1 FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of March 2 through March 9. Weather permitting, work will be done at the following locations throughout the county. For around-the-clock, real-time, traffic information on major south Florida highways call 511, download the FL 511 app on your mobile device or view real-time video from the Florida Department of Transportation s traffic monitoring cameras on the web at For updated lane closure information, visit our website at and follow us on INTERSTATE CONSTRUCTION PROJECTS 1.I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale Three northbound and three southbound lanes of I-95 between Broward Boulevard and Commercial Boulevard will be closed Sunday night through Thursday night between 10:30 p.m. and 5 a.m. The first lane will close at 10:30 p.m., the second lane at 11:30 p.m. and the third lane at 12:30 a.m. until 5 a.m. All lanes will be open by 5:30 a.m. The I-95 northbound entrance ramp from Oakland Park Boulevard will be closed to all traffic Sunday night through Thursday night from 11:30 p.m. until 5 a.m. Traffic will be detoured off I-95 at Commercial Boulevard. FHP will be on site to direct motorists. I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly. The southbound I-95 exit ramp to Davie Boulevard will be closed Sunday night, March 11 through Thursday night, March 15 between 11:30 p.m. and 5 a.m. each night. One lane of the eastbound/westbound I-595 to northbound I-95 will be closed overnight Sunday, March 11 through Thursday night, March 15 between 11:30 p.m.and 5 a.m. each night. Advanced Notice: The southbound exit and entrance ramps at Oakland Park Boulevard will be closed intermittently11:30 p.m. to 5 a.m. Sunday, March 18 through Thursday, April 12. When closed, traffic will be detoured via I-95 to Sunrise Boulevard. FHP will be on site to assist motorists.

2 Advanced Notice: The southbound exit and entrance ramps at Sunrise Boulevard will be closed, as needed, 11:30 p.m. to 5 a.m. Sunday, March 18 through Thursday, April 12. When closed traffic will be closed to either Broward Boulevard or Oakland Park Boulevard. FHP will be on site to assist motorists. Description: This project will extend the High Occupancy Toll lanes from south of Broward Boulevard to north of Commercial Boulevard in Broward County. The scope of work includes adding a lane and converting the High Occupancy Vehicle (HOV) lanes to create two express lanes in each direction. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I- 95 Southbound between Broward Boulevard and NW 6 th Street, and along I-95 Northbound between Powerline Road and Commercial Boulevard. Construction began Sunday, August 21, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $149 million. Completion is expected in spring I-95 from north of Commercial Boulevard in Fort Lauderdale to south of SW 10 th Street in Deerfield Beach Three northbound and three southbound lanes of I-95 between Commercial Boulevard and SW 10th Street will be closed Sunday night through Thursday night between 10:30 p.m. and 5:30 a.m. The first lane will close at 10:30 p.m., the second lane at 11:30 p.m. and the third lane at 12:30 a.m. until 5:30 a.m. One lane in each direction of Atlantic Boulevard from Andrews Avenue to N. Dixie Highway will be closed Monday through Friday between 9 a.m. and 3 p.m. One lane in each direction of Copans Road between North Andrews Avenue and North Dixie Highway will be closed nightly, 10 p.m. until 5 a.m., Sunday through Thursday One westbound lanes of Copans Road will be closed between North Andrews Avenue and North Dixie Highway Monday through Friday between 9 a.m. and 3 p.m. daily. Sample Road at I-95 will be closed to all traffic overnight Sunday night through Thursday night between 11 p.m. and 5:30 a.m. for bridge demolition and construction. Eastbound Sample Road traffic will be detoured via I-95 and Copans Road. Westbound Sample Road traffic will be detoured via I-95 and SW 10th Street. FHP will be on site to direct motorists Atlantic Boulevard at I-95 will be closed to all traffic overnight Sunday through Thursday night from 11 p.m. to 5:30 a.m. Eastbound Atlantic Boulevard traffic will be detoured via I-95 south to Cypress Creek Road. Westbound Atlantic Boulevard will be detoured via I- 95 north to Copans Road. FHP will be on site to assist motorists. The I-95 northbound entrance ramp from westbound Atlantic Boulevard will be closed to all traffic overnight Sunday through Thursday night from 10 p.m. to 5 a.m. Traffic will be detoured via I-95 to cypress Creek Road. FHP will be on site to assist motorists. The I-95 southbound entrance ramp from Atlantic Boulevard will be closed nightly, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via N. Andrews Avenue. FHP will be on site to assist motorists. I-95 southbound exit ramp to Cypress Creek Road will be closed nightly, 10 p.m. until 5 a.m., Sunday night, February 25 through Thursday, March 1. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists.

3 I-95 southbound entrance ramp from westbound Cypress Creek Road will be closed nightly, 10 p.m. until 5 a.m., Sunday night, February 25 through Thursday, March 1. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists. The I-95 southbound exit ramp to westbound Atlantic Boulevard is completely closed through March Traffic is detoured to a temporary ramp just south of the closed ramp. The I-95 southbound entrance ramp from Andrews Avenue will be closed nightly, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Commercial Boulevard. FHP will be on site to assist motorists. Description: This project will extend the High Occupancy Toll lanes from north of Commercial Boulevard to south of SW 10 th Street in Broward County. The scope of work includes adding a lane and converting the High Occupancy Vehicle (HOV) lanes to create two express lanes in each direction. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I-95 northbound between Atlantic Boulevard and Sample Road, and along I-95 southbound north of Sample Road. Contract time for this $154 million project began Friday, January 8, 2016, with design activities currently underway. Construction began Sunday, August 14, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $154 million. Completion is expected in spring I-95 Interchange from Hillsboro Boulevard to SW 10 th Street The I-95 southbound exit ramp to SW 10th Street will be closed nightly, as needed, Sunday night through Thursday night through May between 9 p.m. and 5 a.m. Motorists will be detoured via Hillsboro Boulevard The outside lanes of southbound I-95 from Hillsboro Boulevard to SW 10th Street will be closed Sunday night through Thursday night with the first lane closing at 9 p.m., the second lane closing at 10 p.m. and the third lane, if necessary, closing at 12:30 a.m. until 5 a.m. Two westbound lanes of SW 10th Street at I-95 will be closed Sunday night through Thursday night between 9 p.m. and 5 a.m. The sidewalk on the north side of SW 10th Street between SW 12th Avenue and SW Natura Boulevard is closed through February Signs are in place to direct pedestrians to the south sidewalk Description: Construction on this 1.5-mile project began Monday, January 26, Work consists of widening southbound I-95 to add an auxiliary lane from the Hillsboro Boulevard entrance ramp to the SW 10 th Street exit ramp, widening the existing southbound I-95 exit ramp to SW 10 th Street, addition of a free flow right turn lane to westbound SW 10 th Street, widening of westbound SW 10 th Street to add an acceleration lane, utility relocation, milling and resurfacing, bridge widening, installation of barrier walls, curbs, sidewalks, guardrail, drainage, overhead signs, signing and pavement markings, signals, lighting, and retaining walls. This is the first of five interchange improvement projects throughout Broward and Palm Beach Counties.

