Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five
|
|
- Helen Goodwin
- 6 years ago
- Views:
Transcription
1 DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330 million within Brevard, Lake, Orange, Osceola, Seminole and Sumter Counties. Summary of Major Project Funding by Project Type: The table below summarizes the funding programmed for the major Turnpike projects in the Tentative Five-Year Work Program (FY 2015/2016 through FY 2019/2020) that are located in District Five. The project descriptions below this section identify and describe the major projects by county. The following phase abbreviations are used in the project tables: PDE Project Development and Environment (Funding Codes: 21, 22) PE Preliminary Engineering (Funding Codes: 31, 32) ROW Right of Way (Funding Codes: 41, 42, 43, 4B) RRU Railroad & Utilities (Funding Codes: 56, 57) CST Construction (Funding Codes: 52, 53, 54, 58, 61, 62) Work Description Add Lanes & Reconstruction $161,754,000 $2,830,000 $0 $214,000 $250,000 $165,048,000 Resurfacing & Other Work $30,256,000 $11,344,000 $4,885,000 $0 $0 $46,485,000 Major Projects Total $192,010,000 $14,174,000 $4,885,000 $214,000 $250,000 $211,533,000 Summary of Major Projects by County: The major Turnpike project expenditures by county in the Tentative Five-Year Work Program are shown in the table below. County Brevard $5,300,000 $0 $0 $0 $0 $5,300,000 Lake $3,600,000 $0 $0 $0 $0 $3,600,000 Orange $143,483,000 $2,830,000 $0 $180,000 $0 $146,493,000 Osceola $39,627,000 $11,344,000 $4,885,000 $34,000 $0 $55,890,000 Seminole $0 $0 $0 $0 $250,000 $250,000 Total $192,010,000 $14,174,000 $4,885,000 $214,000 $250,000 $211,533,000 1 As of December 2, 2014
2 Brevard County Project: Widen the Beachline Expressway/SR 528 from I-95 (MP 42) to Industry Road/SR 524 (MP 45) FPN: This project will widen the Beachline Expressway from the I-95 to Industry Road/SR 524 and includes pavement milling and resurfacing and right-of-way costs. PE $5,300,000 $0 $0 $0 $0 $5,300,000 Total $5,300,000 $0 $0 $0 $0 $5,300,000 Lake County Project: Widen the Turnpike/SR 91 from the Lake/Orange County Line to the Minneola Interchange from MP to MP 279 FPN: This project will widen the Turnpike/SR 91 from the Lake/Orange County Line (MP 274.2) to the Minneola Interchange (MP 279) and includes pavement milling and resurfacing and right-of-way costs. PE $3,600,000 $0 $0 $0 $0 $3,600,000 Total $3,600,000 $0 $0 $0 $0 $3,600,000 Orange County Projects: Widen the Turnpike/SR 91 from the Osceola County Line to the Beachline Expressway/SR 528 from MP to MP 254 FPN: ,-2 This project will widen the Turnpike from the Osceola County Line (MP 249.3) to the Beachline Expressway/SR 528 (254) from four to eight travel lanes, including express lanes in both directions, pavement milling and resurfacing and right-of-way costs. The final three ramps at the Turnpike/SR 417 system-to-system interchange in Orange County are also included in this project. The initial five ramps of the Turnpike/SR 417 interchange were completed as part of two earlier projects: one project was managed by the Central Florida Expressway Authority and the second project (FPN ) was managed by the Florida s Turnpike Enterprise. ROW $100,000 $0 $0 $0 $0 $100,000 RRU $1,000,000 $0 $0 $0 $0 $1,000,000 CST $138,683,000 $2,830,000 $0 $180,000 $0 $141,693,000 Total $139,783,000 $2,830,000 $0 $180,000 $0 $142,793,000 2 As of December 2, 2014
3 Widen the Turnpike/SR 91 from SR 50 (MP 273.0) to Lake/Orange County Line (MP 274.2) - FPN: This project will widen the Turnpike from the SR 50 (MP 273.0) to Lake/Orange County Line (MP 274.2) from four to six travel lanes and includes pavement milling and resurfacing and right-of-way costs. PE $1,200,000 $0 $0 $0 $0 $1,200,000 Total $1,200,000 $0 $0 $0 $0 $1,200,000 Widen the Beachline Expressway/SR 528 from Turnpike/SR 91 to East of McCoy Road from MP 4 to MP FPN: This project will widen the Beachline Expressway from MP 4 to MP from six to eight travel lanes, and includes pavement milling and resurfacing and right-of-way costs. PE $2,500,000 $0 $0 $0 $0 $2,500,000 Total $2,500,000 $0 $0 $0 $0 $2,500,000 Osceola County Projects: Resurface the Turnpike/SR 91 from MP to MP FPN: ,-2,-3 This project will resurface the Turnpike/SR 91 in Osceola County from MP to MP This project also includes guardrail and pavement marking improvements. PE $858,000 $0 $0 $0 $0 $858,000 CST $0 $10,362,000 $349,000 $0 $0 $10,711,000 Total $858,000 $10,362,000 $349,000 $0 $0 $11,569,000 3 As of December 2, 2014
