RTA Project Delivery Status Detail Data Report as of August 31, 2016

Size: px
Start display at page:

Download "RTA Project Delivery Status Detail Data Report as of August 31, 2016"

Transcription

1 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Marana Tangerine Rd: I 10 to La Canada Dr 01_a ST Segment 1: Dove Mountain to Thornydale Segment 2: Tangerine Rd.: Thornydale to La Canada Segment 3: I 10 to Dove Mountain Tangerine+Twin Peaks/Dove Mountain Blvd Tangerine+Camino De Oeste Tangerine+Thornydale Tangerine+La Cholla Tangerine+I 10 Frontage Rd. Tangerine Twin Peaks EB Twin Linda Vista SB Bus Pull out (transferred to ) Tangerine Rd.: Dove Mountain to La Canada (5 mile) Tangerine Multi Use Path Pathway Tangerine Rd.: I 10 to Dove Mountain (5 mile), Tangerine Multi Use Path Pathway Tangerine Rd.: Dove Mountain to La Canada Tangerine On Street Bikelanes Tangerine Rd.: I 10 to Dove Mountain (5 Mile) Tangerine On Street Bikelanes Tangerine Rd.: Dove Mountain to La Canada Tangerine Tangerine Rd.: I 10 to Dove Mountain (5 mile) Tangerine Oro Valley Tangerine Rd: Shannon to La Canada 01_b Segment 3: Tangerine Rd.: La Canada to Shannon Marana Camino de Manana / Dove Mtn Extn. 02 ST Camino De Manana Twin Peaks Rd./Dove Mountain Blvd. (formerly Camino De Manana) + Tangerine Camino De Manana + Oasis Camino De Manana + Twin Peaks/Camino De Manana Tangerine Twin Peaks SB Twin Linda Vista NB Camino De Manana s Camino De Manana s Marana Twin Peaks Rd / Linda Vista Blvd TI 03_a Twin Peaks, Silverbell to I 10 Twin Peaks+I 10 East Frontage Rd. Twin Peaks+Linda Vista Blvd 03_b Twin Peaks+Tiffany Loop Twin Peaks+I 10 West Frontage Rd. Marana Twin Peaks Bridge / Roadway 03_b Twin Peaks Bridge/Roadway Twin Peaks Bridge/Roadway: Grade Separated RR Crossing Bridge Deficiency Twin Peaks Twin Peaks La Cholla Blvd: Overton to Magee 04_a 4RTLTM La Cholla Blvd., Tangerine to Magee Rd. DCR DCR Study La Cholla Blvd: Overton to Magee La Cholla/Overton La Cholla/Overton La Cholla/Overton s Oro Valley La Cholla Blvd. Tangerine to Overton 04_b La Cholla Blvd. Tangerine to Overton La Cholla Blvd. Tangerine to Overton Bikelanes La Cholla Blvd. Tangerine to Overton Silverbell Rd: Grant to Ina Silverbell Rd.: Grant Rd. to Ina Rd. DCR (Design Concept Report) Segment 1 = Grant to Goret Roadway DCR Study 9/19/2016 2:36:28 PM 1 1 of 60

2 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Segment 2 = Goret to Cmo. Del Cerro Roadway Segment 3 = Cmo Del Cerro to Ina Road Roadway Segment 1 s Segment 2 s Segment 3 s Segment 1 s Segment 2 s Segment 3 s ADOT I 10: Ina TI I 10: Ina TI (Reconstruct TI and construct RR Overpass) MageeRd: MonaLisatoLaCanada La 07_a 4RTMLI Magee Rd: Mona Lisa to La Canada La Cholla + Magee Rd Magee Rd + Mona Lisa Cortaro Ranch Escondido Pedestrian Crossing Magee Rd: Mona Lisa to La Canada Magee Rd: Mona Lisa to La Canada Magee Rd. Thornydale to Mona Lisa 07_b 4MCFTL 152 Magee Rd. :Thornydale to Mona Lisa Magee Rd. + Shannon Northbound Magee Rd. + Shannon Southbound Magee Rd. + Thornydale Club + Magee Rd. Magee Rd: Mona Lisa to La Canada Magee Rd: Mona Lisa to La Canada Sunset Rd. Silverbell to I RTSUN _a Sunset, Silverbell to I 10 Sunset, I 10 to River ADOT I 10: Ruthrauff TI 09_a 5.12 I 10: Ruthrauff TI Phase 1 La Cholla Blvd: Ruthrauff Rd to River Rd La Cholla: Ruthrauff to River Road Segment La Cholla + Curtis s La Cholla + Ruthrauff s La Cholla #1 La Cholla + Ruthrauff La Cholla #2 La Cholla + River Deleted Paid by RTA 36ak La Cholla #3 La Cholla t#4 La Cholla #5 La Cholla #6 La Cholla: Ruthrauff to River La Cholla: Ruthrauff to River s La Canada Dr. #1 River to Ina 11_a 4LCRRI 150 La Canada River to Ina: River>Calle Concordia La Canada River to Ina: River>Calle Concordia La Canada River to Ina: River>Calle Concordia La Canada Dr. #6 Ina to Calle Concordia 11_b 4RTCCI La Canada Dr.: Ina to Calle Concordia La Canada+ Hardy La Canada + Magee La Canada + Ina La Canada + Orange Grove 9/19/2016 2:36:28 PM 1 2 of 60

3 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type La Canada + Calle Concordia La Canada + Sunset La Canada Dr.: Ina to Calle Concordia La Canada Dr.: Ina to Calle Concordia s Magee Rd. La Canada to Oracle Magee Rd.: La Canada to Oracle Roadway Magee + Northern Magee + Oracle 1st Ave: Orange Grove Rd to Ina Rd Not Started 1st Ave: Orange Grove Rd to Ina Rd 1st Ave: Grant to River st Ave: Grant to River Widen to 6 lanes Grant Rd: RR Underpass Reconstruction Not Started UPRR Underpass Expansion at Grant Road UPRR Underpass Expansion at Grant Road 15_a UPRR Underpass Expansion at Grant Road Downtown Links: Broadway to I 10 16_a S30N Phase I= 8th Street Drainage Downtown Links: High School Wash Improvements Phase II= St Mary's: I 10 to Church Ave. Phase III=6th Street to Broadway Blvd St Mary's + Granada Downtown Links + Broadway Downtown Links + 6th Avenue Downtown Links + 6th Street Downtown Links + Stone Downtown Links + Church Davis Bilingual Elementary Pedestrian Crossing Granada WB Downtown Links: I 10 to Broadway Blvd. s Downtown Links: I 10 to Broadway Blvd. s Broadway Blvd. Euclid to Country Club Broadway Blvd.: Euclid Ave. to Country Club Rd. Grant Rd: Oracle Rd to Swan Rd Phase I Grant Rd + Oracle Rd. (includes roadway West at 9th and East to 15th) Phase II 15th Ave West of Stone Ave. to Santa Rita East of Park Ave. Phase III: Alvernon Way to Venice Place, West of Swan Rd & Phase IV: Dodge Blvd. (Palo Verde) to Alvernon Way Phase V: Santa Rita East of Park Ave. to Blvd & Phase VI Blvd. to Pal Verde West of Dodge Grant Rd. + Oracle ILT East Grant Rd. + Oracle ILT West Grant Rd. + Oracle Rd North Grant Rd. + Oracle Rd South Grant Rd. + Oracle Rd East Oracle Rd. to Swan Rd. s Phase I Oracle Rd. to Swan Rd. s Phase II Oracle Rd. to Swan Rd. s Phase III & IV Oracle Rd. to Swan Rd. s Phase V & VI Oracle Rd. to Swan Rd. s Phase I Oracle Rd. to Swan Rd. s Phase II Oracle Rd. to Swan Rd. s Phase III & IV Oracle Rd. to Swan Rd. s Phase V & VI 22nd Street: I 10 to Blvd. 19_a SR5A 131 9/19/2016 2:36:28 PM 1 3 of 60

4 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type 22nd. Street 3rd Segment Kino Parkway to I 10 (1st segment overpass listed as interseciton) 22nd. Street: 2nd Segment Kino Parkway to Blvd. 22nd. Street + Kino Parkway Kino Parkway Overpass at 22nd St. Eastbound 22nd. Street + Kino Parkway Kino Parkway Westbound 22nd. Street + Kino Parkway Kino Parkway Barraza Aviation Pkwy Extension Not Started Barraza Aviation Pkwy Extension Valencia Rd: Ajo Way to Mountain Eagle Dr 21_a Valencia Rd.: Ajo to Mark Value Analysis VA Study ValenciaRd: AjotoWade 21_b Valencia Ajo Way to Mountain Eagle Dr. Wade Valencia Rd.: Ajo to Wade: Valencia + Camino Verde Valencia Rd. Wade to Mark 21_c 4RTVMW Valencia Rd.: Ajo to Mark DCR DCR Study Valencia Rd.: Wade to Mark Valencia Rd.: Wade to Mark: Valencia + Mark Valencia Rd.: Wade to Mark: Valencia + Wade Valencia Rd.: Wade to Mark: Valencia + San Ignacio Baumea Valencia Rd.: Wade to Mark: Valencia + South Camino Verde Irvington Rd: West of I Not Started Irvington Rd: West of I 19 Valencia Rd: I 19 to Alvernon Not Started Valencia Rd: I 19 to Alvernon Valencia Rd.: Alvernon to Kolb 24 4VAKDP Alvernon to Wilmot Roadway Segment Wilmot to Kolb Roadway Segment Valencia + I 10 Eastbound Valencia + Benson Highway Valencia + Littletown Rd. Valencia + I 10 Westbound Valencia (Eastbound) + Kolb Rd. Valencia + Wilmot Valencia Rd.+ Desert View High School Valencia Rd: Kolb Rd to Houghton Rd Not Started Kolb Rd.: Connection to Sabino Canyon Tanque Verde Rd: Catalina Hwy to Houghton Rd Speedway Blvd: Camino Seco to Houghton Valencia Rd: Kolb Rd to Houghton Rd Kolb, Et Extension to Sabino Sbi Canyon Kolb Rd.: Kolb + Tanque Verde Kolb Road s Tanque Verde Rd.: Catalina Hwy to Houghton Rd Tanque Verde Rd. + Houghton Rd Tanque Verde Rd.: Catalina Hwy to Houghton Rd Tanque Verde Rd.: Catalina Hwy to Houghton Rd Speedway: Camino Seco to Houghton Road Segment Speedway + Camino Seco Speedway + Harrison Speedway + Houghton Speedway at Igo Pedestrian Crossing 9/19/2016 2:36:28 PM 1 4 of 60

