1 CITY OF RICHMOND MEDIA BRIEFING SERIES April 23, 2015
2 EVENT HIGHLIGHTS 450,000+ total spectators over the nine days 300 million global television viewers 400 hours of live television 6,000 accredited representaaves 1,000 athletes from 70 countries 500 journalists Media outlets from more than 35 countries
3 EVENT IMPACT Significant economic impact for the enare Richmond region Staging the event expected to generate cumulaave $21.3 million Visitor spending expected to bring $129.2 million to region $3.8 million esamated regional tax revenue for local governments $5.0 million esamated state tax revenue $158.1 million esamated economic impact for Virginia
4 CITY PREPARATIONS AN OVERVIEW Public Safety and Emergency Management Streets and Road PreparaAons Wayfinding BeauAficaAon Sustainability Tourism and Economic Development Permits and Licensing City Customer Service
5 PUBLIC SAFETY and EMERGENCY MGMT Unified Planning OperaAon underway for two+ years Local, State and Federal partners Police overame budget = $1,084,000 Emergency CommunicaAons overame budget = $50,000 Fire and Emergency Services overame budget = $100,000 Richmond Ambulance Authority overame budget = $185,000 Incident AcAon Plan to be completed in May
6 PUBLIC SAFETY (con%nued) CriAcal Infrastructure MeeAngs ongoing quarterly Group includes: - ualiaes - airport - banks - railroads - courts - Retail Merchants AssociaAon - hotels - Chamber of Commerce
7 STREETS AND ROADS PREPARATION Monthly Public Works and Infrastructure meeangs since 2012 Address street surface, walkability, streetscape and public right of way issues 24 lane miles of paving completed along race route ($1.6 million) 13 addiaonal race route lane miles to be completed prior to the race ($1 million budgeted) Benefit of course overlap with areas targeted for ongoing paving Target compleaon of paving race route August 30
8 STREETS AND ROADS (conanued) VDOT interstate gateway landscaping of interchanges (I- 95/I- 64 at Broad Street, Nine Mile Road, 3 rd /5 th /7 th, and Boulevard) in conjuncaon with the City Total cost = $2.6 million (Fed + City) City s share = $580,000 Richmond gateway sign to be installed by VDOT at the I- 95 North/I- 64 East /7 th Street Bridge exit area
9 STREETS AND ROADS (conanued) 23 rd Street Hill Cobblestone RestoraBon Project has begun. Another example of leveraging the event to make progress on long sought improvements Franklin Street cobbles also to be restored and street converted from one- way to two- way AddiAonal future work include 14 th Street (west), Main Street (north), 21 st Street (east) and Dock Street (south) Total budgeted cost = $1.25 million
10 STREETS AND ROADS (conanued) (ini%a%ve to improve bikeability, not specifically for UCI) Six miles of bike lanes installed ($400K) 14.5 addiaonal lane miles of bike lanes including the Floyd Avenue bike boulevard ($1,427K) by the World Championships VA Capital Trail and Cannon Creek Greenway (total of 2.57 miles) constructed by September Bike Racks installed to coincide with race route and throughout City areas with high volume bike traffic Workforce Development welding program ualized for some producaon 268 bike racks installed (150 addiaonal racks projected by September)
11 STREETS AND ROADS (conanued) 7.5 miles of sidewalks repaired and upgraded for ADA More than 630 street signs on the route and Downtown restored and replaced (target of 950 by race Ame) 83 intersecaons on the route and Downtown area marked with crosswalks
12 WAYFINDING Contractor (Color Ad) on board for sign installaaons 99 Wayfinding signs to be installed for overall wayfinding project 60% percent to be completed by race
13 BEAUTIFICATION 147 trees planted to date along main UCI race route 29 empty tree wells to be planted by Urban Forestry by mid- May 3 rd and 5 th Streets gateways to receive planters (In partnership with Venture Richmond and Maymont FoundaAon) East Broad Street gateway (College Street to North 16 th Street) Low Line Park (Dock Street) In Partnership with Capital Trees Parks and tree projects undertaken at Libby Hill by Tree Stewards
14 BEAUTIFICATION (con%nued) Gateway projects begins on 3rd Street April 28
15 BEAUTIFICATION (con%nued)
16 SUSTAINABILITY City sustainability plan resulted in first eco label for event Highlights include: - Water bokle filling staaons - Recycling efforts - ComposAng efforts - EducaAonal enhancement - Volunteer involvement
17 TOURISM LOCAL ORGANIZING COMMITTEE The Richmond Local Organizing Commikee (LOC) is working to enhance the visitor experience and encourage resident paracipaaon Working with Richmond Region Tourism to train ambassadors Encourage and spearhead beauaficaaon throughout race routes Partner with local groups to offer new retail opportuniaes near finish line
18 PERMITS AND LICENSING. Specific work restricaons on streets ensue Sept Established dates for compleaon of construcaon acaviaes within race course and surrounding area Right- of- Way ordinances and regulaaons must be adhered to Vendor licensing handled by Richmond 2015
19 CITY CUSTOMER SERVICE CALLS DPU Customer Service - DPU Customer Contact at Southside Plaza - Strategic deployment of emergency gas and water leak first responders - Dispersing DPU- 311 Call Center Resources to remote site for ConAnuity of OperaAon Plan (COOP) resiliency
