Size: px
Start display at page:

Download ""

Transcription

1

2

3

4

5

6

7

8

9 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? CUY D12 BH FY2014 MISC Bridge Repair CE ODOT $3, IR : Brook Park IR : Brecksville US L&R: Solon IR : Bedford Hts IR : Bedford Hts CE BR $31, CE ODOT $3, CE NH $31, CE ODOT $7, CE IM $63, CO ODOT $100, CO BR $400, CO ODOT $100, CO NH $400, CO ODOT $100, CO IM $900, $2,140, CUY D12 GR FY2014 Guardrail CE NHPP $63, Cleveland, Linndale, Brooklyn: Maintenance/Repair CE ODOT $22, Along IR 71 corridor from approximately IR 480 to Denison Ave CO NHPP $630, CO ODOT $220, $935, CUY D12 PPM FY2014 Preventive Maintenance CE ODOT $6, Various routes and sections throughout ODOT District 12 CE IM $54, CO ODOT $200, CO IM $1,800, $2,060, CUY RIVERVIEW RD Stream Relocation PE PLHD $37, Brecksville: South of SR 82 (Chippewa Rd) PEDDPLHD $24, C PLHD $681, $742,000 3/1/13

10 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? CUY RIVERVIEW RD/VAUGHN RD Culvert Repair/Roadway PE PLHD $25, Brecksville: Improvements PEDDPLHD $45, Riverview Rd north of Vaughn Rd C PLHD $756, Vaughn Rd east of Cuyahoga Valley Scenic RR $826, CUY SNOWVILLE RD Culvert Repair CE PLHD $2, Brecksville: Snowville Rd over a stream approximately 0.3 miles west of Riverview Rd CE PLHD $29, CO PLHD $23, CO PLHD $268, $324, CUY SR PAINT PART 2 Bridge Painting CO NHPP $16,000,000 Plan Cleveland: Main Ave bridge CO ODOT $4,000,000 Plan $20,000, CUY US Bridge Repair PEPDODOT $75, Cleveland: Herman Ave over US 6 (West Shoreway) CE ODOT $10, CE BR $40, CO ODOT $100, CO BR $400, $625, CUY SR SLOPE Slope Repair CE ODOT $20,000 Plan Garfield Hts: Granger Rd east of Canal Rd Project involves improving the collection and transport of groundwater, constructing a catchment wall and removing vegetation and or rock outcropping CE S/STP $80,000 Plan CO ODOT $200,000 Plan CO S/STP $800,000 Plan $1,100, CUY IR PAINT Bridge Painting CO ODOT $2,000,000 Plan Independence, Cuyahoga Hts: IR 77 bridge over the Cuyahoga River Valley PROJECT SPLIT FROM CUY IR : PID No CO BR $18,000,000 Plan $20,000,000 3/1/13

11 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? CUY SR Intersection Widening PEDDSolon $250, Solon: SR 91 (SOM Center Rd) and SR 43 (Aurora Rd) RW Solon $57, RW HSIP $519, CE Solon $217, CO Solon $585, CO HSIP $1,247, $2,878, CUY SR SLIDE Slide Repair CE ODOT $8, Gates Mills: SR 174 (Chagrin River Rd) south of Rodgers Rd Project includes slope stabilization, removal of current roadway surface and rebuilding of 2 lane asphalt roadway 0.04 mile CE S/STP $34, CO ODOT $86, CO S/STP $346, $476, CUY SR Bridge Repair PE ODOT $5, Richmond Hts: SR 175 (Richmond Rd bridge) over the East Branch of Euclid Creek, south of US 6 (Chardon Rd) and north of White Rd PEDDODOT $100, RW ODOT $20,000 Plan CE ODOT $20,000 Plan CE BR $80,000 Plan CO ODOT $200,000 Plan CO BR $800,000 Plan $1,225, CUY/LAK IR NOISE Noise Wall Replacement & CE ODOT $9, Beachwood, Pepper Pike, Lyndhurst, Mayfield Hts: Repair CE NHPP $81, Shaker Blvd to Mayfield Rd 4.00 miles CO ODOT $300, Replace deteriorated concrete panels and reuse existing steel posts CO NHPP $2,700, $3,090,000 3/1/13

