LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018
|
|
- Dwight Chambers
- 5 years ago
- Views:
Transcription
1 LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018
2 MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May 2018
3 Timeline to the FY TIP TPA adopts Priority List for FY September Today FDOT evaluates available funds and costs Fall 2018 TPA reviews FDOT Draft Tentative Work Program - December 2018 TPA reviews Draft TIP May 2019 TPA adopts Final TIP June 2019 Operating under FY TIP July 1, 2019 to June 30, 2020 Draft FDOT WP Dec 2018
4 Priority List project types Project Category Source of Projects Funding Major Projects Local Initiatives LRTP Cost Feasible List Annual Competitive Application $40 million/yr Primarily State Funds (District Dedicated Revenue-DDR, Statewide Fuel Tax-DS, Public Transit Office-DPTO); Some Fed Surface Transportation Funds SA $20 million/yr Primarily Federal Funds (Surface Transportation Program suballocated to TPA SU) Transportation Alternatives Annual Competitive Application $3 million/yr Additional Federal Surface Transportation Program Funds for non-motorized projects
5 Status Reports Cost Feasible projects with LRTP rank, score, and current status Local Initiatives and Transportation Alternatives with ranking, staff score, and current status *Includes all 2018 applications with explanations for those not proposed for inclusion on Priority List* Example:
6 TPA Major Projects Prioritized annually from the Cost Feasible list in LRTP Five Year Target: ~$200M FY TIP: ~$100M Current Priorities need $646 million for full implementation HIGHLIGHTS Split US 1 corridor to show all Tier 1 projects from study (~$20M) Three are lane repurposing: Lake Worth, North Palm, West Palm Need Local Resos & FDOT approval No suggested additions allow more time to vet/advance the three new projects added in 2017
7 Local Initiatives Annual competitive application process ~$20M/yr in fed & state funds 2018 Applications 6 proposed for inclusion on priority list 2 did not submit resolutions of support 3 have design/feasibility issues Addition of funds to support TPA Planning & Administration Modifications to Existing Priority Projects Sandalfoot Dr and New England Blvd bridge replacements deleted Video detection at signalized intersections reduced from 27 to 15 Congress Ave from C-15 canal to Atlantic Ave withdrawn by City
8 Local Initiatives 2018 Applications 1 of 2 ~$20M/yr in fed & state funds Rank Applicant Location Description Total Cost Score Project Status Roadway repurposing to add Westgate Ave from Congress Ave to 1 Westgate CRA designated bike lanes and widen $2, On Priority List Wabasso Dr sidewalks Install ITS technology on 200 buses & 2 Palm Tran Palm Tran onboard buses & paratransit $4, No resolution 250 paratransit buses 3 West Palm Beach Parker Avenue from Forest Hill Blvd to Nottingham Blvd Install separated bicycle lanes, pedestrian lighting and street trees $5, On Priority List 4 Palm Beach County Lyons Rd/Sansbury Way from Forest Hill to Okeechobee Blvd Install separated bicycle lanes $4, On Priority List 5 Delray Beach Linton Blvd between Federal Highway and A1A Install separated bicycle lanes $ No agreement with Palm Beach County for ROW 6 Boynton Beach Boynton Beach Blvd from I-95 to US 1 Install 4' designated bike lanes and widen to 9' sidewalks $2, On Priority List
