1 Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7 $51.2 Congestion Management set aside $51.4 $65.6 $81.1 1st Bridge Golden Glades Multi-modal Facility Upgrade Golden Glades Multimodal Terminal I-95 (NB) Ramp to Turnpike/SR 826 Miami Beach Intermodal Center over Miami River 63rd Collins US-1 Tri-Rail/MDT Terminal 87th West Bay Drive Bridge replacement Capacity improvement, including a pedestrian overpass to connect Golden Glades intermodal center to business park west of CSX tracks 1,000 space deck, intermodal center with improved bus circulation and improved ADA, Replace multiple existing pedestrian bridges with a single-level bridge Add 1 auxiliary/ acceleration lane New North Beach bus transfer station $13.9 $96.5 $0.9 $3.2 $2.7 $20.4 $1.8 $18.0 $3.4 C-28 Miami-Dade Metropolitan Planning Organization

2 NW 14th NW 25th NW 25th NW 25th Viaduct NW 87th NW 87th extension NW 107th NW 107th NW South River Drive Parking expansion at Opa-Locka Tri-Rail station Civic Center NW 89th Court NW 89th Court SR 826 NW 36th NW 58th NW 41st 1000ft N of NW 122nd NW 19th Opa-Locka Tri-Rail Station Biscayne Boulevard HEFT SR 826 NW 87th Court NW 58th NW 95th NW 25th Okeechobee Road NW 23rd Widen to 3 lanes (2 to 3) $0.3 $1.3 $0.2 $0.2 $0.4 Traffic signal improvements; improve intersections to $5.0 $3.0 $20.2 accommodate truck movements. $64.7 Phase 2 - construction of Viaduct from SR $ to NW 87th Court $0.8 $2.4 $13.6 $0.1 $0.3 $0.7 Extend to connect the freight hubs of $3.5 $3.0 $10.1 $0.3 $0.7 $1.7 Doral and Medley $0.8 $5.0 $12.5 $0.1 $0.3 $0.6 Widen bridge over Miami Canal $5.9 $0.1 $0.1 $0.1 Widen Tamiami Swing Bridge to 4 lanes Opa-Locka Tri-Rail station parking improvements $2.2 $44.6 $0.1 $0.1 $0.2 $0.4 $2.6 C-29 Miami-Dade Metropolitan Planning Organization

3 Port of Miami South Beach bus transfer station SR 25/Okeechobee Road SR 823/NW 57th /Red Road SR 823/NW 57th /Red Road SR 823/NW 57th /Red Road SR 823/NW 57th /Red Road SR 860/NW 186th /Miami Gardens Drive SW 137th SW 137th SW 264th SW 264th/SW 268th St at NW 154th W 19th Okeechobee Road W 53rd W 23rd NW 97th SW 136th SR 94/ Kendall Drive US-1 SW 24th US-1 SW 147th Ave W 23rd W 19th W 65th W 46th I-75 Kendall Drive SR 90/SW 8th SW 184th SW 8th SW 147th SW 112th Construct parking garage - intermodal hub capacity New South Beach bus transfer station Traffic signals Widen to 5 lanes (4 to 5) New 4 lanes New 2-lane Roadway improvements $10.5 $1.8 $1.9 $31.5 $15.4 $25.9 $43.2 $2.2 $15.8 $10.9 $12.36 $46.89 $52.9 $28.8 $0.6 $8.5 $0.1 $0.3 $0.7 $0.1 $0.5 $2.5 $0.1 $0.1 $0.2 $1.3 $4.1 $20.7 $0.4 $0.9 $2.2 C-30 Miami-Dade Metropolitan Planning Organization

4 SW 320th / Mowry Drive SW 328th / North Canal Drive Truck Parking Improvement Truck Parking Improvement West 24th Downtown/Port Access I-95 S. Dixie Highway W 52nd Golden Glades SW 187th US-1 Okeechobee Road W 76th Broward County Line with continuous left turn lanes (2 to 4) $3.6 $4.6 $18.2 $0.1 $0.3 $0.7 Intersection improvements - $0.1 $0.1 $0.5 $0.1 $0.1 $0.1 add turn lanes Provide a location in the area of Okeechobee and the HEFT for longterm $0.3 $1.3 $1.7 truck parking and staging. Develop a truck staging area near NW 36th and NW 37th $0.4 $1.2 $2.7 for the Port of Miami River. Widen to 5 lanes (2 to 5) $0.4 $13.2 $0.6 $0.7 $1.7 Construct I-95 NB Slip Ramp on NW 6th St; Implement NE/NW 5th/6th St/Port Blvd. $2.4 $0.1 $43.3 improvements for access between POM and I-95 slip ramp Special use lanes (managed lanes) $105.1 MIC Loan Repayment $93.0 C-31 Miami-Dade Metropolitan Planning Organization

