DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
|
|
- Briana Jackson
- 5 years ago
- Views:
Transcription
1 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC) REPLACE BRIDGE #46 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 W-5214M HAYWOOD Division POC Let (DPOC) US 276 (RUSS AVENUE) FROM BARBER BOULEVARD TO THE US 23/74 EASTBOUND RAMPS IN WAYNESVILLE 05/15 W-5601AI Division POC Let (DPOC) SR 1543 (ELM BEND ROAD) FROM US 276 TO SR 1540 (WILSON ROAD) NEAR BREVARD 06/15 EB-5537 NON - DOT LET (Bicycle and PedestrVILLE - OKLAWAHA GREENWAY FROM PATTON PARK TO BALFOUR ROAD/BERKLEY MILLS 08/15 U-5104 Division Design Raleigh Let (DDRL) BREVARD - US 64 BUSINESS FROM SR 1349 (WEST MAIN STREET) TOUS /15 R-2409C Division Design Raleigh Let (DDRL) US 64 FROM CASHIERS TO ROSMAN 01/16 B-4822 Raleigh Letting (LET) REPLACE BRIDGE 13 OVER NICHOLSON CREEK ON SR /16 B-5403 Raleigh Letting (LET) REPLACE BRIDGE 196 OVER CRAB CREEK ON SR /16 W-5506 Division Design Raleigh Let (DDRL) CONSTRUCT A CONTINUOUS THREE-LANE SECTION, EXTEND RIGHT TURN LANE INTO SCHOOL, REVISE AND INSTALL GUARDRAIL, AND CONSTRUCT PAVED SHOULDERS ON NC FROM SR 1381 (MOUNTAIN ROAD) TO NORTH OF SR 1365 (NORTH RUGBY ROAD) 02/16 BD-5114AJ Division POC Let (DPOC) REPLAC E BRIDGE 64 OVER NORTH PRONG FLAT CREEK ON SR /16 B-5550 NON - DOT LET (Local) BREVARD - BRIDGE 102 ON RAILROAD AVENUE OVER KINGS CREEK 03/16 BD-5114AA Division POC Let (DPOC) REPLACE BRIDGE 117 OVER EAST FORK FRENCH BROAD RIVER ON SR /16 BD-5114AB Division POC Let (DPOC) REPLACE BRIDGE 138 OVER LITTLE CREEK ON SR /16 BD-5114AC Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR /16 BD-5114AD Division POC Let (DPOC) REPLACE BRIDGE 86 OVER EAST FORK FRENCH BROAD RIVER ON SR /16 BD-5114AE Division POC Let (DPOC) REPLACE BRIDGE 77 OVER MUD CREEK ON SR /16 R-5605 Raleigh Letting (LET) DAVIDSON RIVER VILLAGE CONNECTOR, FROM US 64 TO US 276/US 64 IN PISGAH FOREST 07/16 BD-5114X HAYWOOD Division POC Let (DPOC) REPLACE BRIDGE 144 OVER DUTCH COVE CREEK ON SR 1836 REPLACEBRIDGE 144 OVER DUTCH COVE CREEK ON SR /16 BD-5114Y Division POC Let (DPOC) REPLACE BRIDGE 135 OVER SHAW CREEK ON SR /16 R-5207C Division POC Let (DPOC) FROM SR 1539 (JACKSON ROAD) TO US 25 IN FLETCHER 08/16 U-5105 Division Design Raleigh Let (DDRL) VILLE - US 25/SR 1164 (ERKWOOD DRIVE)/ SR 1779(SHEPHERD STREET) - INTERSECTION IMPROVEMENTS 09/16 I-5756 HAYWOOD Division POC Let (DPOC) I-40 FROM 0.4 MILE EAST OF SR 1366 (ORCHARD COVE ROAD) TO 0.2 MILE EAST OF SR 1513 (HYDER MOUNTAIN ROAD) 09/16 I-5757 HAYWOOD Division POC Let (DPOC) I-40 FORM 0.2 MILE EAST OF SR 1513(HYDER MOUNTAIN ROAD)TO SR 1535 (THOMPSON COVE ROAD) 09/16 I-5759 Division POC Let (DPOC) I-26 FROM 1 MILE EAST OF SR 1793(TRACY GROVE ROAD) TO 0.2 MILE EAST OF US 25 09/16 U-5548 HAYWOOD Raleigh Letting (LET) ASHEVILLE - BROWN AVENUE REALIGHMENT FROM