R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects
|
|
- Hilda Cannon
- 6 years ago
- Views:
Transcription
1
2 Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements Rhode Island extension SR 15 (US 17) - widen to 4 lanes SR 4 - widen to 6 lanes SR 4 - widen to 4 lanes SR 4 - widen to 4 lanes SR 15 (US 17) Preliminary Design and Engineering (PD&E) SR 1 - widen to 6 lanes I-95 Interchange/Maytown Rd (Farmton Interchange) RCTPO 4 LRTP Draft Project List as Approved by the TPO Board (June 4, 15) Strategic Intermodal System (SIS) Projects Limits (from - to) Est. Cost (PDC) * (in millions) Seminole County to SR 47 $51. Add managed-use lanes - public private partnership Graves Ave to Kentucky/MLK Blvd $6. Road/Intersection (I-4 Beyond the Ultimate) I-4 to Normandy Blvd $33.5 Saxon Blvd widening to 3 lanes from EB ramps terminal to Normandy Blvd (I-4 Beyond the Ultimate) Veterans Memorial to Normandy Blvd $15.5 Extend Lane with & overpass (I-4 Beyond the Ultimate) Ponce DeLeon Blvd to SR 4 r e $39.4 Construction only & includes 1 foot multi-use trail Williamson Blvd. to Breakaway Trails $3.4 (Note: Funded in Other Arterial Category) not in FDOT's SIS Cost Feasible. Includes 1 foot multi-use trails Cone Road to SR 11 $43.8 Includes 1 foot multi-use trail SR 11 to SR 15 (US 17) $37.9 Includes 1 foot multi-use trail SR 4 to Putnam Co. line $. Safety study Old Kings Road to Belle Terre Parkway $34.87 (Note: Funded in Other Arterial Category) not in FDOT's SIS Cost Feasible I-95 & Maytown Road $1.9 New interchange ($1.9 Developer funded) Notes I-95 Interchange /US 1 interchange modifications I-95 Interchange/LPGA interchange modifications I-95 Interchange/SR 44 interchange modifications I-95 Interchange/Pioneer Trail new interchange at I-95 & SR 5 (US 1) SIS Needs $8. Interchange improvements/safety & Capacity Williamson Blvd to Tymber Creek Ext $. Interchange improvements/safety & Capacity at I-95 & SR 44 $15. Interchange improvements/safety & Capacity at Pioneer Trail $. Interchange Justification Report (IJR) underway by FDOT * Present Day Costs Page 1
3 Printed 6/9/15 SR 4 - widen to 6 lanes SR 1 - widen to 6 lanes Project RCTPO 4 LRTP Draft Project List as Approved by the TPO Board (June 4, 15) Other Arterial Projects List Limits (from - to) On System (State Roadways) Projects Williamson Blvd. to Breakaway Trails $34. Total Funding Available Est. Cost (PDC) * (in millions) $43. Estimated Funding Available (Present Day Value); 8.1% of funding $3.4 SIS project not currently funded in FDOT's Cost Feasible Plan (Includes 1 foot multi-use trail) Old Kings Road to Belle Terre Parkway $34.87 SIS project not currently funded in FDOT's Cost Feasible Plan Notes SR 483 (Clyde Morris Blvd) - widen to 6 lanes SR 44 - Misc. upgrades to improve access to DeLand Sunrail US 9 - widen from 4 to 6 lanes SR 6/SR 15 (US 17/9) - emerging SIS SR 44 extend roadway (Edgewater to Deltona) Local Corridor Initiatives Old Kings Rd - widen from to 4 lanes Old Kings Rd - extension roadway (Phase II) Commerce Pkwy Connector Road - new lane roadway Matanzas Woods Pkwy (west) widen to 4 lanes LPGA - widen to 3 lanes Howland Blvd. - widen to 4 lanes North Entrance DeLand Airport (Industrial Park) SR 4 (Beville Road) to US 9 $3.6 Construction only SR 15A to the DeLand SunRail Station $19.1 SR 44 Study completed I-4 EB Ramps to CR 415 (Tomoka Farms Rd) $5.8 ROW/Construction only - design completed SR 47 to SR 15A (Taylor Road) $35. Intersection/corridor improvements SR 44 to SR alignment not set $1. PD&E/PE Total Estimated Costs (PDC) On System $185.7 Off System Projects Balance $58.14 Palm Coast Parkway to Forest Grove Dr. $14.85 Add thru lanes Available for On System projects; including complete streets, roundabouts, major ITS projects to improve capacity and safety $6.8 Estimated Funding Available (Present Day Value); 19.99% of funding Matanzas Woods Pkwy to Old Kings Rd $5. New 4-lane roadway/row programmed $6, SR 1 to SR 5 (US 1) $4.7 Construction only finding/row donated/6% plans completed SR 5 (US 1) to Southbound I-95 ramps $16.3 PE completed/design funded FY 17/18 Nova Road to US 1 $9.9 Providence Blvd to Elkcam Blvd. $13. Add lanes Industrial Drive to SR 11 $1.7 New lane access road Total Estimated Costs (PDC) - Off System $63.9 Improve segment to three lane section with turn lanes, improved bike and pedestrian facilities Balance -$3.1 Available revenue TBD based on further cost estimates Page
4
5
6
