2017 LIST OF PRIORITY PROJECTS

Size: px
Start display at page:

Download "2017 LIST OF PRIORITY PROJECTS"

Transcription

1 River to Sea Transportation Planning Organization 2017 LIST OF PRIORITY PROJECTS STRATEGIC INTERMODAL SYSTEM (SIS) PROJECTS... 2 REGIONALLY SIGNIFICANT, NON-SIS ROADWAY PROJECTS... 3 TRAFFIC OPERATIONS, SAFETY, AND LOCAL INITIATIVES PROJECTS... 5 BICYCLE/PEDESTRIAN AND B/P LOCAL INITIATIVES PROJECTS TRANSIT PROJECTS TRANSPORTATION PLANNING STUDIES Pg 1

2 River to Sea TPO List of Prioritized Strategic Intermodal System (SIS) s ADOPTED 6/28/17 Rank 1 FDOT FM# Name Limits Type Programmed Phase(s) 2 Needed Phase(s) Estimated Total Cost I-4 widening to 10 Lanes (1-4 Beyond the Ultimate) /Seminole county line to 1/2 mile east of SR 472 widening PE - $1,228,818- FY 16/17; ENV - $150,270 - FY 17/18 ROW - $46,355,000; CST - $372,070,000 (all costs are 2014) $424,800,000 To be funded as a public-private partnership using tolled lanes SR widen from 4 lanes to 6 Graves Av to Kentucky/MLK widening CST - $40,480,000, $40,480,000 To be undertaken as part of the I-4 Beyond the Ultimate Saxon Ramp/Roadway I-4 to Normandy CST - $35,380,000 $35,380,000 To be undertaken as part of the I-4 Beyond the Ultimate Rhode Island Extension SR 15 (US 17) - widen to 4 lanes SR 40 - widen to 6 lanes SR 40 - widen to 4 lanes SR 40 - widen to 4 lanes 6 SR 100 widen to 6 lanes Veterans Memorial Pkwy to Normandy Ponce de Leon to SR 40 Williamson to Breakaway Tr widening PE - $455,410 - FY 16/17; ROW - $13,691,472 - FY 16/17 through FY 20/21; RRU - $3,000,000 - FY 20/21; CST - $50,186,043 - FY 20/21 widening PE - $2,130,000, ENV -$130,000, ROW - $7,430,000, CST - $22,990,000, (all costs are 2014) Cone Rd to SR 11 widening ROW - $2,300,000, CST - $41,500,000 (all costs are 2015) SR 11 to SR 15 (US 17) Old Kings Rd to Belle Terre Pkwy widening ENV - $4,500,000 - FY 16/17; ROW - $5,246,000 - FY 21/22 CST - $34,870,000 $34,870,000 To be undertaken as part of the I-4 Beyond the Ultimate CST - $35,000,000; (all costs are2017) widening ROW - $3,170,000; CST - $31,700,000 $76,700,000 FULLY-FUNDED $33,260,000 (2014) Also on Regionally-Significant, Non-SIS List; PD&E was completed in 2014 $50,360,000 PE/ENV was completed in 2016 $48,500,000 (2017) $34,870,000 (2015) PE was completed in 2014 Also on Regionally Significant, Non-SIS s List 1 s which are ranked one through five on the List of Prioritized SIS Roadway s will remain in their current spot or move to the next available higher spot until they are completed and drop out of the Work Program. 2 Funds and phases programmed in prior years are not reported here, but can be found in the R2CTPO s Transportation Improvement Program (TIP). Pg 2

3 River to Sea TPO List of Prioritized Regionally Significant, Non-SIS s ADOPTED 6/28/17 Rank 3 FDOT FM# Name Limits Type Programmed Phase(s) 4 Needed Phase(s) 1 US 1 intersections intersection (from the US 1 AIS) improvements SR 5 (US 1) at Park Av SR 5 (US 1) at Park Av SR 5 (US 1) at Canal St SR 5 (US 1) at Reed Canal Rd SR 5 (US 1) at Big Tree Rd SR 483 (Clyde Morris ) widen to 6 lanes Old Kings Rd widen from 2 lanes to SR 44 Miscellaneous upgrades to improve access to DeLand SunRail SR 5 (US 1) at Canal St SR 5 (US 1) at Reed Canal Rd SR 5 (US 1) at Big Tree Rd SR 400 (Beville Rd) to SR 600 (US 92 International Speedway ) Palm Coast Pkwy to Forest Grove Dr between SR 15A and SunRail Station Estimated Total Cost - - PE- $372,000 - FY 19/20 CST TBD bound right turn lane added as part of FM# , US 1 Median Modifications); PE for signal system upgrade to improve intersection operations is programmed in FY 19/ PE - $107,342 FY 16/17; - - $7,345,128 FULLY FUNDED ROW - $5,718 FY 16/17; RRU - $605,264 FY CST - $4,887,349- FY 18/ PE - $7,793 FY 16/17; - - $2,485,713 FULLY FUNDED ROW - $15,152 FY 16/17; CST $1,279,781- FY 16/17 through FY 17/ PE - $10,389 FY 16/17; - - $1,237,336 FULLY FUNDED ROW - $17,171 FY 16/17; CST - $635,530 - FY 17/18 widening PE - $13,934 FY 16/17; ROW $24,673,760 - FY 17/18 through FY 21/22 CST - $29,100,000 (2017) widening CST - $13,250,000 (2014); CEI - $1,600,000 (2014) misc. upgrades to improve access to the SunRail station - - ROW - $1,740,000, CST - $17,36,000 $70,100,000 CST cost matches CFLRoads info last updated 2017 $17,260,000 Cost estimates per Table 1, Palm Coast FY 14/15 - FY 18/19 FDOT 5-Yr Work Program Priorities $19,100,000 SR 44 corridor study completed 3 s which are ranked one through five on the List of Prioritized Regionally Significant, Non-SIS Roadway s will remain in their current spot or move to the next available higher spot until they are completed and drop out of the Work Program. 4 Funds and phases programmed in prior years are not reported here, but can be found in the R2CTPO s Transportation Improvement Program (TIP). Pg 3

