FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018

Size: px
Start display at page:

Download "FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018"

Transcription

1 FDOT Broward County Traffic Report August 10, 2018 through August 17, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of August 10 through August 17, Weather permitting, work will be done at the following locations throughout the county. For around-the-clock, real-time, traffic information on major south Florida highways call 511, download the FL 511 app on your mobile device or view real-time video from the Florida Department of Transportation s traffic monitoring cameras on the web at For updated lane closure information, visit our website at and follow us on Interstate 95 1.I-95 from south of Broward Boulevard to north of Commercial Boulevard in Fort Lauderdale I-95 will have three lanes closed in each direction Sunday through Thursday night between 9 p.m. and 5 a.m. The first two lanes will close at 9 p.m., the third lane at 10 p.m. and the fourth lane at 11 p.m. until 5 a.m. All lanes will be open by 5:30 a.m. I-95 in both directions, from south of Davie Boulevard to north of Commercial Boulevard, will have intermittent shoulder and ramp shoulder closures, as needed, daily and nightly. The I-95 northbound exit ramp to Commercial Boulevard will be closed as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Cypress Creek Road. FHP will be on site to assist motorists. The I-95 northbound exit ramp to Oakland Park Boulevard will be closed as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via I-95 and Commercial Boulevard. FHP will be on site to assist motorists. Please note that consecutive ramps will not be closed at the same time. The I-95 southbound entrance ramps from Oakland Park Boulevard will be closed as needed, 10 p.m. until 5 a.m., Sunday through Thursday. Traffic will be detoured via Powerline Road and Sunrise Boulevard. FHP will be on site to assist motorists. The I-95 northbound entrance ramp from Oakland Park Boulevard will undergo a full nightly closure, 10 p.m. until 5 a.m., Sunday, August 12 through Thursday, August 16.

2 Traffic will be detoured via Commercial Boulevard and Powerline Road. FHP will be on site to assist motorists. The I-95 northbound exit ramp to Commercial Boulevard will have one inside lane closed daily, 9 a.m. until 3 p.m., Monday through Friday, through October 10. Description: This project will extend the High Occupancy Toll lanes from north of Commercial Boulevard to south of SW 10 th Street in Broward County. The scope of work includes adding a lane and converting the High Occupancy Vehicle (HOV) lanes to create two express lanes in each direction. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I-95 northbound between Atlantic Boulevard and Sample Road, and along I-95 southbound north of Sample Road. Contract time for this $154 million project began Friday, January 8, 2016, with design activities currently underway. Construction began Sunday, August 14, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $154 million. Completion is expected in spring I-95 from north of Commercial Boulevard in Fort Lauderdale to south of SW 10 th Street in Deerfield Beach I-95 between Commercial Boulevard and SW 10 th Street will be have three lanes closed in each direction Sunday through Thursday night between 10:30 p.m. and 5:30 a.m. The first lane will close at 10:30 p.m., the second lane at 11:30 p.m. and the third lane at 12:30 a.m. until 5:30 a.m. One lane in each direction of Copans Road between North Andrews Avenue and North Dixie Highway will be closed daily, 9 a.m. until 3 p.m., Monday through Friday. One lane in each direction of Cypress Creek Road will be closed daily, 9 a.m. until 3:30 p.m. McNab Road at I-95 will have two lanes closed in each direction, 10:30 p.m. until 5 a.m., Sunday through Thursday. 15 th Street at I-95 will undergo a full closure for bridge construction, 11 p.m. until 5 a.m., Sunday through Thursday. Eastbound 15 th Street traffic will be detoured south on Andrews Avenue, east on Atlantic Boulevard and north on NW 6 th Avenue. Westbound 15 th Street traffic will be detoured south on NW 6 th Avenue, west on Atlantic Boulevard, and north on Andrews Avenue. FHP will be on site to assist motorists. Copans Road at I-95 will undergo a full closure for bridge construction, 11 p.m. until 5 a.m., Sunday through Thursday. Westbound traffic will be detoured via I-95 northbound and Sample Road. Eastbound traffic will be detoured via I-95 southbound and Atlantic Boulevard. FHP will be on site to assist motorists. I-95 Full Closure Advanced Notice: I-95 southbound lanes at SW 10 th Street will be closed to traffic overnight, 11:30 p.m. until 5:30 a.m., Wednesday night, August 22 and Thursday night, August 23 for overhead sign structure installation. Motorists will be detoured via the I-95 southbound exit ramp to SW 10 th Street, Military Trail and Sample Road. FHP will be on site to assist motorists. Please see detour flyer attached. Long-term Full Closure Notice: The Park & Ride entrance from the eastbound exit ramp to Cypress Creek Road is closed completely, reopening 5 a.m., Monday morning,

3 September 10. Traffic will be detoured east along Cypress Creek Road to a U-Turn at NE 7 th Ave/Corporate Drive, and then west along Cypress Creek Road to the Park and Ride. Long-term Full Closure Notice: The I-95 southbound entrance ramp from the Cypress Creek Park & Ride Lot is closed completely, reopening 5 a.m., Monday morning, September 10. Traffic will be detoured via West Cypress Creek Road or North Andrews Avenue and I-95. FHP will on site to assist motorists. Description: This project will extend the High Occupancy Toll lanes from north of Commercial Boulevard to south of SW 10 th Street in Broward County. The scope of work includes adding a lane and converting the High Occupancy Vehicle (HOV) lanes to create two express lanes in each direction. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I-95 northbound between Atlantic Boulevard and Sample Road, and along I-95 southbound north of Sample Road. Contract time for this $154 million project began Friday, January 8, 2016, with design activities currently underway. Construction began Sunday, August 14, For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost is $154 million. Completion is expected in spring I-95 Interchange from Hillsboro Boulevard to SW 10 th Street The I-95 southbound exit ramp to SW 10 th Street will be fully closed, as needed, Sunday night through Thursday night between 9 p.m. and 5 a.m. Motorists can detour via Hillsboro Boulevard. The outside lanes of I-95 southbound from Hillsboro Boulevard to SW 10 th Street will be closed Sunday night through Thursday night with the first lane closing at 9 p.m., the second lane closing at 10 p.m. and the third lane, if necessary, closing at 12:30 a.m. until 5 a.m. Two westbound lanes of SW 10 th Street at I-95 will be closed Sunday night through Thursday night between 9 p.m. and 5 a.m. The sidewalk on the north side of SW 10 th Street between SW 12 th Avenue and SW Natura Boulevard is closed through August Signs are in place to direct pedestrians to the south sidewalk. Description: Construction on this 1.5-mile project began Monday, January 26, Work consists of widening southbound I-95 to add an auxiliary lane from the Hillsboro Boulevard entrance ramp to the SW 10 th Street exit ramp, widening the existing southbound I-95 exit ramp to SW 10 th Street, addition of a free flow right turn lane to westbound SW 10 th Street, widening of westbound SW 10 th Street to add an acceleration lane, utility relocation, milling and resurfacing, bridge widening, installation of barrier walls, curbs, sidewalks, guardrail, drainage, overhead signs, signing and pavement markings, signals, lighting, and retaining walls. This is the first of five interchange improvement projects throughout Broward and Palm Beach Counties. For more information, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction cost for all five projects is $32.5 million. Completion in summer I-95 from south of SW 10 th Street to south of Glades Road (95 Express Phase 3B-1)

