DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name

Size: px
Start display at page:

Download "DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name"

Transcription

1 DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name RTP ID Name Location Description th St Extension Between 4th and 6th Av Nogales Hwy to Sonoran * Aerospace Parkway Air Monitoring & Data New roadway, curbs, walk, landscape & street lights South Tucson $ 1,000 Corridor Widen to 4-lane roadway Pima County $ 31, Collection Expand Air Quality Monitoring PAG/Pima County $ 8,715 Air Quality Model and Develop new air quality model with Inventory Upgrades Air Quality Planning Alternative Energy and Fuel Vehicle Infrastructure Alternative Modes Program Alvernon Wy Corridor Hughes Access Road to Ft * Project Lowell Rd emissions inventory PAG $ 2,500 Regional Air Quality Planning, inventory and monitor pollutants PAG $ 7,500 Improve alternative energy and fuel infrastructure Multiple $ 10,250 Education and outreach to promote alternative modes PAG $ 3,500 Improve Corridor - Widen to 4 and 6- lanes Tucson $ 73, Arterial Street Lighting Arterial streets regionwide Construct roadway lighting Multiple $ 20,000 Arterial Traffic Management Improve the operation of traffic signal System Avra Valley Rd #2 Clayton Rd. to I-10 systems and traffic flow Multiple $ 100,000 Widen to 4-lane roadway, re-align, multi-purpose lanes & sidewalks Marana $ 62,700 1of17

2 Bicycle Boulevards Bicycle Lanes Connectivity Bicycle Parking and other Install bicycle boulevards, see bike plan for more information Multiple $ 35,000 Fill gaps in the bike lane system, including protected bike lanes, see bike plan for more information Multiple $ 73, amenities Install racks, corrals, lockers, etc. Multiple $ 5,000 Bicycle Signage and Way-finding, wrong-way & stenciling Stenciling Bikeways Continuity and Maintenance along bikeways Multiple $ 1,540 Improve bike infrastructure and maintenance Multiple $ 9,750 Bicycle and Pedestrian Encouragement and Safety Outreach Programs Develop and distribute materials on bicycle and pedestrian safety Multiple $ 6, Bus Pullouts Fixed-route system Bridge Program Bus Rapid Transit - 6th Ave / Nogales Downtown to TIA Bus Rapid Transit - Downtown to Houghton Broadway Bl Rd Bus Rapid Transit - Campbell Av South / Kino Pkwy Speedway Blvd to TIA Construct transit pullouts at select bus stops Multiple $ 30,000 Construction of New or Replacement Bridges Multiple $ 26,716 BRT Downtown to TIA (see 2009 HCT plan for details) Tucson Transit $ 98,750 BRT along Broadway (see HCT plan for details) Tucson Transit $ 116,150 BRT along Campbell to TIA (see HCT plan for details) Tucson Transit $ 62,140 2of17

3 Oracle Rd to Tanque Verde Bus Rapid Transit - Grant Rd Rd Bus Rapid Transit - Oracle Downtown to Tangerine Rd Rd Bus Shelters BRT along Grant Rd ((see HCT plan for details) Tucson Transit $ 65,585 BRT along Oracle Rd (see HCT plan for details) Tucson Transit $ 115,600 Add new and refurbish existing bus shelters Tucson Transit $ 2, Camino de Oeste (South) Calle Torim to Valencia Widen to 4-lane roadway Pascua Yaqui $ 8,500 Speedway Bl to Widen to 4-lane divided roadway, bike Camino Seco Wrightstown Rd lanes, sidewalks & drainage Tucson $ 3, * Camino Verde Valencia Rd to Ajo Wy Widen to 3-lane roadway Pima County $ 12,500 Add shoulders and intersection Campbell Av North River Rd to Skyline Dr Quail Crossing Bl to Campbell Av South Sahuarita Rd widening Pima County $ 3,375 Extend 2-lane roadway, bike lanes, sidewalks & drainage Sahuarita $ 18, * Catalina Hwy Houghton Rd to Snyder Rd Widen to 3-lane roadway Pima County $ 10,000 I-10 to Mary Ann Colossal Cave Rd Cleveland Wy Widen to 3-lane roadway Pima County $ 10,400 Communications Expansion - Expand communications to improve ITS Commuter Incentives for alternative transportation 7.14 CNG Fueling System NW 6.14 CNG Fueling System TOPSC Sun Tran Maintenance Facility Northwest Sun Tran's South Park/Thomas O Price data collection & distribution Multiple $ 8,000 Incentives aimed at changing the behavior of drive-alone commuters PAG $ 5,000 Install new CNG fueling system to fuel CNG vehicles Tucson Transit $ 14,500 Service Center Upgrade existing CNG Fueling system Tucson Transit $ 13,000 3of17