4 River to Sea TPO List of Prioritized Regionally Significant, Non-SIS Roadway s Continued Rank 3 FDOT FM# Name Limits Type Programmed Phase(s) 4 Needed Phase(s) US 92 widen from 4 I 4 EB Ramps to widening PE - $185,655 FY 16/17; CST - $23,000,000 to 6 lanes SR 600 (US 92) to CR ROW - $9,863,891- (2017) 415 (Tomoka Farms FY 18/19 through Rd) FY 21/22; ENV - $1,500,000 FY 16/ Old Kings Road Extension - Phase II and Commerce Pkwy Connector Road new 2 lane roadway Matanzas Woods Pkwy (west) widen to 4 lanes 9 SR 600/SR15 (US 17/92) Emerging SIS 10 LPGA - widen to 3 lanes 11 IFZ3-1 Howland - widen to 4 lanes 12 North Entrance DeLand Airport (Industrial Park) SR 40 - widen to 6 lanes Matanzas Woods Pkwy to Old Kings Rd SR 100 to US 1 US 1 to I-95 southbound ramps SR 472 to SR 15A (Taylor Rd) SR 5A (Nova Rd) to SR 5/US 1 Providence to Elkcam Industrial Park to SR 11 Williamson to Breakaway s 14 SR 100 widen to 6 lanes Old Kings Rd to Belle Terre Pkwy 15 SR 442 Extension SR 442 to SR 415 PD&E for new road new road construction CST - $3,782,318 - FY 18/19 new road construction widening PE - $1,903,000 - FY 18/19 CST - $8,800,000 (2017) CEI - $880,000 ROW - $183,000; ENV - $28,000; CST - $12,653,000; CEI - $1,265,000 not yet determined - - ROW - $3,000,000 CST - $27,000,000 widening - - ROW - $3,500,000 CST - $9,000,000 widening ROW - $2,500,000 FY 17/18; CST - $10,850,000 FY 18/19 - FY 19/20 Estimated Total Cost $37,500,000 CST cost estimate from CFLRoads (2017) - - $5,600,000 FULLY FUNDED $10,979,000 $459,638 remaining in LAP to apply toward CST; plans are complete; $16,032,000 Cost estimates per Table 1, Palm Coast FY 14/15 - FY 18/19 FDOT 5-Yr Work Program Priorities $30,000,000 $12,500,000 new road - - CST - $970,000 $970,000 widening PD&E - $5,881 FY 16/17 PE - $2,130,000, ENV - $130,000, ROW - $7,430,000, CST - $22,990,000, widening - - ROW - $3,170,000 $14,320,000 FULLY FUNDED w/ local funding (Bond & LOGT) Also on SIS s List $34,870,000 Also on SIS s List CST - $31,700, PD&E - $10,000,000 $10,000,000 s which are ranked one through five on the List of Prioritized Regionally Significant, Non-SIS Roadway s will remain in their current spot or move to the next available higher spot until they are completed and drop out of the Work Program. Pg 4

5 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s ADOPTED 6/28/17 Tier "A" - s with One or More Phases Funded Rank FDOT FM# Name Limits Type Doyle Road Paved Lush Ln to Paved Shoulders Courtland shoulders Mast Arm Installation on SR A1A at Cardinal Dr Turnbull Bay Road Paved Shoulders Old New York Avenue Paved Shoulders and Lane Widening Dunlawton Av Walk Light Construction - Ph Mast Arm Installation on SR A1A at Harvard Dr US 1 Traffic Signal Upgrades SR40 Signal Design Build Operate & Maintain SR A1A and Cardinal Dr from Pioneer to Sunset Drive from SR 44 to Shell Rd SR 5 (US-1) to Spruce Creek Rd at SR A1A and Harvard Dr at 3rd St, 6th St, 8th St, Walker St, and Flomich St Tymber Creek Rd to SR A1A Traffic signal support system upgrade Paved shoulders Paved shoulders Pedestrian lighting Traffic signal support system upgrade Traffic signal support system upgrade Arterial Traffic Management Sponsor Ormond Programmed Phase(s) 5 PE - $98,662 - FY 16/17; CST - $1,142,182 - FY 17/18 PE - $227,000 - FY 17/18 CST - $545,316 - FY 19/20 PE - $289,000 FY 16/17; CST - $2,403,195 - FY 18/19 PE - $390,000 - FY 16/17; CST - $2,962,539 - FY 20/21 Port Orange PE - $99,000 FY 16/17; CST - $577,100 - FY 16/17 Ormond Holly Hill PE - $227,000 - FY 17/18 CST - $573,986 - FY 19/20 PE - $1,51,000 FY 16/17 and FY 17/18 FDOT PD&E - $120,000 FY 18/19 OPS - $1,560,000 FY 19/20 through FY 21/22 Needed Phase(s) Estimated Total Cost Local Match % - - $1,240,844 10% FULLY-FUNDED $772,316 10% FULLY-FUNDED - - $2,692,195 10% FULLY -FUNDED - - $3,352,539 10% FULLY-FUNDED - - $786,000 10% FULLY-FUNDED - - $800, FULLY-FUNDED CST - $2,000,000 $3,505,000 0% - - $1,680,000 0% FULLY-FUNDED; replaces SR 40 Corridor Traffic Control Adaptive System 5 Funds and phases programmed in prior years are not reported here, but can be found in the R2CTPO s Transportation Improvement Program (TIP). Pg 5

6 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "B" - s Ready for Funding Rank 6 Name 1 Seminole Woods Pkwy/SR 100 Safety Improvement 2 LPGA Corridor Traffic Control Adaptive System 3 SR 44 (New Smyrna ) Corridor Traffic Control Adaptive System 4 SR 15 (US 17/92) at Fort Florida Rd SunRail Bus/Pedestrian Pre-Emption 5 Saxon Corridor Traffic Control Adaptive System 6 SR 421 (Port Orange) Corridor Traffic Control Adaptive System Limits Type Sponsor Needed Phase(s) Seminole Palm PE - $3,809; CST - Woods improvement Coast $145,808; CEI - $14,580 Pkwy at SR (add turn lane (2017) 100 & upgrade signal heads) from the I- 95 SB ramps to Clyde Morris Airport Rd to 3rd Av US 17/92 at Fort Florida Rd Market Place Dr to Normandy Summer Trees Rd to SR A1A (S. Atlantic Av) Adaptive Signal Control Adaptive Signal Control Traffic Signal Adaptive Signal Control Adaptive Signal Control PD&E - $18,000 PE - $35,000 CST - $500,000 CEI - $75,000 PD&E - $35,000 PE - $98,000 CST - $1,400,000 CEI - $210,000 PE - $30,000 (FDOT inhouse) CST - $200,000 CEI - $30,000 PD&E - $18,000 PE - $56,000 CST - $800,000 CEI - $120,000 PD&E - $35,000 PE - $98,000 CST - $1,400,000 CEI - $210,000 Estimated Total Cost Local Match % Year Submitted Score $160,388 10% $628, % $1,610,000 (excludes SEMP and Design) $230,000 (excludes Design) 0% % $994,000 10% $1,610,000 (excludes SEMP and Design) 0% s which are ranked one through eight on Tier "B" of the List of Prioritized XU Traffic Operations/ITS/Safety s will be ranked in their current spot or move to the next available higher spot until they are completed and drop out of the Work Program. Pg 6