4 Traffic Impacts: I-95 will have three lanes closed in each direction nightly, as needed, between Hillsboro Boulevard and Palmetto Park Road, with the first lane closing at 9:30 p.m., the second lane closing at 10:30 p.m., and the third lane closing at 11:30 p.m. until 5:30 a.m., Sunday through Thursday, through August. The I-95 southbound exit ramp to Hillsboro Boulevard will be closed, 11:30 p.m. until 5:30 a.m., Thursday night, August 16. Traffic will be detoured via the I-95 southbound exit ramp to SW 10 th Street, west to Military Trail and north to Hillsboro Boulevard. FHP will be on site to assist motorists. Camino Real between SW 15 th Avenue and SW 19 th Avenue will have one outside lane closed in each direction, daily, 9 a.m. until 4 p.m., Monday, August 13 through Friday, December 14. For more information, please contact Andrea Pacini, Community Outreach Specialist, Description: This 4.8-mile project will extend the High Occupancy Toll lanes from south of SW 10 th Street to south of Glades Road in Broward and Palm Beach counties. The scope of work includes widening and converting the existing I-95 HOV Lanes to Managed Lanes which will result in two tolled Express Lanes in each direction; the number of General Use lanes will remain the same. Other activities include reconstruction of I-95 on the northbound and southbound approaches to the Hillsboro Canal bridges, milling and resurfacing of I-95, construction of northbound and southbound auxiliary lanes between Hillsboro Boulevard and Palmetto Park Road, and construction of a northbound auxiliary lane between the SW 10 th Street entrance ramp and the Hillsboro Boulevard exit ramp. Other project improvements include: guardrail, barrier wall, attenuators, shoulder gutters, drainage, dredging of Hillsboro Canal, bridge widenings at Palmetto Park Road and Camino Real, bridge replacement at Hillsboro Canal, temporary and permanent retaining walls, noise wall construction, sign structures, portable traffic monitoring sites, toll gantry installation, Intelligent Transportation System (ITS) installation, signing and pavement markings; Express Lane markers, lighting, ramp metering signals, utility relocation, and landscape relocation. Contract time for this $102 million project began Monday, July 10, 2017, with design and construction activities currently underway. For more information on this project, please contact Community Outreach Specialist Andrea Pacini at Cost/Completion: Construction began Friday, January 19, Work is being performed by Prince Contracting, LLC and is expected to be completed spring Interstate Segments A & B - I-75 from NW 170 to South of Miramar Parkway One lane in each direction of I-75 from Florida s Turnpike to NW 170 Street will be closed Sunday, August 12 through Thursday, August 16 from 9 a.m. to 4 p.m. Two lanes in each direction of I-75 from Miami Gardens Drive to NW 170 Street will be closed nightly Sunday, August 12 through Thursday, August 16 from 9 p.m. to 6 a.m. Two lanes in each direction of I-75 from Florida s Turnpike to Miami Gardens Drive will be closed nightly Sunday, August 12 through Thursday, August 16 from 10 p.m. to 7 a.m.

5 Two southbound lanes of I-75 from Miramar Parkway to Snake Creek Canal will be closed nightly Sunday, August 12 through Thursday, August 16 from 11 p.m. to 6 a.m. One northbound lane of I-75 from Snake Creek Canal to Florida s Turnpike will be closed nightly Sunday, August 12 through Thursday, August 16 from 9 p.m. to 6 a.m. Two lanes in each direction of I-75 from Snake Creek Canal to Miami Gardens Drive will be closed nightly Sunday, August 12 through Thursday, August 16 from 9 p.m. to 6 a.m. One northbound ramp lane of Florida s Turnpike from Okeechobee Road to I-75 Interchange will be closed Sunday, August 12 through Thursday, August 16 from 9 p.m. to 6 a.m. One lane in each direction of Florida s Turnpike from Red Road to the I-75 Interchange may be closed Sunday, August 12 through Thursday, August 16 from 9 p.m. to 6 a.m. One lane in each direction of Florida s Turnpike from I-75 Interchange to Okeechobee Road may be closed Sunday, August 12 through Thursday, August 16 from 9 p.m. to 6 a.m. The southbound lanes of Florida s Turnpike between Red Road and Snake Creek Canal closure will continue 11 p.m. Thursday, August 16 until 6 a.m. Friday, August 17. During this closure, southbound Florida s Turnpike motorists wishing to continue south will be detoured to exit at Red Road (Exit 43), travel north on Red Road to Miramar Parkway, west on Miramar Parkway to I-75, then south on I-75 to take the exit ramp to Florida s Turnpike (Exit 5). In the event of inclement weather or other unexpected conditions this work will be rescheduled. 6. I-75 / I-595 Interchange Landscaping Improvements Project All lanes open through Friday, August 17. Description: The improvements under this contract include installing a temporary irrigation system, constructing retaining walls of various heights and lengths that will serve as elevated planters, and installing plants throughout the interchange including several species of palms and shade trees. Work on this project is expected to begin Monday, August. 14. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com Cost/Completion: $4.9 million / fall 2019 Interstate I-595 from Davie Road to 126 Avenue One right lane of eastbound I-595 from one mile east of University Drive to west of Davie Road will be closed from 10:00 a.m. to 3:00 p.m. on Tuesday, August 14 through Thursday, August 16 for maintenance. One right lane of westbound I-595 from west of Hiatus Road to one mile east of NW 126 th Avenue will be closed from 10:00 a.m. to 3:00 p.m. on Tuesday, August 14 through Thursday, August 16 for maintenance. Northeast Broward

