Bicycle Count Data. December 2008
|
|
- Amberlynn Woods
- 5 years ago
- Views:
Transcription
1 Bicycle Count Data December 28 Published By: San Luis Obispo Public Works Department 919 Palm Street, San Luis Obispo, California 9341 Telephone (85) ; FAX (85)
2 Introduction The City s General Plan Circulation Element encourages San Luis Obispo residents to reduce their use of private motor vehicles and increase their use of bicycles, carpools, buses, and walking. The City has instituted a variety of programs to promote this shift in transportation modes. To determine the effect of these programs, the use of various transportation types is monitored every two years. This report presents one component of the monitoring program. Beginning in 1996, the City of San Luis Obispo instituted a program to count bicycle traffic at various street intersections throughout the community. This initial study involved 14 stations across the city, and counted a total of 1,452 bicyclists. This work has been continued every two years since, and is made possible by the voluntary efforts of students from the Civil and Environmental Engineering Department at Cal Poly State University, San Luis Obispo and from members of the City s Bicycle Advisory Committee. Bicycle counts are taken in the middle of the week and collected at fifteen minute intervals for two hours in the afternoon during the month of October. This time is chosen because the goal of the counts is to measure the amount of bicycle commuters, as well as recreational riders. Bicycle commuters represent a daily shift in automobile vehicle use, and utilize bicycling facilities on a regular basis. However, this time period is only a small snapshot of overall bicycle usage throughout the City. Since Cal Poly University is a popular bicycling destination, all streets entering the campus are counted. At other stations, at least one leg of the intersection is part of the City s official bikeway network (The official bikeway network is identified in the San Luis Obispo s Bicycle Transportation Plan). For analysis purposes, these two types of stations are compared further in the report. See Figure 8 on page 11 for a map of locations where counts were performed. Location summaries for each station are included at the end of this report. It is important to note that these counts are subject to substantial variation from year to year. This data can be considered a snapshot of the total ridership of the City. There may be factors such as weather conditions, road conditions, gas prices, and localized special events that can influence the volume of bicycle traffic on any given day at a particular count station, or throughout the City. For each count year, these statistics are recorded so that comparisons may be made between each year. Several charts show these comparisons. In 28, the City began to collect data regarding helmet usage and sidewalk usage at each bicycle station. This data is included in the report as a baseline measure for future counts. For more information about San Luis Obispo s transportation program, contact the San Luis Obispo Public Works Department, Transportation Division, at (85)
3 Summary of 28 Bicycle Counts Date: Tuesday, October 7, and Wednesday, October 8, 28 Time: 3:45pm 5:45pm Weather Conditions: Sunny, Clear, High Temperatures o Average Temperature: 85 F (High temperature of 1 tied record on October 7 th ) City Population: 44,697 (28) Cal Poly Population: o 19,777 students (Fall 27) o 2,955 Faculty, staff and employees (Fall 27) Total Count Locations: 27 Total Bicycles Counted: 3,375 Maximum Volume: California Boulevard and Foothill Boulevard: 496 Minimum Volume: Railroad track at Mill Street overcrossing: 3 Unique circumstances or differences from 26 count conditions: o Cal Poly Area Stadium construction completed. California Blvd. between Campus and Highland open to traffic. Railroad Safety Trail open on Cal Poly property. Phase I of the Poly Canyon Village housing complex open in September. Complex houses approx nd year students. Phase II will be occupied in September of 29. The total estimated occupancy is 2,7 students. Two residential parking structures will be constructed, providing 1,9 spaces to residents only. o City of San Luis Obispo Cal Trans performing intermittent sidewalk improvements and pavement refreshing on Hwy. 227 and Hwy. 1. Bicycle detour signs posted. On Bill Roalman Bicycle Boulevard, stop signs were reversed at Buchon, Islay, Leff and Church Streets. Bicycle stencils painted on roadway. Bicycle only signal phase installed at Santa Barbara & Upham intersection. Straight through bicycle channel installed in the eastbound direction of the Santa Rosa and Foothill intersection. Orcutt Rd. widened between McMillan Street and Laurel Lane. Pedestrian crossing realigned. Continued construction in area for Laurel Creek Townhomes project. No trains were parked on the train tracks during the times the counts were performed. Cal Poly Parking fees (28) o $1.5 per hour for metered parking, $5. per day general pass, and $11 per quarter (11 weeks) general permit. On October 7, the average price of gas in San Luis Obispo was $3.53/gallon. o California average for regular unleaded was $3.6/gallon. o These gas prices are approximately 72% higher than during the last count in 26. 3