7 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "B" - s Read y for Funding Rank 6 Name 7 Tivoli Dr 8 East Traffic Management Center Relocation Limits Type Sponsor Needed Phase(s) Tivoli Dr at Deltona PD&E - $5,000 Saxon PE - $100,000 and CST - $1,614,700 Providence CEI - $55,000 Other - $635,300 on SR 44 west of SR 415 New Traffic Management Center PE - $105,000 CST - $700,000 CEI - $70,000 Other - $17,500,000 (VC match) Estimated Total Cost Local Match % Year Submitted Score $2,410,000 33% $875,000 (w/o local match, excludes site acquisition/development costs) 10% SR 5 (US 1) at Turgot Av Eastbound Right-Turn Lane 10 East International Speedway. (US 92) "side" Corridor Improvement 11 Elkcam Boulevard paved Shoulders 12 SR 421 Right Turn Lane on Westbound Dunlawton Av at City Center Pkwy/Victoria Gardens US 1 at Turgot Av from Halifax River to SR A1A from Fort Smith Boulevards to Sylvia Drive SR 421 at City Center Pkwy Corridor improvements Paved shoulders Edgewater PE - $30,000 CST - $73,302 CEI - $7,330 PE - $750,000 ROW - $26,100,000 CST - $7,000,000 CEI - $750,000 Deltona PE - $316,224 CST - $1,581,122 CEI - 287,168 Port Orange PE - $30,000 CST - $202,500 CEI - $20,150 $110,632 10% $34,600,000 -% $2,134,515 10% $252,650 0% Pg 7

8 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "B" - s Read y for Funding Rank 6 Name 13 Belle Terre Pkwy Corridor (Pine Grove Dr to Pritchard Dr) 14 Belle Terre Corridor Improvement- Ponce DeLeon- Point Pleasant 15 Belle Terre Pkwy/Royal Palms Pkwy 16 Doyle Road Paved Shoulders from Twisted Oak to Lush Lane 17 Fluhart Drive Roundabouts 18 Paved Shoulders and s on Jacobs Rd from Plymouth Av to US-92 Limits Type Sponsor Needed Phase(s) from Pine Palm PE - $?? Grove Dr Coast CST - $500,000 to CEI - $50,000 Pritchard Dr from Ponce DeLeon to Point Pleasant At Royal Palms Pkwy from Twisted Oak Tr to Lush Ln Fluhart Dr at Halifax and Riverside Dr from Plymouth Av to US- 92 Paved shoulders Roundabouts Paved shoulders Palm Coast Palm Coast Ormond PE - $?? CST - $281,000 CEI - $28,100 PE - $?? CST - $1,698,000 CEI - $169,800 PE - $80,000 ROW - $222,785 CST - $507,292 CEI - $60,000 PE - $45,600 CST - $277,600 CEI - $22,800 PE - $100,000 CST - $1,873,265 CEI - $100,000 Estimated Total Cost Local Match % Year Submitted Score $550,000 10% City to use local funds for PE and CEI; $309,100 10% City to use local funds for PE and CEI; $1,867,800 10% City to use local funds for PE and CEI; $870,077 10% to use local funds for PE and CEI; $296,000 10% $1,973,265 10% to use local funds for PE and CEI; Pg 8

9 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "B" - s Read y for Funding Rank 6 Name 19 Paved Shoulders and on Stone Street from Orange Av to CR-92 / W Int'l Speedway 20 Railroad Quiet Zone Crossing Protection Limits Type Sponsor Needed Phase(s) from Paved PE - $100,000 Orange Av shoulders ROW - $159,242 to CR-92 / CST - $1,443,213 W Int'l CEI - $100,000 Speedway FEC Ridge, Big Tree Rd, Beville Rd, and Country Club Rd Rail crossing improvements Estimated Total Cost Local Match % Year Submitted Score $1,802,455 10% to use local funds for PE and CEI; CST - $97,350 $97,350 10% 2016 (not scored) City was awarded a state Quiet Zone Grant of $52,175 (50% match required) Pg 9

10 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "C" s Awaiting Feasibility Study Rank Name Limits Type Sponsor 1 Traffic Camera Network city-wide ITS 2 US 92 (Int'l Speedway ), Tomoka Farms Rd, & Bellevue Av Study 3 Dirksen/Fort Florida & US SR 44 & Kepler Rd - Alternative Design or Areawide Plan for Congestion Mitigation 5 SR 15A (Spring Garden ) at SR 44 (W New York Av) Turn Lane Feasibility Study 6 US 92 & Kepler Road - Westbound Left Turn Lane Extension 7 Taylor Rd/ Williamson & Taylor Rd/Dunlawton Av corridor at I-95 8 US & Highbanks Road - bound Right Turn Lane Extension US 92 at Tomoka Farms Rd & Bellevue Av US at Ft Florida Rd & Dirksen Rd SR 44 at Kepler Rd SR 15A at SR 44 US 92 at Kepler Rd Taylor Rd at Williamson US at Highbanks Rd improvements improvements Alternative Design or Areawide Plan for Congestion Mitigation improvements Local Year Match % Submitted 10% 2011 Score 0% DeBary 0% % Install traffic monitoring system; on hold pending outcome of ITS Master Plan; 10% Feasibility study may be needed; coordinate scope w/ VC and FDOT; as of 9/15/2016, reported by Amir Asgarinik as In Scope Development 10% At mtg. w/ VC & FDOT on 7/20/16, Amir Asgarinik agreed to develop a project scope with the expectation that FDOT would do this project; it was agreed that the TPO does not need to do a feasibility study; Port Orange 10% % At mtg. w/ VC & FDOT on 7/20/16, Jon Cheney recommended 7 TIP Subcommittee ranked, but did not score, applications submitted in 2011 for feasibility study. Pg 10

11 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "C" s Awaiting Feasibility Study Rank Name Limits Type Sponsor 9 US & New York Av - bound Right Turn Lane Extension 10 Old Mission Road Guardrail Addition (Park Av to Josephine St) 11 SR 421/Dunlawton Av & Victoria Gardens - Westbound Left Turn Lane Extension 12 Signal Enhancement at SR 5/US 1 and SR Pioneer Paved Shoulders (Tomoka Farms Rd to Airport Rd) 14 Pioneer Paved Shoulders (Airport Rd to Williamson ) 15 SR 400 (Beville Rd) Mast Arm Traffic Signals (Golfview & Magnolia Av) 16 Eastbound Madeline Avenue Left- Turn Lane at Clyde Morris Boulevard 17 of Herbert Street and Nova Rd 18 US 1 Streetscape Phase II US at New York Av Park Av to Josephine St Safety Improvement SR 421 at Victoria Gardens SR 5 at SR 100 Tomoka Farms Rd to Airport Rd Airport Rd to Williamson SR 400 at Golfview & Magnolia Av Madeline Av at CR 483 (Clyde Morris ) Herbert St at SR 5A (Nova Rd) McDonald Av to City Limit Add protected left turn arrow Safety Safety Local Year Match % Submitted Score 10% no action be taken regarding these projects until after the Cross Transit Connector Study has been completed to see if BRT is recommended; then, we need to consider the need for queue-jumping right turn lanes; 10% On hold per (2/24/2017) 10% to request FDOT review w/ expectation that FDOT will do as push button project; Bunnell 10% Traffic Signal Upgrade improvements improvements Streetscape and resurfacing 10% % % Port Orange 10% Port Orange 10% % Pg 11

