1 District Construction Projects

2 Ohio Department of Transportation District 7 AUG-116/ /5.10 Auglaize County Projects 2014 AUG AUG-VAR AUG AUG AUG-VAR AUG-Heritage Trail AUG-VAR AUG-VAR AUG AUG-VAR AUG-High Street AUG AUG-116/ / AUG AUG-M&E Trail 2. AUG AUG-M&E Trail 3. AUG AUG/MER/SHE-VAR-VAR 4. AUG AUG/MER/SHE-VAR/VAR AUG-VAR AUG-Heritage Trail AUG County Manager: Ted Hemleben Ph.: (419) AUG-High Street

3 Auglaize County 1.) State Route 116 & State Route ) State Route 65 AUG-116/197/8.22/5.10, PID AUG , PID Remove and replace existing overlays with new latex modified concrete. Reface abutments using anodes, and place pier piling encasements on all piles. AUG & AUG Traffic Detoured Br. No. AUG Traffic Maintained Estimated Cost: $739,182 Estimated Cost: $81,649 Award Date: 4/7/2014 Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 8/15/ ) State Route ) State Route 67 AUG , PID AUG , PID Placement of 3" of asphalt concrete. Project will be following a reconstruction project being performed by the Village of Waynesfield. S.R. 67 to Karen St. Traffic Maintained Replace bridge deck, repair and paint structural steel, and rehabilitate substructures. Br. No. AUG Traffic Maintained Estimated Cost: $141,793 Estimated Cost: $3,418,271 Award Date: 8/4/2014 Award Date: Awarded Tentative Start Date Sept Tentative Start Date Under Construction Estimated Completion Date 10/31/2014 Estimated Completion Date 9/30/2014

4 Auglaize County 5.) Auglaize County 6.) Auglaize County AUG-VAR-Bridges, PID AUG-Heritage Trail Park District, PID Seal bridge deck with SRS, and paint existing structural steel. Clearing, grubbing, and constructing an aggregate drive and parking lot. Various bridges within the county Dr. Elizabeth Yahl-Kuffner Nature Preserve Short duration closures Estimated Cost: $1,958,860 Estimated Cost: $25,153 Award Date: AWARDED Award Date: 3/24/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 7/31/ ) State Route 66 8.) City of St. Marys AUG , PID AUG-High Street Bridges, PID Roadway widening, radius improvement, and relocation of signal strain poles. S.R. 66 at McKinley Road Traffic Maintained Remove and replace and existing 2 span bridge over the Miami and Erie Canal. Remove an existing bridge over the Upper Mill Race and replace w/ 66" culvert. High Street in the City of St. Marys Traffic detoured on local streets; all drives maintained Estimated Cost: $200,684 Estimated Cost: $1,297,441 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date 9/9/2013 Estimated Completion Date 9/30/2014 Estimated Completion Date 7/15/2014

5 Auglaize County 9.) State Route ) Auglaize County AUG , PID AUG-Miami & Erie Shared Use Trail, PID Remove and replace existing overlay, reface abutments, repair deck edges, & encase pier piling. Br. No. AUG Traffic Detoured Construction of new pedestiran, bicycle and handicap trail, extending from down town to the north side of the Village of New Bremen. Lockkeeper's House to Lock 2 Rd. Traffic Maintained Estimated Cost: $271,766 Estimated Cost: $548,937 Award Date: 3/24/2014 Award Date: 5/5/2014 Tentative Start Date May 2014 Tentative Start Date June 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 11/15/ ) State Route 119 AUG/MER/SHE-VAR-VAR, PID Remove existing asphalt wearing surface and overlay with Micro Silica modified concrete. Br. No. AUG Traffic Detoured Estimated Cost: $653,938 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 7/31/2014

6 Ohio Department of Transportation District 7 Champaign County Projects 2014 CHP-245/VAR-20.05/VAR CHP/LOG-245/ /3.52 CHP-36/559-VAR CHP-36/559-VAR CHP /7.17 CHP CHP/LOG-245/ /3.52 CHP-245/VAR-20.05/VAR CHP-36/559-VAR CHP /7.17 CHP County Manager: Shawn Anverse Ph.: (937)

7 Champaign County 1.) State Route ) State Route 245 CHP/LOG-245/ /3.52, PID CHP-245/VAR-20.05/VAR, PID Resurface the existing roadway. Repair of curb & gutter, sidewalk, tree lawn, and other roadway related items. N. Lewisburg E. Corp. Limit to County Line S.R. 245 within the Village of N. Lewisburg Traffic maintained Estimated Cost: $268,710 Estimated Cost: $435,766 Award Date: 5/5/2014 Award Date: 7/21/2014 Tentative Start Date June 2014 Tentative Start Date Aug Estimated Completion Date 10/15/2014 Estimated Completion Date 11/1/ ) U.S. Route 36 & State Route ) U.S. Route 68 CHP-36/559-VAR, PID CHP /7.17, PID Field pave invert of steel culverts with concrete Milling the existing roadway and resurfacing with asphalt concrete. Vaious locations Various locations within the City of Urbana Estimated Cost: $122,919 Estimated Cost: $553,649 Award Date: 5/5/2014 Award Date: 5/5/2014 Tentative Start Date June 2014 Tentative Start Date June 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 8/31/2014