4 Analysis of Count Data The bicycle count information was collected for 15 minute intervals from 3:45pm to 5:45pm on Tuesday, October 7 th and Wednesday, 8 th, 28. Table 1 lists the total count results by location. Location summaries at the end of this report describe the individual count locations and turning movements associated with each location. Several changes to count locations have been made since the study s inception, including the addition and deletion of locations. For this year, three additional count locations were added: Jefferey and Cerro Romauldo (#25), BeeBee and South (#26), and Oceanaire and Los Osos Valley Road (#27). These locations were identified to analyze bicycle usage on Bike Plan identified routes through the Foothill, South Street and Laguna Lake neighborhoods. The station at Mill and the UPRR tracks (#24) was expanded to include bicyclists traveling east and west on Mill Street at the railroad overpass in addition to cyclists riding along the railroad tracks below. For the 2 count, location #1 at Foothill and Los Osos Valley Road was discontinued. This location is not within the City Limits and bicycles at this location would be counted at location #14, Madonna and Los Osos Valley Road or location #21, Foothill Boulevard and Tassajara Drive. Counts at Morro and Leff Street began in 24 as Location #1 to document use of the Bill Roalman Bicycle Boulevard. Table 1 - Total Bicycle Count Results by Current Year s Highest Volume * Counts at the Mill and Railroad location counted bicycles on Mill Street for the first time in 28. ** Stations 25, 26 and 27 are new for 28. 4
5 Figure 1 -Total bicycle volume is increasing over a twelve-year time period. See Table 2 on Page 13 for specific data. Figure 2 -Cal Poly average volumes are consistently greater than those of City stations. 5
6 As new bicycle facilities are developed or improved, the counts at existing locations may vary as bicyclists change their routes to make better use of these facilities. As the population changes, the City may gain new bicyclists. External influences, such as gas prices or weather, may also change ridership trends. One goal of this count program is to develop a trend line to measure how bicycle usage on the City's major transportation corridors is changing over time. Because of the types of fluctuations described above, it is necessary to have several data points for each location to accurately determine a trend. Five or more data points will be collected before a positive or negative trend in bicycle usage is determined at a particular location. The following charts help to show trends for bicycle ridership in the City and their relationship to other factors, such as weather, gas prices, and population. Figure 3 No direct correlation between the weather and count volumes can be established. 6
7 California Average Gas Prices for the First Week in October Dollars (unadjusted) $4. $3.5 $3. $2.5 $2. $1.5 $1. $.5 $. $1.26 1/1/96 $1.43 1/1/97 $1.15 $1.38 $1.83 $1.58 $1.55 $1.85 $2.2 $2.96 $2.6 $3. $3.6 1/1/ 98 1/1/99 1/1/ 1/1/ 1 1/1/2 1/1/3 1/1/4 1/1/ 5 1/1/6 1/1/7 1/1/8 Figure 4 Gas prices have been increasing regularly since Figure 5 A direct correlation between the rise in gas prices and increased count volumes can be established. 7
8 Data was collected for the first time in 28 on bicycle helmet usage and sidewalk riding for each location. In particular, the sidewalk riding information is useful to identify locations where bicyclists may not feel safe riding in the roadway. No conclusions are made based on this base year data. Figure 6 Observed helmet usage per location as a percentage of the total location volume. Figure 7 Observed sidewalk riding per location as a percentage of the total location volume. 8
9 Conclusions The total count of bicycles has increased for the eighth year in a row. The total count number was 44% above that of 26. Figure 2, on page 5, comparing the average volume at City and Cal Poly locations, further illustrates this upward trend. The three new stations for 28 were not included in comparisons. As with past counts, bicycle volumes around the Cal Poly area to the north east of the city are higher on average. The five Cal Poly stations made up 39% of the total volume in just five out of the 24 stations. All five stations increased by at least 6% and each station counted more than 15 bicycles in the two hour time frame, or an average of 1.25 bicycles per minute passing the station. The California & Foothill station (#1) counted a record 496 bicycles in the two hour count period, an increase of 123 bicycles; this was 33% higher than 26 volumes. The trend for the past six years shows an overall increase at many of the count locations. 