12 River to Sea TPO List of Prioritized Traffic Operations, Safety, and Local Initiatives s Tier "C" s Awaiting Feasibility Study Rank Name Limits Type Sponsor 19 James Street/Anastasia Drive Traffic Circle at Big Tree Rd 20 Traffic Signal at Carmen Dr and Reed Canal Rd 21 Golfview Boulevard Traffic Circle at Big Tree Road 22 Magnolia Avenue Traffic Calming Island 23 Reed Canal Road Roadway Enhancements 24 Anastasia Drive Traffic Calming Island 25 Big Tree Road Roadway Enhancements Big Tree Rd at James St/Anastasia Dr Reed Canal Rd at Carmen Dr Big Tree Rd at Golfview from Reed Canal Road to Big Tree Road from SR 5A (Nova Rd) to SR 5/US 1 (Ridgewood Av) from Big Tree Road to Ridge Boulevard from SR 5A (Nova Rd) to SR 5/US 1 (Ridgewood Av) 26 Sauls Street Traffic Calming Island from Reed Canal Rd to Madeline Av 27 Reed Canal Park Wood Bridge Replacement Reed Canal at entrance to Reed Canal Park New roundabout Traffic signal upgrade New roundabout Traffic calming Roadway/sidewalk barrier Traffic calming Corridor enhancements Traffic calming Bridge replacement Local Year Match % Submitted Score 10% % % % % Resurfacing component is not eligible for TPO funding 10% % Resurfacing component is not eligible for TPO funding 10% % Pg 12

13 River to Sea TPO List of Prioritized Bicycle and Pedestrian s ADOPTED 6/28/17 Tier "A" s with One or More Phases Funded Rank FDOT FM# Name Limits Type Sponsor Programmed Phase(s) 8 Needed Phase(s) Estimated Total Cost Local Match % Flagler Av 12th St to Park Av Edgewater PE - $4,312 - FY 16/17; CST - $416,830 - FY 17/18 -- $457,945 10% FULLY-FUNDED Forrest Hills Connector N. Spruce Creek Rd Halifax River/East Coast Greenway Seminole/ Gap Black Bear Scenic (SR 40) W. French Av and Bike Lane W. French Av Shared Use Path Old Tomoka Rd to Scottdale Dr Nova Rd to Angelina Ct Wilder Bv to Shady Place Wayside Park to (Seminole ) Spring to Spring ( ) SR 35 (Marion ) to US 17 ( ) N. Carpenter Av to Valentine Park Spring to Spring to Valentine Park Alabama Av Minnesota Av to US Beville Rd Shared Use Path Williamson Bv to Clyde Morris Bv and Bike Lane Ormond Port Orange Orange City Orange City PE - $1,281 - FY 16/17; CST - $589,288 FY 17/18 PE - $74,355 - FY 16/17; CST - $404,595 FY 18/19 PE 101,000 - FY 16/17CST - 1$400,000 - FY 17/18 CST - $2,572,266 - FY 16/17$25,675 - FY 17/18 PD&E - $4,620 - FY 16/17 DeLand CST - $1,344,112 - FY 19/20 -- $645,692 10% FULLY-FUNDED -- $478,158 10% FULLY-FUNDED -- $525,517 10% FULLY-FUNDED -- $2,099,356 0% FULLY-FUNDED PE, CST TBD 0% Also known as SR 40 CST - $579,083; CEI - $49,871 $727,142 10% Connects to FM # PE - $19,299 - FY 16/17 ROW; CST TBD 10% Alternative design on south side French Av PE - $131,800 - FY 16/17CST - $964,030 - FY 2020/21 -- $1,494,267 0% FULLY-FUNDED -- $1,095,830 0% FULLY-FUNDED 8 Funds and phases programmed in prior years are not reported here, but can be found in the R2CTPO s Transportation Improvement Program (TIP). Pg 13

14 River to Sea TPO List of Prioritized Bicycle and Pedestrian s Tier "A" s with One or More Pha Funded Rank FDOT FM# Name Limits East Central Guise Rd to Regional Rail Gobbler s Lodge (ECRRT) Rd Spring to Spring Detroit Terrace to US US 17 W. Baxter St to SR Spring to Spring Lake Beresford Park to Grand Av Nova Rd Bellevue Av to St Halifax River Greenway Freemont Av Marina Point Dr to Orange Av US 17 Washington Av to Palmetto Av Deltona Lakes/Spirit Elem s Spring to Spring Connector Halifax River Greenway Tomoka Elementary Connector Type Sponsor Programmed Phase(s) 8 Needed Phase(s) Estimated Total Cost Local Match % -- $5,003,500 10% FULLY-FUNDED Niles St to US 1 CST - $$5,003,500 - FY 17/18 PE - $299,271 - FY 16/17 ROW, CST TBD 10% SUN funded for ROW and CST phases. PE, ROW,CST -- TBD 0% FULLY-FUNDED Included in roadway widening project PE - $751,000 - FY 16/17 CST - $298,116 - FY FY 16/17 PE - $101,000 - FY 16/17; CST - $450,000 - FY 17/18 CST (RR Xing Only) - $350,000 FY 16/17 Pierson PE - $301,000 - FY 17/18 CST TBD 0% SUN funded -- $298,116 10% FULLY-FUNDED -- $551,000 0% FULLY-FUNDED SUN CST $399,665 CST needed is for S/W only, pending completion of RR Xing work -- $1,424,240 0% FULLY-FUNDED SUN [multiple limits] Deltona PE - $15,901 - FY 17/18 CST TBD 10% Deferred to FY 2018/19 Spring to Spring to US Bellevue to Marina Point Dr Main to Granada Bv DeBary PE - $25,000 - FY 16/17; CST - $225,000 - FY 18/19 Ormond PE - $66,000 - FY 16/17; CST - $450,000 - FY 17/18 -- $250,000 0% FULLY-FUNDED Coast to Coast -- $516,000 0% FULLY-FUNDED SUN PE - $28,400 - FY 17/18 CST TBD 10% along Old Tomoka Road Pg 14