8 Champaign County 5.) U.S. Route 68 CHP , PID94564 Construct a left turn lane at the intersection of Hickory Grove. Intersection of U.S. 68 & Hickory Grove Part witdth construction Estimated Cost: $597,345 Award Date: 6/16/2014 Tentative Start Date July 2014 Estimated Completion Date 9/30/2014

9 Ohio Department of Transportation District 7 Clark County Projects 2014 CLA-41/ /8.65 CLA /0.86 CLA CLA-George Rogers Clark Park CLA-68-VAR CLA-70/ /0.00 CLA CLA-41/ /8.65 CLA /0.86 CLA CLA-George Rogers Clark Park CLA-68-VAR CLA-70/ /0.00 CLA County Manager: Shawn Anverse Ph.: (937)

10 Clark County 1.) State Route 41 & State Route ) State Route 334 CLA-41/ /8.65, PID CLA /0.86, PID Intersection improvement by constructing a roundabout Intersection of S.R. 41 & S.R. 235 Replace or rehabilitate deteriorated backwalls/expansion joints/approach slabs. Br. No. CLA & CLA Traffic Maintained Traffic shall be maintained at all times. Estimated Cost: $1,147,621 Estimated Cost: $1,768,063 Award Date: 4/21/2014 Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date July 2013 Estimated Completion Date 9/15/2014 Estimated Completion Date 5/30/ ) State Route ) Clark County CLA , PID CLA-George Rogers Clark Park, PID Replace the existing structure. Perform pavement repairs and resurface the existing parking area with asphalt concrete Br. No. CLA George Rogers Clark Park Traffic maintained; Temporary signal Traffic shall be maintained at all times. Estimated Cost: $681,096 Estimated Cost: $58,500 Award Date: Awarded Award Date: 6/2/2014 Tentative Start Date May 2014 Tentative Start Date July 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 8/31/2014

11 Clark County 5.) U.S. Route 68 6.) Interstate 70 & Interstate 675 CLA-68-VAR, PID CLA-70/ /0.00, PID Project to paint the structural steel on various bridges along U.S. 68. Various Bridges Traffic Maintained Mill and resurface the existing roadway, and other roadway related items. I-70 - Approx. County line to Enon Rd I County line to I-70 Traffic shall be maintained at all times. Estimated Cost: $532,931 Estimated Cost: $5,586,612 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date May 2014 Tentative Start Date August 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 10/31/ ) Interstate 70 CLA , PID Mill and resurface the existing mainline lanes, and construct an additional lane to the median side. Enon Rd. to just west of U.S. 68 Traffic maintained utilizing part width construction Estimated Cost: $17,529,009 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 10/31/2015

12 Ohio Department of Transportation District 7 Darke County Projects 2014 DAR /9.47/10.33 DAR /25.30 DAR DAR DAR-127/ /5.29 DAR /25.30 DAR-36/ /9.01 DAR DAR-Shawnee Prairie DAR-36/ /9.01 DAR-127/ / DAR /9.47/ DAR-127/ / DAR /25.30 DAR DAR DAR DAR-36/ /9.01 DAR-Shawnee Prairie County Manager: Jeff Whetstone Ph.: (937)

13 Darke County 1.) State Route ) U.S. Route 127 DAR /9.47/10.33, PID DAR /25.30, PID Removal and replacement of three bridges along State Route 705. Project is Design Build Pavement planing and resurfacing of the existing roadway with asphalt concrete Br. No. DAR /0947/1033 Part 1 - Horatio Harris Creek to S.R. 47 Part 2 - S.R. 185 to North Star north corp. Traffic Detoured Estimated Cost: $952,784 Estimated Cost: $2,082,709 Award Date: Awarded Award Date: 6/16/2014 Tentative Start Date Under Construction Tentative Start Date July 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 10/15/ ) State Route ) State Route 47 DAR , PID DAR , PID Replacement of deteriorated structure with minimal approach work. Pavement planing and resurfacing of the existing roadway with asphalt concrete Br. No. DAR Ansonia East Corp. limit to US 127 Traffic Detoured Estimated Cost: $840,542 Estimated Cost: $572,896 Award Date: Awarded Award Date: 5/5/2014 Tentative Start Date Feb Tentative Start Date June 2014 Estimated Completion Date 4/30/2014 Estimated Completion Date 10/15/2014

14 Darke County 5.) U.S. Route 127 & State Route ) State Route 121 DAR-127/ /5.29, PID DAR , PID88758 Pavement planing and resurfacing of the existing roadway with asphalt concrete Replace deteriorating wearing surface with MSC with no approach work. U.S S. Corp. of Castine to U.S. 36 S.R within the Village of Versailles Br. No. DAR Traffic Detoured Estimated Cost: $2,173,370 Estimated Cost: $417,878 Award Date: 5/5/2014 Award Date: Awarded Tentative Start Date June 2014 Tentative Start Date May 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 6/30/ ) U.S. Route 36 & State Route ) Darke County DAR-36/ /9.01, PID DAR-Shawnee Prairie Reserve, PID Remove and replace existing latex modified concrete overlay with new deck overlay system. Perform pavement repairs and resurface the existing parking area with asphalt concrete DAR & DAR Darke County Garage Traffic Detoured N/A Estimated Cost: $311,798 Estimated Cost: $23,385 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 8/31/2014

