03/16 BD-5114AC 14 TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
|
|
- Lindsay Hawkins
- 5 years ago
- Views:
Transcription
1 5 YEAR TIP LET LIST DIVISION 14 Let (B) TIP Sub No. Div County Let Type Description 10/14 I Division Design Raleigh Let (DDRL) I-40 REHABILITATE TUNNELS 15, 17, AND /14 W-5214M 14 Division POC Let (DPOC) US 276 (RUSS AVENUE) FROM BARBER BOULEVARD TO THE US 23/74 EASTBOUND RAMPS IN WAYNESVILLE 01/15 I Raleigh Letting (LET) I-40 NEAR MILEPOST 7 07/16 BD-5114X 14 Division POC Let (DPOC) REPLACE BRIDGE 144 OVER DUTCH COVE CREEK ON SR 1836 REPLACEBRIDGE 144 OVER DUTCH COVE /17 I Division Design Raleigh Let (DDRL) I-40 FROM THE TENNESSEE STATE LINE TO MILE MARKER 15 02/18 I Division Design Raleigh Let (DDRL) I-40 FROM MILE MARKER 20 TO MILE MARKER 34 10/14 BP-5500BB 14 Division POC Let (DPOC) BRIDGE 30 ON I-26 OVER SR 1834 (MACEDONIA ROAD) 12/14 SS-4914BT 14 Division POC Let (DPOC) SR 1171 (FINLEY COVE RD) FROM SR 1210 (BIG WILLOW ROAD) TO SR 1137 NEAR VILLE 06/15 R-5207C 14 Division POC Let (DPOC) FROM SR 1539 (JACKSON ROAD) TO US 25 IN FLETCHER 06/15 EB NON - DOT LET (Bicycle and Pedestrian) VILLE - OKLAWAHA GREENWAY FROM PATTON PARK TO BALFOUR ROAD/BERKLEY MILLS 07/15 U NON - DOT LET (Local) VILLE - TRANSIT CENTER 01/16 W Division Design Raleigh Let (DDRL) CONSTRUCT A CONTINUOUS THREE-LANE SECTION, EXTEND RIGHT TURN LANE INTO SCHOOL, REVISE AND INSTALL AND CONSTRUCT PAVED SHOULDERS ON NC FROM SR 1381 (MOUNTAIN ROAD) TO NORTH OF SR 1365 (NORTH RUGBY ROAD) 02/16 I Division Design Raleigh Let (DDRL) I-26 FROM MILEMARKER 51 TO MILEMARKER 61 REHABILITATION 03/16 BD-5114AE 14 Division POC Let (DPOC) REPLACE BRIDGE 77 OVER MUD /16 BD-5114Y 14 Division POC Let (DPOC) REPLACE BRIDGE 135 OVER SHAW /16 U Division Design Raleigh Let (DDRL) VILLE - US 25/SR 1164 (ERKWOOD DRIVE)/ SR 1779(SHEPHERD STREET) - INTERSECTION IMPROVEMENTS 04/15 R-2409C 14 Division Design Raleigh Let (DDRL) US 64 FROM CASHIERS TO ROSMAN 06/15 U Division Design Raleigh Let (DDRL) BREVARD - US 64 BUSINESS FROM SR 1349 (WEST MAIN STREET) TOUS /16 BD-5114AJ 14 Division POC Let (DPOC) REPLAC E BRIDGE 64 OVER NORTH PRONG FLAT /16 B Raleigh Letting (LET) REPLACE BRIDGE 13 OVER NICHOLSON /16 B Raleigh Letting (LET) REPLACE BRIDGE 196 OVER CRAB /16 BD-5114AA 14 Division POC Let (DPOC) REPLACE BRIDGE 117 OVER EAST FORK FRENCH BROAD RIVER ON SR /16 BD-5114AB 14 Division POC Let (DPOC) REPLACE BRIDGE 138 OVER LITTLE /16 BD-5114AC 14 Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE /16 B NON - DOT LET (Local) BREVARD - BRIDGE 102 ON RAILROAD AVENUE OVER KINGS CREEK 03/16 BD-5114AD 14 Division POC Let (DPOC) REPLACE BRIDGE 86 OVER EAST FORK FRENCH BROAD RIVER ON SR /16 R-2409D 14 Division Design Raleigh Let (DDRL) US 64 FROM NC 107 AT CASHIERS TO US 178 AT ROSMAN 07/17 B Raleigh Letting (LET) REPLACE BRIDGE 12 OVER HOGSED /18 B Raleigh Letting (LET) REPLACVE BRIDGE 139 OVER EAST BRANCH TOXAWAY 1139