12 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? CUY /LAK IR /00.00 NOISE Noise Wall Replacement & CE ODOT $5, CUY IR ( US 322) to (Mayfield/Highland Hts Repair CE NHPP $45, Corporation Line): Mayfield Hts, Highland Hts 3.49 miles CO ODOT $170, LAK IR (Cuyahoga/Lake County Line) to 1.75 (IR 90): Willoughby Hills CO NHPP $1,530, Replace deteriorated concrete panels and reuse existing steel posts $1,751, miles CUY IR INTERCHANGE Intersection Improvement CO IM $306, Brooklyn: IR 480/Tiedeman Interchange CE IM $30, CE ODOT $3, CE ODPS $207, CO ODOT $34, CO ODPS $2,070, PEDDODPS $180, $2,831, CUY IR NOISE BARRIER Construct Noise Wall Barrier CE ODOT $15, Cleveland: IR 480 westbound between US 42 (Pearl Rd) and SR 94 (State Rd) 1.37 miles CE NHPP $61, CO ODOT $154, CO NHPP $616, $847, GEA BELL RD (WEST) Repair and Resurface RW S Russell $2, South Russell Village: S Russell Village WCL to east of SR miles CE S Russell $18, CE STP $72, CO S Russell $582, CO STP $2,329, $3,005,300 3/1/13

13 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? GEA BUNDYSBURG RD Bridge Replacement CE GEA CO $2,320 Plan Parkman Twp: Bundysburg Rd bridge over Swine Creek 0.06 mile CO GEA CO $23,180 Plan CE TRC $6,960 Plan CO TRC $69,540 Plan CE LBR $37,120 Plan CO LBR $370,880 Plan $510, GEA SR Resurfacing CE ODOT $9,000 Plan Newbury Twp, Munson Twp: SR 87 (Kinsman Rd) to US 322 (Mayfield Rd) 4.27 miles CE NHPP $36,000 Plan CO ODOT $300,000 Plan CO NHPP $1,200,000 Plan $1,545, GEA SR Resurfacing CE ODOT $7,200 Plan Burton Twp: Burton East Corporation Line to Middlefield West Corporation Line 2.41 miles CE S/STP $28,800 Plan CO ODOT $180,000 Plan CO S/STP $720,000 Plan $936, GEA SR SLIDE Slide Repair CE ODOT $10,000 Plan Burton Twp: SR 168 (Tavern Rd) between Claridon Troy Rd and South Cheshire St CE S/STP $40,000 Plan CO ODOT $100,000 Plan CO S/STP $400,000 Plan $550, LAK D12 GR FY2014 (B) Safety Improvement CE HSIP $25, Various routes and sections in Geauga and Lake Counties CO HSIP $250, $275,000 3/1/13

14 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? LAK METROPARK BIKE TRAIL Construct 10' wide multi-use RW LCMPD $54, Concord Twp: path RW SAFETEA- $217, Plan and construct extension of bicycle trails adjacent to the IR- CE TRC $19, /SR-44 interchange, along the Greenway Corridor and throughout Lake County CE SAFETEA- $79, SAFETEA-LU Earmark: OH175 for PE, RW and CO CE LCMPD $59, CO TRC $178, CE CMAQ $236, CO LCMPD $532, CO CMAQ $2,128, CO SAFETEA- $714, $4,221, LAK SR L&R Bridge Deck Replacement PEDDODOT $150,000 Plan Eastlake: Over a stream west of SR 91 PROJECT COMBINED WITH LAK SR R: PID No CE ODOT $14,000 Plan CO ODOT $100,000 Plan CO NHPP $400,000 Plan CE Fed $56,000 Plan CO ODOT $100,000 Plan CO BR $400,000 Plan $1,220, LAK SR SLOPE Slope Repair CE ODOT $11,900 Plan Concord Twp: SR 608 (Concord-Hambden Rd) near Big Creek Project includes constructing a retaining wall to maintain proper drainage CE S/STP $47,600 Plan CO ODOT $119,000 Plan CO S/STP $476,000 Plan $654,500 3/1/13

15 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? LAK SR Bridge Deck Replacement PEPDODOT $5, Concord Twp: SR 608 bridge over the Lake Metroparks Greenway Corridor multiuse path, just east of Ravenna Rd PEDDODOT $130, CE ODOT $18,200 Plan CE BR $72,800 Plan CO ODOT $260,000 Plan CO BR $1,040,000 Plan $1,526, LOR BP FY2016 Bridge Painting CO ODOT $300,000 Plan SR : Elyria SR : Elyria SR : North Ridgeville CO S/STP $1,200,000 Plan $1,500, LOR SR010/SR010C/SR /00.00/00.00 Resurfacing CE N Rdgvl $10,357 Plan North Ridgeville: SR (IR 480) to (Lorain/Cuyahoga County Line) SR 10C (Ohio Turnpike Ramp) to (SR 10) SR 83C (SR 83) to (Chestnut Ridge Rd) 0.52 mile 0.77 mile 0.75 mile CE ODOT $7,241 Plan CE Fed $52,673 Plan CO N Rdgvl $258,910 Plan CO ODOT $10,683 Plan CO Fed $635,500 Plan $975, LOR US PM 1 Crack Seal CE ODOT $682 Plan New Russia Twp, Carlisle Twp: US (southwest of Parsons Rd) to (southwest of SR 301) 4.05 miles CE Fed $2,726 Plan CO ODOT $17,039 Plan CO Fed $68,157 Plan $88,604 3/1/13