BOYD AVENUE TO SOUTH OF THE INTERSECTION, AND CONSTRUCTION OF NEW ROADWAY (SCHOOL STREET), RAISED CROSSWALK, PAINTED CROSSWALKS, REFUGE ISLAND, BULBOUT AND SIGNAGE 07/17 B-4823 Raleigh Letting (LET) REPLACE BRIDGE 12 OVER HOGSED CREEK ON SR /17 I-5758 Division Design Raleigh Let (DDRL) I-26/US 74 FROM BUNCOMBE COUNTY LINE TO 1 MILE EAST OF SR 1534 (SOUTH NAPLES ROAD) 09/17 I-5776 HAYWOOD Division POC Let (DPOC) I-40 FROM 0.4 MILE EAST OF SR 1366 (ORCHARD COVE ROAD) TO SR 1535 (THOMPSON COVE)
2 TIP 5 YEAR LET LIST 10/17 B-5929 Raleigh Letting (LET) REPLACE BRIDGE 350 OVER DEVILS FORK CREEK ON SR 1932 (OLD DANA ROAD) 02/18 B-5405 Raleigh Letting (LET) REPLACVE BRIDGE 139 OVER EAST BRANCH TOXAWAY CREEK ON SR /18 I-5810 HAYWOOD Division POC Let (DPOC) I-40 FROM 0.2 MILE EAST OF SR 1338 (WHITE OAK ROAD) TO 0.7 MILE EAST OF US /18 B-5409 Raleigh Letting (LET) REPLACE BRIDGE 58 OVER DEVILS FORK CREEK ON SR /19 EB-5605 NON - DOT LET (Bicycle and PedestrRAILROAD AVENUE/BREVARD WEST LOOP MULTI-USE PATH FROM MCLEAN ROAD TO WEST MAIN STREET IN BREVARD 06/19 B-5408 HAYWOOD Raleigh Letting (LET) REPLACE BRIDGE 386 OVER ALLENS CREEK ON SR /19 I-5834 HAYWOOD Division Design Raleigh Let (DDRL) I-40 FROM 0.4 MILES EAST OF SR 1366 (ORCHARD COVE ROAD) TO 0.4 MILE EAST OF SR 1535 (THOMPSON COVE ROAD) 09/19 I-5835 Division Design Raleigh Let (DDRL) I-26/US 74 FROM SR 1525 (DANA ROAD) TO 0.1 MILE EAST OF THEPOLK COUNTY LINE 12/19 I-4400C Raleigh Letting (LET) I-26 FROM US 25 BUSINESS (EXIT 44) TO NC 280 (EXIT 40)
3 DIVISION LET LIST COUNTY CONTRACT # WBS # DESCRIPTION LET DATE DN00409 R-5524 SIERRA NEVADA PAVING TBD DN Summerwind Dr 5/12/2015 DN FD36 W-5601AI SR 1543 ELM BEND ROAD GUARDRAIL 5/12/2015 HAYWOOD FR13; PE W-5214M US 276 RUSS AVE- DN FR13 ACCESS MANAGEMENT 5/12/2015 PE-ONLY-Fletcher - Howard Gap State Forces improvements 6/1/2015 HAYWOOD DN BP.14.R.5 HAYWOOD /9/2015 DN CR RESURFACING 6/9/15 DN CR RESURFACING 6/9/ BP.14.R.51 DN /28/ BP.14.R.58 DN /28/ BP.14.R.24 DN /25/ BP.14.R.7 DN /25/2015 DN00159 DN00161 DN00268 DN00269 DN00288 DN00286 DN BP.14.R /27/ BP.14.R /10/ BP.14.R /9/ BP.14.R /9/ BP.14.R BP.14.R /11/2016 8/22/ BP.14.R /13/2018 DN BP.14.R /13/2018 DN BP.14.R.101 BRIDGE #48 2/13/ BP.14.R.119 DN BP.14.R.121 DN BP.14.R.122 DN BP.14.R.123 DN BP.14.R.124 DN BP.14.R.125 DN BP.14.R.126 DN BP.14.R.127 DN00295
4 DIVISION LET LIST DN BP.14.R.6 BRIDGE #28
5 CONSTRUCTION PROGRESS MAY 2015 Contract Number County Federal Aid Number TIP # Route Location Description Type of Work Actual Progress C Henderson R-5207B SR-1006 C Transylvania BRZ-1107(9) B-4288 SR-1107 C Transylvania BRZ-1324(2) B-4289 SR-1324 C Haywood STP-1184(4) U-4412 SR-1184 SR-1006 (HOWARD GAP RD) FROM BRIDGE #334 TO SR-1539 (JACKSON RD). BRIDGE OVER EAST FORK FRENCH BROAD RIVER AND APPROACHES ON SR BRIDGE OVER NORTH FORK FRENCH BROAD RIVER AND APPROACHES