1 INTERSECTION CONTROL NOVEMBER 2018

2 ICE OVERVIEW AGENDA Why ICE? When ICE is Required? Applicability and Process 2

3 AVAILABLE RESOURCES 3

4 INTERSECTION TYPES Roundabout ICE will replace the 3 step roundabout evaluation process in

5 INTERSECTION TYPES Median U Turn (MUT) No left turns allowed at main signalized intersection 5

6 INTERSECTION TYPES Median U Turn (MUT) No left turns allowed at main signalized intersection 6

7 INTERSECTION TYPES Restricted Crossing U Turn (RCUT) Unsignalized Signalized 7

8 INTERSECTION TYPES Jughandle 8

9 INTERSECTION TYPES Displaced Left Turn Left turns and through movements operate concurrently Also called continuous flow intersection Could have displaced lefts on 2 legs instead of all 4 9

10 INTERSECTION TYPES Quadrant Roadway No left turns allowed at main signalized intersection 10

11 INTERSECTION TYPES Quadrant Roadway No left turns allowed at main signalized intersection 11

12 INTERSECTION TYPES Quadrant Roadway No left turns allowed at main signalized intersection 12

13 STAGES OF ICE 13 Reference: FDOT Manual of Intersection Control Evaluation; Nov. 1, 2017; Figure 1; Page 7

14 ICE STAGE 1 PROCESS 14 Reference: FDOT Manual of Intersection Control Evaluation; Nov. 1, 2017; Figure 2; Page 10

15 1.1 A PROJECT APPLICABILITY CHECK ICE is REQUIRED when New signalization is proposed Major reconstruction of existing signalized intersection is proposed Adding exclusive left turns, adding intersection legs Conversion of a directional or bi directional median opening to a full median opening is proposed Driveway/Connection permit applications for Category E, F, G District Design Engineer (DDE) and District Traffic Operations Engineer (DTOE) consider an ICE a good fit for the project 15 Reference: FDOT Manual of Intersection Control Evaluation; Nov. 1, 2017; Section 2.3; Page 5

16 1.1 A PROJECT APPLICABILITY CHECK ICE NOT REQUIRED Work does not include substantive proposed changes to intersection Mill and resurface pavement; changing full median opening to directional median opening Minor intersection operational improvements Adding right turn lane or signal phasing changes or equipment upgrades Encouraged for local roadways, not required Recommended for ramp terminal intersections (stop control, signalized, or yield), not required 16 Reference: FDOT Manual of Intersection Control Evaluation; Nov. 1, 2017; Section 2.3; Page 5

17 ICE STAGE 2 PROCESS 17 Reference: FDOT Manual of Intersection Control Evaluation; Nov. 1, 2017; Figure 3; Page 14

18 ICE STAGE 3 PROCESS 18 Reference: FDOT Manual of Intersection Control Evaluation; Nov. 1, 2017; Figure 4. Page 18

19 FDOT ICE IMPLEMENTATION PLAN 2018: Training and Acclimation Implementation Focus: District Training Two intersections per district 2019: Districts Identify & Conduct ICE Analysis for Additional Locations Implementation Focus: Refine ICE Process Evaluate minimum of three projects in these offices/focus areas PD&E Traffic Operations Access Management/Permitting 2020: Full ICE Procedure Implementation by Districts Implementation Focus: Mainstream ICE Process ICE Manual Procedures fully effective January 1, 2020 Quality Assistance Reviews (QAR) starting in Year 4 19

20 CONCEPT DEVELOPMENT 20

21 S.R. 535 EXISTING 21

22 S.R. 535 PRELIMINARY CONCEPT DEVELOPMENT Signalized Restricted Crossing U Turn N S Construction $1,300,000 Design Cost $430,000 ROW Cost $500,000 22

23 Median U Turn N S Construction $1,220,000 Design Cost $320,000 ROW Cost $510,000 S.R. 535 PRELIMINARY CONCEPT DEVELOPMENT 23

24 Partial DLT N S Construction $1,170,000 Design Cost $320,000 ROW Cost $4,500,000 S.R. 535 PRELIMINARY CONCEPT DEVELOPMENT 24

25 US 41 / PINE ISLAND RD EXISTING Signal Existing Construction and Design Cost $0 ROW Cost $0 D1 Training 25

26 US 41 / PINE ISLAND RD PRELIMINARY CONCEPT DEVELOPMENT PMUT Construction and Design Cost $1,480,000 ROW Cost $0 D1 Training 26