4 Resurface the Turnpike/SR 91 from MP to MP FPN: ,-2,-3 This project will resurface the Turnpike/SR 91 in Osceola County from MP to MP This project also includes guardrail and pavement marking improvements. CST $14,267,000 $288,000 $0 $0 $0 $14,555,000 Total $14,267,000 $288,000 $0 $0 $0 $14,555,000 Resurface the Turnpike/SR 91 from MP to MP FPN: , -2, -3 This project will resurface the Turnpike/SR 91 in Osceola County from MP to MP This project also includes guardrail and pavement marking improvements. PDE $150,000 $0 $0 $0 $0 $150,000 PE $0 $339,000 $0 $0 $0 $339,000 CST $0 $0 $4,536,000 $0 $0 $4,536,000 Total $150,000 $339,000 $4,536,000 $0 $0 $5,025,000 Resurface the Turnpike/SR 91 from MP to MP FPN: ,-2,-3 This project will resurface the Turnpike/SR 91 in Osceola County from MP to MP This project also includes guardrail, pavement marking improvements, and resurfacing and ramp improvements at including the southbound off- and northbound on-ramps up to the cross road at CR 525 (MP 239.5), the northbound off-ramp at US 192/441 (MP 242.5), the northbound on-, southbound off- and on-ramps at US 192/441 (MP 244.5), and the northbound on- and off-ramps, and the southbound on- and off-ramps at Osceola Parkway (MP 248.7). CST $14,981,000 $355,000 $0 $0 $0 $15,336,000 Total $14,981,000 $355,000 $0 $0 $0 $15,336,000 4 As of December 2, 2014
5 Widen the Turnpike/SR 91 from the US 192/US 441 to South of Osceola Parkway from MP 242 to MP FPN: This project will widen the Turnpike/SR 91 from US 192/US 441 to South of Osceola Parkway from four to six travel lanes. These lanes will be express lanes and includes pavement milling and resurfacing and right-of-way costs. PE $4,500,000 $0 $0 $0 $0 $4,500,000 Total $4,500,000 $0 $0 $0 $0 $4,500,000 Widen the Turnpike/SR 91 from South of the Osceola Parkway (MP 248.5) to the Orange/Osceola County Line (MP 254) - FPN: ,-5 This project will widen the Turnpike from South of the Osceola Parkway (MP 248.5) to the Orange/Osceola County Line (MP 254) from four to eight travel lanes. These lanes will be express lanes and includes pavement milling and resurfacing and right-of-way costs. CST $4,871,000 $0 $0 $34,000 $0 $4,905,000 Total $4,871,000 $0 $0 $34,000 $0 $4,905,000 Seminole County Project: Widen Seminole Expressway/SR 417 from Orange/Seminole County Line (MP 37) to Aloma Avenue (MP 38) FPN: This project will widen the Seminole Expressway/SR 417 from the Orange/Seminole County Line (MP 37) to Aloma Avenue (MP 38); includes pavement milling and resurfacing. PE $0 $0 $0 $0 $250,000 $250,000 Total $0 $0 $0 $0 $250,000 $250,000 5 As of December 2, 2014
6 Summary of Minor Project Funding by Project Type: The table below summarizes the funding programmed for minor projects (signing/pavement markings, landscaping, environmental, bridge paintings, canal revetment and on-going project phases) for Turnpike roadways throughout the District. Work Description Signing/Pavement Markings $0 $0 $828,000 $94,000 $0 $922,000 Bridge Rehabilitation $356,000 $0 $0 $0 $0 $356,000 Bridge Paintings $0 $186,000 $767,000 $0 $0 $953,000 Landscaping $3,162,000 $0 $0 $0 $0 $3,162,000 Minor Projects Total $3,518,000 $186,000 $1,595,000 $94,000 $0 $5,393,000 Summary of All Project Funding: PROJECTS Minor Projects Total $3,518,000 $186,000 $1,595,000 $94,000 $0 $5,393,000 Major Projects Total $192,010,000 $14,174,000 $4,885,000 $214,000 $250,000 $211,533,000 Total $195,528,000 $14,360,000 $6,480,000 $308,000 $250,000 $216,926,000 6 As of December 2, 2014
7 7 As of December 2, 2014
2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018
Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationUNFUNDED PRIORITY PROJECTS
UNFUNDED PRIORITY PROJECTS THROUGH 2012/13 Adopted August 22, 2007 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationLIST OF PRIORITY PROJECTS 2020/ /35
LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationPRESENTATION OUTLINE
November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL
More informationTurnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018
Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles
More informationDeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights
DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationLIST OF PRIORITY PROJECTS
LIST OF PRIORITY PROJECTS THROUGH 2013/14 Adopted August 27, 2008 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationFY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015
FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More information2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017
Florida Department of TRANSPORTATION 2017 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW THE RITZ CARLTON, AMELIA ISLAND August 10-13, 2017 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationSR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationINTERSECTION CONTROL NOVEMBER 2018
INTERSECTION CONTROL NOVEMBER 2018 ICE OVERVIEW AGENDA Why ICE? When ICE is Required? Applicability and Process 2 AVAILABLE RESOURCES http://www.fdot.gov/traffic/trafficservices/intersection_operations.shtm
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationBoard of Supervisors February 27, 2017
: Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis
More informationICPP Phase II Report
Executive Summary... 5 1. Introduction... 11 2. Selection of Express Lane Projects... 13 2.1 Veterans Expressway/SR 589... 13 2.2 Turnpike/SR 821... 15 3. Pricing Policy for Express Lanes... 19 4. Conceptual
More informationDurrance Elementary School
Durrance Elementary School SCHOOL ROUTE PLAN For DURRANCE ELEMENTARY SCHOOL LOCATION 9 ORANGE COUNTY Prepared for: ORANGE COUNTY SCHOOL ASSESSMENT PROGRAM ORANGE COUNTY PUBLIC WORKS Traffic Engineering
