1 Lake Ave, Lakewood West Shoreway Lakefront Path 2017 Lake Ave, Cleveland Clifton Blvd Extension 2017 Neighborhood street bike boulevards Proposed Lake Connector Existing Bike Trails Trails - Funded Trails - Proposed West Side Greenway The West side needs a safe and easy bike path connection between the new Shoreway Lakefront Path at Edgewater Park and the Rocky River Reservation Path. It would be an active transportation link to the Metroparks and downtown for Lakewood and the West side of Cleveland. Re-connecting Cleveland TIGER Project

2 Lake Ave, Lakewood Clifton Blvd Extension 2017 West Shoreway Lakefront Path 2017 Lake Ave, Cleveland Neighborhood street bike boulevards Proposed Lake Link Trail Existing Bike Trails 1 Trails - Funded Trails - Proposed 4 miles of new off street path or protected bike lanes 0.5 miles of new bicycle boulevards miles of Lake Ave in Cleveland (off street path) 2.7 miles of Lake Ave in Lakewood (off street path) 4 5 Re-connecting Cleveland TIGER Project 0.2 miles on Lake/Clifton rd (neighborhood street bike boulevard) 0.5 miles on Clifton Blvd Extension (2017 protected bike lanes) 0.5 miles on Lake rd and Sloane Ave (bike boulevard / protected lanes)

3 Biking on Lake Ave in Lakewood and Cleveland is unsafe for all except experienced and fearless riders because cars pass at high speed and lanes are undefined. Lake Ave should have safe protected bike infrastructure, separated from cars, to make it safe for all people on bikes, age 8 to 80. A safe and easy bike path connection between the new Shoreway Lakefront Path at Edgewater Park and the Rocky River Reservation Path would provide Lakewood and Cleveland residents with an active link to Lakewood Park, the Metroparks, and downtown. Bike lanes separated from car traffic have been proven to make the road safer for people driving, walking and biking. Protected bike lanes and bike paths also increase property values, since people want to live close to good biking and walking routes.

4 1 Lake Avenue in Cleveland Off street path on the North side of Lake Ave connecting to the Shoreway Lakefront Path at Edgewater park e.g. Off-street path. Part of Lake Link Trail on Fairhill Rd Current: 4 ft sidewalks on North side 24 feet of existing treelawn Proposed: 12 foot path 16 foot treelawn Metroparks Trail Friendship Trail - Fort Erie, Canada

5 2 Lake Avenue in Lakewood Off street path on the North side of Lake Ave e.g. Off-street path. Part of Lake Link Trail on Fairhill Rd and Freedom Trail in Fort Erie, Canada Current: 4 ft sidewalks on North side 24 feet of existing treelawn Proposed: 12 foot path 16 foot treelawn On-street protected bike lanes are also an option. Lake Ave in Lakewood resurfacing planned for

6 3 Lake Rd & Clifton Rd Bicycle boulevard connecting Lake Ave path to Clifton Blvd Extension protected lanes 0.2 mile bicycle boulevard on low-speed residential streets, connecting to Clifton blvd extension protected bike lanes.

7 4 Clifton Boulevard Extension Lakewood is installing 10 foot bike lanes with 4 foot stanchionprotected buffers on both sides of the street in August 2017.

8 5 Lake Rd & Sloane Ave 0.25 mile bike boulevard on residential streets Lake Rd and Sloane Subway 0.25 mile off-street path or protected bike lane on Sloane Ave. Bike signal to cross Detroit Ave and connect to Rocky River Metropark path

Our vision for Chicago s bike network focuses on three types of routes:

Our vision for Chicago s bike network focuses on three types of routes: Bikeways for All In recent years, bicycling in Chicago has been transformed from a fringe activity to a mainstream mode of transportation, thanks in large part to investments made by city leaders in new

More information

Major Bike Routes 102 Avenue Workshop April 21, 2015

Major Bike Routes 102 Avenue Workshop April 21, 2015 Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how

More information

Franklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017

Franklin Boulevard Traffic Calming Study. Public Meeting #1 October 11, 2017 Franklin Boulevard Traffic Calming Study Public Meeting #1 October 11, 2017 Agenda Welcome and Introductions Project Overview Potential Improvements Map Exercise Report Out NOACA Technical Assistance (TA)