16 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? LOR SR Resurfacing CE Lorain $10,809 Plan Lorain: SR (north of Lorain SCL) to (US 6) 4.67 miles CE Lorain $1,673 Plan CE S/STP $6,692 Plan CE Lorain $12,795 Plan CE NH $51,181 Plan CO Lorain $360,316 Plan CO Lorain $55,766 Plan CO S/STP $223,062 Plan CO Lorain $426,504 Plan CO NH $1,706,015 Plan $2,854, LOR IR090/SR /07.97 PM Surface Treatment CE ODOT $2,299 Plan IR (north of IR 80) to (west of SR 57): Elyria Twp, Elyria SR (west of North Ridge Rd) to (IR 90): Amherst Twp, Elyria Twp 2.26 miles 3.17 miles CE Fed $20,689 Plan CE ODOT $3,175 Plan CE Fed $28,571 Plan CO ODOT $76,628 Plan CO NH $689,654 Plan CO ODOT $211,640 Plan CO IM $846,558 Plan $1,879, LOR IR PM Surface Treatment CE ODOT $7,035 Plan Avon: IR (southwest of SR 611) to (Lorain/Cuyahoga County Line) 4.72 miles CE NHPP $63,312 Plan CO ODOT $234,490 Plan CO NHPP $2,110,406 Plan $2,415,243 3/1/13

17 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? LOR SR Resurfacing CE ODOT $21,144 Plan Henrietta Twp, New Russia Twp, South Amherst, Amherst Twp, Elyria Twp, Elyria: SR (Erie/Lorain County Line) to (SR 57) miles CE Fed $84,577 Plan CE ODOT $6,235 Plan CE Fed $24,938 Plan CO ODOT $704,807 Plan CO Fed $2,819,230 Plan CO ODOT $207,821 Plan CO Fed $831,282 Plan $4,700, LOR SR /05.89 Resurfacing CE Avon $6,250 Plan Avon: SR (Avon West Corporation Line) to (southwest of SR 611) SR (southwest of SR 83) to (Lorain/Cuyahoga County Line) 2.25 miles 2.96 miles CE Avon $8,364 Plan CE Fed $33,459 Plan CO Avon $208,320 Plan CO Avon $278,828 Plan CO Fed $1,115,313 Plan $1,650, LOR SR Resurfacing CO ODOT $78,002 Plan Penfield Twp, Lagrange Twp, Lagrange, Carlisle Twp: SR (Medina/Lorain County Line) to (US 20) miles CO Fed $312,010 Plan CO ODOT $909,842 Plan CO Fed $3,639,369 Plan $4,939, LOR SR Bridge Replacement PEDDODOT $125, Rochester Twp: SR 511 bridge over the west branch of the Black River 0.01 miles CE ODOT $13,000 Plan CE Fed $52,000 Plan CO ODOT $130,000 Plan CO Fed $520,000 Plan $840,000 3/1/13

18 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? LOR SR Bridge Repair CO ODOT $650,000 Plan Lorain: SR to mile CO Fed $2,600,000 Plan $3,250, MED D03 IR071 RM FY2017 (A) Mill & Fill CE ODOT $801 Plan Westfield Twp, Guilford Twp: IR (northeast of Leroy Rd) to (southwest of SR 3) 3.15 miles CE Fed $3,206 Plan CO ODOT $10,017 Plan CO Fed $90,149 Plan $104, MED SR Resurfacing CO Wadswth $143,438 Plan Wadsworth Twp, Wadsworth: SR (Wayne/Medina County Line) to (IR 76) 3.24 miles CO Fed $328,398 Plan CO ODOT $65,879 Plan CO Fed $263,516 Plan CO ODOT $32,049 Plan CO Fed $128,197 Plan $961, MED IR Surface Treatment CE ODOT $18,788 Plan Westfield Center, Westfield Twp, Guilford Twp: IR (northeast of Leroy Rd) to (southwest of SR 3) 3.15 miles CE IM $169,096 Plan CO ODOT $187,884 Plan CO IM $1,690,956 Plan $2,066, MED IR PM Surface Treatment CE ODOT $8,749 Plan Guilford Twp, Montville Twp: IR (southwest of SR 3) to (northeast of Ridgewood Rd) 6.57 miles CE IM $78,740 Plan CO ODOT $291,629 Plan CO IM $2,624,662 Plan $3,003,780 3/1/13