5 SR 821/HEFT Eureka Drive Kendall 67th SR 836/Dolphin SR 886/Port Bridge SR 924/Gratigny Parkway Extension (west) SW 127th SW 152nd Venetian Causeway Bridge Farmlife Roadway Expansion SR 836 NW 12th SR 826/I-75 SW 120th SW 147th Bayshore Drive SW 312th (Campbell Drive) NW 87th on I-75 Ramp to I-95 HEFT SW 144th SW 157th Purdy SW 328th (Lucy ) Widen to 8-, 10-, 12-lanes plus auxiliary lanes Special use lanes improvements - reconstruct as SPUI interchange Ramp to I-95 Repairs to bascule rail and vehicle bridge Limited access facility providing a connection between HEFT, I-75, SR 924, SR 826 New 4 lanes / Bridge replacement with left turn lanes $550.3 $13.9 $87.3 $68.3 $24.5 $143.7 $184.5 $42.2 $79.2 $371.8 $1.5 $5.7 $0.1 $0.2 $0.6 $2.5 $12.2 $0.2 $1.0 $0.7 $11.5 $0.1 $0.6 $4.9 $185.9 $0.2 $1.2 $4.4 $5.5 $22.1 $0.2 C-32 Miami-Dade Metropolitan Planning Organization

6 Freight Rail Safety and Security I-395 East of I-95 Medley Bridge/ Canal Improvement Program NW 82nd NW 97th NW 170th Perimeter Road NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave NW 8th NW 58th HEFT NW 20th MacArthur Causeway Bridge NW 12th NW 74st NW 97th NW 57th Safety and security enhancements of freight transportation system, including grade crossing improvements and signal upgrades $12.2 $60.8 Major capital improvement $210.9 $397.5 $795.0 Improve the connections between Okeechobee Rd and Medley through a combination of bridge widening and canal improvements (NW 121 Way, NW 116 Way, NW 105 Way, NW 79 Ave) New 4 lanes New 4 lanes / New 6 lanes $2.0 $8.2 $2.4 $0.4 $39.8 $0.3 $4.4 $21.8 $0.2 $13.6 $17.0 $67.8 $1.2 $5.9 $29.7 $0.8 C-33 Miami-Dade Metropolitan Planning Organization

7 South Florida Rail Corridor SR 5/US-1/ Biscayne Boulevard SR 823/NW 57th /Red Road (EB) to I-95 57th (NB) (EB) to NW 167th SR 836/Dolphin SR 874/Don Shula Ramp Connector SR 924/Gratigny Parkway Extension (east) North of Hialeah Market W 65th Okeechobee Road SW 136th NW 32nd North of MIC W 84th NW 103rd NW 87th SR 874 I-95 Double tracking of the remaining single track of Tri-Rail $8.4 $13.2 $41.6 Expand SB left turn lane for trucks $0.4 $2.2 entering Port $33.2 Operational improvement within the $3.5 $35.1 Golden Glades Improvements - reconstruct as $28.7 $169.2 SPUI interchange Addition of 1 auxiliary lane $1.4 $14.0 Operational improvement within the $35.1 Golden Glades improvement $189.5 Ramp connection to SW 136th $32.0 $25.9 $302.3 Limited access facility providing E/W mobility to I-95 $62.1 $108.0 $238.3 $316.4 C-34 Miami-Dade Metropolitan Planning Organization

8 SR 985/SW 107th Truck By-Pass SW 8th North of SW 8th SR-5/US-1 SW 296th Along Flagler / Civic Court SW 328th (Lucy ) Flagler SW 328th (Lucy ) SW 136th NW 6th SW 296th $18.7 $76.3 $43.0 (2 to 4 ) New 2 lanes (Companion project with Krome widening SW 328th to SW 296th ) (2 to 4) (Companion project with Krome truck bypass) $91.0 $190.4 $130.1 $28.5 $152.3 $48.8 $72.8 $57.9 $82.4 C-35 Miami-Dade Metropolitan Planning Organization