15 County Manager: Ted Hemleben Ph.: (937) Ohio Department of Transportation District 7 Logan County Projects 2014 LOG LOG LOG LOG LOG CHP/LOG-245/ / LOG LOG LOG LOG LOG CHP/LOG-245/ /3.52

16 Logan County 1.) State Route ) State Route 366 LOG , PID LOG , PID Installation of guardrail along the south side of S.R. 368 and connect to the existing guardrail 500 ft East of the intersection of Lakeshore Dr. East S.R. 235 to T.R. 94 & S.R. 368 Traffic shall be maintained at all times. Milling the existing roadway and resurfacing with asphalt concrete. Traffic shall be maintained at all times. Estimated Cost: $30,000 Estimated Cost: $800,680 Award Date: 8/18/2014 Award Date: 7/21/2014 Tentative Start Date Sept Tentative Start Date Aug Estimated Completion Date 10/31/2014 Estimated Completion Date 10/15/ ) U.S. Route33 4.) U.S. Route 33 LOG , PID LOG L/R, PID Resurfacing the existing roadway along with other roadway related items. S.R. 117 to U.S. 68 Traffic shall be maintained at all times. Reface abutments, patch wing walls, and upper haunch. Br. No. LOG L & R Traffic shall be maintained at all times Estimated Cost: $114,948 Estimated Cost: $3,680,895 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date May 2014 Tentative Start Date Aug Estimated Completion Date 7/31/2014 Estimated Completion Date 10/15/ ) State Route 47 6.) State Route 559 LOG , PID CHP/LOG-245/ /3.52, PID Pavement planing and resurfacing with asphalt concrete. Resurface and repair the existing roadway with asphalt concrete. C.R. 23 to Everett Street 0.5 mi south of S.R. 287 Traffic shall be maintained at all times. Traffic shall be maintained at all times. Estimated Cost: $271,377 Estimated Cost: $268,710 Award Date: 7/7/2014 Award Date: 5/5/2014

17 Tentative Start Date Aug Tentative Start Date June 2014 Estimated Completion Date 9/15/2014 Estimated Completion Date 10/15/2014

18 Ohio Department of Transportation District 7 Mercer County Projects 2014 MER-CR-FY14 MER MER-CR-FY14 MER-CR-FY14 MER MER AUG/MER/SHE-VAR MER/SHE-274/ / MER MER MER-CR-FY14 MER AUG/MER/SHE-VAR 6. MER/SHE-274/ /23.99 County Manager: Jeff Whetstone Ph.: (937)

19 Mercer County 1.) State Route 29 2.) Mercer County MER , PID MER-CR-FY14, PID Replace deteriorated and distorted culvert type bridge with minimal roadwork. Project to repair or replace culverts under ten feet. SR 29 at Hickory Branch Rd. Various locations within Mercer County Traffic detoured Maintenance of Traffic varies by route Estimated Cost: $209,293 Estimated Cost: $340,617 Award Date: Awarded Award Date: 6/2/2014 Tentative Start Date May 2014 Tentative Start Date July 2014 Estimated Completion Date 6/30/2014 Estimated Completion Date 8/31/ ) State Route ) State Route 29 MER , PID MER , PID Overlay bridge deck with latex modified concrete, patch abutments and piers. Milling and resurfacing of the existing pavement with asphalt concrete Br. No. MER Traffic detoured U.S. 127 to Enterprise St. Estimated Cost: $184,346 Estimated Cost: $382,059 Award Date: Awarded Award Date: 3/24/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/15/2014 Estimated Completion Date 6/30/2014

20 Mercer County 5.) State Route ) State Route 29 AUG/MER/SHE-VAR, PID MER/SHE-274/ /23.99, PID Project to remove the existing asphalt wearing surface and overlay with micro silica modified concrete. Br. No. MER Field pave the existing corrugated metal pipe 700 ft. west of Harrison Rd. Traffic detoured Estimated Cost: $653,938 Estimated Cost: $41,482 Award Date: Awarded Award Date: 5/19/2014 Tentative Start Date May 2014 Tentative Start Date June 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 8/29/2014

21 County Manager: Shawn Anverse Ph.: (937) Ohio Department of Transportation District 7 Miami County Projects 2014 MIA/SHE /0.00 MIA-48/ MIA-Stillwater Prairie Reserve MIA-CR 25A MIA-BIKEPATH CONNECTIONS MIA-GMR BRIDGE CONNECTOR MIA MIA-48/ MIA /7.93 MIA MIA /7.93 MIA MIA-40/ /4.15 MIA MIA/MOT / MIA/SHE /0.00 MIA-CR 25A MIA-40/ /4.15 MIA/MOT /18.24 MIA-40/ / MIA-48/ / MIA MIA MIA-GMR BRIDGE CONNECTOR 5. MIA MIA-BIKEPATH CONNECTIONS 6. MIA / MIA-Stillwater Prairie Reserve 7. MIA