ON SR SR-1184 (HOWELL MILL RD) FROM US-276 TO US-23 BUS. AND STRUCTURE % STRUCTURE % PAVING AND STRUCTURE % AND STRUCTURES % C Henderson R-5207A SR-1006 C Henderson BRSTP-1525(8) B-4547 SR-1525 C Haywood NHS-0023(18) K-5002 US-23 C Haywood NC-191 C Henderson BRZ-1574(4) B-4765 SR-1574 C Henderson BRZ-1734(3) B-3346 SR-1734 C Henderson BRZ-1528(6) B-4988 SR-1528 C Haywood BRZ-1407(5) B-4762 SR-1407 C Haywood BRZ-1503(8) B-4763 SR-1503 SR-1006 (HOWARD GAP RD) FROM US-64 TO BRIDGE #20. AND STRUCTURE % CULVERT % BRIDGE #45 OVER DEVIL'S FORK CREEK ON SR-1525 (DANA RD). US-23/74 SOUTHBOUND REST AREA ON NEW LOCATION AND RENOVATE EXISTING NORTHBOUND REST AREA. REST AREA % BRIDGES - 3 IN HAYWOOD COUNTY AND 1 IN BRIDGE COUNTY. PRESERVATION % BRIDGE #113 OVER TAZEWELL CREEK AND #38 OVER CLEAR CREEK ON SR BRIDGE #42 OVER SACONON CREEK ON SR-1734 (STEPP MILL RD). BRIDGE #309 OVER FEATHERSTONE CREEK ON SR BRIDGE #72 OVER JONATHAN CREEK ON SR BRIDGE #35 OVER BALD CREEK ON SR-1503 (UPPER CRABTREE CREEK RD). C Haywood STP-0209(6) R-4047 NC-209 NC-209 FROM US-23 BUS TO NORTH OF SR NHPP-040- C Haywood 1(248)34 I-5323 I-40 I-40 FROM MM-34 TO MM-36. STRUCTURES % RETAINING WALL, AND STRUCTURE % CULVERT % STRUCTURE % CULVERT % WALL, RAIL, & STRS % REHABILITATION %
6 CONSTRUCTION PROGRESS MAY 2015 RET C Haywood IMS-040-1(245)7 I-5508 I-40 I-40 NEAR MP-7. WALL & ROCK SLOPE STABIL % C Haywood NONE- OF 2 BRIDGES IN HAYWOOD COUNTY AND 4 BRIDGES IN JACKSON COUNTY. DESIGN BUILD. 9.48% C Haywood NONE- OF 10 BRIDGES IN HAYWOOD COUNTY AND 1 BRIDGE IN JACKSON COUNTY WITH CULVERTS. DESIGN BUILD. 9.40% C Haywood NHPIM-040-1(260) I-5512 I-40 TUNNELS 15, 17 & 104 ON I-40 BETWEEN THE TENNESSEE STATE LINE & SR-1338 (FINES CREEK ROAD). PAVING & TUNNEL REPAIR. 3.35% DN00036 Haywood STP-000S(416) R-4049R US-74 US 74 NEAR EXIT 105 DYNAMIC MESSAGE SIGN, TRAFFIC CONTROL % DN00099 Henderson I-26 I-26 EB WEIGH STATION MM 45 CONCRETE, SHOULDERS, PAVMENT MARKINGS % DN00135 Haywood SR-1863 BRIDGE #368 OVER GARDEN CREEK ON SR 1863 WILSON BRANCH ROAD SIGNING, CULVERT % DN00145 Transylvania SR-1504 DN00160 Haywood SR-1513 DN00173 Haywood SR-1545 DN00179 Haywood SR-1334 DN00180 Haywood SR-1820 DN00339 Henderson NHPP-026-1(197)25 BP- 5500BB I-26 DN00351 Transylvania SR-1152 DN00353 Haywood NC-276 BRIDGE #195 OVER LYDAY CREEK ON SR 1504 OLD US 64 BRIDGE #165 OVER CHAMBERS BRANCH ON SR 1513 THICKETY ROAD BRIDGE #356 OVER BOWEN BRANCH ON SR 1545 SORRELLS COVE ROAD BRIDGE #214 OVER FINES CR ON SR 1334 BRIDGE #359 OVER JONES COVE CR ON SR 1531 BRIDGE #321 OVER CONNER MILL BRANCH ON SR 1820 I-26-BRIDGE #30 & #33 OVER SR 1834 BRIDGE #23 OVER BURLINGAME CREEK ON SR 1152 UPPER WHITEWATER ROAD US 19, US 23, US 74, US 276, NC 110, NC 209, NC 215 PAVE, GUARDRAIL, STRUCTURE 82.97% SIGNAGE, STRUCTURE % CULVERT, GUARDRAIL, PAVE % PAVE, STRUCTURE, SIGNING, UTILITIES SIGNING, CULVERT % BRIDGE PRESERVATION- DECK OVERLAY GUARDRAIL, CULVERT 99.95% LONG ARM MOWING 37.74%