More informationR2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects
Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements
More informationFleur Drive Reconstruction
Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths
More informationHighway Construction
Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationSIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS
TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationDescription: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.
I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationFDOT Broward County Traffic Impact Report November 24 through December 1, 2017
FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during
More informationFlorida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE
1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange
More informationCity of Fairfax, Virginia City Council Work Session
City of Fairfax, Virginia City Council Work Session Agenda Item # City Council Meeting 12a 9/8/2015 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: FISCAL IMPACT: RECOMMENDATION: ALTERNATIVE COURSE OF ACTION: RESPONSIBLE
More informationCOMMUNITY WORKSHOP (CW) 3 February 21, 2015
QEW Improvements QEW Improvements COMMUNITY WORKSHOP (CW) 3 February 21, 2015 1 WORKSHOP PURPOSE MOVING FORWARD Review of Technically Preferred alternative Seeking feed back for progressing to next design
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road. Closed due to bridge down. Road is open to local traffic only.
ROAD CLOSURES!! JACK JONES ROAD, from Boyd Cowart Road to N. Hollandtown Road Closed due to bridge down. Road is open to local traffic only. ALTON CARLTON ROAD, from W. Main Street to the bridge Closed
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationDistrict Construction Projects
District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationGDOT Fiscal 2015 Year 2017 GDOT PowerPoint. Title Page
GDOT Fiscal 2015 Year 2017 GDOT PowerPoint Savannah Post SAME Title Page Annual Programs Review Sub Titles K. Joe Carpenter, Jr., P.E. Body Text Director Division of P3/Program Delivery June 15, 2016 Transportation
More informationCFI TEAM AVAILABLE PROPERTIES
Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 April 1 Block 28 3 1 Class III Front - $5.75 NNN $1.20 End cap unit;
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationUpdate January 4, 2016
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT
More informationCOMMUNITY ADVISORY COMMITTEE AGENDA
COMMUNITY ADVISORY COMMITTEE AGENDA November 28, 2018 9:30 A.M. COMMUNITY ADVISORY COMMITTEE MEETING NOTICE DATE: Wednesday, November 28, 2018 LOCATION: TIME: MetroPlan Orlando David L. Grovdahl Board
More informationAGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:
AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM
More informationCFI TEAM AVAILABLE PROPERTIES
Type Photo Location Bldg Northwest Orange County 3122 Shader Rd Shader Industrial Park 2515 Shader Rd Center, Bldg 2 Available Properties for or Rate/ 82,137 C 20,162 2,016 Feb 1 Block 28 3 1 Class III
More informationNevada s Transportation Infrastructure and Future Transportation Needs
Nevada s Transportation Infrastructure and Future Transportation Needs Susan Martinovich, P.E. Director Interim Legislative Committee on Transportation Nov. 13, 2007 State Transportation Board of Directors
More informationTechnical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016
2040 Long Range Transportation Plan Technical Report 3: Plan Development & Cost Feasible Projects Adopted -January 2016 Updated August 2016 315 East Robinson Street, Suite 355, Orlando, FL 32801 407-481-5672
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationS.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project
Open House Public Meeting S.R. 3009, Section A20 South Park & Logan Road Intersection Improvement Project Municipality of Bethel Park, Allegheny County Bethel Park Municipal Building 5001 West Library
More informationDIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)
More information72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting
72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationIowa Highway 58 Corridor Improvement Study
1 Iowa Highway 58 Corridor Improvement Study Public Informational Meeting May 6, 2014 2 Welcome and Introductions Randy Lorenzen, City of Cedar Falls Engineer 3 Outline of Presentation Review of Project
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationFlorida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018
Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes
More informationCity of Moorhead Committee of the Whole Meeting
City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview
More informationCity of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County
City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationRADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016
RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,