6 8. Broward Boulevard Improvements and Bridge Replacement Project in Fort Lauderdale Up to two lanes in each direction of Broward Boulevard from US 1 to NW 18 Avenue (500 feet maximum at a time) will be closed between 9 p.m. and 6 a.m. and Saturdays between 9 a.m. and 4 p.m. for sidewalk construction and street light pole installation. The sidewalk on the south side of the road from NW 18 Avenue to NW 15 Avenue is closed for construction. Signs are in place to direct pedestrians to the open sidewalk on the north side of the road. Description: Project improvements include replacing the bridge over the North Fork of the New River, removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, upgrading signs and pavement markings, relocating bus shelters, adding roadway lighting, installing drainage structures, upgrading signalized intersections to mast arms, reconstructing sidewalks, and widening roadway to add bike lanes in each direction. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $16 million / Summer Broward Mobility Project One lane on each direction of NW 31 Avenue from Oakland Park Boulevard to Commercial Boulevard will be closed Sunday through Thursday evenings between 8 p.m. and 5 a.m. for milling and resurfacing. One lane in each direction of SW 4 Avenue from SW 28 Street to SR 84 will be closed Sunday night through Thursday evenings between 8 p.m. and 5 a.m. for milling and resurfacing. Description: The improvements under this contract include constructing sidewalks, multi-use pedestrian paths, and bicycle lanes along 45 roadways in Broward County within Hollywood, Pembroke Pines, Davie, Plantation, Deerfield Beach, Pompano Beach, Lauderhill, Oakland Park, Lauderdale Lakes, and Fort Lauderdale. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $15 million / early A1A Landscaping Improvements Project from Oakland Park Boulevard to Flamingo Avenue in Fort Lauderdale One northbound lane of A1A from Oakland Park Boulevard to NE 34 Street will be closed Monday through Friday between 9 a.m. and 3 p.m. for landscaping and irrigation installation. Description: Project improvements include installing a new irrigation system in the median and along both sides of the road and installing plants in the median and along both sides of the road, including various species of palms, shade trees and shrubs. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $1,225,731 / Fall 2018

7 11. US 1 Improvements Project from Oakland Park Boulevard to Commercial Boulevard in Oakland Park and Fort Lauderdale The outside lane in each direction of US 1 from Oakland Park Boulevard to Commercial Boulevard will be intermittently closed Monday through Friday between 9 a.m. and 3 p.m. for pedestrian signal improvements. Description: Project improvements include removing existing asphalt and resurfacing the road repairing sidewalks along the roadway and constructing Americans with Disabilities Act (ADA) compliant curb ramps, adding a designated 4-foot bicycle lane on both sides of the roadway and upgrading pedestrian signals at NE 33 Court, NE 43 Street, NE 38 Court and Floranada Road. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: approximately $2 million / early SR 811 / NE 4 Avenue / Wilton Drive Complete Streets Project in Fort Lauderdale and Wilton Manors One northbound lane of SR 811 / NE 4 Avenue / Wilton Drive from Sunrise Boulevard to NE 11 Street will be closed Monday through Friday between 9 a.m. and 4 p.m. for median demolition. Description: Project improvements include removing old asphalt and resurfacing the roadway, upgrading signs and pavement markings, adding a buffered bike lane in each direction, widening sidewalks, upgrading pedestrian signals and modifying pedestrian curb ramps to meet ADA requirements, upgrading roadway and pedestrian lighting, and installing new drainage structures and upgrading the existing drainage system. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $3.3 million / late 2019 Northwest Broward 13. Sunset Strip Complete Streets Project from Sunrise Boulevard to Nob Hill Road in Sunrise All lanes open through Friday, August 17. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, upgrading crosswalk ramps to meet ADA requirements, adding roadway lighting, upgrading existing drainage structures and adding one new drainage structure east of NW 68 Avenue, replacing the signalized intersection at NW 64 Avenue with a roundabout, replacing the four-way stop sign at NW 19 Street with a roundabout, reconstructing sidewalks in various locations, upgrading signs and pavement markings, and adding bike lanes throughout the corridor as follows Nob Hill Road to NW 15 Street: Eliminating a travel lane by milling, resurfacing, and restriping to provide one 12-foot travel lane and a 6-foot bike lane separated by a 3-foot striped buffer; NW 15 Street to Sunrise Boulevard: Widening the road to accommodate 5-foot bike lanes; At the intersections of Nob Hill Road, Pine Island Road, University Drive and Sunrise Boulevard, two through lanes will be maintained in each direction

8 and the road will be widened to provide a 5-foot bike lane. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $3.4 million / Summer SR 7 Improvements Project from Commercial Boulevard to south of Glades Road in Tamarac, North Lauderdale, Fort Lauderdale, Margate, Coral Springs, Coconut Creek, Parkland and Palm Beach County Commercial Boulevard to Broward / Palm Beach County Line: One lane in each direction of SR 7 from north of NW 31 Street to south of the Broward / Palm Beach County Line will be closed Monday through Friday between 9 a.m. and 3 p.m. for the installation of drainage structures, concrete operations, and road widening. One southbound lane of SR 7 from Atlantic Boulevard to NW 31 Street will be closed Monday through Friday between 9 a.m. and 3 p.m. for conduit installation. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, upgrading pedestrian features including10-foot sidewalks on both sides and detectable warning surfaces at crosswalks, installing overhead sign structures, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, installing new bus shelters with bicycle racks, trash receptacles, and benches, upgrading drainage structures, upgrading signalization, including pedestrian signals and detectors and vehicle video detection, and upgrading lighting. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $13,403, / Late 2019 Broward / Palm Beach County Line to south of Glades Road: One lane in each direction of SR 7 from the Broward / Palm Beach County Line to south of Glades Road will be closed Monday through Friday between 9 a.m. and 3 p.m. for concrete, drainage, and sod placement. One lane in each direction of SR 7 from the Broward / Palm Beach County Line to south of Glades Road will be closed Sunday through Thursday evenings between 9 p.m. and 6 a.m. beginning Sunday, August 12 for milling and resurfacing. One northbound lane of SR 7 from the Broward / Palm Beach County Line to south of Glades Road will be closed Monday through Thursday evenings between 9 p.m. and 6 a.m. beginning Monday, August 13 for AT&T manhole adjustments. Description: The improvements under this contract include removing old asphalt and resurfacing the roadway, minor shoulder widening, upgrading drainage structures, upgrading pedestrian features including a 10-foot sidewalk on the west side and a 5-foot sidewalk on the east side, and detectable warning surfaces at crosswalks, upgrading signalization, including pedestrian signals and detectors and vehicle video detection, upgrading signs and pavement markings to include a 7-foot bike lane in each direction, and upgrading lighting. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $6,772, / Spring 2019