5 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Speedway at Schrader Lane Pedestrian Crossing Speedway Bus Pull out #1 Speedway + Camino Seco Speedway Bus Pull out #2 Speedway + Harrison Speedway Bus Pull out #3 Speedway + Harrison Speedway Speedway Broadway Blvd: Camino Seco to Houghton Broadway Blvd: Camino Seco to Houghton 22nd St: Camino Seco to Houghton Rd Not Started 22nd St: Camino Seco to Houghton Rd Harrison Rd. Irvington to Golf Links Not Started Harrison Rd. Irvington to Golf Links Houghton Rd. Golf Links to Tanque 32_a SR1_ Verde Houghton Rd. Golf Links to Tanque Verde Houghton Rd. Old Spanish Trail to 32_b SR Tanque Verde Houghton Rd. Old Spanish Trail to Tanque Verde DCR Only Houghton Rd: Valencia to Old Spanish 32_c Trail DCR Houghton Roadway: Valencia to Old Spanish Trail DCR Houghton Rd.: I 10 to Valencia 32_d Houghton Roadway: I 10 to Valencia DCR only for road widening DCR Study DCR Study DCR Study Houghton Road: UPRR Bridge to I 10 32_e Houghton: UPRR Bridge to I 10 Houghton UPRR 32_f SR1D Reconstruct and widen RR bridge Bridge Deficiency Houghton Rd:Irvington to Valencia, Intersect Imp Old Vail Rd 32_g SR1E Houghton Roadway: Segment 3 Irvington to Valencia Houghton Roadway: Segment 1 Old Spanish Trl to Golf Links Houghton Roadway: Segment 4 Irvington to I 10 Houghton Roadway + Drexel Houghton Roadway + Mary Ann Cleveland Houghton Roadway + Poor Man Houghton Roadway + Valencia Vl Intersection ti Improvement Houghton Roadway + Irvington Houghton Roadway: Houghton Greenway 500 ft North of Irvington to 1000 ft south of Valencia Greenway Houghton Roadway: Greenway along Eastside, I 10 to 1000 ft South of Valencia Greenway Houghton Roadway: Greenway along Eastside, 500 ft North of Irvington to 22nd St Greenway Houghton Roadway: Greenway along Eastside, Broadway to Tanque Verde Greenway Houghton Roadway: Bus Pull out 500ft North of E. Irvington Rd. Houghton Roadway: Houghton Roadway: Houghton Rd: Broadway to 22nd, Intersection 32_h SR1F Houghton: Broadway to 22nd Street Road Segment Houghton Roadway + Broadway (plus roadway taper) Houghton + Broadway Intersection Bikelanes Houghton Roadway + Broadway sidewalks Houghton Roadway: Greenway along Eastside: Broadway to 22nd Street Greenway 9/19/2016 2:36:28 PM 1 5 of 60

6 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Houghton: Valencia to Mary Ann Cleveland Way 32_i Not Started Houghton: Valencia to Mary Ann Cleveland Way Houghton: Valencia to Mary Ann Cleveland Way Bikelanes Houghton Road: 22nd to Irvington 32_j Houghton Road, widen from 22nd to Irvington Houghton Rd. I 10 to Golf Links 32aa SR Houghton Rd. Golf Links to Tanque Verde Wilmot North of Sahuarita Rd 33 4RTWNS Wilmot North of Sahuarita Rd. Wilmot North of Sahuarita Rd.: Wilmot + Sahuarita Sahuarita Sahuarita Road: I 19 to Country Club 34_a 6.04 Sahuarita Roadway: Segment 1= I 19 to La Vilita Roadway Segment 4= Azatlan> CC Rd Segment Nogales Hwy to Country Club Roadway Segment 2= (I19) Rancho Sahuarita>La Villita Roadway Segment 3=La Villita to Azatlan Ave. Sahuarita Roadway + La Villita Sahuarita Roadway + Ranch Sahuarita Sahuarita Roadway + Nogales Hwy Sahuarita Road + Country Club Sahuarita Roadway: Pedestrian crossing at Underpass (In front of Town Hall) Pedestrian Crossing Sahuarita Roadway: Bikelanes La Villita> CC Rd Segment 3 4: La Villita to Azatlan Ave. s: La Villita> CC Rd Segment 3 4: La Villita to Azatlan Ave. Sahuarita Roadway: La Villita to Country Club Wildlife Crossings Wildlife Linkages I 19: NB Frontage Rd Part I 19 Frontage Road: Canoa Ranch to Continental Rd. I 19 Frontage Road: I 19 + Conoa I 19 Frontage Road: I 19 + Continental I 19 Frontage Road: Canoa Ranch to Continental Rd. Bikelanes Grant / Craycroft Intersection 36_a SN Grant/Craycroft Grant/Craycroft: Bus Pull out #1 Grant/Craycroft: Bus Pull out #2 Grant/Craycroft: Bus Pull out #3 Alamo Wash Bridge (Grant/Craycroft Intersection) Railroad Safety Golf Links/Wilmot Intersection 36_b SN Golf Links/Wilmot Bus Pull out #1: Golf Links/Wilmot Bus Pull out #2: Golf lflinks/wilmot Bus Pull out #3: Golf Links/Wilmot Ft Lowell/Campbell Intersection 36_c SN Ft. Lowell/Campbell Bus Pull out Ft. Lowell/Campbell Bus Pull out Ft. Lowell/Campbell Bus Pull out Ft. Lowell/Campbell Bus Pull out Ft. Lowell/Campbell Starr Pass/Mission Rd Intersection 36_d SN Starr Pass/Mission Wilmot/Park Place Intersection 36_e 5.07 Wilmot/Park Place Starr Pass/La Cholla Intersection 36_f 6.07 Starr Pass/La Cholla 6th Ave / Euclid Ave Signal Upgrade 36_g SG Sixth/Euclid 9/19/2016 2:36:28 PM 1 6 of 60

7 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Country Club/Pima Signal Upgrade 36_h SG Country Club/Pima Nogales/Drexel Signal Upgrade 36_i SG Nogales/Drexel Stone/Glenn Signal Upgrade 36_j SG Stone/Glenn Old Vail/Valencia Signal 36_k Old Vail/Valencia Rita/Old Vail Traffic Signal 36_l Rita/Old Vail South South Intersections 36_m South Intersection #1: 29th St / 10th Ave South Intersection #2: 29th St / 4th ave South Intersection #3: 29th St / 6th Ave South Intersection #4: 36th St / 4th Ave South Intersection #5: 36th St / 6th Ave South Intersection #6: 39th St / 6th Ave Sahuarita Alpha Ave/Duval Mine Intersection 36_n Alpha Ave./Duval Mine Sahuarita Duval Mine/La Canada Intersection 36_o Duval Mine/La Canada Oro Valley Lambert Ln/La Cholla Intersection 36_p Lambert Lane/La Cholla La Cholla/Overton Intersection 36_q La Cholla/Overton Benson Hwy/Valencia Intersection 36_r Valencia/Benson Hwy Valencia/Wilmot Intersection 36_s Valencia/Wilmot Tanque Verde/Soldier Trail Intersection 36_t Tanque Verde/Soldier Trail Ina Rd / Wade Rd Intersection 36_u Ina + Wade Marana Silverbell/Ina Intersection 36_v Silverbell/Ina Tohono O'odham Mission/Valencia Intersection 36_w Mission/Valencia Houghton Rd./Sahuarita Rd. Intersection ti 36_x Houghton/Sahuarita Oro Valley Glover/La Cholla Safety Improvement & School Crossing 36_y Glover/La Cholla RTA Kolb and Valencia intersection reconstruction 36_z Valencia/Kolb Marana Silverbell/Coachline Intersection Improvements 36aa Silverbell/Coachline Camino Seco/Wrightstown s 36ab Camino Seco/Wrightstown Flowing Wells Rd. and Wetmore s 36ac /19/2016 2:36:28 PM 1 7 of 60