More information

Plant City Walk-Bike Plan

Plant City Walk-Bike Plan Plant City Walk-Bike Plan Plant City Commute Mode Share 2.2% 1.4% 2.9% Drove alone 10.2% Carpooled Public transportation (0.1%) Walked Used a Bike (0.4%) 82.9% Taxicab, motorcycle, or other means Worked

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

City of Birmingham Draft Multi-modal Transportation Plan

City of Birmingham Draft Multi-modal Transportation Plan City of Birmingham Draft Multi-modal Transportation Plan City Commission Public Hearing Monday, November 25, 2013 7:30 pm Norman Cox, PLA, ASLA The Greenway Collaborative, Inc. Ann Arbor, Michigan The

More information

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting

City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting City Birmingham Multi-Modal Transportation Plan Visioning Workshop Results Meeting Monday, January 28, 2013 7:30 PM, City Hall Norman Cox, PLA, ASLA. Ann Arbor, Michigan. www.greenwaycollab.com Community

More information

The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study

The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study Submitted to: The City of Rocky River September 21, 2015 The Detroit Road Traffic, Parking Analysis and Marion Ramp Feasibility Study Table of Contents Chapter 1: Executive Summary Chapter 2: Purpose of

More information

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016

City of Atlanta-MARTA Sales Tax Referendum Draft Project List. Atlanta City Council Work Session May 19, 2016 1 City of Atlanta-MARTA Sales Tax Referendum Draft Project List Atlanta City Council Work Session May 19, 2016 2 SB 369 - MARTA Sales tax for up to 0.50% is allowed in the City of Atlanta for MARTA Purpose

More information

Physical Implications of Complete Streets Policies

Physical Implications of Complete Streets Policies Presentation Overview Physical Implications of Complete Norm Cox, ASLA, LLA Landscape Architect Ann Arbor, Michigan, 10:45 to Noon What Are Complete Streets? What Matters to Bicyclists and Pedestrians

More information

Board of Supervisors February 27, 2017

Board of Supervisors February 27, 2017 : Traffic Analysis Results & Draft Conceptual Plan Board of Supervisors February 27, 2017 Transportation Solutions Building Better Communities Presentation Overview Background Summary of Traffic Analysis

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Planning Suburban Bike Networks

Planning Suburban Bike Networks Planning Suburban Bike Networks Stacey Meekins, AICP 28 October, 2015 Bikeway design guidance Different Cyclists Have Different Needs No interest 33% Strong and Fearless 1% Enthused and Confident 7% Interested,

More information

Completing the Street: Denning Drive

Completing the Street: Denning Drive Completing the Street: Denning Drive Public Workshop and Walking Audit Winter Park Civic Center May 12, 2016 Completing the Street What Makes This a Complete Street? Completing the Street Complete Streets

More information

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE

VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE VAN AKEN DISTRICT CONNECTIONS PLAN COMMUNITY MEETING #1 June 20, 2016 SMITHGROUP JJR WSP PARSONS BRINCKERHOFF STUDIO GRAPHIQUE 01 02 03 04 05 06 Project Overview + Goals RMS Development District-wide Connections

More information

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads

Stakeholder Update. Agenda. Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads 1 Stakeholder Update May 21, 2018 2 Agenda Project update Needs Identification Strategy Proposed needs Safety Collectors/Arterials Greenways Local roads Proposed Evaluation Criteria Next Steps 1 Project/Schedule

More information

Appendix B: Benefit-Cost Analysis

Appendix B: Benefit-Cost Analysis Appendix B: Benefit-Cost Analysis RE-CONNECTING CLEVELAND: PATHWAYS TO OPPORTUNITY RE-CONNECTING CLEVELAND: PATHWAYS TO OPPORTUNITY [this page intentionally blank] RE-CONNECTING CLEVELAND: PATHWAYS TO

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. Community Plan Skiatook Community Overview Skiatook Skiatook is a growing city located approximately 14 miles north of downtown Tulsa with its main street, W.C. Rogers

More information

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013

Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 Bicycle Pedestrian Master Plan Pre Bid Meeting Portsmouth, NH August 15, 2013 2005 Master Plan GOAL: Provide for safe and convenient bicycle and pedestrian circulation throughout the City. Develop a city