7 CONSTRUCTION PROGRESS MAY 2015 DN00356 Haywood SR-1613 SR 1613 FROM SR 1663 TO SR 1645 LEVEL, PAVE, MARKINGS DN00357 Transylvania SR-1128 SR 1128 FROM SR 1195 TO US 64 DN00360 Henderson SR-1309 VARIOUS LOCATIONS DN00370 Henderson SR-1525 VARIOUS LOCATIONS DN00384 Henderson NC-191 DN00388 Transylvania SR-1143 DN00389 Henderson SS- 4914BJ I-26 DN00393 Henderson SR-1963 VARIOUS NC191 FROM BUNCOMBE LINE TO NC280 BRIDGE #72 OVER FROZEN CREEK ON SR 1143 FROZEN CREEK ROAD I-26 NEAR THE GREEN RIVER GORGE BRIDGE LEVEL, MILL, PAVE, MARKINGS MILL, PAVE, MARKINGS LEVEL, PAVE, TRAFFIC CONTROL MILLING, MARKING, SIGNAL LOOPS CULVERT SIGNING, TRAFFIC CONTROL AST, TRIPLE SEAL AND THIN LIFT OVERLAY
03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division
More informationTo Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)
nt Name Rank B150857 Bike and Ped improvement s to include Signal and Crossing treatments US 25 US 25/70 SR 1601 Deringer Drive/US 25/US70/Stu dent Dropoff Way improvements to include Signal - Crosswalk
More informationAppendix V Other Water Quality Data in the French Broad River Basin
Appendix V Other Water Quality Data in the Basin Appendices Other Water Quality Research North Carolina actively solicits "existing and readily available" data and information for each basin as part of
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
339 New Leicester Highway, Suite 140 Asheville. NC 28806 www.fbrmpo.org Long-Range Transportation Plan Transportation Improvement Program Highway Planning Bicycle and Pedestrian Planning Transit Planning
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
STP-DA and TAP Projects Project Location Total Local Federal Type WDR PH1 Asheville $6,100,000 $1,220,000 $4,880,000 ROW Replacement Diesel Bus Asheville $450,000 $90,000 $360,000 Bike Share Study Asheville
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationDraft Local Input Points for Division Needs Transportation Projects
2018 Local Input for Transportation Projects FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION SEPTEMBER 28, 2018 INTRODUCTION The Strategic Transportation Investments (STI) law governs the process
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationNJTPA DRAFT Transportation Improvement Program Fiscal Years
County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five
DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330
More information09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:
MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationNorth Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary
Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationState Route 160 (Blue Diamond Highway)
State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.