8 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Flowing Wells + Wetmore Sahuarita Pima Mine Rd./Rancho Sahuarita Blvd. Traffic Signal 36ad Pima Mine Rd./Rancho Sahuarita Blvd. Traffic Signal Oracle and Auto Mall Design 36ae Oracle and Auto Mall Design Alvernon Way and Valencia Rd. s 36af 4RTAWV 8.08 Valencia/Alvernon Way Valencia Rd./Alvernon Bus Pull out Grant and Rosemont Design and Build 36ag Grant and Rosemont Design and Build Campbell Ave./Skyline shoulder widening, left turn bay 36ah 4RTCAS Campbell/Skyline Palo Verde Rd. and Michigan St./Coach Dr. 36ai Palo Verde/Michigan & Coach Detection cameras 36aj Detection Cameras, Intersection #01: 22nd St / Harrison Rd Detection Cameras, Intersection #02: 22nd / Kolb Detection Cameras, Intersection #03: 22nd / Park Ave Detection Cameras, Intersection #04: 22nd / Wilmot Rd Detection Cameras, Intersection #05: Ajo Way / 12th Ave Detection Cameras, Intersection #06: Ajo Way / 6th Ave Detection Cameras, Intersection #07: Ajo Way / Park Ave Detection Cameras, Intersection #08: Broadway Blvd / Chantilly Dr Detection Cameras, Intersection #09: Broadway Blvd / Craycroft Rd Detection Cameras, Intersection #10: Broadway Blvd / Kolb Rd Detection Cameras, Intersection #11: Broadway Blvd / Wilmot Detection Cameras, Intersection #12: Campbell Ave / River Rd Detection Cameras, Intersection #13: Fort Lowell / Stone Ave Detection Cameras, Intersection #14: Golf Links / Harrison Detection Cameras, Intersection #15: Golf Links / Pantano Rd Detection Cameras, Intersection #16: Grant Rd / 1st Ave Detection Cameras, Intersection #17: Grant Rd / Campbell Ave Detection Cameras, Intersection #18: Grant Rd / Rosemont Blvd Detection Cameras, Intersection #19: Irvington Rd / Midvale Park Rd Dt Detection ti Cameras, Intersection ti #20: Kolb lbrd / Speedway Bld Intersection ti Improvement Detection Cameras, Intersection #21: Prince Rd / Mountain Ave Detection Cameras, Intersection #22: Rita Rd / Houghton Rd Detection Cameras, Intersection #23: River Rd / 1st Ave Detection Cameras, Intersection #24: Speedway Blvd / Alvernon Way Detection Cameras, Intersection #25: Speedway Blvd / Campbell Detection Cameras, Intersection #26: Speedway Blvd / Cherry Ave Detection Cameras, Intersection #27: Speedway Blvd / Euclid Ave Detection Cameras, Intersection #28: Speedway Blvd / Mountain Ave Detection Cameras, Intersection #29: Speedway Blvd / Park Ave Detection Cameras, Intersection #30: Speedway Blvd / Blvd Detection Cameras, Intersection #31: Speedway Blvd / Wilmot Rd Detection Cameras, Intersection #32: Swan Rd / Camp Lowell Dr Detection Cameras, Intersection #33: Tanque Verde / Sabino Canyon Detection Cameras, Intersection #34: Valencia Rd / 12th Ave 36ak Detection Cameras, Intersection #35: Valencia Rd / Nexus Dr 9/19/2016 2:36:28 PM 1 8 of 60

9 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Detection Cameras, Intersection #36: Wilmot Rd / Park Place Dr. La Cholla Blvd./River Rd. Intersection Improvements 36ak La Cholla + River La Cholla + River: Bus Pull out Tanque Verde and Pima Intersection Improvements 36al Tanque Verde/Pima Camino Verde and Valencia Rd. s 36am 4.08 Camino Verde/Valencia Wilmot and Nicaragua Traffic Signal 36an Wilmot/Nicaragua (design only) Mona Lisa Rd. at Orange Grove s 36ao Mona Lisa + Orange Grove Ina Rd. and Oracle Rd. Intersection Improvement 36ap 4RTIRO Ina + Oracle Alvernon/Los Reales Traffic Signal 36aq Alvernon/Los Reales Continental Rd and Camino del Sol Traffic Circle 36ar Continental/Camino del Sol 6th St/Highland Intersection Improvements 36at SN th/Highland Marana Tangerine and Thornydale 36au ST Tangerine + Thornydale Prince Rd / Runway Dr Traffic Signal 36av Prince/Runway Dr Traffic Signal Marana Cortaro Rd. Widening and Striping 36aw Silverbell/Cortaro Sahuarita Old Nogales Highway & Nogales Hwy 36ax RTA Regional Intersection MUTCD Compliance Program Nogales/Old Nogales Intersection Improvement Golf Links/Kolb Rd. Intersection Improvement Kolb Rd.: Ventana Canyon and Mt. Shadows Cardinal/Valencia Road Intersection Improvements 36ay Not Started 36az 4OTNHS ba bb bc 4RTVLS Old Nogales Highway & Nogales Hwy Regional lintersection MUTCD Compliance Program Intersection ti Improvement Nogales/Old Nogales Golf Links/Kolb Rd. Golf Links/Kolb Rd. Intersection #1 Golf Links/Kolb Rd. Intersection #2 Golf Links/Kolb Rd. Intersection #3 Kolb Rd.: Ventana Canyon and Mt. Shadows Cardinal/Valencia Road s 9/19/2016 2:36:28 PM 1 9 of 60

10 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Rita Rd: I 10 to UPRR 36bd SR9A Rita Rd: I 10 to UPRR Rita Rd: I 10 to UPRR Rail Improvement Railroad Safety Rita Rd: I 10 to UPRR Harrison/Irvington Signalization 36be Harrison/Irvington Signalization ADOT I 10 Interchange Signals Connection into ITOC System 36bf I 10 Interchange Signals Connection into ITOC System: Sub Project #1 I 10 Interchange Signals Connection into ITOC System: Sub Project #2 I 10 Interchange Signals Connection into ITOC System: Sub Project #3 I 10 Interchange Signals Connection into ITOC System: Sub Project #4 I 10 Interchange Signals Connection into ITOC System: Sub Project #5 ADOT Ajo Signal Interconnect 36bg Ajo Signal Interconnect ADOT Regional Traffic Signal Data to ITOC 36bh Regional Traffic Signal Data to ITOC Oro Valley Count Down Pedestrian Heads 36bi Pedestrian Countdown Head: N. First Ave / Palisades Pedestrian Countdown Head: La Canada / W Naranja Dr Pedestrian Countdown Head: La Canada W Lambert Pedestrian Countdown Head: La Cholla Blvd / Glover Rd Pedestrian Countdown Head: La Cholla Blvd + Tangerine Pedestrian Countdown Head: First Ave / Lambert Pedestrian Countdown Head: First Ave / E Naranja Pedestrian Countdown Head: La Cholla Dr. / W Lambert Pedestrian Countdown Head: Northern / Magee Pedestrian Countdown Head: Innovation Park / Rancho Vistoso Pedestrian Countdown Head: First Ave + Tangerine Pedestrian Countdown Head: Innovation Park + Tangerine Pedestrian Countdown Head: La Cholla Blvd / W Naranja Dr Pedestrian Countdown Head: First Ave Pedestrian Countdown Head: La Canada + Tangerine Speedway/6th Avenue Signal Upgrade 36bj SG Speedway/6th Avenue Signal Upgrade Left Turn Phasing Installations 36bk Valencia + Rita Rd. Speedway + Park Ave Speedway + Mountain Speedway + Cherry 2009 City of Intersection Improvements 36bl SN Wilmot / Nicaragua Dr St. Mary's + Silverbell Tanque Verde / Pima Street Oracle + Auto Mall Grant/Rosemont Sahuarita Pima Mine Rd./Nogales Highway Traffic Signal 36bm #N/A 40_t 40_t Pima Mine Rd/Nogales Hwy Traffic Signal Pima Mine Rd./Nogales Highway Traffic Signal Stone Avenue Gateway: Speedway to Drachman 36bn 30 9/19/2016 2:36:28 PM 1 10 of 60

11 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Stone Avenue Gateway: Speedway to Drachman Bus Pull out Stone Speedway NB Bus Pull out Stone Drachman SB Bikelane Colossal Cave Rd UPRR Success Drive 36bo 4rtccs Colossal Cave Rd UPRR Success Drive La Villita/Rancho Sahuarita Sahuarita 36bp Intersection La Villita/Rancho Sahuarita Intersection Kolb/UATech ParkSignal 36bq SG Kolb/UA Tech Park Signal Rancho Vistoso Blvd at Vistoso Oro Valley 36br Highlands Signal Rancho Vistoso Blvd at Vistoso Highlands Signal Ina and Thornydale: EB/WB right turn Marana 36bs ST lane widening Ina Rd. + Thornydale: EB/WB right turn lane widening Orange Grove Rd./Silverbell Rd. 36bt Intersection Orange Grove Rd./Silverbell Rd. Intersection Elderly and Pedestrian Safety RTA Improvements Various Pedestrian Crossings Euclid/2nd St 37_a th Avenue/14th Street (formerly Euclid/2nd.) Stone / Cushing (formerly at 37_b Euclid / 5th), TIP Stone/Cushing (formerlyeuclid/5th. TIP 25.07) Santa Clara/Drexel 37_c Santa Clara/Drexel Fennimore Ave / Tanque Verde Rd 37_d Camino Fennimore/Tanque Verde Camino La Zorrela/Orange Grove 37_e Camino La Zorella/Orange Grove Pascua Yaqui Hohokam 37_f Hohokam San Xavier Elderly/Ped l d Safety Sf Tohono O'odham 37_g Improvements San Xavier Elderly/Pedestrian Master Plan Broadway / Sarnoff Dr. 37_h Broadway / Sarnoff Dr Euclid / Lester 37_i Euclid / Lester Pedestrian Crossing Agua Caliente Safe Routes to School 37_j 4SRSAC Agua Caliente Safe Routes to School:Limberlost Rd.: Melpomene Way to Agua Caliente School Agua Caliente Safe Routes to School:Melpomene Way:Fort Lowell Rd. to Catalina Hwy Agua Caliente Safe Routes to School:Melpomene Way:Limberlost Rd. to Camino Miramonte Improvements: Various Locations 37_k Improvements: Sub Project #01 12th Ave / Michigan Dr Improvements: Sub Project #02 12th Ave: 38th St to 44th St 9/19/2016 2:36:28 PM 1 11 of 60

