AGENDA ACTION ITEMS INFORMATION ITEMS

Size: px
Start display at page:

Download "AGENDA ACTION ITEMS INFORMATION ITEMS"

Transcription

1 NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, June 20 th, :30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio Phone: (216) ; website: AGENDA ACTION ITEMS 1. Approval of minutes from fiscal year 2014 fourth quarter meeting 2. Fiscal year 2015 first quarter project planning review a. NOACA Provisional Transportation Asset Management Program i. FY th Quarter and FY st Quarter Provisional Transportation Asset Management Program projects ii. Erie St. reconstruction INFORMATION ITEMS 3. Future meeting topics and work plan discussion 4. New Business 5. Old Business 6. Adjournment NEXT MEETING: Friday, September 19, :30 a.m. AT NOACA OFFICE 3 rd FLOOR

2 Agenda Item No. 1 Approval of FY 2014 Fourth Quarter Meeting Minutes

3 Bicycle and Pedestrian Advisory Council March 21, 2014 NOACA Offices, 1299 Superior Avenue, Cleveland, Ohio Present: Please see the attached attendance sheet. Councilman Martin Keane, Chair of the Bicycle and Pedestrian Advisory Council (BPAC), convened the meeting at 10:35 a.m., with a quorum having been established. He noted that public notice of the meeting and its agenda were issued. Mr. Marc Von Allmen stated the BPAC has traditionally discussed project planning reviews (PPRs) and bike and pedestrian planning related efforts. He gave an overview of how comments are developed, reviewed, incorporated into the PPR process and then submitted to project sponsors. Ms. Grace Gallucci reviewed the new committee structure. She encouraged members to make recommendations that would affect change. ACTION ITEMS Fiscal Year 2014 Fourth Quarter Project Planning Reviews SR 82 & IR 77 Interchange Improvements Mr. Von Allmen stated this project is located in Broadview Heights and involves the modification and improvements to the interchange at IR-77 and Royalton Road to correct geometric deficiencies of two exit ramps. The sponsor is requesting 80% of the project be funded with Transportation Alternative Program (TAP) funds. BPAC Comments: o The BPAC supports the addition of sidewalks and crosswalks. o This is a wide and relatively high-speed roadway, so the project sponsor should use a longer pedestrian signal phase or consider installing a refuge island. o The project sponsor could consider using a shared use path instead of sidewalks. If so, future projects concerning this roadway should include connecting the path to nearby destinations. Cleveland Metropolitan School District School Travel Plan Mr. Von Allmen stated this project involves the development of a district-wide Safe Route to School travel plan for 70 schools. The school district is requesting funds from NOACA for its local match. BPAC Comment: The BPAC gives its endorsement for this project. Downtown Euclid Transportation Plan Mr. Von Allmen stated this project is located in the City of Euclid and involves two phases.

4 The first phase involves the reconfiguration of the Lakeshore Blvd/ East 222 nd Street/Babbitt Road intersection and the realignment of Bliss Lane. The second phase involves a road diet, bicycle/pedestrian improvements, streetscape enhancements and green infrastructure along Lakeshore Blvd from East 217 th Street to East 232 nd Street. Mr. Von Allmen stated this project is the result of a TLCI study done by NOACA and was awarded preliminary engineering core funding and ODOT safety funds for construction. Mr. Von Allmen reviewed the area of construction using Google maps. He stated additional on street parking will be included with this project. Mr. Von Allmen noted Lakeshore Blvd. has one of the largest bicycle count volumes in Cuyahoga County. Mr. Jacob VanSickle commented that the Cleveland side of Lakeshore Blvd. will be used as a bicycle route for the Northern Tier Adventure Cycling Association traveling across the country. He went on to say Bike Cleveland is working with the City of Cleveland and the Northeast Ohio Regional Sewer District to add bike lanes. He added it would be nice to see bike lanes continue through the City of Euclid. He suggested that parking be on one side of Lakeshore Blvd. and a bike lane on the other side. BPAC Comments: o The project sponsor should reconsider adding two parking lanes given there is ample off-street parking available. o The sponsor should limit on street parking to the south side of Lakeshore Blvd. to create a buffer for pedestrians. o The project sponsor should include bike lanes within the scope of the project. o In order to avoid the dooring of northbound bicyclists on E 222 nd St., the project sponsor should consider extending the shared use path through the park. Pearl Road Enhancement Mr. Von Allmen stated this project is part of a project on Brookpark Road near the IR- 71 overpass. The sponsor is looking to have streetscape improvements from State Road to Wildlife Way and is planning to eliminate a parking lane. Mr. Cader mentioned the project connects to a multi-purpose trail to Wildlife Way and the area has a signalized intersection. BPAC Comments: o The project sponsor should consider narrowing the sidewalks or travel lanes in order to include a buffered bike lane. o The sponsor should consider a midblock crossing for pedestrians.