2 Contract Number C C C C Route Location Description Type of Work TIP # County SR-1184 US-74 US-23 NC-191 SR-1184 (HOWELL MILL RD) FROM US- 276 TO US-23 BUS. US-74 FROM EXIT 98 IN COUNTY TO WEST OF AND JACKSON MEDIAN COUNTY LINE. GUARDRAIL. W-5315 Haywood US-23/74 SOUTHBOUND REST AREA ON NEW LOCATION AND RENOVATE EXISTING NORTHBOUND REST AREA. REST AREA. K-5002 Haywood BRIDGES - 3 IN COUNTY AND 1 IN COUNTY. Federal Aid Number Actual Progress SIGNALS, AND STRUCTURES. U-4412 Haywood STP-1184(4) 39.96% STPNHS- 0074(117) 76.01% NHS- 0023(18) 12.29% BRIDGE PRESERVATION. Haywood 47.32% C SR-1407 C SR-1503 C NC-209 C I-40 C BRIDGE #72 OVER JONATHAN BRIDGE #35 OVER BALD 1503 (UPPER CRABTREE CREEK RD). NC-209 FROM US- 23 BUS TO NORTH OF SR AND STRUCTURE. B-4762 Haywood BRZ-1407(5) 22.09% AND CULVERT. B-4763 Haywood BRZ-1503(8) 47.51% SIGNALS, WALL, RAIL, & STRS. R-4047 Haywood STP-0209(6) 2.62% REHABILITATIO N. I-5323 Haywood I-40 FROM MM-34 TO MM-36. OF 2 BRIDGES IN COUNTY AND 4 BRIDGES IN JACKSON COUNTY. DESIGN BUILD. Haywood NHPP-040-1(248) %
3 C DN00036 US-74 DN00135 SR-1863 DN00142 SR-1164 DN00143 SR-1380 DN00154 SR-1818 DN00160 SR-1513 DN00172 SR-1313 DN00173 SR-1545 DN00180 SR-1820 OF 10 BRIDGES IN COUNTY AND 1 BRIDGE IN JACKSON COUNTY WITH CULVERTS. DESIGN BUILD. Haywood DYNAMIC MESSAGE US 74 NEAR EXIT SIGN, TRAFFIC 105 BRIDGE #368 OVER GARDEN 1863 WILSON BRANCH ROAD BRIDGE # 61 OVER PLOTT 1164 GREEN VALLEY ROAD BRIDGE #216 OVER TURKEY 1380 TURKEY CR RD BRIDGE #194 OVER RATCLIFFE COVE BRANCH ON SR 1818 (RATCLIFFE COVE ROAD) BRIDGE #165 OVER CHAMBERS BRANCH ON SR 1513 THICKETY ROAD BRIDGE #162 OVER BRANCH OF JONATHAN 1313 BRIDGE #356 OVER BOWEN BRANCH ON SR 1545 SORRELLS COVE ROAD BRIDGE #321 OVER CONNER MILL BRANCH ON SR 1820 CONTROL R-4049R Haywood CULVERT Haywood STP- 000S(416) % STRUCTURE Haywood % STRUCTURE Haywood 37.87% STRUCTURE Haywood 98.49% SIGNAGE, STRUCTURE Haywood % CULVERT Haywood % CULVERT, PAVE Haywood 24.88% CULVERT Haywood 18.06%
4 DN00320 DN00325 SR-1870 US-276 SR 1870 SHADY BROOK ROAD 0.1 MILES SOUTH OF SR 1871 JETER MOUNTAIN ROAD US 276 FROM SR 1890 HUNGRY CREEK ROAD FOR 1.0 MILE NORTH RETAINING WALL, DRAINAGE Haywood % TRAFFIC CONTROL W-5214Q Haywood HSIP- 0276(12) DN00331 DN00332 DN00335 US-276 US-25 US 276 FROM SR 1102 TO SHINING ROCK TRAIL HEAD NC 215 FROM BRIDGE #116 TO SR 1111 BUFFALO LANE FROM BOUNDARY STREET TO SHACKFORD STREET IN WAYNESVILLE US 25; US 64; US 176; US 276 LEVEL, FOG SEAL, AST, MARKINGS Haywood 56.04% GRADE, PAVE Z-4614A Haywood MARKINGS R-4067N Haywood NONE- STP- FY06(15) % STPNHS- 000S(16) 27.06% DN00341 US-19 US 19 FROM 1.4 MILES EAST OF JACKSON COUNTY LINE TO 1.0 MILES WEST OF JACKSON COUNTY LINE GRADE, PAVE, MARKINGS, EROSION CONTROL W-5214L Haywood HSIP- 0019(46) DN00345 DN00356 C US-276 SR-1613 SR-1783 US 276 VARIOUS LOCATIONS FROM NC 110/215 TO WAYNESVILLE CITY LIMITS SR 1613 FROM SR 1663 TO SR 1645 SR-1783 (UPWARD RD) FROM US-176 TO (HOWARD GAP RD). TRAFFIC CONTROL LEVEL, PAVE, SS- 4914BS Haywood MARKINGS Haywood WIDENING, SIGNALS, & STRUCTURES. R-4430 Henderson STP-1783(3) 99.97%