More informationJourney to Excellence. Building Markham s Future Together MARCH 24, 2015 HIGHWAY 407 TO HIGHWAY 7 MAIN STREET MARKHAM
MAIN STREET MARKHAM HIGHWAY 407 TO HIGHWAY 7 1 MARCH 24, 2015 2 DISCUSSION Update Committee on Project Schedule Reversible Lanes Recommendations Next Steps 3 COMPLETED WORK 4 PROJECT UPDATE Enbridge is
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More informationCITY OF SOUTH DAYTONA
CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage
More informationFDOT Broward County Traffic Report March 2 through March 9, 2018
FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of
More informationCHAPTER 3 STUDY AREA OPERATIONAL OVERVIEW
HPTER 3 STUY RE OPERTIONL OVERVIEW This chapter describes the overall traffic operations within the study area under existing and future conditions and focuses on individual intersections not directly
More informationI-20 ODESSA-MIDLAND CORRIDOR STUDY. Public Meeting for Schematic Design
I-20 ODESSA-MIDLAND CORRIDOR STUDY Public Meeting for Schematic Design The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being,
More informationFairfax County Parkway Widening Fairfax County
Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationAppendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station
Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,
More informationPalm Beach County Traffic Report November 16 through November 23, 2018
November 16, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report November 16 through November 23, 2018 Palm Beach County Palm Beach County traffic will
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationSTIP Scoping and Design Projects November Administrative Amendment
NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33
More informationFrequently Asked Questions
Why is this roadway needed? Can't SR 50, University Boulevard and Aloma Avenue be widened instead of building this road? The need for this roadway was identified and determined through the East Orange
More informationPRFSC Feb 2017 Meeting Minutes
PRFSC Feb 2017 Meeting Minutes On Tuesday February 7,2017 PRFSC hosted Atlee Mercer, Chairman of the Osceola Expressway Authority as our guest speaker. He spoke on the topic of plans for future Poinciana
More informationCapital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024
Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year 2020 - Fiscal Year 2024 Priority RMP ID# Project Name/Limits FDOT WPI# Programmed Funding Project/Strategy
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,
More informationLAKE COUNTY CONSTRUCTION IN PROGRESS
August 2013 Contact: Vickie.Wyche@dot.state.fl.us (386) 943-5185 LAKE COUNTY CONSTRUCTION IN PROGRESS 238275-6 SR 429 (Wekiva Pkwy) from Orange County Line to West of Old McDonald Road (Section 4B), 2.447
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationLee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax
Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection
More informationBRIDGE REPLACEMENT AND REHABILITATION PROGRAM
BRIDGE REPLACEMENT AND REHABILITATION PROGRAM INTRODUCTION An integral element of the City's transportation infrastructure is a network of bridges designed to carry vehicular, railroad, light rail, pedestrian,
More informationLos Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, AGENDA ITEM #2.B Presentation
Los Altos Hills Town Council - June 18, 2015 Palo Alto City Council June 22, 2015 AGENDA ITEM #2.B Presentation Previous Presentations Los Altos Hills Town Council in May 2014 and February 2015 Palo Alto
More informationBICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA
BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION Tel: (941) 883-3535 1. Call to Order & Roll Call AGENDA 3:00 p.m., Thursday, September
More informationDrag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School
Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Maxey Elementary School SCHOOL ROUTE PLAN For MAXEY ELEMENTARY SCHOOL LOCATION 33 ORANGE COUNTY Prepared for:
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More informationCost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN
Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationUS 1 Express Lanes Public Kick-Off Meeting
US 1 Express Lanes Project Development & Environment (PD&E) Study Public Kick-Off Meeting September 7 & 8, 2011 Miami Dade County, Florida 1 Presentation Agenda Introduction to MDX Background to PD&E studies
More informationTurnpike System Projected Debt Service Coverage Ratio ($000)*
Fiscal Year Toll Concession Turnpike System Projected Debt Service Coverage Ratio ($000)* Toll Administrative Charges** Total Gross O&M Expenses*** Net Existing Annual Senior Debt Service Requirement****
More informationCTH M HIGHWAY PROJECT CTH Q to STH 113
CTH M HIGHWAY PROJECT CTH Q to STH 113 PUBLIC INFORMATIONAL MEETING #3 Wednesday, May 25, 2005 Town of Westport Administration Building 5387 Mary Lake Road 6:00 p.m. to 8:00 p.m. PUBLIC INFORMATIONAL MEETING
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More information