5 o When designing the streetscape elements of the project, the sponsor should take into consideration the character of the Metroparks Zoo as well as the neighborhood. o The sponsor should work with RTA to include bus shelters in the area. IR-90 Pedestrian Bridge Mr. Von Allmen stated this project is included in the ODOT District 12 Bridge Program. The project involves the construction of a new pedestrian bridge over IR- 90 just west of East 185 th Street. Mr. Cader stated he met with an ODOT representative and consultants at this site. It was determined that the corkscrew ramp no longer meets Americans with Disabilities Act (ADA) standards. Mr. Cader stated ODOT is in the process of developing some standards for aesthetic treatments. BPAC Comments: o The project sponsor should avoid a switchback ramp. o The project sponsor should include wayfinding signage at the bridge. o The project sponsor should consider enhancing the underpass at East 185 th Street to make it bicycle and pedestrian friendly, possibly in lieu of the bridge replacement. Elyria Avenue Rehabilitation Mr. Von Allmen stated this project involves improvements along 1.25 miles of Elyria Avenue from East 39 th Street to East 21 st Street in Lorain. The project runs parallel to a TLCI project on Broadway Avenue. BPAC Comments: o If bike facilities are not possible to include in the Broadway Avenue resurfacing project which recently went through NOACA s PPR process, the project sponsor should consider including bike facilities on Elyria Ave. o The project sponsor should only include an additional travel lane if it is recommended in a traffic study. Otherwise, the lanes should remain unchanged. INFORMATION ITEMS 2014 Bicycle and Pedestrian Count Report Mr. Von Allmen gave a presentation on the draft Bicycle and Pedestrian Count Report. He stated biannual counts are done in May and September and that the data collected will help prioritize future bikeway projects. Mr. Von Allmen went on to say to program works to achieve three broad objectives: 1) Gauge regional and local levels of bicycling and walking beyond Census data

6 2) Identify trends based on count data (gender, location, and bike lane usage) 3) Aid in the prioritization of bicycle and pedestrian infrastructure and planning projects Mr. Von Allmen reviewed the count data and correlations for both cyclists and pedestrians. He noted other studies have shown areas that are considered to be bike friendly have a significant number of female cyclists. As of September 2011, 47 locations were used for the count. He stated ideally, NOACA would like to have at least 20 volunteers to conduct the counts. Unfortunately, NOACA has had a problem getting volunteers outside of Cuyahoga County. Mr. Wong suggested BPAC members encourage their interns to volunteer for the bike counts. Mr. Von Allmen stated future improvements to the count program will include using automatic bike counters, continuing to identify trends, and developing performance measures and targets. He stated a final report will be presented to the BPAC at a later date. Calendar Year 2014 ODOT Safe Routes to School Program Mr. Von Allmen stated the purpose of the program is to assist communities in developing and implementing projects and programs that encourage and enable children to walk or bike to school safely. Project sponsors can apply for funds to develop a school travel plan. Mr. Von Allmen advised funding for the program is available annually. Unfortunately, the deadline for this year has passed. He did say if sponsors wish to participate in the future, NOACA would be happy to provide them with a letter of support. Clean Ohio Trail Fund NOACA Region Applicants Mr. Von Allmen stated this is a statewide program for sponsors looking to improve outdoor recreational opportunities for Ohioans by funding trails for outdoor pursuits of all kinds. There are six additional criteria that are listed on the Clean Ohio Fund website. He stated the deadline for this year has passed. He did say if sponsors wish to participate in the future, NOACA would be happy to provide them with a letter of support. Trails Leadership Consortium Mr. Von Allmen stated NOACA hosted the second Trails Leadership Consortium on March 20, The purpose of the consortium is to drive progress of the trail and bikeway plans in Cuyahoga County through collaboration among organizations. Ms. Gallucci stated this initiative is being led by Cuyahoga County Planning Commission and participating organizations include the City of Cleveland, the Metroparks and Bike Cleveland. Ms. Gallucci stated it is important for the BPAC to be integrated into the process. Mr. Von Allmen mentioned NOACA staff will provide updates to the BPAC on discussions at the consortium and vise versa. No old or new business was discussed. The meeting was adjourned at 11:58 a.m. The next meeting will be held on Friday, June 20 at 10:30 a.m. Respectfully submitted,