15 River to Sea TPO List of Prioritized Bicycle and Pedestrian s Tier "A" s with One or More Pha Funded Rank FDOT FM# Name Limits Williamson Hand Av to Regal Bv/Hand Av Theater Driveway Pedestrian Navy Canal Museum Bv to Clyde Morris Bv Tomoka State Park Sanchez Park to Tomoka State Park Lakeview Bv Matanzas Parkway to London Dr Type Sponsor Programmed Phase(s) 8 Needed Phase(s) Ormond Ormond Palm Coast Local Match Estimated Total Cost % PE - $28,400 CST TBD 10% Pedestrian Signal and. PE - $48,500; CST - $250, $299,070 10% FULLY-FUNDED PE - $87,000 CST TBD 10% connector between Sanchez Park and Tomoka Park CST - $563, $563,771 10% FULLY-FUNDED Pg 15

16 River to Sea TPO List of Prioritized Bicycle and Pedestrian s Tier "B" s Ready for Funding Ranking Name Limits 1 N. Orange/E. Graves Av s 2 Providence Bv Shared Use Path 3 East ISB side Corridor Improvement Plan 4 Coast to Coast Wayfinding Signage 5 Center Av, Phase 1 6 Ormond Downtown Crosswalk RRFB French Av to University Av/Thorpe Av to Leavitt Av Spring to Spring to Alexander Dr and Tivoli Dr to Joyner Dr US 92 Bridge to SR A1A Lake Monroe Park to Rotary Park LPGA Bv to Flomich St side of SR 40 to Northside of SR 40 7 Flomich St Nova Rd to Decatur St 8 SR A1A National Scenic & Historic Coastal Byway Beautification, Phase 1 N. 10th St to S. 10th St 9 15th St Nova Rd to Center Av 10 SR A1A Pedestrian [multiple locations] Safety 11 S. Holly/E. Lansdowne Av s Graves Av to Blue Springs Av/ Av to Orange Av Type Sponsor Needed Phase(s) Orange City PE - $56,587; CST - $185,665 (2015) Deltona PE - $284,256; CST - $1,421,281 (2017) Complete Streets Signage PE - $750,000; ROW - $20,000,000; CST - $6,000,000; CEI - $750,000 (2017) PE/CST - $150,000 (2017) Holly Hill PE - $207,208; CST - $664,026 (2017) RRFB Ormond PE - $10,000; CST - $36,750 (2017) Holly Hill PE - $87,110 ROW - $79,050 CST - $340,729 (2016) Hardscapi ng Flagler Holly Hill PE - $170,700; CST - $542,304 (2017) Crosswalk Ormond PE - $18,000; CST - s $120,000 (2017) Orange City Estimated Total Cost Local Match % Year Submitted Score $241,952 10% Protected Status $1,918,729 33% Phase 1 trail segment $27,500,000 -% sponsor has proposed advancing design with local funds $150,000 10% Signs along Coast to Coast and Rail corridors $937,667 10% LAP Certification needed $52,750 0% Funded by FDOT Safety Office $506,889 10% LAP Certification needed PE - ; CST - TBD 10% To be completed in the reconstruction of SR A1A PE $101,294 CST - $289,412 (2016) $767,234 10% LAP Certification needed $144,000 10% Funded by FDOT Safety Office $492,883 10% LAP Certification needed Pg 16

17 River to Sea TPO List of Prioritized Bicycle and Pedestrian s Tier "B" s Ready for Fu nding Ranking Name Limits 12 Halifax River/East Coast Greenway 13 Graham Swamp Gap, Phase 2 14 Reed Canal Rd Shared Use Path Orange Av to Intl. Speedway Bv Lehigh to Graham Swamp head Nova Rd to Ridgewood Av 15 US 1 Airport Rd to Wilmette Av 16 Lehigh head At Palm Coast Tennis Center 17 Derbyshire Park and s 18 Bunnell Elementary School s 19 Derbyshire Park 20 SR 44 Median, Phase 2 21 Tarragona Way Internal to Derbyshire Park Type Sponsor Needed Phase(s) and head and Palm Coast Ormond Palm Coast PE - $55,000; CST - $385,500 CEI - $77,000 (2016) PE - $350,000; CST - $2,500,000 (2017) CEI - $250,000 PE - $725,608; CST- TBD (2016) PE - $28,000 CST - $253,000 (2015) PE - $100,000; CST - TBD (2016) [multiple limits] Bunnell PE - $83,467 CST - $417,333 (2015) Vine St to Nova Rd and Brentwood St to 5th St Glencoe Rd to Sugarmill Dr Australia St to Museum St Landscapi ng and Median Improvem ents New Smyrna Estimated Total Cost Local Match % Year Submitted Score $517,000 10% Also known as Sweetheart $3,100,000 10% Phase 2 trail segment TBD 10% Construction cost to be determined $281,000 10% Includes upgraded pedestrian signals TBD 10% Serves Lehigh CST - $458,736 (2014) $458,736 10% Internal Derbyshire Park $500,800 10% LAP Certification needed CST - $413,648 (2014) $413,648 10% External Derbyshire Park PE - $80,000; CST - $548,000; CEI - $20,000 (2015) $648,000 10% Landscaping to be local ly funded CST - $300,894 (2014) $300,894 10% Designed by project sponsor Pg 17

18 River to Sea TPO List of Prioritized Bicycle and Pedestrian s Tier "C" s Awaiting Feasibility Study Local Match Year Ranking Name Limits Type Sponsor % Submitted Score 1 Flomich St, Phase Decatur St to Ridgewood Av Holly Hill 10% Ponce Inlet Mobility [multiple limits] Ponce Inlet 10% Turnbull Bay Road Industrial Park Av to Fairgreen Av New Smyrna 10% SR 442 I-95 to Air Park Rd Edgewater 10% Taylor Road Leaning Tree Place to Blue Lake Av DeLand 10% Madeline Av Clyde Morris Bv to Nova Rd Port Orange 10% Willow Run Bv Harms Way to Clyde Morris Bv Port Orange 10% Magnolia Av Shared Use Reed Canal Rd to Beville Rd 10% Path 9 St Turnbull Bay Rd to US 1 New Smyrna 10% Center Av, Phase 3 rd St to LPGA Bv Holly Hill 10% Anastasia Dr Shared Use Reed Canal Rd to Big Tree Rd 10% Path 12 Ocean Av S. Peninsula Av to S. Atlantic Av New Smyrna 10% Gap US Bridge to Spring to Spring 10% Art Center Bv Sundance to US 1 New Smyrna 10% Lambert Av Palm Dr to Lambert Cove Flagler 10% TBD to be determined Pg 18

