REPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER

Size: px
Start display at page:

Download "REPORT TO FRESNO COUNCIL OF GOVERNMENTS STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER"

Transcription

1 REPORT TO FRESNO COUNCIL OF GOVERNMENTS DATE: APRIL 2012 TO: FROM: FRESNO COG POLICY BOARD STEVE BRANDT, QUAD KNOPF ASSISTANT PROJECT MANAGER THROUGH: LAUREN DAWSON, FRESNO COG PROJECT MANAGER SUBJECT: GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT INFRASTRUCTURE IMPROVEMENTS: PLANNING ENGINEERING AND ENVIRONMENTAL STUDY In October 2009 Fresno COG began the process of preparing plans for the revitalization of the Golden State Corridor. This work was to be the second of several steps in the process that began in 2003 with the visioning document prepared by Fresno COG and Chabin Concepts entitled Community Vision for the Golden State Corridor. This second step was funded by Measure C allocations. The project consists of the revitalization of the Golden State Corridor to make it an inviting, enjoyable, and dynamic economic engine for the surrounding communities. The project area is Golden State Boulevard (Whitson Street in Selma and Simpson Street in Kingsburg) from just south of American Avenue north of Fowler to Mission Street in Kingsburg. Improvements along the Corridor include infrastructure improvements, pavement rehabilitation, new traffic signals, a continuous bikeway, landscaping, and signage. Fresno COG requested proposals for the work, and the team led by Quad Knopf, with VRPA Technologies, Planning Design Consultants, and Chabin Associates (writers of the 2003 Visioning Plan) was selected in March The project deliverables are intended to bring the design to a 30% completion level and provide the environmental review documentation. Specifically, the project consists of: Design Guidelines Manual Topographic Survey of the 14.2-mile long Corridor 30% Construction Plans for the length of the Corridor and its intersections Utility/Railroad/CPUC Report Water Conservation Study

2 Existing Pavement Assessment Study Engineer s Cost Estimate Grant Opportunities Report CEQA Document (Mitigated Negative Declaration) CEQA Technical Studies NEPA Technical Studies These deliverables are now complete and have been delivered to Fresno COG. In addition, the CEQA process has been completed, with the exception of adoption by the COG Policy Board. Together, they represent significant progress in the goal of revitalizing this important regional transportation asset. Throughout this planning and design process, the three cities, Fowler, Selma, and Kingsburg, along with Fresno County, were heavily involved in providing key information and in determining the design and outcome of the project. A Golden State Advisory Committee was formed consisting of staff members from the four jurisdictions, as well as representatives from Caltrans, FAX, the CPUC, and the Fresno Bicycle Coalition. This group met six times to review, discuss, and determine the details of the project. In addition, Quad Knopf presented a progress report to each City Council mid-way through the process, and held three public meetings, one in each city, to give the general public a say in the project. During the 45-day public review period, copies of the plans and documents were made available to the public for review at the Fresno COG office, Fresno County Public Works and Planning Department, each of the three city halls, the downtown Fresno library, and branch libraries in Fowler, Selma, and Kingsburg. The proposed Initial Study/Mitigated Negative Declaration was completed in accordance with CEQA and is ready to be adopted by the Policy Board. The attached seven sheets provide details of the improvements that are planned, including additional lanes at intersections, location of the bicycle path planned for connecting the three cities, and new signal locations. RECOMMENDATION: Fresno COG staff is requesting that the TTC and the PAC recommend adoption of the CEQA environmental document and acceptance of the project and that the Fresno COG Policy Board adopt the CEQA/MND document and accept the project studies. Attachments: Figure 1- Project Vicinity Figure 2 Project site (five pages) Project Summary Sheets (seven pages) 2