7 Councilman Martin Keane Bicycle and Pedestrian Advisory Council Brenda Walker, Recorder

8 Agenda Item No. 2 FY 2015 First Quarter Project Planning Review

9 City of Cleveland Paving Projects Title: City of Cleveland Paving Projects Sponsor: Cleveland Potential Funding Sources: City of Cleveland, Ohio Department of Transportation (ODOT), Cuyahoga County and NOACA s Provisional Transportation Asset Management Policy (PTAMP) CUY ROCKY RIVER DR - This project involves pavement repairs along Rocky River Drive (SR 237), between Brookpark Road and Hogsback Lane in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 59 and 90. The project length is 3.86 miles. The estimated cost for this project is $1,961,900. The project will be ready to construct by fiscal year Potential Funding Source: ODOT CUY WARREN RD - This project involves pavement repairs along Warren Road, between Munn Road and South Marginal Road in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 58 and 67. The project length is 0.95 mile. The estimated cost for this project is $900,000. Potential Funding Source: City of Cleveland CUY W 150TH ST - This project involves pavement repairs along W. 150th Street, between Industrial Parkway and Puritas Avenue in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 59 and 78. The project length is 1.90 miles. The estimated cost for this project is $500,000. Potential Funding Source: City of Cleveland CUY W 117TH ST - This project involves pavement repairs along W 117th Street, between Bellaire Road and Clifton Boulevard in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 57 and 88. The project length is 2.94 miles. The estimated cost for this project is $720,000. The project will be ready to construct by fiscal year This project expense is in addition to the work planned by the Cuyahoga County Department of Public Works. Potential Funding Source: City of Cleveland/Cuyahoga County/NOACA PTAMP. CUY WEST BLVD - This project involves pavement repairs along West Boulevard, between W. 105th Street and Madison Avenue in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 46 and 50. The project length is 2.17 miles. The estimated cost for this project is $2,500,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP. CUY ST CLAIR AVE - This project involves pavement repairs along 0.33 mile of St. Clair Avenue, from Old River Road to W. 3 rd Street (the estimated cost is $410,000) and E. 13 th Street to E. 55th Street (2.15 miles) in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 51 and 80. The estimated cost for this project is $3,000,000. Potential Funding Source: City of Cleveland.

10 CUY HARVARD AVE - This project involves pavement repairs along Harvard Avenue, between the Cleveland west corporation line and E. 93rd Street in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 47 and 50. The project length is 1.56 miles. The estimated cost for this project is $1,600,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP. CUY HARVARD AVE - This project involves pavement repairs along Harvard Avenue, between E. 116th Street and E. 160th Street in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 45 and 56. The project length is 1.78 miles. The estimated cost for this project is $1,877,680. Potential Funding Source: City of Cleveland. CUY EAST BLVD / FORD DR - This project involves pavement repairs along East Boulevard and Ford Drive, between Euclid Avenue and St. Clair Avenue in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 49 and 56. The project length is 2.37 miles. The estimated cost for this project is $2,300,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP. CUY COMMUNITY COLLEGE AVE - This project involves pavement repairs along Community College Avenue, between E. 22nd Street and E. 40th Street in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 43 and 50. The project length is 0.88 mile. The estimated cost for this project is $1,200,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP. CUY NORTH MARGINAL RD - This project involves pavement repairs along North Marginal Road, between E. 9th Street and E. 55th Street in the City of Cleveland. The 2015 projected PCR on this section of roadway is 46. The project length is 2.73 miles. The estimated cost for this project is $1,651,140. Potential Funding Source: City of Cleveland. CUY CLARK AVE - This project involves pavement repairs along Clark Avenue, between Lorain Road and Quigley Avenue in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 46 and 81. The project length is 3.35 miles. The estimated cost for this project is $2,716,350. Potential Funding Source: City of Cleveland. CUY PROSPECT AVE - This project involves pavement repairs along Prospect Avenue, between Ontario Street and E. 22nd Street in the City of Cleveland. The 2015 projected PCR on this section of roadway is 54. The project length is 1.0 mile. The estimated cost for this project is $1,200,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP. CUY BROADVIEW RD - This project involves pavement repairs along Broadview Road, between Brookpark Road and Pearl Road in the City of Cleveland. The 2015 projected PCR on this section of roadway is 52. The project length is 1.72

11 miles. The estimated cost for this project is $2,000,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP. CUY E 152ND ST - This project involves pavement repairs along E. 152nd Street, between 200 south of Hartley Road and Waterloo Road in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 55 and 63. The project length is 1.19 miles. The estimated cost for this project is $1,260,330. Potential Funding Source: City of Cleveland. CUY ONTARIO ST AND BROADWAY AVE (US 422) - This project involves pavement repairs along US 422, between Superior Avenue (Public Square) and E. 30th Street in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 59 and 62. The project length is 1.56 miles. The estimated cost for this project is $1,444,470. Potential Funding Source: City of Cleveland/ODOT. CUY E 55TH ST - This project involves pavement repairs along E. 55th Street, between Broadway Avenue and Superior Avenue in the City of Cleveland. The 2015 projected PCR on this section of roadway is 57. The project length is 3.55 miles. The estimated cost for this project is $4,479,070. Potential Funding Source: City of Cleveland. CUY FULTON PKWY - This project involves pavement repairs along Fulton Parkway between Memphis Avenue and Park Drive in the City of Cleveland. The 2015 projected PCR on this section of roadway is 64. The project length is 0.5 mile. The estimated cost for this project is $503,170. Potential Funding Source: City of Cleveland. CUY E 93RD ST - This project involves pavement repairs along E. 93rd Street, between Union Avenue and 120 north of Mt. Auburn Road in the City of Cleveland. The 2015 projected PCR on this section of roadway is 55. The project length is 0.88 mile. The estimated cost for this project is $1,195,190. Potential Funding Source: City of Cleveland. CUY CARNEGIE AVE - This project involves pavement repairs along Carnegie Avenue, between E. 9th Street and Cedar Glen Parkway in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 60 and 66. The project length is 4.13 miles. The estimated cost for this project is $5,624,840. Potential Funding Source: City of Cleveland. CUY LAKESIDE AVE - This project involves pavement repairs along Lakeside Avenue, between SR 2 and E. 12th Street in the City of Cleveland. The 2015 projected PCRs on this section of roadway range between 61 and 66. The project length is 0.69 mile. The estimated cost for this project is $916,200. Potential Funding Source: City of Cleveland.

