TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT

Size: px
Start display at page:

Download "TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT"

Transcription

1 TRAFFIC IMPACT ANALYSIS OF PROPOSED CHESTNUT HILL COLLEGE MASTER PLAN DEVELOPMENT Prepared by Orth-Rodgers & Associates, Inc. December 14, 2009 Updated November 9, South Broad Street Philadelphia PA Phone Fax

2 TABLE OF CONTENTS Page No. Introduction..1 Existing Conditions....2 Existing Roadway Conditions....2 Existing Traffic Volumes...3 Existing Transit Service. 3 Existing Levels of Service...4 Characteristics of Chestnut Hill College Traffic Existing College Campus and Population.. Existing College Daily Traffic Patterns..8 Existing College Traffic Volumes during Commuter Peak Hours...9 Projected Future Campus and Population...9 Methodology for Projecting Future College Traffic. 10 Future College Peak Hour Traffic Volumes.11 Future Traffic Conditions..12 Sugarloaf Hill Campus Driveway Access.12 Future Peak Hour Traffic Volumes...13 Future Peak Hour Levels of Service..14 Conclusion....15

3 Introduction Chestnut Hill College (CHC) is located in the Chestnut Hill section, at the northwestern edge of City of Philadelphia, Pennsylvania. CHC currently has two campuses. The Main Campus is bounded by Germantown Avenue, Northwestern Avenue and the Wissahickon Creek. The Sugarloaf Hill Campus, used as a conference center by Temple University prior to its acquisition by CHC in 2006, is located south of and across Germantown Avenue from the Main Campus. The Chestnut Hill College Master Plan 2008 was developed based on the College s ambitious strategic plan. Highlights of the proposed Master Plan include: 1. Increase student enrollment headcount from 2,300 to 2,900. The majority of the increase will be made up of undergraduate students. 2. Increase full time staff (including faculty) headcount from 240 to Increase the number of student housing beds from 560 to 1, Redevelop the newly acquired Sugarloaf Hill Campus, increasing the gross square foot area from 46,523 to 344,829 (not including parking structure). 5. Provide new facilities at the Main Campus. increasing the gross square foot area from 61,688 to 839,60 (not including parking structure). 6. Construct new parking structures to increase the number the parking spaces from 616 to approximately 1,200. Orth-Rodgers & Associates (ORA) was retained by CHC to study the potential traffic impact of the proposed Master Plan expansion. This plan will take years to implement, and it will go through several different development phases. However, this study only examines the future traffic conditions assuming the completion of all the Master Plan development. Accordingly, ORA s staff conducted the following tasks: 1. Conducted field views and observations to note physical roadway conditions, traffic controls and regulations, and peak period traffic conditions. 2. Conducted manual turning movement counts from :00 9:00 am and from 4:00 6:00 pm at the following locations: o Germantown Avenue and Northwestern Avenue o Germantown Avenue and Rogers Drive o Germantown Avenue and Hillcrest Avenue o Germantown Avenue and Bells Mill Road o Northwestern Avenue and CHC Service Driveway/Lincoln Woods Apartment o Northwestern Avenue and CHC Driveway 3. Placed tube traffic counters across Rogers Road and other campus driveways to obtain hourly entry and exit volumes and establish daily traffic patterns and times of peak campus traffic activity. 4. Estimated the new morning and evening peak hour traffic volumes generated by the expanded population and activity on both campuses. Chestnut Hill College Master Plan Expansion Page 1

4 5. Assigned college traffic to the Master Plan campus site access driveways in accordance with the future parking locations and supply, and determined future morning and evening peak hour traffic volumes at the studied intersections. 6. Conducted analysis to determine future intersection levels of service.. Provided recommendations for design of site access. The remainder of this report details these efforts and the findings of the analysis. Existing Conditions An analysis of existing conditions in the vicinity of the CHC campuses was conducted in order to provide a base condition for an assessment of the traffic impact of the proposed college expansion. This included field investigations of the surrounding roadways and intersections, and collection of traffic volume data. Existing Roadway Conditions Germantown Avenue Germantown Avenue is a community arterial that runs approximately north-south through the study area. Germantown Avenue provides one travel lane in each direction except for the segment between Hillcrest Avenue and Bells Mill Road where there are three lanes: two southbound lanes with one of them a dedicated right turn lane at the intersection of Bells Mill Road, and a single northbound lane. Germantown Avenue also has channelized left turn lanes at some of the signalized intersections: northbound and southbound at Northwestern Avenue, southbound at Hillcrest Avenue, and northbound at Bells Mill Road. There are striped bicycle lanes on both sides of Germantown Avenue but only in the area of the Wissahickon Creek Bridge. The bike lanes do not extend all the way to Northwestern Avenue or to Hillcrest Avenue because left turn lanes are striped at those intersections within the same pavement width. The speed limit on Germantown Avenue is 30 mph with no on-street parking permitted on either side of the roadway. Northwestern Avenue Northwestern Avenue is a collector roadway that runs east-west. To the west it ends in Fairmount Park; to the east it connects to Stenton Avenue and continues as Wissahickon Avenue into Flourtown. The main campus of CHC is located on the south side of this street. Northwestern Avenue carries one travel lane at each direction and the speed limit is 35 mph. The intersection of Northwestern Avenue and Germantown Avenue is controlled by a two-phase traffic signal. Rogers Drive is the main access to Chestnut Hill College. It provides one entry and one exit lane. The intersection with Germantown Avenue is controlled with a two-phase signal. There is no left turn lane on Germantown Avenue at Rogers Drive. When a vehicle is stopped on southbound Germantown Avenue waiting to turn left, other vehicles sometimes bypass using the bike lane area depending on where the left turn vehicle has stopped. Hillcrest Avenue Hillcrest Avenue is a local collector roadway that runs east-west and connects Germantown Avenue with Stenton Avenue and Bethlehem Pike. It has one travel lane Chestnut Hill College Master Plan Expansion Page 2

5 plus a striped shoulder in each direction and the speed limit is 30 mph. The T-intersection of Hillcrest Avenue and Germantown Avenue is controlled by a two-phase signal. Hillcrest Avenue provides separate left and right turn lanes at the signal. Bells Mill Road Bells Mill Road is a collector roadway that runs east-west. West of Germantown Avenue, it provides one travel lane each direction and connects Germantown Avenue with Ridge Avenue. Bells Mill Road is one of a limited number of bridge crossings of the Wissahickon Creek, and the road runs through Fairmount Park. The speed limit is 30 mph. At the Forbidden Drive trail in Fairmount Park, Bells Mill Road is Stop sign controlled. Cars must stop for pedestrians, cyclists and horseback riders crossing the road. East of Germantown Avenue, Bells Mill Road is a one-way eastbound street connecting to Stenton Avenue. The intersection of Germantown Avenue and Bells Mill Road is controlled by a three-phase traffic signal. Northbound Germantown Avenue left turns to west Bells Mill Road have a leading left turn arrow (northbound through and right turn traffic also has a green light during this phase), followed by a phase for all movements on Germantown Avenue, then a phase for Bells Mill Road. During the Bells Mill Road phase, southbound Germantown Avenue right turns have a right turn arrow. Existing Transit Service SEPTA runs the Route L bus on Germantown Avenue in the area of CHC. The route extends from the Plymouth Meeting Mall to Chestnut Hill and then to Broad and Olney Streets. Stops are posted at Northwestern Avenue, Rogers Drive, and Bells Mill Road. CHC runs an intercampus shuttle between the Sugarloaf Hill Campus and the Main Campus. It is anticipated that once good walking routes connecting the two campuses are constructed as proposed in the Master Plan, walking will be the primary mode of travel between the two campuses and shuttle service will be more limited. Existing Traffic Volumes Tube traffic counters were placed on Germantown Avenue from Tuesday September 15 through Thursday September 24, 2009 to capture daily traffic volumes and travel patterns along the roadway. In addition, manual vehicle turning movement counts were conducted on Thursday September 10 and Tuesday September 15, 2009 from :00 9:00 am and 4:00 6:00 pm at the following locations: o Germantown Avenue and Northwestern Avenue o Germantown Avenue and Rogers Drive o Germantown Avenue and Hillcrest Avenue o Germantown Avenue and Bells Mill Road o Northwestern Avenue and CHC Service Driveway/Lincoln Woods Apartment o Northwestern Avenue and CHC Driveway Chestnut Hill College Master Plan Expansion Page 3