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

AGENDA ACTION ITEMS INFORMATION ITEMS

AGENDA ACTION ITEMS INFORMATION ITEMS NOACA Bicycle and Pedestrian Advisory Council Meeting Friday, June 20 th, 2014 10:30 a.m. NOACA Office 1299 Superior Avenue Cleveland, Ohio 44114 Phone: (216) 241-2414; website: www.noaca.org AGENDA ACTION

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

Today. Develop Plans. Public Listening Session

Today. Develop Plans. Public Listening Session Welcome! 1. Share Existing Conditions and Data 2. Share Details of Proposed Project 3. Gather Feedback from Public M Ju ee ly tin 17 g D th a, 2 te 01 : 7 Meeting Purpose and 26th Street Project Timeline

More information

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018

Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Tunnel Reconstruction Brooklyn CB 1 August 14, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of Customers The Service

More information

New Castle County Bicycle Plan. Heather Dunigan ext

New Castle County Bicycle Plan. Heather Dunigan ext New Castle County Bicycle Plan Heather Dunigan hdunigan@wilmapco.org 302-737-6205 ext 118 www.wilmapco.org/bikencc www.facebook.com/bikencc April 2018 Statewide Bicycle Policy Plan Purpose Build upon past

More information

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on

Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on CAPITAL Large Category Projects Board-Approved Funding Awards for Cycle 4 Active Transportation Grant Program Projects (in Order of Project Rankings) Approved on 07-27-18 1 La Mesa University Ave Pedestrian

More information

Regional Trails Corridor Assessment

Regional Trails Corridor Assessment Regional Trails Corridor Assessment Project Goals Complete the regional trails network in the River to Sea TPO Planning Area and advance the Florida Greenways and Trails System Plan by developing/finalizing

More information

Goodlettsville Bicycle and Pedestrian Plan Executive Summary

Goodlettsville Bicycle and Pedestrian Plan Executive Summary Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities

More information

Designing for Pedestrian Safety

Designing for Pedestrian Safety Designing for Pedestrian Safety Road Diets Presented by: Peter Lagerwey Senior Planner, Toole Design Group November 3, 2010 Before After Learning Objectives At the end of this module, you will be able

More information

Complete & Green Streets Progress Report 2016

Complete & Green Streets Progress Report 2016 Complete & Green Streets Progress Report 2016 Prepared by the Mayor s Office of Sustainability, Mayor s Office of Capital Projects, City Planning, and Department of Public Works 1 Introduction The purpose

More information

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN

TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN TOWN OF WILLIAMSTON, SC BICYCLE AND PEDESTRIAN MASTER PLAN Americans Want Choices 55% of Americans would rather drive less & walk more. Transit use is growing faster than population or highway travel.

More information

Bicycle and Pedestrian Advisory Council May 15, 2015

Bicycle and Pedestrian Advisory Council May 15, 2015 Bicycle and Pedestrian Advisory Council May 15, 2015 Updates Spring Bike/Ped counts took place Tuesday May 12 Thursday, May 14 40 volunteers and locations counted across the region More than double the

More information

CONCERNS / CHALLENGES

CONCERNS / CHALLENGES CONCERNS / CHALLENGES Time frame Transit Pedestrian Access & Comfort Bicycle Access & Comfort Neighborhood Spillover Public Info & Signange Connection to Downtown Physical Contraints of site 0-5 years

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

Pavement Rehabilitation & Buffered Bike Lane

Pavement Rehabilitation & Buffered Bike Lane Pembina Highway from Grant Avenue to Osborne Street Pavement Rehabilitation & Buffered Bike Lane Welcome April 21, 2016 Please complete and submit a comment sheet prior to leaving or complete it online

More information

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures. Before After ROAD DIETS MODULE 10 1 of 9 Safety Proven Countermeasures http://safety.fhwa.dot.gov/provencountermeasures/fhwa_sa_12_013.htm Learning Objectives At the end of this module, you will be able

More information

BICYCLE FACILITIES FULL BUILD PLAN

BICYCLE FACILITIES FULL BUILD PLAN KIMBALL RD ROCKY RD CYPRESS DR CITY PARK AVE S SHIELDS ST CONSTITUTION AVE S TAFT HILL RD S OVERLAND TRL HILLCREST DR SKYLINE DR MOBY DR CRAGMORE DR CASTLEROCK DR MEADOWBROOK DR S BRYAN AVE BICYCLE FACILITIES