3 PROJECT VICINITY Figure 1 3

4 PROJECT SITE Figure 2a 4

5 PROJECT SITE Figure 2b 5

6 PROJECT SITE Figure 2c 6

7 PROJECT SITE Figure 2d 7

8 PROJECT SITE Figure 2e 8

9 Golden State Corridor North Fowler LOCATION EXISTING CONDITION PROPOSED MODIFICATIONS American Avenue/ 4-way intersection with RR Xing, 2-way stop. Intersection modifications to American Avenue by separate County project. Fowler Sphere of Influence Golden State Corridor project begins approximately 200 feet south of the intersection. Start Class I Bike Path on west side of Golden State Blvd. Start Class II bike lanes in each direction adjacent to curb. Jefferson Avenue 3-way intersection (west), 1-way stop. Private 1-way stop to remain. New NB and SB left and right turn lanes. Bike Path Xing. RR Xing. Lincoln Avenue 3-way intersection with RR Xing, 1-way stop. 1-way stop to remain. New SB U-turn lane. New NB left turn lane. New SB acceleration lane. Clovis Avenue Frontage Rd. 3-way signalized intersection. Signal to remain. Lengthen existing NB and SB left turn lanes. Bike Path Xing. Clovis Avenue overcrossing Grade separated overcrossing over GS Blvd. SB lanes shifted into median to allow room for Class 1 Bike Path under and RR tracks. the overcrossing. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

10 Golden State Corridor - Central Fowler ITEM II C LOCATION EXISTING CONDITION PROPOSED MODIFICATIONS Clayton Avenue 4-way intersection with RR Xing, 2-way stop. 2-way stop to remain. New NB right and left turn lanes. New SB right and left turn lanes. Bike Path Xing. Fowler City limits "Welcome to Fowler" sign (SB). Bonita Avenue 3-way intersection (west) to access 8 th Street, 1-way stop to remain. New NB left turn lane and SB right turn lane. Bike Path Xing. 1-way stop. Abandon portion of 8 th Street between Bonita Avenue and Adams Avenue. Adams Avenue 4-way signalized intersection with RR Xing. Signal to be modified. New SB right turn lane. Access from 8 th Street to Adams Avenue closed. NEW ROAD SHIFT None currently. Transition SB GS Blvd. to 8th Street and NB GS to SB GS Blvd. Class I Bike Path ends with ped/bike Xing at Mariposa Street for access to Class II lanes. Mariposa Street 3-way intersection (east) with RR Xing, 1-way stop. 1-way stop to remain. New WB drive approach for access to future development site. New NB right and left turn lanes. New SB left turn lane. Tuolumne Street 3-way intersection with 8 th Street, 1-way stop. 1-way stop to remain with new access to GS Blvd. New NB and SB No access to GS Blvd. left turn lanes. New EB drive approach for access to future development site. Merced Street 4-way signalized intersection with RR Xing. Focal point of Fowler, transit stop site, signage. Signal to be modified. New EB right turn lane. Main Street 3-way intersection with 8 th Street, 1-way stop. 1-way stop to remain with new access to Golden State Blvd. New NB and SB No access to Golden State Blvd. left turn lanes. New EB drive approach for access to future development site. Fresno Street 3-way intersection with 8 th Street, 1-way stop. 1-way stop to remain with new access to Golden State Blvd. New NB and SB No access to Golden State Blvd. left turn lanes. New EB drive approach for access to future development site. NEW ROAD SHIFT None currently. Transition back to existing alignment between Fresno Street and Tulare Street. Class I Bike Path begins again south of Fresno Street with ped/bike Xing at Fresno Street. Vine Street 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB and SB right and left turn lanes. New WB left turn lane. Bike Path Xing. Peach Street 3-way intersection (west), 1-way stop 1-way stop to remain with new NB access to Golden State Blvd. New NB and SB No access to NB Golden State Blvd. left turn lanes. New SB acceleration lane. Bike Path Xing. South Avenue 4-way intersection with RR Xing, 2-way stop 2-way stop to remain. New NB right turn lane. New SB left turn lane. New EB right turn lane. "Welcome to Fowler" sign (NB). Bike Path Xing. Temperance Avenue 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB right turn lane. New SB right turn. Realign EB approach lanes to intersect at 90 degrees. Bike Path Xing. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

11 Golden State Corridor - South Fowler ITEM II C LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Parlier Avenue 3-way intersection (west), 1-way stop. 1-way stop to remain. Add median break with NB left turn lane. Bike Path Xing. No median break. East Valley Drive 3-way intersection (west), 1-way stop. 1-way stop to remain. Add SB left turn lane for U-turns. Bike Path Xing. Manning Avenue Signalized intersection with RR Xing. Signal modifications. Add 2 nd NB left turn lane. Add 3 rd WB through lane and WB right turn lane. Bike Path Xing. San Antonio Drive 3-way signalized intersection. Signal and all existing turn lanes remain. Bike Path Xing. Fowler City limits DeWolf Ave./ 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB and SB left turn lanes. New NB right turn lane. Springfield Ave./ Bike Path Xing. Fowler and Selma Sphere of Influence Selma City limits SB lanes only are inside city limits. Pull-off location Chicago Canal (circa 1885). Add pull-off location on west side with historical marker. Incorporate bike rest stop. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

