information, please contact the District 9 Offices at or

Size: px
Start display at page:

Download "information, please contact the District 9 Offices at or"

Transcription

1

2 O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible for maintaining one of the largest transportation networks in the nation. Guided by ethical principles and accountability, ODOT works to improve safety, enhance travel and advance economic development. As a nearly $3 billion enterprise, the department wisely invests in its core services of snow and ice removal, annual construction program and highway maintenance operations. This year, ODOT and District 9 will embark on the state s first ever public-private partnership (P3) when construction of the Portsmouth Bypass begins in Scioto County this spring. The Portsmouth Gateway Group is set to build a $429 million, 16-mile highway that will be the state s largest, modern earthwork project to date. The Portsmouth Bypass is a four-lane, limited access highway from U.S. Route 23 north of Lucasville to U.S. Route 52 near Sciotoville. It is designed to complete the missing link of the Appalachian Highway System in Ohio and fuel economic development in the region. While ODOT District 9 s 2015 construction program will include start of construction for the department s single, largest project ever, its traditional contract-bid construction program will include 88 projects to be awarded and/or constructed during through FY2015 and the first quarter of FY2016. With an estimated cost of $125 million, these projects include: 59 Preservation 19 Maintenance 4 Facility 3 Enhancement 2 Safety 1 New Alignment The following summary outlines those projects which are being programmed or considered for construction throughout the year. However, due to production and planning variables, not all projects may be sold as proposed. Any cost estimates or sale dates cited in this document are subject to change. Additional information about these and other construction or maintenance projects will be released as they are scheduled or awarded. For more information, please contact the District 9 Offices at or d09.pio@dot.state.oh.us. PID = Project Identification Number CRS = County, Route, Section

3 $50,000,000 $45,000,000 $40,000,000 $35,000,000 $30,000,000 $25,000,000 $20,000,000 43,570,860 $15,000,000 $10,000,000 19,146,695 19,498,533 16,289,794 15,975,273 $5,000,000 5,588,140 5,440,198 9,230,870 $0 Adams Brown Highland Jackson Lawrence Pike Ross Scioto

4 Districtwide Scioto County Ross County Pike County Lawrence County Jackson County Highland County Brown County Adams County

5 ADAMS COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost ADA-CR3F (Island Creek Road) Bridge (OBPP) MOT: The route will be closed; traffic will be detoured locally. 07/01/14 $384, ADA-CR2E (Eckmansville Road) Bridge (OBPP) MOT: The route will be closed; traffic will be detoured locally. 07/01/14 $294, ADA-County HM Facility Maintenance Facility Construction of a new, full-service facility on S.R. 41 in West Union. MOT: NA; construction will be completed off roadway. 03/01/15 $9,879, ADA / ADA /5.89 Bridge Repair (two locations) Bridge (two locations) Just east of T.R. 130 (Mendenhall Road); one-half mile west of S.R. 73. Located between C.R. 3C (Clayton Road) and T.R. 233 (Irwin Road) ADA Resurfacing From the Brown County line to S.R. 41 at West Union. MOT: Traffic will be maintained in a minimum of one lane in each direction. MOT: The route will be closed, and traffic will be detoured via U.S. 52 and S.R MOT: Traffic will be maintained in one lane with flaggers. 01/29/15 $3,299,748 05/21/15 $510,808 08/17/15 $1,735, ADA Slide Repair Immediately east of T.R. 12 (Grimes MOT: Traffic will be maintained with 06/04/15 $842,329 Road) and Brown County line. temporary signals ADA Slide Repair Located between T.R. 256 (Ralston MOT: Traffic will be maintained with 04/23/15 $1,285,500 Road) and C.R. 56 (Frank Young Road). temporary signals ADA Slide Repair Approximately one mile north of MOT: The route will be closed; traffic 01/15/15 $428,691 U.S. 52. will be detoured via S.R ADA Slide Repair Between C.R. 14 (Tranquility Pike) and T.R. 411 (McCreight Road). MOT: Traffic will be maintained with temporary signals. 10/16/14 $487,201 Estimated Total Cost $19,146,695