4 175.08* Country Club Rd Corridor 6.03* Drexel Rd Extension East Frontage Rd along I-19 Aviation to 22nd and Speedway to Prince Widen to 5-lane roadway Tucson $ 46,680 Midvale Park to Calle Santa Extend 2-lane roadway, with bridge Cruz S ¼ corner of Sec 26 to El Toro Rd Part 1 La Cañada to La Villita High Capacity Transit Enhancements over Santa Cruz Tucson $ 16,750 Nogales Hwy Realign and reconstruct roadway Sahuarita $ 3,500 Construct new 2-lane roadway, sidewalks & multi-use lanes Sahuarita $ 7,014 Enhance transit infrastructure with highcapacity elements Tucson Transit $ 10, Houghton Parkway #2 Dawn Rd to I-10 Widen to 4-lane divided roadway Tucson $ 23,000 Camino del Toro to Dawn 12.02* Houghton Road Ignacio M Baumea Rd Rd) (Sheridan Ave / CAP Line Rd Reconstruct 2-lane roadway Pima County $ 17,350 Los Reales Rd to Calle Torim Improve Pedestrian Mobility Construct 2-lane roadway to PY reservation Pascua Yaqui $ 3,000 Improvements includes sidewalks, maintenance, ADA ramps, lighting, landscaping, refuges, etc. (refer to Regional Pedestrian Plan for candidate locations) Multiple $ 305, * Ina Rd Wade Rd to Silverbell Rd Widen to 3-lane roadway Pima County $ 10,800 Widen to 4-lane roadway, includes Ina Rd #2 Silverbell Rd to I-10 bridges Marana $ 18, Ina Rd #3 I-10 to Camino de la Tierra Widen to 6-lane roadway Marana $ 13,100 4of17

5 Innovative Transit Services Intermodal Transit Center 6th Av / Toole Av Innovative transit including circulators and other gap services including RTA circulator Multiple $ 106,950 Design and construct new intermodal transit center Tucson Transit $ 22, * Irvington Rd Ajo Wy to Mission Rd Complete 2-lane roadway Pima County $ 4,600 Widen to 4-lane roadway, bike lanes, Irvington Rd #4 Kolb Rd to Houghton Rd Eastside Maintenance 8.14 Facility Emergency & Incident Management System Environmental Mitigation Strategies Expand Fixed-Route Bus Eastside/TBD sidewalks & drainage Tucson $ 44,400 Construct a new Sun Tran maintenance facility on the east side of Tucson Tucson Transit $ 25,000 Programs to address emergency situations and routine incidents Multiple $ 30,000 Environmental mitigation strategies for transportation projects Multiple $ 3, System Increase service area and frequency Tucson Transit $ 200,000 Create a divided cross-section with Flowing Wells Rd Grant Rd to River Rd Freeway Management System (all phases) I-10 and I-19 Luckett / Moore Rd to Grier Rd Intersection improvements ITS - Intelligent turning lanes Tucson $ 52,500 Cameras, detection, message-boards & traffic control strategies ADOT $ 50,000 Tangerine Farms Widen to 3-lane roadway Marana $ 12,800 Improve intersections throughout the region Multiple $ 35, Transportation Systems ITS improvements Multiple $ 18,000 5of17

6 La Villita Rd Extension (South) * Lambert Ln Linda Vista Safety * Improvements Local funding for non roadway projects Local Bicycle Infrastructure Sahuarita Rd to Nogales Hwy Shannon Rd to La Canada Construct 2-lane roadway, bike lanes, sidewalk & drainage Sahuarita $ 10,000 Widen to 4-lane roadway, bike lanes, Dr multi-use paths & drainage Oro Valley $ 37,000 Calle Buena Vista to Oracle Reconstruct, drainage, pedestrian, bike Rd lanes Oro Valley $ 2,500 al discretion for local transit and other alternative modes Multiple $ 81,000 Construct Bicycle Infrastructure by the regional jurisdictions Multiple $ 9, * Luckett / Moore Rd Luckett Rd to Sanders Rd Construct 4-lane roadway Marana $ 20,000 Marana Rd to Tortolita TI * Luckett/Moore Rd with I-10 Widen to 4-lane roadway Marana $ 33, * Marana Rd Trico Rd to I-10 Widen to 4-lane roadway Marana $ 35, * Mark Rd / Joseph Rd Los Reales Rd to Ajo Wy Reconstruct 2-lane roadway Pima County $ 8,000 Mary Ann Cleveland Wy / Tucson city limits to Colossal Cave Rd Camino Loma Alta Widen to 4-lane roadway Pima County $ 22, Moore Rd Sanders Rd to Adonis Rd Widen to 4-lane divided roadway Marana $ 23,800 La Cholla Blvd to La 4.14* Moore Rd * Naranja Dr Shannon Rd to First Ave No Drive Days Program Canada Dr Redesign and reconstruct roadway Oro Valley $ 4,000 Grade, pave, drain, add curb, gutter, widen to 3 lanes, bike lanes and multi use lanes Oro Valley $ 8,200 PDEQ Program to promote alternative modes of transportation Pima County $ 6,750 6of17