12 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Improvements: Sub Project #03 5th St / Alvernon Way Improvements: Sub Project #04 6th Ave: I 10 to 19th St Improvements: Sub Project #05 6th Ave: President St to Michigan Dr Improvements: Sub Project #06 6th St / Stone Ave Improvements: Sub Project #07 Broadway Blvd: Kolb Rd to Pantano Rd Improvements: Sub Project #08 Broadway Blvd: Park Ave to Campbell Ave Improvements: Sub Project #09 Broadway: Campbell Ave to Craycroft Rd Improvements: Sub Project #10 Campbell: Grant Rd to Elm St Improvements: Sub Project #11 Escalante Rd: Kolb Rd to Pantano Rd Improvements: Sub Project #12 Euclid Ave: Speedway Blvd to Broadway Blvd Improvements: Sub Project #13 Fort Lowell Rd / Fontana Ave Improvements: Sub Project #14 Glenn St: Swan Rd to Craycroft Rd Improvements: Sub Project #15 Golf Links Rd: Pantano Rd to Bonanza Ave Improvements: Sub Project #16 Grant Rd: Country Club Rd to Alvernon Way Improvements: Sub Project #17 Grant Rd: Country Club Rd to Columbus Blvd Improvements: Sub Project #18 Harrison Rd: Old Spanish Tr to Golf Links Rd Improvements: Sub Project #19 Kino Pkwy: Aviation Pkwy to Benson Hwy Improvements: Sub Project #20 Mountain Ave: Grant Rd to Fort Lowell Rd Improvements: Sub Project #21 Palo Verde Rd: Glenn St to Grant Rd Improvements: Sub Project #22 Pantano Rd: Escalante Rd to Golf Links Rd Improvements: Sub Project #23 Pantano Rd: Escalante Rd to Irvington Rd Improvements: Sub Project #24 Pantano Rd: Speedway Blvd to Wrightstown Rd Improvements: Sub Project #25 Park Ave: Irvington Rd to Valencia Rd Improvements: Sub Project #26 Pima St: Craycroft Rd to Wilmot Rd Improvements: Sub Project #27 Pima St: Swan Rd to Craycroft Rd Improvements: Sub Project #28 Silverbell Rd: Speedway Blvd to St Mary's Rd Improvements: Sub Project #29 Speedway Blvd: Rosemont Blvd to Kolb Rd Improvements: Sub Project #30 St. Mary's: I 10 to Silverbell Rd Improvements: Sub Project #31 Stella Rd: Kolb Rd to Pantano Rd Improvements: Sub Project #32 Swan Rd: Rillito River to 22nd St Improvements: Sub Project #33 Blvd: Irvington Rd to Valencia Rd Improvements: Sub Project #34 Wetmore Rd: Oracle Rd to 1st Ave Improvements: Sub Project #35 Wilmot Rd: Broadway Blvd to Golf Links Rd Improvements: Sub Project #36 1st Ave & Ft Lowell Rd Improvements: Sub Project #37 5th St & Craycroft Rd Improvements: Sub Project #38 6th St & 3rd Ave Improvements: Sub Project #39 12th Ave and Nebraska St Improvements: Sub Project #40 22nd St & Craycroft Rd Improvements: Sub Project #41 Ajo Way & Park Ave Improvements: Sub Project t#42 Alvernon Way & 22nd St Improvements: Sub Project #43 Alvernon Way & Broadway Blvd Improvements: Sub Project #44 Alvernon Way & Fort Lowell Improvements: Sub Project #45 Alvernon Way and Hayne Street Improvements: Sub Project #46 Broadway Blvd & Camino Seco Improvements: Sub Project #47 Broadway Blvd & Swan Rd (SE) Improvements: Sub Project #48 Broadway Blvd & Swan Rd (NW) Improvements: Sub Project #49 Campbell Ave & Speedway Blvd Improvements: Sub Project #50 Craycroft & Speedway Improvements: Sub Project #51 Ft Lowell Rd & 1st Ave Improvements: Sub Project #52 Grant Rd & Alvernon Way Improvements: Sub Project #53 Pantano Rd and Speedway Improvements: Sub Project #54 Prince Rd & Campbell Ave Improvements: Sub Project #55 Prince Rd & Oracle Rd (NW) Improvements: Sub Project #56 Prince Rd & Oracle Rd (SE) Improvements: Sub Project #57 Prince Rd & 1st Ave 9/19/2016 2:36:28 PM 1 12 of 60

13 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Improvements: Sub Project #58 Prince Rd & Stone Rd (SE) Improvements: Sub Project #59 Prince Rd & Stone Rd (SW) Improvements: Sub Project #60 Speedway Blvd & 6th Ave Improvements: Sub Project #61 Speedway Blvd & Craycroft Improvements: Sub Project #62 Speedway Blvd & Euclid Ave Improvements: Sub Project #63 Speedway Blvd & Rook Ave Improvements: Sub Project #64 Speedway Blvd: Stone Euclid Improvements: Sub Project #65 St Mary's Rd & I 10 Improvements: Sub Project #66 St Mary's Rd at Furr's Cafeteria (SW Bonita Ave) Improvements: Sub Project #67 Stone Ave & Blacklidge Dr 37_m Improvements: Sub Project #68 Speedway Blvd: Stone Ave Improvements: Sub Project #69 Speedway Wilmot Sam Hughes Elementary SRTS 37_m Sam Hughes Elementary SRTS: Sub Project #1 3rd St: Country Club Rd Campbell Ave Sam Hughes Elementary SRTS: Sub Project #2 4th St: Country Club Rd Campbell Ave Sam Hughes Elementary SRTS: Sub Project #3 Norton Ave: 1st St 6th St Sam Hughes Elementary SRTS: Sub Project #4 Wilson Ave: 1st St 6th St 17th/Swan 37_n th/Swan West Curtis Rd at N. Shannon 37_o 4RTHCS Curtis + Shannon Valencia Rd Street Lighting and 37_p 4RTVLS 2.08 Valencia Street Lighting / Camino De La Tierra to Cardinal +Lighting Valencia Street Lighting / Westover to Cardinal +Lighting Sahuarita Great Expectations School Flasher Assembly 37_q Great Expectations School Flasher Pedestrian Crossing Wrightstown/Fountain Park 37_r Wrightstown/Fountain Park South 31st St. and 6th Ave. Pedestrian Crossing 37_s th/31st South 34th St. and 6th Ave. Pedestrian Crossing 37_t th/34th Euclid Ave / 9th Ave 37_u Euclid/9th Ave Pascua Yaqui Health Center to Senior Center Project 37_ v _w Health Center to Senior Center Camino Benem: Calle Torim to Senior Center Health Center to Senior Center PYT Health Center to Senior Center Oro Valley La Cholla Pedestrian Improvements (SRTS) 37_w La Cholla School Walking Path Pathway Homer Davis School Bike/Ped Enhancement 37_x 4HDBPE Homer Davis Safe Routes to School Pedestrian Crossings 37_y SH th/Alvord 3rd/Swan Camino Seco/Kenyon Country Club/Silver Drexel/Del Moral Drexel/Liberty 9/19/2016 2:36:28 PM 1 13 of 60

14 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Escalante/Prudence Esmond/Rita (Desert Sky 1) Euclid/9th Flower/Alvernon Grande/St. Clair La Paloma Academy PELICAN ; Golf Links / E. Lakeside Pkwy North Sahuara Ave/East Pima Street Old Spanish Trail/29th Old Spanish Trail/Kenyon Rita/Via Del Tiembre Starr Pass/Santa Cruz Swan/17th Wilson/6th Wrightstown/Fountain Park 2nd Ave/Speedway Pedestrian Refuge 37_z Fruchthendler Elementary School Walking Paths Picture Rocks & Desert Winds Safe Routes to School 37aa ab 4PRDWE nd/Speedway Pedestrian Refuge Fruchtendler School Walking Paths Pedestrian Refuge Picture Rocks Safe Routes to Schools: Rudasill Rd: Avra Rd to Chaparral Rd 37ac Picture Rocks Safe Routes to Schools: Rudasill Rd: Chaparral Rd to Sanders Rd Picture Rocks Safe Routes to Schools: Sanders Rd: Rudasill Rd to Sunset Dr beacon at 6th Ave and 14th St. 37ac beacon at 6th Ave and 14th St. Camino de Oeste 37ad 5.1 Camino de Oeste Continental School Safe Routes to School 37ae 4CEMSR af Shared Use Path White House Canyon Rd. Madera Reserve Rd Pathway Bikelines Whitehouse Canyon Rd. Continental Rd 18th St / Main Ave Pedestrian Refuge 37af 7.1 Main/18th Pedestrian Refuge Pedestrian Refuge Manzanita Elementary Safe Routes to School 37ag 8.1 Manzanita Elementary Safe Sf Routes to School Sh Safe Routes to School Camino del Sol Pedestrian Ramps 37ah 9.1 Camino del Sol Pedestrian Ramps Ramps Broadway/Old Spanish Trail Pelican 37ai 10.1 Broadway/Old Spanish Trail Pelican Signal Pelican Oaktree/Drexel Pedestrian Refuge 37aj 11.1 Oaktree/Drexel Pedestrian Refuge Pedestrian Refuge School Signals Package I 37ak SH School Signals Package I: 22nd Street / Magnolia School Signals Package I: Stone Ave / King School Signals Package I: Park Ave / 33rd St 37al School Signals Package I: Campbell Ave / Bantam School Signals Package I: La Cholla Blvd / Merlin Speedway/10th 37al 13.1 Speedway/10th 9/19/2016 2:36:28 PM 1 14 of 60