19 PE=preliminary engineering, RW=right of way, C=construction, PEDD=preliminary engineering detailed design, PEPD=preliminary engineering preliminary development, AR=archeological recovery SFY Transportation Improvement Highway and Bikeway Element Amendments PID Project Description Type of Work Funding Data AQ required? MED SR HIGH ST CORRIDOR IMPROVEMENTS Reconstruct & Access RW Wadswth $300,000 Plan (PHASE 2) Management RW HSIP $2,700,000 Plan Wadsworth: south of West St to Smokerise Dr (improvements include 1.15 miles CO Wadswth $89,280 Plan reconstruction, widening the bridge over IR 76, coordinate traffic CO ODOT $357,120 Plan signals, realign Park Ctr Dr with Great Oaks Trail, shared use path CE Wadswth $41,281 Plan on west side of SR 94, construct access mngmnt.) CO Wadswth $548,452 Plan CONSTRUCTION FUNDING ADDED FROM MED IR : CE Wadswth $6,720 Plan PID No CE ODOT $26,880 Plan CE Wadswth $52,999 Plan CO Wadswth $704,135 Plan CE HSIP $476,994 Plan CO HSIP $6,337,209 Plan CE STP $165,125 Plan CO STP $2,193,805 Plan $14,000, MED SR Resurfacing CE ODOT $5,104 Plan Wadsworth, Wadsworth Twp: SR (SR 94) to 2.29 (Medina/Summit County Line) 2.29 miles CE Fed $20,414 Plan CO ODOT $127,590 Plan CO Fed $510,358 Plan $663, MED SR Install roundabout RW ODOT $15, Granger Twp: SR-94 and Granger Rd RW HSIP $135, CO HSIP $2,000,000 Plan $2,150,000 3/1/13

20 State Funding Source Funding $ 3/1/2013 Funding Source $1,522,902 $53,302 $0 $0 $0 $353,843 $405,157 $206,540 $400,000 $0 $148,000 $600,000 $57,757 $1,500,000 $929,289 $570,711 Total Project Cost $ $7,614,508 $266,508 $0 $0 $0 $1,769,215 $2,025,785 $1,032,700 $2,000,000 $0 $740,000 $25,000 $288,783 $7,500,000 $4,646,444 $2,853,556 $950,000 $46,000 $250,000 SFY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TRANSIT ELEMENT AMENDMENT Delete Modify Add Transit System Name FTA ALI Code Project Description PID No. Qty. Expansion or Replacement Accessible Air Quality Type SFY Fiscally Constrained Federal Funding $ Federal Funding Source State Funding $ Proposed TIP revisions for FY 2013 Formula Grants XXX GCRTA Bus Replacement Vehicles Replacement Yes Capital 2013 Yes $6,091,606 XXX GCRTA XXX GCRTA XXX GCRTA XXX GCRTA XXX GCRTA XXX GCRTA XXX GCRTA XXX GCRTA Bus Replacement Spare Parts Paratransit Improvement Vehicles Paratransit Improvement Spare Parts Paratransit Improvement Vehicles East 81st and East 83rd Track Bridge Rehab Const. East 81st and East 83rd Track Bridge Rehab Const. West 65th Street Substation Rehabilitation Construction West 65th Street Substation Rehabilitation Construction Exempt Capital 2013 Yes $213, Exempt Capital 2013 Yes $ Exempt Capital 2013 Yes $ Exempt Capital 2013 Yes $0 Fixed Guideway Exempt Capital 2013 Yes $1,415,372 Modernization/State of Good Repair Exempt Capital 2013 Yes $1,620,628 Fixed Guideway Exempt Capital 2013 Yes $826,160 Modernization/State of Good Repair Exempt Capital 2013 Yes $1,600,000 XXX GCRTA 12.7A.00 Rail Infrastructure Exempt Capital 2013 Yes $0 XXX GCRTA XXX GCRTA Light Rail Grade Crossing Rehabilitation Construction Light Rail Grade Crossing Rehabilitation Construction Fixed Guideway Exempt Capital 2013 Yes $592,000 Modernization/State of Good Repair Exempt Capital 2013 Yes $2,400,000 XXX GCRTA Transit Waiting Environment Exempt Capital 2013 Yes $231,026 XXX GCRTA 11.7A.00 Bus Preventative Maintenance Exempt Capital 2013 Yes $6,000,000 Fixed Guideway XXX GCRTA 12.7A.00 Rail Preventative Maintenance Exempt Capital 2013 Yes $3,717,155 Modernization/State of Good Repair XXX GCRTA 12.7A.00 Rail Preventative Maintenance Exempt Capital 2013 Yes $2,282,845 The following are revisions and additions for the Competitive State of Good Repair Grant XXX GCRTA Paratransit Bus Replacement Vehicles Replacement Yes Capital 2013 Yes Section $760,000 Competitive Bus State of Good Repair Section XXX GCRTA Paratransit Bus Replacement Spare Exempt Capital 2013 Yes $36,800 Competitive Bus State Parts of Good Repair Section XXX GCRTA Asset Management Database Software Exempt Capital 2013 Yes $200,000 Competitive Bus State of Good Repair U:\emay\public\Transit TIP Amendment GCRTA & Laketran xls $190,000 $9,200 $50,000