12 Minor Rehabilitation Roadway Projects Title: NOACA s Provisional Transportation Asset Management Policy Estimated Total Cost: $18,582,000 Proposed Source of Federal Funds: NOACA will work to secure additional funding through innovative funding strategies in an amount equal to the identified needs, through NOACA s Provisional Transportation Asset Management Program. No project financing will be executed without approval of the Board of Directors. LOR SR-57 - This project involves pavement repairs along SR-57 (Lorain Boulevard), between SR-113 and the Ohio Turnpike off ramp in the City Elyria. The 2015 projected PCR on this section of roadway is 55, and the project length is 0.69 miles. The estimated cost for this project is $716,580. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP LAK SR-91 - This project involves pavement repairs along SR-91 (SOM Center Road), between Lake/Cuyahoga County Line and US-20 in the Cities of Willoughby and Willoughby Hills. The 2015 projected PCR s on this section of roadway ranges between 58-67, and the project length is 3.81 miles. The estimated cost for this project is $1,482,823. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY US-42 - This project involves pavement repairs along US-42 (Pearl Road), between 0.15 miles north of Sprague Road and Wetzel Avenue in the Cities of Parma, Parma Heights, Middleburg Heights and Cleveland. The 2015 projected PCR s on this section of roadway ranges between 52-68, and the project length is 7.1 miles. The estimated cost for this project is $4,130,765. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY SR-8 - This project involves pavement repairs along SR-8 (Northfield Road), between the Maple Heights, Bedford, Bedford Heights corporation limits and the North Randall South Corporation line the Cities of Maple Heights, Bedford Heights and Warrensville Heights. The 2015 projected PCR s on this section of roadway ranges between 42-68, and the project length is 1.1 miles. The estimated cost for this project is $1,734,474. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY RIDGE RD - This project involves pavement repairs along Ridge Road, between Pearl Road and Fowerdale Avenue the Cities of Cleveland, Parma and Brooklyn. The 2015 projected PCR s on this section of roadway ranges between 59-67, and the project length is 0.74 miles. The estimated cost for this project is $437,516. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY US This project involves pavement repairs along US-322 (Mayfield Road), between Eastwood Avenue and Lander Road in the City of Mayfield Heights. The 2015 projected PCR on this section of roadway is 60, and the project length is 0.54 miles. The estimated cost for this project is $205,751. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP

13 CUY US-42 - This project involves pavement repairs along US-42 (Pearl Road), between Shurmer Road and 0.13 miles south of the Ohio Turnpike access road in the City of Strongsville. The 2015 projected PCR s on this section of roadway ranges between 63-66, and the project length is 2.44 miles. The estimated cost for this project is $853,681. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY W.130TH ST - This project involves pavement repairs along W.130th, between Pleasant Valley Road and Snow Road in the Cities of Brook Park, Parma, Parma Heights, and Middleburg Heights. The 2015 projected PCR on this section of roadway is 69, and the project length is 2.83 miles. The estimated cost for this project is $966,739. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY SNOW RD - This project involves pavement repairs along Snow Road, between SR- 237 and Van Wert Avenue in the city of Brook Park. The 2015 projected PCR s on this section of roadway ranges between 58-64, and the project length is 2.38 miles. The estimated cost for this project is $1,008,257. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY PLEASANT VALLEY RD - This project involves pavement repairs along Pleasant Valley Road, between State Road and Broadview Road in the City of Parma. The 2015 projected PCR s on this section of roadway ranges between 59-68, and the project length is 1.67 miles. The estimated cost for this project is $570,478. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP LOR SR-83 - This project involves pavement repairs along US-83 (Center Road), between 0.10 miles South of Detroit Road and Walker Road in the Cities of Avon and Avon Lake. The 2015 projected PCR s on this section of roadway ranges between 54-68, and the project length is 3.47 miles. The estimated cost for this project is $1,620,402. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY WARRENSVILLE CENTER RD - This project involves pavement repairs along Warrensville Center Road, between Farnsleigh Road and Fairmount Boulevard in the City of Shaker Heights. The 2015 projected PCR s on this section of roadway ranges between 61-68, and the project length is 1.30 miles. The estimated cost for this project is $573,894. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP CUY SR This project involves pavement repairs along SR-175 (E.260 th Street), between Euclid Avenue and the IR-90 in the City of Euclid. The 2015 projected PCR s on this section of roadway ranges between 58-62, and the project length is 0.93 miles. The estimated cost for this project is $523,000. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP LAK SR This project involves pavement repairs along SR-306 (Reynolds Road), between Johnnycake Ridge Road and the Lakeshore Boulevard in the City of Mentor. The