6 Existing intersection turning volumes during the peak hours are illustrated in Figures 1 and 2. The recorded traffic data reveal that Germantown Avenue experiences a distinct peaking in volume during commuter rush hours. On Germantown Avenue, the traffic peak hours occur :30 am 8:30 am in the morning and 5:00 pm 6:00 pm in the evening. The hourly two-way traffic volume on Germantown Avenue varies between 1,200 vehicles and 1,00 vehicles during the peak hours. The heaviest travelled segment of Germantown Avenue is the one between Hillcrest Avenue and Bells Mill Road. In this segment, the southbound traffic volume is always higher than northbound volume, because of westbound vehicles turning left from Hillcrest Avenue to southbound Germantown Avenue and then turning right to travel west on Bell Mill Road (whereas eastbound Bells Mill Road traffic can continue straight across Germantown Avenue). Bells Mill Road west of Germantown Avenue carries a morning peak hour total traffic volume of 1,350 vehicles, with about 50 vehicles travelling eastbound approaching Germantown Avenue. During the evening peak hour, the total traffic volume on Bells Mill Road is about 1,400 vehicles with 800 vehicles travelling westbound away from Germantown Avenue. Northwestern Avenue east of Germantown Avenue carries a total of about 650 vehicles during both peak hours, split about evenly by direction. The majority of vehicles on Northwestern Avenue turn right onto Germantown Avenue to travel north; the reverse left turn from Germantown Avenue into Northwestern Avenue is also very heavy. Northwestern Avenue west of Germantown Avenue ends in Fairmount Park and carries a low traffic volume of about 100 total vehicles during each of the peak hours. Hillcrest Avenue carries a higher volume of traffic in the westbound direction than it carries eastbound. About 650 westbound vehicles and no more than 330 eastbound vehicles travel on Hillcrest during both the AM and PM peak hours. This is due to the fact that Bells Mill Road between Bethlehem Pike and Germantown Avenue is one-way eastbound. The majority of westbound vehicles on Hillcrest Avenue turn left on Germantown Avenue. Field observations reveal that most of these left turning vehicles from Hillcrest Avenue then turn right onto Bells Mill Road to continue traveling west towards Ridge Avenue. Existing Levels of Service While traffic volumes provide an important measure of activity on the area roadway system, evaluating how well that system accommodates those volumes is also important (i.e. a comparison of peak traffic volumes with available roadway capacity). By definition, capacity represents the maximum number of vehicles that can be accommodated, given the constraints of roadway geometry, environment, traffic characteristics, and controls. Intersections generally control capacity in road networks because most conflicts exist at these points between through, crossing, and turning vehicles. Because of these conflicts, congestion is most likely to occur at intersections. Therefore, intersections are studied most often when determining the quality of traffic flow on a roadway network. Chestnut Hill College Master Plan Expansion Page 4

7 An unsignalized intersection on a through route is seldom critical from an overall capacity standpoint. However, it may be of great significance to the capacity of the minor cross route and it may influence the levels of service on both. In analyzing intersections, it is assumed that the major street through movement and the right turn are unimpeded and have the right-of-way over all side streets and left turns from the major street. All other movements through the intersection cross, merge with, or are affected by other flows. A descriptive mechanism (Level of Service) has been developed for unsignalized intersections which indicates average delay at the intersection on a scale from a, indicating an average delay between zero and 10 seconds, to f, indicating an average delay greater than 50 seconds. Table 1 summarizes unsignalized intersection level of service criteria. Table 1: Levels of Service and Expected Delay for Unsignalized Intersections 1 Level of Service Expected Traffic Delay Average Total Delay (Seconds/Vehicles) a Little or no delay 10.0 b Short traffic delays 10.1 to 15.0 c Average traffic delays 15.1 to 25.0 d Long traffic delays 25.1 to 35.0 e Long traffic delays 35.1 to 50.0 f Very long traffic delays >50.0 At signalized intersections, factors that affect the various approach capacities include width of approach, number of lanes, signal green time, turning volumes, truck percentages, etc. However, operation at capacity can be less satisfactory since substantial delays or reduced operating speeds are likely. Delays cannot be related to capacity in a simple one-to-one fashion. It is possible to have delays in the Level of Service F range without exceeding roadway capacity. Substantial delays can exist without exceeding capacity if one or more of the following conditions exist: o Long signal cycle lengths o A particular movement experiences a long red time o Progressive movement for a particular lane group is poor Table 2 summarizes the level of service criteria for signalized intersections. In general, Level of Service D is considered acceptable in an urbanized area. 1 Transportation Research Board, Special Report 209, Highway Capacity Manual, Third Edition, published by the Transportation Research Board, Washington, D.C., 2000 Chestnut Hill College Master Plan Expansion Page 5

8 Table 2: Level of Service and Expected Delay for Signalized Intersections 2 Level of Service A B C D E F Description Very low delay, good progression; most vehicles do not stop at intersection. Generally good signal progression and/or short cycle length; more vehicles stop at intersection than Level of Service A. Fair progression and/or longer cycle length; significant number of vehicles stop at intersection Congestion becomes more noticeable; individual cycle failures; longer delays from unfavorable progression, long cycle length, or high volume/capacity ratios; most vehicles stop at intersection. Usually considered limit of acceptable delay indicative of poor progression, long cycle length, or high volume/capacity ratio; frequent individual cycle failures. Could be considered excessive delay in some areas, frequently an indication of oversaturation (i.e. arrival flow exceeds capacity), or very long cycle lengths with minimal side street green time. Capacity is not necessarily exceeded under this level of service. Average Total Delay (seconds per vehicle) to to to to 80.0 > 80.0 The capacity analysis for the study area intersections was performed using Synchro Version for signalized and unsignalized intersections. Figures 3 and 4 illustrate the existing peak hour levels of service. During the morning peak hour, all movements at each of the study intersections are operating at good service levels except for three movements. The southbound Germantown Avenue left turn at Hillcrest Avenue is operating at LOS E with average delay per vehicle of more than a minute. The southbound Germantown Avenue through movement at the intersection of Bells Mill Road operates at LOS F with 111 seconds delay. This delay means that about half the drivers making this movement do not get through on the first green. This is because the through movement is only getting 22 seconds of green time out of the 80-second total cycle. The Bells Mill Road eastbound approach to Germantown Avenue experiences long delays and queues. 2 Transportation Research Board, Special Report 209, Highway Capacity Manual, Third Edition, published by the Transportation Research Board, Washington, D.C., 2000 Chestnut Hill College Master Plan Expansion Page 6