12 Golden State Corridor North Selma LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Dinuba Avenue 4-way intersection with RR Xing, 2-way stop. New traffic signal. New NB right turn lane. New SB right turn lane. "Welcome to Selma" sign (SB). Bike Path Xing. Selma City limits NB lanes now also inside city limits. Highland Avenue 4-way signalized intersection. Signal modifications. New WB left turn lane. Bike Path Xing. EXISTING ROAD Existing shift to Whitson Street. Realign W. Front Street into a T intersection (1-way stop) with Whitson SHIFT Street. Class 1 Bike Path crosses to east side of Whitson Street and then merges into new Class II bike lanes on W. Front Street. Class II bike lanes end on GS Blvd. (Whitson Street) at new W. Front Street intersection. Floral Avenue 4-way signalized intersection. Directional signage, terminated vista 1,000 ft north, looking NB. New EB right turn lane (Floral Ave) Gaither Street 3-way intersection (west), 1-way stop. 1-way stop to remain. Stillman Street 4-way intersection (west), 1-way stop. No changes with this project. City of Selma plans to close Stillman between Stillman Street between Whitson and Thompson Whitson Street and Thompson Avenue via a separate project. is one-way east only. Thompson Avenue 4-way signalized intersection. Signal to remain. New NB left turn lane. New SB left turn lane. Branch Street 4-way intersection, 2-way stop. 2-way stop to remain. New NB left turn lane. New SB left turn lane. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

13 Golden State Corridor South Selma ITEM II C LOCATION EXISTING CONDITION PROPOSED MODIFICATIONS Sherman Street 3-way intersection (west), 1-way stop. 1-way stop to remain. North Street 4-way intersection, 2-way stop. 2-way stop to remain. New NB left turn lane. New SB left turn lane. First Street 4-way intersection, 2-way stop. 2-way stop to remain. Second Street 4-way signalized intersection. Singal to remain. Focal point of Selma, transit stop site, directional signage. Third Street 4-way intersection, 2-way stop. No changes to Third Street/Whitson Street intersection. New intersection modifications at Third/Front/McCall intersection for bike lanes and better turning movements. McCall Avenue 4-way intersection, 4-way stop. No changes. EXISTING ROAD Existing shift from Whitson Street to GS Blvd. SHIFT Todd Street 3-way intersection (west), 1-way stop Realign W. Front Street into a 4-way intersection with Todd Street with 2-way stop. End W. Front Street Class II bike lanes. New bike lane Xings. Begin Class II bike lanes on GS Blvd. south of Todd Street. Begin Class I Bike Path on west side of GS Blvd. south of Todd Street. Nebraska Ave/ 4-way intersection with RR Xing, 2-way stop 2-way stop to remain. New NB right and left turn lanes. New SB left turn lane. Bike Park Street Path Xing. Dockery Avenue 3-way intersection (west), 1-way stop 1-way stop to remain. New NB left turn lane. New SB left turn lane. Bike Path Xing. Saginaw Avenue/ 3-way intersection (east) with RR Xing, 1-way stop. 1-way stop to remain. New NB right turn lane. New SB left turn lane. Selma City limits "Welcome to Selma" sign (NB). Bike Path Xing. Van Horn Avenue 3-way intersection (west), 1-way stop. 1-way stop to remain. New NB left turn lane. Bike Path Xing. Mountain View Ave./ 4-way signalized intersection with RR Xing. Modify RR crossing. New NB right turn lane. Bike Path connects to existing Class Selma and Kingsburg I Bike Path south of Mt. View Avenue.* Sphere of Influence * The City of Kingsburg is on schedule to complete a Class 1 bike path on west side of GS Blvd from Kingsburg to Mountain View Ave. ahead of GS project. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