5 C C C SR-1525 (HOWARD GAP RD) FROM BRIDGE #334 TO SR-1539 (JACKSON RD). (HOWARD GAP RD) FROM US-64 TO BRIDGE #20. BRIDGE #45 OVER DEVIL'S FORK CREEK ON SR-1525 (DANA RD). SIGNALS, AND STRUCTURE. R-5207B Henderson 57.37% SIGNALS, AND STRUCTURE. R-5207A Henderson 72.55% AND CULVERT. B-4547 Henderson BRSTP- 1525(8) 96.67% C SR-1574 C SR-1734 C SR-1528 DN00099 I-26 C SR-1107 C SR-1324 C US-64 BRIDGE #113 OVER TAZEWELL CREEK AND #38 OVER CLEAR BRIDGE #42 OVER SACONON 1734 (STEPP MILL RD). BRIDGE #309 OVER FEATHERSTONE I-26 EB WEIGH STATION MM 45 BRIDGE OVER EAST FORK FRENCH BROAD RIVER AND APPROACHES ON SR BRIDGE OVER NORTH FORK FRENCH BROAD RIVER AND APPROACHES ON SR BRIDGE #27 OVER ROCKY CREEK ON US-64. AND STRUCTURES. B-4765 Henderson BRZ-1574(4) 51.90% RETAINING WALL, AND STRUCTURE. B-3346 Henderson BRZ-1734(3) 25.44% AND CULVERT. B-4988 Henderson BRZ-1528(6) 69.00% CONCRETE, SHOULDERS, PAVMENT MARKINGS Henderson % AND STRUCTURE. B-4288 Transylvania BRZ-1107(9) 33.15% PAVING AND STRUCTURE. B-4289 Transylvania BRZ-1324(2) PAVING AND CULVERT. B-5010 Transylvania BRSTP- 0064(99) 85.62%
6 DN00032 DN00145 SR-1388 SR-1504 SR 1388 FROM US 64 TO US 178 BRIDGE #195 OVER LYDAY 1504 OLD US 64 GUARDRAIL PAVE, STRUCTURE SS- 4914AJ Transylvania 94.13% Transylvania DN00251 DN00347 DN00352 DN00357 SR-1301 NC-281 SR-1527 SR-1128 SR 1301 COLD MOUNTAIN ROAD 4.7 MILES NORTH OF NC 281 NC 281 FROM 0.03 MILES SOUTH OF SR 1376 TO US 64 SR 1527 TALLEY ROAD SR 1191 RIVER ROAD SR 1128 FROM SR 1195 TO US 64 SHORED MSE RETAINING WALL Transylvania LEVEL, PAVE, MARKINGS Transylvania 73.26% TRAFFIC CONTROL W-5214K Transylvania LEVEL, MILL, PAVE, MARKINGS Transylvania HSIP- 1527(8)
7 NON TIP LET LIST County Contract # wbs DESCRIPTION DELIVERY METHOD Let Date SR 1338A, WHITE 14C OAK ROAD Constr. by State Forces (CSF) 4/11/ BP.14.R Division POC Let (DPOC) 11/23/ BP.14.R Division POC Let (DPOC) 12/9/ BP.14.R.37 DN BP.14.R.42 14C FD1 17BP.14.R BP.14.R.28 17BP.14.R.18 17BP.14.R.44 17BP.14.R.45 17BP.14.R BP.14.R BP.14.R.26 17BP.14.R.49 17BP.14.R Constr. by State Forces (CSF) 4/1/2015 Division POC Let (DPOC) 9/22/2015 SR 1347, Foster Creek Constr. by State Forces (CSF) 4/29/2013 SR 1309/1312, N-S Rugby, guardrail Division POC Let (DPOC) 12/10/2013 SR 1690, Broadpoint - access to Empire Distributing c/s 6/2/2014 SS-4914BJ- CON - I- Division POC Let (DPOC) 26 10/14/2014 SR 1171, Finley Cove Rd - GR Division POC Let (DPOC) 12/23/ Constr. by State Forces (CSF) 2/24/2015 SS-4914BL - CON - SR 1803/1804 Constr. by State Forces (CSF) 4/7/2015 Fletcher - Howard Gap improvements Division POC Let (DPOC) 6/1/ Division POC Let (DPOC) 1/20/ Division POC Let (DPOC) 1/26/ Division POC Let (DPOC) 8/9/ Division POC Let (DPOC) 8/9/ Division POC Let (DPOC) 2/13/ Division POC Let (DPOC) 2/13/ Division POC Let (DPOC) 3/15/ Division POC Let (DPOC) 10/23/ Constr. by State Forces (CSF) 1/27/2015