22 Miami County 1.) Interstate Route 75 2.) County Road 25A MIA/SHE /0.00, PID MIA-CR 25A-18.31, PID Multilane major rehabilitation of the existing pavement by milling 7" and replacing with 8.25" Widening roadway to 4 lanes, create an urban cross section with curb and gutter and sidewalk Mile Marker 84.2 to S.R. 29 Country Club Rd. to Looney Rd. Traffic maintained utilizing contraflow traffic patterns. Estimated Cost: $21,039,155 Estimated Cost: $2,747,159 Award Date: 6/16/2014 Award Date: Awarded Tentative Start Date July 2014 Tentative Start Date Under Construction Estimated Completion Date 10/31/2015 Estimated Completion Date 7/31/ ) State Route 48 & State Route ) State Route 718 MIA-48/ /0.00, PID MIA , PID Resurface the existing roadway, along with other roadway related items. Remove and replace existing deck overlay, refurbish bearings and repair top of backwalls. SR County Line to Piqua Corp Limit SR 48 - Within the Village of Pleasant Hill Br. No. MIA Traffic Detoured Estimated Cost: $1,927,824 Estimated Cost: $363,583 Award Date: 7/7/2014 Award Date: 4/7/2014 Tentative Start Date Aug Tentative Start Date May 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 10/15/2014

23 Miami County 5.) State Route ) Interstate Route 75 MIA , PID MIA /7.93, PID Rehabilitation of structure by replacing bearings, deck edge repair, painting, and encasing piers. Rehabilitate structures by repairing the abutments Br. No. MIA Traffic detoured Br. No. MIA Br. No. MIA Estimated Cost: $528,287 Estimated Cost: $79,145 Award Date: Awarded Award Date: 4/21/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 8/31/ ) State Route ) U.S. Route 40 & State Route 201 MIA , PID MIA-40/ /4.15, PID Replace deteriorating concrete deck Resurface the existing roadway with asphalt concrete. Br. No. MIA Traffic detoured U.S County Line to County Line S.R From S.R. 571 to S.R. 41 Estimated Cost: $717,544 Estimated Cost: $2,451,331 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date Mar Tentative Start Date Aug Estimated Completion Date 5/9/2014 Estimated Completion Date 10/15/2014

24 Miami County 9.) Interstate Route ) State Route 571 MOT/MIA /18.24, PID MIA , PID Crack sealing the existing pavement Pavement planing and resurfacing of the existing roadway Mile Marker 59.1 to Mile Marker 70.2 C.R. 25A to Northbound I-75 ramps Estimated Cost: $351,715 Estimated Cost: $422,393 Award Date: Awarded Award Date: 4/21/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 6/30/2014 Estimated Completion Date 9/15/ ) Miami County 12.) Miami County MIA-G. Miami River Bridge Connector, PID MIA-Bikepath Connections, PID Construct a bikeway/pedestrian bridge over the Great Miami River to connect sections five and six of the county trail system. Approx. 1600' south of Peterson Rd. Improving, and connecting bike sections within the City of Piqua Various locations within the City of Piqua N/A Estimated Cost: $1,557,291 Estimated Cost: $609,664 Award Date: Awarded Award Date: 8/4/2014 Tentative Start Date 9/18/13 Tentative Start Date Sept Estimated Completion Date 7/31/2014 Estimated Completion Date 10/15/2014

25 Miami County 13.) Miami County MIA-Stillwater Prairie Reserve, PID Resurfacing of existing drives and parking lots Stillwater Prairie Reserve Estimated Cost: $49,500 Award Date: 5/19/2014 Tentative Start Date June 2014 Estimated Completion Date 9/15/2014

26 Ohio Department of Transportation District 7 Montgomery County Projects 2014 MOT MIA/MOT /18.24 MOT MOT MOT MOT MOT MOT MIA/MOT /18.24 Not Included on the Map 19. MOT MOT-35/40/741-VAR 20. MOT MOT County Manager: Bob Lenser Ph.: (937)

27 Ohio Department of Transportation District 7 Montgomery County Projects 2014 MOT MOT-40/ /1.06 MOT /14.39/14.41 MOT MOT-40/ /1.06 MOT R MOT /14.39/14.41 MOT-Landscape Maintenance MOT-48/201-VAR MOT MOT-48/201-VAR MOT MOT MOT-Monument Lighting MOT-Five Rivers Metro Park MOT MOT /11.80 MOT MOT MOT-48/201-VAR MOT-40/ /1.06 MOT MOT MOT MOT /11.80 MOT MOT R 9. MOT MOT MOT /14.39/ MOT-Monument Lighting 16. MOT-48/201-VAR MOT MOT-Landscape Maint MOT-Five Rivers Metro Park MOT County Manager: Bob Lenser Ph.: (937)