9 During the evening peak hour, there are three movements operating at undesirable service levels. The southbound Germantown Avenue left turn at Hillcrest is operating at LOS F. At times, the left turn vehicle queue extends beyond the provided storage lane and extends onto the through lane, thus blocking all southbound traffic. The westbound left turn from Hillcrest Avenue is operating at Level of Service E and a long queue of left turn vehicles is constantly observed during the evening peak hour. Finally, eastbound Bells Mill Road approaching Germantown Avenue experiences queues that at times extend to Forbidden Drive. Field observations showed some other notable conditions: During the evening peak hour, at times a long line of westbound vehicles on Bells Mill Road was observed extending from the Stop sign at the Forbidden Drive pedestrian crossing. The queue can extend back to the signalized intersection of Germantown Avenue and prevent vehicles from turning into Bells Mill Road. When this occurs, a queue can quickly form on southbound Germantown Avenue in the exclusive right turn lane. This issue appears to be seasonal and weather limited, since it is related to a high number of joggers, cyclists and horseback riders on the Forbidden Drive trail during the PM commuter peak hour. The southbound through lane of Germantown Avenue at Hillcrest Avenue leads into the right lane of the two southbound lanes approaching Bells Mill Road. The right lane becomes an exclusive right turn lane at the intersection of Bells Mill Road. Motorists sometimes appear to be trapped in the right turn lane trying to merge back to the through lane. This slows down traffic progression and can cause backup on both of the southbound lanes between Hillcrest Avenue and Bells Mill Road. This situation could be improved by revising the pavement markings and placing another lane designation sign closer to Hillcrest Avenue. Characteristics of Chestnut Hill College Traffic Existing College Campus and Population Chestnut Hill College has two campuses, Main Campus and the Sugarloaf Hill Campus. The Main Campus is located on the east side of Germantown Avenue and north of the Wissahickon Creek. The Sugarloaf Hill Campus is located on the west side of Germantown Avenue and south of the Wissahickon Creek. Currently, the Sugarloaf Hill Campus is still under renovation and provides housing to about 60 undergraduate students. In the Fall Semester of Year , the total number of students enrolled is 2,300 (900 undergraduate students plus 1,400 graduate and continuing studies students). Out of the 900 undergraduate students, 560 live on campus. There are 4 full time faculty and 166 full time staff. Chestnut Hill College Master Plan Expansion Page

10 Existing College Daily Traffic Patterns The Main Campus has three driveways, one on Germantown Avenue and the other two on Northwestern Avenue. Rogers Drive on Germantown Avenue serves as the College s main entrance and carries the highest traffic volumes throughout the day. The driveway located across from the Lincoln Woods Apartments is used by service vehicles and carries the lowest volume among the three. The third driveway connects to the internal parking lots and provides an alternative access point to Rogers Drive. The Sugarloaf Hill campus presently has three driveways. On Bells Mill Road there is a driveway located approximately 60 feet from Germantown Avenue. There is a driveway to Germantown Avenue about 80 feet west of Bells Mill Road. The third driveway is a one-way entry-only driveway located 540 feet west of Bell Mill Road and 300 feet east of Hillcrest Avenue. Automatic Traffic Recorders (ATR) were placed on the campus driveways (except for the Main Campus service drive) to measure the daily campus traffic volumes and patterns. The data reveal that the college daily traffic has three significant peaks. The school morning peak hour is from 9:00 to 10:00 am when faculty, staff, and students arrive. The school evening peak hour is from 5:00 to 6:00 pm when daytime students and staff are leaving while students attending evening classes arrive. The third peak occurs from 8:00 to 9:00 pm when the evening students and faculty leave. The morning school traffic peak hour occurs about one hour later than the morning commuter peak hour on Germantown Avenue, while the afternoon school peak hour is the same as the commuter peak. The graph below illustrates the CHC traffic pattern throughout a typical weekday. Chestnut Hill College Master Plan Expansion Page 8

11 For purposes of the traffic analysis, the critical time period is the weekday afternoon commuter peak hour (5:00 6:00 pm). During the 8:00 9:00 pm evening school exiting peak, traffic volume on Germantown Avenue is much lower. Weekends are not critical for the traffic analysis because weekend traffic volume on Germantown Avenue is relatively low, and traffic generated by a weekend event at the Sugarloaf Hill Campus would also be lower than the college weekday peak. Existing College Traffic Volumes during Commuter Peak Hours Based on the traffic counts conducted at all the school driveways of both campuses, there are 145 entering vehicles and 34 exiting vehicles during the morning commuter peak hour. Rogers Drive carries about 65% of the traffic while the non-service driveway carries 25%. During the evening peak hour, there are 251 entering vehicles and 154 exiting vehicles. Rogers Drive carries 80% of the school traffic while the non-service driveway carries 15%. It can also be seen that the school generates much more traffic during the evening commuter peak hour than during the morning peak hour. The great majority of the peak hour traffic is currently generated at the Main Campus. Sugarloaf Hill Campus currently generates no more than 30 vehicles total during either of the peak hours. Projected Future Campus and Population According to the Master Plan, development will occur at both campuses but the majority of new facilities will be located at the Sugarloaf Hill Campus. The future Sugarloaf Hill Campus will host residential halls, academic buildings, and a 450-space parking garage. With the Master Plan development in place, the College is expecting to increase its undergraduate student population from existing 900 to 1, % or 1,200 of these undergraduate students will live on campus. The number of full time faculty and staff will grow accordingly from existing 240 to 433. This is to maintain the ratio of one faculty to 12 undergraduate students. However, for the graduate and continuing studies programs, the number of students is expected to remain about the same as today s 1,400. Table 3 illustrates the comparison between the existing population and the future population of different categories. Chestnut Hill College Master Plan Expansion Page 9

12 Table 3: Comparison of Existing and Future College Population Category Existing Population Future Population % Increase Undergraduate 900 1,500 6% Faculty/Staff % Graduate/Continuing Studies 1,400 * 1,400 0% * 1,400 is the headcount, or number of individual students registered, not the number of students that come to campus on a given day. Many graduate/continuing studies students take only one class per week. Methodology for Projecting Future College Traffic To project the future college peak hour traffic volume, it is assumed that the CHC travel patterns will remain the same as today. Therefore, the future college traffic was increased in proportion to the college Master Plan population increase. The school traffic during the morning commuter peak hour is a combination of faculty, staff, and undergraduate students. Faculty and staff will have a higher percentage population increase than students, but the faculty/staff rate was applied to all morning traffic in order to be conservative. The future morning entering and exiting peak hour traffic volumes were increased by 80% over the existing counts. During the evening peak hour, the entering traffic is mainly from graduate or Continuing Studies students, whose population will remain constant. The evening peak hour school exiting traffic is mainly from faculty and staff getting off work, as well as some day students. The future evening entering peak hour traffic was kept at the same level as existing, but the exiting peak hour traffic was increased by 80%. This methodology is summarized in the following Table 4. Table 4: CHC Trip Increase over Existing with Completion of Master Plan Development Entering Exiting AM Peak Hour 80% 80% PM Peak Hour 0% 80% Chestnut Hill College Master Plan Expansion Page 10

13 Future College Peak Hour Traffic Volumes Applying the aforementioned methodology results in projected future peak hour CHC traffic volumes as illustrated below in Table 5. With completion of the Master Plan development, it is projected that the total traffic generated by CHC will increase over today s levels by 80% in the morning peak hour and by 30% in the evening peak hour. Table 5: Future CHC Trip Projection (Vehicles in Peak Hour) Existing Future Total Entering Exiting Entering Exiting Increase AM Peak PM Peak Based on the parking demand study by Chance Management Advisors, the master plan parking demand will total 1,09 vehicles (daytime) and 898 vehicles (evening), which includes a parking demand of 232 spaces for junior and senior resident students. Freshmen and sophomore students will not be permitted to bring a car to campus. With the proposed 1,200 space parking supply, the daytime occupancy will be 91% and the evening occupancy (during classes) will be 5%. For purposes of the traffic study, we have assumed that 80% (186 spaces) of resident student parking will be assigned at Sugarloaf campus, with the remaining 20% (46 spaces) at the Main Campus. Applying equal occupancy rates at both campuses, it is estimated that about 25% of commuter (commuter student and faculty/staff ) parking will take place at Sugarloaf Campus. This is because of the lower parking supply and the amount of residential parking at Sugarloaf. The breakdown of the distribution to each campus is shown in the table below: Table 6: Future Trip Generation/Distribution Methodology Based on Parking Allocation CHC Sugarloaf Total Parking Supply 50 63% % 1200 Parking Demand (day) 109 Parking Demand (night) 898 Assume 80% resident Sugarloaf Resident parking 46 20% % 232 Assume equal both campuses Daytime parking demand (91% occupancy) Resident parking 46 20% % 232 Commuter parking (AM) 63 4% % 865 Evening parking demand (5% occupancy) Resident parking 46 20% % 232 Commuter parking (PM) 514 % % 666 Chestnut Hill College Master Plan Expansion Page 11