8 NON TIP LET LIST 17BP.14.R.19 17BP.14.R.7 17BP.14.R.24 17BP.14.R.51 17BP.14.R.58 17BP.14.R BP.14.R BP.14.R BP.14.R BP.14.R BP.14.R BP.14.R BP.14.R BP.14.R BP.14.R Constr. by State Forces (CSF) 2/24/2015 Division POC Let (DPOC) 8/25/2015 Division POC Let (DPOC) 8/25/2015 Division POC Let (DPOC) 1/20/2016 Division POC Let (DPOC) 1/20/2016 Division POC Let (DPOC) 8/22/2017 Division POC Let (DPOC) 1/20/2019
DIVISION /16 BD-5114AC TRANSYLVANIA Division POC Let (DPOC) REPLACE BRIDGE 205 OVER LITTLE CREEK ON SR 1143
TIP 5 YEAR LET LIST Let (B) TIP Sub County Let Type Description 05/15 B-5554 Division POC Let (DPOC) REPLACE BRIDGE #73 OVER NORTH FORK FRENCH BROAD RIVER ON NC215 05/15 B-5555 Division POC Let (DPOC)
More informationAppendix V Other Water Quality Data in the French Broad River Basin
Appendix V Other Water Quality Data in the Basin Appendices Other Water Quality Research North Carolina actively solicits "existing and readily available" data and information for each basin as part of
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFDOT Treasure Coast Traffic Impact Report
January 20, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report January 20 through January 27, 2017 TREASURE COAST Construction and maintenance
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationFDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017
April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related
More informationFDOT Treasure Coast Traffic Report
July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationFDOT Treasure Coast Traffic Impact Report
February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
STP-DA and TAP Projects Project Location Total Local Federal Type WDR PH1 Asheville $6,100,000 $1,220,000 $4,880,000 ROW Replacement Diesel Bus Asheville $450,000 $90,000 $360,000 Bike Share Study Asheville
More informationDraft Local Input Points for Division Needs Transportation Projects
2018 Local Input for Transportation Projects FRENCH BROAD RIVER METROPOLITAN PLANNING ORGANIZATION SEPTEMBER 28, 2018 INTRODUCTION The Strategic Transportation Investments (STI) law governs the process
More informationFDOT Treasure Coast Traffic Impact Report
September 29, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report September 29 through October 6, 2017 TREASURE COAST Construction and maintenance
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported
More informationState Route 160 (Blue Diamond Highway)
State Route 160 (Blue Diamond Highway) ~ Multi-Year Expansion Program ~ Highway Improvement Projects in Clark and Nye Counties EXHIBIT G Treasures Document consists of 16 slides. Entire exhibit provided.
More informationTo Description County Division. US 25/US 70 - Widening (Marshall) from North Main Street (US 25/US70 Bus) to Brush Creek Rd (SR 1143)
nt Name Rank B150857 Bike and Ped improvement s to include Signal and Crossing treatments US 25 US 25/70 SR 1601 Deringer Drive/US 25/US70/Stu dent Dropoff Way improvements to include Signal - Crosswalk
More informationFY 2006 TRANSPORTATION CAPITAL PROGRAM