19 River to Sea TPO List of Prioritized Transit s ADOPTED 6/28/17 Rank FDOT FM# Name Limits 1 Commuter Rail - SunRail Phase 2 DeBary Station to North expansion DeLand Station Type Programmed Phase(s) 9 Needed Phase(s) Estimated Total Cost Rail - - PE/CST $77.1 million Includes new DeLand Station Note: Transit projects are typically identified by the designated recipient of transit funding. No transit projects have been identified at this time. 9 Funds and phases programmed in prior years are not reported here, but can be found in the R2CTPO s Transportation Improvement Program (TIP). Pg 19

20 River to Sea TPO List of Prioritized Transportation Planning Studies ADOPTED 6/28/17 Rank FDOT FM# Study Name Study Limits Sponsor 1 Mason Avenue Corridor Study from Riverside Dr to Williamson 2 SR 44 & Beresford Avenue Extension 3 LPGA Corridor Management Plan 4 side Neighborhood Pedestrian Safety, Mobility & Access Programmed (Year) Estimated Total Study Cost Year Submitted Score - $75, FDOT is committed to a partnership, but can t initiate before FY 17/18. from Kepler Rd to SR 44 DeLand - $100, LPGA from US 92 to SR 5A (Nova Rd) beachside in $75, Ft Florida Road Planning Study US 17 DeBary - $75, DeBary Village Center Corridor Improvement Study 7 West extension of DeLand Greenway 8 New Smyrna Trolley Feasibility Study 9 New Smyrna US 1 Complete Streets 10 Flagler Multi-Modal Hub Study 11 Bicycle & Pedestrian Master Plan SIS Planning 1 I-95/ US 1 Interchange Modifications 2 I-95/LPGA Interchange Modifications 3 I-95/Pioneer New Interchange TBD to be determined from Highbanks Rd at US to Plantation Rd at US From Alabama Greenway to Spring to Spring City-wide city limit to north city limit City-wide City-wide DeBary - TBD DeLand - $25,000 to $55,000 New Smyrna New Smyrna Flagler Pg 20 - $50, $64, $150, $115, at SR 5/US 1 - TBD 2016 (not scored) at LPGA - TBD 2016 (not scored) at Pioneer - TBD 2016 (not scored) Multiple alignments between Minnesota Av and Euclid Av will be considered SIS Needs List SIS Needs List -Funded s List

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects

R2CTPO 2040 LRTP Draft Project List as Approved by the TPO Board (June 24, 2015) Strategic Intermodal System (SIS) Projects Printed 6/9/15 Project I-4 - widen to 1 lanes (Managed Use Lanes) Part of the I-4 Beyond the Ultimate project SR 47 - widen from 4 to 6 lanes (including ramps) Saxon Blvd - ramp and roadway improvements

More information

Regional Trails Corridor Assessment

Regional Trails Corridor Assessment Regional Trails Corridor Assessment Project Goals Complete the regional trails network in the River to Sea TPO Planning Area and advance the Florida Greenways and Trails System Plan by developing/finalizing

More information

NOTE: PLEASE SILENCE ALL BEEPERS AND CELL PHONES DURING THE MEETING!! AGENDA I. CALL TO ORDER / ROLL CALL / DETERMINATION OF QUORUM

NOTE: PLEASE SILENCE ALL BEEPERS AND CELL PHONES DURING THE MEETING!! AGENDA I. CALL TO ORDER / ROLL CALL / DETERMINATION OF QUORUM Please be advised that the Volusia Transportation Planning Organization (TPO) CITIZENS ADVISORY COMMITTEE (CAC) & TECHNICAL COORDINATING COMMITTEE (TCC) will be meeting on: DATE: Tuesday, August 21, 2012

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

2016 TELL THE TPO SURVEY

2016 TELL THE TPO SURVEY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 TELL THE TPO SURVEY CAMPAIGN SUMMARY August 2016 Introduction The River to Sea Transportation Planning Organization (TPO) conducted its second Tell

More information

Planning & Development Services Division

Planning & Development Services Division Planning & Development Services Division To: From: County Chair and Members Volusia County Council Kelli McGee Acting Director of Growth and Resource Management Date: March 21, 2011 for Transmittal Hearing

More information

DRAFT Transportation Congestion Management/Performance Measures Report

DRAFT Transportation Congestion Management/Performance Measures Report DRAFT 20176 Transportation Congestion Management/Performance Measures Report Table of Contents INTRODUCTION... 1 CMP NETWORK IDENTIFICATION... 2 PERFORMANCE SCORECARD... 3 MOTOR VEHICLE TRAVEL... 6 FEDERAL

More information

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL

APPENDIX D: Southwest Volusia Regional Transportation Study. Evaluation Criteria FINAL D: PROJECT PRIORITIZATION Prioritization of the improvements proposed in the Multimodal Improvement Plan is required in order to determine which projects should be funded first, where the transportation

More information

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES

DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES DRAFT FY 2017-FY 2021 FLORIDA-ALABAMA NON-SIS PROJECT PRIORITIES PROPOSED CHANGES BY ESCAMBIA AND SANTA ROSA COUNTIES Table 2: Non-Strategic Intermodal System (Non-SIS) Project Priorities FDOT Item- Phases

More information

This report was financed, in part, by the U.S. Department of Transportation and the Florida Department of Transportation.

This report was financed, in part, by the U.S. Department of Transportation and the Florida Department of Transportation. This report was financed, in part, by the U.S. Department of Transportation and the Florida Department of Transportation. Special recognition and appreciation is extended to the following members of the

More information

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information

Presentation Outline. PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact Information Volusia Transportation Planning Organization CAC / TCC Project Update Tuesday, May 21, 2013 1 Presentation Outline PD&E Study Process Project Overview Proposed Alternatives & Evaluation Schedule Contact

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017

Congress Avenue. Palm Beach MPO Subcommittee Meetings December 2017 1 Congress Avenue Palm Beach MPO Subcommittee Meetings December 2017 2 Agenda Study Purpose Study Process Multimodal Alternatives Development Next Steps *ACTION ITEM: CONFIRM ALTERNATIVES TO MOVE INTO

More information

AGENDA I. CALL TO ORDER/ROLL CALL/DETERMINATION OF QUORUM/PLEDGE OF ALLEGIANCE

AGENDA I. CALL TO ORDER/ROLL CALL/DETERMINATION OF QUORUM/PLEDGE OF ALLEGIANCE MEETING NOTICE & AGENDA Please be advised that the River to Sea Transportation Planning Organization (R2CTPO) BICYCLE AND PEDESTRIAN ADVISORY COMMITTEE (BPAC) will be meeting on: DATE: Wednesday, May 13,