20 FUTURE BRIEFING TOPICS TransportaBon and OperaBons Plan Projected compleaon date late June Will address: Impact on City services Employee Parking ResidenAal Parking Street Conversions Bus Routes
21 FUTURE BRIEFING TOPICS Entertainment/InternaAonal Exposure OpportuniAes Official Fan Zones are Finish Line (Broad Street), Monroe Park and Libby Hill R2015 will be programming Extended target opportunity areas include: - Monument Avenue - Main Street StaAon - Lee Bridge
22 FUTURE BRIEFING TOPICS Stakeholder Schedules and Closings Stakeholders currently developing plans to respond to course impacts include: - Richmond Public Schools - State - Courts - Downtown merchants - Churches
23 QUESTIONS?
Enhancing Downtown
Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses
More informationDraft Recommended List of Potential Projects
Draft Recommended List of Potential Projects To Pursue Using the GID Fund Recommendations are based on results of public outreach, City Council discussion, and staff evaluation of all project ideas identified
More informationGRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015
GRTC Bus Rapid Transit: Semi-Final Design Phase Public Meetings: October 26 & 27, 2015 Welcome! Meeting Agenda Project update presentation Up to 15 minutes for Pulse Q&A about project design. (Please reserve
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationSPRINGFIELD REVITALIZATION REPORT
SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization
More informationCML s 91 st Annual Conference June 18 21, 2013 Vail, Colorado. Why a Campaign? Learn More. City of Brush! 6/13/2013
REVITALI ZE Your Community with LiveWell Colorado s HEAL Cities & Towns Campaign CML s 91 st Annual Conference June 18 21, 2013 Vail, Colorado Vicky Quinlin, Council Member, Brush! Monty Torres, City Administrator,
More informationBuilding Great Neighbourhoods BONNIE DOON
Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement
More informationLynchburg District Update
Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active
More informationTraffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014
Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control
More informationBicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013
Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city
More informationROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS
RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationJOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica
JOINT PARTNERSHIPS: Working Together To Support Light Rail in Santa Monica ITY OF ANTA MONICA RAIL-VOLUTION / OCTOBER 17, 2012 SARAH LEJEUNE, PRINCIPAL PLANNER, STRATEGIC + TRANSPORTATION PLANNING DIVISION
More information5. Automobile Circulation, Wayfinding and Signage
5. Automobile Circulation, Wayfinding and Signage Policy: The City Center should have a balanced, safe, and interconnected circulation system that provides expanded travel opportunities for transit, pedestrian,
More informationDALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS Peer Chacko, AICP, Assistant Director, City of Dallas
DALLAS MIDTOWN REDEVELOPMENT PLAN FOCUS NORTH TEXAS 2014 Peer Chacko, AICP, Assistant Director, City of Dallas Dallas Midtown: Strategic growth area Future transit node 2 Peterson Road Study Area Galleria
More informationPEDESTRIAN ACTION PLAN
ATTACHMENT 2 CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN CITY OF SANTA MONICA PEDESTRIAN ACTION PLAN This page intentionally left blank EXECUTIVE SUMMARY CHAPTER 1 EXECUTIVE SUMMARY Setting the Stage
More informationWalkable Community Workshops
Presented by: Larry McAuliffe Manager, Research Unit, Planning Division New York Metropolitan Transportation Council NYSMPO Conference 2008 Walkable Community Workshops Discussion Topics: I. NYMTC in the
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationCITY OF PORTSMOUTH PLANNING DEPARTMENT
CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background
More informationUNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE
January 8, 2017 PUBLIC OPEN HOUSE COLLABORATIVE COMMUNITY-BASED DESIGN IS THE FOUNDATION TO A SUCCESSFUL PROJECT AGENDA FOR TONIGHT 1 INTRODUCTIONS 2 WHY ARE WE HERE PROJECT NEED 3 SCHEDULE & GOALS 4 OPEN
More informationTLC GRANT K / WATER STREETSCAPE ENHANCEMENTS WILL HANDSFIELD, AICP TRANSPORTATION DIR, GEORGETOWN BID
TLC GRANT K / WATER STREETSCAPE ENHANCEMENTS Applied Fall 15 Awarded Winter 15/ 16 Notice to Proceed Spring 16 Completion Summer 16 Community Outreach Ongoing WILL HANDSFIELD, AICP TRANSPORTATION DIR,
More informationMayor s Bicycle Advisory Council. Wednesday, December 13 th, 2017
Mayor s Bicycle Advisory Council Wednesday, December 13 th, 2017 Bicyclist Fatalities, Year to Date (January 1 November 30, 2017) - MBAC Briefing Bicyclist Fatality Statistics Year to date total, 2017
More information12 RECOMMENDATIONS Road Improvements. Short Term (generally the next five years)
12 RECOMMENDATIONS Recommendations are based on the technical analysis of existing and future road and active transportation conditions, the results of the review of existing City policies and public feedback.