4 For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost for all five projects is $32.5 million. Completion in spring I-95 from south of SW 10 th Street in Deerfield Beach to south of Glades Road in Boca Raton I-95 northbound exit ramp to eastbound Hillsboro Bouelvard will be closed nightly 11 a.m. to 5:30 a.m. Wednesday, March 7 and Thursday, March 8. Traffic will be detoured via the I-95 northbound exit ramp to westbound Hillsboro Boulevard. Project Open House: FDOT and our project partners are holding a construction Open House to discuss new construction in this area that will extend the High Occupancy Tolled Express Lanes into south Palm Beach County. The Open House will be held on Wednesday, March 14 from 5:30 p.m. until 7:30 p.m. at the Spanish River Library at 1501 Spanish River Boulevard, Boca Raton FL Description: This project will extend the High Occupancy Toll lanes from south of SW 10 th Street to south of Glades Road in Broward and Palm Beach counties. Scope of work includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other activities include reconstruction of I-95 on the northbound and southbound approaches to the Hillsboro Canal bridges, milling and resurfacing of I-95, construction of northbound and southbound auxiliary lanes between Hillsboro Boulevard and Palmetto Park Road, and construction of a northbound auxiliary lane between the SW 10 th Street entrance ramp and the Hillsboro Boulevard exit ramp. Other project improvements include: guardrail, barrier wall, attenuators, shoulder gutters, drainage, dredging of Hillsboro Canal, bridge widenings at Palmetto Park Road and Camino Real, bridge replacement at Hillsboro Canal, temporary and permanent retaining walls, noise wall construction, sign structures, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, signing and pavement markings; Express Lane markers, lighting, ramp metering signals, utility relocation, and landscape relocation. Contract time for this $102 million project began Monday, July 10, 2017, with design activities currently underway. Construction began Monday, January 8, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $102 million. Completion is expected in spring I-75 from NW 170 th Street in Miami-Dade County to I-595 in Broward County Segment A & B (NW 170 th Street in Miami-Dade County to South of Miramar Parkway in Broward County) Two lanes in each direction of I-75 from Miami Gardens Drive to NW 170 Street will be closed nightly Sunday, March 4 through Thursday, March 8. The northbound lane will be

5 closed from 9 p.m. to 6 a.m., and the southbound lane will be closed from 10 p.m. to 6 a.m. Two southbound lanes of I-75 from Florida s Turnpike to Miami Gardens Drive will be closed nightly Sunday, March 4 through Thursday, March 8 from 9 p.m. to 6 a.m. Two northbound lanes of I-75 from Miramar Parkway to Florida s Turnpike will be closed 10 p.m. Friday, March 2 to 6 a.m. Saturday, March 3. These lanes are also scheduled to close nightly Sunday, March 4 through Thursday, March 8 from 10 p.m. to 6 a.m. Two southbound lanes of I-75 from Miramar Parkway to Florida s Turnpike will be closed nightly Sunday, March 4 through Thursday, March 8 from 9 p.m. to 6 a.m. Two lanes in each direction of I-75 from Miramar Parkway to Florida s Turnpike will be closed nightly Sunday, March 4 through Thursday, March 8. The northbound lanes will be closed from 10 p.m. to 6 a.m., and the southbound lanes will from 9 p.m. to 6 a.m. Two northbound lanes of I-75 from NW 170 Street to Miami Gardens Drive will be closed nightly Sunday, March 4 through Thursday, March 8 from 10 p.m. to 7 a.m. One lane in each direction of Florida s Turnpike from Red Road to the I-75 Interchange will be closed nightly Sunday, March 4 through Thursday, March 8 from 9 p.m. to 6 a.m. One lane in each direction of Florida s Turnpike from I-75 Interchange to Okeechobee Road will be closed nightly Sunday, March 4 through Thursday, March 8 from 9 p.m. to 6 a.m. One northbound ramp lane of Florida s Turnpike from Okeechobee Road to I-75 Interchange will be closed nightly Sunday, March 4 through Thursday, March 8 from 9 p.m. to 6 a.m. One southbound ramp lane of I-75 from Snake Creek Canal to Florida s Turnpike will be closed nightly Sunday, March 4 through Thursday, March 8 from 9 p.m. to 6 a.m. One lane in each direction of I-75 from NW 170 Street to Florida s Turnpike will be closed daily Sunday, March 4 through Thursday, March 8 from 10 a.m. to 4 p.m. The northbound ramp to I-75 from Florida s Turnpike will be closed 10 p.m. Monday, March 5 to 5 a.m. Tuesday, March 6. During this time, motorists wishing to use the northbound ramp to I-75 from Florida s Turnpike will be detoured to exit at US 27/Okeechobee Road (Exit 35), continue south on US 27/Okeechobee Road to NW 138th Street, and east on NW 138th Street to Hialeah Garden Boulevard to take the northbound entrance ramp to I-75. All northbound lanes on I-75 between Florida s Turnpike and Bass Creek Bridge will be closed 10 p.m. Monday, March 5 to 5 a.m. Tuesday, March 6. During this time, motorists wishing to travel northbound on I-75 between Florida s Turnpike and Bass Creek Bridge will be detoured to exit at Miami Gardens Drive (Exit 4), continue east on Miami Gardens Drive to Flamingo Road, north on Flamingo Road to Miramar Parkway, and west on Miramar Parkway to take the northbound entrance ramp to I-75. Segment C (South of Miramar Parkway to South of Sheridan Street) One lane in each direction of I-75 from south of Miramar Parkway to north of Miramar Parkway will be closed Sunday, March 4 through Thursday, March 8. The northbound lane will be closed nightly from 10 a.m. to 2 p.m., and the southbound lane will be closed daily from 11 a.m. to 3 p.m. One lane in each direction of I-75 from south of Pines Boulevard to north Pines Boulevard will be closed daily Sunday, March 4 through Thursday, March 8. The northbound lane