27 US 41 / PINE ISLAND RD PRELIMINARY CONCEPT DEVELOPMENT PDLT Construction and Design Cost $2,160,000 ROW Cost $9,000,000 D1 Training 27

28 US 41 / PINE ISLAND RD PRELIMINARY CONCEPT DEVELOPMENT Quadrant Roadway Construction and Design Cost $3,080,000 ROW Cost $2,250,000 D1 Training 28

29 US 41 / PINE ISLAND RD PRELIMINARY CONCEPT DEVELOPMENT Quadrant Roadway Continued D1 Training 29

30 US 27 / CALIFORNIA BLVD EXISTING D1 Training 30

31 US 27 / CALIFORNIA BLVD - PRELIMINARY CONCEPT DEVELOPMENT PMUT Construction and Design Cost $1,130,000 ROW Cost $0 D1 Training 31

32 US 27 / CALIFORNIA BLVD - PRELIMINARY CONCEPT DEVELOPMENT Signalized RCUT Construction and Design Cost $1,160,000 ROW Cost $0 D1 Training 32

33 33 US 1 / RATLIFF RD. EXISTING

34 US 1 / RATLIFF RD. PRELIMINARY CONCEPT DEVELOPMENT RCUT Alternative Construction and Design Cost $1,440,000 ROW Cost $0 34

35 US 1 / RATLIFF RD. PRELIMINARY CONCEPT DEVELOPMENT Roundabout Alternative Construction and Design Cost $1,350,000 ROW Cost $300,000 35

36 SR 392A / CLARA AVE EXISTING D3 Training 36

37 SR 392A / CLARA AVE PRELIMINARY CONCEPT DEVELOPMENT Signal Construction and Design Cost $430,000 ROW Cost $0 D3 Training 37

38 SR 392A / CLARA AVE PRELIMINARY CONCEPT DEVELOPMENT Roundabout Construction and Design Cost $1,520,000 ROW Cost $300,000 D3 Training 38

39 US 27 / TALPECO RD EXISTING D3 Training 39

40 US 27 / TALPECO RD PRELIMINARY CONCEPT DEVELOPMENT Signalized Construction and Design Cost $510,000 ROW Cost $0 D3 Training 40

41 US 27 / TALPECO RD PRELIMINARY CONCEPT DEVELOPMENT Signalized RCUT Construction and Design Cost $1,520,000 ROW Cost $0 D3 Training 41

42 US 27 / TALPECO RD PRELIMINARY CONCEPT DEVELOPMENT Roundabout Construction and Design Cost $2,150,000 ROW Cost $300,000 D3 Training 42

43 SR 710 / NORTHLAKE BLVD. EXISTING D4 Training 43

44 SR 710 / NORTHLAKE BLVD. PRELIMINARY CONCEPT DEVELOPMENT DEVELOPMENT Quad SE Construction and Design Cost $1,350,000 ROW Cost $0 D4 Training 44

45 SR 710 / NORTHLAKE BLVD. PRELIMINARY CONCEPT DEVELOPMENT Quad SE Zone 1 D4 Training 45

46 SR 710 / NORTHLAKE BLVD. PRELIMINARY CONCEPT DEVELOPMENT Quad SE Zone 2 D4 Training 46

47 SR 710 / NORTHLAKE BLVD. PRELIMINARY CONCEPT DEVELOPMENT Quad SE Zone 3 D4 Training 47

48 SR 710 / NORTHLAKE BLVD. PRELIMINARY CONCEPT DEVELOPMENT MUT Construction and Design Cost $1,060,000 ROW Cost $0 D4 Training 48

49 SR 710 / NORTHLAKE BLVD. PRELIMINARY CONCEPT DEVELOPMENT Partial DLT Construction and Design Cost $2,500,000 ROW Cost $100,000 D4 Training 49

50 SR 414 / MAITLAND AVE EXISTING D4 Training 50

51 SR 414 / MAITLAND AVE PRELIMINARY CONCEPT DEVELOPMENT RCUT Construction and Design Cost $1,710,000 ROW Cost $1,000,000 D4 Training 51

52 SR 414 / MAITLAND AVE PRELIMINARY CONCEPT DEVELOPMENT MUT/PDLT Construction and Design Cost $2,090,000 ROW Cost $4,500,000 D4 Training 52

53 SR 414 / MAITLAND AVE PRELIMINARY CONCEPT DEVELOPMENT PMUT/PDLT Construction and Design Cost $2,060,000 ROW Cost $4,500,000 D4 Training 53