Airport Circle Elimination, CR 563, 646 S9820 Intersection, operational, and safety improvements at the intersection of Tilton Road (CR 563) and Delilah Road (CR 646) will include elimination of the circle,
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationFebruary 11, 2016 TPO Board Presentation
February 11, 2016 TPO Board Presentation SR A1A (Highway A1A) US 192 to SR 404 (Pineda Causeway), Brevard County, Florida Financial Project Number: 428753-1-32-01 Project Limits US 192 to SR 404 (428753-1)
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationTRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS
ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by
More informationEXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %
Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south
More informationNJTPA DRAFT Transportation Improvement Program Fiscal Years
County Route 6 Bridge (MA-14) Mileposts: 0.46 DBNUM: NS9811 The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient and functionally obsolete.
More informationFY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION
AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state
More informationINGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI
INGHAM COUNTY ROAD DEPARTMENT AUSTIN E. CAVANAUGH ADMINISTRATION BUILDING 301 Bush Street, P.O. Box 38, Mason, MI 48854-0038 March 27, 2018 William M. Conklin, P.E. Managing Director FOR IMMEDIATE RELEASE:
More informationCulpeper District. Albemarle County Monthly Report September, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationSouthwestern RPO Prioritization Local Input Points for Division Needs Funding
H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
339 New Leicester Highway, Suite 140 Asheville. NC 28806 www.fbrmpo.org Long-Range Transportation Plan Transportation Improvement Program Highway Planning Bicycle and Pedestrian Planning Transit Planning
More informationImportant Lane Closures for Jan , 2012
Jan. 19, 2011 CONTACT: Marcia McAllister T: 703-572-0506 C: 571-730-9117 marcia.mcallister@dullesmetro.com Important Lane Closures for Jan. 22-28, 2012 Bridge Construction along Median of Route 7 Continues,
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
15 339 New Leicester Highway, Suite 140 Asheville. NC 28806 www.fbrmpo.org Long-Range Transportation Plan Transportation Improvement Program Highway Planning Bicycle and Pedestrian Planning Transit Planning
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationMay 10, 2013 Meredith Cruz, (561) Palm Beach County Traffic Report May 10 through May 17, 2013
May 10, 2013 Meredith Cruz, (561) 641-6440 mcruz@corradino.com Palm Beach County Traffic Report May 10 through May 17, 2013 Palm Beach County Palm Beach County traffic will be affected this week by ongoing
More informationAccess Routes from US 101 to the Richmond San Rafael Bridge
Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationWelcome to the Sellwood Bridge Project Open House!
Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred
More informationNorth Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary
Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare
More informationNew Mexico Transportation Funding Challenges
New Mexico Transportation Funding Challenges Rocky Mountain Pavement Preservation Partnership Meeting October 29-31, 2008 Ernest Archuleta, P.E. Field Operations Division Director 1 NMDOT DISTRICT OFFICES
More informationODOT DISTRICT CONSTRUCTION PROGRAM SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES.
ODOT DISTRICT 8 2018 CONSTRUCTION PROGRAM Preble Greene SERVING BUTLER, CLERMONT, CLINTON, GREENE, HAMILTON, PREBLE AND WARREN COUNTIES. Butler Hamilton Warren Clinton Lebanon Clermont John R. Kasich,
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationRemainder to be County Route Begin MP End MP Length Item Number Funding Type* Description Type of Work Phase*
TIP Fayette NA PL TRANSIT FACILITY INVENTORY MATCHED FED FUNDS N $32,000 $0 Jessamine 2.66 07 00087.50 STPE EAST NICHOLASVILLE BYPASS SECTION II; FROM KY 39, EXTENDING SOUTHWESTERLY TO US 27 SOUTH OF NICHOLASVILLE.
More informationNJTPA Transportation Improvement Program Fiscal Years
Revision 1 As of 7/2/2015 Mileposts: 0.46 DBNUM: NS9811 County Route 6 Bridge (MA-14) The Amboy Avenue bridge (MA-14) over Matawan Creek in the Boroughs of Keyport and Aberdeen is structurally deficient
More informationFY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationLandscapes, Mills, and Waterfalls
Jan. 2015 Landscapes, Mills, and Waterfalls Album # Photo # LANDSCAPES LMW L-1 Brevard NC Overview LMW L-2 Brevard NC Cotton Mill in foreground LMW L-3 Brevard NC from Cooper's Hill (Cotton Mill on right)
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationMUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)
B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek
More informationPoor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns
Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement
More informationGravel Bike Guide Haywood County
Gravel Bike Guide Haywood County Haywood County is an ideal place for bicycling on gravel roads, because 37% or 129,994 acres of Haywood County is federal property, including portions of the Pisgah National
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationSan Tomas Expressway
Implementation Plan San Tomas Expressway Roads and Airports Department August 19, 2003 Implementation Plan San Tomas Expressway County of Santa Clara Roads and Airports Department 101 Skyport Drive San
More information09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS:
MONTANA ROAD CONSTRUCTION REPORT 09/28/2011 NEW/UPDATED ROAD CONSTRUCTION AND RESTRICTIONS: US 191 - WARM SPRINGS CREEK BRIDGE MILE POST 10.0 TO 10.1 SITE IS 10 MILES NORTH OF LEWISTOWN, MT. CONTRACTOR
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
339 New Leicester Highway, Suite 140 Asheville. NC 28806 www.fbrmpo.org Long-Range Transportation Plan Transportation Improvement Program Highway Planning Bicycle and Pedestrian Planning Transit Planning
More informationA summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013
Annual Listing of Federally Obligated Projects 2013 Fiscal Year A summary of Federal transportation obligations in the Knoxville TPO Planning Area between October 1, 2012 and September 30, 2013 Knoxville
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationFlorida s Turnpike Enterprise Tentative Five-Year Work Program - FY 2015/16 thru FY 2019/20 Summary of Projects in FDOT District Five
DISTRICT FIVE PROJECT OVERVIEW Florida s Turnpike Enterprise continues to make significant project investments in District Five. In fiscal years 2014 and 2015, current Turnpike projects total over $330