14 2015 projected PCR s on this section of roadway ranges between 50-63, and the project length is 3.91 miles. The estimated cost for this project is $3,757,717. The project will be ready to construct by fiscal year Potential Funding Source: NOACA PTAMP

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

Bicycle and Pedestrian Advisory Council May 15, 2015

Bicycle and Pedestrian Advisory Council May 15, 2015 Bicycle and Pedestrian Advisory Council May 15, 2015 Updates Spring Bike/Ped counts took place Tuesday May 12 Thursday, May 14 40 volunteers and locations counted across the region More than double the

More information

Greater Cleveland Regional Transit Authority

Greater Cleveland Regional Transit Authority Greater Cleveland Regional Transit Authority Transit Priority Corridor Initiatives West 25 th Street /East 105 th /East 93 rd Streets June 20, 2017 Presented to: Planning & Development Committee Greater

More information

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE 01 02 03 04 05 06 Project Overview + Goals RMS Development District-wide Connections

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

EXECUTIVE DIRECTOR S REPORT. Board of Directors, December 8, 2017

EXECUTIVE DIRECTOR S REPORT. Board of Directors, December 8, 2017 EXECUTIVE DIRECTOR S REPORT Board of Directors, December 8, 2017 EXECUTIVE DIRECTOR AGENDA PRIORITIES & STATUS NOACA Regional Strategic Plans Long-Range Transportation Plan Communications & Outreach Legislative

More information

Engineering - Bicycle and Pedestrian

Engineering - Bicycle and Pedestrian Capital Improvement Plan Project Summary # Bikeways Program 781,000 860,000 900,000 933,000 933,000 933,000 # Cannonball Path 1,200,000-780,000 - - - # Capital City Trail - 70,000 - - 910,000 - # Goodman

More information

Complete & Green Streets Progress Report 2016

Complete & Green Streets Progress Report 2016 Complete & Green Streets Progress Report 2016 Prepared by the Mayor s Office of Sustainability, Mayor s Office of Capital Projects, City Planning, and Department of Public Works 1 Introduction The purpose

More information

Plant City Walk-Bike Plan

Plant City Walk-Bike Plan Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop

MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN. Public Workshop MAYFIELD ROAD CORRIDOR MULTIMODAL TRANSPORTATION PLAN Public Workshop 06.06.18 AGENDA Project Process & Schedule Document Review Summary Project Goals Initial Findings Concept Development Next Steps PROJECT

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...

Table of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan... BICYCLE AND This plan was created through a grant from the Healthy Communities Program with the cooperation of the City of Cynthiana, Cynthiana Main Street, Cynthiana-Harrison County-Berry Joint Planning

More information

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland.

It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland. Lake Ave, Lakewood 2018-2019 West Shoreway Lakefront Path 2017 Lake Ave, Cleveland Clifton Blvd Extension 2017 Neighborhood street bike boulevards Proposed Lake Connector Existing Bike Trails Trails -

More information

City of Madison: 2017 Capital Budget Capital Improvement Plan

City of Madison: 2017 Capital Budget Capital Improvement Plan Capital Improvement Plan Project Summary Bikeways Program 779,000 751,000 630,000 670,000 703,000 703,000 Cannonball Path 210,000 - - 730,000 - - Cap City Trail 1,140,000-360,000 - - 910,000 Ice Age Junction

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31

2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Page 1 of 31 2018 Pedestrian and Bicycle and Safe Routes to School Application for Funding Part 1: General Information Funding

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on CAPITAL Large Category Projects Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on 07-27-18 1 La Mesa University Ave Pedestrian

More information

Roosevelt Estates Neighborhood Improvements

Roosevelt Estates Neighborhood Improvements Roosevelt Estates Neighborhood Improvements Transportation Alternatives Application May 5 th, 2016 Qualifying Activities Construction of on-road and off-road trail facilities for pedestrians, bicyclists,

More information

DISTRICT BICYCLE PROGRAM

DISTRICT BICYCLE PROGRAM DISTRICT BICYCLE PROGRAM TxDOT Fort Worth District Public Hearing Bicycle Use on the State Highway System Public Hearing Agenda 1 2 3 4 5 6 Introduction Susan Howard TxDOT Public Involvement Specialist

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment

Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Bridgewater Complete Streets Prioritization Plan and Pedestrian Safety Assessment Presented by Luciano Rabito Manager of Complete Streets Presented to Bridgewater, MA Wednesday, April 26, 2017 6:30 P.M.