7 Nogales Hwy # Nogales Hwy #2 (South) Old Vail Connection Rd to Los Reales Rd Widen to 6-lane roadway Pima County $ 44,100 Calle Valle Verde to Sahuarita Rd Widen to 4-lane roadway Sahuarita $ 25, Non-Regional Roadways al Discretion for local roads Multiple $ 2,714,821 Add bike lanes, multi-use paths & 44.08* Northern / Calle Buena Magee Rd to Linda Vista Valencia Rd to Camino Old Spanish Trail transit elements Oro Valley $ 4,000 Loma Alta Widen to 4-lane roadway Pima County $ 34, * Old Vail Connection Road Alvernon Way to Rita Road Construct new 2-lane roadway Pima County $ 30,000 Thornydale Rd to Corona * Orange Grove Rd #2 Rd Reconstruct 4-lane roadway Pima County $ 8, * Orange Grove Rd #3 Corona Rd to Oracle Rd Widen to 4-lane roadway Pima County $ 26, Orange Grove Rd #4 Oracle Rd to Skyline Dr Widen to 4-lane roadway Pima County $ 25,800 PAG Bicycle & Pedestrian Coordinate Ped/Bike activities for the Program Park & Ride Lots Palisades Rd First Avenue to 1 mile east Paratransit Services region PAG $ 1,500 New Park-n-Ride Lots throughout region Multiple $ 20,000 Widen to 3-lanes, shoulders, turn lanes & bike lanes Oro Valley $ 4, Expansion Expand paratransit service within region Multiple $ 200,000 Pavement Preservation and Maintain and Repair Roadway Reconstruction Pima County Roadway Safety Program Various Locations in Pima County Pavement Regional $ 3,180,000 Minor intersection, alignment, drainage & shoulder improvements Pima County $ 50,000 7of17

8 18.02 Pima Mine Rd #1 I-19 to Nogales Hwy Widen to 4-lane roadway Sahuarita $ 22,000 Program - Pave Dirt Roads Pavement of dirt roads to control & Shoulders Quail Creek Bl Extension Railroad Grade Crossing Warning System Old Nogales Hwy to Nogales Hwy particulate matter Pima County $ 20,000 Construct 2-lane divided roadway, includes bridge over Santa Cruz Sahuarita $ 15,700 Install warning systems at railroad crossing locations Multiple $ 6,550 Railroad Grade Separation at Cortaro Farms Cortaro Farms Rd Railroad Underpass at Grant Union Pacific Mainline and Rd Grant Road Rancho Sahuarita Bl Sahuarita Rd to El Toro Rd Construct grade separated railroad crossing Marana $ 16,000 Expand railroad underpass east of I-10 to accommodate 6 lanes Tucson $ 38,000 Construct 4-lane roadway, bike lanes, sidewalk & drainage Sahuarita $ 7, * Rancho Vistoso Bl Moore Rd to Tangerine Rd Reconstruct, mill & overlay Oro Valley $ 1, Regional Aerial Mapping Orthophotos and other mapping work PAG $ 8,000 Regional Comprehensive Transit Operations Analysis Study Conduct a comprehensive operations analysis (COA) study Tucson Transit $ 1,800 Regional Transit Maintenance Facility and Equipment Upgrades Miscellaneous facility improvements over 30 years Tucson Transit $ 36,000 Regional Traveler Information System Programs to obtain and disseminate traveler information Multiple $ 20,000 Right-of-Way (RW) Preservation Purchase RW to preserve from development Multiple $ 15,000 8of17

9 83.14 Safe Routes to School Safety Programming and Funding Process Safety Remediation Programs Improve bike and pedestrian infrastructure near schools Multiple $ 20,000 Dedicated staff to manage safety program Multiple $ 2,000 Expansion of safety & operations related projects Multiple $ 40, * Sahuarita Rd Country Club Rd to SR 83 Reconstruct 2-lane roadway Pima County $ 49,500 La Cañada Dr to La Villita Sahuarita Rd #1 Rd Widen to 6-lane roadway Sahuarita $ 15, * Sandario Rd Ajo Wy to Emigh Rd Reconstruct 2-lane roadway Pima County $ 78,100 Cortaro Farms Rd to * Shannon Rd 65.03* Shannon Rd Shared Use Paths Signalized Pedestrian & Bike Crossings Lambert Ln Widen to 4-lane roadway Pima County $ 30,200 Lambert Ln to Tangerine Rd Construct a new 4-lane road Oro Valley $ 25,000 Create more shared-use paths, see bike 4.06 Small Business Assistance Sonoran Corridor Tier 1 EIS I-19 to I * Speedway Bl I-10 to Euclid Av plan for more information Multiple $ 85,000 Construct signalized pedestrian/bike crossings (HAWKS, etc.) Multiple $ 25,000 Provides help to businesses along major construction corridors RTA $ 20,000 Tier 1 Tier 1 Environmental Impact Statement for new 4-lane freeway Pima County $ 5,000 Widen to 6-lane roadway, includes new railroad underpass Tucson $ 41, SR 77 #1: Miracle Mile I-10 to Oracle Rd Widen to 6-lane roadway ADOT $ 19, SR 77 #2: Oracle Rd Rudasill Rd to Ina Rd Widen to 8-lane roadway ADOT $ 11, SR 77 #3: Oracle Rd Ina Rd to Magee Rd Widen to 8-lane roadway ADOT $ 2,500 9of17