6 will be closed from 10 a.m. to 3 p.m., and the southbound lane will be closed from 10 a.m. to 5 p.m. One lane in each direction of I-75 from south of Pines Boulevard to north of Pines Boulevard will be closed nightly Sunday, March 4 through Thursday, March 8. The northbound lane will be closed from 8 p.m. to 7 a.m., and the southbound lane will be closed from 7 p.m. to 7 a.m. One lane in each direction of I-75 from south of Miramar Parkway to north of Pines Boulevard will be closed Sunday, March 4 through Thursday, March 8. The northbound lane will be closed from 8 p.m. to 3 p.m., and the southbound lane will be closed from 10 a.m. to 7 a.m. One lane in each direction of I-75 from south of Miramar Parkway to Miramar Parkway will be closed daily Sunday, March 4 through Thursday, March 8. The northbound lane will be closed from 10 a.m. to 2 p.m., and the southbound lane will be closed from 11 a.m. to 3 p.m. One lane in each direction of I-75 from south of Miramar Parkway to Miramar Parkway will be closed nightly Sunday, March 4 through Thursday, March 8. The northbound lane will be closed from 9 p.m. to 7 a.m., and the southbound lane will be closed from 7 p.m. to 6 a.m. One lane in each direction of Miramar Parkway from west of I-75 to east of I-75 will be closed nightly Sunday, March 4 through Thursday, March 8 10 p.m. to 6 a.m. Segment D (South of Sheridan Street to North of Griffin Road) One lane in each direction of I-75 from south of Sheridan Street to north of Griffin Road will be closed daily Saturday, March 3 through Saturday, March 10. The northbound lane will be closed from 10 a.m. to 3 p.m., and the southbound lane will be closed from 11 a.m. to 3 p.m. Two lanes in each direction of I-75 from south of Sheridan Street to north of Griffin Road will be closed nightly Saturday, March 3 through Saturday, March 10 from 9 p.m. to 7 a.m. one lane in each direction of Sheridan Street will be closed daily Sunday, March 4 through Thursday, March 8 from 9 a.m. to 6 p.m. Two lanes in each direction of Sheridan Street may be closed nightly Sunday, March 4 through Thursday, March 8 from 10 p.m. to 5 a.m. Segment E (North of Griffin Road to I-595) The entrance ramp from eastbound I-595 into the express lanes, located west of SW 136 Avenue, will be closed continuously for seven days from 4 a.m. Saturday, March 3 through 4 a.m. Saturday, March 10. During this time, motorists wishing to use the express lanes should continue east on I-595 to the express lane entrance ramp just east of SW 136 Avenue. Two southbound lanes of I-75 from the Sawgrass Expressway to south of Royal Palm Boulevard will be closed daily Sunday, March 4 through Friday, March 9 from 9 a.m. to 4 p.m. and overnight 7 p.m. to 5 a.m. Northbound Lane Balancing Project (Indian Trace to I-595)

7 All lanes are open Description: This 15-mile project will add four tolled managed lanes in the I-75 median from NW 170 th Street in northern Miami-Dade County to I-595 in Broward County. The work will be completed in four segments to minimize the impact to the public. This project includes entrance and exit access points to the express lanes; a bridge with a direct connection to 595 Express; integrated Intelligent Transportation System and tolling components; noise barrier walls at various locations and new signage, lighting, drainage and landscaping improvements. For more information, please contact Community Outreach Specialist Gerdy St. Louis at or gerdy@iscprgroup.com. Cost/Completion: Construction cost is $485 million. Completion in early NORTHEAST BROWARD CONSTRUCTION PROJECTS 6.A1A from Oakland Park Boulevard to Flamingo Avenue in Fort Lauderdale One lane in each direction on A1A from Oakland Park Boulevard to Flamingo Avenue may be intermittently closed Monday through Friday between 8 a.m. and 5 p.m. Description: Project improvements include removing old asphalt and resurfacing the roadway within the project limits, upgrading sidewalks and ramps to meet ADA requirements, repairing, adjusting, and replacing drainage structures throughout the project limits, upgrading the following existing intersections to mast arm signals: 34th Street, mid-block between 36th and 40th Street, and at 40th Street, upgrading all existing pedestrian signals to countdown timers, upgrading signs and pavement markings throughout the project limits, including adding a 1.5 foot striped buffer to separate the four-foot wide bike lanes from the outside vehicle travel lane, upgrading existing lighting along the corridor to lighting with a variable intensity function that can be accessed remotely in order to cause minimal disruption to sea turtles during their nesting season, adding elevated roadway lighting and lower level lighting to illuminate the sidewalk, and adding a business access drive aisle along the east side of road between NE 34th and NE 36th Street. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $9.3 million / Early Broward Boulevard from NW 18 Avenue to US 1 in Fort Lauderdale The sidewalk is closed along the north side of Broward Boulevard between NW 18 Avenue and NW 15 Avenue Detour signs are in place to guide pedestrians Westbound traffic is shifted slightly north and will use the 3-lane temporary bridge for the duration of construction Eastbound traffic is shifted slightly north to the newly constructed north side of the bridge through early 2018 while crews construct the south side of the bridge