54 US 92 / TOMOKA FARMS RD EXISTING D4 Training 54

55 US 92 / TOMOKA FARMS RD PRELIMINARY CONCEPT DEVELOPMENT Signalized RCUT Construction and Design Cost $1,490,000 ROW Cost $0 DEVELOPMENTS D4 Training 55

56 US 92 / TOMOKA FARMS RD PRELIMINARY CONCEPT DEVELOPMENT Partial MUT Construction and Design Cost $1,480,000 ROW Cost $0 DEVELOPMENTANALYSIS D4 Training 56

57 US 27 / NW 138 ST EXISTING D6 Training 57

58 US 27 / NW 138 ST - PRELIMINARY CONCEPT DEVELOPMENT Median U Turn Alternative Construction and Design Cost $2,710,000 ROW Cost $3,400,000 D6 Training 58

59 US 27 / NW 138 ST PRELIMINARY CONCEPT DEVELOPMENT RCUT Alternative Construction and Design Cost $9,230,000 ROW Cost $3,200,000 D6 Training 59

60 US 27 / NW 138 ST PRELIMINARY CONCEPT DEVELOPMENT Partial Displaced Left Turn Alternative Construction and Design Cost $1,410,000 ROW Cost $3,000,000 D6 Training 60

61 U.S. 41 / S.R. 44 EXISTING D7 Training 61

62 U.S. 41 / S.R. 44 PRELIMINARY CONCEPT DEVELOPMENT Quadrant Roadway Construction and Design Cost $1,190,000 ROW Cost $2,000,000 D7 Training 62

63 U.S. 41 / S.R. 44 PRELIMINARY CONCEPT DEVELOPMENT Roundabout Construction and Design Cost $2,120,000 ROW Cost $725,000 D7 Training 63

64 FDOT Road and Bridge Staff Hour Guidelines for ICE Analysis 64

65 FDOT ROAD/BRIDGE STAFF HOUR GUIDELINES - DRAFT 65

66 US 98 at TRILBY ROAD ROUNDABOUT ANALYSIS 66

67 U.S. 98 at Trilby Road Roundabout Analysis Intersection identified for potential signalization Existing intersection is TWSC Conducted ICE analysis instead of 3 Step Roundabout Analysis Data Collection Obtained existing AM and PM TMCs Obtained opening year and design year AADTs for both roads Safety Data 2 fatalities in 2009 Over 3 crashes per year ( ) ½ angle crashes ½ injury crashes Conducted field review 67

68 U.S. 98 at Trilby Road Existing Conditions U.S. 98 is two lanes; 55 mph posted speed U.S. 98 has 16% to 19% daily trucks; WB 67 design vehicle Trilby Road is two lanes; 30 mph posted speed Trilby Road has 10% trucks westbound 68

69 U.S. 98 at Trilby Road CAP-X Analysis Existing AM Peak Hour Existing PM Peak Hour 69

70 Roundabout is: 80% lower in Fatal & Injury crashes than traffic signal 65% lower in Total crashes than traffic signal U.S. 98 at Trilby Road Stage 1 SPICE Analysis 70

71 Stage 1 ICE Form Evaluation Summary U.S. 98 at Trilby Road Stage 1 Analysis 71

72 U.S. 98 at Trilby Road Stage 2 Concept Development 72

73 U.S. 98 at Trilby Road Stage 2 Concept Development 73

74 U.S. 98 at Trilby Road Stage 2 Operations Analysis TWSC Synchro Analysis Conduct for Opening Year and Design Year AM and PM peak periods Shows Trilby Road Approach Delay and U.S. 98 Left Turn delay Traffic Signal Synchro Analysis Conduct for Opening Year and Design Year AM and PM peak periods Shows average vehicle delay for all movements 74

75 U.S. 98 at Trilby Road Stage 2 Operations Analysis Roundabout Analysis in Sidra Conduct for Opening Year and Design Year AM and PM peak periods Shows average vehicle delay for all movements 75

76 U.S. 98 at Trilby Road Stage 2 SPICE Analysis 76

77 U.S. 98 at Trilby Road Stage 2 SPICE Analysis 77

78 U.S. 98 at Trilby Road Stage 2 SPICE Analysis 78

79 Roundabout is: 80% lower in Fatal & Injury crashes than traffic signal 65% lower in Total crashes than traffic signal U.S. 98 at Trilby Road Stage 2 SPICE Analysis 79