10 SR 86: #A Sandario Rd to Valencia Rd MP to Widen to 4-lane divided roadway ADOT $ 38,250 SR 86: #B Valencia Rd to Kinney Rd MP to Widen to 6-lane divided roadway ADOT $ 47, SR 86: #C Kinney to Mission MP 166 to Widen to 6-lane, divided roadway ADOT $ 9,000 SR 86: #D Mission Rd to I Mission Rd to I-19 Reconstruct and widen to 6 lanes ADOT $ 23,150 Widen to 6-lane divided roadway, SR 86: #E I-19 to I-10 drainage & bus pullouts ADOT $ 23, * Starr Pass Bl Shannon Rd to I-10 Widen to 4-lane roadway Tucson $ 55,600 Stone Av Corridor Gateway University Bl to Wetmore Enhance the gateway, alternative mode Project Streetcar Extension Sun Tran Express Bus Rd Campbell Ave, Broadway, or S. 6th St. (exact location TBD) improvements Tucson $ 30,250 4-mile extension to the existing Sun Link streetcar Tucson Transit $ 170, Service Expansion Expand Sun Tran express route services Tucson Transit $ 78,420 Sun Tran Facility Pavement SunTran parking lot (5 Repave and maintain bus fleet parking Replacement Sun Tran Maintenance upgrades over 30 years) area Tucson Transit $ 5, Facility rehab S. Park Ave Replace/repair roof for facility Tucson Transit $ 600 Sun Tran Maintenance Replace/repair roof for all buildings at Facility NW Sun Van Maintenance Prince/I-10 facility Tucson Transit $ 1, * Tangerine Connector Tangerine Rd to Adonis Rd 9.14 Facility rehab E Ajo Way Building improvements and upgrades Tucson Transit $ 4,320 Construct 4-lane roadway, multipurpose lanes & sidewalks Marana $ 30,000 10of17

11 Technology Transfer Program (LTAP) Traffic Data Collection Ongoing training for regional jurisdictions Multiple $ 1, Stations Install traffic data collection stations Multiple $ 4,375 Transit - Transit Station Oro Valley Oracle Rd and First Av Construct a Regional Transit Station Oro Valley $ 3,250 Transit Amenities at bus Electronic signs, route maps, shelters, stop locations Fixed-route transit system Ronstadt Center, Laos Center, Tohono Tadai etc. Tucson Transit $ 4, Transit Center Upgrades Center, etc Rehabilitate regional transit centers Tucson Transit $ 11,000 Transit Project Development Planning Transit planning activities Multiple $ 4, Transportation Art by Youth Transportation Planning Program Transportation Studies Travel Demand Management Program Tucson Regional Bike Share A program that employs youth to create art for transportation facilities PAG $ 6,000 Regional transportation planning, includes RTP and TIP planning PAG $ 62,488 Studies to improve our transportation network Multiple $ 20,000 Includes rideshare, TRP, vanpool & congestion management PAG $ 24, Program Implement bike share system Tucson $ 11, Center Tucson Traffic Operations City of Tucson Regular maintenance upgrades to the City of Tucson Traffic Operations Center Tucson $ 6,000 11of17

12 69.98 Twin Peaks Rd #1 UA Travel Demand Management University of Arizona Car Sharing Program SWC Sct 19, T12S, R12E for 1/2 Mile East In and around UA alternatives Car Rental locations on the UA Campus Urban Loop Path System Houghton Rd to Old Valencia Rd Valencia Rd 3.06 Wildlife Linkages Wilmot Rd #3 South Pima Mine Rd to I-10 Reconstruct, Drain, Pave Two Lanes & Shoulders Marana $ 300 UA parking options and transportation University of Arizona $ 4,000 University of Affordable hourly car rentals on campus Arizona $ 200 Divided urban path loop, see bike plan for more details Multiple $ 12,000 Spanish Trail Widen to 4-lane roadway expansion Pima County $ 19,000 Camino Verde to Mission Rd Widen to 6-lane roadway Pima County $ 45,420 Construct wildlife linkages to help protect wildlife Multiple $ 40,000 Widen to 4-lane divided roadway, turn Pima lanes, bike lanes & drainage Widen to 4-lane roadway, bike lanes & County/Tucson $ 92, st Av Orange Grove Rd to Ina Rd sidewalks Pima County $ 11,000 Widen to 6-lane roadway, bike lanes, st Av #1 Grant Rd to River Rd sidewalks & bus pullouts Tucson $ 74,398 I-10 to Tucson Bl / Barraza- Widen to 6-lane divided roadway, nd St # nd St #2 Aviation Pkwy bridge over railroad & bike lanes Tucson $ 133,805 Camino Seco to Houghton Widen to 4-lane roadway, bike lanes, Rd sidewalks & bus pullouts Tucson $ 17,300 Widen to 6-lane roadway, bus lanes, Broadway Bl #1 Euclid to Country Club Rd bike lanes & sidewalks Tucson $ 71,207 Camino Seco to Houghton Widen to 4-lane roadway, bike lanes & Broadway Bl #2 Rd sidewalks Tucson $ 22,750 12of17