21 State Funding Source Funding $ 3/1/2013 Funding Source $2,123,361 $74,318 $300,000 $0 $56,300 $283,700 $0 $57,393 $86,740 $182,000 $1,024,446 XXX GCRTA Bus Camera Systems Exempt Capital 2013 Yes $0 Unidentified $1,000,000 XXX GCRTA Bus Security Devices Exempt Capital 2013 Yes $0 Unidentified $500,000 XXX GCRTA Bus Improvement Replacement Yes Exempt Capital PLAN Yes $5,000,000 CMAQ $1,250,000 XXX GCRTA Bus Improvement Replacement Yes Exempt Capital PLAN Yes $5,000,000 CMAQ $1,250,000 XXX GCRTA 11.7C.00 ADA Paratransit Service Yes Exempt Capital PLAN Yes $2,500,000 STP $625,000 Total Project Cost $ $10,616,803 $371,588 $1,500,000 $0 $281,500 $1,418,500 $0 $286,963 $433,700 $910,000 $5,122,229 $1,000,000 $500,000 $6,250,000 $6,250,000 $3,125,000 $3,125,000 SFY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TRANSIT ELEMENT AMENDMENT Delete Modify Add Transit System Name FTA ALI Code Project Description PID No. Qty. Expansion or Replacement Accessible Air Quality Type SFY Fiscally Constrained Federal Funding $ Federal Funding Source State Funding $ The following are revisions to items within FY2012 grants OH-90-X739 and OH XXX GCRTA Bus Replacement Vehicles Replacement Yes Capital 2012 Yes $8,493,442 XXX GCRTA Bus Replacement Spare Parts Exempt Capital 2012 Yes $297,270 Fixed Guideway XXX GCRTA Rail Infrastructure Exempt Capital 2012 Yes $1,200,000 Modernization XXX GCRTA 12.7A.00 Rail Infrastructure Exempt Capital 2012 Yes $0 Fixed Guideway XXX GCRTA Tower City Escalator Replacement Exempt Capital 2012 Yes $225,200 Modernization XXX GCRTA Tower City Escalator Replacement Exempt Capital 2012 Yes $1,134,800 XXX GCRTA Bus Shelter Replacements Exempt Capital 2012 Yes $0 XXX GCRTA Transit Waiting Environment Exempt Capital 2012 Yes $229,270 XXX GCRTA Information Systems ADP Software Exempt Capital 2012 Yes $346,960 XXX GCRTA Information Systems 3rd Party Contracts Exempt Capital 2012 Yes $728,000 XXX GCRTA 12.7A.00 Bus Preventative Maintenance Exempt Capital 2012 Yes $4,097,783 The following are contingency projects which we are seeking funding and are adding to the TIP with 100% local funding at this time XXX GCRTA 11.7C.00 ADA Paratransit Service Yes Exempt Capital PLAN Yes $2,500,000 STP $625,000 U:\emay\public\Transit TIP Amendment GCRTA & Laketran xls