9 15.Districtwide Truck Parking Availability System Project in Martin, St. Lucie, and Broward Counties There are no anticipated traffic impacts on this project and no more than three (3) parking stops will be closed at a time at each location. All lanes are open through August 17. Description: On Monday, March 19, Traffic Control Devices, Inc. will begin installing a Truck Parking Availability System (TPAS) at rest areas and weigh stations in Martin, St. Lucie, and Broward Counties, which detects available spaces at rest areas and weigh stations and alerts commercial drivers via message boards. The Truck Parking Availability System installation will occur at the following locations: I-95 Northbound & Southbound Rest Areas in St. Lucie County at MM 133, two miles north of Orange Avenue / SR 68 (Exit 131), near Ft. Pierce; I-95 Northbound Rest Area in Martin County at MM 106, four miles south of Martin Highway / SR 714 (Exit 110), near Palm City; I-95 Southbound Rest Area in Martin County at MM 107, three miles south of Martin Highway / SR 714 (Exit 110), near Palm City; I-95 Southbound Weigh-in- Motion Station in Martin County at MM 113, one mile south of Becker Road (Exit 114), near Palm City; I-95 Northbound Weigh-in-Motion Station in Martin County at MM 92, four miles south of Bridge Road (Exit 96), near Hobe Sound; and I-75 Rest Area in Broward County at MM 34, 11 miles north of SR 25 / US 27 South (Exit 23), near Weston. For more information, contact Community Outreach Specialist Kathleen Dempsey at (772) or kdempsey@corradino.com. Cost/Completion: $2,285, Completion is expected in fall Florida s Turnpike All Electronic Tolling (AET) Phase 5A from I-595 to south of Lantana Road Westbound or eastbound Commercial Blvd. at various locations between Rock Island Rd. and east of S.R. 7 without affecting on and off ramps, single lane closures, 9:30 a.m. to 3:30 p.m., Monday, August 13 through Friday, August 17. Description of activities: subsurface explorations for foundation installation, and foundation installation for cantilever signs. Westbound or eastbound Atlantic Blvd. at various locations close to approach to southbound Florida s Turnpike on-ramp without affecting on and off ramps, and close to approach to NW 31st Avenue, single lane closures, 4:00 a.m. to 4:00 p.m., Monday, August 13 through Friday, August 17. Description of activities: subsurface exploration for installation of sign foundation, and sign foundations and sign panel installations. Westbound or eastbound Sample Rd. at various locations between Tradewinds Park Rd. and NW 27th Avenue without affecting on and off ramps, single lane closures, 9:00 a.m. to 3:30 p.m., Monday, August 13 through Friday, August 17. Description of activities: subsurface exploration for sign foundation installation, and installation of sign foundations. Westbound or eastbound Coconut Creek Pkwy. at various locations between Coconut Creek Blvd. to NW 27th Avenue, single lane closures, 9:00 a.m. to 3:30 p.m., Monday, August 13 through Friday, August 17. Description of activities: subsurface exploration for sign foundation installation, and installation of sign foundations. Northbound Florida s Turnpike (MP 62 to 63), single lane closures, 10:00 p.m. to 5:00 a.m., Monday, August 13 through Thursday, August 16 and Sunday, August 19.

10 Description of activities: clearing and grubbing on mainline right shoulder including demolition of concrete barrier wall. Left lane NB off-ramp to Commercial Blvd (Ramp C) (MP 62 to 63), single lane closures, 9:00 p.m. to 5 a.m., Monday, August 13 through Thursday, August 16 and Sunday, August 19. Description of activities: clearing and grubbing on left shoulder of ramp including demolition of concrete barrier wall. Florida s Turnpike southbound entrance ramp at Commercial Boulevard will be closed nightly from 9 p.m. to 5 a.m., Monday, August 13 through Thursday, August 16. DETOUR Motorists will be directed to travel east on Commercial Boulevard, then continue south on SR 7/US 441 and then continue west on Sunrise Boulevard to enter southbound Turnpike. * Please note, entrance and exit ramps will not be closed at the same time. Description: Work consists of providing all labor, materials, equipment, and incidentals necessary to continue with the complete conversion of the Florida s Turnpike Mainline to an All Electronic Toll (AET) collection system in Broward County. The comprehensive scope includes: milling and resurfacing, new pavement, drainage improvements, curb & gutter, lighting, highway signing, guardrail, MSE walls, toll facilities improvements, and other incidental construction on SR 91 (Turnpike Mainline) from I-595 (MP 54) to South of Lantana Toll Plaza (MP 88) for 34 miles in Broward and Palm Beach Counties. Construction to begin in Summer 2018 through the end of For more information, contact Fiorella Teodista at (954) or Fiorella.Teodista@dot.state.fl.us. Cost/Completion: $20.4 million / Summer Turnpike and Sunrise Boulevard (Exit 58) Interchange Modifications Lane Closures on Florida s Turnpike between Sunrise Boulevard (Exit 58) and Broward Boulevard Northbound and southbound, double lane closures, 10 p.m. to 6 a.m., Sunday, August 12, through Thursday, August 16. On these nights, a third lane may be closed in each direction beginning at 11 p.m. Sunrise Boulevard between Northwest 47 Avenue and Northwest 56 Avenue Eastbound and westbound, single daytime lane closure, 9 a.m. to 4 p.m. Monday, August 13 through Saturday, August 18. Nighttime single lane closure in each direction from 7 p.m. to 6 a.m. are possible Sunday, August 12 through Thursday, August 16. Ramp Closures The northbound off ramp to Sunrise Blvd will be closed 11 p.m. to 5 a. m., Wednesday, August 15, and Thursday, August 16. This closure is to relocate temporary barrier. The southbound on ramp from Sunrise Blvd will be closed 11 p.m. to 5 a.m., Monday, August 13 through Thursday, August 16. This closure is to install the gantry at Toll Site #3 and perform paving operations. Description: Florida s Turnpike is modifying and improving the interchange with Sunrise Boulevard and implementing All-Electronic Tolling at the interchange. For more information, contact Fiorella Teodista at (954) or Fiorella.Teodista@dot.state.fl.us. Cost/Completion: $50 million / late 2019 Southeast Broward