6

7 BROWN COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost BRO-Mt. Orab Sidewalks (SRTS) Along the east side of Boyd Road at Mt. Orab. MOT: Traffic will be maintained on affected routes as needed by flaggers. 05/07/15 $173, BRO-County HM Facility Maintenance Facility Construction of a new, full-service facility on S.R. 125 in Georgetown. MOT: NA; construction will be completed off roadway. 03/01/15 $9,879, BRO Culvert Approximately one-half mile north of U.S BRO Bridge Between U.S. 62 at Redoak and T.R. 4 (Mt. Aire Road) BRO Bridge Between S.R. 756 and C.R. 84 (Feesburg-Poetown Road) BRO-763- Bridge Between T.R. 24 (West Fork Road) and S.R BRO Resurfacing From the Clermont to the Highland County line BRO Streetscape From Main Street to U.S. 62/68 in the village of Ripley BRO Resurfacing Between U.S. 68 and the northern corporation limit of Russellville BRO-52/68- Resurfacing U.S. 52: From the western 4.31/41.01 corporation limit of Higginsport to just east of T.R. 255 (Pisgah Hill Road). U.S. 68: From the northern corporation limit of Fayetteville to the Clinton County line BRO Resurfacing Between S.R. 32 at Mt. Orab and U.S. 50 in Fayetteville. MOT: Traffic will be maintained with the use of temporary signals. 12/11/14 $495,232 MOT: The route will be closed. 07/30/15 $297,000 MOT: The route will be closed. 06/04/15 $290,970 MOT: The route will be closed. 03/19/15 $351,645 MOT: Traffic will be maintained in one lane with the use of flaggers. MOT: Traffic will be maintained on affected routes as needed by flaggers. MOT: Traffic will be maintained in one lane with the use of flaggers. MOT: Traffic will be maintained in one lane with the use of flaggers. 08/03/15 $1,645,683 05/21/15 $837,897 02/10/15 $1,100,642 09/18/14 $2,925,532 MOT: Traffic will be maintained in one lane with the use of flaggers. 12/11/14 $1,401,674 Estimated Total Cost $19,498,533

8

9 HIGHLAND COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost HIG-TR Bridge On Fenwick Road, just south of S.R MOT: The route will be closed; traffic will be detoured locally. 09/04/14 $409, HIG-Various Routes HIG-Various Routes HIG-TR / HIG-CR / HIG-Hobart Road/Carl Smith Drive (OBPP) Pavement Marking Guardrail Bridge Bridge New Construction On various county routes. On various county routes. Two locations on Tolle Road, between U.S. 62 and U.S On Bridges Road, over Hardin Creek. Construction of a two-lane route, extending Hobart Road from its termini near Homestead Drive to S.R. 73, at the northern corporation limit of Hillsboro HIG Resurfacing From the Clinton County line to the village of Leesburg corporation limit HIG-138- Resurfacing From T.R. 288 (Rittenhouse Road) to the intersection with S.R. 753 in the HIG HIG Bridge Rehabilitation Bridge village of Greenfield. Approximately one-half mile south of the Hillsboro corporation limit. Between T.R. 357 (Rupple Road) and T.R. 360 (Titus Road). MOT: Traffic will be maintained by flaggers or temporary traffic signals. MOT: Traffic will be maintained by flaggers or temporary traffic signals. MOT: The route will be closed; traffic will be detoured locally. MOT: The route will be closed; traffic will be detoured locally. MOT: Most construction will take place off roadway; traffic will be maintained at affected intersections. MOT: Traffic will be maintained in one lane with the use of flaggers. MOT: Traffic will be maintained in one lane with the use of flaggers. MOT: The route will be closed; traffic will be detoured via S.R. 73 and S.R MOT: The route will be closed; traffic will be detoured via U.S. 50, S.R. 41 and S.R /28/15 $144,200 07/06/15 $288,500 03/19/15 $2,068,721 06/05/14 $2,126,855 01/15/15 $6,897,909 10/16/14 $1,170,770 11/13/14 $1,365,590 02/10/15 $1,242,788 09/18/14 $574,767 Estimated Total Cost $16,289,794