22 3/1/2013 XX LAKETRAN Enhancement Items Exempt Capital 2013 Yes $40, $10,000 Sales Tax XX LAKETRAN 11.7C.00 Non-Fixed Route ADA Paratransit Service Exempt Operating 2013 Yes $230, $57,500 Sales Tax XX LAKETRAN Rehabilitation of seats on MCI buses Exempt Capital 2013 Yes $80, $20,000 Sales Tax XX LAKETRAN Renovations to Facility Exempt Capital 2013 Yes $288, $72,020 Sales Tax XX LAKETRAN Purchase Paratransit Vans for Dial-a-Ride Service Replacement Yes Exempt Capital PLAN Yes $676,749 CMAQ $169,187 XX LAKETRAN Purchase Paratransit Vans for Dial-a-Ride Service Replacement Yes Exempt Capital PLAN Yes $710,634 CMAQ $177,658 Total Project Cost $ $93,750 $50,000 $287,500 $100,000 $360,100 $845,936 $888,292 $2,572,243 SFY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TRANSIT ELEMENT AMENDMENT Delete Modify Add Transit System Name FTA ALI Code Project Description PID No. Qty. Expansion or Replacement Accessible Air Quality Type SFY Fiscally Constrained Federal Funding $ Federal Funding Source XX LAKETRAN Administration Exempt Operating 2013 Yes $75, $18,750 Sales Tax State Funding $ State Funding Source Funding $ Funding Source Prior 5307 Grant XX LAKETRAN Communication System Exempt Capital 2013 Yes $1,474,049 Funds $368,512 Sales Tax $1,842,561 XX LAKETRAN Purchase Buses for Commuter Express Service Replacement Yes Exempt Capital PLAN Yes $2,057,794 CMAQ $514,449 U:\emay\public\Transit TIP Amendment GCRTA & Laketran xls

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

SFY Transportation Improvement Program Highway and Bikeway Element Amendments PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST omo AREAWIDE COORDINATING AGENCY

RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST omo AREAWIDE COORDINATING AGENCY REVISED RESOLUTION NO. 2012-030 (PLAN AND TIP AMENDMENT 4th QUARTER SFY 2012) RESOLUTION OF THE GOVERNING BOARD OF THE NORTHEAST omo AREAWIDE OORDINATING AGENY WHEREAS, the Northeast Ohio Areawide oordinating

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, June 20 th, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Clermont County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Clermont County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

EXECUTIVE DIRECTOR S REPORT. Board of Directors, December 8, 2017

EXECUTIVE DIRECTOR S REPORT. Board of Directors, December 8, 2017 EXECUTIVE DIRECTOR S REPORT Board of Directors, December 8, 2017 EXECUTIVE DIRECTOR AGENDA PRIORITIES & STATUS NOACA Regional Strategic Plans Long-Range Transportation Plan Communications & Outreach Legislative

More information

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement.

ODOT construction cost is $51,000,000. State assumes and bears 100 percent of the cost of improvement. 1. I 271 WIDENING & RESURFACING - PID 89458 Project consists of major reconstruction, widening and bridge deck replacement. Project will accomplish widening from 4 to 6 lanes, including redecking and widening

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.

ODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,

More information

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015

FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015 FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL

More information

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose

More information

Phone: Fax: Project Reference No. (to be filled out by MassHighway):

Phone: Fax: Project Reference No. (to be filled out by MassHighway): Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Remainder to be County Route Begin MP End MP Length Item Number Funding Type* Description Type of Work Phase*

Remainder to be County Route Begin MP End MP Length Item Number Funding Type* Description Type of Work Phase* TIP Fayette NA PL TRANSIT FACILITY INVENTORY MATCHED FED FUNDS N $32,000 $0 Jessamine 2.66 07 00087.50 STPE EAST NICHOLASVILLE BYPASS SECTION II; FROM KY 39, EXTENDING SOUTHWESTERLY TO US 27 SOUTH OF NICHOLASVILLE.

More information

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018 ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment

More information

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

DISTRICT CONSTRUCTION PROGRAM

DISTRICT CONSTRUCTION PROGRAM ODOT DISTRICT 3 2016 CONSTRUCTION PROGRAM photo by Tom Puskar SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES JOHN R. KASICH, OHIO GOVERNOR JERRY WRAY, ODOT DIRECTOR

More information

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009 Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

Taylor Road Resurfacing Project

Taylor Road Resurfacing Project Project General Information: Contractor: Perk Company, Inc. Awarded: July 28, 2011 Signed Contract: August 25, 2011 Project Bid Price: $3,600,000 Project Length: 1.5 miles 2 General Information: Project

More information

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION

MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year AGENCY CONTACT INFORMATION MEASURE B AND MEASURE BB Annual Program Compliance Report Reporting Fiscal Year 2016-2017 AGENCY CONTACT INFORMATION Agency Name: City of Livermore Date: 12/4/2017 Primary Point of Contact Name: Debbie

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

2017 (FY 21,22,23) Ohio CMAQ Project Selection

2017 (FY 21,22,23) Ohio CMAQ Project Selection 2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

2017 (FY 21,22,23) Ohio CMAQ Prioritization

2017 (FY 21,22,23) Ohio CMAQ Prioritization 2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit

More information

Downtown Connector Trail

Downtown Connector Trail December 27, 2010 Updated January 10, 2012 1 ew Broadway / 9th Street Downtown Connection I-77 East 34th RTA Station I-490 Job Ready Development Parcel Morgana Run Steel Warehouse Washington Reservation

More information

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143

03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143 5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I-5512 14 Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND 104 12/14 W-5214M 14 Division

More information

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID

District 2 Projects Scheduled for award during the period from 06/19/18 to 06/18/19 Sorted by PID 77825 SA US 6/20 14.61/14.59 R Resurface US-6/US-20; perform necessary (Originally PID 76709); UPDATE (9/25/14) added culvert at SA-20-22.50 PID 95861. SSAUS00006**C 14.610 18.450 8,950,000.00 SA US 6/20

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR

ODOT DISTRICT CONSTRUCTION PROGRAM MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT DEPUTY DIRECTOR ODOT DISTRICT 9 2019 CONSTRUCTION PROGRAM SERVING ADAMS, BROWN, HIGHLAND, JACKSON, LAWRENCE, PIKE, ROSS AND SCIOTO COUNTIES MIKE DEWINE, OHIO GOVERNOR JACK MARCHBANKS, ODOT DIRECTOR MIKE DOMBROWSKI, DISTRICT

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

STIP Scoping and Design Projects November Administrative Amendment

STIP Scoping and Design Projects November Administrative Amendment NW Dekalb US 36 1P3237 Scoping for pavement and shoulder improvements in the westbound lanes from east of Rte. 31 (north) to Rte. C. Project includes eastbound lanes shoulder improvements from Rte. 33

More information

Request for Authorization to Open Public Comment Period

Request for Authorization to Open Public Comment Period Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents

Keep Placer Moving. Placer is Growing. POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents Keep Placer Moving Placer is Growing Keep Placer Moving POPULATION (From 2014 to 2045) 70,000 new homes and well over 180,000 more residents 30% of the total housing market growth in the Sacramento region.

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013) B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments

ACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose

More information

APPENDIX B: FUNDING MATRIX

APPENDIX B: FUNDING MATRIX APPENDIX B: FUNDING MATRIX 101752 B - 1 FEDERAL SAFETEA-LU -- Congestion Mitigation and Air Quality Improvement Program (CMAQ) SAFETEA-LU -- Surface Transportation Program (STP)/Congestion Mitigation and

More information

Trans-Canada Highway 1 RW Bruhn Bridge Replacement

Trans-Canada Highway 1 RW Bruhn Bridge Replacement Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

TIP. TIP Amendments for Consideration in January, 2019

TIP. TIP Amendments for Consideration in January, 2019 2018 2027 IP IP Amendments for Consideration in January, 2019 FNDING FNDING DESCRIPION FNDING FNDING DESCRIPION ADAP Appalachian Development L Local ransportation Assistance Program APD Appalachian Development

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514

COMMITTED TOTAL 9,518,714 5,167, ,800 15,185,405 BALANCE (2,486,243) 6,751, ,256 5,082,514 TMACOG TIP PROGRAM FY2010 AND FY2011 PLUS PIPELINE PROJECTION FY2012 THROUGH 2017 revised 02/03/2010 FISCAL PROJECT R/W PS&E FEDERAL PROJECT CONSTRUCT CONSTRUCT YEAR PID SPONSOR PROJECT NAME PROJECT LIMITS

More information

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program

Attachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

2019 Federal Transportation Improvement Program

2019 Federal Transportation Improvement Program VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417

More information

Hospital Link Project Project Update November 2017

Hospital Link Project Project Update November 2017 Hospital Link Project Project Update November 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

Bicycle and Pedestrian Advisory Council May 15, 2015

Bicycle and Pedestrian Advisory Council May 15, 2015 Bicycle and Pedestrian Advisory Council May 15, 2015 Updates Spring Bike/Ped counts took place Tuesday May 12 Thursday, May 14 40 volunteers and locations counted across the region More than double the

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

A summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013

A summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013 Annual Listing of Federally Obligated Projects 2013 Fiscal Year A summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013 Knoxville

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Hospital Link Project Project Update September 2017

Hospital Link Project Project Update September 2017 Hospital Link Project Project Update September 2017 General The project provides a link from Riverside Drive and the Transitway to the Hospital Link Road. Construction is well underway. Read on for important