9 Local Initiatives 2018 Applications 2 of 2 ~$20M/yr in fed & state funds Rank Applicant Location Description Total Cost Score Project Status 7 Boca Raton Yamato Rd and 20 Intersections in the downtown area Adaptive Control Systems $2, On Priority List 8 Wellington Greenbrier Blvd from Aero Club Dr to Greenview Shores Blvd 4' designated bike lanes $1, No Resolution 9 Delray Beach Germantown Rd from Old Germantown Rd to Congress Ave Install 6' separated bike lanes & 6' sidewalks $5, On Priority List 10 Boca Raton St Andrews Blvd from Glades Rd to Palmetto Park Rd Construct 10' shared use path $1, Withdrawn by City 11 Royal Palm Beach La Mancha Ave to Okeechobee Blvd La Mancha Ave road and pedestrian extension $2, Requires PD&E and ROW phases - not eligible
10 Transportation Alternatives Annual competitive application process ~$3/yr in fed & state funds 2018 Applications for proposed for inclusion on priority list 1 not prioritized, 2 no resolution of support, 1 design/feasibility issues Modifications to Existing Priority Projects Tamarind Ave from Banyan Blvd to Palm Beach Lakes Blvd FDOT cancelled funding Belle Glade sidewalks reduction in total sidewalk length Anchorage Dr between north and south US 1 intersections Village withdrew project *Add project* Lake Worth Rd from Raulerson Dr to Palm Beach St College Ent Add multimodal improvements to FDOT FY 21 resurfacing project
11 Transportation Alternatives 2018 Applications ~$3/yr in fed & state funds Rank Applicant Location Description 1 West Palm Beach 2 PalmTran Fixed-route 3 Greenacres 4 Boca Raton 5 Westgate CRA Trailway on NW side of Clear Lake connecting Okeechobee Blvd to Palm Beach Lakes Blvd Dillman Trail from Forest Hill Blvd to Dillman Rd SW 18th St from E of SW 6th Ter to SW 4th Ave Bridgeman Dr, Wellington Rd, Prairie Rd within Westgate CRA Construct 10' shared use path on west side of Clear Lake Install three-rack bicycle racks on entire fleet Total Cost Score Project Status $1, On Priority List $ No resolution Construct 12' shared use path $ On Priority List 6' sidewalk along the southside of the roadway Install 5' sidewalks and pedestrian scale lighting - Phase II $1, Withdrawn by City $ On Priority List 6 Palm Beach County CR A1A/Ocean Drive Pedestrian Crossing Enhancements $ On Priority List 7 Wellington 8 Delray Beach Greenview Shores Blvd from Binks Forest Dr Designated bike lanes $ No resolution to Wellington Trc Brant Bridge Loop - Carl Bolter Dr from Lindell Not prioritized 6' separated bike lanes & 6' sidewalks $ Blvd to Blue Jay Turn inadequate funds
12 SUN Trail Program Annual state application process US 1 (Broadway Ave) from 25 th St to 42 nd street Project deleted and City can resubmit to FDOT for SUN Trail program funding
2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR
2018 Transportation Alternatives Program (TAP) Application Presentation to Palm Beach TPA BRANT BRIDGE CONNECTION LOOP EXTENSION ON CARL BOLTER DR Project Location N N Connecting South Delray Beach Existing
More information::~-~ w ANNUAL LIST OF PALM BEACH MPO PRIORITY PROJECTS FY Adopted July 20, '"',, - ==~"'c;;f'";~":?:'!""
PALM BEACH MPO w ANNUAL LIST OF PRIORITY PROJECTS FY 2019-2023 Adopted July 20, 2017 ::~-~ '"',, - ==~"'c;;f'";~":?:'!"" ~~ Ch a r www. Pa Im M PO.org/p ri oriti es 2300 North Jog Road. 4th Floor.. FL.
More informationDRAFT TENTATIVE WORK PROGRAM FY
DRAFT TENTATIVE WORK PROGRAM FY 2020-2024 PREPARED BY PALM BEACH TPA DECEMBER 2018 PalmTPA.org/TIP EXECUTIVE SUMMARY Pursuant to 23 C.F.R. 450.324, one of the primary roles of the Palm TPA is the adoption
More informationCITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved
CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter
More informationTransit Initiatives 1
Transit Initiatives 1 TPA Transit Overview Capital Projects Transit Planning Initiatives Challenges Tri-Rail Layover Facility, New Boca Station Northern Layover Facility $28.7 M; Completion in 2023 Boca
More informationWestgate/Belvedere Homes Community Redevelopment Agency. Belvedere Heights. Streetlights & Sidewalks Improvements Project.