28 Montgomery County 1.) Interstate Route 70 & U.S. Route 40 2.) Interstate 70 MOT-40/ /1.06, PID MOT , PID Remove and replace the existing microsilica and latex modified concrete deck overlay. Bridge deck overlay with other bridge repairs I-70 - Br. No. MOT U.S Br. No. MOT Traffic detoured Br. No. MOT L & R Traffic maintained Estimated Cost: $318,750 Estimated Cost: $2,303,572 Award Date: 5/5/2014 Award Date: Awarded Tentative Start Date June 2014 Tentative Start Date Under Construction Estimated Completion Date 7/31/2014 Estimated Completion Date 7/31/ ) State Route 49 4.) Interstate Route 70 MOT R, PID MOT /14.39/14.41, PID Replace deteriorated bridge deck with minimal approach work. Overlay bridge decks with micro silica concrete with minimal approach work. Br. No. MOT R MOT , MOT , MOT Traffic Detoured Bridge Traffic Detoured Estimated Cost: $972,341 Estimated Cost: $701,955 Award Date: Awarded Award Date: 4/7/2014 Tentative Start Date Under Construction Tentative Start Date May 2014 Estimated Completion Date 4/30/2014 Estimated Completion Date 9/30/2014

29 Montgomery County 5.) Interstate Route 75 6.) Interstate 70 & Interstate 75 MOT , PID MOT-Landscape Maintenance-FY14/15, PID Construct a new noise wall along the west side of Interstate 75 just south of the U.S. 40 interchange I-75 at U.S. 40 Provide maintenance and upkeep of the existing landscaping at the I-70/I-75 interchange. I-70 / I-75 Interchange Traffic maintained Traffic maintained Estimated Cost: $432,424 Estimated Cost: $482,010 Award Date: 6/16/2014 Award Date: Awarded Tentative Start Date July 2014 Tentative Start Date March 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 2/28/ ) State Route 4 8.) Interstate Route 75 MOT , PID MOT , PID Overlay bridge decks with latex modified concrete. Remove and replace deck overlay and patch large spalls on the abutments. Br. No. MOT L/R Br. No. MOT Traffic Maintained Estimated Cost: $455,751 Estimated Cost: $641,898 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 10/31/2014

30 Montgomery County 9.) State Route 4 10.) Montgomery County MOT , PID MOT-Monument Lighting, PID Replacement of the bridge super structure with minimal approach work. Install decorative LED lighting on the existing structure. Br. No. MOT Monument Ave bridge Traffic maintained Traffic maintained Estimated Cost: $2,116,926 Estimated Cost: $323,000 Award Date: Awarded Award Date: 7/7/2014 Tentative Start Date May 2014 Tentative Start Date August 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 11/15/ ) Montgomery County 12.) U.S. Route 35 MOT-Five Rivers Metro Park, PID MOT , PID Grading and resurfacing existing parking lots and drives. Replacement or MOT L/R, and the rehabilitation of MOT L/R. Eastwood Metro Park MOT L/R, & MOT L/R Traffic Maintained Estimated Cost: $204,394 Estimated Cost: $13,972,741 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date Under Construction Estimated Completion Date 9/15/2014 Estimated Completion Date 7/15/2014

31 Montgomery County 13.) Interstate Route ) State Route 835 MOT /11.80, PID MOT , PID Replace deficient bridge decks on two ramps within the I-75/US 35interchange. Remove asphalt wearing surface and replace with micro-silica modified concrete overlay. Br. No. MOT Br. No. MOT Traffic detoured Br. No. MOT Estimated Cost: $4,693,292 Estimated Cost: $443,533 Award Date: 6/16/2014 Award Date: 5/19/2014 Tentative Start Date July 2014 Tentative Start Date June 2014 Estimated Completion Date 9/30/2015 Estimated Completion Date 9/30/ ) Interstate Route ) State Route 48 &State Route 201 MOT , PID MOT-48/201-VAR, PID Interchange Gateway to add city logos on concrete retaining wall. Microsurface approach lanes of three intersections in Montgomery County I-75, Exit 47 SR 48 at SR 725; SR 48 at Shoup Mill Rd. SR 201 at Chambersburg Rd. Estimated Cost: $451,050 Estimated Cost: $132,811 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 6/30/2014 Estimated Completion Date 6/30/2014

32 Montgomery County 17.) Interstate ) Interstate Route 75 MOT , PID MOT/MIA /18.24, PID Widening and replacement of mainline pavement, including replacement or replacement of mainline bridges. (Design Build) S.R. 48 to Airport Access Rd. Crack sealing the existing pavement Mile Marker 59.1 to Mile Marker 70.2 Estimated Cost: $50,415,394 Estimated Cost: $116,843 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 7/1/2017 Estimated Completion Date 6/30/ ) State Route ) Interstate Route 75 MOT , PID MOT , PID Pavement planing and resurfacing Reconstruction of Interstate 75 through downtown Dayton. Poplar St to Clayton S. Corp. Limit SR 4 to US 35 Estimated Cost: $540,367 Estimated Cost: $125,564,985 Award Date: 8/4/2014 Award Date: Awarded Tentative Start Date Sept Tentative Start Date Under Construction Estimated Completion Date 10/15/2014 Estimated Completion Date 9/1/2017