15 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type 22nd St/Lakeshore and La Cholla/Ocelot 37am an 22nd St/Lakeshore La Cholla/Ocelot Speedway/Arcadia 37an 15.1 Speedway/Arcadia South 26th St and 10th Ave 37ao th and 10th South Upgrades 37ap 17.1 Not Started Upgrades and Safe Routes to School Package 2 37aq and SRTS Package 2: Laguna Elementary SRTS Shannon Rd: Curtis to Diamond and SRTS Package 2: Camino Del Sol, Placita de la Cotonia to Canoa Rd and SRTS Package 2: Centennial/Flowing Wells Jr H. (Wetmore:La Cholla Romero 37ar Camino De Oeste: Valencia to Tetakusim Rd. and SRTS and SRTS Package 2: Manzanita Elem. SRTS; La Encantada to Manzanita (Design) South 4th Avenue Street Lighting Improvements City of South Tuc. 37ar th Avenue Street Lighting Improvements City of South Tuc. Street Lighting Tohono O'odham San Xavier: Little Nogales Mission Gateway Path 37as San Xavier: Little Nogales Mission Gateway Path Pathway 22nd/Avenida Sirio 37at SH nd/Avenida Sirio Campbell/Ninth 37au SH Campbell/Ninth Craycroft/Ft. Lowell Park 37av SH Craycroft/Ft. Lowell Park Grant/Sahuara Bike 37aw SH Grant/North Sahuara Ave Bike Palo Verde s 37ax 4RTPAM Palo Alvord Palo Milton Summerhaven 37ay 4SUMSW Summerhaven La Cholla / Ocelot 37az La Cholla / Ocelot Desert Sky 1 37ba Desert tsky 1 Mary Ann Cleveland at Kush 37bb 4TAMAC Mary Ann Cleveland at Kush Laguna Elementary School Pedestrian Enhancement Project 37bc 4LEMSI Laguna Elementary School Pedestrian Enhancement Project. Shannon Rd. adjacent to Flowing Wells District Park Pedestrian Enhancement Nogales and Olive Crossing 37be Projects, Valencia Corridor 38_a s, Valencia Corridor: 01 Valencia Rd + Caballo Rd EB s, Valencia Corridor: 02 Valencia Rd + Caballo Rd WB s, Valencia Corridor: 03 Valencia Rd + Camino de la Tierra EB s, Valencia Corridor: 04 Valencia Rd + Camino de la Tierra WB s, Valencia Corridor: 05 Valencia Rd + Camino de Oeste EB s, Valencia Corridor: 06 Valencia Rd + Camino de Oeste WB 9/19/2016 2:36:28 PM 1 15 of 60

16 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type s, Valencia Corridor: 07 Valencia Rd + Mark Rd EB s, Valencia Corridor: 08 Valencia Rd + Mark Rd WB s, Valencia Corridor: 09 Valencia Rd + Sorrell Ln EB s, Valencia Corridor: 10 Valencia Rd + Sorrell Ln WB Projects, Package 1 38_b Pkg 01: 01 Broadway Blvd + Alvernon Way Pkg 01: 02 Country Club Rd + Kleindale Rd NB Pkg 01: 03 Country Club Rd + Kleindale Rd SB Pkg 01: 04 Glenn St + Oracle Rd NB Pkg 01: 05 Grant Rd + Alvernon Way Pkg01: 06 Irvington Rd+ Campbell Ave Pkg 01: 07 Irvington Rd + Campbell Ave Projects, Package 2 38_c Pkg 02: 01 Ajo Way + Park Ave Pkg 02: 02 Grant Rd + Oracle Rd Pkg 02: 03 Speedway Blvd + 6th Ave Pkg 02: 04 Stone Ave + Yavapai Rd Projects, Package 3 38_d Pkg 03: 01 Broadway Blvd + Country Club Rd Pkg 03: 02 Fort Lowell Rd + Dodge Blvd Pkg 03: 03 Irvington Rd + Park Ave Pkg 03: 04 Los Reales Rd + Nogales Hwy OWP TDOT Accessible Bus Stop 38_e Accessible Palo Verde Corridor Transit Improvements 38_f 4RTPVC Palo Verde Corridor Palo Verde Rd. / Ajo Way NB Palo Verde Corridor Palo Verde Rd. / Ajo Way SB Palo Verde Corridor Palo Verde Rd. / Benson Hwy NB Projects, Package 4 38_g s Package 4: Subproject 1 Sixth St + Euclid Ave NB s Package 4: Subproject 2 Sixth St + Highland Ave WB s Package 4: Subproject 3 Sixth St + Campbell Ave WB s Package 4: Subproject 4 Grant Rd + Silverbell Rd EB 38_h s Package 4: Subproject 5 Fifth St + Alvernon Way SB s Package 4: Subproject 6 22nd St + Country Club Rd SB Sahuarita Sahuarita Town Hall Park and Ride 38_h Sahuarita Park & Ride Transit Facility: Park & Ride Package 5 38_i s Package 5: Subproject1: 29th St / Craycroft ftrd EB s Package 5: Subproject2: Congress St WB / Avenida Del Convento WB (El Rio Neighborhood Health Ctr) 38_j s Package 5: Subproject3: Craycroft Rd / 29th St NB s Package 5: Subproject4: Flowing Wells Rd / Roger Rd SB RTA Packages #6 #15 38_j RTA pkg 06: Alvernon Way / Ft Lowell Rd SB RTA Pkg 06: Alvernon Way / Glenn St NB RTA Pkg 06: Alvernon Way / Glenn St SB RTA pkg 06: Alvernon Way / Pima St NB RTA pkg 06: Alvernon Way / Pima St SB RTA pkg 07: 1st Ave / Ft Lowell Rd NB RTA pkg 07: 1st Ave / Ft Lowell Rd SB RTA pkg 07: 1st Ave / Prince Rd SB RTA pkg 07: 1st Ave / Roger Rd SB RTA pkg 07: Ft Lowell / 1st Ave EB RTA pkg 08: 22nd St / Country Club Rd WB 9/19/2016 2:36:28 PM 1 16 of 60

17 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type RTA pkg 08: 29th St / Columbus Blvd EB RTA pkg 08: St. Mary's Rd / Silverbell Rd EB RTA pkg 08: Wilmot Rd / Broadway Blvd SB RTA pkg 09: Alvernon Way / 22nd St SB RTA pkg 09: Alvernon Way / 29th St NB RTA pkg 09: Alvernon Way / 32nd St SB RTA pkg 10: Campbell Ave / Adams St SB RTA pkg 10: Campbell Ave / Prince Rd SB RTA pkg 10: Ft. Lowell Rd / Alvernon Way WB RTA Pkg 11: Oracle Rd + Glenn St SB RTA pkg 11: OracleRd+ Prince Rd EB RTA pkg 11: Oracle Rd + Prince Rd NB RTA pkg 11: Oracle Rd + Prince Rd SB RTA pkg 12: 12th Ave / Nebraska St NB RTA pkg 12: 12th Ave / Valencia Rd NB RTA pkg 12: 6th Ave / Veterans Blvd NB RTA pkg 12: Park Ave / Irvington Rd NB RTA pkg 12: Valencia Rd / San Fernando Rd EB RTA pkg 13: Speedway Blvd / Euclid Ave EB RTA pkg 13: Speedway Blvd / Swan Rd EB RTA pkg 13: Speedway Blvd / Swan Rd WB RTA pkg 13: Speedway Blvd / Wilmot Rd EB RTA pkg 13: Swan Rd / Speedway Blvd SB RTA pkg 14: 6th Ave / 26th St NB RTA pkg 14: 6th Ave / 29th St NB RTA pkg 14: 6th Ave / 29th St SB RTA pkg 14: 6th Ave / 36th St NB RTA pkg 14: 6th Ave / 39th St NB RTA pkg 14: 6th Ave / 39th St SB RTA pkg 15: Oracle Rd / C. Adobes Dr NB RTA pkg 15: Oracle Rd / C. Adobes Dr SB RTA pkg 15: Oracle Rd / Cresta Loma NB RTA pkg 15: Oracle Rd / Cresta Loma SB RTA pkg 15: Oracle Rd / Las Lomitas NB RTA pkg 15: Oracle Rd / Las Lomitas SB RTA pkg 15: Oracle Rd / Lavery Ln SB RTA pkg 15: Oracle Rd / Rudasill Rd SB RTA pkg 13: Harrison / 22nd SB Marana Northern Marana Bus Stop 38_k 71.1 Marana Civic i Center Pull outs: #1 Civic i Center Marana Civic Center Pull outs: #2 Civic Center Marana Civic Center Pull outs: #3 Grier Rd/Sandario Rd. RTA s: Packages _l RTA Packages #16 Project #01 Stone Ave./ Prince Rd. NB RTA Packages #16 Project #02 RTA Packages #16 Project #03 RTA Packages #16 Project #04 RTA Packages #16 Project #05 RTA Packages #16 Project #06 RTA Packages #16 Project #07 RTA Packages #17 Project #01 RTA Packages #17 Project #02 RTA Packages #17 Project #03 RTA Packages #17 Project #04 RTA Packages #17 Project #05 9/19/2016 2:36:28 PM 1 17 of 60