10

11 JACKSON COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost JAC-Jackson Bridge (OBPP) On Huron and Dickason streets in the city of Jackson. MOT: The route will be closed, and traffic will be detoured locally. 08/27/15 $656, JAC-Jackson Bridge (OBPP) JAC-TR Bridge Rehabilitation On Harding Avenue and over Little Salt Creek in the city of Jackson. On Johnson Road, approximately one mile north of S.R. 776 and the Scioto County line. MOT: The route will be closed, and traffic will be detoured via Main and Broadway streets. MOT: The route will be closed; traffic will be detoured via S.R. 776 and T.R /05/15 $799,773 09/30/14 $201, JAC-Cooper Hollow Resurfacing (ODNR) Various locations in the Cooper Hollow Wildlife Area. MOT: Traffic will be maintained in one lane with the use of flaggers. 02/10/15 $78, JAC Bridge Repair At the C.R. 78 overpass, just west of the S.R. 124/S.R. 327 interchange JAC Bridge Repair/ Just north of the Jackson-Lawrence Rehabilitation County line JAC Bridge Between C.R. 52 (Lenhart Road) and T.R. 319 (Albert Swartz Road) JAC Resurfacing From U.S. 35 to approximately one mile south of S.R JAC-327- Rockfall/Slide Between T.R. 804 (Ray Cemetery Repair Road) and T.R. 207 (Woodrow Hale Road), approximately two miles south of the Vinton County line JAC Slide Repair Approximately 1.2 miles west of the junction with S.R MOT: Traffic will be maintained in a minimum of one lane in each direction. MOT: Traffic will be maintained by flaggers or temporary traffic signals. MOT: The route will be closed, and traffic will be detoured via S.R. 279, S.R. 93 and S.R. 32. MOT: Traffic will be maintained in one lane with the use of flaggers. MOT: The route will be closed, and traffic will be detoured via U.S. 50, S.R. 683 and S.R /19/15 $165,385 02/10/15 $770,000 01/29/15 $276,000 08/17/15 $1,155,113 11/26/14 $648,007 MOT: Traffic will be maintained in a 07/02/15 $1,002,891 minimum of one lane in each direction. Estimated Total Cost $5,588,140

12

13 LAWRENCE COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost LAW-CR4/6/13 (three) Bridge (OBPP) Structures located on C.R. 4, C.R. 6 and C.R. 13. MOT: The routes will be closed; traffic will be detoured locally. 07/01/14 $1,007, LAW-Wilgus Outpost Salt Storage Building Construction of a new salt storage building at the Wilgus Outpost. MOT: NA; construction will be completed off roadway. 08/08/14 $325, LAW Building Demolition Clearing within the right of way for MOT: NA; construction will be 06/04/15 $106,000 the project. completed off roadway LAW Drainage Construction Just east of the junction with S.R. MOT: Traffic will be maintained by 06/04/15 $576, , in the village of Chesapeake. flaggers LAW Slide Repair Between C.R. 193 (Telegraph Hill MOT: Traffic will be maintained in 03/05/15 $341,873 Road) and C.R. 40 (Brady Fork Road). one lane with the use of temporary signals LAW Bridge Between the intersecting points of MOT: The route will be closed at 02/10/15 $1,320,370 S.R. 378, approximately nine miles east of S.R the bridge the intersections will remain open. Traffic will be maintained in one lane with the use of flaggers and/or temporary signals LAW Culvert / Between S.R. 7 and C.R. 2 (Greasy MOT: The route will be closed, 05/22/14 $742,185 Alignment Improvement Ridge Road). and traffic will be detoured via S.R. 7, S.R. 775, S.R. 217 and S.R LAW Slide Repair Between the intersections of C.R. 2 MOT: Traffic will be maintained in 10/30/14 $740,345 (Greasy Ridge Road). one lane with the use of flaggers and/or temporary signals LAW Bench Cleaning Adjacent to the exit to the Ashland, Ky. twin bridges. MOT: Traffic will be maintained in a minimum of one lane in each direction. 01/15/15 $280,670 Estimated Total Cost $5,440,198