22 of the 24 stations increased by at least 2% over 26 numbers. The railroad at Mill Street overpass saw a decrease in riders on the railroad tracks, likely due to increased enforcement of trespassing regulations by Union Pacific Railroad in the past year. Every other station saw an increase in ridership. In addition to the higher counts around the Cal Poly area, several other increases indicate an overall increase in ridership. There was a 21% increase at Station #14 (Madonna & Los Osos Valley Road) 4 more bicycles than the 26 count. Station #13 (the Railroad trail at Del Campo) saw a 1% increase, from 38 to 76 bicycles utilizing the trail. Location #19 (Tank Farm & Broad) saw a 14% increase, from 24 to 49 bicycles. And count location #6 (California & Monterey) saw a 93% increase, from 9 to 174 bicycles in the two hour period. With total bicycle counts up 44% from 26, the highest recorded count location, and an upward trend for average bicycle volumes, the counts for 28 are encouraging for the City s goal to reduce the use of private motor vehicles. This count information will be used by transportation planners and engineers to plan for future bikeway facilities, to evaluate bicycle travel patterns, and to continue to extend the bicycle network for the City of San Luis Obispo. 9
10 Appendices Figure 8 Station Location Map 11 Figure 9 Volume Intensity Map 12 Table 2 Cal Poly and City Station Volume Comparison Table 13 Figure 1 Map of Existing and Proposed Bikeways 14 Station 1 (California & Foothill) Details 15 Station 2 (Grand & Slack) Details 15 Station 3 (Hathway & Via Carta) Details 16 Station 4 (Highland & Santa Rosa) Details 16 Station 5 (Broad / South / Santa Barbara) Details 17 Station 6 (California & Monterey) Details 17 Station 7 (Chorro & Lincoln) Details 18 Station 8 (Osos & Leff) Details 18 Station 9 (Santa Rosa & Mill) Details 19 Station 1 (Morro & Leff) Details 19 Station 11 (Higuera & Madonna) Details 2 Station 12 (Orcutt & Broad) Details 2 Station 13 (Railroad & Del Campo) Details 21 Station 14 (Madonna & LOVR) Details 21 Station 15 (Johnson & San Luis) Details 22 Station 16 (Hathway & Longview) Details 22 Station 17 (Santa Rosa & Foothill) Details 23 Station 18 (Broad & Marsh) Details 23 Station 19 (Tank Farm & Broad) Details 24 Station 2 (Higuera & High) Details 24 Station 21 (Foothill & Tassajara) Details 25 Station 22 (Johnson & Laurel) Details 25 Station 23 (Jennifer St. Bridge) Details 26 Station 24 (Railroad & Mill) Details 26 Station 25 (Jeffrey & Cerro Romauldo) Details 27 Station 26 (BeeBee & South) Details 27 Station 27 (Oceanaire & LOVR) Details 28 1
11 Figure 8 Station locations throughout the City. 11
12 Figure 9 Volume intensity at stations. 12
13 Table 2 Cal Poly and City Station Volume Comparisons. * Average bicycle volume per hour for two-hour count period is the BPH, bicycles per hour. ** Counts at the Mill and Railroad location counted bicycles on Mill Street for the first time in
14 14 Figure 1 Map of the existing and proposed bikeways and classification system, from the 27 Bicycle Transportation Plan. 14
15 #1 California & Foothill 6 5 California & Foothill California & Foothill is included in the counts as it is a major entrance to the Cal Poly Campus. This intersection has historically had the highest count volumes out of all stations. The bicycle lanes were changed in late 27 to add through slots in both the EB and SB directions. These are not shown in the aerial photograph. #2 Grand & Slack 25 4 Grand & Slack Grand and Slack is included in the counts as it is a major entrance to the Cal Poly Campus. 15
16 #3 Hathway & Via Carta Hathway & Via Carta Hathway and Via Carta is included in the counts as it is a major entrance to the Cal Poly Campus. Via Carta is a foot/bicycle traffic only entrance to Cal Poly. #4 Highland & Santa Rosa 25 4 Highland & Santa Rosa Highland & Santa Rosa is included in the counts as it is a major entrance to the Cal Poly Campus. Cal Trans is continuing work at this intersection, including adding sidewalks and bicycle lanes. These are not shown in the aerial photograph. 16
17 #5 Broad / South / Santa Barbara Broad & South The intersection of Broad, South and Santa Barbara is included in the counts because it is a major intersection in the City, connecting the south part of town with the Downtown Core. Cal Trans is continuing work along Highway 227 to upgrade sidewalks and curb ramps, and has periodically closed the bicycle lane. Bicycle detour signs were posted to divert bicycling traffic during count period. #6 California & Monterey California & Monterey California and Monterey is included in the counts as it is a major connection between the Downtown Core and the east side of town. Monterey is currently a Class III facility, and California is a Class II facility. 17