9 SW 72nd / Sunset Drive SW 104th / Killian Parkway SW 157th SW 157th SW 200th SW 312th / Campbell Drive SW 312th / Campbell Drive SW 117th SW 160th SW 8th SW 184th US-1 SW 152nd SW 157th SW 167th SW 42nd SW 216th Quail Roost Drive SW 137th New 4 lanes / New 4 lanes / New 2 lanes Turnpike access ramps (west-tonorth and southto-west) with left turn lanes $3.8 $63.4 $2.0 $0.5 $2.1 $6.9 $0.1 $1.0 $8.7 $16.2 $2.5 $1.8 $0.4 $28.6 $0.3 $1.5 $23.4 $0.8 $3.1 $15.6 $0.1 $4.1 $5.2 $20.6 $0.5 C-36 Miami-Dade Metropolitan Planning Organization

10 SW 312th / Campbell Drive US-1 (Busway) US-1 (Busway) West NW 14th SW 176th SW 88th SW 88th North of Lincoln Road SW 197th Ave HEFT Florida City Florida City South of 18th Additional parkand-ride lots at selected locations Bus signal priority New connector bridge $3.5 $8.6 $67.5 $0.6 $5.9 $42.5 $50.1 $52.7 $0.5 $1.8 $1.5 $5.3 $4.7 $0.1 Partially Funded Projects SR 826/ Palmetto East-West/Dolphin Corridor Premium Transit* FEC Corridor* Additional Tracks at Miami Intermodal Center** I-75 Golden Glades MIC Vicinity of FIU Downtown Miami Miami Intermodal Center Broward County Line Add Special Use Lanes Premium transit service Passenger rail on the FEC corridor Construct passenger rail tracks to allow Amtrak service at the MIC and/or commuter rail *Preliminary phases (Planning,, and/or ROW) funded in TIP (Priority 1) **Illustrative project $73.6 C-37 Miami-Dade Metropolitan Planning Organization

11 SR25/Okeechobee Rd/US 27 79th Krome Conversion - Construct Grade Separated Overpasses at Major Intersections $43.5 Metrorail North Corridor Extension* SW 82 Ave* SW 102 Ave* SR 836/Dolphin SR 836/I-95 Corridor Martin Luther King Jr. Metrorail station Tamiami Canal Tamiami Canal NW 42nd / NW 27th West of NW 17th NW 215th St/ NW 27th Ave NW 17th /NW 57th I-95 Premium transit service along NW 27th Ave Bridge Construction Bridge Construction EB Auxiliary Lane from NW 42nd Avnuee to NW 17th ; WB Auxiliary Lane from NW 27th to NW 57th and associated interchange improvements at NW 42nd and NW 27th Corridor Improvements $55.9 $128.2 *Preliminary phases (Planning,, and/or ROW) funded in TIP (Priority 1) C-38 Miami-Dade Metropolitan Planning Organization

12 SR 836/Dolphin SR 836/SR 112 Interconnector HEFT SR 836/ Lejeune interchange SR 826/836 SR 112/37th interchange SR 836/SR112 SR 826 I-95/I-395 Connect 4Xpress SR 836 Southwest Extension* SR 5/US-1 SR 25/Okeechobee Road Central Miami-Dade County NW 137th Ave Dadeland South SR 826 North Miami- Dade County SW Miami- Dade I-95 Krome Conversion of general purpose lanes to managed lanes Express connection between SR 836 and SR 112 in the general alignment of 37th/42nd avenues Conversion of general purpose lanes to managed lanes Limited access N/S facility connecting the northern and central portion of the County. Multimodal Corridor Multi-modal transportation corridor Corridor improvements and managed lanes Conversion to limited access toll facility $30.7 $100.2 $1.1 $112.3 $100.0 $117.0 $60.8 *Preliminary phases (Planning,, and/or ROW) funded in TIP (Priority 1) C-39 Miami-Dade Metropolitan Planning Organization

13 Dadeland US-1 Busway Florida City Managed Lanes $65.1 South SR 821/HEFT SR 836 I-75 Widen to 10-lanes $3.0 SR 821/HEFT I-75 $28.6 Modification Turnpike SR 821/HEFT I-75 Widen to 8-lanes $0.2 Mainline Biscayne Dr SR 821/HEFT Campbell Dr Widen to 6-lanes $0.9 (SW 288th St) SR 821/HEFT Golden Glades Biscayne Dr (SW 288th ) SR 826 (EB) I-75 SR-826 NW 103rd SW 216th I-95 (NB) Broward County Line I-75 Widen to 8-lanes $2.3 Ramp Improvements to provide direct system to system connection Add special use lanes and provide an envelope for future transit service Provide transit envelope for future transit service $5.6 $24.7 $20.1 $1.3 C-40 Miami-Dade Metropolitan Planning Organization