14 Golden State Corridor North Kingsburg ITEM II C LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Amber Avenue 3-way intersection (west), 1-way stop. 1-way stop to remain. Close median, eliminating NB left turns onto Amber Avenue. "Welcome to Kingsburg" sign (SB). Kingsburg City limits Kamm Avenue/ 4-way intersection with RR Xing, 4-way stop. New traffic signal. New NB right and left turn lanes. New SB left turn lanes. Bethel Avenue Revise intersection grades to reduce vertical differences. Design to accommodate future overcrossing over GS Blvd. and RR tracks. Consider widening RR Xing at 100% plan stage. Bike Path Xing by others.* * The City of Kingsburg is on schedule to complete a Class 1 bike path on west side of GS Blvd from Kingsburg to Mountain View Ave. ahead of GS project. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

15 Golden State Corridor South Kingsburg ITEM II C LOCATION EXISTING CONDITION PROPOSED ROADWAY GEOMETRIC MODIFICATIONS Stroud Avenue 4-way intersection with RR Xing, 2-way stop. Realign intersection with new RR Xing to connect to new industrial driveway on Bike Path Xing. west side of GS. 2-way stop to remain. New NB right and left turn lanes. Existing EB Stroud Avenue to become a 3-way intersection with 1-way stop. Between Stroud Narrow right of way. No median island. Add curb and gutter on west side of GS Blvd. with defined drive approaches. Avenue and Sierra Transition from 4-lane to 2-lane, with continuous Modify parking lots and buildings that encroach into GS Blvd. right of way. Avenue left turn lane. Existing Class I Bike Path ends. Continue shared use bike/pedestrian path on west side of GS Blvd. to Sierra Street. Sierra Street/ 4-way signalized intersection with RR Xing. Signal to remain. End shared bike/pedestrian path. State Hwy 201 Median island begins south of intersection. Ellis Street 3-way intersection (west), 1-way stop. 1-way stop to remain. Draper Street 4-way signalized intersection with RR Xing. Signal to remain. New NB right turn lane. Focal point of Kingsburg. Transit stop site, possibly at train station. Class II bike lanes end. Class III bike routes begin south of intersection. Lewis Street 3-way intersection (west), 1-way stop. 1-way stop to remain. New NB left turn lane. Earl Street 4-way signalized intersection with RR Xing. Signal to remain. New NB left turn lane. New SB left turn lane. Mission Street 3-way intersection (west), 1-way stop. 1-way stop to remain. No changes. Class III bike route ends. End of Golden State Corridor improvements. Abbreviations: GS = Golden State NB = northbound SB = southbound WB = westbound EB = eastbound RR Xing = railroad crossing

16 BEFORE THE FRESNO COUNCIL OF GOVERNMENTS RESOLUTION NO In the Matter of: ) RESOLUTION ADOPTION OF THE MITIGATED ) NEGATIVE DECLARATION (SCH# ) AND GOLDEN STATE CORRIDOR - ECONOMIC ) ACCEPTANCE OF THE GOLDEN STATE CORRIDOR - DEVELOPMENT INFRASTRUCTURE IMPROVEMENTS: ) ECONOMIC DEVELOPMENT INFRASTRUCTURE PLANNING ENGINEERING AND ) IMPROVEMENTS: PLANNING, ENGINEERING ENVIRONMENTAL STUDY ) AND ENVIRONMENTAL STUDY ) WHEREAS, the Fresno Council of Governments (Fresno COG) has previously authorized the preparation of the Golden State Corridor-Economic Development Infrastructure Improvements: Planning Engineering and Environmental Study; and WHEREAS, documents have been prepared consisting of a Topographic Survey, 30% Design Plans, a Design Guidelines Manual, a Utility/Railroad CPUC Report, an Engineer s Cost Estimate, a Water Conservation Study, an Existing Pavement Assessment Report, a Grant Opportunities Report, and an Initial Study/Negative Declaration with background technical studies; and WHEREAS, the cities of Fowler, Selma, and Kingsburg, and the County of Fresno participated heavily in the design of these project deliverables; and WHEREAS, public meetings were held in each of the three cities in June and July of 2011 to gather public input on the project; and WHEREAS, a Initial Study/Negative Declaration was prepared and circulated for a 45-day public review in accordance with the California Environmental Quality Act. WHEREAS, Fresno COG has independently reviewed the contents of the Mitigated Negative Declaration and agrees with the findings therein; and NOW, THEREFORE, BE IT RESOLVED, that the Fresno COG, acting at Lead Agency, adopts the Initial Study Mitigated Negative Declaration, in accordance with the California Environmental Quality Act. BE IT FURTHER RESOLVED, that the Fresno COG, acting at Lead Agency, adopts Mitigation and Monitoring Program (Section 5 of the Final Mitigated Negative Declaration), in accordance with the California Environmental Quality Act. BE IT FURTHER RESOLVED, that the Fresno COG accepts the Golden State Corridor-Economic Development Infrastructure Improvements: Planning Engineering and Environmental Study project as complete. THE FOREGOING RESOLUTION was passed and adopted by the Fresno Council of Governments this 26th day of April, AYES: NOES: ABSTAIN: ABSENT: ATTEST: Signed: Amarpreet Dhaliwal, Chair I hereby certify that the foregoing is a true copy of a resolution of the Fresno Council of Governments duly adopted at a regular meeting thereof held on the 26th day of April, Signed: Tony Boren, Executive Director