11 18. Hollywood Boulevard Complete Streets Project in Hollywood from east of City Hall Circle to Dixie Highway A portion of the left turn lane from westbound Hollywood Boulevard to southbound Dixie Highway will be continuously closed beginning Thursday, May 10 7 a.m. at through August for underground drilling to install a new water main underneath Dixie Highway. Left turns will be permitted from the remaining portion of the turn lane. This work will take place Mondays through Fridays between 7 a.m. and 7 p.m. Eastbound Hollywood Boulevard from 22 Avenue to Dixie Highway is temporarily closed while the contractor prepares to shift traffic south to the newly constructed road. Motorists are being detoured via S 24 Avenue and Van Buren Street. Eastbound Hollywood Boulevard from 22 Avenue to Dixie Highway is expected to be reopened Tuesday, August 14. Description: The improvements under this contract include removing old asphalt, resurfacing the roadway, adding decorative lighting, widening sidewalks and adding decorative pattern, upgrading existing pedestrian signals to countdown timers, constructing new median with parallel parking, replacing the existing water main and connections at various cross streets, and upgrading signs and pavement markings to reflect the new roadway configuration as follows: two lanes in each direction throughout the entire corridor, a four-foot bike lane in each direction separated by a two-foot buffer throughout the entire corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $7,667, / Summer A1A Improvements Project from Sheridan Street to Monroe Street in Hollywood Traffic has been shifted into a new pattern consisting of one lane in each direction of A1A and a dual left turn lane in the center of the road. Oklahoma Street at A1A will be closed beginning Monday, August 13 at 7 a.m. through Wednesday, August 22 at 7 a.m. for side street paver installation. Motorists traveling north or south on A1A to Oklahoma Street will be detoured via Cleveland Street and North Surf Road. Oklahoma Street will be accessible for westbound and eastbound local traffic only. To access A1A, motorists will be detoured via North Surf Road and Nebraska Street. Two lanes in each direction of A1A from Monroe Street to Hollywood Blvd will be closed Wednesday, August 15 through Wednesday, August 22 between 7 a.m. and 5 p.m. Description: Improvements under this project include removing old asphalt and resurfacing the roadway, widening sidewalks and upgrading ramps to meet ADA requirements, replacing drainage structures and installing flap gates, removing, narrowing, and /or upgrading medians and curb and gutter, adding 4-foot bike lanes from Monroe Street to Arizona Street, adding sharrows (share the road pavement markings) from Arizona Street to Sheridan Street, upgrading and installing new pedestrian signals, and minor signalization and street light improvements. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $9,366, / Spring 2019

12 Southwest Broward 20. SR 7 / US 441 Improvements from SW 25 th Street to Fillmore Street in West Park, Miramar, and Hollywood One of the two left turn lanes from southbound SR 7 to eastbound Hollywood Boulevard is continuously closed for median construction through August. One lane in each direction of SR 7 at Pembroke Road may be closed Monday through Saturday between 7 a.m. and 4 p.m. for ITS improvements, bus shelter installation, concrete improvements, and water main grouting and Sunday through Thursday evenings between 9 p.m. and 6 a.m. for asphalt improvements through August. One lane in each direction of SR 7 from SW 25 Street to Fillmore Street will be intermittently closed Monday through Saturday between 9 a.m. and 4 p.m. for concrete repairs, bus shelter improvements, and miscellaneous repairs through August. Two lanes in each direction of SR 7 from Pembroke Road to Fillmore Street will be closed overnight Sunday through Thursday between 9 p.m. and 6 a.m. for sewer improvements through August. One lane in each direction will be maintained. Northbound traffic on SR 7 from Mayo Street to Washington Street will be shifted slightly west for sewer improvements beginning Thursday, June 21 at 9 p.m. through mid-august. Two lanes of traffic will be maintained in each direction. One inside lane in each direction of SR 7 from Pembroke Road to Hollywood Boulevard is continuously closed for median construction through August. Description: The improvements under this contract include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians; constructing new storm sewer system and retention ponds; installing new water and sewer lines; constructing bus bays at current bus stop locations; constructing curbs and gutters; adding or replacing sidewalks with ADA compliant ramps on both sides of the road; upgrading existing signalized intersections with mast arms and adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard; improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441; adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $30.7 million. Completion in Fall SR 7 / US 441 Improvements Project from Fillmore Street to south of Stirling Road in Hollywood and the Seminole Indian Reservation One lane in each direction of SR 7 from Fillmore Street to south of Stirling Road may be closed intermittently Sunday through Thursday evenings between 10 p.m. and 5 a.m. Sheridan Street at SR 7 will be closed Friday, August 17 at 9 p.m. through Monday, August 20 at 5 a.m. for drainage construction. Motorists will be detoured to NW 56 Avenue, Stirling Road, NW 68 Avenue, NW 64 Avenue, and Taft Street. Description: Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system

13 and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and add pedestrian countdown timers at Johnson Street, Taft Street, and Sheridan Street, installing new signalized intersection and pedestrian countdown timers at Fillmore Street, improving street lighting along the corridor by installing new lighting system along the west side of SR 7/US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or Cost/Completion: $29.6 million / Spring Hallandale Beach Boulevard Improvements from SR 7 to Lake Shore Drive in Pembroke Park and West Park The outside westbound lane of Hallandale Beach Boulevard from SW 32 Avenue to SW 44 Avenue is continuously closed through Friday, August 10 for drainage improvements. Description: The improvements under this contract include adding new drainage along project corridor, removing old asphalt and resurfacing the roadway within project limits, installing new traffic signal mast arms and pedestrian countdown timers at SW 56th Avenue and SW 40th Avenue, and installing 4-foot bike lanes throughout the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $6.6 million. Completion in early US 27 Improvements Project in Pembroke Pines, Miramar, and Southwest Ranches All lanes open through Friday, August 17. Description: The improvements under this contract include removing old asphalt and resurfacing, constructing a buffered 7-foot bike lane in both directions, widening at existing intersections, and installing new lights and pavement markings along the corridor. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com. Cost/Completion: $8.5 million / Summer Advanced Traffic Management System Installation on Pines Boulevard from Dykes Road to Flamingo Road in Pembroke Pines Up to two lanes in each direction of Pines Boulevard at signalized intersections from Flamingo Road to Dykes Road may be closed intermittently Sunday through Thursday evenings between 10:30 p.m. and 5:30 a.m. for installation of video detection and / or incident management cameras at intersections. Description: The improvements under this contract include the installation of Intelligent Transportation System (ITS), Adaptive Traffic Control System (ATCS), and Advanced Transportation Management System (ATMS) components. These include enhancements to vehicle detection, fiber optic communications infrastructure, traffic monitoring cameras, and new poles and data collection devices at the eight signalized intersections and the I-75 interchange