Westgate/Belvedere Homes Community Redevelopment Agency Belvedere Heights Streetlights & Sidewalks Improvements Project Phase II TPA 2018 Transportation Alternatives Program (TAP) BTPAC Presentation Thursday,
More informationTPA Committee Meetings May 2018
TPA Committee Meetings May 2018 Purpose Develop a comprehensive plan to identify multimodal improvements for all users of the roadway and evaluate the potential for a premium express bus service Overview
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationTurnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018
Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationDRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES
DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases
More informationFlorida Redevelopment Association 2015 Annual Conference
Florida Redevelopment Association 2015 Annual Conference Reimagining State Arterials Jeff Costello, Delray Beach CRA Executive Director I-95 Fed. Hwy Pairs Two blocks west of Intracoastal Waterway One-way
More informationTechnical Advisory Committee (TAC)
Technical Advisory Committee (TAC) January 17, 2018 CareerSource Heartland Sebring, FL 1) ROLL CALL 2) PUBLIC COMMENT 3) APPROVAL OF MINUTES* October 18, 2017 Meeting 4) SR 710 Extension in Okeechobee
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationHIA Working Group Meeting #4 September 27, 2017
HIA Working Group Meeting #4 September 27, 2017 Icebreaker Agenda US-1 Corridor Study Update Health Indicator Assessment Station Demonstration Area Assessment Preliminary Recommendations Discussion Next
More informationBelvedere Heights Streetlights & Sidewalks Improvements Project
Westgate/Belvedere Homes Community Redevelopment Agency Belvedere Heights Streetlights & Sidewalks Improvements Project Phase I MPO 2017 Transportation Alternatives Program (TAP) BTPAC Special Workshop
More information2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018
Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently
More informationAgenda. US-1 Corridor Study and HIA Update. Pathway Diagram / Primary Indicators. Research Questions. Linking Multimodal Improvements to Indicators
Icebreaker Agenda US-1 Corridor Study and HIA Update Pathway Diagram / Primary Indicators Research Questions Linking Multimodal Improvements to Indicators Vulnerable Populations US-1 Corridor Study Vision
More informationFY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015
FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL
More informationVISION ZERO ACTION PLAN
PALM BEACH Transportation Planning Agency VISION ZERO ACTION PLAN TPA Advisory Committee Meetings March 2019 PURPOSE Present the Data Analysis Key Findings and the Action Items from the Draft Action Plan
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationCompleting the Vision
Villas of Positano Completing the Vision North A1A Lane Reconfiguration N. Surf Rd. Redirection of Traffic Margaritaville Resort March 4, 2014 1 Completing The Vision Project Limits Hollywood Blvd. to
More informationAPPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL
D: PROJECT PRIORITIZATION Prioritization of the improvements proposed in the Multimodal Improvement Plan is required in order to determine which projects should be funded first, where the transportation
More informationTypical Rush Hour Commute. PennyforTransportation.com
Typical Rush Hour Commute In the News Overview of the Plan Collaborative plan with projects in every community Prioritizing connectivity and congestion relief Dedicated transportation-specific funding;
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More information1000 FRIENDS OF FLORIDA PALM BEACH COUNTY 2070 OCTOBER 2018
1000 FRIENDS OF FLORIDA PALM BEACH COUNTY 2070 OCTOBER 2018 HEALTHIER COMMUNITIES & BETTER ECONOMIES THROUGH COMPLETE STREETS PRESENTED BY TREASURE COAST REGIONAL PLANNING COUNCIL The Question of Safety
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationCity of Charlottesville Bicycle and Pedestrian Master Plan Update
City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network
More informationBICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA
BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION Tel: (941) 883-3535 1. Call to Order & Roll Call AGENDA 3:00 p.m., Thursday, September
More informationStakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads
1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule
More informationWest End Connectivity Master Plan
West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity
More informationVIII. Project Prioritization & Implementation
Transportation Plan 2030 July 2006 VIII. Project Prioritization & Implementation Public Transit Service Investigation into the development of a demand responsive service route system through a process
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationPROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE
Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM
More informationCHARLOTTE COUNTY PUNTA GORDA MPO
CHARLOTTE COUNTY PUNTA GORDA MPO 2035 Long Range Transportation Plan Summary Report (For Adoption by Charlotte County Punta Gorda MPO Board on December 13, 2010) Table of Contents Table of Contents Introduction
More informationBRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update
BRIEFING ON PROPOSED ADDITIONS AND CHANGES Additions and Changes to Projects Proposed for Inclusion in the 2015 CLRP Update January 23, 2015 Travel Forecasting Subcommittee What is the CLRP? Federally
More informationR2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects
Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements
More informationAGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014
Humboldt County Association of Governments Eureka, CA, 95501 AGENDA ITEM NO. 5b HCAOG TAC meeting of May 8, 2014 DATE: May 1, 2014 TO: HCAOG Technical Advisory Committee (TAC) FROM:, SUBJECT: Letters of
More informationSR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationRoad Diets FDOT Process
Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationREGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012
WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More informationCity of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016
1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose
More informationBICYCLE, TRAILWAYS AND PEDESTRIAN ADVISORY COMMITTEE (BTPAC) AGENDA. DATE: Thursday, February 8, 2018
BICYCLE, TRAILWAYS AND PEDESTRIAN ADVISORY COMMITTEE (BTPAC) AGENDA DATE: Thursday, February 8, 2018 TIME: 9:07 A.M. PLACE: Vista Center 4 th Floor Conference Room 4E-12 2300 North Jog Road West Palm Beach,
More informationCity Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting
City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting Monday, January 28, 2013 7:30 PM, City Hall Norman Cox, PLA, ASLA. Ann Arbor, Michigan. www.greenwaycollab.com Community
More informationSR 693 (Pasadena Avenue) Corridor Study from Shore Drive South to 66 th Street
Welcome and Introduction Sign-in and comment sheets Restrooms and exits Meeting agenda and timeline Meeting goals / expectations Provide input to guide study recommendations Actively participate throughout
More informationDeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights
DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation
More informationCHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC)
BPAC Minutes 03-16-2017 Page 1 CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION BICYCLE/PEDESTRIAN ADVISORY COMMITTEE (BPAC) MINUTES OF THE MEETING HELD ON MARCH 16, 2017 AT THE CULTURAL
More informationEXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP
EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492
More informationBicycle Lanes Planning, Design, Funding South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator
Bicycle Lanes Planning, Design, Funding 2018 South Mountain Partnership Trails Workshop Roy Gothie PennDOT Statewide Bicycle Pedestrian Coordinator Policy Changes: BOP Bicycle Policy Changes The OLD Way
More informationAmelia Island Trails (AIT) Progress and Proposed 5-YR Plan JANUARY 16, 2018
Amelia Island Trails (AIT) Progress and Proposed 5-YR Plan JANUARY 16, 2018 PHIL SCANLAN FRIENDS OF AIT, INC. CEO WHY AM I HERE? 1. We have made good progress on A.I. Trails. 2. We CAN T meet our Goal
More informationFlorida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE
1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North
More informationTransportation in Washoe County. Lee Gibson, Executive Director February 15, 2011
Transportation in Washoe County Lee Gibson, Executive Director February 15, 2011 RTC OF WASHOE COUNTY Metropolitan Planning Organization Meet long term needs Deliver federal funding Program projects in
More informationCentral Avenue Corridor Study FPID Number:
Central Avenue Corridor Study FPID Number: 437932-1-18-01 City Commission Presentation 1 March 27, 2018 Meeting Agenda 1. Introductions 2. Project Overview 3. Opportunity for Economic Development 4. Healthy
More informationBay to Bay Boulevard Complete Streets Project
Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information
More informationBicycle and Pedestrian Plans and Improvements
Bicycle and Pedestrian Plans and Improvements Presented to the City Council By Randle Harwood, Planning and Development, and Richard Zavala, Parks and Community Services September 24, 2013 Purpose Review
More informationWelcome to the Quebec Alternatives Analysis Public Meeting
Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical
More informationPalm Beach MPO Complete Streets Working Group
Palm Beach MPO Complete Streets Working Group March 23, 2016 www.palmbeachmpo.org 2300 North Jog Road 4 th Floor West Palm Beach, FL 33411 561 684 4170 Agenda What are Complete Streets? Welcome Complete
More informationPlant City Walk-Bike Plan
Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked
More informationPerformance Criteria for 2035 Long Range Transportation Plan
Minimizing Impacts on Natural, Historic, Cultural or Archeological Resources 2035 LRTP Weighting Factor: 7% Objective 1.1: Use appropriate planning and design criteria to protect and enhance the built
More informationSan Jose Transportation Policy
San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland
More informationDRAFT- LMS Prioritized Project List
PALM BEACH COUNTY UNIFIED LOCAL MITIGATION STRATEGY DRAFT- LMS Prioritized Project List November 14, 2018 2018 ~ :'cniciiiec1/ C ~ IIEOITATION pflogv.p. 20 S O U T H M I L I T A R Y T R A I L, W E S T
More informationRETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE
October 17, 2017 RETREAT AGENDA ITEM MIDTOWN AREA TRANSPORTATION PLAN UPDATE STATEMENT OF ISSUE An update on the Midtown Area Transportation Plan will be provided including a discussion of preliminary
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationCOMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015
COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland
More informationDES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017
DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities
More informationAttachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program
Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the
More informationTRANSPORTATION TRAINING TOPICS. April 6, 2010
TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA
More informationBicycle Master Plan Goals, Strategies, and Policies
Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of
More information2016 TELL THE TPO SURVEY
RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 TELL THE TPO SURVEY CAMPAIGN SUMMARY August 2016 Introduction The River to Sea Transportation Planning Organization (TPO) conducted its second Tell
More informationHIA Working Group Meeting #5 November 29, 2017
HIA Working Group Meeting #5 November 29, 2017 ICEBREAKER Agenda US-1 Corridor Study Update Health Indicator Assessment Update Station Demonstration Area Assessment HIA Recommendations Discussion + Exercise
More informationT A B L E O F C O N T E N T S
T R A N S P O R T A T I O N E L E M E N T T A B L E O F C O N T E N T S Page BACKGROUND... TR - 1 FUTURE TRAFFIC CIRCULATION MAP... TR - 1 INVENTORY... TR - 1 ANALYSIS... TR - 5 NEEDS AND RECOMMENDATIONS...