18 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type RTA Packages #17 Project #06 RTA Packages #17 Project #07 RTA Packages #17 Project #08 Prince / First NB RTA Packages #18 Project #01 RTA Packages #18 Project #02 RTA Packages #18 Project #03 RTA Packages #18 Project #04 RTA Packages #18 Project #05 RTA Packages #18 Project #06 Speedway / Blvd WB RTA Packages #19 Project #01 RTABusPullout Packages #19 Project #02 RTA Packages #19 Project #03 RTA Packages #19 Project #04 RTA Packages #19 Project #05 RTA Packages #19 Project #06 RTA Packages #19 Project #07 Madera Canyon Canyon Wash (8302) 39_a SB406 01C 867 Madera Canyon Florida Canyon Wash Railroad Safety Madera Canyon Wash (8301) 39_b SB405 01C 151 Madera Canyon Medium Wash Railroad Safety Downtown Rail Safety Project 39_c Not Started Downtown Rail Safety Project Study Railroad Safety Sahuarita Pima Mine Rd. Bridge Replacement 39_d Pima Mine Santa Cruz River Bridge Deficiency Sabino Canyon Rd. Bridge 39_e Sabino Canyon Rd Bridge Rehabilitation Bridge Deficiency Speedway Blvd.: RR Underpass Reconstruction 39_f S Speedway/Union Pacific Railroad Underpass Railroad Safety Sahuarita La Canada El Toro Rd. Rail Crossing 39_g La Canada El Toro Rd Rail Crossing Railroad Safety Tohono O'odham San Xavier Rd Pedestrian Bridge 39_h San Xavier Rd Pedestrian Bridge Bridge Deficiency Marsh Station Road Bridge at Cienega Wash 39_i Marsh Station Road Bridge at Cienega Wash Bridge Deficiency Colossal Cave Road UPRR Success Dr., Ruthrauff ffuprr crossing 39_j 4RTCCS _k Colossal Cave Road UPRR Success Dr. Railroad Safety Ruthrauff UPRR Railroad Safety Oro Valley Rancho Vistoso Blvd Big Wash Bridge Barrier walls 39_k 2.1 Rancho Vistoso Blvd Big Wash Bridge Barrier walls Bridge Deficiency UPRR Nogales Branch Rail Safety 39_l 3.1 UPRR Nogales Branch Rail Safety Railroad Safety Ruthrauff UPRR 39_m 4.1 Ruthrauff UPRR Railroad Safety Golder Ranch Rd Bridge 39_n 72.1 Golder Ranch Rd Bridge Rehabilitation Bridge Deficiency Elephant Head Road Bridge Repair 39_o 4RTEHB 8.15 Elephant Head Road, over the Santa Cruz River Bridge Deficiency Golf Links Aviation Shared Use Path Bridge Deck Replacement 39_p Not Started 9/19/2016 2:36:28 PM 1 18 of 60

19 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Golf Links Aviation Shared Use Path Bridge deck rehab RTA Signalization Technology Signalization Technology: 29th St / 4th Ave Signalization Technology: 29th St / 6th Ave Signalization Technology: 29th St / 10th Ave Signalization Technology: 36th St / 4th Ave Signalization Technology: 36th St / 6th Ave Signalization Technology: 39th St / 6th Ave UPS/LED (20 intersections) 40_a UPS/LED Intersection #01: Ajo Way / 3rd Ave UPS/LED Intersection #02: Ajo Way / 6th Ave UPS/LED Intersection #03: Ajo Way / Park Ave UPS/LED Intersection #04: Alvernon Way / Elm St UPS/LED Intersection #05: Alvernon Way / 5th St UPS/LED Intersection #06: Campbell Ave / Elm St UPS/LED Intersection #07: Campbell Ave / 3rd Ave UPS/LED Intersection #08: Irvington Rd / 6th Ave UPS/LED Intersection #09: Nogales Hwy / Bilby Rd UPS/LED Intersection #10: Nogales Hwy / Drexel Rd UPS/LED Intersection #11: Nogales Hwy / Valencia Rd UPS/LED Intersection #12: Speedway Blvd / Alvernon Way UPS/LED Intersection #13: Speedway Blvd / Campbell Ave UPS/LED Intersection #14: Speedway Blvd / Cherry Ave UPS/LED Intersection #15: Speedway Blvd / Country Club Rd UPS/LED Intersection #16: Speedway Blvd / Euclid Ave UPS/LED Intersection #17: Speedway Blvd / Mountain Ave UPS/LED Intersection #18: Speedway Blvd / Park Ave UPS/LED Intersection #19: Speedway Blvd / Blvd UPS/LED Intersection #20: Valencia Rd / 12th Ave UPS/LED Intersection #21: Valencia Rd / 6th Ave UPS/LED Intersection #22: Valencia Rd / Calle Santa Cruz UPS/LED Intersection #23: Valencia Rd / Campbell Ave UPS/LED Intersection #24: Valencia Rd / I 19 UPS/LED Intersection #25: Valencia Rd / Santa Clara Ave UPS/LED Intersection #26: Valencia Rd / Blvd UPS/LED Intersection #27: UPS/LED Intersection #28: UPS/LED Intersection #29: UPS/LED Intersection #30: Pre emp on and Transit itpi Priority it 40_b Pre emption & Transit Priorty U of A Atlas Center 40_c SC U of A Atlas Study Ina Rd Corridor Signal Timing 40_d 4RTICS Ina Road Signal Coordination Regional Traffic Signal Central System 40_e Regional Traffic Signal Central System Traffic Signal Wireless Communication 40_f System Traffic Signal Wireless Communication System South Speed Alert Monitor Signs 40_g Not Started Speed Alert Monitor Systems South 27th St 6th Emergency Signal 40_h th Street & 6th Avenue Emergency Signal 9/19/2016 2:36:28 PM 1 19 of 60

20 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Traffic Signal Battery Backup System 40_i o RTA Traffic Signal Battery Backup System OWP PAG Regional Traffic Signal Services 40_j o RTA Traffic Signal Services (2008) Pima Association of Governments/RTA o RTA Traffic Signal Services (2009) Pima Association of Governments/RTA o RTA Traffic Signal Services (2010) Pima Association of Governments/RTA Fire Station 17 Flasher 40_k Fire Station 17 Flasher South UPS City of South 40_l #N/A 40_x 40_x Not Started UPS South Signals Town wide Signal Technology Upgrade Marana Marana Wireless Signal Upgrades 40_m Marana Wireless Signal Upgrades: N/S Thornydale Rd. & E/W Cortaro Rd. Oro Valley Wireless Signal Link 40_n Wireless Signal Link: First Ave Wireless Signal Link: La Canada / Tangerine Rd Wireless Signal Link: La Canada / W Lambert Wireless Signal Link: La Canada / W Naranja Drive Wireless Signal Link: La Cholla / Tangerine Wireless Signal Link: La Cholla Blvd / Glover Rd Wireless Signal Link: Lambert / First Ave Wireless Signal Link: N First / E Naranja Wireless Signal Link: N First Ave / Palisades Wireless Signal Link: N La Cholla Dr. / W Lambert Wireless Signal Link: Northern / Magee Wireless Signal Link: Rancho Vistoso Blvd / Innovation Park Wireless Signal Link: Tangerine / First Ave 40_o Wireless Signal Link: Tangerine / Innovation Park Wireless Signal Link: W Naranja Drive / N La Cholla Blvd Sahuarita Wireless signal & controller/equipment upgrades 40_o RTA Traffic Signal Wireless Communications Systems Real Time Signal Timing & Traffic Info 40_q SC Real Time Signal Timing & Traffic Info Regional Traffic Signal Operations Program 40_r 490V Regional ltraffic Signal Operations Program Regional Traffic Operations Center 40_s Not Started Regional Traffic Operations Center Sahuarita Town wide GPS Clock and Yellow LED Retrofit 40_u Not Started Signal Technology Improvement Oro Valley Signal Synchronization Oro Valley 40_v Various Locations Oro Valley UPS Oro Valley 40_w UPS Oro Valley Signals Transit Priority FY _y Transit Priority FY 2009 Signal Technology Upgrade Sahuarita UPS Sahuarita. 3 Intersections along Nogales HWY 40ak UPS Sahuarita Signals Intersection#1 UPS Sahuarita Signals Intersection#2 9/19/2016 2:36:28 PM 1 20 of 60