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT

CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE FOR BROAD STREET BICYCLE BOULEVARD PROJECT City of San Luis Obispo, News Release DATE: August 1, 2017 RELEASE: Immediate CONTACT: Luke Schwartz (805) 781-7190 Transportation Planner-Engineer, Public Works CITY OF SLO SEEKS INPUT ON PREFERRED ALTERNATIVE

More information

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue

Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue Commerce Street Complete Street Project from Good Latimer Expressway to Exposition Avenue T A N Y A B R O O K S A S S I S T A N T D I R E C T O R M O B I L I T Y P L A N N I N G M O B I L I T Y A N D S

More information

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY NORTHEAST OHIO AREAWIDE COORDINATING AGENCY M E M O R A N D U M TO: Bicycle and Pedestrian Advisory Council Members Samuel Alai, Mayor, City of Broadview Heights Joyce Braverman, Director, Planning Department,

More information

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need

More information

Walkable Community Workshops

Walkable Community Workshops Presented by: Larry McAuliffe Manager, Research Unit, Planning Division New York Metropolitan Transportation Council NYSMPO Conference 2008 Walkable Community Workshops Discussion Topics: I. NYMTC in the

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

NJDOT Complete Streets Checklist

NJDOT Complete Streets Checklist Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Broad Street Bicycle Boulevard Design Guidelines

Broad Street Bicycle Boulevard Design Guidelines Broad Street Bicycle Boulevard Design Guidelines Building from the strategies introduced in the 2013 Bicycle Transportation Plan and community input received thus far, City Transportation Staff have identified

More information

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.

Minutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014. CITY OF BIRMINGHAM START-UP MEETING OF THE MULTI-MODAL TRANSPORTATION BOARD THURSDAY, JUNE 19, 2014 City Commission Room 151 Martin Street, Birmingham, Michigan Minutes of the regular meeting of the City

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

SFY Transportation Improvement Program Highway and Bikeway Element Amendments

SFY Transportation Improvement Program Highway and Bikeway Element Amendments PID Project Description SFY 2014-2017 Transportation Improvement Program Highway and Bikeway Element Amendments Type of Work Funding Data CUY FARNSLEIGH RD IMPROVEMENT Bike/Pedestrian/Streetscape C Shaker

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

TABLE OF CONTENTS. Executive Summary

TABLE OF CONTENTS. Executive Summary Executive Summary Background... ES-1 Pedestrian Network... ES-2 Bikeway Network... ES-2 Collision History... ES-2 Public Input... ES-4 Conclusions and Recommendations... ES-4 1. Introduction and Setting

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

CAHOON PARK AREA CONNECTIVITY STUDY. City of Bay Village Prepared by the Northeast Ohio Areawide Coordinating Agency October 2017

CAHOON PARK AREA CONNECTIVITY STUDY. City of Bay Village Prepared by the Northeast Ohio Areawide Coordinating Agency October 2017 CAHOON PARK AREA CONNECTIVITY STUDY City of Bay Village Prepared by the Northeast Ohio Areawide Coordinating Agency October 2017 Prepared By Month 20## 1) Title & Subtitle Cahoon Park Area Connectivity

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM

TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM TRANSPORTATION ALTERNATIVES SET-ASIDE PROGRAM 2017 Call for Projects Recommendations for the North Central Texas Region Kevin Kokes Regional Transportation Council June 8, 2017 ELECTRONIC ITEM 4.1 FAST

More information

City of Waterloo Complete Streets Policy

City of Waterloo Complete Streets Policy City of Waterloo Complete Streets Policy Chris Hodgson P. Eng City of Waterloo Complete Streets Forum 2011 April 28-29 Toronto Waterloo context: Current population Major employers Universities and student

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle

CITY OF SEATTLE RESOLUTION. WHEREAS, the Washington State Department of Transportation (WSDOT) led the Seattle SDOT SR0 Design Refinements RES August, 0 Version #D 0 CITY OF SEATTLE RESOLUTION..title A RESOLUTION relating to the State Route 0, Interstate to Medina Bridge Replacement and High Occupancy Vehicle Project;

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

Bicycle Facilities Planning

Bicycle Facilities Planning Bicycle Facilities Planning Overview Types of Cyclists Purpose for Riding Types of Facilities Bike Lanes Bicycle Boulevards Cycle Tracks Intersections Signals Signing and Marking Discussion Types of Bicyclists

More information

Members Present Mr. Gary Thomas, Mr. Dave Martinez, Mr. Robert Massaro, Ms. Jody Van Curen, Mr. Dan Hill and Ms. Joan Shaffer

Members Present Mr. Gary Thomas, Mr. Dave Martinez, Mr. Robert Massaro, Ms. Jody Van Curen, Mr. Dan Hill and Ms. Joan Shaffer Meeting called to order at 4:01 p.m., by Chair Mr. Gary Thomas Members Present Mr. Gary Thomas, Mr. Dave Martinez, Mr. Robert Massaro, Ms. Jody Van Curen, Mr. Dan Hill and Ms. Joan Shaffer Members Absent

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

City of Charlottesville Bicycle and Pedestrian Master Plan Update

City of Charlottesville Bicycle and Pedestrian Master Plan Update City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network

More information

SAFETY ADVISORY AND TRANSPORTATION COMMITTEE

SAFETY ADVISORY AND TRANSPORTATION COMMITTEE SAFETY ADVISORY AND TRANSPORTATION COMMITTEE The Safety Advisory and Transportation Committee Meeting was held on June 26, 2013, at 5:07 p.m. with Chairman Hutchison presiding. Members present were Mr.