8 Up to two lanes in each direction of Broward Boulevard from US 1 to NW 18 Avenue (500 feet maximum at a time) will be closed weekdays between 10 p.m. and 6 a.m. and Saturdays between 9 a.m. and 4 p.m. A portion of the sidewalk is closed on either side of Broward Boulevard from NW 18 Avenue to US 1 Signs are in place to direct pedestrians to the open sidewalk on the opposite side of the road SW 15 Terrace is closed at Broward Boulevard through April Detour signage is in place to guide motorists via SW 14 Avenue to access SW 15 Terrace Description: Project improvements include replacing the bridge over the North Fork of the New River, removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, upgrading signs and pavement markings, relocating bus shelters, adding roadway lighting, installing drainage structures, upgrading signalized intersections to mast arms, reconstructing sidewalks, and widening roadway to add bike lanes in each direction. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $16 million / Summer Hillsboro Boulevard from Military Trail to US 1 in Deerfield Beach The off ramp from northbound I-95 to eastbound Hillsboro Boulevard will be closed overnight March 7 and March 8 between 11 p.m.and 5:30 a.m. During this closure crews will remove the impact attenuator and temporary barrier walls and resurface the ramp. Detour signs will be in place to direct motorists to the I-95 off ramp to westbound Hillsboro Boulevard where they can make a T-Turn at SW 12 Avenue/Jim Moran Boulevard to access eastbound Hillsboro Boulevard One lane in each direction of Hillsboro Boulevard from Military Trail to US 1 may be closed through April Up to two lanes in each direction of Hillsboro Boulevard from Military Trail to US 1 will be closed nightly between 7:30 p.m. and 5:30 a.m. through March The outside westbound lane of Hillsboro Boulevard from SE 2 Avenue to US 1 is closed permanently. This lane will remain closed as the final configuration includes two lanes in this segment of Hillsboro Boulevard The inside lane in each direction of Hillsboro Boulevard from east of I-95 to east of Dixie Highway will be closed through early March Description: Project improvements include improving the off-ramp from northbound I-95 to eastbound Hillsboro Boulevard including adding a new signalized intersection and adding second lane to increase capacity, relocating and upgrading drainage structures, upgrading crosswalk ramps to meet ADA requirements, constructing new stamped asphalt crosswalks from east of Natura Boulevard to US 1, upgrading existing pedestrian signals to countdown timers, upgrading signalized intersections to mast arms, installing new decorative lighting, constructing new medians east of SE 2 Avenue, removing old asphalt and resurfacing the roadway, upgrading signs and pavement markings to reflect the new roadway configuration as follows: (1) Military

9 Trail to Dixie Highway - Three 11-foot lanes in each direction (2) NE / SE 2 Avenue to US 1 - Two 11-foot lanes in each direction, and adding a bike lane or sharrows in each direction as follows: (1) Military Trail to NW/SW 2 Terrace - 4-foot bike lane (2) NW / SW 2 Terrace to NE / SE 2 Avenue - Sharrow symbols to designate that the outside travel lane will be shared with vehicles (3) NE / SE 2 Avenue to US 1-7-foot bike lane. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $9.4 million / Early Broward Mobility Project: SW 31 Avenue from Riverland Road to Broward Boulevard in Fort Lauderdale One lane in each direction of NW 31 Avenue from Broward Boulevard to Oakland Park Boulevard will be closed overnight Sunday through Thursday night between 8:30 p.m. and 5 a.m. to remove old asphalt and repave the travel lanes Description: The improvements under this contract include constructing sidewalks, multi-use pedestrian paths and bicycle lanes along 45 roadways in Broward County within Hollywood, Pembroke Pines, Davie, Plantation, Deerfield Beach, Pompano Beach, Lauderhill, Oakland Park, Lauderdale Lakes, and Fort Lauderdale. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $15 million / Fall Old Dixie Highway from NE 13 th Street to the south end of the Middle River Bridge in Fort Lauderdale Traffic Impacts: The new roundabout at NE 16 Court is open to traffic. One lane in both directions of Old Dixie Highway from NE 13 Street to the south end of the Middle River Bridge may be closed weekdays through Friday, March 2, 2018 between 7:30 a.m. and 6 p.m. Flaggers will direct traffic through the work zone. Motorists can expect delays. No Thru Trucks signs have been installed at both ends of the corridor (NE 13 th Street in Fort Lauderdale and NE 11 th Avenue in Wilton Manors) to enhance safety now that portions of Old Dixie Highway have been narrowed to accommodate the construction work Lanes widths have been narrowed from NE 14 Place to NE 18 Court. This is a No Passing Zone. Use caution when driving through the work zone There is a new traffic pattern in place from NE 14 Place to NE 16 Court because of the new raised intersections, raised crosswalks, and new roundabout at NE 16 Court. Use caution when driving through the work zone Description: The improvements under this contract include reducing the width of the travel lanes and modifying shoulders to add 4-foot bike lanes in both directions, constructing sidewalk, drainage improvements, adding roundabout at NE 16th Court, permanently reducing speed limit to 25 MPH, installation of pedestrian lighting, adding landscaping and swales to improve drainage, removing old asphalt and resurfacing the roadway, constructing 8 raised intersections and 6 raised pedestrian crosswalks and adding new signing and pavement markings. For more

10 information, contact Community Outreach Specialist Dayana Diaz at or Cost/Completion: $2.6 million / Early SW 4 Avenue at SW 28 Street Intersection in Fort Lauderdale One lane of SW 28 Street at SW 4 Avenue will be intermittently closed Monday through Friday between 9 a.m. and 4 p.m. Flaggers will direct traffic as needed Description: Project improvements include installing new mast arm signals to replace the existing four-way stop signs, upgrading sidewalk and pedestrian curb ramps, removing old asphalt and resurfacing the intersection, minor widening along SW 28 Street to add left turn lanes, upgrading pavement markings and signs, and installing new drainage structures. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $741, / spring I-595 to I-95 Ramp in Fort Lauderdale All lanes are open. This project was completed February 27. Description: Project improvements include retrofitting bridge railings and constructing concrete barrier wall transitions. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $419, / Project completed February 27, NORTHWEST BROWARD CONSTRUCTION PROJECTS 13.Sunset Strip Complete Streets Project from Nob Hill Road to Sunrise Boulevard in Sunrise The signalized intersection at NW 64 Avenue has been removed and the intersection is now operating as a traffic circle One eastbound lane of Sunset Strip at NW 64 Avenue and the westbound right turn lane from Sunset Strip to NW 64 Avenue are closed continuously through March One eastbound lane of Sunset Strip from Nob Hill Road to University Drive will be closed Monday through Friday between 7 a.m. and 5 p.m. through March One lane in each direction of Sunset Strip from NW 74 Avenue to NW 64 Avenue will be closed Monday through Friday between 7 a.m. and 5 p.m. One eastbound lane of Sunset Strip from University Drive to NW 74 Avenue will be closed Monday through Friday through March between 7 a.m. and 5 p.m. One westbound lane of Sunset Strip from NW 82 Avenue to Nob Hill Road will be closed Monday through Friday through March between 7 a.m. and 5 p.m. The outside lane in each direction of Sunset Strip from NW 19 Street to Sunrise Boulevard will be closed through March