This report was financed, in part, by the U.S. Department of Transportation and the Florida Department of Transportation.
This report was financed, in part, by the U.S. Department of Transportation and the Florida Department of Transportation. Special recognition and appreciation is extended to the following members of the
More information2017 LIST OF PRIORITY PROJECTS
River to Sea Transportation Planning Organization 2017 LIST OF PRIORITY PROJECTS STRATEGIC INTERMODAL SYSTEM (SIS) PROJECTS... 2 REGIONALLY SIGNIFICANT, NON-SIS ROADWAY PROJECTS... 3 TRAFFIC OPERATIONS,
More informationPresentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information
Volusia Transportation Planning Organization CAC / TCC Project Update Tuesday, May 21, 2013 1 Presentation Outline PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact
More informationDRAFT Transportation Congestion Management/Performance Measures Report
DRAFT 20176 Transportation Congestion Management/Performance Measures Report Table of Contents INTRODUCTION... 1 CMP NETWORK IDENTIFICATION... 2 PERFORMANCE SCORECARD... 3 MOTOR VEHICLE TRAVEL... 6 FEDERAL
More informationPlanning & Development Services Division
Planning & Development Services Division To: From: County Chair and Members Volusia County Council Kelli McGee Acting Director of Growth and Resource Management Date: March 21, 2011 for Transmittal Hearing
More informationAPPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL
D: PROJECT PRIORITIZATION Prioritization of the improvements proposed in the Multimodal Improvement Plan is required in order to determine which projects should be funded first, where the transportation
More informationDRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES
DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationCongress Avenue. Palm Beach MPO Subcommittee Meetings December 2017
1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO
More informationNOTE: PLEASE SILENCE ALL BEEPERS AND CELL PHONES DURING THE MEETING!! AGENDA I. CALL TO ORDER / ROLL CALL / DETERMINATION OF QUORUM
Please be advised that the Volusia Transportation Planning Organization (TPO) CITIZENS ADVISORY COMMITTEE (CAC) & TECHNICAL COORDINATING COMMITTEE (TCC) will be meeting on: DATE: Tuesday, August 21, 2012
More informationSR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationPROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE
Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM
More informationFDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates
Florida Department of Transportation FDOT Northern US 19 - Pinellas County Strategic Intermodal System (SIS) Projects Updates Forward Pinellas Technical Coordinating Committee (TCC) April 25, 2017 District
More informationEXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP
EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492
More informationRegional Trails Corridor Assessment
Regional Trails Corridor Assessment Project Goals Complete the regional trails network in the River to Sea TPO Planning Area and advance the Florida Greenways and Trails System Plan by developing/finalizing
More informationFY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015
FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL
More information2016 TELL THE TPO SURVEY
RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 TELL THE TPO SURVEY CAMPAIGN SUMMARY August 2016 Introduction The River to Sea Transportation Planning Organization (TPO) conducted its second Tell
More informationFlorida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE
1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange
More informationREGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012
WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)
More informationCost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN
Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationNeeds Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN
Needs Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared by West
More informationATTACHMENT "A" ULTIMATE IMPLEMENTATION DESCRIPTION
Red denotes new funding in FDOT WP since last year. ATTACHMENT "A" 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021, ADOPTED JULY 9, A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT SIS
More informationNeeds Plan and Cost Feasible Plan Amendment Report FLORIDA-ALABAMA 2040 LONG RANGE TRANSPORTATION PLAN