More information

DRAFT ROCKY RIVER MASTER PLAN PUBLIC MEETING 1 RESULTS REPORT

DRAFT ROCKY RIVER MASTER PLAN PUBLIC MEETING 1 RESULTS REPORT DRAFT ROCKY RIVER MASTER PLAN PUBLIC MEETING 1 RESULTS REPORT May 26, 2017 Cuyahoga County Planning Commission 2079 East 9th Street Suite 5-300 Cleveland, OH 44115 216.443.3700 www.countyplanning.us www.facebook.com/countyplanning

More information

Old Colony Bikeway. Erin Pacileo Joe Conroy Pat Ruby Ryan Hipp. Civil & Environmental Engineering. South Bay Center. Moakley Park.

Old Colony Bikeway. Erin Pacileo Joe Conroy Pat Ruby Ryan Hipp. Civil & Environmental Engineering. South Bay Center. Moakley Park. Old Colony Bikeway South Bay Center Dorcheste er Ave. Old Colo ony Ave. Moakley Park UMass Boston Erin Pacileo Joe Conroy Pat Ruby Ryan Hipp Outline Project Overview Objectives & Goals Proposed Corridor

More information

Sharrows and Elephants and Bike Boxes!, s, Oh My!

Sharrows and Elephants and Bike Boxes!, s, Oh My! Sharrows and Elephants and Bike Boxes!, s, Oh My! New Traffic Control Devices on Vancouver s Bike Routes David Rawsthorne, P.Eng. City of Vancouver Engineering g Services CITE Quad Conference, May 2009

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area

More information

MAKE YOUR PLACE IN CHANNELSIDE

MAKE YOUR PLACE IN CHANNELSIDE MAKE YOUR PLACE IN CHANNELSIDE INTRODUCTION PROJECT LIMITS Channelside Drive from Cumberland Ave to Kennedy Boulevard EXISTING CONDITIONS EXISTING CONDITIONS CHANNELSIDE DRIVE FROM E. CUMBERLAND AVENUE

More information

City of Richmond Bicycle Master Plan

City of Richmond Bicycle Master Plan City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with

More information

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE

2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,

More information

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary

Winnipeg Walk Bike Projects Downtown Tire Talk - Summary Winnipeg Walk Bike Projects Downtown Tire Talk - Summary Downtown Projected Bike Lane System Connecting The Forks to the Exchange District (Fort Street, Garry Street & The Forks to Assiniboine Connection)

More information

42nd Ave N Reconstruction

42nd Ave N Reconstruction CITY OF MINNEAPOLIS 42nd Ave N Reconstruction Community Meeting #2 May 2016 6:00 7:30 p.m. 5/16/2016 1 Purpose of Meeting Inform: Provide an overview of project, identify anticipated scope of work, and

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures.

After. Before ROAD DIETS MODULE of 9 Safety Proven Countermeasures. 1 Before After ROAD DIETS MODULE 10 1 of 9 Safety Proven Countermeasures http://safety.fhwa.dot.gov/provencountermeasures/fhwa_sa_12_013.htm 2 Learning Objectives At the end of this module, you will be

More information

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice

Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice Lessons Learned from Cycle Tracks (Class IV Bikeways) Design Practice By: Min Zhou, P.E., Principal/Vice President KOA Corporation 1 What is a Cycle Track (Class IV) TYPICAL BIKEWAY CLASSIFICATION CLASS

More information

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co.

Safe Routes to School: Munroe Elementary Walk Audit Report. Image: Drexel, Barrell & Co. Safe Routes to School: Munroe Elementary Walk Audit Report Image: Drexel, Barrell & Co. April 12, 2016 OVERVIEW As part of the 2014/2015 Denver Safe Routes to School (SRTS) Program, WalkDenver coordinated

More information

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident

Bobbie Walthall. Hi Bobby, please include these comments in tonight s CC packet. Thanks for your consideration, Phil Collison Lawrence Resident Bobbie Walthall From: Sent: To: Subject: Phil Collison Tuesday, October 16, 2018 9:44 AM Bobbie Walthall Comments for Agenda item 3 Bike Boulevard Hi Bobby, please include these comments