14

15 PIKE COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost PIK-TR Bridge On Shoemaker Road, just north MOT: The routes will be closed; 06/04/15 $481,257 of S.R traffic will be detoured locally PIK-CR Slide Repair Near C.R. 55 (Hay Hollow Road) and just north of S.R MOT: Traffic will be maintained in one lane with the use of 07/24/14 $1,525, PIK-CR85/116 Guardrail Various locations on C.R. 85 and C.R temporary signals. MOT: Traffic will be maintained in one lane with the use of flaggers. 03/05/15 $359, PIK-Kincaid Fish Hatchery Resurfacing (ODNR) Parking and roadway area within the hatchery. MOT: Traffic will be maintained with the use of flaggers. 07/06/15 $92, PIK Intersection Reconstruction Bridge (ODNR) Between S.R. 551 and S.R. 552 at Lake White. MOT: S.R. 104 will be closed at various intervals during construction; traffic will be detoured via S.R /27/15 $31,223, PIK Resurfacing From the Highland County line to MOT: Traffic will be maintained in 10/21/14 $1,125,924 C.R. 6 (Lapperell Road). one lane with the use of flaggers PIK Resurfacing From C.R. 6 (Lapperell Road) to MOT: Traffic will be maintained in 07/16/15 $1,663,043 S.R. 32. one lane with the use of flaggers PIK Resurfacing From just south of C.R. 117 (Groves Road), approximately five miles north of the Scioto County line, to the southern corporation limit of the village of Waverly. MOT: Traffic will be maintained in one lane in each direction. 09/18/14 $7,100,312 Estimated Total Cost $43,570,860

16

17 ROSS COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost ROS-Frankfort Sidewalks (SRTS) On High, Porter and Main streets in the village of Frankfort. MOT: There should be no impact to traffic. 05/21/15 $210, ROS-CR-Various Pavement Markings Various locations. MOT: Traffic will be maintained in one lane with the use of flaggers ROS-CR1/60/9 Guardrail Various locations on C.R. 1, C.R. 60 MOT: Traffic will be maintained in and C.R. 92. one lane with the use of flaggers ROS-CR Bridge Just south of U.S. 23 on Three MOT: The route will be closed; Locks Road, over Indian Creek. traffic will be detoured locally ROS-CR235/240/241 Guardrail Various locations on C.R. 235, C.R. MOT: Traffic will be maintained in 240 and C.R one lane with the use of flaggers. 09/15/14 $150,000 04/23/15 $300,000 06/04/15 $470,004 05/07/15 $300, ROS-County HM Facility Maintenance Facility Construction of a new, full-service facility in Chillicothe. MOT: NA; construction will be completed off roadway. 03/01/15 $9,280, ROS Culvert Between T.R. 72 (Waugh Road) and C.R. 92 (Ragged Ridge Road), approximately five miles south of U.S ROS Resurfacing From Marietta Road to C.R. 553 (Kenworth Road), at the Chillicothe corporation limit ROS Culvert Between T.R. 152 (Harris Station Road) and T.R. 154 (Camelin Hill Road) ROS Slide Repair Just north of C.R. 175 (Liberty Hill Road) ROS Bridge Repair/Scour One-quarter mile north of the S.R. 104/Three Locks Road exit ROS Fence Installation Various locations between S.R. 159 and the Pickaway County line. MOT: The route will be closed, and traffic will be detoured via S.R. 28, S.R. 753, S.R. 41 and U.S. 35. MOT: Traffic will be maintained in a minimum of one lane in each direction. MOT: The route will be closed, and traffic will be detoured via S.R. 220, S.R. 104 and U.S. 23. MOT: The route is closed; detour via S.R. 104, U.S. 23 and S.R MOT: Traffic will be maintained in a minimum of one lane in each direction. MOT: Traffic will be maintained in a minimum of one lane in each direction. 08/17/15 $350,000 08/03/15 $1,899,970 06/04/15 $138,600 11/26/14 $1,384,366 09/22/14 $1,190,630 07/20/15 $300,000 Estimated Total Cost $15,975,273

