consultants 440 Park Avenue South 7th Floor New York, NY 10016 tel: 212 696-0670 fax: 212 213-3191 www.akrf.com Draft Memorandum To: Michael

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

CONNECTING PEOPLE TO PLACES

CONNECTING PEOPLE TO PLACES CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the

More information

Congestion Management Report

Congestion Management Report Congestion Management Report F.E. EVERETT TURNPIKE (NORTH), MERRIMACK Segment Length: 7.0 miles Daily Traffic Volumes: 60,000-69,000 Analysis Period: May 2015 Number of Traffic Signals: 0 Number of travel

More information

10/30/2012 VIA

10/30/2012 VIA 10/30/2012 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Blvd., 3 rd Floor Sacramento, CA 95811 RE: The Cannery On-Site

More information

7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811

7/23/2017 VIA  . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Memorandum. Sunday, July 13, Saturday, July 19, 2014

Memorandum. Sunday, July 13, Saturday, July 19, 2014 Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn

More information

Open House #1 Summary

Open House #1 Summary Open House #1 Summary Date: Tuesday, December 09, 2014 Time: Location: 6PM TO 8PM Centennial High School Cafeteria, 3505 SE 182 nd Ave., Gresham, OR The first public open house event for the US 26: Outer

More information

Eliminate on-street parking where it will allow for a dedicated bus only lane %

Eliminate on-street parking where it will allow for a dedicated bus only lane % Traffic Dashboard Priorities Survey Responses Introduction 1) Are you familiar with bus rapid transit (BRT)? a. No, BRT is new to me. 597 23.5% b. I ve heard of BRT, but I don t know much about it. 1,136

More information

Public Meeting #1 Comment Summary

Public Meeting #1 Comment Summary Public Meeting #1 Comment Summary This summary includes comments received on comment forms and during conversations between attendees and project team staff at the February 18, 2016 public open house.

More information

12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)

12/4/2016 VIA  . RE: Grocery Outlet Del Paso (DR16-328) 12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010

Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010 Poplar Avenue, US101 to Humboldt, Traffic Improvements Small Group Reports Community Workshop May 20, 2010 Group 1 Facilitated by Ken Chin, PUBLIC WORKS Latino population Schools SEMIs/Commercial Burlingame

More information

Executive Summary Route 30 Corridor Master Plan

Executive Summary Route 30 Corridor Master Plan Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,

More information

Grove Hall Business District Parking Analysis

Grove Hall Business District Parking Analysis Grove Hall Business District Parking Analysis February 2014 Prepared for The Roxbury Great Neighborhoods Partnership Nuestra Comunidad Development Corporation Dudley Square Main Streets Greater Grove Hall

More information

COMMUNITY MEETING #1 Summary

COMMUNITY MEETING #1 Summary COMMUNITY MEETING #1 Summary October 26, 2016 LOCATION: TIME: ATTENDEES: Dr. Phillips High School Cafeteria 6500 Turkey Lake Road, Orlando, FL 32819 6:00 pm to 8:00 pm 79 citizens Commissioner Scott Boyd,

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH

CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS. Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH CAPITOL DRIVE & FOND DU LAC AVENUE INTERSECTION ANALYSIS Urban Planning 772 SARAH BREGANT, RYAN PETERSON, & MATT WERDERITCH OVERVIEW N 51 ST BOULEVARD N 51 ST BOULEVARD 12,100 44,700 W CAPITOL DRIVE 52,600

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

Typical Rush Hour Commute. PennyforTransportation.com

Typical Rush Hour Commute. PennyforTransportation.com Typical Rush Hour Commute In the News Overview of the Plan Collaborative plan with projects in every community Prioritizing connectivity and congestion relief Dedicated transportation-specific funding;

More information

6/22/2018 VIA . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670

6/22/2018 VIA  . Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 6/22/2018 VIA EMAIL Darcy Goulart, Planning Manager City of Rancho Cordova Planning Department 2729 Prospect Park Drive Rancho Cordova, CA 95670 RE: Quick Quack Car Wash (DD9801) Dear Ms. Goulart: WALKSacramento

More information

Chair Jim Wideman and Members of the Planning and Works Committee. Recommended Intersection Modifications at Mill Street and Ottawa Street

Chair Jim Wideman and Members of the Planning and Works Committee. Recommended Intersection Modifications at Mill Street and Ottawa Street Report: E-4-009 Region of Waterloo Transportation and Environmental Services Rapid Transit To: Chair Jim Wideman and Members of the Planning and Works Committee Date: January 8, 04 File Code: A0-30/PW

More information

9/22/2014 VIA . RE: Butano Apartments Pre App (PAMP )

9/22/2014 VIA  . RE: Butano Apartments Pre App (PAMP ) 9/22/2014 VIA EMAIL Surinder Singh, Senior Planner Planning and Environmental Review Division Sacramento County 827 7th Street, Second Floor RE: Butano Apartments Pre App (PAMP2014-00012) Dear Mr. Singh:

More information

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session

Intersection Improvement: Sturgeon Road, Silver Avenue and Murray Park Road Roundabout. Welcome. Public Information Session Intersection Improvement: 1 Welcome WHY IS AN INTERSECTION IMPROVEMENT NEEDED? 2 Traffic volumes for Sturgeon Road, Silver Avenue and Murray Park Road exceed the capacity of the existing 4-way stop controlled

More information

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.

More information

Transportation Feasibility Study

Transportation Feasibility Study Transportation Feasibility Study Redevelopment of the Naval Air Station Brunswick (NASB) Prepared for Prepared by Bedford, New Hampshire In partnership with Office of the Governor Maine Office of Redevelopment

More information

11/3/2014 VIA . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the

11/3/2014 VIA  . WALKSacramento has reviewed the Stockton and T Mixed-Use project at 3675 T Street in the 11/3/2014 VIA EMAIL Antonio Ablog Planning Department City of Sacramento 300 Richards Boulevard Sacramento, CA 95811 RE: Design Review for Stockton and T Mixed-Use (P14-042) Dear Mr. Ablog: WALKSacramento

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

San Rafael School District. Task Force Meeting Notes. November 5, 2012

San Rafael School District. Task Force Meeting Notes. November 5, 2012 San Rafael School District Task Force Meeting Notes November 5, 2012 Attendees (8) Wendi Kallins Program Director for Safe Routes to Schools; Laura Kelly Volunteer Liaison for Safe Routes to Schools; Leslie