More information72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME. Public Information Meeting
72 Avenue Four Laning (BNSF Overpass to 120 Street) WELCOME Public Information Meeting Project Goals About the Project The goal of this project is to address congestion along 72 Avenue and adjacent streets
More informationTRAFFIC ALERT FOR FEBRUARY 26 to MARCH 2, 2018 Highway Work Zones in the Staunton District
RELEASE: IMMEDIATE February 23, 2018 CONTACT: Sandy Myers 540-332-9201 (office) STA18-039 540-292-2500 (cell) Sandy.Myers@VDOT.virginia.gov Ken Slack 540-332-9264 (office) 540-414-5670 (cell) Ken.Slack@VDOT.virginia.gov
More informationSecondary Road Program
Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved
More informationTransportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners
Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationAppendix A: Grouped Projects Projects by Grouping (FHWA Format)
Appendix A: Grouped Projects Projects by Grouping (FHWA Format) MPO TIP Report 5/22/28 5:18:43 PM Appendix A Projects by Grouping MPO Construction : Bridge Rehabilitation/Replacement/Reconstruction GRP-1
More informationEXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative
EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of
More informationEl Dorado County / Tahoe Roadwork Schedule
Today s Date: Friday, August 3, 2012, #12-220 District: District 3 - Marysville, http://www.dot.ca.gov/dist3 Jody Jones, District Director Contact: Deanna Shoopman deanna_shoopman@dot.ca.gov 530. 741.4566
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationMay 4, Dear Mr. Thomas and Mr. Snyder,
Daniel Thomas, Principal Planner Christopher Snyder, County Engineer DuPage County Division of Transportation 421 N County Farm Road Wheaton, IL 60187 May 4, 2016 Dear Mr. Thomas and Mr. Snyder, On behalf
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationRADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016
RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,
More information339 New Leicester Highway, Suite 140 Asheville. NC Long-Range Transportation Plan Transportation Improvement Program Highway
. o o o Citizens Advisory Committee Application The French Broad River MPO s Citizen Advisory Committee (CAC) plays a key role in getting the public involved in the transportation planning process.
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009
Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116
More informationEveryone is a Pedestrian
Everyone is a Pedestrian Improving Pedestrian Safety in Texas Transportation and Trinity River Project Committee 26 May 2015 Everyone is a Pedestrian Federal Highway Administration [ FHWA ] Programs to
More informationProject changes are summarized below and highlighted in yellow on the attached copy of the TIP. Federal Aid Type. Federal Funds
Jason Bottjen Arizona Department of Transportation 206 South 17 th Ave., 301B Phoenix, AZ 87 Via: Email Re: FY2016 2025 Sun Corridor MPO TIP Amendment #5 Dear Jason: Attached is a copy of Amendment #5
More informationDr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS
Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control
More informationShort and Long Term Needs
Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation
More informationDesign Criteria. Design Criteria
F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road
More informationBuckeye Mountaineer Conference Directions
Buckeye Mountaineer Conference Directions Beaver Local: Volleyball, Basketball, Football, Track, Wrestling Beaver Local Middle School 46088 Bell School Road East Liverpool, OH 43920 Route 7 North to Route