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

SUNRAIL FEEDER ROUTES BEGINS MAY 1 ST 2014

SUNRAIL FEEDER ROUTES BEGINS MAY 1 ST 2014 Votran will implement the following route and schedule changes on Sunday, April 27, 2014 EAST SIDE SCHEDULES Route 10: Will no longer serve the rear of Halifax Medical Center or Mayberry Av. and Heineman

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE

PROGRAMMED PHASE FISCAL YEAR, FDOT FM NO. SIS FUNDS 2014 PRIORITY 2015 PRIORITY PROJECT NAME ULTIMATE IMPLEMENTATION DESCRIPTION PROPOSED PHASE Red denotes new funding in FDOT WP since last year. SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) DRAFT 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021 A(1). STRATEGIC INTERMODAL SYSTEM

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

CITY OF SOUTH DAYTONA

CITY OF SOUTH DAYTONA CITY OF SOUTH DAYTONA FIVE YEAR WORK PLAN for HALF-CENT SALES TAX FY 2020-2025 Table of Contents Executive Summary Purpose of the Work Program... 3 Project List Magnolia Avenue North Roadway, Drainage

More information

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018

LIST OF PRIORITY PROJECTS FY TPA Committee Meetings & Board Review September 2018 LIST OF PRIORITY PROJECTS FY 2020-2024 TPA Committee Meetings & Board Review September 2018 MISSION To collaboratively plan, prioritize, and fund the transportation system. El Rio Trail Boca Raton, May

More information

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45 th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. SR 9/I-95 Interchange at PD&E Study Palm Beach County, Florida FPID No.: 436519-1-22-01 FAP No.: 0951-682-1 ETDM No.: 14225 Palm Beach County MPO October 19, 2017 SR 9/I-95 Interchange at PD&E Study Presentation

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES

BOARD ACTION AGENDA ITEM #VI PROJECT PRIORITIES NOTES BOARD ACTION AGENDA ITEM #VI-2 2017 PROJECT PRIORITIES Presenter: Summary: Colleen McGue, Mike Maholtz, and Leigh Holt, MPO Staff Each year the MPO Board adopts an annual list of Priorities. Once

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue

US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue 41 US 41 COMPLETE STREETS CORRIDOR PLANNING STUDY from University Parkway to Whitfield Avenue EXECUTIVE SUMMARY DRAFT FEBRUARY 2019 Project Overview The US 41 Complete Streets Corridor Planning Study,

More information

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017

Planning Study SR 976. Project Advisory Team Meeting May 24, 2017 ` SR 976 BIRD ROAD/SW 40TH STREET FROM SR 821/HEFT TO SR 5/US-1 Miami-Dade County, Florida FPID No.: 434845-4-22-01 Planning Study Project Advisory Team Meeting May 24, 2017 1 Agenda Introductions Project

More information

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies

CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN. Section VIII Mobility Element Goals, Objectives, and Policies CITY OF COCOA BEACH 2025 COMPREHENSIVE PLAN Section VIII Mobility Element Goals, Objectives, and Policies Adopted August 6, 2015 by Ordinance No. 1591 VIII MOBILITY ELEMENT Table of Contents Page Number

More information

INTRODUCTION. Specifically, the objectives are to:

INTRODUCTION. Specifically, the objectives are to: INTRODUCTION The River to Sea Transportation Planning Organization (TPO) conducts the Tell the TPO Transportation Trends Survey to better understand the transportation preferences and priorities for the

More information

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE

Florida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE 1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange

More information

Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period

Multi-Modal Transportation Improvement Projects Identified by Neighborhood for the 20-year Planning Period 2011 CITY CENTER MASTER PLAN UPDATE ADOPTED TRANSPORTATION ELEMENT PROJECT LIST FOR THE CBD, WATERFRONT, AND YORK, SEHOME, AND LETTERED STREETS NEIGHBORHOODS IMMEDIATELY ADJACENT TO CITY CENTER TRANSPORTATION

More information

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved

CITY OF DELRAY BEACH. Overview Map. Commuter Mode of Choice QUICK FACTS. 47 Median Age. 65,804 Residents. 29.1% Traditionally Underserved CITY OF $51,829 Median Income 291% Traditionally Underserved 438% Growth from 2010 859% HS/GED 345% Bachelors 27,041 Households 620% Labor Force Lake Okeechobee Delray Beach Palm Beach County Commuter

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1)

SPACE COAST TRANSPORTATION PLANNING ORGANIZATION (SCTPO) FY 2018 TRANSPORTATION PROJECT PRIORITIES FY FY 2023 (ADOPTED JULY 13, 2017) A(1) A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT FISCAL YEAR, FDOT PROJECT NO SIS FUNDS 1 1 ELLIS ROAD WIDENING at I-95 ETEND/WIDEN ELLIS ROAD CONNECTION TO WICKHAM DESIGN/DRAINAGE ANALYSIS

More information

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA

BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION. Tel: (941) AGENDA BICYCLE/PEDESTRIAN ADVISORY COMMITTEE-REGULAR MEETING CHARLOTTE COUNTY-PUNTA GORDA METROPOLITAN PLANNING ORGANIZATION Tel: (941) 883-3535 1. Call to Order & Roll Call AGENDA 3:00 p.m., Thursday, September

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

Chapter 3.3 Horizon Elementary School. Volusia County MPO. June 2009

Chapter 3.3 Horizon Elementary School. Volusia County MPO. June 2009 Chapter 3.3 Horizon Elementary School Port Orange, FL Volusia County MPO June 2009 Volusia County MPO School Bicycle and Pedestrian Review Study, Phase 3C School Summary Horizon Elementary School is located

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

LIST OF PRIORITY PROJECTS 2020/ /35

LIST OF PRIORITY PROJECTS 2020/ /35 LIST OF PRIORITY PROJECTS 2020/21-2034/35 Adopted June 10, 2015 Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748 This report was financed in part

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five

Florida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

TRANSPORTATION ELEMENT

TRANSPORTATION ELEMENT TRANSPORTATION ELEMENT CITY OF SOUTH DAYTONA Preparation of this Document was aided through financial assistance received from the State of Florida under the Local Government Comprehensive Planning Assistance

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012

REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017

FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during

More information

West End Connectivity Master Plan

West End Connectivity Master Plan West End Connectivity Master Plan Office of Commissioner Juan C. Zapata District 11 Page 1 of 13 Juan C. Zapata MIAMI- DADE COUNTY COMMISSIONER Introduction I am pleased to announce the West End Connectivity

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

PRESENTATION OUTLINE

PRESENTATION OUTLINE November 8, 2017 PRESENTATION OUTLINE Regional Express Lanes Network Purpose/Benefits of Express Lanes 95 Express Phase 3C Project Video and Overview 95 Express Phase 3C Schedule 2 SOUTH FLORIDA REGIONAL