11 The outside lane in each direction of Sunset Strip from Nob Hill Road to Sunrise Boulevard will be closed Sunday through Thursday evenings between 9 p.m. and 6 a.m. for resurfacing. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, adding roadway lighting, upgrading existing drainage structures and adding one new drainage structure east of NW 68 Avenue, replacing the signalized intersection at NW 64 Avenue with a roundabout, replacing the four-way stop sign at NW 19 Street with a roundabout, reconstructing sidewalks in various locations, upgrading signs and pavement markings, and adding bike lanes throughout the corridor as follows Nob Hill Road to NW 15 Street: Eliminating a travel lane by milling, resurfacing, and restriping to provide one 12-foot travel lane and a 6-foot bike lane separated by a 3-foot striped buffer; NW 15 Street to Sunrise Boulevard: Widening the road to accommodate 5-foot bike lanes; At the intersections of Nob Hill Road, Pine Island Road, University Drive and Sunrise Boulevard, two through lanes will be maintained in each direction and the road will be widened to provide a 5-foot bike lane. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $3.4 million / Summer State Road 7 (SR 7)/US 441 from Commercial Boulevard to south of Glades Road in Tamarac, North Lauderdale, Fort Lauderdale, Margate, Coral Springs, Coconut Creek, Parkland and Palm Beach County Commercial Boulevard to Broward / Palm Beach County Line: One lane in each direction of SR 7/US 441 from north of NW 31 Street to south of Hillsboro Boulevard will be closed Monday through Friday between 9 a.m. and 3 p.m. One southbound lane of SR 7/US 441 from Atlantic Boulevard to Copans Road will be closed Monday through Friday between 9 a.m. and 3 p.m. One northbound lane of SR 7 from north of Wiles Road to north of Sawgrass Expressway will be closed overnight Sunday through Thursday between 9 p.m. and 6 a.m. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, upgrading pedestrian features including10-foot sidewalks on both sides and detectable warning surfaces at crosswalks, installing overhead sign structures, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, installing new bus shelters with bicycle racks, trash receptacles, and benches, upgrading drainage structures, upgrading signalization, including pedestrian signals and detectors and vehicle video detection, and upgrading lighting. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $13,403, / Late 2019 Broward / Palm Beach County Line to south of Glades Road: One lane in each direction of SR 7/US 441 from the Broward/Palm Beach County Line to south of Glades Road will be closed Monday through Friday between 9 a.m. and 3 p.m.

12 The signalized intersection of SR 7/US 441 and Palmetto Park Road will be inoperable overnight Thursday, March 8 between 10 p.m. and 6 a.m. while the service is switched to a new traffic control cabinet. Off-duty officers will direct traffic at the intersection during this time. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, minor shoulder widening, upgrading drainage structures, upgrading pedestrian features including a 10-foot sidewalk on the west side and a 5-foot sidewalk on the east side, and detectable warning surfaces at crosswalks, upgrading signalization, including pedestrian signals and detectors and vehicle video detection, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, and upgrading lighting. For more information, contact Community Outreach Specialist Dayana Diaz at or ddiaz@corradino.com. Cost/Completion: $6,772, / Spring 2019 SOUTHEAST BROWARD CONSTRUCTION PROJECTS 15.Hollywood Boulevard Complete Streets Project from City Hall Circle to Dixie Highway in Hollywood Eastbound Hollywood Boulevard traffic has been shifted slightly north into the dual left turn lane to accommodate work on the south side of the road. One lane will be maintained in each direction Description: The improvements under this contract include removing old asphalt, resurfacing the roadway, adding decorative lighting, widening sidewalks and adding decorative pattern, upgrading existing pedestrian signals to countdown timers, constructing new median with parallel parking, replacing the existing water main and connections at various cross streets, and upgrading signs and pavement markings to reflect the new roadway configuration as follows: two lanes in each direction throughout the entire corridor, a four-foot bike lane in each direction separated by a two-foot buffer throughout the entire corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $7,667, / Summer A1A from Sheridan Street to Monroe Street in Hollywood There is one travel lane in each direction on A1A with a dual left-turn lane in the center Description: Improvements under this project include removing old asphalt and resurfacing the roadway, widening sidewalks and upgrading ramps to meet ADA requirements, replacing drainage structures and installing flap gates, removing, narrowing, and /or upgrading medians and curb and gutter, adding 4-foot bike lanes from Monroe Street to Arizona Street, adding sharrows (share the road pavement markings) from Arizona Street to Sheridan Street, upgrading