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

MEMORANDUM. David Mohlenbrok, Environmental Services Manager

MEMORANDUM. David Mohlenbrok, Environmental Services Manager MEMORANDUM DATE: August 10, 2017 TO: FROM: RE: Planning Commission Members David Mohlenbrok, Environmental Services Manager Blue Memo # 1 for Rocklin Station Project Comments Received on Initial Study/Mitigated

More information

Staff Report City of Manhattan Beach

Staff Report City of Manhattan Beach Agenda Item #: Staff Report City of Manhattan Beach TO: THROUGH: FROM: Honorable Mayor Wilson and Members of the City Council Geoff Dolan, City Manager Richard Thompson, Director of Community Development

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line

Table 1.0 Grade Crossing Enhancements PVL San Jacinto Branch Line Grade Crossing Enhancements CPUC 1 2 3 4 5 Citrus Avenue, Riverside County Palmyrita Ave., Columbia Avenue, Marlborough Ave., Spruce St., MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3

More information

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA CITY OF SIGNAL HILL 2175 Cherry Avenue Signal Hill, CA 90755-3799 AGENDA ITEM TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL FROM: STEVE MYRTER, P. E. DIRECTOR OF PUBLIC WORKS SUBJECT: SPRING STREET

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 11 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic modifications on Twin Peaks Boulevard between Christmas

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.3 DIVISION: Sustainable Streets Division BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving traffic and parking modifications to install

More information

APPENDIX E GRADE CROSSING LOCATIONS

APPENDIX E GRADE CROSSING LOCATIONS APPENDIX E GRADE CROSSING LOCATIONS 1 2 3 Citrus Avenue Riverside County and City Palmyrita Avenue Columbia Avenue MP 0.57 002X-0.6 027301Y MP 1.00 002X-1.0 027302F MP 1.24 002X-1.3 027303M 1. Existing

More information

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY

APPROVE A RESOLUTION ADOPTING A COMPLETE STREETS POLICY STAFF REPORT MEETING DATE: September 13, 2016 TO: FROM: City Council Bob Brown, Community Development Director Russ Thompson, Public Works Director Patrick Filipelli, Management Analyst 922 Machin Avenue

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation

Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District

Toronto and East York Community Council. Director, Transportation Services, Toronto and East York District No Turn on Red Regulations STAFF REPORT ACTION REQUIRED Date: June 1, 2010 To: From: Toronto and East York Community Council Director, Transportation Services, Toronto and East York District Wards: Trinity

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.5 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY SUMMARY: The South Van Ness and Mission Intersection Improvements

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Transportation Development Act Grant Center Avenue Pedestrian Signal Project

Transportation Development Act Grant Center Avenue Pedestrian Signal Project CITY OF MARTINEZ CITY COUNCIL AGENDA April 15, 2015 TO: FROM: SUBJECT: DATE: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Center Avenue Pedestrian Signal Project

More information

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS

UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various parking and traffic modifications on Herbst Road

More information

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1

BD RESOLUTION NO RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE 1 BD00 RESOLUTION NO. - RESOLUTION ADOPTING THE VISION ZERO RAMP INTERSECTION STUDY PHASE [NTIP PLANNING] FINAL REPORT WHEREAS, The Vision Zero Ramp Intersection Study Phase was recommended by Commissioner