More informationFront and Myrtle Improvement Project
Front and Myrtle Improvement Project MAKING BOISE THE MOST LIVABLE CITY IN THE COUNTRY DOWNTOWN: Our unique and vibrant urban neighborhood GUIDING PRINCIPLES: Innovation Celebration Transportation Downtown
More informationA CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.
A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment
More informationRichmond Connects Visioning Update
Richmond Connects Visioning Update To date there have been four elements of the visioning process: Vision20 Night at Byrd Theatre on May 3rd Advisory Committee Meeting on May 12 th Public Visioning Workshop
More informationCHAPTER SIXTEEN THE MASTER PLAN. Oakland Alive
CHAPTER SIXTEEN THE MASTER PLAN 191 THE MASTER PLAN To continue to preserve and restore Oakland for future generations requires a comprehensive program of strategies and recommendations; a commitment from
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationCONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach
CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More information83 AVENUE PRE-CONSTRUCTION MEETING
83 AVENUE PRE-CONSTRUCTION MEETING April 6, 2017 5-8PM Please visit displays for project information Talk to staff, ask questions, visit website at: www.edmonton.ca/bike83avenue Pre-Construction Meeting
More informationCity of Novi Non-Motorized Master Plan 2011 Executive Summary
City of Novi Non-Motorized Master Plan 2011 Executive Summary Prepared by: February 28, 2011 Why Plan? Encouraging healthy, active lifestyles through pathway and sidewalk connectivity has been a focus
More informationIntroduction. North 12 th Complete Street Project Overview
Introduction On Wednesday, March 1, 2017, the City of Sacramento, in partnership with Sacramento Regional Transit District and the Sacramento Housing and Redevelopment Agency, hosted a community outreach
More informationWELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input
WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith
More informationS T A T I O N A R E A P L A N
The Circulation and Access Plan describes vehicle, pedestrian, and transit improvements recommended within the Concept Plan. In order to create and sustain a vibrant business district that provides pedestrian-friendly
More informationOTO BIKE/PED PLAN REPORT
OTO BIKE/PED PLAN REPORT 6/30/2012 Implementation in FY2012 This report outlines the bike/ped accomplishments related to the OTO Bike/Ped Plan. Activities occurring during the 2012 Fiscal Year, July 1,
More informationLand Use and Transportation Town Hall September 17, 2018
Land Use and Transportation Town Hall September 17, 2018 Welcome! Tonight s Agenda: 7:00-7:30 OVERVIEW PRESENTATIONS 7:30-8:15 BREAKOUT SESSIONS 8:15 - End TOWN HALL CITIZEN S TIME Purpose of Tonight s
More informationObey Creek PEDESTRIAN CIRCULATION EAST WEST PARTNERS PEDESTRIAN CIRCULATION CREEK SIDE LANE SLIP STREET SCOTT MURRAY MAIN STREETS EAST/WEST
THE VILLAGE AT PEDESTRIAN CIRCULATION MAIN STREETS NORTH/SOUTH MAIN STREETS EAST/WEST SLIP STREET CREEK SIDE LANE PEDESTRIAN CIRCULATION DESCRIPTION: Circulation through the downtown of is organized by
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationFAYETTE COUNTY. Fayette County Active Transportation Profile REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA
REGIONAL ACTIVE TRANSPORTATION PLAN FOR SOUTHWESTERN PENNSYLVANIA 1 2 ACTIVE TRANSPORTATION AT A GLANCE Trails + Bike Routes 4 miles 73 miles 130 miles 90 miles Parkland Parkland Trail Off Street Trail
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationExecutive Summary Route 30 Corridor Master Plan
Route Corridor Master Plan Project Overview The Route Corridor Master Plan is a coordinated multimodal transportation and land use plan for the entire stretch of Route through East Whiteland Township,
More informationPaoli Road Improvement Feasibility Study
Paoli Road Improvement Feasibility Study & Public Participation Project March 24, 2015 Prepared for: Tredyffrin Township Prepared by: McMahon Associates, Inc. with Town Planning Partnership, LLC Glackin
More informationGood Neighbor Plan Initiative Update. Transportation & Trinity River Project Committee 9 September 2013 Dallas Love Field Phase One Final Report
Good Neighbor Plan Initiative Update Transportation & Trinity River Project Committee 9 September 213 Dallas Love Field Phase One Final Report PURPOSE As briefed to the Transportation and Environmental
More informationBeyond Park Boundaries: Connecting Communities to Trails International Trail Symposium May 9, 2017