18 #7 Chorro & Lincoln Chorro & Lincoln The intersection of Chorro and Lincoln is included because it serves as a main connector between the Highland/Foothill areas of the City and the Downtown Core. Chorro St. is one of the five connections between the north and south side of the City across Hwy. 11. #8 Osos & Leff Osos & Leff The intersection of Osos and Leff is included in the counts because it parallels the Bill Roalman Bicycle Boulevard. Osos Street traditionally has channeled traffic to and from Broad Street and captures bicycles utilizing the existing section of the railroad trail. As one of the original 1996 count stations, counts were taken at this intersection before the construction of the Bill Roalman Bicycle Boulevard. Leff Street is identified as a possible bicycle boulevard in the Bike Plan. 18
19 #9 Santa Rosa & Mill 12 1 Santa Rosa & Mill Santa Rosa and Mill Street is included in the count locations because it is an entrance to the Downtown Core from the north side of town from Hwy. 1. Mill Street is one of the seven connections between the east and west side of the UPRR tracks. #1 Morro & Leff 8 7 Morro & Leff The count station at Morro and Leff counts bicycle volumes utilizing the Bill Roalman Bicycle Boulevard. Counts began at this location in 24, after Morro Street was closed at Santa Barbara. Between the 26 and 28 counts, stop signs were reversed at Buchon, Islay, Leff and Church streets, stencils were painted on the roadway identifying the boulevard, and a bicycle only phase was added to the signal at Santa Barbara & Upham. Leff Street is identified as a possible bicycle boulevard in the Bike Plan. 19
20 #11 Higuera & Madonna Higuera & Madonna Madonna is a principle connector between the Laguna Village shopping center, Oceanaire Neighborhood, Laguna Middle School and the Downtown Core. This intersection also connects the South Higuera area with the Downtown Core. #12 Orcutt & Broad 9 8 Orcutt & Broad Orcutt and Broad is a major connection between the east and west sides of the City across the UPRR railroad tracks. Ongoing construction of the Laurel Creek Townhomes to the east of this intersection was present during the count period. The first section of the railroad safety trail exits onto Orcutt Road at Laurel Lane. 2
21 #13 Railroad & Del Campo 8 7 Railroad & Del Campo The Railroad and Del Campo station counts bicycles traveling along the existing segment of the Railroad Safety Trail between the Jennifer St. Bridge (Station #23) and Orcutt Road. This is a multi use, roadway separated, Class I pathway. #14 Madonna & LOVR 7 6 Madonna & LOVR Madonna and Los Osos Valley Road is a major arterial intersection in the southwest area of the City. 21
22 #15 Johnson & San Luis 8 7 Johnson & San Luis Johnson at San Luis Drive is a major arterial intersection in the southwest area of the City. This intersection is located at an entrance to the Downtown Core, and Johnson Ave. is one of the seven connections between the east and west sides of the City across the UPRR tracks. The City s only public high school is located one block north of this intersection. #16 Hathway & Longview Hathway & Longview Hathway and Longview is included in the counts as it is a major entrance to the Cal Poly Campus. Longview turns into a foot/bicycle traffic only entrance to Cal Poly at this intersection. 22
23 #17 Santa Rosa & Foothill 35 3 Santa Rosa & Foothill Santa Rosa & Foothill is included in the counts as it is a major arterial/arterial intersection in the City. This intersection has historically had the second highest count volumes out of all stations. Foothill Blvd. is a major connection to the Cal Poly Campus. The eastbound bicycle lane was changed in late 27 to add a through slot. #18 Broad & Marsh 12 1 Broad & Marsh Broad and Marsh is included in the count locations because it is an entrance to the Downtown Core from the southwest side of town (Madonna and South Higuera areas) and from the south side of the City via Broad St. 23
24 #19 Tank Farm & Broad 6 5 Tank Farm & Broad Tank Farm and Broad is a major arterial intersection in the City. Tank Farm connects the South Higuera area of the City with the Edna/Islay neighborhood, and areas south of the City. #2 Higuera & High 12 1 Higuera & High The intersection of Higuera and High Street also includes an intersection with Pismo Street, as shown in the map above. High and Pismo Streets are considered the same westbound approach for count purposes. These three streets are major connections through the Downtown Core and surrounding residential areas. 24
25 #21 Foothill & Tassajara 9 8 Foothill & Tassajara The Foothill and Tassajara station counts bicycles in the Foothill neighborhood. Foothill Blvd. is a major connection to the Cal Poly Campus. #22 Johnson & Laurel 25 4 Johnson & Laurel The Johnson and Laurel intersection connects the Johnson area of town with the Orcutt area of town. This intersection is located in a residential neighborhood. Flora Street, which is parallel to Johnson Ave., is identified in the Bicycle Transportation Plan as a possible location for a bicycle boulevard. 25