33 Montgomery County 21.) United States Route ) State Route 741 MOT , PID MOT , PID Pavement planing and resurfacing Bricker Ave. to SR 49 Project consists of resurfacing the roadway, installation of sidewalks, curb ramps, and updates to the traffic signal. Orchard Run Rd. to Alex Bell Rd. Estimated Cost: $382,930 Estimated Cost: $1,256,259 Award Date: 7/7/2014 Award Date: 4/21/2014 Tentative Start Date Aug Tentative Start Date May 2014 Estimated Completion Date 10/15/2014 Estimated Completion Date 10/15/ ) Montgomery County MOT-35/40/741-VAR, PID Bridge structural steel painting Numerous bridges throughout the district Estimated Cost: $1,876,818 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 11/15/2014

34 Ohio Department of Transportation District 7 Shelby County Projects 2014 SHE /10.96/12.90 CHP-245/VAR-20.05/VAR SHE SHE AUG/MER/SHE-VAR-VAR SHE SHE /10.96/12.90 SHE /10.96/12.90 SHE-HQ Radio Room SHE MIA/SHE /0.00 SHE MER/SHE-274/ /23.99 SHE-Lock One SHE SHE /10.96/ SHE MER/SHE-274/ / SHE SHE SHE-HQ Radio Room 3. AUG/MER/SHE-VAR-VAR 8. MIA/SHE / SHE- Lock One 4. CHP-245/VAR-20.05/VAR 9. SHE SHE SHE County Manager: Tony Brown Ph.: (937)

35 Shelby County 1.) State Route 29 2.) State Route 119 SHE /10.96/12.90, PID SHE , PID Remove and replace the existing roadway culverts. Various locations within Shelby County Roadway reconstruction, curbs, sidewalk, and storm sewer. SR 119 within the Village of McCartyville Traffic detoured Traffic Detoured Estimated Cost: $299,849 Estimated Cost: $657,701 Award Date: 4/21/2014 Award Date: 5/19/2014 Tentative Start Date May 2014 Tentative Start Date June 2014 Estimated Completion Date 7/31/2014 Estimated Completion Date 9/30/ ) State Route ) State Route 245 AUG/MER/SHE-VAR-VAR, PID CHP-245/VAR-20.05/VAR, PID Remove existing asphalt wearing surface and overlay with Micro Silica modified concrete. Repair of curb & gutter, sidewalk, tree lawn, and other roadway related items. Br. No. SHE S.R. 274 within the Village of Jackson Center Traffic Detoured Estimated Cost: $653,938 Estimated Cost: $435,766 Award Date: Awarded Award Date: 7/21/2014 Tentative Start Date May 2014 Tentative Start Date Aug Estimated Completion Date 7/31/2014 Estimated Completion Date 11/1/2014

36 Shelby County 5.) Interstate Route 75 6.) Interstate Route 75 SHE , PID SHE , PID Overlay bridge deck, remove safety curb and railing, patch piers, and paint structure. Br. No. SHE Resurfacing of existing pavement with asphalt concrete. SR 29 to SR 274 Traffic detoured Estimated Cost: $460,334 Estimated Cost: $6,114,620 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 9/30/ ) State Route 47 8.) Interstate Route 75 SHE , PID MIA/SHE /0.00, PID Replace deficient bridge with minimal approach work Reconstruction of mainline pavement Br. No. SHE Mile Post 84.4 to SR 29 Estimated Cost: $1,296,590 Estimated Cost: $21,039,155 Award Date: Awarded Award Date: 6/16/2014 Tentative Start Date May 2014 Tentative Start Date July 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 10/30/2015

37 Shelby County 9.) Interstate Route ) Interstate Route 75 SHE , PID SHE , PID Replace deficient bridge decks Br. No. SHE L & R Raise the structure and replace the bridge deck. concrete. Br. No. SHE Traffic detoured (Bridge traffic) Estimated Cost: $3,388,012 Estimated Cost: $1,139,929 Award Date: Awarded Award Date: Awarded Tentative Start Date Under Construction Tentative Start Date May 2014 Estimated Completion Date 9/30/2014 Estimated Completion Date 10/15/ ) State Route ) Shelby County MER/SHE-274/ /23.99, PID D07-Radio Room, PID Field pave the existing corrugated metal pipe Demolish the back section of the Annex and add a new area onto the District Garage to house the demolished Radio Room ft. east of SR 589 District Headquarters N/A Estimated Cost: $41,482 Estimated Cost: $570,000 Award Date: 5/19/2014 Award Date: Awarded Tentative Start Date June 2014 Tentative Start Date 7/1/2013 Estimated Completion Date 8/29/2014 Estimated Completion Date 6/30/2014

38 Shelby County 13.) Shelby County SHE-Lock One, PID Reconstruct Lock 1, remove foundation stones, and replace with a concrete foundation Lock One in the Village of Lockington N/A Estimated Cost: $1,687,101 Award Date: Tentative Start Date Awarded Under Construction Estimated Completion Date 5/15/2014

39 District Wide 1.) D07-FY 14-Herbicidal Spray 2.) D07-Mowing-FY14/15 PID PID Applying herbicides along roadsides for noxious weed control District wide mowing Auglaize, Champaign, Clark, and Logan Counties District wide Estimated Cost: $106,012 Estimated Cost: $1,060,003 Award Date: Awarded Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 7/15/2014 Estimated Completion Date 11/15/ ) D07-FDPM-FY14 4.) D07-PPM-FY14 PID PID District wide fast dry pavement marker 2014 District wide polyester pavement marking program program District wide District wide Estimated Cost: $1,846,990 Estimated Cost: $679,948 Award Date: 3/24/2014 Award Date: 4/21/2014 Tentative Start Date May 2014 Tentative Start Date May 2014 Estimated Completion Date 8/31/2014 Estimated Completion Date 8/31/2014