13 and installing new pedestrian signals, and minor signalization and street light improvements. For more information, contact Community Outreach Specialist Rebecca Guerrero at or Cost/Completion: $9,366, / Spring State Road 7 (SR 7)/US 441 from SW 25 th Street to Fillmore Street in West Park, Miramar, and Hollywood One of the two left turn lanes from southbound SR 7/US 441 to eastbound Hollywood Boulevard is closed through March One lane in each direction of SR 7/US 441 at Pembroke Road may be closed Monday through Saturday between 7 a.m. and 4 p.m. and Sunday evenings through Thursday evenings between 9 p.m. and 6 a.m. One lane in each direction of SR 7/US 441 at Washington Street may be closed Monday through Saturday between 7 a.m. and 4 p.m. and Sunday evenings through Thursday evenings between 9 p.m. and 6 a.m. Intermittent lane closures in each direction of SR 7/US 441 from SW 25 th Street to Fillmore Street will be closed Monday through Saturday between 9 a.m. and 4 p.m. Description: The improvements under this contract include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians; constructing new storm sewer system and retention ponds; installing new water and sewer lines; constructing bus bays at current bus stop locations; constructing curbs and gutters; adding or replacing sidewalks with ADA compliant ramps on both sides of the road; upgrading existing signalized intersections with mast arms and adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard; improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441; adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $30.7 million. Completion in Summer State Road 7 (SR 7)/US 441 from Fillmore Street to south of Stirling Road in Hollywood and the Seminole Indian Reservation One lane in each direction of SR 7/US 441 from Stirling Road to Fillmore Street will be closed overnight, intermittently Monday through Thursday between 10 p.m. and 5 a.m. Sheridan Street will be closed at SR 7/US 441 overnight Friday, March 9 through Monday, March 12 between 9 p.m and 5 a.m. Motorists will be detoured to NW 64 Avenue, NW 68 Avenue, NW 56 Avenue, Taft Street and Stirling Road. Description: Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and

14 add pedestrian countdown timers at Johnson Street, Taft Street, and Sheridan Street, installing new signalized intersection and pedestrian countdown timers at Fillmore Street, improving street lighting along the corridor by installing new lighting system along the west side of SR 7/US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at or Cost/Completion: $29.6 million / Fall Ravenswood Road Bridge over Dania Cut-Off Canal Replacement Project in Dania Beach The Ravenswood Road Bridge is now open to traffic. One lane of Ravenswood Road may be closed between SW 45 Street and SW 42 Street Monday through Friday between 9 a.m. and 5 p.m. Flaggers will be on site directing traffic Intermittent closures of the Dania Cut-Off Canal at the Ravenswood Road Bridge can be expected through March These closures are expected to occur Monday through Saturday during daytime hours, and are not anticipated to last more than three hours at a time More information will be available on the VHF FM Radio Channel 9 Crews will be working from a barge/pontoon for the installation of the new fender system The barge/pontoon will be illuminated and is approximately 18 feet wide. Approximately 40 feet of navigable waterway will remain available to boaters, who are advised to use caution when traveling through the work zone Description: The improvements under this project consist of replacing the existing bridge over the Dania Cut-Off Canal, including replacement of the existing fender system. The work will consist of existing bridge demolition and new bridge construction. Additional improvements include the reconstruction of Ravenswood Road, installation of new roadway drainage, canal dredging and armoring, and placement of new signing and pavement markings. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $4.8 million / Early Hallandale Beach Boulevard from State Road 7 (SR 7)/US 441 to Lake Shore Drive in Pembroke Park and West Park The outside eastbound lane of Hallandale Beach Boulevard from SW 40 Avenue to SW 32 Avenue will be closed at all times through March The outside right lane on Hallandale Beach Boulevard will be closed from SW 37 Avenue to Lake Shore Drive until 5 p.m. Monday, March 5. Motorists traveling northbound on SW 32 Avenue will be detoured to SW 32 Street, SW 33 Avenue, SW 30 Street and SW 37 Avenue. Motorists traveling southbound on SW 32 Avenue will be detoured to west Hallandale Beach Boulevard, SW 40 Avenue and SW 25 Street.

15 Description: The improvements under this contract include adding new drainage along project corridor, removing old asphalt and resurfacing the roadway within project limits, installing new traffic signal mast arms and pedestrian countdown timers at SW 56th Avenue and SW 40th Avenue, and installing 4-foot bike lanes throughout the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at or Cost/Completion: $6.6 million. Completion in Fall I-95 from Hallandale Beach Boulevard to Hollywood Boulevard in Hallandale Beach, Hollywood, and Pembroke Park The shoulder in each direction of I-95 from north of Hollywood Boulevard to south of Hallandale Beach Boulevard will be closed Monday through Friday between 8 a.m. and 4 p.m. The outside lane in each direction of I-95 from north of Hollywood Boulevard to south of Hallandale Beach Boulevard will be closed overnight Monday through Friday between 10 p.m. and 6 a.m. Description: The improvements under this contract include the installation of new light poles, conduits, conductors, barrier wall, guardrail and new load centers for electrical components within project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $1.9 million. Completion in Summer SOUTHWEST BROWARD CONSTRUCTION PROJECTS 22.Stirling Road from University Drive to State Road 7 (SR7)/US 441 in Hollywood, Davie, and the Seminole Indian Reservation The lane in either direction of Stirling Road from University Drive to SR 7/US 441 will be closed daily Monday through Friday between 9:30 a.m. and 4:30 p.m. One outside lane in either direction of SR 7/US 441 at Stirling Road will be closed daily Monday through Friday between 9:30 a.m. and 4:30 p.m. Two lanes of Stirling Road in either direction from University Drive to the Turnpike will be closed overnight through February between 9 p.m. and 5 a.m. Description: The improvements under this contract include roadway widening east and west of SR 7/US 441 to allow for new 5-foot bike lane to connect to existing bike lanes along Stirling Road, median modifications to accommodate longer turn lanes from Stirling Road to SR 7/US 441, removing old asphalt and resurfacing the roadway, upgrading sidewalks and ramps to meet current ADA standards, installing new pedestrian countdown timers at multiple intersections, installing Intelligent Transportation System technology, replacing overhead aluminum signs, improving the existing lighting, installation new bus shelter pads at existing bus stop locations,