More information

Speed Limits Study and Proposal. Public Input Session: 8/14/13

Speed Limits Study and Proposal. Public Input Session: 8/14/13 Speed Limits Study and Proposal Public Input Session: 8/14/13 Why is Decatur a unique place for this project? First Community Transportation Plan in the nation with a Health Impact Assessment. Strong sense

More information

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution

Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Bicycle-Pedestrian Master Plan: Chapters 3 and 4 Distribution Finksburg Planning and Citizens Council March 22, 2018 Overview Progress Citizen Outreach Vision Chapter 3 - Existing Conditions Chapter 4

More information

KEARNY MESA COMMUNITY PLAN UPDATE

KEARNY MESA COMMUNITY PLAN UPDATE KEARNY MESA COMMUNITY PLAN UPDATE January 18, 2018 SUBCOMMITTEE MEETING Mobility Concepts and Urban Design Presentation Outline Mobility Concepts: Multimodal Planning Toolbox Presentation and Activities

More information

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis

Reference number /VP. Lafayette Downtown Congestion Study - Additional Traffic Analysis To James Hinkamp and Tony Coe, City of Lafayette Date January 19, 2017 Copies Reference number 243381/VP From Michael Iswalt and Vanessa Peers File reference 4-05 Subject Lafayette Downtown Congestion

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Glenpool Community Overview Glenpool Glenpool is a city of nearly 12,000 residents located in Tulsa County southwest of Tulsa and Jenks. The city is growing

More information

LANCASTER CITY BICYCLE NETWORK

LANCASTER CITY BICYCLE NETWORK LANCASTER CITY BICYCLE NETWORK Downtown Merchants Meeting Wednesday, July 19, 2017 http://www.lancasteratp. DOWNTOWN WALKABILITY ANALYSIS What changes can be made, in the least amount of time, and for

More information

Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011

Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011 Bicycle Master Plan for Greenville, SC Presentation to City Council June 13, 2011 In collaboration with: Alta Planning + Design Fuss & O Neill Darrohn Engineering DNA Creative Bicycle Master Plan Advisory

More information

COMMENT CARD SUMMARY

COMMENT CARD SUMMARY NORTH PARK MID-CITY REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS COMMUNITY ADVISORY GROUP MEETING 1 January 30, 2013 6:00 p.m. 8:30 p.m. City Heights Wellness Center 4440 Wightman

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

64% UNSAFE and. Where can features be added to improve the street for bicyclists?

64% UNSAFE and. Where can features be added to improve the street for bicyclists? BICYCLING Where can features be added to improve the street for bicyclists? Due to its proximity to neighborhoods, downtown and the waterfront, many people bike Niagara Street to get to where they need

More information

43 rd Avenue, Skillman Avenue Protected Bike Lanes

43 rd Avenue, Skillman Avenue Protected Bike Lanes 43 rd Avenue, Skillman Avenue Protected Bike Lanes Presented to Queens Community Board 2 Transportation Committee - November 6, 2017 43 rd Avenue, Skillman Avenue: Presentation Overview Background Project

More information

Road Diets and Roundabouts

Road Diets and Roundabouts Road Diets and Roundabouts Paul Zykofsky, AICP Local Government Commission Sacramento, CA Classic Road Diet 4 to 3 lanes San Antonio TX On-street parking Median Bike Lanes Center Turn-Lane Seattle WA Road

More information

SHIFTING GEARS. for a better ride ahead. MONTGOMERY COUNTY DEPARTMENT OF TRANSPORTATION April 5, 2014

SHIFTING GEARS. for a better ride ahead. MONTGOMERY COUNTY DEPARTMENT OF TRANSPORTATION April 5, 2014 SHIFTING GEARS for a better ride ahead MONTGOMERY COUNTY DEPARTMENT OF TRANSPORTATION April 5, 2014 CYCLING IN THE USA The number of bicyclists is growing rapidly in the United States Transportation &

More information

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011

GIS Based Data Collection / Network Planning On a City Scale. Healthy Communities Active Transportation Workshop, Cleveland, Ohio May 10, 2011 The Purpose of GIS Based Network Planning GIS Based Data Collection / Network Planning Healthy Communities Active Transportation Conference Tuesday, May 10, 2011 10:00 AM Norman Cox, LLA, ASLA. Ann Arbor,