80 FDOT ICE TOOL OVERVIEW 80

81 Roundabout results: Overall B/C is 1.78 and NPV is $1.5M TWSC better than traffic signal U.S. 98 at Trilby Road Stage 2 B/C and NPV Analysis 81

82 Stage 2 ICE Form Evaluation Summary Roundabout recommended U.S. 98 at Trilby Road Stage 1 Analysis 82

83 DISCUSSION & QUESTIONS 83

FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool

FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool FHWA Safety Performance for Intersection Control Evaluation (SPICE) Tool Virginia Section ITE Annual Meeting Virginia Beach June 217 Pete Jenior Kittelson & Associates, Inc. 1 Intersection Control Evaluation

More information

Innovative Intersections

Innovative Intersections Innovative Intersections Things You Need to Know About FDOT D-7 Safety Academy October 19, 2016 Mark Doctor FHWA Resource Center Atlanta, GA HOW DO YOU FEEL??? about innovative intersections??? Why is

More information

PennDOT ICE Policy An Introduction

PennDOT ICE Policy An Introduction PennDOT ICE Policy An Introduction January 2018 What is Intersection Control Evaluation (ICE)? Purpose: To consistently consider and screen among many proven combinations of geometry and traffic control

More information

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB

J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB J-Turn An Intersection Safety Improvement Purdue Road School 2016 Tuesday, March 8, 2016 Brian Malone, INDOT & Josh Cook, HNTB US 231 and SR 62 and SR 68 US 231 and SR 62 Intersection Traffic Data Traffic

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session

Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session Pine Hills Road Pedestrian/Bicycle Safety Study Board of County Commissioners Work Session February 20, 2018 Meeting Agenda Study Overview Existing Conditions Access Management Potential Gateway Features

More information

Roundabout Feasibility Memorandum

Roundabout Feasibility Memorandum Roundabout Feasibility Memorandum To From Gwen Pipkin Bill Howell Date June 18, 2013 Subject Roundabout Feasibility Study SR 29 PD&E Study From Oil Well Road to SR 82 Collier County, FL FPID 417540-1-22-01

More information

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE

RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE October 17, 2017 RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE STATEMENT OF ISSUE An update on the Midtown Area Transportation Plan will be provided including a discussion of preliminary

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

INNOVATIVE INTERSECTION DESIGN

INNOVATIVE INTERSECTION DESIGN INNOVATIVE INTERSECTION DESIGN J. Eddie Valtier, P.E. ELP TP&D Director Introduction Why Do We Need To Start Looking For Innovative Intersection Designs? Congestion is worsening and traffic volumes and

More information

Alternative Intersection Analysis Using SIDRA INTERSECTION

Alternative Intersection Analysis Using SIDRA INTERSECTION Alternative Intersection Analysis Using SIDRA INTERSECTION ITEANZ Innovative Intersections Seminar Melbourne, 5 Nov 2015 Rahmi Akçelik and Mark Besley sidrasolutions.com youtube.com/sidrasolutions Alternative

More information

Alternative Intersection Analysis Using SIDRA INTERSECTION

Alternative Intersection Analysis Using SIDRA INTERSECTION Alternative Intersection Analysis Using SIDRA INTERSECTION ITEANZ Innovative Intersections Seminar Melbourne, 5 Nov 2015 Rahmi Akçelik and Mark Besley SIDRA SOLUTIONS Presenter: David Nash TRAFFINITY sidrasolutions.com

More information

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate

INNOVATIVE INTERSECTION SOLUTIONS. Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Jay Bockisch, PE, PTOE Senior Associate INNOVATIVE INTERSECTION SOLUTIONS Innovative intersection overview Case studies Continuous flow intersection Modern roundabouts

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL

THE FUTURE OF THE TxDOT ROADWAY DESIGN MANUAL THE FUTURE OF THE TXDOT ROADWAY DESIGN MANUAL Kenneth Mora, P.E. (Design Division) 10/10/2017 Table of contents 1 2 Reduction in FHWA design controlling criteria Innovative Intersection Guidance 3-7 8-42

More information

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates

FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates Florida Department of Transportation FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates Forward Pinellas Technical Coordinating Committee (TCC) April 25, 2017 District

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection

Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection TRAFFIC FEASIBILITY STUDY Route 28 (South Orleans Road)/Route 39 (Harwich Road)/Quanset Road Intersection Orleans, Massachusetts Prepared for: Town of Orleans Prepared by: Fay, Spofford & Thorndike, LLC

