SFY Transportation Improvement Program Highway and Bikeway Element Amendments
|
|
- Leonard Hood
- 5 years ago
- Views:
Transcription
1
2
3
4
5 PID Project Description SFY Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker Ht $208,052 Plan Shaker Hts: Improvements C TA $832,209 Plan Warrnesville Ctr Rd to Van Aken Blvd $1,040,261 AQ required? CUY SOUTH EUCLID SRTS (INFRASTRUCTURE) Safety Improvements RW SRS $15, South Euclid: Project involves improvements to crosswalks, sidewalks, bike paths, and drop-off areas at four South Euclid Schools PEPDSRS $5, PEDDSRS $20, CO SRS $291, $331, CUY IR L&R Bridge Painting CO ODOT $370,000 Plan Cleveland: IR 90 over GCRTA CO S/STP $3,330,000 Plan $3,700, CUY IR Resurfacing CE ODOT $13,500 Plan Cleveland: Rocky River Bridge to W 139th Project includes lighting upgrade 3.60 miles CE S/STP $121,500 Plan CO ODOT $575,000 Plan CO S/STP $5,175,000 Plan $5,885, CUY IR NOISE WALL Construct Noise Wall PEPDODOT $10, Brooklyn: Along IR 480 between Tiedeman Rd and Ridge Rd 1.20 miles PEPDNHPP $90, PEDDODOT $15, PEDDNHPP $135, CE ODOT $15, CE NHPP $136, CO ODOT $217, CO NHPP $1,953, $2,571,900 PE=preliminary engineering, RW=right of way, C=construction, CE=construction engineering, CO=construction contract, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery
6 PID Project Description SFY Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data AQ required? GEA US Minor Rehabilitation CE ODOT $8,400 Plan Chardon Twp: (Lake/Geauga County Line) to 3.75 (Chardon West Corporation Line) 3.75 miles CE S/STP $33,600 Plan CO ODOT $280,000 Plan CO S/STP $1,120,000 Plan $1,442, GEA SR Minor Rehabilitation CE ODOT $13,800 Plan Auburn Twp, Newbury Twp: US 422 to SR 87 (Kinsman Rd) 6.07 miles CE S/STP $55,200 Plan CE ODOT $10,000 Plan CO Fed $40,000 Plan CO ODOT $460,000 Plan CO S/STP $1,840,000 Plan $2,419, GEA SR Minor Rehabilitation CE ODOT $10,200 Plan Thompson Twp, Montville Twp: SR 166 (Rock Creek Rd) to SR 528 (Madison Rd) 4.45 miles CE S/STP $40,800 Plan CO ODOT $340,000 Plan CO S/STP $1,360,000 Plan $1,751, GEA SR Resurfacing CE ODOT $9,600 Plan Parkman Twp: Portage/Geauga County Line to Hosmer Rd miles CE S/STP $38,400 Plan CO ODOT $320,000 Plan CO S/STP $1,280,000 Plan $1,648, LOR CR VAR GR Replace guardrail at various CE HSIP $14, Lorain County: locations CO HSIP $186, Ward Rd, Gore-Orphanage Rd Bridges, New London-Eastern Rd Bridge; Griggs Rd Bridges; Jones Rd Bridge; Whitehead Rd; Lake Ave; Durkee Rd; Butternut Rd Bridge; and Butternut Ridge Rd $200,000 PE=preliminary engineering, RW=right of way, C=construction, CE=construction engineering, CO=construction contract, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery
7 PID Project Description SFY Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data LOR LAKE AVE (CR 204) Resurface C LOR CO $292,575 Plan Elyria Twp: Griswold Rd to Elyria Ave 1.1 miles C STP $1,170,299 Plan $1,462,874 AQ required? LOR LAKE AVE (CR 204) Resurface C LOR CO $224,626 Plan Elyria Twp: Parmly St to Griswold Rd; and Elyria Ave to North Ridge Rd 1.4 miles C STP $898,502 Plan $1,123, LOR NORTH RIDGEVILLE SRTS (INFRASTRUCTURE) Safety Improvements PEDDN Rdgvl $50, North Ridgeville: Project involves upgrading crosswalks including curb ramps, pavement markings, traffic control signage, and flashing beacons. Includes new sidewalks around Liberty, Wilcox and Lear North Elementary Schools CE SRS $37, CO SRS $338, $426,000 LOR OBERLIN BIKE PATH TRAILHEAD Bikepath Trailhead C Oberlin $108,885 Plan Oberlin: Donald J. Pease Memorial Bike Path Trailhead along the North Coast Inland Trail (north of the Oberlin Gasholder Building site) C TA $435,542 Plan $544,427 LOR OBERLIN-ELYRIA RD (CR 231) Resurface C LOR CO $255,256 Plan Carlisle Twp, New Russia Twp: SR 511 to Butternut Ridge Rd 2.1 miles C STP $1,021,025 Plan $1,276, LOR PITTS RD (TR ) Bridge Replacement PEPDFed $28, Wellington Twp: Pitts Rd (TR ) over Charlemont Creek PEPDLOR CO $1, CE LOR CO $4,215 Plan CE LBR $80,085 Plan CO LOR CO $42,135 Plan CO LBR $800,565 Plan $957,000 PE=preliminary engineering, RW=right of way, C=construction, CE=construction engineering, CO=construction contract, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery
8 PID Project Description SFY Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data AQ required? LOR SR (SIGNAL) Intersection Improvement PEDDODOT $25, Wellington Village: Intersection of SR 18 and SR 58 RW ODOT $5, RW HSIP $25, CE Wllngtn $8, CE HSIP $13, CO Wllngtn $86, CO HSIP $136, $300, MED CHIPPEWA RD (CR ) Mill & Fill CE MED CO $5, Lafayette Twp, Montville Twp: Lake Rd to SR 3 (Wooster Pike Rd) 1.81 miles CE C/STP $22, CO MED CO $140, CO C/STP $563, $732,000 PE=preliminary engineering, RW=right of way, C=construction, CE=construction engineering, CO=construction contract, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery
9 SFY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TRANSIT AMENDMENT LAKETRAN Sorted by PID No. PID Cnty Project Name (ie CRS) Project Description Ph Subphase Committed Estimate Committed Total SFY Fed-State-Local SAC Obli. Code Obligation Description Activity Line Item ALI Code LAK Laketran Operating 2014 Operating Assistance Operating Trnst/Av $98,000 $98, General Revenue 4EQ General Revenue Fund State E&D Exempt Air Quality Status LAK Laketran ADA Paratransit Non-Fixed Route ADA Paratransit Service Capital Oth Remb $107, Local Match TOTH 0003 Local Other 11.7C.00 Local Other Exempt LAK Laketran ADA Paratransit Non-Fixed Route ADA Paratransit Service Capital Oth Remb $230,000 $337, Federal Transit Direct FTAD 5307 Urban Formula Program 11.7C.00 Federal Exempt LAK Laketran Capitalized Maint Maintenance Capitalization Capital Oth Remb $1,616, Federal Transit Direct FTAD 5307 Urban Formula Program 11.7A.00 Federal Exempt LAK Laketran Capitalized Maint Maintenance Capitalization Capital Oth Remb $239, General Revenue 4EG5 GRF General Revenue Fund 11.7A.00 State UTP Exempt LAK Laketran Capitalized Maint Maintenance Capitalization Capital Oth Remb $164,926 $2,020, Local Match TOTH 0003 Local Other 11.7A.00 Local Other Exempt LAK Laketran Enhancement Transit Amenities Capital Oth Remb $16, Federal Transit Direct FTAD 5307 Urban Formula Program Exempt LAK Laketran Enhancement Transit Amenities Capital Oth Remb $4,000 $20, Local Match TOTH 0003 Local Other Exempt LAK Laketran Enhancement Transit Amenities Capital Oth Remb $10, Local Match TOTH 0003 Local Other Exempt LAK Laketran Enhancement Transit Amenities Capital Oth Remb $40,000 $50, Federal Transit Direct FTAD 5307 Urban Formula Program Exempt LAK Laketran Misc Equipment Miscellaneous Support Equipment Operating Trnst/Av $121, Local Match TOTH 0003 Local Other Exempt LAK Laketran Misc Equipment Miscellaneous Support Equipment Operating Trnst/Av $484,000 $605, Federal Transit Direct FTAD 5339 Urban Formula Program Exempt LAK Laketran Professional Serv Professional Services Operating Trnst/Av $5, Local Match TOTH 0003 Local Other Exempt LAK Laketran Professional Serv Professional Services Operating Trnst/Av $20,000 $25, Federal Transit Direct FTAD 5307 Urban Formula Program Exempt LAK Laketran Education/Training Employee Education/Training Operating Trnst/Av $2, Local Match TOTH 0003 Local Other 11.7D.02 Exempt LAK Laketran Education/Training Employee Education/Training Operating Trnst/Av $9,197 $11, Federal Transit Direct FTAD 5307 Urban Formula Program 11.7D.02 Exempt
PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY 2012-2015
More informationRESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST omo AREAWIDE COORDINATING AGENCY
REVISED RESOLUTION NO. 2012-030 (PLAN AND TIP AMENDMENT 4th QUARTER SFY 2012) RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST omo AREAWIDE OORDINATING AGENY WHEREAS, the Northeast Ohio Areawide oordinating
More informationODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #
More informationODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)
Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL
More informationAGENDA ACTION ITEMS INFORMATION ITEMS
NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, June 20 th, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationBicycle and Pedestrian Advisory Council May 15, 2015