14 The total future college traffic is then distributed between the Main and Sugarloaf campuses as follows: Table : Future Trips by Campus AM Peak Hour PM Peak Hour In Out Total In Out Total Future Trip Projection (Table 5) Using commuter traffic % by campus in Table 6 CHC Sugarloaf Figures 5 and 6 illustrate projected college traffic movements for the AM and PM peak hours. Future Traffic Conditions Sugarloaf Hill Campus Driveway Access The three existing driveways that serve the Sugarloaf Hill Campus are not suitable to support increased traffic activity. The driveways are too close to the intersection of Germantown Avenue and Bells Mill Road, and queues at the traffic signal block exits from the driveways. None of the existing driveways is at a location that is suitable for a traffic signal. It is recommended that the existing driveways be closed. The driveway on Germantown Avenue closest to Bells Mill Road should be retained as an emergency access only. An extensive study was performed to determine the best location for a new main access driveway. The location must be suitable for a traffic signal, must provide acceptable traffic operations within the existing constraints of Germantown Avenue and its other existing signals, and the driveway must be able to achieve acceptable alignment and grades to its destinations within the Sugarloaf Campus. Traffic analysis and simulations show that the best location for meeting all these criteria is on Germantown Avenue opposite Hillcrest Avenue. The driveway will form a fourth leg to what is now a T intersection. The following improvements to the intersection are recommended in order to provide for the new driveway: 1. The Sugarloaf Hill driveway should provide on entry lane and two exit lanes: an exclusive left turn lane and a lane for through and right turn movements. Chestnut Hill College Master Plan Expansion Page 12

15 2. A left turn lane for motorists travelling north on Germantown Avenue to turn into the Sugarloaf Hill Campus should be created within the existing street width. This is accomplished by reallocating 125 feet of the center lane on Germantown Avenue south of Hillcrest Avenue that is now used by southbound traffic to create a 5-foot long full width left turn lane with 50 foot taper. 3. On Hillcrest Avenue, the existing right turn lane would also provide for straight through movements into the new driveway. 4. The traffic signal should be upgraded in several ways: Since the left turn from Hillcrest Avenue to eastbound Germantown Avenue has such a high volume, it is recommended that the traffic signal provide a long advance left-turn phase for Hillcrest Avenue before the signal turns green for the CHC Driveway. Detectors should be installed for the CHC driveway. This phase will not appear when there is no vehicle present. A left turn signal arrow is recommended for the southbound left turn into Hillcrest Avenue, to prevent the left turns from backing up into the through lane. A detector is recommended for this phase. A pedestrian crosswalk should be striped across Germantown Avenue on the north side of the intersection. Pedestrians would cross Germantown Avenue on the Hillcrest Avenue eastbound advance left-turn phase, which provides ample time for the crossing. Pedestrian signal heads should be included for all crosswalks in the upgraded signal. 5. The traffic signal at Hillcrest Avenue should be interconnected and coordinated with the signal at Bells Mill Road. This will improve the level of service on Germantown Avenue at Bells Mill Road. Future Peak Hour Traffic Volumes Comparison of traffic counts along Germantown Avenue conducted in Years 2006 and 2009 shows no significant change in traffic volumes along Germantown Avenue during the last several years. Therefore, for the purposes of projecting future traffic, the new CHC traffic was added to the 2009 volumes. The existing directions of approach and departure to Chestnut Hill College, as described below, were used to distribute the projected college traffic onto the roadway network: o 34% from / to the north on Germantown Avenue; o 25% from / to the south on Germantown Avenue; o 26% from / to the east on Northwestern Avenue or Hillcrest Avenue; o 15% from / to the west on Bells Mill Road. Chestnut Hill College Master Plan Expansion Page 13

16 Applying this distribution to the future total trip generation for each campus (from Table ) results in the AM and PM peak hour college trips illustrated in Figures 5 and 6. Figures and 8 illustrate the projected total future peak hour traffic volumes at the study area streets and intersections with full development of the CHC Master Plan. Future Peak Hour Levels of Service Capacity analysis was conducted of the study area intersections with the projected future traffic volumes. Roadway and signal improvements were assumed to be in place as described in this report section on Sugarloaf Hill Campus Driveway Access (page 12). Figures 9 and 10 illustrate the future peak hour Level of Service of the studied intersections. The comparison of existing and future intersection overall average level of service (with average delay in seconds) is summarized in Table 8. Table 8: Level of Service Comparison Signalized Intersections on Germantown Avenue Intersection AM Peak Hour PM Peak Hour Existing Future Existing Future Northwestern Avenue C(21) B(18) B(1) B(1) Rodgers Drive A(3) A(5) A(9) A(9) Hillcrest Avenue C(25) C(2) E(69) D(55) Bell Mill Road D(46) D(38) C(23) C(20) It can be seen that, with the optimized signal timings and lane reassignment (but no widening for new travel lanes), all intersections will operate at good service levels comparable to their existing conditions during both peak hours. All intersections will operate with an overall Level of Service D or better during both peak periods. In addition to levels of service, queue lengths were examined to check that the queues do not exceed the available storage. On Germantown Avenue between Bells Mill Road and Hillcrest Avenue, the expected queues in both directions will have adequate room to store. The queue in the southbound Germantown Avenue left turn lane at Hillcrest Avenue will sometimes exceed the available 180 feet of storage in the PM peak hour and extend into the through lane (as happens today). The average left turn vehicle queue is projected to be 130 feet. The left turn lane could be lengthened by reconfiguring the lanes within the existing road width without pavement widening; this would involve some reconstruction of the Belgian block median area. Some community members indicated in previous public meetings they are not in favor of that improvement. Chestnut Hill College Master Plan Expansion Page 14

17 Conclusion From a traffic perspective, the impacts of the Master Plan development of Chestnut Hill College are low. Of today s undergraduate population of 900 students, 560 live on campus and 340 are commuters. The Master Plan will house 80% of undergraduate students on campus, so that while the undergraduate population will increase to 1,500, the number of commuting undergraduates will decrease from today s number to 300 students, resulting in a decrease in student trips. The parking supply will increase, but that is largely to correct an existing deficiency in parking supply and to account for a future increase in upper-class resident students. These students, while they may have a car on campus, will not be making trips during the commuter peak hours. The graduate and continuing studies student population is expected to remain at today s levels and the numbers of students arriving at campus during the PM commuter peak hour will not increase. The primary means of transportation between the Main Campus and the Sugarloaf Hill Campus will be by walking. The AM campus entry and exit traffic and the PM exiting traffic were increased by 80% of today s counted levels, based on the projected percentage increase in faculty and staff. This is a conservatively high estimate, since existing peak hour traffic includes an unknown number of commuter students, and the number of commuter students will decrease, not increase, in the future. Even so, the projected traffic increase at most intersections averages 4%. For overall network traffic operations, the best location for the new Sugarloaf Hill Campus driveway is on Germantown Avenue opposite Hillcrest Avenue. The levels of service generally remain the same as existing at all intersections. Except for certain specific movements during the PM commuter peak hour, all movements at all intersections will operate at good levels of service during all times. Future Levels of Service at Hillcrest Avenue will not degrade from existing Levels of Service with signal optimization and phasing changes. In conclusion, with the proposed site access and traffic improvements, the Master Plan development of Chestnut Hill College will provide acceptable and safe traffic operations, as well as safe pedestrian movements and intersection crossings. Chestnut Hill College Master Plan Expansion Page 15