More information

2012 Capital Budget Capital Improvement Program

2012 Capital Budget Capital Improvement Program 2012 Capital Budget Capital Improvement Program Agency Name: Eng. - Bicycle and Pedestrian Agency Number: 53L Capital Budget Future Year Estimates Project Name 2012 2013 2014 2015 2016 2017 1 Bikeways

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Status February Transportation Priority Projects in Chester County

Status February Transportation Priority Projects in Chester County Transportation Priority Projects in Chester County February 2018 Highway & Trail Projects # Project Scope Current /Phase 1 US 202 over Amtrak Major bridge rehabilitation 17.6 2017-2019 2 US 202 at PA 926

More information

Clackamas County Comprehensive Plan

Clackamas County Comprehensive Plan ROADWAYS The County s road system permits the movement of goods and people between communities and regions, using any of a variety of modes of travel. Roads provide access to virtually all property. They

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

District Construction Projects

District Construction Projects District 7 2014 Construction Projects Ohio Department of Transportation District 7 AUG-116/197-8.22/5.10 Auglaize County Projects 2014 AUG-65-13.19 AUG-VAR AUG-196-4.15 AUG-67-3.45 AUG-VAR AUG-Heritage

More information

S/TIP LIST OF PROJECTS

S/TIP LIST OF PROJECTS LI OF PROJECTS : October 04, 2018 Page: 1 of 5 Responsible GPA Type Name Limits Length Primary 2017 120683 Berrien Berrien Line Dayton Rd Multiple 2.448 Segments $69,210 $0 $24,742 $93,952 $93,952.00 U

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

Smoothing Out the Bumpy Road Ahead

Smoothing Out the Bumpy Road Ahead Julie Hannah, P.E. Technical Services and Asset Management May 11, 2017 Smoothing Out the Bumpy Road Ahead Nationwide D = Poor, At Risk Conditions & Capacity Pavement Condition & Congestion Nationwide

More information

NJTPA DRAFT Transportation Improvement Program Fiscal Years

NJTPA DRAFT Transportation Improvement Program Fiscal Years County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.

More information

Highway Construction

Highway Construction Ohio Department of Transportation Traffic Advisory DISTRICT 1 KIRK SLUSHER, P.E., DISTRICT DEPUTY DIRECTOR 1885 North McCullough St. Lima, Ohio 45801 www.transportation.ohio.gov/dist1 www.facebook.com/odotdistrict1;

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

SUMMARY OF TRANSPORTATION INVESTMENTS

SUMMARY OF TRANSPORTATION INVESTMENTS Santa Cruz County 2016 Measure D: Transportation Improvement Expenditure Plan - Approved by over 2/3 of Santa Cruz County voters on November 8, 2016 - Overview Measure D, the 2016 Transportation Improvement

More information

City of Temecula Capital Improvement Program FY CMAA Inland Empire Cities Update October 24, 2018

City of Temecula Capital Improvement Program FY CMAA Inland Empire Cities Update October 24, 2018 City of Temecula Capital Improvement Program FY 2018-23 CMAA Inland Empire Cities Update October 24, 2018 Introduction City Profile Population: 113,181 (up 1.9% from 2017) Median Age: Number of Households:

More information

MIAMI & ERIE CANAL SHARED USE TRAIL

MIAMI & ERIE CANAL SHARED USE TRAIL New Bremen, Ohio Survey Transportation Engineering Grant Writing Project Cost Engineers Estimate: $509,358 Bid Amount $480,892 Size 1.12 miles $597,696 ODOT TEP $249,815 ODNR Completion Projected 11/15/14

More information

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016 RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP

EXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492

More information

NEED FOR ADDITIONAL FUNDING

NEED FOR ADDITIONAL FUNDING Measure B BACKGROUND 2013: Vision for a supplement to Measure A that prioritizes local roads & regional capital projects Plan developed by Professional Advisory Group Consensus recently built on RT O&M

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

CY2017 Summary of STP applications

CY2017 Summary of STP applications CY2017 Summary of STP applications Project Sponsor Project Name Project Location Project Description County Line Road Widening Project Indian Ripple Road Reconstruction County Line Road from Willow Run

More information

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN Public Workshop 06.06.18 AGENDA Project Process & Schedule Document Review Summary Project Goals Initial Findings Concept Development Next Steps PROJECT

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

STATION #3 INITIAL ALTERNATIVES

STATION #3 INITIAL ALTERNATIVES www.dot.il.gov www.eisenhowerexpressway.com STATIO #3 IHB RR Heavy Rail Transit (HRT) High capacity transit mode serving urban areas:» Steel wheeled, high performance electric powered rail vehicles» Right-of-way

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA

NOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927

More information

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013

May 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013 May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.

MOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9. CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure

More information