26 #23 Jennifer St. Bridge 9 8 Jennifer St. Bridge The Jennifer Street Bridge is a multi use bridge over the UPRR tracks which connects the Johnson neighborhood with the Downtown Core. The bridge is located at the end of the first section of the Railroad Safety Trail, which extends to Orcutt Rd. Ella Street, which is adjacent to this location, is identified in the Bicycle Transportation Plan as a possible location for a bicycle boulevard. #24 Railroad & Mill 12 1 Railroad at Mill Mill at Railroad Bridge The count station at Mill and the UPRR overpass was originally chosen to monitor bicycle volumes using only the tracks. This year, the station was expanded to include bicycle volumes crossing the tracks on Mill St. This station was the only location with a reduction of volume when compared with 26 count data. It is trespassing to enter the UPRR right of way. 26
27 #25 Jeffrey & Cerro Romauldo 4 35 Jeffrey & Cerro Romauldo The station at Jeffrey and Cerro Romauldo is new for 28, and was chosen to monitor bicycle volumes traveling through the Highland neighborhood on Cerro Romauldo. This route is identified in the Bicycle Transportation Plan as a possible location for a bicycle boulevard. The current count time period may not capture this location s highest volumes, which are expected to be generated by elementary school children going to/from Bishop s Peak, Teach, and Pacheco schools. This location will continue to be monitored in future counts. #26 BeeBee & South 6 5 BeeBee & South The station at BeeBee and South Street is new for 28, and was chosen to monitor bicycle volumes traveling through the South Street neighborhood on BeeBee. It was also chosen to help more accurately show the bicycle volumes in the vicinity of the Higuera / South / Madonna intersection. This location will continue to be monitored in future counts. 27
28 #27 Oceanaire & LOVR 45 4 Oceanaire & LOVR The station at Oceanaire and Los Osos Valley Road is new for 28, and was chosen to monitor bicycle volumes traveling through the Laguna Lake neighborhood on Oceanaire. This location will continue to be monitored in future counts. 28
The Big Picture. FY Bicycling Highlights
FY 2007 2009 Bicycling Highlights Bikeway Improvements are identified as a Major City Goal in the 2007-2009 Financial Plan. Objectives of the goal are to continue to work towards the completion of the
More information4.12 TRANSPORTATION Executive Summary. Setting
4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions
More informationCITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT
City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE
More informationAppendix N: Sensitivity Analysis
N Sensitivity Appendix N: Sensitivity Analysis Analysis Please see the next page. General Plan Update Project #: 172760 June 3, 2014 TECHNICAL MEMORANDUM City of San Luis Obispo General Plan Update Sensitivity
More informationSolana Beach Comprehensive Active Transportation Strategy (CATS)
Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element
More informationCONNECTING PEOPLE TO PLACES
CONNECTING PEOPLE TO PLACES 82 EAST BENCH MASTER PLAN 07 Introduction The East Bench transportation system is a collection of slow moving, treelined residential streets and major arteries that are the
More informationTRANSPORTATION & MOBILITY
TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines
More informationTABLE OF CONTENTS. Executive Summary
Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting
More informationCastro Valley Municipal Advisory Council March 19, 2018
Castro Valley Municipal Advisory Council March 19, 2018 1 Background 2 Draft Bicycle Vision and Pedestrian Networks 3 Next Steps 4 Updates Agenda 2 PROJECT AREA: Unincorporated Areas of Alameda County
More informationFigure 1: East West Connector Alignment Alternatives Concept Drawing
Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationAnholm Bikeway Plan Planning Commission Meeting Summary (8/14/18)
Anholm Bikeway Plan Planning Commission Meeting Summary (8/14/18) Overview: On August 14, 2018, the Planning Commission considered plans for the middle section of the Anholm Bikeway Plan, focusing on the
More informationBroad Street Bicycle Boulevard City Council Study Session Summary
Broad Street Bicycle Boulevard City Council Study Session Summary Overview: On August 15 th, 2017, a City Council Study Session was held to invite community input and request City Council guidance on a
More informationDEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:
DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,
More informationRoads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations
CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationUBC Vancouver Transportation Status Report Fall 2014
UBC Vancouver Transportation Status Report Fall 2014 July 2015 1. Introduction... 1 1.1. Context... 1 1.2. Transportation Monitoring Program... 2 1.3. Changes at UBC Affecting Travel Patterns... 4 1.4.