More informationSouthwestern RPO Prioritization Local Input Points for Division Needs Funding
H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationCity of El Cerrito San Pablo Avenue Specific Plan. Capital Improvement Program
City of El Cerrito San Pablo Avenue Specific Plan Capital Improvement Program May 2015 San Pablo Avenue Intersection Improvements San Pablo Avenue and Hill Street/Eastshore Boulevard Background Existing
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationNews Release Eastern Oregon Region 5
News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:
More informationHIGHWAY CAPITAL IMPROVEMENT PLAN
2018 2023 HIGHWAY CAPITAL IMPROVEMENT PLAN 0.5% Sales Tax CIP July 25, 2017 6-Year CIP Summary 2018-2023 CALENDAR YEAR 2018 Highway & Bridge Improvement Projects COUNTY PROJECT LANE IMPROVEMENT TOTAL FEDERAL
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
. o o o Citizens Advisory Committee Application The French Broad River MPO s Citizen Advisory Committee (CAC) plays a key role in getting the public involved in the transportation planning process.
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationSecondary Road Program
Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved
More informationKalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission
FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort
More informationHighway Construction
Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;
More informationGravel Bike Guide Haywood County
Gravel Bike Guide Haywood County Haywood County is an ideal place for bicycling on gravel roads, because 37% or 129,994 acres of Haywood County is federal property, including portions of the Pisgah National
More informationDrag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationImportant Lane Closures for Jan , 2012
Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566
More informationDeck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge
Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll
More informationDriving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter
Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter BUSINESS 40 IMPROVEMENT PROJECT AUGUST 31, 2018 DRIVING TO THE DOWNTOWN HEALTH PLAZA DURING BUSINESS
More informationLandscapes, Mills, and Waterfalls
Jan. 2015 Landscapes, Mills, and Waterfalls Album # Photo # LANDSCAPES LMW L-1 Brevard NC Overview LMW L-2 Brevard NC Cotton Mill in foreground LMW L-3 Brevard NC from Cooper's Hill (Cotton Mill on right)
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationBOERNE/KENDALL COUNTY TRANSPORTATION FORUM. March 22, 2018
BOERNE/KENDALL COUNTY TRANSPORTATION FORUM March 22, 2018 Frontage Road Operational Improvements 2 Frontage Roads Under Construction Fair Oaks Pkwy to Dominion I-10 - Fair Oaks Pkwy to FM 3351 Scope: Convert
More informationODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
15 339 New Leicester Highway, Suite 140 Asheville. NC 28806 www.fbrmpo.org Long-Range Transportation Plan Transportation Improvement Program Highway Planning Bicycle and Pedestrian Planning Transit Planning
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationNJTPA Transportation Improvement Program Fiscal Years
Revision 1 As of 7/2/2015 Mileposts: 0.46 DBNUM: NS9811 County Route 6 Bridge (MA-14) The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient
More informationTIP. TIP Amendments for Consideration in January, 2019
2018 2027 IP IP Amendments for Consideration in January, 2019 FNDING FNDING DESCRIPION FNDING FNDING DESCRIPION ADAP Appalachian Development L Local ransportation Assistance Program APD Appalachian Development
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationRADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016
RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,
More informationPUBLIC INFORMATION MEETING
PUBLIC INFORMATION MEETING Bridge Rehabilitation Project Project Identification Number 5134.45 NY Route 5 Buffalo Skyway I-190 North Ramp, Pearl Street Ramp Wednesday, April 18, 2018 4:00 p.m. to 7:00
More information01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS
01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED
More informationTransportation Improvement Program (TIP) for Fiscal Years Presentation to Chittenden County Regional Planning Commission July 18, 2018
Transportation Improvement Program (TIP) for Fiscal Years 2019-2022 Presentation to Chittenden County Regional Planning Commission July 18, 2018 Transportation Planning and Project Implementation Metropolitan