18

19 SCIOTO COUNTY PID CRS Project Type Location Description & Maintenance of Traffic Sale Date Estimated Cost SCI-TR79/262 Bridge (OBPP) On Mill Road, north of S.R. 522, and on Laurel Fork Road, immediately south of S.R. 73. MOT: The routes will be closed; traffic will be detoured locally. TBD TBD SCI-Shawnee Forest Culvert (ODNR) Various forest roads. MOT: Roads will be subject to intermittent closures; at all other times, traffic will be maintained by flaggers. 12/11/14 $454, SCI Bridge Over Rarden Creek, immediately west of the village of Rarden SCI Resurfacing From U.S. 52 to the Jackson County line SCI-140- Bridge Between C.R. 17 (Frederick Road) 9.22/9.48 and the community of South Webster SCI Bridge Between C.R. 204 (Cathey Road) and T.R. 192 (Adams Road) SCI Slide Repair Approximately one-half mile east MOT: Traffic will be maintained by flaggers and temporary traffic signals as needed. MOT: Traffic will be maintained in one lane with the use of flaggers. MOT: Traffic will be maintained by temporary signals. 10/02/14 $1,248,303 04/23/15 $4,348,042 08/21/14 $808,904 MOT: Traffic will be maintained by temporary signals. 06/04/15 $286,000 MOT: Traffic will be maintained by 11/13/14 $334,562 of S.R. 73, at the village of Otway. temporary signals SCI Bridge Immediately east of S.R. 335, MOT: The route will be closed, and 07/16/15 $224,751 west of T.R. 203 (Charles Graham traffic will be detoured via S.R. 335 and Road). S.R SCI Signalization At the intersection of U.S. 23 and MOT: Traffic will be maintained in a 06/04/15 $290,928 S.R. 348 at Lucasville. minimum of one lane and with the use of flaggers SCI Resurfacing Eastbound lanes in the village of MOT: Traffic will be maintained in a 04/09/15 $1,235,215 New Boston. minimum of one lane. Estimated Total Cost $9,230,870

20

21 DISTRICTWIDE PID CRS Project Type Maintenance of Traffic Sale Date Estimated Cost Various Routes Raised Pavement Markers MOT: Traffic will be maintained in one lane with flaggers. 01/23/14 $188, Various Routes Auxiliary Markings MOT: Traffic will be maintained in one lane with flaggers. 10/02/14 $89, Various Routes Preventive Maintenance MOT: Traffic will be maintained in one lane with flaggers. 10/02/14 $1,673, Various Routes Bridge Maintenance MOT: Traffic will be maintained in one lane with flaggers. 12/11/14 $612, Various Routes Herbicidal Spraying MOT: Traffic will be maintained in one lane with flaggers. 12/11/14 $109, Various Routes Guardrail MOT: Traffic will be maintained in one lane with flaggers. 01/15/15 $1,028, Various Routes Raised Pavement Markers MOT: Traffic will be maintained in one lane with flaggers. 03/19/15 $210, Various Routes Pavement Marking MOT: Traffic will be maintained in one lane with flaggers. 05/07/15 $1,500,000 Estimated Total Cost $5,416,753 Linking Ohio's highways, railways, transit, aviation and port facilities, the Ohio Department of Transportation will promote a world-class, integrated multi-modal transportation system that is efficient, cost-effective and reliable for all of the state's citizens, businesses and travelers. ODOT District 9 serves the transportation needs of Adams, Brown, Highland, Jackson, Lawrence, Pike, Ross and Scioto counties in south-central Ohio. There are more than 3,790 lane miles of state and federal routes maintained by District 9, and there are 1,243 bridges inspected and monitored by its bridge department. For more information, call ODOT District 9 at or Visit us on the web at and follow us on Twitter at Facebook at Instagram at