TRANSPORT AT ION PLAN

TRANSPORT AT ION PLAN MPO for the Miami Urbanized Area TRANSPORT AT ION PLAN DRAFT SOUTH MPClED THE SOUTH AREA The South Area of analysis in Miami-Dade County covers the area to the south of Coral Reef Drivel152 nd Street to

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Alternatives Public Workshop

Alternatives Public Workshop US 1 Express Lanes Project Development & Environment (PD&E) Study Alternatives Public Workshop August 2013 1 Today s Agenda Project Background and Overview Tier 1 Alternatives Development Tier 2 Decision-Making

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

US 1 Express Lanes Public Kick-Off Meeting

US 1 Express Lanes Public Kick-Off Meeting US 1 Express Lanes Project Development & Environment (PD&E) Study Public Kick-Off Meeting September 7 & 8, 2011 Miami Dade County, Florida 1 Presentation Agenda Introduction to MDX Background to PD&E studies

More information

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION Project Development and Environment PD&E Study Miami-Dade County, Florida Citizens Advisory Committee Meeting March 13, 2018 ETDM NUMBER: 11482 MDX WORK

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018

Turnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018 Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006

Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Project Development & Environment (PD&E) Study Public Hearing January 12 th, 2006 Public Hearing Regulations Chapter 23 of United States Code 128 Title 40 of the Code of Federal Regulations Parts 1500

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)

More information

Proposed Project I 35 from Denton to Cooke County Line

Proposed Project I 35 from Denton to Cooke County Line Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity

More information

Status February Transportation Priority Projects in Chester County

Status February Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County February 2018 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.6 2017-2019 2 US 202 at PA 926

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Hollywood/Pines Boulevard Multimodal Corridor Study

Hollywood/Pines Boulevard Multimodal Corridor Study Hollywood/Pines Boulevard Multimodal Corridor Study FINAL REPORT Prepared for: Broward County Metropolitan Planning Organization Prepared by: Kimley-Horn and Associates, Inc. Fort Lauderdale, Florida Kimley-Horn

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles. I-71 KIPDA ID # 130 Project Type: ROADWAY CAPACITY Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles. Purpose: Improve capacity and level of service along I-71 in the project

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway

State Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018

Florida Department of Transportation District Six Project FM # Public Information Meeting Tuesday, July 24, 2018 Florida Department of Transportation District Six Project FM #432687-1-52-01 Public Information Meeting Tuesday, July 24, 2018 South Florida Express Lanes Network The I-75/SR 826 Palmetto Express Lanes

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY

BROWARD BOULEVARD CORRIDOR TRANSIT STUDY BROWARD BOULEVARD CORRIDOR TRANSIT STUDY FM # 42802411201 FINAL REPORT July 2012 GOBROWARD Broward Boulevard Corridor Transit Study FM # 42802411201 Prepared For: Ms. Khalilah Ffrench, PE, Project Manager

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

Non-Motorized Overpass at SR 5/US1

Non-Motorized Overpass at SR 5/US1 Non-Motorized Overpass at SR 5/US1 And SR 97/SW th Street (Bird Road) Executive Summary March 9, 17 Prepared By: MARLIN Engineering Inc 17 NW th Avenue, Ste. 1 Plantation, FL 33313 P: 35.77.7575 www.marlinengineering.com

More information

Transit Operations in the I-95 Express Lanes

Transit Operations in the I-95 Express Lanes Transit Operations in the I-95 Express Lanes TRB 15 th International Conference on Managed Lanes Miami, Florida Presented by Diane Quigley FDOT Transit Planning Administrator May 5, 2016 FDOT Governance

More information

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010

A Federal Perspective on Congestion Pricing. Wayne Berman Federal Highway Administration July 8, 2010 A Federal Perspective on Congestion Pricing Wayne Berman Federal Highway Administration July 8, 2010 Overview Background on Congestion Pricing Benefits and Experiences of Pricing Case Study Miami I-95

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer

I-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No.

SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: ETDM No. SR 826/PALMETTO EXPRESSWAY EXPRESS LANES PD&E STUDY From US 1/SR 5/Dixie Highway to SR 836/Dolphin Expressway FPID No.: 432639-1-22-02 ETDM No.: 14308 Newsletter 3 - March 2019 Incluye versión en español

More information

Comprehensive Collection of Stakeholder Alternatives by Mode

Comprehensive Collection of Stakeholder Alternatives by Mode 2011 Illinois Department of Transportation Comprehensive Collection of Stakeholder Alternatives by Mode October 2009 January 2011 www.dot.il.gov www.eisenhowerexpressway.com FILEY RD FILEY RD IHB RR 2

More information

CAMPUS MASTER PLAN UPDATE

CAMPUS MASTER PLAN UPDATE FLORIDA INTERNATIONAL UNIVERSITY CAMPUS MASTER PLAN UPDATE 2010-2020 Work Session #2 FOCUS GROUP 6 2 Group 6 Transportation Typical items to be discussed at each Focus Group Provide overview of Campus

More information

Status April Transportation Priority Projects in Chester County

Status April Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County April 2017 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.567 began 03/17 2017 2 US 202 at

More information

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI)

Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) Broward Boulevard Gateway Implementation Project, Downtown Walkability Analysis, & Joint Development Initiative (JDI) City of Fort Lauderdale ~ Commission Conference July 10, 2012 Page 1 of 15 A Multi-Agency

More information

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA

TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA HOT LLanes and d TTransit i P f Performance TRB Managed Lanes Conference May 22 24, 2012, Oakland, CA Miami UPA Transit Results (2008 2010 Data) Miami UPA Transit Improvements 2 new routes Dade-Broward

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES NOTES BOARD ACTION AGENDA ITEM #VI-2 2017 PROJECT PRIORITIES Presenter: Summary: Colleen McGue, Mike Maholtz, and Leigh Holt, MPO Staff Each year the MPO Board adopts an annual list of Priorities. Once

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

State Route 160 (Blue Diamond Highway)

State Route 160 (Blue Diamond Highway) State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.

More information

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report March 2 through March 9, 2018 FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases

More information

Section 5: Bike and Pedestrian

Section 5: Bike and Pedestrian Section 5: Bike and Pedestrian Existing Conditions: One defining feature of Glynn County appreciated by both residents and visitors is the extensive sidewalk and bike path system. The City of Brunswick,

More information

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016

CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CITY OF TAMARAC NOTICE OF WORKSHOP MEETING CITY COMMISSION OF TAMARAC, FL City Hall - Conference Room 105 June 20, 2016 CALL TO ORDER: 9:30 a.m. ROLL CALL: PLEDGE OF ALLEGIANCE: Vice Mayor Diane Glasser

More information

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400

% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400 Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

INTERMODAL TRANSPORTATION PLAN

INTERMODAL TRANSPORTATION PLAN INTRODUCTION INTERMODAL TRANSPORTATION PLAN Effective intermodal transportation implies a public policy for actively decreasing the demand for automobile trips and consequently reducing automobile related

More information

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor

Alleviate Traffic Congestion and Improve Operational Reliability of the Route 17 Corridor Project Purpose PURPOSE AND NEED STATEMENT Route 17 Bottleneck Project, MP 10.19 to 12.04 Alternatives Analysis and Preliminary Engineering Borough of Maywood, Township of Rochelle Park, and Borough of

More information

FDOT Broward County Traffic Report April 27 through May 4, 2018

FDOT Broward County Traffic Report April 27 through May 4, 2018 FDOT Broward County Traffic Report April 27 through May 4, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM

FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM FINAL DESIGN TRAFFIC TECHNICAL MEMORANDUM July 2014 FINAL (SR 43) Project Development and Environment Study From State Road 60 (Adamo Drive) to I-4 (SR 400) Hillsborough County, Florida Work Program Item

More information

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)?

1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? 1. What is the Doran Street and Broadway/Brazil Grade Separation Project (Project)? The Los Angeles County Metropolitan Transportation Authority (Metro) is evaluating the development of a grade separation

More information

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study.

Welcome. The Brooklin Secondary Plan and Transportation Master Plan are collectively referred to as the Brooklin Study. Welcome The Town of Whitby is undertaking a study to prepare a Secondary Plan and Transportation Master Plan to guide and manage growth in the Brooklin area. The Brooklin Secondary Plan and Transportation

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Project Development & Environment (PD&E) Study. November 17, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1 Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) Study SR 90 (SW 8th Street

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011

Corridor Advisory Group and Task Force Meeting #10. July 27, 2011 Corridor Advisory Group and Task Force Meeting #10 July 27, 2011 1 Agenda Recap CAG/TF #9 Public Meeting #2 Summary Single Mode Alternatives Evaluation Results Next Steps 2 3 CAG/TF #9 Recap CAG /TF #9