14 within the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or Cost/Completion: $2,949,000 / Late Stirling Road At I-95 Lighting Improvements Project In Hollywood and Dania Beach All lanes open through Friday, August 17. Description: The improvements under this contract include installing 11 additional light poles and luminaires on both sides of Stirling Road from west of SW 19 Court to SW 18 Court, upgrading pedestrian crosswalk signal near the on-ramp from Stirling Road to northbound I-95, and upgrading signs within the project limits, including pedestrian crossing signs and signal ahead signs. For more information, contact Community Outreach Specialist Dayana Diaz at (954) or ddiaz@corradino.com. Cost/Completion: $199,400/ fall Hollywood Gardens West Sidewalk Improvements Project in Hollywood No lane closures are expected for this project. Description: The improvements under this contract include updating striping on the existing roadway to provide up to 7-foot bike lanes in each direction on Columbus Parkway and Glenn Parkway from south of Johnson Street to south of Tyler Street, adding sharrow pavement markings (share the road arrows) on N 58 Avenue from Johnson Street to Hollywood Boulevard, Lincoln Street and Polk Street from SR 7 to N 56 Avenue and Taft Street from N 20 Avenue to N 14 Avenue, constructing new sidewalks and repairing damaged sidewalks, modifying and adding drainage structures and regrading swale areas, relocating mailboxes and fences, and removing trees as needed to accommodate the proposed improvements and installing light poles and signs throughout the project limits. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com.. Cost/Completion: $2,654, / spring Davie Road Park and Ride Lot Improvements in Davie The park and ride lot is closed through spring While construction is ongoing, 595 Express Route 114 will temporarily serve the Fort Lauderdale Airport Tri-Rail Station in Dania Beach. Customers can also board the bus at the BB&T Center in Sunrise. Description: The improvements under this contract include adding 101 additional parking spaces for a total of 206 spaces, including 7 disabled spaces, improving lighting within the existing Park and Ride facility, installing ITS components for an Intelligent Parking System, including a dynamic message sign on eastbound SR 84 approaching Davie Road that will indicate the number of available spaces, improving sidewalk, drainage and driveways, relocating bus shelters and bus shelter pads, installing detectable warning surfaces and vehicle detection system, and upgrading signing and pavement markings. For more information, contact Community Outreach Specialist Rebecca Guerrero at (954) or rguerrero@corradino.com or visit Cost/Completion: $1,075, / spring 2019

15 Maintenance & Permit Projects: 28. Henry E. Kinney Tunnel on US 1 in Fort Lauderdale The northbound lanes will be closed overnight Tuesday, August 14 from 10 p.m until 5 a.m. Wednesday for monthly cleaning. The southbound lanes will be closed overnight Wednesday, August 15 from 10 p.m. until 5 a.m. Thursday. During these closures traffic will be detoured to the SE 3 rd Avenue via Broward Boulevard on the north and SE 6 Street on the south. 29. Bridge and Roadway Improvements in Pompano Beach The outside eastbound lane of the Atlantic Boulevard Bridge over the Intracoastal Waterway will be closed through September The sidewalk on the south side of the Atlantic Boulevard Bridge over the Intracoastal Waterway will be closed through September Signage will be in place to direct pedestrians. For more information about this work, please contact Burkhardt Construction, Inc. Project Manager Brandon Rhodes at (561) or brandon@burkhardtconstruction.com. 30. Sewer Line Improvements in Fort Lauderdale SE 6 Avenue from SE 1 Street to Broward Boulevard will be closed Monday, July 23 through Friday, August 24. Two eastbound lanes of the Broward Boulevard at US 1 will be closed Monday, July 23 through Friday, August 24. Access to 6th Avenue from Las Olas Blvd will be closed permanently Monday, May 28 through Friday, August 24 and detour signage will be in place. Two lanes in each direction of Broward Boulevard at US 1 will be closed Monday, August 27 through Friday, September 28. For more information about this work, please contact C&W Pipeline Inc. representative Juan Urrutia at (305) or cwpipeline@hotmail.com. 31. Signal Improvements in Fort Lauderdale One lane in each direction of Sunrise Boulevard at NE 10 Avenue will be closed Monday through Friday between 9 a.m. and 3 p.m. For more information about this work, please contact FDOT Project Administrator Tim Butler at Tim Butler (954) or Timothy.Butler@dot.state.fl.us. 32. Roadway and Sidewalk Improvements in Hallandale Beach The sidewalk on the west side of the road and the outside southbound lane of A1A north of Hallandale Beach Boulevard will be closed Mondays through Fridays between 9 a.m. and 4 p.m. through Friday, October 26 For more information about this work, please contact City Engineering Contractors representative Shawn Alava at shawn@cityengineering.net or (786) Turn Lane Construction in Davie

16 One eastbound lane of Griffin Road from SW 64 Avenue to SW 62 Avenue will be closed Monday, June 18 through Tuesday, September 18 between 9 a.m. and 3:30 p.m. For more information about this work, please contact JD Backhoe representative Bruce Clair at (954) or bruce@jdbackhoe.com. 34. I-95 and SR 84 Maintenance I-95 at the C-10 Spur Canal, just north of Sheridan Street, will have one outside lane closed in each direction, 9:30 p.m. until 5:30 a.m., Sunday, August 12 through Thursday, August 16. Advanced Notice: I-95 at the Dania Cut-Off Canal, south of SR-84/Marina Mile Boulevard, will have one outside lane closed in each direction, 9:30 p.m. until 5:30 a.m., Sunday, August 19 through Thursday, August 23. I-95 southbound under westbound SR-84/Marina Mile Boulevard will have one inside lane closed, 9:30 p.m. until 5:30 a.m., Sunday, August 26 through Thursday, August 30. For more information about this work, please contact I-95 Project Spokesperson & Community Outreach Specialist Andrea Pacini at (954) or apacini@corradino.com. 35. FPL Improvements in Hollywood One eastbound lane of Stirling Road at I-95 will be closed Monday, July 9 at 8 a.m. through Friday, August 17 at 8:30 a.m. For more information about this work, please contact Hypower Inc. representative Cliff Spitzer at (954) or cspitzer@hypowerinc.com. 36. Light Pole Installation in Fort Lauderdale The turn lane from southbound SR 7 to Off Lease Only (at SW 8 Court) will be closed Monday through Saturday between 9 a.m. and 4 p.m. Monday, July 23 through Friday, August 24. For more information about this work, please contact Florida Engineering representative Raul Escamilla at (305) or ralexander@floridaengineering.net. 37. Broward County Transit Landscaping Improvements in Fort Lauderdale One lane in each direction of Broward Boulevard at NW 25 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 25 Terrace will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 28 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 28 Way will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 29 Terrace will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 30 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m.