Needs Plan and Cost Feasible Plan Amendment Report FLORIDA-ALABAMA 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Florida-Alabama Transportation Planning Organization and The Florida Department of Transportation,
More informationPrepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY Prepared By: Staff to Bay County TPO
Prepared For: DIRECTION 2035 SHAPING OUR FUTURE SUMMARY REPORT JULY 2012 Prepared By: Staff to Bay County TPO TPO Overview The Bay County Transportation Planning Organization (TPO) is a regional transportation
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationLIST OF PRIORITY PROJECTS
LIST OF PRIORITY PROJECTS THROUGH 2013/14 Adopted August 27, 2008 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationBICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA
BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION Tel: (941) 883-3535 1. Call to Order & Roll Call AGENDA 3:00 p.m., Thursday, September
More informationState Road 54/56 Tampa Bay s Northern Loop. The Managed Lane Solution Linking I-75 to the Suncoast Parkway
State Road 54/56 Tampa Bay s Northern Loop The Managed Lane Solution Linking I-75 to the Suncoast Parkway SUNCOAST PARKWAY Both I 75 and the Suncoast Parkway are planning, or in the process of constructing,
More informationSUNRAIL FEEDER ROUTES BEGINS MAY 1 ST 2014
Votran will implement the following route and schedule changes on Sunday, April 27, 2014 EAST SIDE SCHEDULES Route 10: Will no longer serve the rear of Halifax Medical Center or Mayberry Av. and Heineman
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationBOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES
NOTES BOARD ACTION AGENDA ITEM #VI-2 2017 PROJECT PRIORITIES Presenter: Summary: Colleen McGue, Mike Maholtz, and Leigh Holt, MPO Staff Each year the MPO Board adopts an annual list of Priorities. Once
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five
DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330
More informationCHARLOTTE COUNTY PUNTA GORDA MPO
CHARLOTTE COUNTY PUNTA GORDA MPO 2035 Long Range Transportation Plan Summary Report (For Adoption by Charlotte County Punta Gorda MPO Board on December 13, 2010) Table of Contents Table of Contents Introduction
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationFY FY 2023 Bay County TPO Project Priorities
FY 2019 - FY 2023 Bay County TPO Project Priorities Prepared for Bay County Transportation Planning Organization; and The Florida Department of Transportation, District Three Prepared by West Florida Regional
More informationLIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018
LIST OF PRIORITY PROJECTS FY 2020-2024 TPA Committee Meetings & Board Review September 2018 MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationTurnpike Projects in Palm Beach County. Palm Beach TPA Update September 20, 2018
Turnpike Projects in Palm Beach County Palm Beach TPA Update September 20, 2018 Agenda Background Funded Projects Future Project Status Widenings Interchanges Express Lanes Phasing 2 Background 45 Miles
More informationAppendix B. Transportation Analysis. B.1 Summary. East Nassau Employment Center DSAP
Appendix B Transportation Analysis B.1 Summary This report presents the transportation analysis completed for the East Nassau Community Planning Area (ENCPA). The ENCPA is defined as 24,000 acres in Nassau
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP
Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities
More informationUNFUNDED PRIORITY PROJECTS
UNFUNDED PRIORITY PROJECTS THROUGH 2012/13 Adopted August 22, 2007 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationFM #: ETDM #: 11241
SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden
More information7.0 Preferred Alternative with Service Road Concept
.0 Preferred Alternative with Service Road Concept This section evaluates the traffic operations for all of the study years for the Build conditions as related to the Preferred Alternative with Service
More informationMalabar Road (SR 514) PD&E. Town of Malabar Briefing (July 17, 2017)
Malabar Road (SR 514) PD&E Town of Malabar Briefing (July 17, 2017) 1 Agenda Project limits and briefing focus PD&E process and project status Public and agency project comments Review Recommended Alternatives:
More informationDeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights
DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation
More informationHigh Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey
High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,
More informationState Road (S.R.) 61 (U.S. 319) FPID s and
State Road (S.R.) 61 (U.S. 319) FPID s 220496 2 22 01 and 219747 2 22 01 Crawfordville Highway Conceptual Design and Environmental Reevaluation May 6, 2014 END PROJECT PROJECT LOCATION/LIMITS Project Limits:
More informationCapital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024
Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year 2020 - Fiscal Year 2024 Priority RMP ID# Project Name/Limits FDOT WPI# Programmed Funding Project/Strategy
More informationNorthwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)
Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a
More informationState of the System Report. Agenda. Trends Summary. Corridor Analysis. Safety Analysis
2017 State of the System Report SPACE COAST TRASPORTATIO PLAIG ORGAIZATIO TAC/CAC September 10, 2018 TPO Board September 13, 2018 Agenda s Summary Corridor Analysis Traffic Volumes and Congestion Evacuation
More informationNORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will
More informationSPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)
A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT FISCAL YEAR, FDOT PROJECT NO SIS FUNDS 1 1 ELLIS ROAD WIDENING at I-95 ETEND/WIDEN ELLIS ROAD CONNECTION TO WICKHAM DESIGN/DRAINAGE ANALYSIS
More informationCapital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023
ADOPTED RMP Roadways Project List RMP ID# Project Name/Limits FDOT WPI# Programmed Funding Project/Strategy County SIS Length (miles) Funding Sought 1 1026 Woodville Highway 1 Phase 2018 2019 2020 2021
More informationATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018
ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment
More informationLIST OF PRIORITY PROJECTS 2020/ /35
LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part
More informationHillsborough MPO List of Priority Projects 2016/2017 Transportation Improvement Program Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION
Hillsborough MPO List of s Table 1: EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP Number Limits Description Sponsor Status in /2016 TIP 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD 405492 5 H300
More informationTransportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners
Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation
More informationUS 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue
41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,
More informationDesign Traffic Technical Memorandum
State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL October 2010 State Road 7 Extension PD&E Study Design Traffic Technical Memorandum Palm Beach County, FL Prepared
More informationUS 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)
US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations
More informationA: PLANNED P ROJECTS PROJECTS
Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More information2017 (FY 21,22,23) Ohio CMAQ Prioritization
2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit
More informationWaterford Lakes Small Area Study
Waterford Lakes Small Area Study Existing Traffic Conditions PREPARED FOR: ORANGE COUNTY PUBLIC WORKS DEPARTMENT TRAFFIC ENGINEERING DIVISION ORLANDO, FLORIDA PREPARED WITH: INWOOD CONSULTING ENGINEERS
More informationINTERSECTION CONTROL NOVEMBER 2018
INTERSECTION CONTROL NOVEMBER 2018 ICE OVERVIEW AGENDA Why ICE? When ICE is Required? Applicability and Process 2 AVAILABLE RESOURCES http://www.fdot.gov/traffic/trafficservices/intersection_operations.shtm
More informationPART FIVE. Systems Management, Operations and Maintenance
PART FIVE Systems Management, Operations and Maintenance Path Forward 4 Long Range Transportation Plan TRANSPORTATION SYSTEMS MANAGEMENT AND OPERATIONS TSM&O STRATEGIES INCREASE TRAVEL CHOICES AND EFFICIENCY
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationProject Budget and Schedule Status
Program Management Project Budget and Schedule Status Highway Program Planning & Programming Committee February 20, 2013 Highway Program Project Schedules Project 2010 2011 2012 2013 2015 2016 2017 2018
More informationStakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads
1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule
More informationCHAPTER 5 TRANSPORTATION GOAL
CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationDULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, Susan Shaw, P.E., VDOT, Megaprojects Director
DULLES AREA TRANSPORTATION ASSOCIATION (DATA) February 18, 2015 Susan Shaw, P.E., VDOT, Megaprojects Director I-66 Corridor Conditions Steady population growth Employment growth in activity centers Congestion
More informationGandy Connector: Travel Demand. Policy Committee August 2013
Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More information2017 (FY 21,22,23) Ohio CMAQ Project Selection
2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities
More informationDiamond Springs Parkway Project
Diamond Springs Parkway Project Public Information Meeting, Monday, March 18, 2013 330 Fair Lane, Building A, Placerville County Board of Supervisors Meeting Room, 6:30 8:00 p.m. PRESENTED BY: County of
More informationINTRODUCTION. Specifically, the objectives are to:
INTRODUCTION The River to Sea Transportation Planning Organization (TPO) conducts the Tell the TPO Transportation Trends Survey to better understand the transportation preferences and priorities for the
More informationEmerald Coast Home Show. Public Outreach Event to Solicit Citizen Input on the FY14-18 Project Priorities
Emerald Coast Home Show Public Outreach Event to Solicit Citizen Input on the FY14-18 Project Priorities On September 8th and 9th, staff had a booth at the Emerald Coast Home Show. The following information
More informationCasablanca Boulevard & GO Station Access
Casablanca Boulevard & GO Station Access Class Environmental Assessment STAKEHOLDER WORKSHOP Thursday September 27th, 2018 5:30PM 8:00PM 1 WORKSHOP PURPOSE Provide an overview of the Design Alternatives
More informationOrange County s Transportation Planning and Multimodal Corridor Plan
Orange County Transportation Planning Division Orange County s Transportation Planning and Multimodal Corridor Plan Presentation to UCF LIFE November 11, 2014 Alissa Barber Torres, Ph.D., AICP, PLS Presentation
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District
More informationSIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS
TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor
More informationTransportation Committee Project Priority List
Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000
More informationPRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT MARKET
PRESENTATION WILL BEGIN AT APPROXIMATELY 6:05 P.M. MARKET I-90 EXIT 406 INTERCHANGE MODIFICATION STUDY AND ENVIRONMENTAL ASSESSMENT JANUARY 23, 2017 Public Meeting & Open House #2 TODAY S MEETING Purpose:
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationI-264 CORRIDOR EVALUATION STUDY. September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer
I-264 CORRIDOR EVALUATION STUDY September 7, 2016 Eric Stringfield VDOT Planning Director Chris Lawrence AECOM Senior Transportation Engineer Study Overview Interchange Locations Study Context Follow-up
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More informationCOMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015
COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland
More informationChapter 5. Financial Analysis
Chapter 5 Financial Analysis This page was left blank intentionally. financial analysis Introduction The Connections 2040 RMP serves as the region s long-range transportation strategy. However, the plan
More information% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400
Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)
More informationCITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies
CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationAGENDA I. CALL TO ORDER/ROLL CALL/DETERMINATION OF QUORUM/PLEDGE OF ALLEGIANCE
MEETING NOTICE & AGENDA Please be advised that the River to Sea Transportation Planning Organization (R2CTPO) BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) will be meeting on: DATE: Wednesday, May 13,
More informationApplication of a Complete Street
Application of a Complete Street Southbend to Prima Vista Update May 14, 2018 Meeting Agenda Perspective and History Public input received Typical sections being considered Presentation of the 2-lane master
More informationFY 2018-FY 2022 Florida-Alabama TPO Project Priorities
FY 2018-FY 2022 Florida-Alabama TPO Project Priorities Prepared for Florida-Alabama Transportation Planning Organization; Florida Department of Transportation, District Three; and Alabama Department of
More information