21 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type UPS Sahuarita Signals Intersection#3 NTCIP Communications 40al NTCIP Communications Regional Transportation Data Network 40am 40am Regional Transportation Data Network Sahuarita Speed Monitor Station Nogales Hwy 40an Nogales Highway Speed Monitor Station Oro Valley UPS Town of Oro Valley 40ao UPS / Wireless Signal Upgrade : First Ave / Main UPS / Wireless Signal Upgrade : Northern / Magee UPS / Wireless Signal Upgrade : Tangerine / First Ave UPS / Wireless Signal Upgrade : Tangerine Rd / Innovation Park 40ap UPS / Wireless Signal Upgrade : Tangerine Rd / La Cholla UPS / Wireless Signal Upgrade : First Ave / Main RTDN Mesh Network Expansion 40ap RTDN Mesh Network Expansion ADOT SR 77: Signalization Upgrade 40aq SR77 Signalization Upgrade: Project 01: Ajo Signal Interconnect SR77 Signalization Upgrade: Project 02: Regional Traffic Signal Data to ITOC SR77 Signalization Upgrade: Project 03: I 10 Interchange Signals Connection into ITOC System: Sub Project #1 SR77 Signalization Upgrade: Project 04: I 10 Interchange Signals Connection into ITOC System: Sub Project #2 SR77 Signalization Upgrade: Project 05: I 10 Interchange Signals Connection into ITOC System: Sub Project #3 SR77 Signalization Upgrade: Project 06: I 10 Interchange Signals Connection into ITOC System: Sub Project #4 SR77 Signalization Upgrade: Project 07: I 10 Interchange Signals Connection into ITOC System: Sub Project #5 SR77 Signalization Upgrade: Project 08: SR77 Signalization Upgrade: Project 09: SR77 Signalization Upgrade: Project 10: SR77 Signalization Upgrade: Project 11: SR77 Signalization Upgrade: Project 12: SR77 Signalization Upgrade: Project 13: SR77 Signalization Upgrade: Project 14: SR77 Signalization Upgrade: Project 15: s Package 1 41_a s Package 1 location #1 22nd St: Wilmot RD Kolb s Package 1 location #2 Alvernon Way: Broadway Blvd. 22nd St s Package 1 location #3 Broadway Blvd: Country Club Rd Randolph Way s Package 1 location #4 Grant Rd: Dragoon Ave I 10 s Package 1 location #5 Swan Rd: 22nd dst 29thSt s Package 1 location #6 Wetmore Rd: Oracle Rd Stone Ave s Package 1 location #7 Broadway: Wilmot Rd Kolb Rd s Package 2 41_b Location #1 22nd St: Alvernon Way to Swan Rd Location #2 Broadway Blvd: Alvernon Way to Swan Rd Location #3 Craycroft Rd: Broadway to 22nd Street Location #4 Mission Rd: Ajo Way to Irvington Rd Location #5 Tanque Verde Rd: Kolb Rd to Sabino Canyon Kolb Rd Bike Lane Project 41_c Kolb Road Bike Lane Project Campbell Ave Revitalization 41_d New sidewalks, streetscape and bus bays El Paso & Southwestern Greenway: Kino to University 41_l SP El Paso & Southwestern Greenway: Kino to University Pathway 9/19/2016 2:36:28 PM 1 21 of 60

22 Jurisdiction Project Name: RTA ID Sponsor ID TIP ID Status Sub Project Description Improvement Type Freeman Rd Bike Lanes 41_m Freeman Rd From Broadway To Old Spanish Trail Orange Grove Bike Lanes 41_n Orange Grove From Oracle Rd To Camino la Zorrela Escalante Bike Lanes 41_o Escalante Rd From Houghton To Old Spanish Trail Valencia Bike Lanes 41_p Valencia: From Craycroft To Wilmot Valencia Road Bike Lane Gap Closure Valencia Bike Lanes Wilmot to Kolb 41_q Valencia: Wilmot To Kolb Valencia Bike Lanes Alvernon to 41_r Craycroft Valencia From Alvernon To Craycroft Mission Rd Bike Lanes 41_s Mission Road From San Xavier Rd To Drexel Tanque Verde Bike Lanes 41_t Tanque Verde From Powderhorn To Camino Fennimore Continental Rd Bike Lanes 41_u Continental Rd From Camino Del Sol To La Canada Park Ave Bike Lanes 41_v ) Park Ave Bike Lanes: Benson to Ajo 6th Ave Bike Lanes 41_w ) 6th Ave Bike Lanes: South to Irvington 6th Ave Bike Lanes South to 41_x th St 1) 6th Ave: South to 19th St. Alvernon Bike Lanes 41_y ) Alvernon: Speedway to Broadway Alvernon Bike Lanes Ajo to Valencia 41_z Campbell Bike lanes Glenn to Grant 41aa 49B ) Alvernon: Ajo to Valencia 5) Campbell Ave:Glenn to Grant Campbell Bike Lanes Elm to Speedway 41ab ) Campbell Ave: Elm to Speedway Pantano Bike Lanes 41ac ) Pantano: Speedway to Broadway Park Ave Bike Lanes #2 41ad ) Park: Ajo to Irvington Speedway Bike Lanes 41ae ) Speedway: Alvernon to Rosemont RTA Bicycle Lane Restriping Package #1 41af 49B th Ave From So. city limits To Irvington 6th Ave. From N of 19th St To South northern city limits Alvernon From Speedway To Broadway Alvernon From Ajo Way To Valencia Campbell From Elm To Speedway Campbell From Glenn To Grant Pantano Road From Speedway To Broadway Park From Ajo To Irvington 9/19/2016 2:36:28 PM 1 22 of 60

Detailed Status Report

Detailed Status Report Detailed Status Report Jurisdiction: ADOT Project Name: I-10: Ina TI RTA ID: 06 TIP ID: 3.02 Status: Under Construction I-10: Ina TI (Reconstruct TI and construct RR Overpass) Under Construction Roadway

More information

TIP Amendment #4 - Proposed PAG TIP PROJECTS. A Add project and funding to match ADOT 5-year Program PROPOSED PROPOSED PROPOSED.

TIP Amendment #4 - Proposed PAG TIP PROJECTS. A Add project and funding to match ADOT 5-year Program PROPOSED PROPOSED PROPOSED. PAG 213-217 PROJETS A and funding to match AOT 5-year I I State/Fed I STREET/PROJET NAME PROJET ESRIPTION 56.12 I-1: ortaro Road TI (Right-of-Way). I-1 and ortaro Road Purchase ROW for ortaro Road TI FUNING

More information

DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name

DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name DRAFT Proposed 2045 RTP Project List - 10/29/2015 Projects Listed Alphabetically by Name RTP ID Name Location Description 300.98 40th St Extension Between 4th and 6th Av Nogales Hwy to Sonoran 429.03*

More information

Regional Bicycle and Pedestrian Count Summary Report

Regional Bicycle and Pedestrian Count Summary Report 2013 Regional Bicycle and Pedestrian Count Summary Report Prepared by PAG staff Published June 2014 Table of Contents Introduction and Overview... 1 Process and Methodology... 1 2013 Bicycle and Pedestrian

More information

Regional. Featuring the Tucson streetcar. Over jobs created! See inside projects complete and more on the way!

Regional. Featuring the Tucson streetcar. Over jobs created! See inside projects complete and more on the way! Over 2000 Regional jobs created! 460+ projects complete and more on the way! APRIL 2012 Featuring the Tucson streetcar See inside 177 N. Church Ave. Suite 405 Tucson AZ 85701 (520) 770-9410 [tel] (520)

More information

Regional Bicycle and Pedestrian Count Summary Report

Regional Bicycle and Pedestrian Count Summary Report 2015 Regional Bicycle and Pedestrian Count Summary Report Prepared by PAG staff Published September 2016 Table of Contents Introduction and Overview... 1 This Report... 1 Process and Methodology... 2 Part

More information

Regional Bicycle and Pedestrian Count Summary Report

Regional Bicycle and Pedestrian Count Summary Report 2014 Regional Bicycle and Pedestrian Count Summary Report Prepared by PAG staff Published July 2015 Revised September 2015 Table of Contents Introduction and Overview... 1 This Report... 1 Process and

More information

2010 Regional Bicycle/Pedestrian Count Summary

2010 Regional Bicycle/Pedestrian Count Summary 2010 Regional Bicycle/Pedestrian Count Summary Introduction In October 2010, volunteers counted bicycles and pedestrians at various locations throughout the Tucson region. This was the third year of the

More information

2040 RTP Roadways Draft Project List

2040 RTP Roadways Draft Project List 2040 RTP Roadways Draft Project List RTP ID Street Name 157.08 Multiple 1st Av Corridor Project 161.08 Tucson 22nd St Corridor Project Description of Project Grant to Ina Rd 6 Widen 1st Ave. to a 4-6 roadway

More information

Roadway. Safety. Environment. Transit. FY Annual Report Valencia Rd. Magee Rd. Walking path along Sahuarita Rd.