40 District Wide 5.) D07-RPM-FY14 6.) D07-LG-FY14/15 PID PID District wide raised pavement marker Highway lighting maintenance project program District wide District wide Estimated Cost: $178,267 Estimated Cost: $283,512 Award Date: 5/5/2014 Award Date: Awarded Tentative Start Date May 2014 Tentative Start Date Under Construction Estimated Completion Date 8/31/2014 Estimated Completion Date 8/31/ ) D07-TSG Maint 79-FY13/14 8.) D07-Micro PM-FY14 PID PID Traffic signal maintenance project program Microsurface various roadways throughout the district District wide District wide Estimated Cost: $506,550 Estimated Cost: $1,227,635 Award Date: Awarded Award Date: Awarded Tentative Start Date Under Construction Tentative Start Date May 2014 Estimated Completion Date 10/31/2014 Estimated Completion Date 7/15/2014

41 District Wide 9.) D07-BH-FY14 10.) D07-Brdg Deck Sealing PID PID Pier patching and abutment patching on various bridges within the district. District wide bridge deck sealer treatments District wide District wide Estimated Cost: $658,434 Estimated Cost: $465,991 Award Date: 5/22/2014 Award Date: 6/16/2014 Tentative Start Date June 2014 Tentative Start Date July 2014 Estimated Completion Date 9/30/2015 Estimated Completion Date 10/15/ ) D07-Brdg Deck Sealing PID District wide bridge deck sealer treatments District wide Estimated Cost: $328,130 Award Date: Awarded Tentative Start Date May 2014 Estimated Completion Date 7/31/2014

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

Lake Waterford Community Association Meeting. November 15, 2016

Lake Waterford Community Association Meeting. November 15, 2016 Lake Waterford Community Association Meeting November 15, 2016 Introduction Staff Introduction Project Overviews - Completed Projects - Pavement Management Program - Pasadena Road Sidewalk Improvements

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

New Mexico Transportation Funding Challenges

New Mexico Transportation Funding Challenges New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

APPENDIX E Activity Defect Assignment

APPENDIX E Activity Defect Assignment APPENDIX E Activity Defect Assignment Activity Defect Pct Applicable 2010-ML - SHALLOW PATCHING (STN - 2010-TL - SHALLOW PATCHING (STN - 2020-ML - DEEP PATCHING (STN - 2020-TL - DEEP PATCHING (STN - 2030-ML

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

information, please contact the District 9 Offices at or

information, please contact the District 9 Offices at or O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

CTH M HIGHWAY PROJECT CTH Q to STH 113

CTH M HIGHWAY PROJECT CTH Q to STH 113 CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING

More information

Cincinnati Dayton Rd Widening

Cincinnati Dayton Rd Widening Cincinnati Dayton Rd Widening Project Overview Widening of Cincinnati Dayton Rd to four lanes - providing a center turn lane and an additional northbound lane Realignment of Station Rd Widening of bridge

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

DISTRICT CONSTRUCTION PROGRAM

DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

News Release Eastern Oregon Region 5

News Release Eastern Oregon Region 5 News Release Eastern Oregon Region 5 Morrow, Umatilla, Wallowa, Union, Baker, Grant, Harney, and Malheur Counties Oregon Department of Transportation Date: May 22, 2015 NR number: 150522015 For more information:

More information

Gerald P. Oliveto, P.E. George Franz NJDOT

Gerald P. Oliveto, P.E. George Franz NJDOT Gerald P. Oliveto, P.E. George Franz NJDOT Bridge preservation is defined as actions or strategies that prevent, delay or reduce deterioration of bridges or bridge elements, restore the function of existing

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:

More information

El Dorado County / Tahoe Roadwork Schedule

El Dorado County / Tahoe Roadwork Schedule Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566

More information

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO

MILEGROUND - AIRPORT ROAD. Fall 2018/ Spring Fall 2020 TBD. US 119 Monongalia County HOW WILL TRAFFIC CONTROL BE HANDLED: KNOW BEFORE YOU GO MILEGROUD - AIRPORT ROAD US 119 Monongalia County The Mileground - Airport Road project on US 119 involves upgrading the three-lane facility to a five-lane facility to help eliminate congestion and improve

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT HIGHWAY ALERT VirginiaDOT.org CONTACT: Public Affairs Oct.3, Richmondinfo@VirginiaDOT.org WEEKLY HIGHWAY ALERT RICHMOND DISTRICT COLONIAL HEIGHTS Road construction that is expected to cause delays from

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project

S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library

More information

Building Great Neighbourhoods QUEEN ALEXANDRA

Building Great Neighbourhoods QUEEN ALEXANDRA Building Great Neighbourhoods QUEEN ALEXANDRA We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Existing conditions of each bridge and repair plan are presented in Table