More information

Planned Date of Obligation for 4/1/15 and beyond (please enter as MM/DD/YY)

Planned Date of Obligation for 4/1/15 and beyond (please enter as MM/DD/YY) for 4/1/15 City of Clovis 5208-149 LSTMP454 Pedestrian Bridge / SR 168 NI Master Plan 4/30/2015 $168,000 $168,000 City of Clovis 5208-139 FRE130005 Shaw, Clovis-Sunnyside Street Maintenance 5/1/2015 CON

More information

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927

More information

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes

BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes Minutes Approved as Submitted Date: 8/10/17 Initials: EC BICYCLE AND TRAILS ADVISORY COMMISSION Meeting Minutes June 8, 2017 The Bicycle and Trails Advisory Commission was called to order at 4:00 p.m.

More information

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection

Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection STAFF REPORT ACTION REQUIRED Improving Cyclist Safety at the Dundas Street West and Sterling Road Intersection Date: August 17, 2012 To: From: Wards: Reference Number: Public Works and Infrastructure Committee

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.3 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various traffic and parking modifications on Bay Street

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 6123 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MENLO PARK ADOPTING A COMPLETE STREETS POLICY WHEREAS, the term Complete Streets describes a comprehensive, integrated transportation

More information

Tonight is for you. Learn everything you can. Share all your ideas.

Tonight is for you. Learn everything you can. Share all your ideas. Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns

Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Caltrans Sloat Boulevard Pedestrian Safety Project Response to Community Questions, Comments & Concerns Revised: May 10, 2016 The California Department of Transportation (Caltrans) is planning various

More information

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St)

FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) FOCUS AREA 1 - Alberta Avenue Pocket Park 3 (121 Ave and 92 St) New benches Plant evergreen trees Widen existing sidewalk from 1.5m to 1.8m Marked crosswalk 1.8m wide sidewalk Add pedestrian oriented lights

More information

PISMO BEACH COUNCIL AGENDA REPORT

PISMO BEACH COUNCIL AGENDA REPORT PISMO BEACH COUNCIL AGENDA REPORT Agenda Item 8.E SUBJECT/TITLE: TRAFFIC SAFETY COMMITTEE RECOMMENDATIONS TO CITY COUNCIL RECOMMENDATION: Adopt a Resolution approving the Traffic Safety Committee s recommendation

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677

Abrams Associates. Transportation Impact Analysis. City of Rocklin. Prepared for: David Mohlenbrok City of Rocklin 4081 Alvis Court Rocklin, CA 95677 Transportation Impact Analysis Sierra College Boulevard Commercial Project City of Rocklin Prepared for: David Mohlenbrok City of Rocklin 081 Alvis Court Rocklin, CA 95677 Prepared by: 1875 Olympic Boulevard,

More information

Addendum to Mitigated Negative Declaration

Addendum to Mitigated Negative Declaration Addendum Date: Case No.: 2014.1499E Project Title: (MDSP) - Mission Valencia Green Gateway Streetscape Project Original: 2008.1075, MDSP Mitigated Negative Declaration Project Sponsor: Charlie Ream, San

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 12 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various bicycle improvements and traffic modifications

More information

January 31, Woodrow Wilson Small Area Study

January 31, Woodrow Wilson Small Area Study Woodrow Wilson Small Area Study Overview Woodrow Wilson Complex Consists of: Wilson Elementary School Valley Career and Technical Center Wilson Middle School Wilson High School Wilson Workforce and Rehabilitation

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Transportation Development Act Grant Radar Check Speed Signs

Transportation Development Act Grant Radar Check Speed Signs City Council Agenda January 18, 2017 To: From: Subject: Mayor and City Council Tim Tucker, City Engineer Transportation Development Act Grant Radar Check Speed Signs Date: January 10, 2017 Recommendation

More information

Boston Post Road Design Feasibility Study

Boston Post Road Design Feasibility Study Boston Post Road Design Feasibility Study Prepared for the City of Rye Final Report July 18, 2007 Prepared by: Buckhurst Fish & Jacquemart (BFJ) 115 Fifth Avenue New York, NY 10003 www.bfjplanning.com