17 One lane in each direction of Broward Boulevard at NW 32 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 33 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 35 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 36 Avenue will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. One lane in each direction of Broward Boulevard at NW 38 Way will be closed Wednesday, August 1 through Thursday, August 30 between 9 a.m. and 5 p.m. For more information about this work, please contact Broward County Transit representative Ralph Viola at (954) or rviola@broward.org. 38. Turn Lane Construction in Dania Beach One westbound lane of Stirling road west of US 1 will be closed Monday, July 30 through Friday, September 28 between 9 a.m. and 4 p.m. For more information about this work, please contact Ryan Southern Inc. representative Kendall Crayton at (954) or kcrayton@ryanfl.com. 39. Turn Lane Construction in Hallandale Beach One southbound lane of US 1 from NE 3 Street to NE 4 Street will be closed Thursday, July 19 through Friday, August 31 between 9 a.m. and 4 p.m. For more information about this work, please contact EMS Site Development, LLC representative Mia Lutz at (561) or mia@emssitedevelopment.com. 40. Conduit Installation in Tamarac One southbound lane of University Drive from NW 50 Street to NW 57 Street will be closed Monday, August 6 through Monday, August 27 between 9 a.m. and 4 p.m. For more information about this work, please contact Mastec representative Lazaro Martinez at (305) or lazaro.martinez@mastec.com. 41. Sign Repair in Deerfield Beach Two northbound lanes of I-95 north of SR 869 Sawgrass Expressway will be closed overnight Monday, August 13 and Tuesday, August 14 between 9 p.m. and 4 a.m. For more information about this work, please contact Roy Jorgensen representative Simon R. Castro at (954) or simon_castro@royjorgensen.com. 42. I-595 Maintenance in Fort Lauderdale Three eastbound lanes of I-595 east of SR 7 / US 441 will be closed overnight Wednesday, August 15 and Thursday, August 16 between 9 p.m. and 4 a.m. For more information about this work, please contact Roy Jorgensen representative Simon R. Castro at (954) or simon_castro@royjorgensen.com. 43. Utility Improvements in Fort Lauderdale One eastbound lane of SE 17 Street / A1A from Cordova Road to Portside Drive will be closed Monday through Friday between 9 a.m. and 4 p.m. through Friday, August 31.

FDOT Broward County Traffic Report April 20 through April 27, 2018

FDOT Broward County Traffic Report April 20 through April 27, 2018 FDOT Broward County Traffic Report April 20 through April 27, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week

More information

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018

FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FDOT Broward County Traffic Report June 29, 2018 through July 6, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report April 27 through May 4, 2018

FDOT Broward County Traffic Report April 27 through May 4, 2018 FDOT Broward County Traffic Report April 27 through May 4, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95

FDOT Broward County Traffic Report August 31, 2018 through September 7, Interstate 95 FDOT Broward County Traffic Report August 31, 2018 through September 7, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95

FDOT Broward County Traffic Report September 14, 2018 through September 21, Interstate 95 FDOT Broward County Traffic Report September 14, 2018 through September 21, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report March 2 through March 9, 2018 FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95

FDOT Broward County Traffic Report May 11 through May 18, Interstate 95 FDOT Broward County Traffic Report May 11 through May 18, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Palm Beach County Traffic Report November 16 through November 23, 2018

Palm Beach County Traffic Report November 16 through November 23, 2018 November 16, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report November 16 through November 23, 2018 Palm Beach County Palm Beach County traffic will

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 13 December 19, 2018 Alico Road Widening from Ben Hill Griffin

More information

Palm Beach County Traffic Report January 11 through January 18, 2019

Palm Beach County Traffic Report January 11 through January 18, 2019 January 11, 2019 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report January 11 through January 18, 2019 Palm Beach County Palm Beach County traffic will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 20, 2018 January 2, 2019 Alva Bridge & Big Carlos Pass Bridge:

More information

Palm Beach County Traffic Report October 26 through November 2, 2018

Palm Beach County Traffic Report October 26 through November 2, 2018 October 26, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report October 26 through November 2, 2018 Palm Beach County Palm Beach County traffic will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 9 November 15, 2017 Update: 11/9/17 3:45 p.m. New Pass, Bridge

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE November 10 th, through November 16 th, 2016 Alico & Gator Road Intersection

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 10-16, 2019 Summerlin Road & Colonial Blvd: Lee County DOT will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update April 1, 2016 Corkscrew Road West of I-75: Lee County DOT will

More information

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018 Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May5 th through May 11 th, 2016 Road Maintenance This Week Striping Maintenance:

More information

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018

Department of Transportation 1500 Monroe Street. FortMyers,FL (239) (239) Fax ROAD WATCH UPDATE. July 19 - July 25, 2018 ^Lee County Jt Southwest T:[o ln Onaa Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE July 19 - July 25, 2018 Sanibel Bridge

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 24 August 30, 2017 Hancock Bridge Parkway: Lee County DOT will

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 24-30, 2019 Corbett Road: Motorists who use Corbett Road in North

More information

^Lee County Jt Sotft^West T:foH^a Lee County

^Lee County Jt Sotft^West T:foH^a Lee County ^Lee County Jt Sotft^West T:foH^a Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 11th through August 17th, 2016

More information

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913

Florida Department of Transportation Daniels Parkway Fort Myers, FL 33913 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update January 3-9, 2019 RICK SCOTT GOVERNOR Florida Department of Transportation

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax RoadWatch Update December 6 December 12, 2018 South Pointe Boulevard & College Parkway:

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax ROAD WATCH UPDATE Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE May 25 May 31, 2017 College Parkway: Lee County DOT will be trimming

More information

Update January 4, 2016

Update January 4, 2016 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE Update January 4, 2016 Cape Coral - Del Prado Boulevard Lee County DOT

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 30 September 5, 2018 Buckingham Road: Florida Power and Light

More information

^ Lee County ^OU fewest T:foH^ Lee County

^ Lee County ^OU fewest T:foH^ Lee County ^ Lee County ^OU fewest T:foH^ Lee County Department of Transportation 1500 Monroe Street FortMyers,FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 18th through August 24th, 2016 Ben