13 13.00 Cortaro Farms Road Federal Transit Grant Camino de Oeste to Thornydale Widen to 4-lane roadway Pima County $ 18, Programs 5310 and 5311 Programs PAG $ 47,040 Widen to 6-lane roadway, bike lanes, Grant Rd Corridor Project Oracle Rd to Swan Rd Irvington Rd to Golf Links Harrison Rd Houghton Parkway #3 I-10 to Tanque Verde Rd Irvington Rd # * Kinney Rd Kolb Rd Rd Santa Cruz River to east of I-19 Ajo Wy to Tucson Estates Kolb Rd #1 Escalante Rd to I Kolb Rd #2 sidewalks & streetscaping Tucson 162,037 Widen to 4-lane divided roadway, new bridge over Pantano Wash Tucson $ 22,619 Widen to 4- and 6- lane parkway, new bridges & greenway Tucson $ 160,642 Improve intersections, provide access mgmt, bike lanes & sidewalks Tucson $ 9,800 Parkway Widen to 4-lane roadway Pima County $ 19,160 Sabino Canyon Rd to Sunrise Dr Widen to 3-lane roadway Pima County $ 11,000 Widen to 6-lane roadway, bike lanes, Speedway Bl to Tanque Verde Rd La Cholla Bl #2 Magee Rd to Tangerine Rd Mainsail Bl Oracle Rd to Twin Lakes Dr sidewalks & drainage Tucson $ 43,068 New 4-lane roadway, bridge over Pantano, bike lanes & sidewalks; connection to Sabino Canyon Rd Tucson $ 25,693 Widen to 4-lane roadway, bridge over Canada del Oro Wash Multiple $ 65,600 Construct 2-lane roadway and box culvert Pima County $ 3,900 Widen to 3-lane roadway, multi-modal Naranja Dr Shannon Rd to La Cholla Bl facilities Oro Valley $ 6,000 13of17

14 Silverbell Rd Grant Rd to Ina Rd Widen to 4-lane divided roadway, bike lanes & drainage Tucson $ 57,045 Tangerine to Pinal Co. Line Widen to SR 77 #5: Oracle Rd Tangerine to Pinal Co. Line lane roadway ADOT $ 36,500 SR 86: #5 Sandario to Valencia MP to Reconstruct and widen to 40 ft. ADOT $ 5,000 Sun Link Modern Streetcar Operations and Maintenance Sunset Rd Sun Tran Bus & Support Vehicle Replacements Sun Tran Existing Operations and Maintenance Downtown Tucson to University Medical Center Silverbell to I-10 to River Rd Operations and Maintenance for the Sun Link Modern Streetcar Tucson Transit $ 126,000 New 3-lane roadway, bridge over Santa Cruz & bike lanes Multiple $ 22,764 Replace Sun Tran buses and support vehicles on a regular basis Tucson Transit $ 303,672 Maintain existing Sun Tran levels of service Tucson Transit $ 1,790,000 Sun Tran Service Frequency Improvements - RTA Plan Improve service frequencies on major Sun Tran routes per the RTA Tucson Transit $ 112,800 Sun Van Existing Operations and Maintenance Maintain existing Sun Van service Tucson Transit $ 471,000 Sun Van Vehicle Replacements Replace existing vans and support vehicles Tucson Transit $ 86, Tangerine Rd I-10 to La Cañada Dr Widen to 4-lane divided, bike lanes & drainage Multiple $ 92, Thornydale Rd Cortaro Farms Rd to Tangerine Rd Widen to 4-lane roadway Pima County $ 33,100 14of17

15 Transit - Minor Enhancements 1% FTA requirement for Transit Enhancement program Tucson Transit $ 2,650 University of Arizona Disabled Cart Service In and around UA University of Arizona Transit System In and around UA Houghton Rd to Old Valencia Rd Spanish Trail Valencia Rd Ajo Way to Mark Rd Valencia Rd #4 I-19 to Alvernon Way Valencia Rd #5 Wilmot to Kolb Rd Valencia Rd #6 Kolb Rd to Houghton Rd Demand Response Paratransit Service provided to UA students & staff University of Arizona $ 392 Maintain & Upgrade CatTran Shuttle University of Services Arizona $ 1,528 Constuct 2-lane roadway, includes bridge over Pantano Pima County $ 12,876 Widen to 4-lane roadway, bike lanes & sidewalk Pima County $ 38,157 Access management & safety improvements Tucson $ 9,800 Widen to 6-lane roadway, bike lanes & sidewalks Tucson $ 10,150 Widen to 6-lane roadway, bike lanes & sidewalks Tucson $ 34, Wilmot Rd #1 South Sahuarita Rd to 6 mi north New 2-lane roadway Pima County $ 10, I-10 East Corridor I-19 to east county line Improve I-10 east of 1-19 ADOT $ 637,893 I-10 East #A: Kino TI Kino and I-10 Kino TI (incl. mainline 6 lane widening) ADOT $ 79,000 I-10 East #B: Country Club TI Country Club and I-10 Country Club TI (incl. mainline 6 lane widening) ADOT $ 80,675 I-10 East: Park Ave TI Park Ave and I-10 Park Ave TI (incl. mainline 6 lane widening) ADOT $ 44,000 I-10 East #F: Kolb TI Kolb and I-10 Kolb TI ADOT $ 50,000 15of17