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project

Supervisor Cook Announces Final Plans for Braddock Road Improvement Project Supervisor Cook Announces Final Plans for Braddock Road Improvement Project After more than two years of study and significant community input, I am pleased to announce the final plans for the Braddock

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

East 12 th Street Bikeway Feasibility Study

East 12 th Street Bikeway Feasibility Study Final Report East 12 th Street Bikeway Feasibility Study Prepared for: City of Oakland Public Works Agency Submitted by: 180 Grand Avenue, Suite 250 Oakland, CA 94612 Phone: (510) 839-1742; Fax: (510)

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

CDOT s Transportation Plan for the Obama Presidential Center in Jackson Park

CDOT s Transportation Plan for the Obama Presidential Center in Jackson Park CDOT s Transportation lan for the Obama residential Center in Jackson ark May 10, 2018 repared for Jackson ark Watch JacksonarkWatch.org repared by at Hawley,.E. TOE rasmith 16745 West Bluemound Road Brookfield,

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM

SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Sustainable Streets Transportation Engineering BRIEF DESCRIPTION: Requesting that the San Francisco Municipal

More information

Item 08M 1 of 9

Item 08M 1 of 9 MEETING DATE: December 20, 2017 PREPARED BY: Christopher L. Magdosku, City Engineer DEPT DIRECTOR: Brenda Wisneski DEPARTMENT: Development Services CITY MANAGER: Karen P. Brust SUBJECT: Interim North Coast

More information

January 2018 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN

January 2018 FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN FRESNO COUNTY REGIONAL ACTIVE TRANSPORTATION PLAN January 2018 i Acknowledgements: The Fresno Council of Governments thanks the jurisdiction staff members and community members who contributed to the creation

More information

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview

David DiPierro, John Amberson. Steering Committee Meeting #4 Overview IBI GROUP 18401 Von Karman Avenue Suite 110 Irvine CA 92612 USA tel 949 833 5588 fax 949 833 5511 ibigroup.com Memorandum To/Attention Steering Committee Members Date February 17, 2016 From IBI Group Project

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Sustainable Streets BRIEF DESCRIPTION: Approving various routine parking and traffic modifications. SUMMARY:

More information

Chapter 13 ORANGE COVE

Chapter 13 ORANGE COVE Chapter 13 ORANGE COVE This chapter describes the current status and future plans for biking and walking in the City of Orange Cove. RELATIONSHIP TO CITY PLANS AND POLICIES The Orange Cove General Plan

More information

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAFAYETTE RESOLVES AS FOLLOWS:

NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF LAFAYETTE RESOLVES AS FOLLOWS: BEFORE THE CITY COUNCU. OF THE CITY OF LAFAYETTE IN THE MATTER OF: A Resolution of the City Council of the City ) of Lafayette Authorizing Closure of Certain ) Streets and Establishing No Parking Zones

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

Freeway ramp intersection study

Freeway ramp intersection study Freeway ramp intersection study Supporting Vision Zero: Zero traffic deaths in San Francisco by 2024 Study Goals: Primary Improve Safety Improve Accessibility Secondary Provide Efficient Circulation Accommodate

More information

Chapter 11 KINGSBURG RELATIONSHIP TO CITY PLANS AND POLICIES. City of Kingsburg Bicycle Transportation Plan (2017) City of Kingsburg General Plan

Chapter 11 KINGSBURG RELATIONSHIP TO CITY PLANS AND POLICIES. City of Kingsburg Bicycle Transportation Plan (2017) City of Kingsburg General Plan Chapter 11 KINGSBURG This chapter describes the current status and future plans for biking and walking in the City of Kingsburg. RELATIONSHIP TO CITY PLANS AND POLICIES The Kingsburg General Plan is the

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO.: 10.2 DIVISION: Sustainable Streets BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Approving various routine parking and traffic modifications. SUMMARY:

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA

Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,

More information

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069

WEDNESDAY, SEPTEMBER 6, :00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069 MINUTES Meeting of the San Marcos Traffic Commission WEDNESDAY, SEPTEMBER 6, 2017 6:00 PM City Council Chambers, 1 Civic Center Drive, San Marcos, CA 92069 CALL TO ORDER: Vice Chairman Rico called the