Bicycle and Pedestrian Advisory Council May 15, 2015 Updates Spring Bike/Ped counts took place Tuesday May 12 Thursday, May 14 40 volunteers and locations counted across the region More than double the
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More informationDistrict 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID
77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationMEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION
MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie
More informationU.S. HIGHWAY 50 IMPROVEMENT PROJECT
U.S. HIGHWAY 50 IMPROVEMENT PROJECT in the City of South Lake Tahoe Project Purpose and Need Planned Improvements Project Cost and Delivery Schedule Proposed Construction Staging Project Partners: HIGHWAY
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationTaylor Road Resurfacing Project
Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationNew Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid
New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationSR 2108-A12 Forbes Avenue Betterment. March 1, 2018
SR 2108-A12 Forbes Avenue Betterment March 1, 2018 Introductions Project Team PENNDOT Cheryl Moon-Sirianni, PE; District Executive Jason Zang, P.E.; Acting Assistant District Executive-Construction John
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationPrince George s County plans, policies, and projects
Prince George s County plans, policies, and projects Over 250 projects for trails, bikeways, designated bike lanes and sidewalk construction Trail projects that improve access to Metro Sidewalk and trail
More informationProject changes are summarized below and highlighted in yellow on the attached copy of the TIP. Federal Aid Type. Federal Funds
Jason Bottjen Arizona Department of Transportation 206 South 17 th Ave., 301B Phoenix, AZ 87 Via: Email Re: FY2016 2025 Sun Corridor MPO TIP Amendment #5 Dear Jason: Attached is a copy of Amendment #5
More informationEngineering - Bicycle and Pedestrian
Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More informationRoadway Project Recommendations:
Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationCITY OF KASSON TRANSPORTATION ALTERNATIVES KASSON SAFE ROUTES TO SCHOOL
ve ha 8t G B A Mantorville Ave N 240th Ave 16th St NE 11th Ave NE K-M HIGH SCHOOL SUNRISE TRAIL TO MANTORVILLE MNTH 57 SUNSET TRAIL TO MANTORVILLE NE PARK 16TH ST NE TRAIL K-M ELEMENTARY SCHOOL K-M MIDDLE
More information2012 Capital Budget Capital Improvement Program
2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways
More informationEXECUTIVE DIRECTOR S REPORT. Board of Directors, December 8, 2017
EXECUTIVE DIRECTOR S REPORT Board of Directors, December 8, 2017 EXECUTIVE DIRECTOR AGENDA PRIORITIES & STATUS NOACA Regional Strategic Plans Long-Range Transportation Plan Communications & Outreach Legislative
More informationCRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN
CRESTON ROAD COMPLETE AND SUSTAINABLE STREETS CORRIDOR PLAN Preferred Plan Community Presentation September 27, 2017 City of El Paso de Robles in partnership with: Local Government Commission, W-Trans,
More informationRoosevelt Estates Neighborhood Improvements
Roosevelt Estates Neighborhood Improvements Transportation Alternatives Application May 5 th, 2016 Qualifying Activities Construction of on-road and off-road trail facilities for pedestrians, bicyclists,
More informationF L E T C H E R A V E N U E
Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are
More informationDISTRICT CONSTRUCTION PROGRAM
ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationCY2017 Summary of STP applications
CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run
More informationRemainder to be County Route Begin MP End MP Length Item Number Funding Type* Description Type of Work Phase*
TIP Fayette NA PL TRANSIT FACILITY INVENTORY MATCHED FED FUNDS N $32,000 $0 Jessamine 2.66 07 00087.50 STPE EAST NICHOLASVILLE BYPASS SECTION II; FROM KY 39, EXTENDING SOUTHWESTERLY TO US 27 SOUTH OF NICHOLASVILLE.
More informationODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR
ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationApplications for Funding
Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for
More informationComplete Streets Funding Program Project Prioritization Plan
Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path
More informationATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018
ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment
More informationinformation, please contact the District 9 Offices at or
O hio s highways are essential to keeping and creating new jobs. With a mission to provide easy movement of people and goods from place to place, the Ohio Department of Transportation (ODOT) is responsible
More informationUse of Funding for Local Improvements City Example. Andrew Stone, P.E. City Engineer & Director of Public Works
Use of Funding for Local Improvements City Example Andrew Stone, P.E. City Engineer & Director of Public Works City of Athens Overview Athens Infrastructure Roads over 194 lane miles (not counting alleys)
More informationA Matter of Fairness: ROCOG s Environmental Justice Protocol. What is Mobility Limitation?
No Person Left Behind What is Mobility Limitation? What is the Access Limitation? Environmental Justice population should be provided adequate mobility & access to meet their needs; Identify acceptable
More informationSTIP Scoping and Design Projects November Administrative Amendment
NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationA summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013
Annual Listing of Federally Obligated Projects 2013 Fiscal Year A summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013 Knoxville
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationProject Status Update
Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationChicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS)
Chicago Safe Routes to School Safe Routes to High School (SRTS/SRTHS) Marshall Community High School and Faraday Elementary School Recommended Improvements Agenda Goals Related Programs Project Location/Area
More informationImplementation Plan. 5.1 Improvement Program
5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation
More informationPRESS RELEASE San Joaquin Council of Governments
PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,
More informationQuantity Completed in FY 07/08 (e.g., bike lane miles, sidewalk sq. ft., bike parking spaces, etc. ) Project Status at the end of FY 07/08
ACTIA Programs Annual Compliance Report 2007/2008 Reporting Year Table 1 - Summary of Program Expenditure Accomplishments Measure B-Funded Bicycle and Pedestrian Safety Category Phase Type Name Description
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationAppendix A. Detailed Project Listings. as of October 28, 2016
Appendix A Detailed Project Listings as of October 28, 2016 This appendix includes projects with federal, state and /or local funding in the years 2017-2020. Central Puget Sound 2017-2020 - Regional Transportation
More informationCottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement
Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,
More informationSafe Routes to School. Winton Woods City Schools Informational Presentation Public Input Meeting October, 2017
Safe Routes to School Winton Woods City Schools Informational Presentation Public Input Meeting October, 2017 Presentation Overview What is Safe Routes to School? How is the School Travel Plan developed?
More informationImprovements Infrastructure Gap Assessment and Improvements Street Striping
Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority
More informationDetailed Project Listing Sorted by Agency & MORPC ID for the SFY 2018 to 2021 TIP
2953 Bexley FRA-Bexley Signals Interconnect- 99789 E Signalization ADA curb ramps. Bike Components: Bicycle detectors. MTP Reference: Project ID 334 Bexley Signals Interconnect, Signalization, replace
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationUlster County Non-motorized Transportation Plan
Ulster County Non-motorized Transportation Plan NTAC Meeting NOTES Ulster County Community College Date 08.29.07 Time: 1:00 p.m. - 3:00 p.m. Agenda Welcome /Intro Project Status Report o Project is on
More informationODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.