Roadway. Safety. Environment. Transit. FY Annual Report   Valencia Rd. Magee Rd. Walking path along Sahuarita Rd. FY 2014-2015 Annual Report www.rtamobility.com 1 E. Broadway Blvd., Suite 401, Tucson, AZ 85701 (520) 792-1093 [tel] (520) 620-6981 [fax] Roadway Valencia Rd. Safety Magee Rd. Environment Walking path

More information

Pima Association of Governments Tip Projects

Pima Association of Governments Tip Projects 74.7 I-1: ountry lub TI onstruct TI = Analyzed Total ost = 5 6.15 I-1: raycroft and Wilmot TI Overpass I-1 and raycroft, I-1 and Wilmot Bridge Deck Rehabilitation = Exempt Total ost = 9 5 ASTP 17 HURF26

More information

2019 Runner and Driver Handbook. (Information within this Handbook is subject to change.)

2019 Runner and Driver Handbook. (Information within this Handbook is subject to change.) 2019 Runner and Driver Handbook (Information within this Handbook is subject to change.) What s In Here 1) Organizing a Team...... 3 2) Registration...... 3 3) Refunds/Transfer Policy...... 3 4) Race Start

More information

City of Tucson ADA Sidewalk Inventory Study Report. Prepared by:

City of Tucson ADA Sidewalk Inventory Study Report. Prepared by: City of Tucson ADA Sidewalk Inventory Study Report Prepared by: City of Tucson Department of Transportation October 2012 ADA Sidewalk Inventory Study Report October 2012 City of Tucson Department of Transportation

More information

Executive Summary. September 3, 2014

Executive Summary. September 3, 2014 D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Open Response to Public Comments

Open Response to Public Comments Open Response to Public Comments received for the FY2016-2020 Draft Transportation Improvement Program Introduction: Public comment was solicited as part of the development of the region s Transportation

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

San Pablo High Treatment applied incrementally at each N + ++

San Pablo High Treatment applied incrementally at each N + ++ Transit Improvements T1 Further study options for creation or designation of segregated transit lanes along San Pablo, including options for restrictions during a limited number of peak travel hours and

More information

I-10 Bypass Follow-up Report Tucson Metropolitan Area. Draft Report. Prepared for: Arizona Department of Transportation. Prepared by: URS Corporation

I-10 Bypass Follow-up Report Tucson Metropolitan Area. Draft Report. Prepared for: Arizona Department of Transportation. Prepared by: URS Corporation Prepared for: Prepared by: URS Corporation October 16, 2008 TABLE OF CONTENTS Page EXECUTIVE SUMMARY... iii 1.0 EXISTING AND PLANNED CONDITIONS ON INTERSTATE 10... 1-1 1.1 INTRODUCTION... 1-1 1.2 EXISTING,

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs

2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs 2040 Regional Transportation Plan (RTP) ThinkTank Data Analysis Projects and Programs Between October 2008 and February 2009, PAG held 20 ThinkTank sessions for the 2040 RTP with 275 participants. The

More information

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400 Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)

More information

Recommended Alternatives

Recommended Alternatives 62 Corridor Improvements As part of the Washington Street Corridor Study, improvement recommendations were developed to address vehicle, pedestrian, bicycle and transit transportation needs within the

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

windpro WP A15-Lingewaard WTGs Shadow receptor-input

windpro WP A15-Lingewaard WTGs Shadow receptor-input SHADOW - Main Result Calculation: SHADOW calculation (5 x V150 @ 166m, +LT CORR, NO MITIGATION) Maximum distance for influence Calculate only when more than 20 % of sun is covered by the blade Please look

More information

Circulation and Mobility

Circulation and Mobility SECTION 4 Circulation and Mobility OVERVIEW The first phase of the circulation analysis is to address specific concerns regarding the circulation system in the vicinity of the Gateway Specific Plan area

More information

Planning Committee STAFF REPORT

Planning Committee STAFF REPORT Planning Committee STAFF REPORT Meeting Date: December 7, 2011 Subject Summary of Issues Recommendations Financial Implications Options Attachments Applications Received through the CC TLC and PBTF Call

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico

Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan

Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan Attachment A Amendment to the Summary of Regional Strategic Investments included in the Regional Transportation Plan Street and Highway improvements Project costs include all funded phases including planning,

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School

Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

City of San Bernardino

City of San Bernardino City of San Bernardino Population 204,800 City Overview The City of San Bernardino is the largest City and the county seat of San Bernardino County, California. The City encompasses approximately 81 square

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Final Project Prioritization Plan

Final Project Prioritization Plan Final Project Prioritization Plan For the NM 599 Corridor Executive Summary I. EXECUTIVE SUMMARY NM 599 serves as a North/South by-pass for vehicles traveling through Santa Fe and a WIPP route for low

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Transportation Planning Division

Transportation Planning Division Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meetings Data Collected Focus Areas within Study Limits Design Principles Tool Box Recommended Concepts Schedule Moving

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012

Orange County Rail-Highway Grade Crossing Safety Enhancement Program. City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program City of San Juan Capistrano April 17, 2012 Orange County Rail-Highway Grade Crossing Safety Enhancement Program (OCX) 52 crossings 8

More information

including shade trees; Recommend minimum 13 ft total sidewalk

including shade trees; Recommend minimum 13 ft total sidewalk Appendix B Projects From Other Plans Location Type of Project Description West. Julian St. Intersection and streetscape along West Julian St. Intersection and scape : Add high visibility side street crosswalks

More information

Bicycle Count Data. December 2008

Bicycle Count Data. December 2008 Bicycle Count Data December 28 Published By: San Luis Obispo Public Works Department 919 Palm Street, San Luis Obispo, California 9341 Telephone (85) 781 719; FAX (85) 781 7198 www.slocity.org Introduction

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN

F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN APPENDIX F F.0 APPENDIX F F.1 ENHANCED FISCALLY CONSTRAINED CAPITAL IMPROVEMENT PLAN Recognizing the limitations of the fiscally constrained CIP discussed in Section 7.5, an enhanced fiscally constrained

More information

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010

Bike San Mateo County San Mateo County Bicycle Plan Recommendations August 30, 2010 Policy and Procedures Develop and Implement a Complete Streets Policy to comply with DD-64-R1 and AB1358 Commencing January 1, 2011, AB1358 requires that the legislative body of a city or county, upon

More information

SBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E

SBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E SBCAG STAFF REPORT SUBJECT: 2017 Federal Transportation Improvement Program MEETING DATE: January 19, 2017 AGENDA ITEM: 5E STAFF CONTACT: Anne Jensen RECOMMENDATION: Adopt Resolution 17-01 approving Amendment

More information

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018

El Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018 El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME

SDForward.com/networks PHASE YEAR (IN ALL NETWORK CONCEPTS) ESTIMATED CAPITAL COSTS ($2018) MILLIONS* PROJECT NAME Bayshore Bikeway Segment 8B: Ada Street to Palomar Street $1.64 Border to Bayshore Bikeway $10.18 Central Avenue Bikeway $4.62 North Park/Mid-City Bikeways: Howard $8.42 North Park/Mid-City Bikeways: Monroe

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

Staff Report. Within the $10 million funding limit, ten projects submitted by six different jurisdictions are recommended for funding:

Staff Report. Within the $10 million funding limit, ten projects submitted by six different jurisdictions are recommended for funding: ITEM 7A Staff Report Subject: Contact: 2017 CVAG Bicycle and Pedestrian Safety Program Eric Cowle, Transportation Program Manager (ecowle@cvag.org) Recommendation: Approve ten project applications submitted

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS

PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY 2016-2035 SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS The Sun Corridor Metropolitan Planning Organization (Sun Corridor

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division

More information

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES

PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

If a person walks within this focus area, these are examples of the places he or she could walk to or from: Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City

More information

Premium Report 27/07/2017

Premium Report 27/07/2017 TABL O COTT Images...1 Length Diagram...4 Pitch Diagram...5 Area Diagram...6 otes Diagram...7 Penetrations Diagram...8 Report ummary...9 MAURMT In this 3D model, facets appear as semi-transparent to reveal

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle

Bluffdale South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle Bluffdale 14600 South (SR140) Bicycle/Shoulder Lanes Project Type Bicycle From Pony Express to UPRR Bridge over SR-140 $ 669,700 $ 624,361 To build bicycle/shoulder lanes on SR-140. SR-140 is an official

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

COMMUNITY MEETING AGENDA

COMMUNITY MEETING AGENDA COMMUNITY MEETING AGENDA Welcome and Introductions SAFE Presentation Project Presentation Priorities Feedback Next Steps Q&A Santa Cruz Avenue Corridor Study 1 Santa Cruz Avenue Corridor Study Community

More information

OTO BIKE/PED PLAN REPORT

OTO BIKE/PED PLAN REPORT OTO BIKE/PED PLAN REPORT 6/30/2012 Implementation in FY2012 This report outlines the bike/ped accomplishments related to the OTO Bike/Ped Plan. Activities occurring during the 2012 Fiscal Year, July 1,

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

SUN SHUTTLE SERVICE UPDATE

SUN SHUTTLE SERVICE UPDATE SUN SHUTTLE SERVICE UPDATE RTA Board March 25, 2010 Objectives General service overview Review recommended performance measures Recommendations for route/service changes Timeline for May service changes

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

REPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER

REPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER REPORT TO FRESNO COUNCIL OF GOVERNMENTS DATE: APRIL 2012 TO: FROM: FRESNO COG POLICY BOARD STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER SUBJECT:

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

MIT Kendall Square Initiative

MIT Kendall Square Initiative MIT Kendall Square Initiative Volume II: Technical Studies and Information (NoMa Project and SoMa Project) Final Development Plan Submission Cambridge Planning Board #302 and #303 November 5, Submitted

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho

More information

May 4, Dear Mr. Thomas and Mr. Snyder,

May 4, Dear Mr. Thomas and Mr. Snyder, Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

State Highway 16 Kuna-Mora Road to Ada/Gem County Line

State Highway 16 Kuna-Mora Road to Ada/Gem County Line Background Update! (February 2018): This project has been partially funded; see below. State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents

More information