18 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing AM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE _125_Figs.cdr Lincoln Woods Apartments NORTHWESTERN PEAK HOUR 9/15/09 :15-8:15 AM PEAK HOUR 9/15/09 :15-8:15 AM PEAK HOUR 9/10/09 :30-8:30 AM ROGERS DRIVE Chestnut Hill College PEAK HOUR 9/15/09 :30-8:30 AM GERMANTOWN LEGEND HILLCREST SIGNALIZED INTERSECTION PEAK HOUR 9/10/09 :30-8:30 AM Sugar Loaf Hill 65 PEAK HOUR 9/10/09 :30-8:30 AM BELLS MILL ROAD

19 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing PM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE _125_Figs.cdr Lincoln Woods Apartments NORTHWESTERN ROGERS PEAK HOUR 9/15/09 4:45-5:45 PM PEAK HOUR 9/15/09 5:00-6:00 PM PEAK HOUR 9/10/09 5:00-6:00 PM DRIVE Chestnut Hill College PEAK HOUR 9/15/09 5:00-6:00 PM GERMANTOWN LEGEND HILLCREST SIGNALIZED INTERSECTION PEAK HOUR 9/10/09 5:00-6:00 PM 1134 Sugar Loaf Hill 588 PEAK HOUR 9/10/09 5:00-6:00 PM BELLS MILL ROAD

20 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing AM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 3 b(14) Lincoln Woods Apartments a(0) a(0) D(35) D(39) ROGERS DRIVE Chestnut Hill College GERMANTOWN a(1) b(14) D(50) A(9) C(25) b(14) C(21) B(22) A(6) A(3) A(3) A(3) B(14) C(30) HILLCREST E(2) B(15) C(25) C(25) F(111) A(4) D(50) D(46) C(29) C(2) 2009_125_Figs.cdr NORTHWESTERN B(1) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

21 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Existing PM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 4 b(13) Lincoln Woods Apartments a(0) C(28) C(31) ROGERS DRIVE Chestnut Hill College GERMANTOWN a(1) b(12) C(29) B(16) C(23) a(1) b(12) B(1) B(11) A() A(9) A(9) A(5) HILLCREST B(13) E(61) F(364) C(26) E(69) B(19) D(54) A(5) C(26) C(23) C(21) C(20) 2009_125_Figs.cdr NORTHWESTERN B(15) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

22 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future AM Peak Hour College Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE (8) (2) (10) 45 Total College Trips 262 enter (61) exit NOTE: THESE VOLUMES INCLUDE EXISTING CHESTNUT HILL COLLEGE TRAFFIC AS WELL AS TRAFFIC FROM MASTER PLAN EXPANSION. Lincoln Woods Apartments (2) 9 (3) (2) 4 13 (5) Chestnut Hill College HILLCREST (3) 4 (11) 21 (5) _125_Figs.cdr 89 (21) (4) 11 8 NORTHWESTERN (1) (30) ROGERS (12) (18) DRIVE (5) GERMANTOWN LEGEND 21 (18) (16) - SIGNALIZED INTERSECTION 8 2 (5) (5) (6) Sugar Loaf Hill (15) (9) (9) BELLS MILL ROAD (15)

23 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future PM Peak Hour Chestnut Hill College PHILADELPHIA, PENNSYLVANIA College Traffic Volumes FIGURE 6 38 (43) (12) (55) 45 NOTE: THESE VOLUMES INCLUDE EXISTING CHESTNUT HILL COLLEGE TRAFFIC AS WELL AS TRAFFIC FROM MASTER PLAN EXPANSION. 2009_125_Figs.cdr Lincoln Woods Apartments (12) NORTHWESTERN () (50) 45 Total College Trips 251 enter (28) exit 85 (95) (14) 11 4 () (2) (81) 4 11 (9) (150) ROGERS (63) (8) DRIVE 13 Chestnut Hill College 9 (18) GERMANTOWN LEGEND 20 (8) 16 HILLCREST (22) (64) - SIGNALIZED INTERSECTION 9 22 (18) (22) (24) Sugar Loaf Hill (69) (42) (42) BELLS MILL ROAD 63 (69) 63

24 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future AM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE _125_Figs.cdr Lincoln Woods Apartments NORTHWESTERN ROGERS DRIVE 136 Chestnut Hill College GERMANTOWN LEGEND HILLCREST SIGNALIZED INTERSECTION Sugar Loaf Hill BELLS MILL ROAD

25 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future PM Peak Hour Traffic Volumes Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE _125_Figs.cdr Lincoln Woods Apartments NORTHWESTERN ROGERS DRIVE 13 Chestnut Hill College GERMANTOWN LEGEND HILLCREST SIGNALIZED INTERSECTION Sugar Loaf Hill BELLS MILL ROAD

26 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future AM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 9 b(14) Lincoln Woods Apartments a(0) a(0) C(31) C(33) ROGERS DRIVE Chestnut Hill College GERMANTOWN C(21) D(44) a(1) b(12) C(22) A(10) D(38) b(14) B(18) B(13) A(6) A(3) A(5) A(5) C(24) B(16) HILLCREST C(2) D(45) D(45) C(25) B(11) D(49) A() D(51) D(38) C(34) D(53) 2009_125_Figs.cdr NORTHWESTERN C(23) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

27 Orth-Rodgers & Associates, Inc. TRANSPORTATION ENGINEERS AND PLANNERS Future PM Peak Hour Levels of Service Chestnut Hill College PHILADELPHIA, PENNSYLVANIA FIGURE 10 c(18) Lincoln Woods Apartments a(0) a(1) C(26) C(32) ROGERS DRIVE Chestnut Hill College GERMANTOWN B(18) E(6) a(1) b(12) B(20) B(12) D(40) c(16) B(1) A(9) A(6) A(6) A(9) A(5) E(8) C(33) HILLCREST D(55) D(43) E(59) E(5) B(20) C(23) A(8) D(35) C(20) B(19) B(19) 2009_125_Figs.cdr NORTHWESTERN C(22) LEGEND - SIGNALIZED INTERSECTION A(#) - SIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) a(#) - UNSIGNALIZED LEVEL OF SERVICE (DELAY IN SECONDS) Sugar Loaf Hill BELLS MILL ROAD

Traffic Study North Shore School District 112

Traffic Study North Shore School District 112 Traffic Study North Shore School District 112 Proposed Expansion of Northwood Junior High School Prepared By: May 1, 2015 1. Introduction Kenig, Lindgren, O Hara, Aboona, Inc. (KLOA, Inc.) has been retained

More information

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas

Traffic Circulation Study for Neighborhood Southwest of Mockingbird Lane and Airline Road, Highland Park, Texas ARIZONA TEXAS NEW MEXICO OKLAHOMA February 13, 2015 Mr. Meran Dadgostar P.E., R.S. Town of Highland Park 4700 Drexel Dr. Highland Park, Texas 75205 Re: Traffic Circulation Study for Neighborhood Southwest

More information

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc.