More information

February 11, 2016 TPO Board Presentation

February 11, 2016 TPO Board Presentation February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)

More information

Completing the Vision

Completing the Vision Villas of Positano Completing the Vision North A1A Lane Reconfiguration N. Surf Rd. Redirection of Traffic Margaritaville Resort March 4, 2014 1 Completing The Vision Project Limits Hollywood Blvd. to

More information

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: , TOWN OF PALM BEACH DATE: November 9, 2018 FOR IMMEDIATE RELEASE MEDIA CONTACT: Patricia Strayer, P.E., Town Engineer Phone: 561-838-5440, Email: pstrayer@townofpalmbeach.com Construction & Traffic Highlights

More information

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street)

Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE August 17 August 23, 2017 Traffic Maintenance: Signal Maintenance Bonita

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax. ROAD WATCH UPDATE June 15, 2018 Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE June 15, 2018 New Update: Landscape: Lee County Department of Transportation

More information

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CALL TO ORDER: 9:30 a.m. ROLL CALL: PLEDGE OF ALLEGIANCE: Vice Mayor Diane Glasser

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018

Broward Complete Streets Advisory Committee (CSAC) Meeting. Monday, September 24, 2018 Broward Complete Streets Advisory Committee (CSAC) Meeting Monday, September 24, 2018 HOUSEKEEPING Please make sure you have signed in and have an agenda. This meeting is being recorded. Please introduce

More information

Mandan Commission Meeting August 2, 2016 Mandan City Hall

Mandan Commission Meeting August 2, 2016 Mandan City Hall Mandan-Bismarck Corridor Improvement Study Mandan Commission Meeting August 2, 2016 Mandan City Hall 2014 HDR, Inc., all rights reserved. Mandan Corridors Study Schedule 2015 2016 Study Kick Off August

More information

Complete Streets Advisory Committee Meeting Summary

Complete Streets Advisory Committee Meeting Summary Complete Streets Advisory Committee Meeting Summary September 24, 2018 BrowardMPO.org Broward MPO Complete Streets Advisory Committee (CSAC) September 24, 2018 ADVISORY COMMITTEE MEETING 2 MEETING PARTICIPANTS

More information

I 595 Express Corridor Improvements Project. February 2014 Update

I 595 Express Corridor Improvements Project. February 2014 Update I 595 Express Corridor Improvements Project February 2014 Update PROJECT COMPONENTS Reversible Express Lanes Direct Connect to Florida s Turnpike Open Road Tolling SR 84 Continuous Connection Florida s

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

U.S. HIGHWAY 50 IMPROVEMENT PROJECT

U.S. HIGHWAY 50 IMPROVEMENT PROJECT U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission

Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission FOR IMMEDIATE RELEASE Date: October 31, 2014 Kalamazoo County Weekly Project Updates from the Cities of Portage, Kalamazoo and the Kalamazoo County Road Commission Kalamazoo, MI- In a collaborative effort

More information

Florida Department of Transportation MIKE DEW SECRETARY

Florida Department of Transportation MIKE DEW SECRETARY RICK SCOTT GOVERNOR Florida Department of Transportation MIKE DEW SECRETARY June 7, 2018 JoAnn May, 239-225-1900 JoAnn.May@dot.state.fl.us DISTRICT ONE NORTHERN COUNTIES ROADWATCH REPORT #23 FOR WEEK OF

More information

Pinellas County Traffic Advisory

Pinellas County Traffic Advisory 12/22/17 2:00PM For up-to-date information regarding traffic (crashes) on Pinellas County roadways that are monitored by our Intelligent Transportation System (ITS) Smart Tracs cameras - follow us on Twitter

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Lee County Department of Transportation

Lee County Department of Transportation Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE New Updates & Revisions September 3 rd, through September 9 th, 2015

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI

INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:

More information

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES

CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES CITY OF WOODINVILLE ONGOING CAPITAL IMPROVEMENT PROJECT UPDATES PROJECT LOCATION MAP (1) DEYOUNG PARK IMPROVEMENTS Project Description - DeYoung Park Improvements include treehouse deck, play area, new

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

PROJECT FACT SHEET May 25, 2018

PROJECT FACT SHEET May 25, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

Meadow Woods Elementary School

Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Meadow Woods Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017

Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active

More information

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018 Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

San Tomas Expressway

San Tomas Expressway Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San

More information

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT

I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT I-215 / NEWPORT ROAD INTERCHANGE PROJECT PRESS KIT March I-215 / NEWPORT ROAD INTERCHANGE PROJECT Fact Sheet Project Overview This project will reconstruct the existing interchange located on Interstate

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Hollywood/Pines Boulevard Multimodal Corridor Study

Hollywood/Pines Boulevard Multimodal Corridor Study Hollywood/Pines Boulevard Multimodal Corridor Study FINAL REPORT Prepared for: Broward County Metropolitan Planning Organization Prepared by: Kimley-Horn and Associates, Inc. Fort Lauderdale, Florida Kimley-Horn

More information

PROJECT FACT SHEET March 21, 2018

PROJECT FACT SHEET March 21, 2018 SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

LANE ELIMINATION PROJECTS

LANE ELIMINATION PROJECTS PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Fulton Market Streetscape

Fulton Market Streetscape Fulton Market Streetscape Ogden Avenue to Halsted Street Public Meeting Recommended Improvements December 10th, 2014 Meeting Purpose and Goals Present Existing Conditions Community Input and Charrette

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Why invest in the 1 Street S.W. Corridor?

Why invest in the 1 Street S.W. Corridor? Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018

SR 2108-A12 Forbes Avenue Betterment. March 1, 2018 SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

PUBLIC REALM MASTER PLAN

PUBLIC REALM MASTER PLAN WESTSHORE BUSINESS DISTRICT PUBLIC REALM MASTER PLAN MASTER PLAN COMMITTEE MEETING MARCH 20, 2013 WESTSHORE BUSINESS DISTRCT PUBLIC REALM MASTER PLAN MACRO-SCALE CONCEPT: A PUBLIC REALM FRAMEWORK DEFINED

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

COMPLETE STREETS DURING CONSTRUCTION

COMPLETE STREETS DURING CONSTRUCTION COMPLETE STREETS DURING CONSTRUCTION MAINTAINING ACCESSIBILITY FOR ALL Presented by Robbie Burgess, P.E., PTOE Associate Principal Construction Services Manager Howard Stein Hudson rburgess@hshassoc.com

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information