Beyond Park Boundaries: Connecting Communities to Trails International Trail Symposium May 9, 2017 Introductions Jessica Baas, Community Planner U.S.DOT Volpe Center Krista Sherwood, Transportation Planner
More informationintegrated action plan
public presentation. june 24, 2009. city of portsmouth, nh islington corridor integrated action plan richardson & associates, landscape architects evan haynes, public arts consultant Islington Street Corridor
More informationKnox Street Complete Streets Project
Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences
More informationDRAFT. Table of Contents. Background
Douglas County Table of Contents Existing Infrastructure 86 Funding 89 Policy and Program Recommendations 90 Infrastructure Recommendations 92 Conclusion 95 Background Home to 4,500 residents and Baker
More informationMontco 2040 Implementation Grant Program Award Summary
Municipality Montco 2040 Implementation Grant Program - 2017 Award Summary Support Downtowns Walk/Bike Montco Name of Project Business Parks Total Project Cost Grant Award Schwenksville Main Street Pedestrian
More informationBicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013
Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:
More informationThe best indicator of an individual s and expanding access to parks and open space.
Health & Wellness Create a Safe and Healthy Built Environment Artist s rendering, 2014 Health is important to Loveland residents, and stakeholders see the many strong connections between quality of life,
More informationPolk Streetscape Project
What is this project? The Polk Streetscape Project is an effort to improve safety for everyone traveling on Polk Street between Union and McAllister streets. Also included in this project are paving, sewer
More informationCASE STUDY WALKABLE WASHINGTON WHO WE ARE & WHAT WE DO CITY OF BOTHELL DOWNTOWN REVITALIZATION PLAN BOTHELL, WA
LKABLE SHNGTON Transformation towards walkability is taking place all over the state of Washington. From urban, suburban and small town initiatives, the program showcases the effects of a renewed focus
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More information4. Action Plan & Projects
4. Action Plan & Projects 45 46 ACTION PLAN AND PROJECTS The Action Plan organizes the list of transportation projects described in the Mobility Framework Plan section into short-term (0-5 years) and long-term
More informationA Complete Streets Policy for Saratoga Springs. Presented By: Shared Access Saratoga
A Complete Streets Policy for Saratoga Springs Presented By: Shared Access Saratoga April 17, 2012 Agenda 1. Introduction to Complete Streets (CS) 2. Shared Access Saratoga 3. Why is CS Important 4. What
More informationLOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT
LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT Fiscal Year SLO Swim Center Pool: The Local Revenue Measure paid for the replacement of the shell plaster at the SLO Swim Center s pool at Sinsheimer Park,
More information2015 Florida Main Street Annual Conference. Complete Streets Equal Stronger Main Streets
WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING YOUR MAIN STREET 2015 Florida Main Street Annual Conference St. Petersburg, Florida August 19, 2015 WHAT ARE COMPLETE STREETS? CASE STUDIES COMPLETING
More informationA COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA
A COMPREHENSIVE APPROACH TO TRANSPORTATION AT SUNTRUST PARK AND THE BATTERY ATLANTA Overview The Atlanta Braves strategically selected the location for SunTrust Park to provide an environment rich in transportation
More information2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:
KEY IDEAS OF PLAN B: Transportation shall support all parts of the cities and improve the quality of life downtown. There is no need to shorten commuting time at rush hour by a few minutes at the risk
More informationPEOPLE ARE PEDESTRIANS BY DESIGN JOIN THE MOVEMENT AT
PEOPLE ARE PEDESTRIANS BY DESIGN JOIN THE MOVEMENT AT WWW.WALKDENVER.ORG Our Vision: In 2040, Denver will be the most walkable city in the United States. As a result, its residents will be the country
More informationFY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices
FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family
More informationIrondale on the Move Public Outreach Summary to Date. July 8, 2015
Irondale on the Move Public Outreach Summary to Date July 8, 2015 Visioning Survey Results 467 Total Responses What do you consider to be the top two strengths of the City of Irondale from your perspective?