More information

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016

Traffic Impact Study WestBranch Residential Development Davidson, NC March 2016 Traffic Impact Study WestBranch Residential Development Davidson, NC March 216 TRAFFIC IMPACT STUDY FOR THE WestBranch Residential Development LOCATED IN DAVIDSON, NC Prepared For: Lennar Carolinas, LLC

More information

Design Traffic Technical Memorandum

Design Traffic Technical Memorandum State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared

More information

ALLEY 24 TRAFFIC STUDY

ALLEY 24 TRAFFIC STUDY ALLEY 24 TRAFFIC STUDY in City of Frostburg, Maryland January 2013 3566 Teays Valley Road Hurricane, WV Office: (304) 397-5508 www.denniscorporation.com Alley 24 Traffic Study January 2013 Frostburg, Maryland

More information

Safety Evaluation at Innovative Geometric Designs Gilbert Chlewicki, PE Advanced Transportation Solutions

Safety Evaluation at Innovative Geometric Designs Gilbert Chlewicki, PE Advanced Transportation Solutions 2016 ITE Mid-Colonial District Annual Conference Wilmington, Delaware Safety Evaluation at Innovative Geometric Designs Gilbert Chlewicki, PE Advanced Transportation Solutions April 18, 2016 WHY INNOVATIVE

More information

Figure 1: Vicinity Map of the Study Area

Figure 1: Vicinity Map of the Study Area ARIZONA TEXAS NEW MEXICO OKLAHOMA May 5, 2016 Mr. Anthony Beach, P.E. BSP Engineers 4800 Lakewood Drive, Suite 4 Waco, Texas 76710 Re: Intersection and Access Analysis along Business 190 in Copperas Cove

More information

Florida s Intersection Safety Implementation Plan (ISIP)

Florida s Intersection Safety Implementation Plan (ISIP) Florida Department of TRANSPORTATION Florida s Intersection Safety Implementation Plan (ISIP) Alan El-Urfali, PE State Traffic Engineering and Operations Office March 28, 2017 Intersection Safety Implementation

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer

Existing Conditions. Date: April 16 th, Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Date: April 16 th, 2015 To: From: Re: Dan Holderness; Coralville City Engineer Scott Larson; Coralville Assistant City Engineer Darian Nagle-Gamm, Traffic Engineering Planner Highway 6 (2 nd Street) /

More information

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas

133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS. Overland Park, Kansas 133 rd Street and 132 nd /Hemlock Street 132 nd Street and Foster Street MINI ROUNDABOUTS Overland Park, Kansas September 1, 2017 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. LITERATURE REVIEW... 1 3. CONCEPT

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Innovative Intersections Presented by: Matt Crim P.E., PTOE Stantec Consulting Services Inc. October 29, 2015

Innovative Intersections Presented by: Matt Crim P.E., PTOE Stantec Consulting Services Inc. October 29, 2015 Innovative Intersections Presented by: Matt Crim P.E., PTOE Stantec Consulting Services Inc. October 29, 2015 1 Traditional Intersections Traditional Intersections allow left turns from all approaches.

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS

ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS ORANGE COUNTY PUBLIC WORKS TRAFFIC INVESTIGATIONS STAFF REPORT OF: January 6, 2019 SUPERVISORIAL DISTRICT: 5 SUBJECT: LOCATION: INVESTIGATOR: O Neill Drive at Roanoke Drive; Ladera Ranch; TB 922-E6 Clever

More information

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1

Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 Pine Hills Road Pedestrian/Bicycle Safety Study Community Meeting #1 June 8, 2017 Meeting Agenda Study Overview Community Survey Existing Conditions Access Management Potential Safety Countermeasures Potential

More information

Roundabouts are good for business

Roundabouts are good for business Roundabouts are good for business What is a roundabout Rules 0f Roundabouts 1. Slow down when approaching a roundabout 2. Yield to vehicles in the roundabout 3. When clear, proceed right into the roundabout

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE

More information

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information Volusia Transportation Planning Organization CAC / TCC Project Update Tuesday, May 21, 2013 1 Presentation Outline PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS

I-35 COMAL COUNTY OPERATIONAL IMPROVEMENTS I- COMAL COUNTY OPERATIONAL IMPROVEMENTS OPEN HOUSE The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been,

More information

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street

SR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout

More information

Access Management Regulations and Standards

Access Management Regulations and Standards Access Management Regulations and Standards Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while simultaneously preserving

More information

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET

PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2 TODAY S MEETING Purpose:

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

PEDESTRIAN SAFETY STUDY

PEDESTRIAN SAFETY STUDY PEDESTRIAN SAFETY STUDY SR 699 (BLIND PASS RD/GULF BLVD) FROM 93 RD AVENUE TO PINELLAS BAYWAY PINELLAS COUNTY SECTION NO.: 15100 MILEPOST: 0.111 3.569 STUDY LIMITS Prepared For: Florida Department of Transportation

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Traffic Impact Analysis Chatham County Grocery Chatham County, NC

Traffic Impact Analysis Chatham County Grocery Chatham County, NC Chatham County Grocery Chatham County, NC TABLE OF CONTENTS 1. INTRODUCTION... 1 1.1. Location and Study Area... 1 1.2. Proposed Land Use and Access... 2 1.3. Adjacent Land Uses... 2 1.4. Existing ways...

More information

Version 1.0 September View Disclaimer. Modified from FHWA's Capacity Analysis for Junctions (CAP-X)

Version 1.0 September View Disclaimer. Modified from FHWA's Capacity Analysis for Junctions (CAP-X) Version 1.0 September 2017 View Disclaimer Modified from FHWA's Capacity Analysis for Junctions (CAP-X) DISCLAIMER & ACKNOWLEDGMENTS DISCLAIMER ACKNOWLEDGMENT By indicating below, I acknowledge that I

More information

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014

City of Prince Albert Statement of POLICY and PROCEDURE. Department: Public Works Policy No. 66. Section: Transportation Issued: July 14, 2014 Page: 1 of 8 1 POLICY 1.01 The City shall follow all of the specifications in the Manual of Uniform Traffic Control Devices for Canada, prepared by the National Committee of Uniform Traffic Control, and

More information

Table of Figures. Table of Tables. Table 1: Traffic Volumes Ramblas Delay. Table 2: Las

Table of Figures. Table of Tables. Table 1: Traffic Volumes Ramblas Delay. Table 2: Las Table of Contents 1. Executive Summary... 4 2. Analysiss Methodology... 4 3. Introduction... 4 4. Roadway Geometric Conditions... 5 4.1 Las Ramblas Community Access/ Egress Roads... 7 5. Traffic Data Collection...

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913

David Agacinski FDOT District One Bicycle & Pedestrian Coordinator Daniels Parkway Ft. Myers, Florida 33913 Meeting Notes Date: December 20, 2018 Project #: 20166 To: David Agacinski FDOT District One Bicycle & Pedestrian Coordinator 10041 Daniels Parkway Ft. Myers, Florida 33913 From: Project: Subject: Patty

More information

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report

County Road 2 Long Sault Improvements EA Study Schedule C Municipal Class Environmental Assessment. Environmental Study Report Study Schedule C Municipal Class Environmental Assessment Prepared By: BT Engineering 100 Craig Henry Drive, Suite 201 Ottawa, ON K2G 5W3 (613) 228-4813 (855) 228-4813 Toll free Executive Summary Executive

More information

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018

League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study. Second Public Meeting February 6, 2018 League City Parkway at Brittany Lakes/Fennigan Intersection Evaluation/ Traffic Study Second Public Meeting February 6, 2018 City Project Information League City Parkway and Brittany Lakes Dr./ Fennigan

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation

Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation Evaluation of M-99 (Broad Street) Road Diet and Intersection Operational Investigation City of Hillsdale, Hillsdale County, Michigan June 16, 2016 Final Report Prepared for City of Hillsdale 97 North Broad

More information

APPENDIX E Evaluation of Improvement Alternatives

APPENDIX E Evaluation of Improvement Alternatives APPENDIX E Evaluation of Improvement Alternatives Table E-1 Preliminary Comparison of Design Alternatives, Concord Table E-2 Preliminary Comparison of Route 2 Improvement Packages, Acton and Concord TABLE

More information

Roundabouts. By: Nezamuddin, Valparaiso University. February 19, 2015

Roundabouts. By: Nezamuddin, Valparaiso University. February 19, 2015 Roundabouts By: Nezamuddin, Valparaiso University February 19, 2015 Outline 1. Background on Roundabouts 2. Silhavy Rd. Corridor Improvement Project in Valparaiso, IN 3. 5-points Roundabout in Valparaiso,

More information

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011

SUPERSTREETS IN TEXAS. ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 SUPERSTREETS IN TEXAS ITS Texas Annual Meeting San Marcos, Texas Session 6A - Operations November 11, 2011 1 Superstreet Corridor Location 2 3 US Highway 281 2007 Looking south above Evans Road, pm peak