More informationPalm Beach County Traffic Report November 16 through November 23, 2018
November 16, 2018 Barbara Kelleher, (954) 777 4090 Barbara.Kelleher@dot.state.fl.us Palm Beach County Traffic Report November 16 through November 23, 2018 Palm Beach County Palm Beach County traffic will
More informationPlanning Study SR 976. Project Advisory Team Meeting May 24, 2017
` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project
More informationThe Transformation of Portland into a Two-Wheeled Mecca. Mia Birk, Principal, Alta Planning + Design
The Transformation of Portland into a Two-Wheeled Mecca Mia Birk, Principal, Alta Planning + Design Development of Portland s Bikeway Network 1990 Early 1990s Infrastructure Growing Public Support Growing
More informationGOAL 2A: ESTABLISH AND MAINTAIN A SAFE, CONVENIENT, AND EFFICIENT MULTI-MODAL TRANSPORTATION SYSTEM TO MOVE PEOPLE AND GOODS THROUGHOUT THE CITY.
2. TRANSPORTATION ELEMENT The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation
More informationDavid Jickling, Public Transportation Director Regional Transportation Commission, Washoe County
David Jickling, Public Transportation Director Regional Transportation Commission, Washoe County Virginia Street Resort corridor connecting University of Nevada, Reno Downtown Truckee River Strip Casinos
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationLANE ELIMINATION PROJECTS
PRESENTATION OUTLINE Lane Elimination Considerations Districts 4 & 7 Draft Lane Elimination Processes FDOT Lane Elimination Guidelines Example Projects D4 Case Study: SR A1A (Ft. Lauderdale) D7 Case Study:
More informationComplete Streets Initiative Update
Complete Streets Initiative Update UrbanAdvantage Council Transportation and Environment Committee April 23, 2012 Presentation Purpose Update the Council Committee on community workshops results and preliminary
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationThe Bike Buzz in Richland. November 2017 Carl Berkowitz
The Bike Buzz in Richland November 2017 Carl Berkowitz Richland has been growing by leaps and bounds with lots of new homes and roads throughout the community. Recognizing all the growth in the Queensgate
More informationNeeds Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN
Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared by West
More informationUS 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue
41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationHarbord Street and Hoskin Avenue Bicycle Lane Upgrades
STAFF REPORT ACTION REQUIRED and Bicycle Lane Upgrades Date: April 22, 2014 To: From: Wards: Reference Number: Public Works and Infrastructure Committee General Manager, Transportation Services 19 and
More informationGeary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee
Geary Corridor Bus Rapid Transit SFMTA Citizens Advisory Committee Project Update SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY August 6, 2015 Project Overview
More informationSPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)
A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT FISCAL YEAR, FDOT PROJECT NO SIS FUNDS 1 1 ELLIS ROAD WIDENING at I-95 ETEND/WIDEN ELLIS ROAD CONNECTION TO WICKHAM DESIGN/DRAINAGE ANALYSIS
More informationEnhancing Downtown
Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses
More informationOrange County s Transportation Planning and Multimodal Corridor Plan
Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation
More information