More information

Active Transportation Access to Transit

Active Transportation Access to Transit Active Transportation Access to Transit Introduction COMO Connect customers access transit service in many ways, including walking, bicycling, riding in a car and being dropped off, and directly boarding

More information

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections

DRAFT - CITY OF MEDFORD TRANSPORTATION SYSTEM PLAN Roadway Cross-Sections Roadway Cross-Sections Medford s roadway cross-section standards apply to new and reconstructed roads. The crosssections take into consideration roadway function and operational characteristics, including

More information

Community and Business Outreach November 2015 Goal #1: Improve safety in the corridor Goal #2: Make a more livable corridor Goal #3: Improve mobility for all Data Collection Alternatives Recommendations

More information

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project

Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project Priority 1: Ala Wai Pedestrian and Bicycle Safety and Mobility Project The full application can be found here: http://www.oahumpo.org/wp-content/uploads/2015/05/alawai_application.pdf Description The Ala

More information

Tunnel Reconstruction South 5 th Street Association October 16, 2018

Tunnel Reconstruction South 5 th Street Association October 16, 2018 Tunnel Reconstruction South 5 th Street Association October 16, 2018 Reconstructing the Tunnel 2 Service During Tunnel Reconstruction April 2019 through July 2020 3 Projected Cross River Travel Paths of

More information

Applications for Funding

Applications for Funding Coordinated Call for Projects Second Cycle of OBAG, TLC and PBTF Funding Applications for Funding As of The following table lists the applications for funding available through the Coordinated Call for

More information

Dowling/Beaty Cycling Route

Dowling/Beaty Cycling Route Public Meeting #2 Dowling/Beaty Cycling Route May 17, 2017 6:00 p.m. 8:00 p.m. Parkdale Public Library - Auditorium 1303 Queen Street West How to Participate Share your questions, ideas and concerns We

More information

Bicycle Friendly Niagara Falls

Bicycle Friendly Niagara Falls Bicycle Friendly Niagara Falls STAKEHOLDER COMMITTEE MEETING 2 SUPPORTED BY THE OATH COMMUNITY FUND AT THE COMMUNITY FOUNDATION FOR GREATER BUFFALO Develop a Bicycle Master Plan to document the city s

More information

N Prospect Ave and E North Ave. URB PLAN 772 Spring 2017 Hamideh Moayyed, Chris Sandor, Trent Schultz, and Charlie Griffith

N Prospect Ave and E North Ave. URB PLAN 772 Spring 2017 Hamideh Moayyed, Chris Sandor, Trent Schultz, and Charlie Griffith N Prospect Ave and E North Ave URB PLAN 772 Spring 2017 Hamideh Moayyed, Chris Sandor, Trent Schultz, and Charlie Griffith N Maryland Ave E North Ave High Density Residential N Maryland Ave Whole Foods

More information

PROJECT KEY TYPICAL SECTION 1 =60

PROJECT KEY TYPICAL SECTION 1 =60 6 WASHINGTON BLVD - BETWEEN NE 1ST ST AND NE 3RD ST Washington Boulevard is a low volume, low speed one-way road, signed for no street between NE 1st Street and NE 2nd Street, and closed to traffic between

More information

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan

STEERING COMMITTEE MEETING June 17, Streetscape Overview Burlington Comprehensive Master Plan STEERING COMMITTEE MEETING June 17, 2015 Streetscape Overview Burlington Comprehensive Master Plan 1 Introduction Slide This slide show was presented to the Burlington Steering Committee on June 17, 2015

More information

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK

Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting

More information

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern:

4404 St. Peter Street New Orleans, LA (504) April 13 th, To Whom It May Concern: 4404 St. Peter Street New Orleans, LA 70119 (504) 861-4022 info@bikeeasy.org April 13 th, 2014 To Whom It May Concern: We are writing to present a design solution for Lakeshore Drive. Earlier this month,

More information

Complete Streets Policies in Charlotte

Complete Streets Policies in Charlotte Complete Streets Policies in Charlotte Complete Streets Peer Exchange Baton Rouge, LA January 19, 2016 Norm Steinman, AICP Charlotte DOT Changing what we do to change what will happen 1. Inventory of Conditions

More information

Complete Streets Successes, Opportunities, and Challenges

Complete Streets Successes, Opportunities, and Challenges Complete Streets Successes, Opportunities, and Challenges Juliet Walker, Transportation Planner, City of Portsmouth Rob Houseman, Director of Planning and Development, Town of Wolfeboro Chris Parker, Director