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationRequest for Authorization to Open Public Comment Period
Request for Authorization to Open Public Comment Period May 12, 2015 LRP, TIPs, and Conformity Reasons for Requested Action: LRP and TIP Amendment to Connections 2040 LRP, and Draft FY 2016 TIP for New
More informationTransportation Advisory Committee Meeting Notice & Agenda
Transportation Advisory Committee Meeting Notice & Agenda Wednesday, November 7, 2012 4:00 p.m. to 5:30 p.m. King Street Meeting Room 100 North King Street Hendersonville, NC 28792 1. Meeting Called to
More informationProject Name Project Description Authorized Amount
1, 13 Branchville-Lewisburg Road (CR 628) Lewisburg-Creamery Road (CR 565) 2,3 Asbury-Bloomsbury Road/Asbury- Anderson Road (CR 632) Skid-resistant surface treatment, enhanced signage, pavement markings
More informationHIGHWAY CAPITAL IMPROVEMENT PLAN
2018 2023 HIGHWAY CAPITAL IMPROVEMENT PLAN 0.5% Sales Tax CIP July 25, 2017 6-Year CIP Summary 2018-2023 CALENDAR YEAR 2018 Highway & Bridge Improvement Projects COUNTY PROJECT LANE IMPROVEMENT TOTAL FEDERAL
More informationFoothill Expressway Improvements Between El Monte and San Antonio
Foothill Expressway Improvements Between El Monte and San Antonio June 29, 2017 - Los Altos Community Meeting Introduction Project Background Agenda Visit Stations: Provide Input and Ask Questions Reconvene:
More informationOCEAN TO SOUND RELAY SEPTEMBER 25, 2016 COURSE DESCRIPTION LEG 1
GENERAL DESCRIPTION: 5.9 MILES--ALL FLAT START: JONES BEACH STATE PARK FIELD #2 FINISH: CEDAR CREEK PARK (SEAFORD) OCEAN TO SOUND RELAY LEG 1 0.0 miles START ON BOARDWALK AT EAST END OF JONES BEACH PARKING
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationAGENDA REQUEST. Unfinished Business BY Neighborhood and Development Services. November 1, 2010 SUBJECT:
AGENDA REQUEST AGENDA HEADING: Unfinished Business BY Neighborhood and Development Services Originating Department COMMISSION MEETING DATE: November 1, 2010 Timothy Litchet Department Head AGENDA ITEM
More informationFDOT Broward County Traffic Impact Report November 24 through December 1, 2017
FDOT Broward County Traffic Impact Report November 24 through December 1, 2017 FORT LAUDERDALE -- Construction and maintenance-related lane closures on state highways in Broward County are expected during
More informationPedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist
2015-17 and Bicycle Safety Program Leg Lummi Nation 42 Kennewick 8 Lummi Nation 42 Jamestown S'Klallam 24 WSDOT-- NW 32 Port of Vancouver 49 Spokane 3 Seattle 46 Shoreline 32 Lummi Shore Drive Columbia
More informationBrooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017
Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationDOUG s CORNER CONTRACTOR S WEEKLY UPDATE COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE. February 2nd, 2015 Volume 2, Issue 107.
CONTRACTOR S WEEKLY UPDATE February 2nd, 2015 Volume 2, Issue 107 DOUG s CORNER COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug s Corner.1 3 Traffic/Active Work 4-5 Construction Notices.6-10 Project
More informationTrans-Canada Highway 1 RW Bruhn Bridge Replacement
Trans-Canada Highway 1 RW Bruhn Bridge Replacement May 2016 RW Bruhn Bridge Project Objectives Improve safety, traffic flow and movement of goods Improve safety for pedestrians and cyclists Replace the
More informationFY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects
-2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationOTO BIKE/PED PLAN REPORT
OTO BIKE/PED PLAN REPORT 6/30/2012 Implementation in FY2012 This report outlines the bike/ped accomplishments related to the OTO Bike/Ped Plan. Activities occurring during the 2012 Fiscal Year, July 1,
More information