16 and adding new signing and pavement markings. For more information, contact Community Outreach Specialist Rebecca Guerrero at or Cost/Completion: $4,580,758 / Early US 27 from Miami-Dade/Broward County line to Griffin Road in Pembroke Pines, Miramar, and Southwest Ranches One lane in each direction of US 27 from the Miami-Dade/Broward County Line to Griffin Road may be closed Monday through Friday between 9 a.m. to 7 p.m. daily Description: The improvements under this contract include removing old asphalt and resurfacing, constructing a buffered 7-foot bike lane in both directions, widening at existing intersections, and installing new lights and pavement markings along the corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $8.5 million / Summer Flamingo Road from Pembroke Road to Griffin Road in Miramar, Pembroke Pines, Cooper City, and Southwest Ranches One southbound lane of Flamingo Road from south of Pembroke Road to Griffin Road may be closed Monday through Friday between 9:30 a.m. and 4:30 p.m. daily Description: The improvements under this contract include replacing guardrail along the west side of the road, installing a mat to protect canal from erosion, replacing sidewalk at various locations as needed to accommodate new guardrail, improving drainage by adding concrete aprons around existing drainage structures, and replacing some existing signs. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $2,267, / Early Pines Boulevard from Dykes Road to Flamingo Road in Pembroke Pines All lanes open Description: The improvements under this contract include the installation of Intelligent Transportation System (ITS), Adaptive Traffic Control System (ATCS), and Advanced Transportation Management System (ATMS) components. These include enhancements to vehicle detection, fiber optic communications infrastructure, traffic monitoring cameras, and new poles and data collection devices at the eight signalized intersections and the I-75 interchange within the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $2,949,000 / Late Pembroke Road at Oleander Drive Intersection in Miramar

17 One lane in each direction of Pembroke Road at Oleander Drive will be closed Monday through Friday between 9 a.m. and 3:30 p.m. daily for drainage installations Description: The improvements under this contract include removing existing asphalt and resurfacing the intersection, installing a new signalized intersection with mast arms, adding crosswalks on both sides of the intersection to provide access across Pembroke Road, installing eight countdown pedestrian signals, replacing drainage structures on Oleander Drive just south of Pembroke Road, and installing approximately 112 feet of sidewalk on the west side of Oleander Drive just south of Pembroke Road.. For more information, contact Community Outreach Specialist Rebecca Guerrero at or rguerrero@corradino.com. Cost/Completion: $621,301.81/ Spring 2018 MAINTENANCE & PERMIT PROJECTS 27.I-595 Express Maintenance The westbound State Road 84 & Pine Island Road on- ramp to westbound I-595 will be closed to all traffic from 9 p.m. Saturday, March 3 until 5 a.m. Monday, March 5 for concrete and asphalt repairs. Detour will be available. Three of four lanes on westbound I-595 between Pine Island Road and Hiatus Road will be closed continuously from 9:00 p.m. Saturday March 3 until 5 a.m. Monday March 5for concrete and asphalt repairs. One lane of the ramp from eastbound I-595 to northbound SR 7/US 441 will be closed overnight Monday, March 5 between 10 p.m. and 5 a.m. for joint repairs The right shoulder on northbound State Road 7/US 441 to westbound I-595 will be closed on Tuesday, March 6 from 10 a.m. to 4 p.m. for bridge repairs. The right shoulder on eastbound I-595 to northbound State Road 7/US 441 will be closed on Thursday, March 8 from 10 a.m. to 4 p.m. for bridge repairs. 28.I-75 Maintenance All lanes open 29.I-95 Express Maintenance The northbound exit ramp to Stirling Road will be closed overnight Monday, March 5 and Tuesday, March 6 between 9 p.m. and 5 a.m. for maintenance. 30.A1A/Hillsboro Mile in Hillsboro Beach One lane in each direction of A1A from the Pompano Beach Bridge to the Deerfield Beach city limits will be closed Monday through Friday through March between 7 a.m. and 7 p.m. daily. Flag crews will direct traffic around the work zone. For more information about this work, contact Chen Moore and Associates representative Peter M. Moore, P.E. at or pmoore@chenmoore.com. 31.Sunrise Boulevard/US 1 from N. Flagler Drive to NE 19 Avenue in Fort Lauderdale One lane in each direction of Sunrise Boulevard/US 1 at NE 7 Avenue will be closed Monday through Friday between 9 a.m. and 3 p.m. daily for pedestrian improvements through March.

18 One lane in each direction of Sunrise Bouelvard/US 1 at NE 19 Avenue will be closed Monday through Friday between 9 a.m. and 3 p.m. through March. For more information about this work, please contact community outreach specialist Dayana Diaz at or ddiaz@corradino.com 32.Las Olas Boulevard from SE 17 Ave to Lido Drive/SE 19 Avenue in Fort Lauderdale One lane in each direction will be closed Monday through Friday through March between 9 a.m. and 4 p.m. for installation of a sanitary force main For information about this work contact V Engineering & Consulting, Corp representative Felix Clavelo at or clavelo@veccorp.net 33.Northbound I-95 Off-Ramp at Stirling Road One lane at the off-ramp from northbound I-95 to Stirling Road will be closed overnight Sunday through Thursday evenings through May 24 between 9 p.m. and 5 a.m. nightly for construction of a right turn lane For more information about this work, please contact AED Corp project manager Taylor Glazer at or tglazer@aedcorp.com. 34.A1A north of Hallandale Beach Boulevard in Hollywood One southbound lane of A1A north of Hallandale Beach Boulevard at Hyde Beach House (4000 S Ocean Drive) will be closed Monday through Friday through March between 9 a.m. and 4 p.m. for utility improvements For more information about this work, please contact City Engineering Project Manager Shawn Alava at or shawn@cityengineering.net. 35.Broward County Transit Improvements in Deerfield Beach One southbound lane of Powerline Road at Hillsboro Boulevard will be closed weekdays through March 5 between 9 a.m. and 5 p.m. One southbound lane of Powerline Road at SW 10 Street will be closed weekdays through March 5 between 9 a.m. and 5 p.m. One lane in each direction of Powerline Road at Sample Road will be closed weekdays through March 12 between 9 a.m. and 5 p.m. One westbound lane of Sample Road at Powerline Road will be closed weekdays through March 19 between 9 a.m. and 5 p.m. One westbound lane of Sample Road at Military Trail will be closed weekdays through March 19 between 9 a.m. and 5 p.m. One westbound lane of Sample Road at NE 3 Avenue will be closed weekdays through March 26 between 9 a.m. and 5 p.m. One westbound lane of Sample Road will be closed at Dixie Highway weekdays through March 26 between 9 a.m. and 5 p.m. For more information about this work, please contact Broward County Transportation Department representative Ralph Viola at or rviola@broward.org. 36.State Road 7/US 441 from Atlantic Boulevard to Sample Road in Margate

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report April 27 through May 4, 2018