More information

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017

CITY OF FRANKLIN, TENNESSEE. Columbia Avenue. Widening & Improvements Project. Public Meeting May 16, 2017 CITY OF FRANKLIN, TENNESSEE Columbia Avenue Widening & Improvements Project Public Meeting May 16, 2017 Agenda 6:00 6:30 Formal Presentation 6:30 8:00 Town Hall Forum City of Franklin Columbia Avenue Alternatives

More information

The current document is revised based on the comments received on:

The current document is revised based on the comments received on: General Overview 1 Introduction Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current

More information

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue 41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,

More information

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE

City of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway

More information

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm

Southview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project

More information

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners

DRAFT. Corridor study. Honeysuckle Road. October Prepared for the City of Dothan, AL. Prepared by Gresham, Smith and Partners DRAFT Corridor study Honeysuckle Road October 2017 Prepared for the City of Dothan, AL Prepared by TABLE OF CONTENTS SECTION I... 1 STUDY SUMMARY... 1 INTRODUCTION... 1 CONCLUSIONS... 5 SECTION II... 7

More information

Intersection Traffic Control Feasibility Study

Intersection Traffic Control Feasibility Study Intersection Traffic Control Feasibility Study CSAH 9 at CSAH 60 (185th Avenue) Prepared For: Dakota County Transportation Department Western Service Center 14955 Galaxie Avenue, 3rd Floor Apple Valley,

More information

Update to DOTD Roundabout Design Policy

Update to DOTD Roundabout Design Policy Update to DOTD Roundabout Design Policy Roundabout In Louisiana Louisiana has 18 roundabouts in operation and 53 proposed History EDSM s or Engineering Directives and Standards set DOTD policies, procedures,

More information

7.0 Preferred Alternative with Service Road Concept

7.0 Preferred Alternative with Service Road Concept .0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service

More information

IH 20 RANGER HILL PUBLIC MEETING

IH 20 RANGER HILL PUBLIC MEETING IH 20 RANGER HILL PUBLIC MEETING AUGUST 25, 2015 IH 20, Eastland County, TX CSJ 0007-06-084 IH 20 from 3.5 mi. East of LP 254 to SH 16 (Ranger Hill) August 25, 2015 Agenda Introductions Purpose of the

More information

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011 Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT

AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT May 15, 2018 AGENDA ITEM 6 D THOMASVILLE ROAD (HERMITAGE BOULEVARD TO LIVE OAK PLANTATION ROAD) ROADWAY SAFETY AUDIT TYPE OF ITEM: Discussion STATEMENT OF ISSUE The Florida Department of Transportation

More information

General References Definitions. (1) Design Guidance. (2) Supporting Information

General References Definitions. (1) Design Guidance. (2) Supporting Information Chapter 1240 Turning Roadways 1240.01 General 1240.02 References 1240.03 Definitions 1240.04 Turning Roadway Widths 1240.05 Documentation 1240.01 General The roadway on a curve may need to be widened to

More information

County Board Workshop

County Board Workshop CH 21 Downtown Reconstruction Project County Board Workshop Tuesday, October 24, 2017 CH 21 Downtown Prior Lake Reconstruction Agenda 1) Review remaining Project Alternatives 2) Public Engagement Summary

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio

TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio TRANSPORTATION ANALYSIS REPORT US Route 6 Huron, Erie County, Ohio December 12, 2012 Prepared for: The City of Huron 417 Main Huron, OH 44839 Providing Practical Experience Technical Excellence and Client

More information

Improving intersections for people that walk in Minneapolis

Improving intersections for people that walk in Minneapolis Matthew Dyrdahl, AICP, LCI Bicycle and Pedestrian Coordinator Minneapolis Public Works CITY OF MINNEAPOLIS Improving intersections for people that walk in Minneapolis Transportation Bonanza February 8,

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay

Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Safety Emphasis Areas & Safety Project Development Florida Department of Transportation District Seven Tampa Bay Stephen L. Benson, AICP, CNU-A FDOT District Seven Safety Office Presentation Overview Safety

More information

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen

Intersection Design. Leah Ness, Craig Hardy and Eric Sorensen Intersection Design Leah Ness, Craig Hardy and Eric Sorensen OVERVIEW TYPES OF INTERSECTIONS SCOPING COORDINATION INTERSECTION EVALUATION HORIZONTAL AND VERTICAL LAYOUTS DESIGN COORDINATION CONSTRUCTION

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC

Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC Traffic Impact Analysis Walton Acres at Riverwood Athletic Club Clayton, NC 1. TABLE OF CONTENTS INTRODUCTION...1 1.1. Site Location and Study Area...1 1.2. Proposed Land Use and Site Access...2 1.3.