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2018 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR VAUGH WILSON, P.E., DISTRICT

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov

More information

DISTRICT CONSTRUCTION PROGRAM

DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR

More information

Weymouth - Abington Route 18 Widening and Reconstruction Project File No

Weymouth - Abington Route 18 Widening and Reconstruction Project File No Weymouth - Abington Route 18 Widening and Reconstruction Project File No. 601630 PROJECT LOCATION Project Limit Previously Completed Signalized Intersections (Typical) Route 18 Widening Bridge No. W-32-013

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

An Easier Commute. Learn how to use I-77 Express to save you time.

An Easier Commute. Learn how to use I-77 Express to save you time. An Easier Commute Learn how to use I-77 Express to save you time PUBLIC-PRIVATE PARTNERSHIP I-77 Express is the first-ever toll lane public-private partnership with NCDOT I-77 Mobility Partners is financing,

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

News Release Eastern Oregon Region 5

News Release Eastern Oregon Region 5 News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:

More information

I-25 South Gap Project Monument to Castle Rock

I-25 South Gap Project Monument to Castle Rock I-25 South Gap Project Monument to Castle Rock Project Overview Castle Rock Town Council April 3, 2018 by Chuck Attardo I-25 South: Monument to C-470 An Important Corridor to Colorado Links the state s

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

D I S T R I C T CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR LLOYD MACADAM, DISTRICT DEPUTY DIRECTOR

D I S T R I C T CONSTRUCTION PROGRAM JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR LLOYD MACADAM, DISTRICT DEPUTY DIRECTOR D I S T R I C T 1 1 2017 CONSTRUCTION PROGRAM SERVING BELMONT, CARROLL, COLUMBIANA, HARRISON, HOLMES, JEFFERSON & TUSCARAWAS COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR LLOYD MACADAM,

More information

Toll Rate Public Hearing

Toll Rate Public Hearing Toll Rate Public Hearing I-77 Express Toll Rate Hearing September 13, 2018 AGENDA AND HOUSEKEEPING Speaker Signup Bathrooms/Exits Facebook Live Introductions Thanks and Recognition 6:30-6:35 6:35-6:55

More information

Spring/Summer Traffic and Construction Technical Briefing

Spring/Summer Traffic and Construction Technical Briefing Spring/Summer Traffic and Construction Technical Briefing 1 1. Introduction 2. Infrastructure Investments 3. Impacts to Mobility 4. Transit Operations 5. Mitigation Measures 6. Wrap-Up Overview 2 Infrastructure

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development

Shenango Valley MPO. State Transportation Commission 2015 Twelve Year Program Development State Transportation Commission 2015 Twelve Year Program Development Regional results of the survey and public feedback from August thru November 2013 Shenango Valley MPO Version 01-2014 Mobility Concerns

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10

Proposed. City of Grand Junction Complete Streets Policy. Exhibit 10 Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility ADA Transition Plan FY19-FY28 Date: November 5, 2018 Prepared by: City Of Gainesville Department of Mobility 1.0 INTRODUCTION 1.1 BACKGROUND The federal statute known as the Americans with Disabilities

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011

Transportation in Washoe County. Lee Gibson, Executive Director February 15, 2011 Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

PROJECT FACT SHEET May 25, 2018

PROJECT FACT SHEET May 25, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

Capital Beltway HOT Lanes - Frequently Asked Questions

Capital Beltway HOT Lanes - Frequently Asked Questions Capital Beltway HOT Lanes - Frequently Asked Questions December 20, 2007 1. What is the cost of the project? The fixed-price design-build cost is approximately $1.4 billion. 2. Why have the project costs