More information

City of Palo Alto (ID # 7812) City Council Staff Report

City of Palo Alto (ID # 7812) City Council Staff Report City of Palo Alto (ID # 7812) City Council Staff Report Report Type: Consent Calendar Meeting Date: 3/20/2017 Summary Title: 101 Auxiliary Project Parcels Relinquishments Acceptance and Release of Parcels

More information

SANTA MONICA BOULEVARD CORRIDOR

SANTA MONICA BOULEVARD CORRIDOR CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

4. Mobility and Transportation Element. Page Bikes and Pedestrians

4. Mobility and Transportation Element. Page Bikes and Pedestrians Below are the specific General Plan text changes proposed for A-16-015 and the proposed changes to Figure MT-2 Paths and Trails. In general changes consist of removing references to the Bicycle, Pedestrian

More information

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st

Mineral Avenue Corridor Assessment. ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Mineral Avenue Corridor Assessment ITE 2017 Western District Annual Meeting San Diego, CA June 21 st Biography - Aaron Heumann, PE, PTOE Currently City of Littleton Transportation Engineering Manager 24

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Pre-Construction Meeting

Pre-Construction Meeting Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope

More information

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY

RESOLUTION NO ?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY RESOLUTION NO. 2018-?? A RESOLUTION OF THE CITY OF NEPTUNE BEACH ADOPTING A COMPLETE STREETS POLICY WHEREAS, safe, convenient, and accessible transportation for all users is a priority of the City of Neptune

More information

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville

Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PRESENT Stakeholder Focus Group Meeting #3 January 9, 2013 Cattlemens, 2000 Taylor Road, Roseville PROJECT TEAM REPRESENTATIVES Name Organization Celia McAdam Luke McNeel Caird Leo Heuston Judy Matsui

More information

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project

Northbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed

More information

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities

AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities I MOVE that the Council: AMENDING MOTION: Mobility Plan - Pedestrians and Disadvantaged Communities 1. INSTRUCT the Department of City Planning to amend the proposed Mobility Plan to include the following;

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018

Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Municipal Class EA To Address Traffic Congestion On The Ontario Street Corridor (Grand Bend) Public Information Meeting June 4, 2018 Background Agenda Traffic Study Update Class EA Alternatives Bridge

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN

HARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,

More information

COMMUNITY PARTICIPATION CHAPTER 8

COMMUNITY PARTICIPATION CHAPTER 8 COMMUNITY PARTICIPATION CHAPTER 8 8.1 ROLE OF THE CITY S BICYCLE ADVISORY COMMISION 8.2 BICYCLE TRANSPORTATION PLAN STAKEHOLDERS 8.2.1 Stakeholders 8.2.2 Stakeholders Letters of Recommendations 8.3 CITY

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study

Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report. Appendix I Traffic Impact Study Lyons Avenue/Dockweiler Road Extension Project Draft Environmental Impact Report Appendix I Traffic Impact Study Street 0 80-1947 500.4501 RITA ld Court 0 91355-1096 400.7401 LA n Avenue 0 590-3745 300-9301

More information

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability

About the study. North Milwaukee Ave. Key goals of this study are to: Achieve Vision Zero* by. Harmonize the space and improve walkability About the study Key goals of this study are to: North Milwaukee Avenue is a local and regional street for multiple modes of transportation. It is officially zoned and functions as a pedestrian street southeast

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE

More information

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM

3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM 3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,

More information

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department

Co-ordinator Transportation Committee. Director, Mobility Services and Corporate Fleet Services Environment and Transportation Department 28 REGIONAL MUNICIPALITY OF OTTAWA-CARLETON MUNICIPALITÉ RÉGIONALE D OTTAWA-CARLETON REPORT RAPPORT Our File/N/Réf. Your File/V/Réf. 25 23-97-R016 DATE 15 April 1997 TO/DEST. FROM/EXP. SUBJECT/OBJET Co-ordinator

More information

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for:

MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. Prepared for: MEDICAL/OFFICE BUILDING 1637 BANK STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2434984 Ontario Inc. 13-5510 Canotek Road Ottawa, Ontario K1J 9J5 June 4, 2015 115-613 Report_2.doc D. J.

More information

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES

REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction

More information

Board of Supervisors February 27, 2017

Board of Supervisors February 27, 2017 : Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information