More information

TRAFFIC SIGNAL WARRANT STUDY

TRAFFIC SIGNAL WARRANT STUDY TRAFFIC SIGNAL WARRANT STUDY 5 th STREET & ENCHANTED PINES DRIVE JANUARY 2013 TRAFFIC OPERATIONS ENGINEERING SERVICES/PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS INTERSECTION LOCATION MAP ii INTRODUCTION

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

Queensgate Drive Corridor Traffic Study

Queensgate Drive Corridor Traffic Study January 2015 Prepared for: City of Richland Prepared by: J-U-B ENGINEERS, Inc. 2810 W. Clearwater Avenue, Suite 201 Kennewick, Washington 99336 Table of Contents Introduction and Background... 1 Existing

More information

INTERSECTION SAFETY STUDY State Route 57 / Seville Road

INTERSECTION SAFETY STUDY State Route 57 / Seville Road INTERSECTION SAFETY STUDY State Route 57 / Seville Road City of Wadsworth, Medina County, Ohio Prepared For: City of Wadsworth Engineering Department 120 Maple Street Wadsworth, OH 44281 Prepared By: GPD

More information

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon

SR 53 Corridor Study. Final Report Presentation. Friday, October 3, :00 AM to noon SR 53 Corridor Study Final Report Presentation Friday, October 3, 2014 10:00 AM to noon SR 53 Corridor Study Final Report Presentation Study Purpose: Investigate safety improvements along the SR 53 corridor

More information

Executive Summary. North Florida Transportation Planning Organization Argyle Traffic Study

Executive Summary. North Florida Transportation Planning Organization Argyle Traffic Study North Florida Transportation Planning Organization i Executive Summary The Argyle Forest area is a highly congested transportation area located in southern Duval County. SR 9A (I-295) and SR 21 (Blanding

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Over the last several years, the Waterford Lakes area has experienced increased congestion due to a substantial increase in residential and commercial development. The current Existing and Future Conditions

More information

VT15 / Allen Martin Drive Intersection Scoping Study

VT15 / Allen Martin Drive Intersection Scoping Study VT15 / Allen Martin Drive Intersection Scoping Study ALTERNATIVES PRESENTATION MEETING DECEMBER 19, 2016 Agenda Study Area Project Background Existing Conditions Identified Issues Proposed Alternatives

More information

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007

Community Meeting February 27, 2007 Dorchester Avenue Transportation & Streetscape Improvements Action Plan February 27, 2007 Community Meeting Tonight s Agenda 6:00 Introductions South Boston/Dot Ave Improvement Study Background 6:15 Consultant Introductions Review of Scope and Schedule Review of Proposed Corridor Wide Guidelines

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff

MEMORANDUM. DATE March 1, 2012 TO Town of Milton Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff MEMORANDUM DATE March 1, 212 TO Town of Milton FROM RE Mark Abbott, Seth Asante, and Efi Pagitsas Boston Region MPO Staff FFY 211 Safety and Operations Analyses at Selected Boston Region MPO Intersections:

More information

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant,

Date: 09/22/2016 Subject: To: From: PennDOT Engineering District 5-0. Dear Applicant, Date: 09/22/2016 Subject: Highway Occupancy Permit Application No. 112807 Returned For Revisions To: Wal-Mart Real Estate Business Trust 2001 SE 10th Street Bentonville, AR 72716 From: PennDOT Engineering

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013

Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Joshua Saak, P.E., PTOE Traffic Design Engineer Ada County Highway District May 23, 2013 Creating Great Streets Through Road Diets and Conversions The Charlotte Experience Topics to Discuss Charlotte s

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane

TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane July 24, 2018 TRANSPORTATION FACILITY PLANNING Waugh Chapel Road Maytime Drive to New Market Lane DPWandYOU.com Making a difference, together Meeting Agenda Purpose of the project Overview of work conducted

More information

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3

PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 3 PERFORMANCE ACTIVITY 613 IMPACT ATTENUATOR WORK DESCRIPTION 1 WORK DESCRIPTION 2 WORK DESCRIPTION 3 Install Remove Repair 613 IMPACT ATTENUATOR ACTIVITY DESCRIPTION Repair, install, remove and maintain

More information