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance

More information

Plant City Walk-Bike Plan

Plant City Walk-Bike Plan Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018

2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Florida Department of TRANSPORTATION 2018 FTBA ANNUAL CONFERENCE FDOT WORK PROGRAM OVERVIEW BOCA RATON RESORT AND CLUB August 2-5, 2018 Mike Dew, Secretary FLORIDA S CONTINUED GROWTH Florida has currently

More information

2. TRANSPORTATION ELEMENT.

2. TRANSPORTATION ELEMENT. 2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax

Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL (239) (239) Fax Lee County Department of Transportation 1500 Monroe Street Fort Myers, FL 33901 (239) 533-8580 (239) 485-8520 Fax ROAD WATCH UPDATE October 12 October 18, 2017 Gunnery Road and 8th Street SW Intersection

More information

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:

AGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT: AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM

More information

FM #: ETDM #: 11241

FM #: ETDM #: 11241 SR 826/Palmetto Expressway PD&E Study From SR 93/I 75 to the Golden Glades Interchange FM #: 418423 1 22 01 ETDM #: 11241 Agency/ Kick Off Meeting October 27, 2011 2 Location Map From SR 93/I 75 to Golden

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN

Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Cost Feasible Plan Report BAY COUNTY 2040 LONG RANGE TRANSPORTATION PLAN Prepared for Bay County Transportation Planning Organization and The Florida Department of Transportation, District Three Prepared

More information

FDOT Broward County Traffic Report March 2 through March 9, 2018

FDOT Broward County Traffic Report March 2 through March 9, 2018 FDOT Broward County Traffic Report March 2 through March 9, 2018 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during the week of

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

Preliminary Engineering Study

Preliminary Engineering Study Preliminary Engineering Study Open House # 2 June 6, 2018 PREPARED FOR: PREPARED BY: Agenda Background and status of preliminary engineering study County Road 26 design summary County Road 63 design summary

More information

DRAFT INVESTMENT CORRIDORS

DRAFT INVESTMENT CORRIDORS DRAFT INVESTMENT CORRIDORS Mode Studied ID CORRIDOR / ROADWAY FROM TO EXISTING CMTA ROUTES CORRIDOR TYPE PRIORITY STREET COMMUTER ELECTRIC EXPRESS LIGHT METRO RAPID RIGHT-OF-WAY PRESERVATION SHUTTLE STREETCAR

More information

ATTACHMENT "A" ULTIMATE IMPLEMENTATION DESCRIPTION

ATTACHMENT A ULTIMATE IMPLEMENTATION DESCRIPTION Red denotes new funding in FDOT WP since last year. ATTACHMENT "A" 2016 TRANSPORTATION PROJECT PRIORITIES FY 2017-FY 2021, ADOPTED JULY 9, A(1). STRATEGIC INTERMODAL SYSTEM (SIS) - HIGHWAY COMPONENT SIS

More information

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10

Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Meeting Schedule 7:00-7:15 Open House 7:15-7:45 Existing Conditions/Short-Term Improvements Study Presentation 7:45-8:00 Q&A Session 8:00-8:10 Long-Term Study Presentation 8:10-8:40 Table Discussions 8:40-9:00

More information

Executive Summary. North Florida Transportation Planning Organization Argyle Traffic Study

Executive Summary. North Florida Transportation Planning Organization Argyle Traffic Study North Florida Transportation Planning Organization i Executive Summary The Argyle Forest area is a highly congested transportation area located in southern Duval County. SR 9A (I-295) and SR 21 (Blanding

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY

CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY CITY OF CASSELBERRY WINTER PARK DRIVE IMPROVEMENT STUDY Preliminary Recommendations October 2018 2014 HDR, Inc., all rights reserved. PROJECT BACKGROUND WALKING AUDIT FINDINGS PROPOSED IMPROVEMENT CONCEPTS

More information

CHAPTER 5 TRANSPORTATION GOAL

CHAPTER 5 TRANSPORTATION GOAL CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018

P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No Halifax Regional Council September 18, 2018 P.O. Box 1749 Halifax, Nova Scotia B3J 3A5 Canada Item No. 14.1.6 Halifax Regional Council September 18, 2018 TO: SUBMITTED BY: Mayor Savage and Members of Halifax Regional Council Original Signed Jacques

More information

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights

DeSoto County. Fiscal Years FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto County Fiscal Years 2019-2023 FDOT Draft Tentative Five Year Work Program Project Highlights DeSoto Map ID 1 Project Description SR 70 over Joshua Creek - Bridge #040027 Bridge - Repair / Rehabilitation

More information

Corridor Improvement Program Phase I: Assessment of US January 28, 2013

Corridor Improvement Program Phase I: Assessment of US January 28, 2013 Corridor Improvement Program Phase I: January 28, 2013 Rural Preservation Pierson Freight Movement Pedestrian and Bicyclist Safety Downtown Redevelopment DeBary Transit Oriented Development Strategic Intermodal

More information

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2023 ADOPTED RMP Roadways Project List RMP ID# Project Name/Limits FDOT WPI# Programmed Funding Project/Strategy County SIS Length (miles) Funding Sought 1 1026 Woodville Highway 1 Phase 2018 2019 2020 2021

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Albany Shaker Road Corridor Study Public Meeting # 2

Albany Shaker Road Corridor Study Public Meeting # 2 Albany Shaker Road Corridor Study Public Meeting # 2 Scope / Meeting Purpose This project is a CDTC Linkage Study. The Linkage Program is designed to implement the adopted planning and investment principles

More information

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024

Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year Fiscal Year 2024 Capital Region Transportation Planning Agency ADOPTED RMP Roadways Priority Project List Fiscal Year 2020 - Fiscal Year 2024 Priority RMP ID# Project Name/Limits FDOT WPI# Programmed Funding Project/Strategy

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Central Avenue Corridor Study FPID Number:

Central Avenue Corridor Study FPID Number: Central Avenue Corridor Study FPID Number: 437932-1-18-01 City Commission Presentation 1 March 27, 2018 Meeting Agenda 1. Introductions 2. Project Overview 3. Opportunity for Economic Development 4. Healthy

More information

Chapter 5. Financial Analysis

Chapter 5. Financial Analysis Chapter 5 Financial Analysis This page was left blank intentionally. financial analysis Introduction The Connections 2040 RMP serves as the region s long-range transportation strategy. However, the plan

More information

Cascade Bicycle Club Recommendations

Cascade Bicycle Club Recommendations Cascade Bicycle Club Recommendations The following recommendations are focused on improving bicycle commuting in the Duwamish (South Park, South Downtown, Georgetown and North Tukwila). The recommendations

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information