More information3.16 TRANSPORTATION, CIRCULATION, AND PARKING Regulatory Setting Environmental Setting ROADWAY SYSTEM
3.16 TRANSPORTATION, CIRCULATION, AND PARKING This section assesses the potential for implementation of the Orchard Park Redevelopment component of the 2018 LRDP to result in impacts related to transportation,
More informationArlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks. Thomas Jefferson Working Group Meeting #6 November 10, 2014
Arlington Public Schools Thomas Jefferson Site Evaluation Transportation Networks Thomas Jefferson Working Group Meeting #6 November 10, 2014 2 3 INTRODUCTION 4 Goal of our work: Identify and assess multi-modal
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationMoPac South: Impact on Cesar Chavez Street and the Downtown Network
MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationAppendix T CCMP TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD
Appendix T CCMP 3.3.4 TRAIL TRAFFIC & TRANSPORTATION DESIGN STANDARD 3.3.4 Trail Traffic and Transportation Design Multi-use trails have certain design standards, which vary depending on the agency that
More informationCirculation and Mobility
SECTION 4 Circulation and Mobility OVERVIEW The first phase of the circulation analysis is to address specific concerns regarding the circulation system in the vicinity of the Gateway Specific Plan area
More information4.10 TRAFFIC AND CIRCULATION
4.10 TRAFFIC AND CIRCULATION The following section is based on a traffic and circulation study prepared by Fehr & Peers, Inc. (November 2003; refer to Appendix F for technical calculations). The effects
More informationRoute 7 Corridor Study
Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi
More informationEUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK
EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,
More informationEXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW Study Scope Study Area Study Objectives
Contents EXECUTIVE SUMMARY... vii 1 STUDY OVERVIEW... 1-1 1.1 Study Scope... 1-1 1.2 Study Area... 1-1 1.3 Study Objectives... 1-3 2 EXISTING CONDITIONS... 2-1 2.1 Existing Freeway Conditions... 2-4 2.1.1
More informationStation 1: Street & Sidewalk Upgrades
Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO
More informationEmployment 8,881 17,975 9,094. Households 18,990 31,936 12,946
This section describes the future transportation environment of the UW Tacoma campus and surrounding area. A description of the future conditions on campus in terms of the street system, traffic and intersection
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationNorthbound San Jose Avenue & I-280 Off-Ramp Road Diet Pilot Project
Project Overview Fed by a two-lane Interstate-280 (I-280) off-ramp, high vehicular volumes and speeds are longstanding issues along San Jose Avenue. Residents in the surrounding neighborhoods have expressed
More informationWaterford Lakes Small Area Study
Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS
More informationDurrance Elementary School
Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationComplete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA
Complete Street Analysis of a Road Diet: Orange Grove Boulevard, Pasadena, CA Aaron Elias, Bill Cisco Abstract As part of evaluating the feasibility of a road diet on Orange Grove Boulevard in Pasadena,
More informationDear Mr. Tweed: Sincerely, Min Zhou, P.E. Vice President
December 17, 2012 Mr. Steve Tweed City of Long Beach, Department of Public Works Traffic & Transportation Bureau, 10 th Floor City Hall 333 West Ocean Boulevard Long Beach, CA 90802 Subject: Broadway and
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More informationTRAFFIC IMPACT ANALYSIS
TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More information4 MOBILITY PLAN. Mobility Plan Objectives. Mobility Context. 1. Integrate with Local and Regional Transit Improvements
Harbor Mixed Use CHAPTER Transit Corridor 4: Mobility Plan 4 MOBILITY PLAN Mobility Plan Objectives The Harbor Corridor Plan seeks to expand and improve the ways that people move along and through the
More informationWest Dimond Blvd Upgrade Jodhpur Street to Sand Lake Road
West Dimond Blvd Jodhpur St to Sand Lake CSS Transportation Project Summary Municipality of Anchorage Project # 05 005 Project Manager: John Smith, P.E. (MOA PM&E) Project Administrator: Julie Makela,
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More informationLOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT
LOCAL REVENUE MEASURE ANNUAL COMMUNITY REPORT Fiscal Year SLO Swim Center Pool: The Local Revenue Measure paid for the replacement of the shell plaster at the SLO Swim Center s pool at Sinsheimer Park,
More informationNM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.
Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationMagnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.
Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6
More informationSafe Routes to School (SRTS) Improvements for Bishop s Peak & Pacheco Elementary Meeting #2 Summary
Safe Routes to School (SRTS) Improvements for Bishop s Peak & Pacheco Elementary Meeting #2 Summary Overview. On March 8 th, 2017, community residents attended the second in a series of neighborhood meetings
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationCPC Parking Lot Riverside Drive. Transportation Rationale
CPC Parking Lot Transportation Rationale Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 September 2015 Novatech File: 114093 Ref: R-2015-153 Table of Contents 1.0 INTRODUCTION...
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More information2016 Annual Traffic Safety Report
2016 Annual Traffic Safety Report Public Works and Police Department September 2016 2016 Traffic Safety Report ii Table of Contents EXECUTIVE SUMMARY... 1 INTRODUCTION... 2 BACKGROUND... 2 MOVING TOWARDS
More informationMCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx
MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project
More informationVIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY
VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates
More informationComplete Streets at CalPoly San Luis Obispo
California Polytechnic State University, San Luis Obispo From the SelectedWorks of William W. Riggs Summer June 16, 2015 Complete Streets at CalPoly San Luis Obispo William W Riggs, California Polytechnic
More information2.0 Existing Conditions
20 2.0 Existing Conditions 2.1 Land Use, Future Growth Patterns, Physical Barriers Geographic Overview Sutter County s land use pattern is characterized by extensive agricultural areas, significant natural
More informationGlenn Avenue Corridor Traffic Operational Evaluation
Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background
More informationChapter 14 PARLIER RELATIONSHIP TO CITY PLANS AND POLICIES. Recommendations to Improve Pedestrian Safety in the City of Parlier (2014)
Chapter 14 PARLIER This chapter describes the current status and future plans for biking and walking in the City of Parlier. RELATIONSHIP TO CITY PLANS AND POLICIES The Parlier General Plan is the primary
More informationBridge Street Corridor Study Report
Bridge Street Corridor Study Report Prepared for: Prepared by: BRIDGE STREET CORRIDOR STUDY REPORT PREPARED FOR: CITY OF ARROYO GRANDE COMMUNITY DEVELOPMENT DEPARTMENT 300 EAST BRANCH STREET ARROYO GRANDE,
More informationDr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018
Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.
More informationINTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS
INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationMASTER BICYCLE AND PEDESTRIAN PLAN
VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.
More informationWaterford Lakes Small Area Study Report
Waterford Lakes Small Area Study Report Orange County District 4 Prepared for: Orange County Public Works Department Traffic Engineering Division 4200 S. John Young Parkway Orlando, FL 32839-9205 Prepared
More informationLincoln Avenue Road Diet Trial
Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume
More information5.13 Soledad. Demographic Profile. Disadvantaged Communities. Safety Profile
5.13 Soledad Demographic Profile The City of Soledad is a small town in the Salinas Valley with 26,065 people, as reported by the California Department of Finance 2017 data. Soledad is a relatively young,
More information3.0 Future Conditions
3.0 Future Conditions In order to be able to recommend appropriate improvements to the transportation system of the Town, it is important to first understand the nature and volume of traffic that is expected
More informationCITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM
CITY OF LOS ANGELES INTER-DEPARTMENTAL MEMORANDUM Date: April 1, 219 To: Honorable City Council c/o City Clerk, Room 395, City Hall Attention: Honorable Mike Bonin, Chair, Transportation Committee From:
More informationClay Street Bridge Replacement Project
Clay Street Bridge Replacement Project Frequently Asked Questions (FAQs) The project is located in downtown Placerville on Clay Street between US Highway 50 and Main Street and Cedar Ravine Road. The proposed
More informationDrag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationUS287 Asset Inventory Fort Collins. Figure 5-1 Fort Collins Bridges and Traffic Signals
Chapter 5: City of Fort Collins US287 through Fort Collins is known as College Avenue, runs for approximately 9.25 miles, and bisects the City north to south. Within the City, US287 is a principal arterial.