Magnolia Place. Traffic Impact Analysis. Prepared for: City of San Mateo. Prepared by: Hexagon Transportation Consultants, Inc. Magnolia Place Traffic Impact Analysis Prepared for: City of San Mateo Prepared by: Hexagon Transportation Consultants, Inc. Updated January 4, 2010 Table of Contents 1. Introduction...1 2. Existing Conditions...6

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

TRAFFIC IMPACT ANALYSIS

TRAFFIC IMPACT ANALYSIS TRAFFIC IMPACT ANALYSIS FOR THE CHAMPAIGN UNIT#4 SCHOOL DISTRICT PROPOSED HIGH SCHOOL (SPALDING PARK SITE) IN THE CITY OF CHAMPAIGN Final Report Champaign Urbana Urbanized Area Transportation Study 6/24/2014

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT

TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT TRAFFIC IMPACT STUDY And A TRAFFIC SIGNAL WARRANT ANALYSIS FOR A SENIOR LIVING AND APARTMENT DEVELOPMENT DEERFIELD TOWNSHIP, WARREN COUNTY, OHIO Nantucket Circle and Montgomery Road () Prepared for: ODLE

More information

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017

Traffic Impact Study. Westlake Elementary School Westlake, Ohio. TMS Engineers, Inc. June 5, 2017 TMS Engineers, Inc. Traffic Impact Study Westlake Elementary School Westlake, Ohio June 5, 2017 Prepared for: Westlake City Schools - Board of Education 27200 Hilliard Boulevard Westlake, OH 44145 TRAFFIC

More information

Gateway Transportation Study

Gateway Transportation Study Gateway Transportation Study Amherst, Massachusetts SUBMITTED TO University of Massachusetts Amherst Town of Amherst SUBMITTED BY Vanasse Hangen Brustlin, Inc. Watertown, Massachusetts March 213 Back of

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

Shockoe Bottom Preliminary Traffic and Parking Analysis

Shockoe Bottom Preliminary Traffic and Parking Analysis Shockoe Bottom Preliminary Traffic and Parking Analysis Richmond, Virginia August 14, 2013 Prepared For City of Richmond Department of Public Works Prepared By 1001 Boulders Pkwy Suite 300, Richmond, VA

More information

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION

3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION Report No. 8 of the Transportation Services Committee Regional Council Meeting of October 20, 2011 3 TRAFFIC CONTROL SIGNAL TIMING AND SYNCHRONIZATION The Transportation Services Committee recommends:

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY

BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY BLOSSOM AT PICKENS SIGNALIZED INTERSECTION IMPROVEMENT STUDY Class Project Report for ECIV 542 Traffic Engineering Submitted by Omor Sharif Muchun Song Narges Kaveshgar Quyen Pham Chih-Yao Lin Submission

More information

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY

VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY VIVA RETIREMENT COMMUNITIES OAKVILLE TRAFFIC IMPACT STUDY DECEMBER 2012 READ, VOORHEES & ASSOCIATES TORONTO, ONTARIO Read, Voorhees & Associates

More information

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study

5858 N COLLEGE, LLC N College Avenue Traffic Impact Study 5858 N COLLEGE, LLC nue Traffic Impact Study August 22, 2016 Contents Traffic Impact Study Page Preparer Qualifications... 1 Introduction... 2 Existing Roadway Conditions... 5 Existing Traffic Conditions...

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

Henderson Avenue Mixed-Use Development

Henderson Avenue Mixed-Use Development Zoning Case: Z145-3 Traffic Impact Analysis Henderson Avenue Mixed-Use Development Dallas, TX October 26 th, 216 Kimley-Horn and Associates, Inc. Dallas, Texas Project #644827 Registered Firm F-928 Traffic

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Road Conversion Study Plumas Street

Road Conversion Study Plumas Street Plumas Street Phase I Submitted to The Regional Transportation Commission of Washoe County Submitted by Zong Tian, Ph.D., P.E. Saeedeh Farivar Haiyuan Li, Ph.D. Center for Advanced Transportation Education

More information

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units

Wesbrook Place Traffic Analysis of Redistributed Dwelling Units Wesbrook Place Traffic Analysis of Redistributed Dwelling Units 1 Summary This report presents an analysis of the changes in traffic volumes in the Wesbrook Place neighbourhood associated with a redistribution

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon

Traffic Analysis and Design Report. NW Bethany Boulevard. NW Bronson Road to NW West Union Road. Washington County, Oregon Traffic Analysis and Design Report NW Bethany Boulevard NW Bronson Road to NW West Union Road Washington County, Oregon May 2011 Table of Contents Table of Contents Section 1 Executive Summary... 2 Section

More information

Glenn Avenue Corridor Traffic Operational Evaluation

Glenn Avenue Corridor Traffic Operational Evaluation Glenn Avenue Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: DECEMBER 2007 Glenn Avenue Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

Operational Comparison of Transit Signal Priority Strategies

Operational Comparison of Transit Signal Priority Strategies Operational Comparison of Transit Signal Priority Strategies Revision Submitted on: November, 0 Author: Adriana Rodriguez, E.I Assistant Engineer Parsons Brinckerhoff 0 South Orange Avenue, Suite 00 Orlando,

More information

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009

MEMORANDUM. Trip Generation and Distribution. CyRide / ISU Intermodal Facility Steering Committee. Date: August 31, 2009 MEMORANDUM Transportation Jim Kollbaum, PE 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: CyRide / ISU Intermodal Facility Steering Committee Date: August 31, 2009

More information

Capital Region Council of Governments

Capital Region Council of Governments March 23, 2018 Capital Region Council of Governments PROJECT CONCEPT REPORT Realignment of Swamp and Northfield Road s approaches to Route 44 (Boston Turnpike) Town of Coventry SUMMARY: The Town of Coventry

More information

THIS PAGE LEFT BLANK INTENTIONALLY

THIS PAGE LEFT BLANK INTENTIONALLY GA SR 25 Spur at Canal Road Transportation Impact Analysis PREPARED FOR GLYNN COUNTY, GEORGIA 1725 Reynolds Street, Suite 300 Brunswick, Georgia 31520 PREPARED BY 217 Arrowhead Boulevard Suite 26 Jonesboro,

More information

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017

Traffic Impact Study Little Egypt Road Development Denver, North Carolina June 2017 Traffic Impact Study Little Egypt Road Development Denver, North arolina June 2017 N. Little Egypt Road DQ\ QDQFLQJ VDOHV RU RWKHU SHUIRUPDQFH EDVHG FULWHULD Proposed Site Driveways Site Driveway 1 TRAFFI

More information

TRAFFIC ASSESSMENT River Edge Colorado

TRAFFIC ASSESSMENT River Edge Colorado TRAFFIC ASSESSMENT River Edge Colorado Submitted by: Fehr & Peers 621 17th Street, Ste. 231 Denver, CO 8293 (33) 296-43 December, 21 App. M-2 Traffic Assessment River Edge Colorado December 21 TABLE OF

More information

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK

EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK EUCLID AVENUE PARKING STUDY CITY OF SYRACUSE, ONONDAGA COUNTY, NEW YORK CITY OF SYRACUSE DEPARTMENT OF PUBLIC WORKS 1200 CANAL STREET EXTENSION SYRACUSE, NEW YORK 13210 DRAFT REPORT DATE: November 13,

More information

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents

Table of Contents FIGURES TABLES APPENDICES. Traffic Impact Study Hudson Street Parking Garage MC Project No.: A Table of Contents Traffic Impact Study Hudson Street Parking Garage MC Project No.: 151714A Table of Contents Table of Contents I. INTRODUCTION... 2 II. EXISTING CONDITIONS... 5 III. 215 EXISTING TRAFFIC CONDITIONS... 6

More information

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY

CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study

More information

Donahue Drive Corridor Traffic Operational Evaluation

Donahue Drive Corridor Traffic Operational Evaluation Donahue Drive Corridor Traffic Operational Evaluation PREPARED FOR: THE CITY OF AUBURN PREPARED BY: JANUARY 2007 Donahue Drive Corridor Study--Auburn, Alabama TABLE OF CONTENTS Introduction... 1 Background

More information

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW.

HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW. HENDERSON DEVELOPMENT 213, 217, 221, 221 ½, 223 HENDERSON AVENUE and 65 TEMPLETON STREET OTTAWA, ONTARIO TRANSPORTATION OVERVIEW Prepared for: 2294170 Ontario Inc. February 2, 2017 117-652 Report_1.doc

More information

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc.

OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: Canada Inc. OFFICE/RETAIL DEVELOPMENT 1625 BANK STREET OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: 9402209 Canada Inc. December 15, 2015 115-625 Report_2.doc D. J. Halpenny & Associates Ltd. Consulting Transportation

More information

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment

Date: April 4, Project #: Re: A Street/Binford Street Traffic/Intersection Assessment To: Peter Cavanaugh General Electric From: David Bohn, PE Ryan White, PE Date: April 4, 217 Project #: 13421. Re: / Traffic/Intersection Assessment Consistent with the Cooperation Agreement between the

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

Highway 111 Corridor Study

Highway 111 Corridor Study Highway 111 Corridor Study June, 2009 LINCOLN CO. HWY 111 CORRIDOR STUDY Draft Study Tea, South Dakota Prepared for City of Tea Sioux Falls Metropolitan Planning Organization Prepared by HDR Engineering,

More information

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc.

INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED. Prepared for: Canada Inc. INDUSTRIAL BUILDING 3009 HAWTHORNE ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW REVISED Prepared for: 7849648 Canada Inc. Octiober 1, 2015 114-598 Overview_2.doc D. J. Halpenny & Associates Ltd. Consulting

More information

Marina Loft (DRC 51-R-12)

Marina Loft (DRC 51-R-12) Marina Loft (DRC 51-R-12) traffic study prepared for: Cymbal Development OCtober 2012 Traf Tech October 1, 2012 Mr. Asi Cymbal - President Cymbal Development 3470 North Miami Avenue Upper Suite Miami,

More information

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK

DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK TRAFFIC IMPACT STUDY FOR THE DIMARCO CANANDAIGUA PROPERTIES HOUSING PROJECT CANANDAIGUA, ONTARIO COUNTY, NEW YORK MARCH 14, 2017 PREPARED FOR: 1950 Brighton Henrietta Town Line Rd Rochester, NY 14623 PREPARED

More information

D.13 Transportation and Traffic

D.13 Transportation and Traffic This section addresses transportation and traffic issues and impacts related to the Proposed Project. Section D.13.1 provides a description of the affected environment for the Proposed Project. Applicable

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment

March 11, Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA Walnut Street Traffic Assessment March 11, 2015 Lynnfield Board of Selectmen Town of Lynnfield 55 Summer Street Lynnfield, MA 01940 Re: Walnut Street Traffic Assessment Dear Board of Selectmen Members: As requested, BETA Group, Inc. (BETA)

More information

MEMORANDUM. Charlotte Fleetwood, Transportation Planner

MEMORANDUM. Charlotte Fleetwood, Transportation Planner MEMORANDUM Date: Updated August 22, 2017 To: Organization: Charlotte Fleetwood, Transportation Planner Boston Transportation Department From: Jason DeGray, P.E., PTOE, Regional Director of Engineering

More information

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report.

REPORT CONCURRENCE. City Manager. The General Manager concurs with the recommendation of this report. COUNCIL REPORT Report No. ENG 08-018 Executive Committee Date: May 0, 018 File No: 5400-1 To: From: Subject: Mayor and Council Purvez Irani, Senior Transportation Engineer Bluejay Street Road Improvements

More information

Chapter 16: Traffic and Parking A. INTRODUCTION

Chapter 16: Traffic and Parking A. INTRODUCTION Chapter 6: Traffic and Parking A. ITRODUCTIO This chapter examines the potential traffic and parking impacts of the proposed Fresh Kills Park roads. The analysis of transit and pedestrians is presented

More information

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015

Project Report. South Kirkwood Road Traffic Study. Meadows Place, TX October 9, 2015 Meadows Place, TX October 9, 2015 Contents 1 Introduction... 1 2 Data Collection... 1 3 Existing Roadway Network... 2 4 Traffic Volume Development... 2 5 Warrant Analysis... 3 6 Traffic Control Alternative

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

10.0 CURB EXTENSIONS GUIDELINE

10.0 CURB EXTENSIONS GUIDELINE 10.0 CURB EXTENSIONS GUIDELINE Road Engineering Design Guidelines Version 1.0 March 2017 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services

More information

Transportation Impact Study for Abington Terrace

Transportation Impact Study for Abington Terrace Transportation Impact Study for Abington Terrace Abington Township, Montgomery County, PA Sandy A. Koza, P.E., PTOE PA PE License Number PE059911 Prepared by McMahon Associates, Inc. 425 Commerce Drive,

More information

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota

Walmart (Store # ) 60 th Street North and Marion Road Sioux Falls, South Dakota Walmart (Store #4865-00) 60 th Street North and Marion Road Sioux Falls, South Dakota Prepared for: Wal-Mart Stores, Inc. Bentonville, Arkansas Prepared by: Kimley-Horn and Associates, Inc. ã2013 Kimley-Horn

More information

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina

PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina PINESTONE TRAFFIC IMPACT STUDY Travelers Rest, South Carolina Prepared for Longbranch Development Prepared by January 13, 219 ii Table of Contents Subject Page Signature Page... i Table of Contents...

More information

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA

EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA April 217 T R A F F I C I M P A C T A N A LY S I S EAST AND SOUTH STREET CITY OF ANAHEIM, CALIFORNIA Submitted

More information

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer

Approximately 360 trail users cross during a typical summer weekday and 420 cross during a typical summer 5. PARKR ROAD AT MISSISSIPPI AVN CROSSIN xisting Conditions The High ine Canal trail crosses Parker Road near the Mississippi Avenue intersection (crossing location #3 on Figure 1). South of Parker, the

More information

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for:

OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY. Prepared for: OTTAWA TRAIN YARDS PHASE 3 DEVELOPMENT CITY OF OTTAWA TRANSPORTATION IMPACT STUDY Prepared for: The Ottawa Train Yards Inc. 223 Colonnade Road South, Suite 212 Nepean, Ontario K2E 7K3 January 17, 2012

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study

Date: September 7, Project #: Re: Spaulding Youth Center Northfield, NH Property. Traffic Impact Study To: Ms. Susan C. Ryan Spaulding Youth Center 72 Spaulding Road Northfield, NH 03276 Date: September 7, 2017 Project #: 52455.00 From: Robin Bousa Director of Transportation Systems Re: Spaulding Youth

More information

Truck Climbing Lane Traffic Justification Report

Truck Climbing Lane Traffic Justification Report ROUTE 7 (HARRY BYRD HIGHWAY) WESTBOUND FROM WEST MARKET STREET TO ROUTE 9 (CHARLES TOWN PIKE) Truck Climbing Lane Traffic Justification Report Project No. 6007-053-133, P 101 Ι UPC No. 58599 Prepared by:

More information

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION

FORM A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION FORM 901.3.A PASCO COUNTY ACCESS CONNECTION PERMIT APPLICATION The following information is required from all applicants directly or indirectly accessing any collector or arterial road or as otherwise

More information

DUNBOW ROAD FUNCTIONAL PLANNING

DUNBOW ROAD FUNCTIONAL PLANNING DUNBOW ROAD FUNCTIONAL PLANNING Final Report August 3, 216 #31, 316 5th Avenue NE Calgary, AB T2A 6K4 Phone: 43.273.91 Fax: 43.273.344 wattconsultinggroup.com Dunbow Road Functional Planning Final Report

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Lake Whitney Elementary School

Lake Whitney Elementary School Lake Whitney Elementary School SCHOOL ROUTE PLAN For LAKE WHITNEY ELEMENTARY SCHOOL LOCATION 18 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Walton Acres at Riverwood Athletic Club Clayton, North Carolina