More informationMay 4, Dear Mr. Thomas and Mr. Snyder,
Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf
More informationTransportation Advisory Committee Meeting Notice & Agenda
Transportation Advisory Committee Meeting Notice & Agenda Wednesday, November 7, 2012 4:00 p.m. to 5:30 p.m. King Street Meeting Room 100 North King Street Hendersonville, NC 28792 1. Meeting Called to
More informationShort and Long Term Needs
Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation
More informationJuly 31, HIGHWAY CAPITAL IMPROVEMENT PLAN
July 31, 2018 2019 2024 HIGHWAY CAPITAL IMPROVEMENT PLAN 6-Year CIP Summary 2019-2024 CALENDAR YEAR 2019 CTH IV IV-2 CTH P to B/K Line Road Surface Maintenance, 2-Lane Town of Humbolt 2.04 Rural, Asphalt
More informationCity Council Work Session
City Council Work Session March 7, 2019 Strategies to address traffic flow in lebanon City Council Goals Infrastructure and Utilities To improve the quality of life of our customers by providing clean,
More informationBicycle and Pedestrian Facilities Toolbox (Excerpt from Figure 3.1)
Appendix B Neighborhood Connections Summaries This Appendix is a supplement to the information presented in Chapter 3 Connect People. The Appendix includes a summary or profile for each of the proposed
More informationDRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan
5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationPublic Outreach Event Summary
MTP 2040 Appendix D Public Involvement The MPO conducted a 21-day public comment period from August 27, 2015 September 18, 2015 in which the Draft MTP was made available to the public for comment and several
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationHigh Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey
High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationOverview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?
Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy
More informationNEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES
NEW JERSEY DEPARTMENT OF TRANSPORTATION RIDE QUALITY SPECIFICATION AND CASE STUDIES BY NARINDER S. KOHLI, P.E. PRINCIPAL ENGINEER PAVEMENT DESIGN, NJDOT (609) 530 8140 NARINDER.KOHLI@DOT.STATE.NJ.US RIDE
More informationInterstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project. Prepared September 6, 2017
EODOT Project: ODOT Project: STA-IR 77-.50; PID 00290 Interstate Route 77 / US Route 62 / State Route 687 (Fulton Road) Transportation Improvement Project Summary of Public Comments Received and Responses
More informationRemainder to be County Route Begin MP End MP Length Item Number Funding Type* Description Type of Work Phase*
TIP Fayette NA PL TRANSIT FACILITY INVENTORY MATCHED FED FUNDS N $32,000 $0 Jessamine 2.66 07 00087.50 STPE EAST NICHOLASVILLE BYPASS SECTION II; FROM KY 39, EXTENDING SOUTHWESTERLY TO US 27 SOUTH OF NICHOLASVILLE.
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationinformation, please contact the District 9 Offices at or
O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationGerald P. Oliveto, P.E. George Franz NJDOT
Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing
More informationProject Name Project Description Authorized Amount
1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings
More informationCITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved
CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter
More informationDistrict Construction Projects
District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More informationHigh Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey
High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,
More informationHidden Oaks Elementary School
Hidden Oaks Elementary School SCHOOL ROUTE PLAN For HIDDEN OAKS ELEMENTARY SCHOOL LOCATION 13 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationU-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0
Winston-Salem Urban Area Metropolitan Planning Organization 2035 Fiscally Constrained Long Range Transportation Plan 2015 Street and Highway Project List Mileage Existing Proposed Regional Federal STIP
More informationWork Session. Agenda Item # 4. Meeting Date September 8, Daryl Braithwaite Public Works Director. Prepared By. Suzanne R. Ludlow City Manager
Agenda Item # 4 Work Session Meeting Date September 8, 2015 Prepared By Approved By Daryl Braithwaite Public Works Director Suzanne R. Ludlow City Manager Discussion Item Background Temporary Neighborhood
More information