More information

Bicycle Master Plan Goals, Strategies, and Policies

Bicycle Master Plan Goals, Strategies, and Policies Bicycle Master Plan Goals, Strategies, and Policies Mobilizing 5 This chapter outlines the overarching goals, action statements, and action items Long Beach will take in order to achieve its vision of

More information

CITY OF BLOOMINGTON COMPLETE STREETS POLICY

CITY OF BLOOMINGTON COMPLETE STREETS POLICY CITY OF BLOOMINGTON COMPLETE STREETS POLICY POLICY OBJECTIVE: The City of Bloomington will enhance safety, mobility, accessibility and convenience for transportation network users of all ages and abilities,

More information

Ajax: The Road to Complete Streets

Ajax: The Road to Complete Streets Ajax: The Road to Complete Streets Hubert Ng, Senior Transportation Planner Elysia Leung, Transportation Demand Management Coordinator Complete Streets Forum October 1, 2015 Overview 1 2 Introduction to

More information

TOWN OF PARADISE VALLEY

TOWN OF PARADISE VALLEY TOWN OF PARADISE VALLEY The Paradise Valley Bicycle & Pedestrian Master Plan Planning Commission January 16, 2018 Purpose of Today s Meeting Review January 2018 draft plan Input on compliance to SOD Review

More information

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input

WELCOME. Purpose of the Open House. Update you on the project. Present a draft recommended plan. Receive your input WELCOME Purpose of the Open House The Town of Smiths Falls has initiated the Beckwith Street Redevelopment Plan that includes the preparation of a streetscape functional design for the renewal of Beckwith

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

North Avenue Corridor Study

North Avenue Corridor Study North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:

More information

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY

APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY APPENDIX 2 LAKESHORE ROAD TRANSPORTATION REVIEW STUDY EXECUTIVE SUMMARY Appendix 2 City of Mississauga Lakeshore Road FINAL REPORT Transportation Review Study December 2010 EXECUTIVE SUMMARY Study Purpose

More information

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

New Castle County Bicycle Plan. Heather Dunigan ext

New Castle County Bicycle Plan. Heather Dunigan ext New Castle County Bicycle Plan Heather Dunigan hdunigan@wilmapco.org 302-737-6205 ext 118 www.wilmapco.org/bikencc www.facebook.com/bikencc April 2018 Statewide Bicycle Policy Plan Purpose Build upon past

More information

Hennepin County Bicycle and Pedestrian Planning

Hennepin County Bicycle and Pedestrian Planning Hennepin County Bicycle and Pedestrian Planning 1 Value of bicycle and sidewalk systems Safety Livability Mobility Health Personal Finances Economic Sustainability Clean Air Recreation Parking and congestion

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2016-15 DATE: January 14, 2016 TO: TAC Planning Committee PREPARED BY: Steven Elmer (651) 602-1756 SUBJECT:

More information

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County.

NM-POLICY 1: Improve service levels, participation, and options for non-motorized transportation modes throughout the County. Transportation PRINCE WILLIAM COUNTY 2008 COMPREHENSIVE PLAN NON-MOTORIZED PLAN CONTENTS Goals, Policies, and Action Strategies Table 4 (Bike Facility Classifications and Descriptions) Table 5 (Bike Facility

More information

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011

Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan. January 18, 2011 Pedestrian, Bicycle and Traffic Calming Strategic Implementation Plan January 18, 2011 Tonight s Agenda Receive update on project Provide feedback on two policy issues Complete Streets Policy Project Prioritization

More information

Morristown, NJ Complete Streets Policy

Morristown, NJ Complete Streets Policy Morristown, NJ Complete Streets Policy Introduction A Complete Street is defined as a means to provide safe access for all users by designing and operating a comprehensive, integrated, connected multi-modal

More information

Chapter 13 ORANGE COVE

Chapter 13 ORANGE COVE Chapter 13 ORANGE COVE This chapter describes the current status and future plans for biking and walking in the City of Orange Cove. RELATIONSHIP TO CITY PLANS AND POLICIES The Orange Cove General Plan

More information

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)

Complete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis) Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street

More information

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017

TRANSPORTATION & MOBILITY VISIONING MEETING. August 23 24, 2017 TRANSPORTATION & MOBILITY VISIONING MEETING August 23 24, 2017 Project Team 1999 South Lakefront Framework Plan In 1999, the Chicago Park District authorized framework plans for three historic parks: Jackson,

More information

Franklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017

Franklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017 Franklin Boulevard Traffic Calming Study Public Meeting #1 October 11, 2017 Agenda Welcome and Introductions Project Overview Potential Improvements Map Exercise Report Out NOACA Technical Assistance (TA)

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee

More information

Shifting Gears for a Healthier City

Shifting Gears for a Healthier City Shifting Gears for a Healthier City Mississauga s Cycling Master Plan is an ambitious strategy that sets out to transform Mississauga into a city that is conducive to cycling for daily transportation needs.