More information

Lawrence Loop SWOT Analysis

Lawrence Loop SWOT Analysis Alignment: A1 (Map Color: Red) Description: This alignment connects to the Sandra Shaw Trail on the north side of the pond and heads north through undeveloped property and then west to Michigan Street

More information

Regina Bikeways Needs Assessment Study: Measuring the value of the bikeway infrastructure

Regina Bikeways Needs Assessment Study: Measuring the value of the bikeway infrastructure Regina Bikeways Needs Assessment Study: Measuring the value of the bikeway infrastructure Norma Moores, P.Eng. ProWalk/ProBike 2008 Regina Bikeway Needs Assessment Study To measure use of the on-road bikeways

More information

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014

NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014 NACTO Designing Cities 2014 Dongho Chang, City Traffic Engineer October 23, 2014 Presentation overview Perspective on Safety Changing needs of our cities How Seattle is meeting those needs Challenge for

More information

Enhancing Downtown

Enhancing Downtown Enhancing Downtown 2014-2015 Process Masterplan reviewed TIF scope, fund availability, and timing Conceptual cost estimate stage things may change with full engineering Sequencing Coordination with businesses

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study

Elon Bicycle, Pedestrian and Lighting Plan. Pedestrian Rail Crossings Study Elon Bicycle, Pedestrian and Lighting Plan Pedestrian Rail Crossings Study Project Overview The Town of Elon, Elon University and the Twin Lakes Retirement Community began a comprehensive bicycle, pedestrian

More information

Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 2018)

Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 2018) Rail Station Fact Sheet North Side Station* (*station under construction with anticipated start of service in late 018) Station Overview North Side Station will be located near the intersection of North

More information

Building Great Neighbourhoods BONNIE DOON

Building Great Neighbourhoods BONNIE DOON Building Great Neighbourhoods BONNIE DOON We Are Here Today To Explain the Neighbourhood Renewal Process Show you the Westwood Preliminary Design Ask for local knowledge Highlight the Local Improvement

More information

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B:

2016 I-30 CROSSING ARKANSAS BOULEVARD KEY IDEAS OF PLAN B: KEY IDEAS OF PLAN B: Transportation shall support all parts of the cities and improve the quality of life downtown. There is no need to shorten commuting time at rush hour by a few minutes at the risk

More information

Good Neighbor Plan Initiative Update. Transportation & Trinity River Project Committee 9 September 2013 Dallas Love Field Phase One Final Report

Good Neighbor Plan Initiative Update. Transportation & Trinity River Project Committee 9 September 2013 Dallas Love Field Phase One Final Report Good Neighbor Plan Initiative Update Transportation & Trinity River Project Committee 9 September 213 Dallas Love Field Phase One Final Report PURPOSE As briefed to the Transportation and Environmental

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Welcome. If you have any questions or comments on the project, please contact:

Welcome. If you have any questions or comments on the project, please contact: Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue

More information

Fairview and Main Local Streets Improvement Plan

Fairview and Main Local Streets Improvement Plan PIM#2 Summary Report Meeting Format Date & Time: Location: Address: Prepared By: Community Open House August 11, 2016 5:30 p.m. 7:30 p.m. Red Lion Hotel 1800 W. Fairview Avenue, Boise Stephanie Borders,

More information

SAFE ROUTES TO SCHOOL (SR2S)

SAFE ROUTES TO SCHOOL (SR2S) SAFE ROUTES TO SCHOOL (SR2S) In partnership with Burbank Unified School District (BUSD) & City of Burbank George Washington Elementary School Thomas Jefferson Elementary School John Muir Middle School

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

EXECUTIVE SUMMARY. Vision

EXECUTIVE SUMMARY. Vision Vision Walking and bicycling in Salt Lake City will be safe, convenient, comfortable, and viable transportation options that connect people to places, foster recreational and economic development opportunities,

More information

West Village Mobility & Integration

West Village Mobility & Integration West Village Mobility & Integration PRESENTED TO TOPCA Town Hall November 9, 2017 [7189-21] Port Credit 2 West Village + Mobility AWalkable Community A CompleteCommunity A SustainableCommunity 3 Mobility