16 I-10 East #H: Houghton TI Houghton and I-10 Houghton TI ADOT $ 40,250 I-10 East Phase 1a: I-19 to Kino I-19 to Kino Widen I-10 to 8 lanes from I-19 to Kino ADOT $ 66,000 I-10 East Phase 2: Kolb Rd to Houghton Rd 6 lanes I-10 East Phase 3: Alvernon to Kolb Kolb to Houghton Alvernon to Kolb Widen I-10 from Kolb to Houghton to 6 lanes ADOT $ 95,000 Widen I-10 from Alvernon to Kolb to 8 lanes ADOT $ 179,968 I-10 East: Corridor Study I-19 to SR-83 Complete I-10 East Corridor Study ADOT $ 3, I-10 West Corridor I-19 to north county line Improve I-10 west of I-19 ADOT $ 335,065 Reconstruct traffic interchange I-10 West: #B - Ruthrauff TI Ruthrauff and I-10 I-10 West: #C - Orange Grove Rd TI Orange Grove and I-10 I-10 West: #D - Ina TI & RR Grade Ina Ina and I-10 I-10 West: Sunset Rd TI & mainline widening to 8 lanes ADOT $ 104,947 Rebuild Traffic Interchange - mainline widening to 8 lanes ADOT $ 34,800 Reconstruct roadway and add grade separation - mainline widening to 8 lanes ADOT $ 85,318 Construct Traffic Interchange and RR Grade separation- mainline widening to RR Grade Separation Sunset and I-10 8 lanes ADOT $ 110, I-19 Corridor County Line to I-10 Improve I-19 ADOT $ 312,535 I-19: Mainline Widening #3: San Xavier to Ajo (4 to 6) San Xavier to Ajo Widen mainline to 6 lanes ADOT 120,000 I-19: TI Irvington Rd Irvington and I-19 Reconstruct Traffic Interchange ADOT $ 69,800 I-19: TI Ajo Wy Ajo and I-19 Reconstruct Traffic Interchange ADOT $ 90,085 16of17

17 I-19: TI Sahuarita Rd I-19 and Sahuarita Rd Reconstruct Traffic Interchange ADOT $ 32,650 SR 210: Barraza-Aviation Parkway Extension Palo Verde Rd to I-10 Construct new corridor ADOT $ 378,602 SR 210: Extension Barraza Parkway to I-10 Extend Barraza Parkway to I-10 ADOT $ 309,000 SR 210: Extension Alvernon TI / GSI Construct new TI / GSI ADOT 1 (cost included in parent project) SR 210: Extension I-10 East: Barraza/Valencia TI / GSI Barraza/Valencia Construct new TI / GSI ADOT 1 (cost included in parent project) SR 210: Right-of-Way Advanced right-of-way funding for Acquisition Barraza Parkway to I-10 future connection with I-10 ADOT $ 19,600 SR 210: Traffic Interchange (Golf Links) SR 210 and Golf Links Reconfigure Traffic Interchange ADOT $ 50,000 17of17

2040 RTP Roadways Draft Project List

2040 RTP Roadways Draft Project List 2040 RTP Roadways Draft Project List RTP ID Street Name 157.08 Multiple 1st Av Corridor Project 161.08 Tucson 22nd St Corridor Project Description of Project Grant to Ina Rd 6 Widen 1st Ave. to a 4-6 roadway

More information

Regional. Featuring the Tucson streetcar. Over jobs created! See inside projects complete and more on the way!

Regional. Featuring the Tucson streetcar. Over jobs created! See inside projects complete and more on the way! Over 2000 Regional jobs created! 460+ projects complete and more on the way! APRIL 2012 Featuring the Tucson streetcar See inside 177 N. Church Ave. Suite 405 Tucson AZ 85701 (520) 770-9410 [tel] (520)

More information

TIP Amendment #4 - Proposed PAG TIP PROJECTS. A Add project and funding to match ADOT 5-year Program PROPOSED PROPOSED PROPOSED.

TIP Amendment #4 - Proposed PAG TIP PROJECTS. A Add project and funding to match ADOT 5-year Program PROPOSED PROPOSED PROPOSED. PAG 213-217 PROJETS A and funding to match AOT 5-year I I State/Fed I STREET/PROJET NAME PROJET ESRIPTION 56.12 I-1: ortaro Road TI (Right-of-Way). I-1 and ortaro Road Purchase ROW for ortaro Road TI FUNING

More information

Regional Bicycle and Pedestrian Count Summary Report

Regional Bicycle and Pedestrian Count Summary Report 2013 Regional Bicycle and Pedestrian Count Summary Report Prepared by PAG staff Published June 2014 Table of Contents Introduction and Overview... 1 Process and Methodology... 1 2013 Bicycle and Pedestrian

More information

Executive Summary. September 3, 2014

Executive Summary. September 3, 2014 D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,

More information

2010 Regional Bicycle/Pedestrian Count Summary

2010 Regional Bicycle/Pedestrian Count Summary 2010 Regional Bicycle/Pedestrian Count Summary Introduction In October 2010, volunteers counted bicycles and pedestrians at various locations throughout the Tucson region. This was the third year of the

More information

2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs

2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs 2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs Between October 2008 and February 2009, PAG held 20 ThinkTank sessions for the 2040 RTP with 275 participants. The

More information

Regional Bicycle and Pedestrian Count Summary Report

Regional Bicycle and Pedestrian Count Summary Report 2015 Regional Bicycle and Pedestrian Count Summary Report Prepared by PAG staff Published September 2016 Table of Contents Introduction and Overview... 1 This Report... 1 Process and Methodology... 2 Part

More information

Regional Bicycle and Pedestrian Count Summary Report

Regional Bicycle and Pedestrian Count Summary Report 2014 Regional Bicycle and Pedestrian Count Summary Report Prepared by PAG staff Published July 2015 Revised September 2015 Table of Contents Introduction and Overview... 1 This Report... 1 Process and

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Detailed Status Report

Detailed Status Report Detailed Status Report Jurisdiction: ADOT Project Name: I-10: Ina TI RTA ID: 06 TIP ID: 3.02 Status: Under Construction I-10: Ina TI (Reconstruct TI and construct RR Overpass) Under Construction Roadway

More information

Roadway. Safety. Environment. Transit. FY Annual Report Valencia Rd. Magee Rd. Walking path along Sahuarita Rd.