Existing conditions of each bridge and repair plan are presented in Table 2.2.2.5 Drainage Structure (1) Bridge Along the concerned section of this project road, there are 4 constructed bridges. The carriageway widths of existing bridges are designed to fit with existing road

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:

09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Revised December 2013 2013 by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2013-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

Street Improvements in the area of New Street and Drury Lane

Street Improvements in the area of New Street and Drury Lane Street Improvements in the area of New Street and Drury Lane Public Information Centre (PIC) Monday February 22, 2016 Central Recreation Centre - Auditorium Page 1 of 45 02/22/16 A G E N D A 1. Project

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Approximate schedule with phases and proposed Maintenance of Travel (MOT) plans February 2017 Project Elements Removal of existing bridge

More information

Paul Vraney Bureau of Project Development 02/11/2016

Paul Vraney Bureau of Project Development 02/11/2016 Paul Vraney Bureau of Project Development 02/11/2016 ADA background & alterations definition Design considerations Provide sufficient layout data Curb ramp selection Maximum curb ramp and gutter slopes

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River

US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Purpose and Need March 2015 US Route 24 Eastbound (Quincy Memorial Bridge) Over the Mississippi River Adams County - Quincy, IL Marion County, MO Region 4 District 6 Table of Contents I. Purpose of the

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA

DRAFT TRAFFIC STUDY BOULDER AVENUE BRIDGE REPLACEMENT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA August 8, 2006 DRAFT CITY OF HIGHLAND SAN BERNARDINO COUNTY, CALIFORNIA Prepared for: City of Highland 27215 Baseline Highland, California 92346

More information

SECTION 14: LANDSCAPING AND BEAUTIFICATION

SECTION 14: LANDSCAPING AND BEAUTIFICATION SECTION 14: LANDSCAPING AND BEAUTIFICATION RULE 14.1 GENERAL PROVISIONS 14.1.1 The rules and guidelines contained in this section have been established to provide proper guidelines for the beautification

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

2018 ROAD MAINTENANCE PROGRAM

2018 ROAD MAINTENANCE PROGRAM 2018 ROAD MAINTENANCE PROGRAM John Tiger Anastasi Town of Bethlehem Superintendent of Highways June 27, 2018 AGENDA Why do we maintain our roads? How is the Road Maintenance Plan developed? The process

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018 SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John

More information

Building Great Neighbourhoods LANSDOWNE

Building Great Neighbourhoods LANSDOWNE Building Great Neighbourhoods LANSDOWNE We are here today to Explain how the City is investing in improving your neighbourhood and how your neighbourhood will be improved to meet current City standards.

More information

Chapter 4: Funding and Implementation

Chapter 4: Funding and Implementation Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

Kentucky Highway District 7

Kentucky Highway District 7 Kentucky Highway District 7 ROAD AND BRIDGE CONDITIONS, TRAFFIC SAFETY, TRAVEL TRENDS, AND NEEDS MARCH 2018 PREPARED BY WWW.TRIPNET.ORG Founded in 1971, TRIP of Washington, DC, is a nonprofit organization

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge

Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge Deck Rehabilitation and Steel Repairs Maurice J. Tobin Memorial Bridge US 1 NB & Ramps Chelsea September 11, 2017 Maurice J. Tobin Memorial Bridge Big Mystic Truss Current Project Little Mystic Truss Toll

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

Building Great Neighbourhoods STRATHEARN

Building Great Neighbourhoods STRATHEARN Building Great Neighbourhoods STRATHEARN Public Involvement Community League Meeting #1: October 5, 2015 Public Meeting #2: March 15, 2016 Public Meeting #3: January 17, 2017 Building Great Neighbourhoods

More information

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM

BRIDGE REPLACEMENT AND REHABILITATION PROGRAM BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018 ^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge

More information

Update January 4, 2016

Update January 4, 2016 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT

More information

Downtown Redevelopment Project Update

Downtown Redevelopment Project Update Downtown Redevelopment Project Update The redevelopment project will begin the week of September 4, 2017. It is anticipated that construction will be approximately 565 days, depending on weather. 8-1-18

More information

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study

East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study East Downtown Tax Increment Reinvestment Zone (TIRZ) No. 15 Infrastructure Assessment Study Houston, TX Technical Memorandum April 15 th, 2009 Prepare by: 2950 North Loop West, Ste. 900 Houston, TX 77092

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2)

October 2004 REVISIONS (2) SUPERELEVATION DEVELOPMENT 11.3(2) October 2004 REVISIONS (2) Chapter 11 HORIZONTAL ALIGNMENT SUPERELEVATION DEVELOPMENT 11.3(2) Chapter 12 VERTICAL ALIGNMENT VERTICAL CURVES PASSING SIGHT DISTANCE 12.5(2) VERTICAL CURVES STOPPING SIGHT

More information

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project

4APNOIPF Vh, YII PTC CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. 8K TH 63 River Crossing Bridge Replacement Project City of RE 4APNOIPF Vh, X` W\ YII PTC ING, CITY COUNCIL AGENDA REPORT Council Meeting Date: September 26, 2016 To: From: Agenda Item: Honorable Mayor and City Council Members Ron Rosenthal, Engineering