More information

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information

Theodore Roosevelt Expressway (TRE) study was completed in Conducted Public meetings Analyzed traffic Provided good information Theodore Roosevelt Expressway (TRE) study was completed in 2010. Conducted Public meetings Analyzed traffic Provided good information 2 All routes in oil producing counties have increased traffic. 3 Super

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,

More information

IL Route 71 Construction Update

IL Route 71 Construction Update 100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The

More information

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Approximate schedule with phases and proposed Maintenance of Travel (MOT) plans February 2017 Project Elements Removal of existing bridge

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018 ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment

More information

SC 41/Joe Rouse Intersection Improvements

SC 41/Joe Rouse Intersection Improvements SC 41/Joe Rouse Intersection Improvements Scope: Add dual left-turn lanes from Joe Rouse Road onto southbound SC 41 to reduce re-occurring peak hour congestion, particularly the AM peak. Construction Cost

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

SFY Transportation Improvement Program Highway and Bikeway Element Amendments PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker

More information

STIP Scoping and Design Projects November Administrative Amendment

STIP Scoping and Design Projects November Administrative Amendment NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33

More information

Transportation and Air Quality Committee GEL Project Briefing and Update

Transportation and Air Quality Committee GEL Project Briefing and Update Transportation and Air Quality Committee GEL Project Briefing and Update Mr. Darryl D. Van Meter, P.E. State Innovative Delivery Engineer June 11, 2015 Georgia Express Lane Projects 2 Program Benefits

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Palm Beach County Traffic Report November 16 through November 23, 2018

Palm Beach County Traffic Report November 16 through November 23, 2018 November 16, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report November 16 through November 23, 2018 Palm Beach County Palm Beach County traffic will

More information

Kentucky s Surface Transportation System

Kentucky s Surface Transportation System Kentucky s Surface Transportation System ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit

More information

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department)

Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering. Minnesota Department of Transportation (the Department) To: From: Paul Huston, P.E., Design-Build Coordinator Chuck Gonderinger, HDR Engineering Date: March 20, 2001 Subject: Roadway Geometric Design Criteria Project: TH 14/218 Design-Build Project, SP 7408-29,

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

VIII. Project Prioritization & Implementation

VIII. Project Prioritization & Implementation Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio

Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 1 Presented By: Jim Roth, P.E. Signing Engineer Office of Traffic Engineering Ohio Department of Transportation 1980 West Broad Street Columbus, Ohio 43223 (614) 752-0438 Fax: (614) 644-8199 jim.roth@dot.state.oh.us

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line

State Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho

More information

MUTCD Part 6: Temporary Traffic Control

MUTCD Part 6: Temporary Traffic Control MUTCD Part 6: Temporary Traffic Control OMUTCD English units are preferred. OHIO MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES TABLE OF CONTENTS PREFACE INTRODUCTION TABLE OF CONTENTS PART 1. GENERAL Chapter

More information

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4

PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 4 PERFORMANCE ACTIVITY 306 DRAINAGE PIPE WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 WORK DESCRIPTION 4 Repair Install Remove Clean 306 DRAINAGE PIPE ACTIVITY DESCRIPTION Install, repair, clean,

More information

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails

Chapter 7. Transportation. Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails Chapter 7 Transportation Transportation Road Network Plan Transit Cyclists Pedestrians Multi-Use and Equestrian Trails 7.1 TRANSPORTATION BACKGROUND The District of Maple Ridge faces a number of unique

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

HIGHWAY 11 CORRIDOR STUDY

HIGHWAY 11 CORRIDOR STUDY HIGHWAY 11 CORRIDOR STUDY Executive Summary August 2016 Roseau County?æA@?çA@ Warroad Lake of the Woods Roseau Roosevelt Badger?ÄA@ Greenbush Legend N Hwy 11 Study Area Figure 1: Corridor Study Limits

More information

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report March 2 through March 9, 2018 FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information