More information

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY 7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

San Jose Transportation Policy

San Jose Transportation Policy San Jose Transportation Policy Protected Intersections in LOS Policies to Support Smart Growth Presented by: Manuel Pineda City of San Jose Department of Transportation Bay Area Map San Francisco Oakland

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

TRANSPORTATION COMMISSION Agenda Staff Report

TRANSPORTATION COMMISSION Agenda Staff Report TRANSPORTATION COMMISSION Agenda Staff Report Agenda Item No. 5.a DATE: JULY 31, 2014 TO: FROM: SUBJECT: TRANSPORTATION COMMISSION COMMUNITY DEVELOPMENT DEPARTMENT - PLANNING DRAFT OLYMPIC CORRIDOR PREFERRED

More information

Welcome to the Quebec Alternatives Analysis Public Meeting

Welcome to the Quebec Alternatives Analysis Public Meeting Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical

More information

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018

ATTRIBUTABLE FUNDS COMMITTEE. Summary of Project Updates and New Funding Requests. September 5, 2018 ATTRIBUTABLE FUNDS COMMITTEE Summary of Project Updates and New Funding Requests September 5, 2018 Funding Management Process Review & Update Policies Adopt Funding Commitments Public Comment Public Comment

More information

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility

ADA Transition Plan. City of Gainesville FY19-FY28. Date: November 5, Prepared by: City Of Gainesville Department of Mobility ADA Transition Plan FY19-FY28 Date: November 5, 2018 Prepared by: City Of Gainesville Department of Mobility 1.0 INTRODUCTION 1.1 BACKGROUND The federal statute known as the Americans with Disabilities

More information

Chapter 7 Nonmotorized Facilities

Chapter 7 Nonmotorized Facilities Chapter 7 Nonmotorized Facilities What is in this chapter? This chapter discusses existing and proposed pedestrian and bicycle facilities referred to as nonmotorized facilities along the SR 520 corridor.

More information

Solana Beach Comprehensive Active Transportation Strategy (CATS)

Solana Beach Comprehensive Active Transportation Strategy (CATS) Solana Beach Comprehensive Active Transportation Strategy (CATS) 3.0 Goals & Policies The Solana Beach CATS goals and objectives outlined below were largely drawn from the Solana Beach Circulation Element

More information

Small Town & Rural Multimodal Networks

Small Town & Rural Multimodal Networks Small Town & Rural Multimodal Networks Fred Young, PLA Andrea Clinkscales, AICP, PMP Alta Planning + Design Funding Partners Project Team Existing Design Guidance AASHTO Flexibility Guide 2004 AASHTO Bike

More information

City of Davis East Covell Corridor Plan

City of Davis East Covell Corridor Plan Community Open House #2 January 22, 2014 6:00 8:00 p.m. Veterans Memorial Center, Club Room City of Davis Introduction The (ECCP) is a taking a comprehensive look at the existing transportation systems

More information

The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study

The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study Submitted to: The City of Rocky River September 21, 2015 The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study Table of Contents Chapter 1: Executive Summary Chapter 2: Purpose of

More information

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014

Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Traffic Improvements for the Transit Oriented Development District (TODD) Meriden Public Library March 11, 2014 Project Overview Coordinate roadway improvements with other major projects HUB Flood Control

More information

TRANSPORTATION & MOBILITY

TRANSPORTATION & MOBILITY TRANSPORTATION & MOBILITY ROADWAY SYSTEM There are approximately 40 miles of roadways in Manitou Springs. For planning purposes, roadways are typically assigned a functional classification which defines

More information

Item No. 14 Town of Atherton

Item No. 14 Town of Atherton Item No. 14 Town of Atherton CITY COUNCIL STAFF REPORT CONSENT AGENDA TO: THROUGH: FROM: HONORABLE MAYOR AND CITY COUNCIL GEORGE RODERICKS, CITY MANAGER MICHAEL KASHIWAGI, COMMUNITY SERVICES DIRECTOR MARTY

More information

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions

Guidance. ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions ATTACHMENT F: Draft Additional Pages for Bicycle Facility Design Toolkit Separated Bike Lanes: Two-Way to One-Way Transitions This treatment provides a transition from two-way separated bike lanes to one-way

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information