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationPre-Construction Meeting
Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope
More informationAnn Arbor Downtown Street Plan
1 Ann Arbor Downtown Street Plan Public Workshop #1 We know that. 2 Public right-of-way (streets, sidewalks, and alleys) make up 30% of the total District area of downtown. Streets need to provide mobility
More informationLincoln Neighborhood Corridor Plan The LiNC
CITY OF SANTA MONICA Lincoln Neighborhood Corridor Plan The LiNC PLANNING COMMISSION September 2, 2015 COMMUNITY DESIGN + ARCHITECTURE TEAM: Community Design + Architecture Iteris Studio 111 Urban Place
More informationCity of Birmingham Draft Multi-modal Transportation Plan
City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The
More informationAreas for Redevelopment or New Development:
Small Group Exercise Summary Areas for Redevelopment or New Development: 1. Downtown a. Job Resource Center b. Community Activities / Activities to draw youth & millennials c. Need for additional parking
More informationG AT E WAY PLAN. Community BRIEFING KIT GATEWAY BIKE
G AT E WAY PLAN GATEWAY BIKE Community BRIEFING KIT PLAN August 2016 TABLE OF CONTENTS INTRODUCTION... 1 THE BENEFITS OF A BIKEABLE COMMUNITY... 2 ECONOMY...2 SAFETY...3 HEALTH...3 HOUSEHOLD SPENDING...3
More informationOctober 30 th, 2012 Committee of the Whole Meeting Cycling Task Force Recommendations BIKE RACKS
BIKE RACKS 1. Replace existing bike racks with functionally designed bike racks that promote year round cycling as well as increase the number of bike racks in town. Existing bike racks are poorly designed
More informationPhasing and Cost Estimate of Downtown Oxford Master Plan Prepared By: Phasing and Cost Estimate of Downtown Oxford Master Plan Purpose of the Study The primary objective of this study is to identify priority
More informationMoving Ahead. (Community Engagement) Chapter Three
3 Community Chapter Three Moving Ahead (Community Engagement) engagement provided an exciting opportunity to engage Redwood City residents, workers, and business owners people who walk, bike, take transit,
More informationPOLICY ADVISORY COMMITTEE
September 27, 2018 POLICY ADVISORY COMMITTEE ENVIRONMENTAL ANALYSIS PHASE Agenda 1. Welcome and introductions. 2. Overview of project activities and process. 3. Public engagement update. 4. Community Advisory
More informationThesis Presentation. Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core. Brad Garcia Advisors: Jason Kost & Dominic Fischer
Thesis Presentation Moorhead City Walk: A Master Plan to Reimage Moorhead, Minnesota s Urban Core Brad Garcia Advisors: Jason Kost & Dominic Fischer MOORHEAD, MN Red River Center Ave 8 TH St N FARGO, ND
More informationBicycle and Pedestrian Plans and Improvements
Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review
More informationPromoting Active Communities Award Application
Promoting Active Communities Award Application Michigan s Promoting Active Communities (PAC) assessment and award application is available for online completion and submission at www.mihealthtools.org/communities.
More informationPROJECT OBJECTIVES. Improve vehicle capacity for the intersection. Improve pedestrian and bicycle access
COMMUNITY MEETING Project Update March 15, 2010 Purcellville, Virginia OVERVIEW Project need / objectives Project recap Design elements Proposed improvements Summary of project benefits / next steps PROJECT
More informationUnlocking the Future of City Parking
NEIGHBORHOOD NOTES 2018 EDITION 3 Unlocking the Future of City Parking MEET LARRY COHEN, EXECUTIVE DIRECTOR, LANCASTER PARKING AUTHORITY MENTION THE WORDS city parking and people usually have a passionate
More informationBICYCLE TOURISM: IDEAS FOR BEST PRACTICE
BICYCLE TOURISM: IDEAS FOR BEST PRACTICE Agenda Overview Understanding the Cycling Industry California Cycling Community Action for Best Practice Cycle California Coast Questions Overview Why Cycling Tourism?