More informationSixth Line Development - Transit Facilities Plan
Memorandum Date: November 13, 2012 To: From: c.c. Subject: Rob Freeman (Freeman Planning) Kevin Phillips Sixth Line Development - Transit Facilities Plan 33016631 This memo was prepared to review the transit
More informationChapter 13 ORANGE COVE
Chapter 13 ORANGE COVE This chapter describes the current status and future plans for biking and walking in the City of Orange Cove. RELATIONSHIP TO CITY PLANS AND POLICIES The Orange Cove General Plan
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More informationCITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study
CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationTRAFFIC IMPACT STUDY CRITERIA
Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat
More informationCity of Madison: 2017 Capital Budget Capital Improvement Plan
Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction
More informationTRAFFIC ACTION PLAN. Laurie Meadows Neighborhood CITY OF SAN MATEO
TRAFFIC ACTION PLAN Laurie Meadows Neighborhood CITY OF SAN MATEO Draft January 2017 Table of Contents Introduction... 2 The Traffic Forum Process... 5 Neighborhood Traffic Issues... 7 Neighborhood Recommendations
More informationBikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN
Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of
More informationTRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT
TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, 2010 230 South Broad Street Philadelphia
More informationSNCC Demographic Trends
Employment Population SNCC Demographic Trends In 1970 the SNCC population was 10,040, accounting for roughly 3% of the County population In 2015, SNCC grew to 60,567 people, roughly 11% of the County population
More informationSANTA MONICA BOULEVARD CORRIDOR
CIRCULATION ELEMENT WHITE PAPER NO. 3 SANTA MONICA BOULEVARD CORRIDOR INTRODUCTION From the 1930s to the beginning of Los Angeles freeway era, Santa Monica Boulevard, (previously Route 66, the Beverly
More informationTunnel Reconstruction Brooklyn CB 1 August 14, 2018
Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationHENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.
HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc
More informationo n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents.
N o n - m o t o r i z e d transportation is an overlooked element that can greatly enhance the overall quality of life for the community s residents. 84 Transportation CHAPTER 11 INTRODUCTION Transportation
More informationWalkShop. Highland Creek Village
On June 5, 2014, 15 people participated in a for the Transportation Master Plan. The purpose of the was to receive feedback from a diverse range of local stakeholders and document existing transportation
More informationSOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM
SOLANA BEACH BICYCLE TRANSPORTATION PLAN SECOND ADDENDUM Prepared by the City of Solana Beach January 2005 Introduction In June of 1993, the Solana Beach City Council adopted a Bikeway Master Plan as directed
More informationOffset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico
Offset Single Point Interchange I-25 at Rio Bravo Boulevard Albuquerque, New Mexico INSTITUTE OF TRANSPORTATION ENGINEERS 2016 WESTERN DISTRICT MEETING JULY 11, 2016 7/11/2016 1 Project Vicinity Map 7/11/2016
More informationU NIVERSITY OF B RITISH C OLUMBIA. Fall 2010 Transportation Status Report
U NIVERSITY OF B RITISH C OLUMBIA Fall 2010 Transportation Status Report 1 April 2011 U NIVERSITY OF B RITISH C OLUMBIA Fall 2010 Transportation Status Report Contents 1. INTRODUCTION... 1 1.1. Context...
More informationA Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study
A Selection Approach for BRT Parking Lots Nicolls Road Corridor Parking Study Chirantan Kansara, P.E. Engineering Construction Design Planning 2018 ITE Northeastern District Annual Meeting Lake George,
More informationChapter 6 Transportation Plan
Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationAPPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY
APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose
More information