FDOT Broward County Traffic Report April 27 through May 4, 2018 FDOT Broward County Traffic Report April 27 through May 4, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Broward County Traffic Report April 20 through April 27, 2018

FDOT Broward County Traffic Report April 20 through April 27, 2018 FDOT Broward County Traffic Report April 20 through April 27, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week

More information

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95 FDOT Broward County Traffic Report May 11 through May 18, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week

More information

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018

FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018 FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95 FDOT Broward County Traffic Report August 31, 2018 through September 7, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95 FDOT Broward County Traffic Report September 14, 2018 through September 21, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Palm Beach County Traffic Report November 16 through November 23, 2018

Palm Beach County Traffic Report November 16 through November 23, 2018 November 16, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report November 16 through November 23, 2018 Palm Beach County Palm Beach County traffic will

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

Palm Beach County Traffic Report October 26 through November 2, 2018

Palm Beach County Traffic Report October 26 through November 2, 2018 October 26, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report October 26 through November 2, 2018 Palm Beach County Palm Beach County traffic will

More information

Palm Beach County Traffic Report January 11 through January 18, 2019

Palm Beach County Traffic Report January 11 through January 18, 2019 January 11, 2019 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report January 11 through January 18, 2019 Palm Beach County Palm Beach County traffic will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 10 th, through November 16 th, 2016 Alico & Gator Road Intersection

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 24-30, 2019 Corbett Road: Motorists who use Corbett Road in North

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 6 December 12, 2018 South Pointe Boulevard & College Parkway:

More information

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018 Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 30 September 5, 2018 Buckingham Road: Florida Power and Light

More information

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 3-9, 2019 RICK SCOTT GOVERNOR Florida Department of Transportation

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CALL TO ORDER: 9:30 a.m. ROLL CALL: PLEDGE OF ALLEGIANCE: Vice Mayor Diane Glasser

More information

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018 ^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 24 August 30, 2017 Hancock Bridge Parkway: Lee County DOT will

More information

^Lee County Jt Sotft^West T:foH^a Lee County

^Lee County Jt Sotft^West T:foH^a Lee County ^Lee County Jt Sotft^West T:foH^a Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 11th through August 17th, 2016

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May 25 May 31, 2017 College Parkway: Lee County DOT will be trimming

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

February 11, 2016 TPO Board Presentation

February 11, 2016 TPO Board Presentation February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

I 595 Express Corridor Improvements Project. February 2014 Update

I 595 Express Corridor Improvements Project. February 2014 Update I 595 Express Corridor Improvements Project February 2014 Update PROJECT COMPONENTS Reversible Express Lanes Direct Connect to Florida s Turnpike Open Road Tolling SR 84 Continuous Connection Florida s

More information

Complete Streets Advisory Committee Meeting Summary

Complete Streets Advisory Committee Meeting Summary Complete Streets Advisory Committee Meeting Summary September 24, 2018 BrowardMPO.org Broward MPO Complete Streets Advisory Committee (CSAC) September 24, 2018 ADVISORY COMMITTEE MEETING 2 MEETING PARTICIPANTS

More information

Update January 4, 2016

Update January 4, 2016 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 17 August 23, 2017 Traffic Maintenance: Signal Maintenance Bonita

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

^ Lee County ^OU fewest T:foH^ Lee County

^ Lee County ^OU fewest T:foH^ Lee County ^ Lee County ^OU fewest T:foH^ Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 18th through August 24th, 2016 Ben

More information

Lee County Department of Transportation

Lee County Department of Transportation Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015

More information

Pinellas County Traffic Advisory

Pinellas County Traffic Advisory 12/22/17 2:00PM For up-to-date information regarding traffic (crashes) on Pinellas County roadways that are monitored by our Intelligent Transportation System (ITS) Smart Tracs cameras - follow us on Twitter

More information

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018 Broward Complete Streets Advisory Committee (CSAC) Meeting Monday, September 24, 2018 HOUSEKEEPING Please make sure you have signed in and have an agenda. This meeting is being recorded. Please introduce

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE June 15, 2018 New Update: Landscape: Lee County Department of Transportation

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Florida Department of Transportation MIKE DEW SECRETARY

Florida Department of Transportation MIKE DEW SECRETARY RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY June 7, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #23 FOR WEEK OF

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

Completing the Vision

Completing the Vision Villas of Positano Completing the Vision North A1A Lane Reconfiguration N. Surf Rd. Redirection of Traffic Margaritaville Resort March 4, 2014 1 Completing The Vision Project Limits Hollywood Blvd. to

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Hollywood/Pines Boulevard Multimodal Corridor Study

Hollywood/Pines Boulevard Multimodal Corridor Study Hollywood/Pines Boulevard Multimodal Corridor Study FINAL REPORT Prepared for: Broward County Metropolitan Planning Organization Prepared by: Kimley-Horn and Associates, Inc. Fort Lauderdale, Florida Kimley-Horn

More information

Multi-Modal Traffic Analysis. Parisi and Associates

Multi-Modal Traffic Analysis. Parisi and Associates Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

Accommodating Pedestrians in the Work Zone

Accommodating Pedestrians in the Work Zone Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

PROJECT FACT SHEET May 25, 2018

PROJECT FACT SHEET May 25, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

IL Route 71 Construction Update

IL Route 71 Construction Update 100 Parkers Mill Oswego, IL. 60543 (630) 554-3618 4.20.16 IL 71 TRAFFIC ADVISORY: Tentatively scheduled for April 21st A new traffic pattern from Paradise to Wolf Crossing on IL 71 will be in use. The

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

ADA on Construction. Guidance for Section C Plan Preparers

ADA on Construction. Guidance for Section C Plan Preparers ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Replacement of N. Carlin Springs Road Bridge over George Mason Dr.

Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Replacement of N. Carlin Springs Road Bridge over George Mason Dr. Approximate schedule with phases and proposed Maintenance of Travel (MOT) plans February 2017 Project Elements Removal of existing bridge

More information

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES

WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES April 1, 2017 WORK ZONE TRAFFIC CONTROL PROCEDURES AND GUIDELINES FOR SCDOT MAINTENANCE ACTIVITIES Table of Contents

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 FINAL REPORT July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Prepared For: Ms. Khalilah Ffrench, PE, Project Manager

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information