Walton Acres at Riverwood Athletic Club Clayton, North Carolina 9. CONCLUSIONS This Traffic Impact Analysis Update was conducted to determine the potential traffic impacts of the proposed Walton Acres at Riverwood Athletic Club residential development, located east

More information

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT

TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT November 2016 TRANSPORTATION IMPACT STUDY PROPOSED RIVERFRONT 47 MIXED USE DEVELOPMENT & Aspinwall Borough, Sharpsburg Borough & O Hara Township, Allegheny County, Pennsylvania Prepared for: Riverfront

More information

3. Central Park Avenue Northbound and South Drive (Site Driveway)

3. Central Park Avenue Northbound and South Drive (Site Driveway) F. TRAFFIC & PARKING 1. Existing Traffic Conditions a. Evaluation of Existing Traffic Conditions John Meyer Consulting has completed a Traffic Impact Study (DEIS Volume III) which utilizes standard traffic

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Focused Traffic Analysis for the 200 Nellen Avenue Project

Focused Traffic Analysis for the 200 Nellen Avenue Project March 13, 2017 Mr. Phil Boyle Town of Corte Madera 300 Tamalpais Drive Corte Madera, CA 94976-0159 Focused Traffic Analysis for the 200 Nellen Avenue Project Dear Mr. Boyle; W-Trans has completed a focused

More information

3.9 - Transportation and Traffic

3.9 - Transportation and Traffic Transportation and Traffic 3.9 - Transportation and Traffic This section describes the potential transportation and traffic effects of project implementation on the project site and its surrounding area.

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018

Meadowlake Ranch Traffic Impact Analysis (LSC #184600) August 27, 2018 LSC TRANSPORTATION CONSULTANTS, INC. 545 East Pikes Peak Avenue, Suite 210 Colorado Springs, CO 80903 (719) 633-2868 FAX (719) 633-5430 E-mail: lsc@lsctrans.com Website: http://www.lsctrans.com Traffic

More information

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946

Employment 8,881 17,975 9,094. Households 18,990 31,936 12,946 This section describes the future transportation environment of the UW Tacoma campus and surrounding area. A description of the future conditions on campus in terms of the street system, traffic and intersection

More information

Traffic Impact Study for Rolling Ridge Redevelopment

Traffic Impact Study for Rolling Ridge Redevelopment Traffic Impact Study for Rolling Ridge Redevelopment Webster Groves, Missouri October 19, 2018 Prepared For: Gershman Commercial Real Estate 150 North Meramec Avenue Suite 500 St. Louis, Missouri 63105

More information

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS

INTRODUCTION THOROUGHFARE SYSTEM CLASSIFICATIONS INTRODUCTION The thoroughfare plan will assist public officials in the development of a specialized system for efficient and safe movement of vehicular traffic while minimizing potential conflicts with

More information

TRANSPORTATION IMPACT STUDY

TRANSPORTATION IMPACT STUDY Dundas MEP Developments Inc. City of Toronto 219 and 231 Dundas Street East, Proposed Mixed-Use Development TRANSPORTATION IMPACT STUDY 9782/2 April 216 LEA Consulting Ltd. Consulting Engineers & Planners

More information

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY

FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY FRONT RANGE CROSSINGS TRAFFIC IMPACT STUDY Prepared for: City of Thornton And Colorado Department of Transportation Prepared by: 11 Blake Street, Suite 2 Denver, Colorado 822 Contact: Brian Bern, PE, PTOE

More information

TRAFFIC IMPACT STUDY CRITERIA

TRAFFIC IMPACT STUDY CRITERIA Chapter 6 - TRAFFIC IMPACT STUDY CRITERIA 6.1 GENERAL PROVISIONS 6.1.1. Purpose: The purpose of this document is to outline a standard format for preparing a traffic impact study in the City of Steamboat

More information

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections...

List of Attachments. Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... List of Attachments Exhibits Location Map... Site Plan... City of Lake Elsinore Circulation Element... City of Lake Elsinore Roadway Cross-Sections... Existing Lane Geometry and Traffic Controls... Existing

More information

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009

Summary: Mercer County Princeton Avenue & Spruce Street Study January 2009 Summary: Several recent studies have assessed potential development and redevelopment opportunities in the Mercer Crossing area of Trenton, Ewing, and Lawrence. This Princeton Avenue and Spruce Street

More information

Lincoln Avenue Road Diet Trial

Lincoln Avenue Road Diet Trial Lincoln Avenue Road Diet Trial Data Collection Report June 1, 2015 Department of Transportation Table of Contents I. Introduction...... 3 II. Data Collection Methodology & Results...... 5 A. Traffic Volume

More information

Mission Street Medical Office Development

Mission Street Medical Office Development reet Medical Office Development Traffic Impact Analysis Prepared for: Palo Alto Medical Foundation February 23, 2012 Hexagon Office: 7888 Wren Avenue, Suite B121 Gilroy, CA 95020 Hexagon Job Number: 11RD11

More information

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary

Reference: Laguna Canyon Road Traffic Conditions Data Collection Summary Stantec Consulting Services Inc. 38 Technology Drive Suite 100, Irvine CA 92618-5312 September 8, 2017 File: 2073014320 Attention: Mark Trestik, Assistant City Engineer City of Beach Department of Public

More information

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9

MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF. Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 MEETING FACILITY 2901 GIBFORD DRIVE CITY OF OTTAWA TRANSPORTATION BRIEF Prepared for: Holiday Inn Express 2881 Gibford Drive Ottawa, ON K1V 2L9 December 18, 2012 112-566 Brief_1.doc D. J. Halpenny & Associates

More information

TAKOMA METRO STATION

TAKOMA METRO STATION TKOM METRO STTION Traffic nalysis Technical Memorandum Station Planning in Support of Joint evelopment Job No. 13-FQ165-LN-2 November 213 WSHINGTON METROPOLITN RE TRNSIT UTHORITY (WMT) Takoma Metro Station

More information

TRAFFIC STUDY GUIDELINES Clarksville Street Department

TRAFFIC STUDY GUIDELINES Clarksville Street Department TRAFFIC STUDY GUIDELINES Clarksville Street Department 9/1/2009 Introduction Traffic studies are used to help the city determine potential impacts to the operation of the surrounding roadway network. Two

More information

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study

Public Involvement Meeting Tuesday, June 13, Albany Shaker Road Corridor Study Public Involvement Meeting Tuesday, June 13, 2017 Albany Shaker Road Corridor Study Agenda / Meeting Outline 1. Introduce the project 2. Complete Streets 3. Share/confirm our findings 4. Your Opinion 5.

More information

Recommended Roadway Plan Section 2 - Land Development and Roadway Access

Recommended Roadway Plan Section 2 - Land Development and Roadway Access Recommended Roadway Plan Section 2 - Land Development and Roadway Access SECTION 2 Land Development and Roadway Access 2.1 Land Use and Access Management The Federal Highway Administration (FHWA) defines

More information

SELECTED ROADWAY CAPACITY ANALYSIS

SELECTED ROADWAY CAPACITY ANALYSIS CHAPTERFOUR SELECTED ROADWAY CAPACITY ANALYSIS 4.1 SELECTED ROADWAY CAPACITY ANALYSIS Introduction Capacity analysis was performed on six selected roadways within the Dearborn County study area using the

More information

THE LANDMARK AT TALBOT PARK

THE LANDMARK AT TALBOT PARK TRAFFIC IMPACT STUDY FOR THE LANDMARK AT TALBOT PARK IN NORFOLK, VA INTERMODAL ENGINEERING, P.C. OCTOBER, 200 The Landmark at Talbot Park is a proposed redevelopment of the existing apartments along the

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN 292 84 140440 TRAFFIC MANAGEMENT PLAN The purpose of the Traffic Management Plan (TMP) is to have established procedures for traffic flow and circulation around the elementary school related to student

More information