Roadway. Safety. Environment. Transit. FY Annual Report   Valencia Rd. Magee Rd. Walking path along Sahuarita Rd. FY 2014-2015 Annual Report www.rtamobility.com 1 E. Broadway Blvd., Suite 401, Tucson, AZ 85701 (520) 792-1093 [tel] (520) 620-6981 [fax] Roadway Valencia Rd. Safety Magee Rd. Environment Walking path

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

UNIVERSITY OF ARIZONA NEEDS ASSESSMENT STUDY

UNIVERSITY OF ARIZONA NEEDS ASSESSMENT STUDY UNIVERSITY OF ARIZONA NEEDS ASSESSMENT STUDY Final Report Prepared for PIMA ASSOCIATION OF GOVERNMENTS AND THE UNIVERSITY OF ARIZONA Prepared by April 2008 Acknowledgments University of Arizona Parking

More information

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx

MCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project

More information

2019 Runner and Driver Handbook. (Information within this Handbook is subject to change.)

2019 Runner and Driver Handbook. (Information within this Handbook is subject to change.) 2019 Runner and Driver Handbook (Information within this Handbook is subject to change.) What s In Here 1) Organizing a Team...... 3 2) Registration...... 3 3) Refunds/Transfer Policy...... 3 4) Race Start

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Open Response to Public Comments

Open Response to Public Comments Open Response to Public Comments received for the FY2016-2020 Draft Transportation Improvement Program Introduction: Public comment was solicited as part of the development of the region s Transportation

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400 Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Castro Valley Municipal Advisory Council March 19, 2018

Castro Valley Municipal Advisory Council March 19, 2018 Castro Valley Municipal Advisory Council March 19, 2018 1 Background 2 Draft Bicycle Vision and Pedestrian Networks 3 Next Steps 4 Updates Agenda 2 PROJECT AREA: Unincorporated Areas of Alameda County

More information

Pima Association of Governments Tip Projects

Pima Association of Governments Tip Projects 74.7 I-1: ountry lub TI onstruct TI = Analyzed Total ost = 5 6.15 I-1: raycroft and Wilmot TI Overpass I-1 and raycroft, I-1 and Wilmot Bridge Deck Rehabilitation = Exempt Total ost = 9 5 ASTP 17 HURF26

More information

Prince George s County plans, policies, and projects

Prince George s County plans, policies, and projects Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail

More information

State Highway 44/State Street High Capacity Corridor

State Highway 44/State Street High Capacity Corridor Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

RTA Project Delivery Status Detail Data Report as of August 31, 2016

RTA Project Delivery Status Detail Data Report as of August 31, 2016 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Marana Tangerine Rd: I 10 to La Canada Dr 01_a ST021 86.06 Segment 1: Dove Mountain to Thornydale Segment

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

University of Arizona Area Bicycle and Pedestrian Study

University of Arizona Area Bicycle and Pedestrian Study University of Arizona Area Bicycle and Pedestrian Study Draft Study May 2012 PREPARED BY: Alta Planning + Design Kimley-Horn and Associates, Inc. PREPARED FOR: Pima Association of Governments The University

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

SUN SHUTTLE SERVICE UPDATE

SUN SHUTTLE SERVICE UPDATE SUN SHUTTLE SERVICE UPDATE RTA Board March 25, 2010 Objectives General service overview Review recommended performance measures Recommendations for route/service changes Timeline for May service changes

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Appendix T-2: Transportation Facilities Inventory

Appendix T-2: Transportation Facilities Inventory Appendix T-2: Transportation Facilities Inventory Roads, Highways and Bridges The Georgia Department of Transportation (GDOT) maintains centerline mile measures for all counties in Georgia based on functional

More information

I-10 Bypass Follow-up Report Tucson Metropolitan Area. Draft Report. Prepared for: Arizona Department of Transportation. Prepared by: URS Corporation

I-10 Bypass Follow-up Report Tucson Metropolitan Area. Draft Report. Prepared for: Arizona Department of Transportation. Prepared by: URS Corporation Prepared for: Prepared by: URS Corporation October 16, 2008 TABLE OF CONTENTS Page EXECUTIVE SUMMARY... iii 1.0 EXISTING AND PLANNED CONDITIONS ON INTERSTATE 10... 1-1 1.1 INTRODUCTION... 1-1 1.2 EXISTING,

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on CAPITAL Large Category Projects Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on 07-27-18 1 La Mesa University Ave Pedestrian

More information

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks

Circulation in Elk Grove includes: Motor vehicles, including cars and trucks Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014

MOBILITY WORKSHOP. Joint City Council and Transportation Commission May 5, 2014 MOBILITY WORKSHOP Joint City Council and Transportation Commission May 5, 2014 Review of General Plan M-1 Develop world-class transit system M-3 Maintain/enhance pedestrian-oriented City M-4 Create comprehensive

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010 Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon

More information

Bus Rapid Transit Plans

Bus Rapid Transit Plans Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

St. Francis Drive through the City of Santa Fe Corridor Study

St. Francis Drive through the City of Santa Fe Corridor Study VII. ENGINEERING AND ENVIRONMENTAL EVALUATION TRAIL CONNECTIVITY In the southern portion of the Corridor there is a lack of a sidewalk, trail or bicycle facility within the right-ofway. However, the City

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation

ROADSOADS CONGESTION HAMPTON SYSTEMYSTEM MANAGEMENT. Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation HAMPTON ROADSOADS CONGESTION MANAGEMENT SYSTEMYSTEM Part II Roadway Congestion Analysis Mitigation Strategies and Evaluation Presented by: Dwight Farmer, PE Deputy Executive Director, Transportation April

More information

This chapter describes the proposed circulation system and transportation alternatives associated with

This chapter describes the proposed circulation system and transportation alternatives associated with 5.0 Circulation 5.1 OVERVIEW This chapter describes the proposed circulation system and transportation alternatives associated with West Landing, and summarize the information contained in the Existing

More information

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback.

WELCOME. Thank you for joining us at the Second Public Workshop for the Carlsbad Pedestrian Master Plan. We look forward to receiving your feedback. City of Carlsbad Pedestrian Master Plan: WELCOME WELCOME Please Sign In Provide Input at Flip Charts Review Boards Presentation of Draft Plan Thank you for joining us at the Second Public Workshop for

More information

PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS

PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY 2016-2035 SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS The Sun Corridor Metropolitan Planning Organization (Sun Corridor

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE Date: May 9, 2017 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:

More information

Balancing Operation & Safety for Motorized and Non-Motorized Traffic

Balancing Operation & Safety for Motorized and Non-Motorized Traffic Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete

More information

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m.

FM 1092/Murphy Road Access Management Study Pulic Meeting #1. Wednesday, August 31, :00 p.m. 8:00 p.m. FM 1092/Murphy Road Access Management Study Pulic Meeting #1 Wednesday, August 31, 2011 6:00 p.m. 8:00 p.m. Introductions Agency Partners H-GAC Missouri City TxDOT Introductions Consulting Team In Association

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

City of Tucson ADA Sidewalk Inventory Study Report. Prepared by:

City of Tucson ADA Sidewalk Inventory Study Report. Prepared by: City of Tucson ADA Sidewalk Inventory Study Report Prepared by: City of Tucson Department of Transportation October 2012 ADA Sidewalk Inventory Study Report October 2012 City of Tucson Department of Transportation

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

2040 RTP. Chapter 6: Investments in our Transportation Future

2040 RTP. Chapter 6: Investments in our Transportation Future 2040 RTP Chapter 6: Investments in our Transportation Future This chapter describes the transportation investments proposed for the San Benito region that support the goals and objectives of the Regional

More information

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015

City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 City of Hamilton s Transportation Master Plan (TMP) Public Consultation 3 December 2015 McPhail Transportation Planning Services Ltd. AGENDA 6:00 7:00 pm Viewing Boards / Q & A with the Team 7:00 7:50

More information

Comprehensive Collection of Stakeholder Alternatives by Mode

Comprehensive Collection of Stakeholder Alternatives by Mode 2011 Illinois Department of Transportation Comprehensive Collection of Stakeholder Alternatives by Mode October 2009 January 2011 www.dot.il.gov www.eisenhowerexpressway.com FILEY RD FILEY RD IHB RR 2

More information

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements

4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements Harbor Mixed Use CHAPTER Transit Corridor 4: Mobility Plan 4 MOBILITY PLAN Mobility Plan Objectives The Harbor Corridor Plan seeks to expand and improve the ways that people move along and through the

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

ACTIVE TRANSPORTATION

ACTIVE TRANSPORTATION ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion

More information

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation

San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco s Capital Plan & the Mayor s Transportation Task Force 2030: Funding the next steps for transportation San Francisco Capital Needs In 2006, the Mayor and Board of Supervisors approved San

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008

SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 SANTA CLARA COUNTYWIDE BICYCLE PLAN August 2008 To assist VTA and Member Agencies in the planning, development and programming of bicycle improvements in Santa Clara County. Vision Statement To establish,

More information

Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs

Projects to Be Evaluated for the STP and CMAQ Funds and the 2021 TAP Programs Multi Utah Transit Authority Bus Stop Improvements NA NA Transit Capital The project will upgrade approximately 50 of the highest ridership bus stop locations in need of improvement throughout the Valley

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018

Better Market Street. Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018 Better Market Street Engineering, Maintenance & Safety Committee (EMSC) February 28, 2018 1 Market Street Market Street - San Francisco by rulenumberone2 2 Market Street is the... City s busiest pedestrian

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Chapter 9: Pedestrians and Bicyclists

Chapter 9: Pedestrians and Bicyclists Chapter 9: Pedestrians and Bicyclists Walking and bicycling are essential modes of transportation. These modes allow people to travel without contributing to congestion and air pollution, to access other

More information

INTERMODAL TRANSPORTATION PLAN

INTERMODAL TRANSPORTATION PLAN INTRODUCTION INTERMODAL TRANSPORTATION PLAN Effective intermodal transportation implies a public policy for actively decreasing the demand for automobile trips and consequently reducing automobile related

More information

CPC Parking Lot Riverside Drive. Transportation Rationale

CPC Parking Lot Riverside Drive. Transportation Rationale CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...

More information