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

COMMUNITY WORKSHOP (CW) 3 February 21, 2015

COMMUNITY WORKSHOP (CW) 3 February 21, 2015 QEW Improvements QEW Improvements COMMUNITY WORKSHOP (CW) 3 February 21, 2015 1 WORKSHOP PURPOSE MOVING FORWARD Review of Technically Preferred alternative Seeking feed back for progressing to next design

More information

Financial Project ID No(s).: and ETDM No(s).: and 14181

Financial Project ID No(s).: and ETDM No(s).: and 14181 Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach

More information

GENERAL DESCRIPTION. Page 1 of 5

GENERAL DESCRIPTION. Page 1 of 5 38. SH 114/SH 121 Corridor The DFW Connector : FT1345, FT 1347, FT1424, FR1424, FT1425, FR1425, FT1440, FT1500, FR1500, FT1505, FR1505, FT1507, FR1507, FT1510, FR1510, FT1715, FR1715, FT2720, FR2720, HM8190

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments!

!!!!!!!!!!!!!!!!!! Metro!Denver!MTD!Governance!Committee! October!23,!2013!!9:00!AM!to!10:00!AM! Denver!Regional!Council!of!Governments! MetroDenverMTDGovernanceCommittee October23,2013 9:00AMto10:00AM DenverRegionalCouncilofGovernments MeetingRecord MetroDenverMTDGovernanceCommittee October23,2013 9:00AM Agenda: 9:00AM Welcome&Introductions

More information

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""

::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '',, - ==~'c;;f';~:?:'! PALM BEACH MPO w ANNUAL LIST OF PRIORITY PROJECTS FY 2019-2023 Adopted July 20, 2017 ::~-~ '"',, - ==~"'c;;f'";~":?:'!"" ~~ Ch a r www. Pa Im M PO.org/p ri oriti es 2300 North Jog Road. 4th Floor.. FL.

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

7.0 Preferred Alternative with Service Road Concept

7.0 Preferred Alternative with Service Road Concept .0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

TRANSPORTATION IMPROVEMENT STRATEGY

TRANSPORTATION IMPROVEMENT STRATEGY TRANSPORTATION IMPROVEMENT STRATEGY A Vision for Staten Island North Shore November 2016 1 EXISTING CONDITIONS Transit Conditions MTA Bus Staten Island Railroad Peak Directional Traffic Volume (per hour)**:

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices

FY Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices FY 2017-2026 Transportation Capital Improvement Plan Update Arlington Committee for Transportation Choices November 1, 2017 Forecasted Growth Arlington continues to grow with a shift towards multi-family

More information

The Bike Buzz in Richland. November 2017 Carl Berkowitz

The Bike Buzz in Richland. November 2017 Carl Berkowitz The Bike Buzz in Richland November 2017 Carl Berkowitz Richland has been growing by leaps and bounds with lots of new homes and roads throughout the community. Recognizing all the growth in the Queensgate

More information

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018 LIST OF PRIORITY PROJECTS FY 2020-2024 TPA Committee Meetings & Board Review September 2018 MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map

INTRODUCTION. The focus of this study is to reduce congestion and improve mobility for all modes of transportation. Figure ES-1 Study Corridor Map INTRODUCTION The I-280 Corridor Study is a highway planning study led by Santa Clara VTA, in partnership with the City of Cupertino and in coordination with other stakeholders in the study area. The study

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM,

CARTERSVILLE-BARTOW METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM, PROJECT NAME: Glade Road/Clark Creek Bridge PROJECT #: CB101 PROJECT DESCRIPTION: Safety improvements of Estimated Cost: 8,316,364 section of Glade Road from Misty Valley Drive to County: Brandy Lane including

More information

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No.

Gwinnett County Department of Transportation SR 324 / Gravel Springs Road at I-85 / SR 403 Interchange Project Number F , PI No. June 4, 2015 Dear Resident: Thank you for attending this public information meeting for the proposed SR 324 / Gravel Springs Road at I-85 Interchange. The purpose of this meeting is two-fold: to provide

More information

Waterford Lakes Small Area Study

Waterford Lakes Small Area Study Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

4.12 TRANSPORTATION Executive Summary. Setting

4.12 TRANSPORTATION Executive Summary. Setting 4.12 TRANSPORTATION 4.12.1 Executive Summary This section is based on the Multimodal Transportation Impact Study (TIS; 2016) prepared by Omni-Means, Ltd. to evaluate projected transportation impact conditions

More information