1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationLANCASTER CITY BICYCLE NETWORK
LANCASTER CITY BICYCLE NETWORK Downtown Merchants Meeting Wednesday, July 19, 2017 http://www.lancasteratp. DOWNTOWN WALKABILITY ANALYSIS What changes can be made, in the least amount of time, and for
More informationBuilding Great Neighbourhoods BONNIE DOON
Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement
More informationSAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT
SAN MATEO COUNTY TRANSPORTATION AUTHORITY STAFF REPORT AGENDA ITEM # 10 (a) MARCH 3, 2016 TO: THROUGH: Transportation Authority Jim Hartnett Executive Director FROM: April Chan Eli Kay Gigi Harrington
More informationFY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015
FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationCITY OF PORTSMOUTH PLANNING DEPARTMENT
CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background
More informationDIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)
More informationDistrict Construction Projects
District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage
More informationKnox Street Complete Streets Project
Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences
More informationMIAMI & ERIE CANAL SHARED USE TRAIL
New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14
More informationANNUAL ROAD CONSTRUCTION PROGRAM 2018
YAKIMA COUNTY PUBLIC SERVICES DEPARTMENT ANNUAL ROAD CONSTRUCTION PROGRAM 2018 COUNTY COMMISSIONERS Ron Anderson Michael D. Leita J. Rand Elliott DIRECTOR Vern M. Redifer, P.E. COUNTY ENGINEER Gary N.
More informationRADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016
RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,
More informationStephen Bell Elementary
Strategy Type (which of the 5 E s) Strategy Detail Time Frame Responsible Party Status Estimated Cost Possible Funding Source Percent of Students Affected Encouragement/ Education Walking School Bus 12-24
More informationProposed. City of Grand Junction Complete Streets Policy. Exhibit 10
Proposed City of Grand Junction Complete Streets Policy Exhibit 10 1 City of Grand Junction Complete Streets Policy Vision: The Complete Streets Vision is to develop a safe, efficient, and reliable travel
More informationFinancial Project ID No(s).: and ETDM No(s).: and 14181
Palm Beach Metropolitan Planning Organization (MPO) Presentation I-95 at Boynton Beach Boulevard Interchange and I-95 at Gateway Boulevard Interchange Project Development and Environment Study Palm Beach
More informationArlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation. Thomas Jefferson BLPC / PFRC Meeting July 27, 2016
Arlington Public Schools New Elementary School at Thomas Jefferson Site Off-Site Transportation Thomas Jefferson BLPC / PFRC Meeting July 27, 2016 1.Review of Analysis 2.Key Transportation Issues 3.Recommendations
More informationBellbrook Middle School
Strategy Type (which of the 5 E s) Strategy Detail Time Frame Responsible Party Status Estimated Cost Possible Funding Source Percent of Students Affected Education Bike Rodeo Completed City of Bellbrook
More informationEligible Schools. Number of K-5/K-8 public schools 219 SRTS plans complete/funding applied 63 Number of schools considered in
Study Goals Prioritize Miami-Dade elementary and K-8 schools for Safe Routes to School (SRTS) infrastructure improvements Develop SRTS plans and infrastructure improvements for 10 priority schools Prepare
More information5 CIRCULATION AND STREET DESIGN
5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing
More informationIncorporating Sidewalks into Transportation Asset Management. Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc.
Incorporating Sidewalks into Transportation Asset Management Presentation by Alan S. Kercher, P.E. Kercher Engineering, Inc. Integrated Management of Infrastructure Example: Urban Environment Pavements
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: June 23, 215 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report
More informationCity of Madison: 2017 Capital Budget Capital Improvement Plan
Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationTable Regional Transportation Improvement Program DRAFT Amendment No. 12 San Diego Region (in $000s)
Table 1 Chula Vista, City of MPO ID: CHV35 TITLE: Traffic Signing, Studies and Signal Upgrade Exempt Category: Other - Intersection signalization projects (Maint) DESCRIPTION: Upgrade of signals located
More informationFranklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017
Franklin Boulevard Traffic Calming Study Public Meeting #1 October 11, 2017 Agenda Welcome and Introductions Project Overview Potential Improvements Map Exercise Report Out NOACA Technical Assistance (TA)
More informationChapter 4: Funding and Implementation
Chapter 4: Funding and Implementation 83 84 Cost Estimating Cost estimating is an iterative process. When a project is in the conceptual stage, preliminary cost estimates are also provided conceptually,
More informationHennepin County Transportation Department
Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation
More informationLynchburg District Update
Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active
More informationMorristown, NJ Complete Streets Policy
Morristown, NJ Complete Streets Policy Introduction A Complete Street is defined as a means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal
More information