More informationWest Capitol Avenue Road Rehabilitation and Safety Enhancement Project
West Capitol Avenue Road Rehabilitation and Safety Enhancement Project Stakeholder Focus Group Meeting #2 Tuesday, August 28, 2018 7:00 8:00 a.m. West Sacramento City Hall 1110 West Capitol Avenue, West
More informationPerryville TOD and Greenway Plan
Perryville TOD and Greenway Plan Greenway Glossary Pathway: A bicycle and pedestrian path separated from motorized vehicular traffic by an open space, barrier or curb. Multi-use paths may be within the
More informationOcean Park Boulevard Green Street Project Community Workshop
Ocean Park Boulevard Green Street Project Community Workshop 2.2.10 Project Objectives Community Priority: reclaim OPB for public open space. Build upon LUCE principles; neighborhood enhancement, connectivity,
More informationTransform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018
Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation
More informationBerkeley Strategic Transportation Plan A-76
Berkeley Strategic Transportation Plan A-76 Appendices 1. A Team Effort 2. Where We ve Been A-11 Berkeley Strategic Transportation Plan Alameda County Transportation Plan Alameda County will be served
More informationMaking Phoenix Streets Complete. City of Phoenix Complete Streets Initiative
Making Phoenix Streets Complete City of Phoenix Complete Streets Initiative City of Phoenix Planning Commission March 2014 Presentation Outline What are Complete Streets? Benefits of Complete Streets Complete
More informationTransportation Day at the Capitol. Charlie Zelle Commissioner, MnDOT Feb. 16, 2017
Transportation Day at the Capitol Charlie Zelle Commissioner, MnDOT Feb. 16, 2017 State Transportation System Highways 59.1 billion annual vehicle miles traveled 33.1 billion on trunk highways Bridges
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More informationFranklin Parking Analysis
Franklin Parking Analysis Report Prepared for: The Town of Franklin, North Carolina Report prepared by: 525 N. Main Street Waynesville, NC 28786 Town of Franklin Parking Study J.M. Teague Engineering 1
More informationTransportation in Washoe County. Lee Gibson, Executive Director February 15, 2011
Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in
More informationEnvironment and Public Works Committee Presentation
Mixed Use Centers Complete Streets Guidelines Project Environment and Public Works Committee Presentation December 10, 2008 Project Objectives: Conduct an inter-departmental and agency process to study
More informationHOST The C. Preparation of a city for the 2014 FIFA World Cup. Host City: Natal
HOST The C Preparation of a city for the 2014 FIFA World Cup Host City: Natal Contents Introduction Set your goals The Big Legacy opportunity Volunteers Think beyond 2014 Introduction It is very important
More informationWEST AND SOUTH WEST RING ROAD DOWNSTREAM TRAFFIC IMPACTS
Page 1 of 9 EXECUTIVE SUMMARY Alberta Transportation ( AT ) is preparing to construct the final sections of the Calgary Ring Road. This includes the South West Ring Road ( SWRR ) (from Lott Creek Blvd
More informationOmaha s Complete Streets Policy
Omaha s Complete Streets Policy (Adopted August 2015) VISION To create great places and enhance our quality of life, the City of Omaha will provide safe, accessible streets for all users. Complete Streets
More informationOcean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs
City Council Study Session January 27, 2009 Ocean Park Boulevard Streetscape Improvement Project Alternatives & Trade Offs Scope of Work Purpose of Tonight s Meeting Review work to date and direct staff
More informationECONOMIC DEVELOPMENT ELEMENT
ECONOMIC DEVELOPMENT ELEMENT Background The Economic Development Element considers labor force and labor force characteristics, employment by place of work and residence, and analysis of the community
More informationTable of Contents. Our Mission & Vision
This document is made available electronically by the Minnesota Legislative Reference Library as part of an ongoing digital archiving project. http://www.leg.state.mn.us/lrl/lrl.asp 2008 Annual Report
More informationSection 9. Implementation
Section 9. Implementation The transportation system is just one of many aspects that must be carefully planned to maintain and enhance the quality of living in Cecil County. The Cecil County Bicycle Plan
More information