Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

Size: px
Start display at page:

Download "Appendix A: Grouped Projects Projects by Grouping (FHWA Format)"

Transcription

1 Appendix A: Grouped Projects Projects by Grouping (FHWA Format)

2 MPO TIP Report 5/22/28 5:18:43 PM Appendix A Projects by Grouping MPO Construction : Bridge Rehabilitation/Replacement/Reconstruction GRP-1 System UPC Jurisdiction / Name / Description Street(Route) Estimate Primary Albemarle County 53 $2,999,997 RTE 53 - BRIDGE REPLACEMENT OVER BUCK ISLAND CREEK FROM:.74 MILE NORTH BUCK ISLAND CREEK TO:.63 MILE SOUTH BUCK ISLAND CREEK (.138 MI) Albemarle County 66 $5,69,461 BRIDGE REPLACE DICKERSON RD OVER NORTH FORK RIVANNA RIVE BRIDGES AND APPROACHES Albemarle County 66 $2,174,217 BRIDGE REPLACEMENT DICKERSON ROAD OVER JACOBS RUN BRIDGE AND APPROACHES TH STREET NE (2) $9,195,319 RTE 2 - BRIDGE REPLACEMENT FROM: GARRETT STREET/LEVY AVENUE TO: EAST MARKET STREET (.3 MI) Construction : Rail System UPC Jurisdiction / Name / Description Street(Route) Estimate Rail T1858 Statewide STIP $2,242,615 RAIL SAFETY S - STATEWIDE (STIP) Funding identified to be obligated statewide as projects are identified 5665 $172,953 CARLTON/MEADE ST. - ADD GATES & UPGRADE FLASHING LIGHTS AT RAILROAD CROSSING Project "grouped" see STIP Item T-1858 for obligations Construction : Safety/ITS/Operational Improvements System UPC Jurisdiction / Name / Description Street(Route) Estimate Interstate T279 Culpeper District-wide $3, 511 Virginia - Travel Information Interstate Interstate Interstate 7672 Culpeper District-wide $ CULR INTERSTATE GUARDRAIL VARIOUS ROUTES 7674 Culpeper District-wide $ CULR ITS DISTRICTWIDE VARIOUS ROUTES 7676 Culpeper District-wide $119,58 CULR INTERSTATE PAVEMENT MARKERS DISTRICTWIDE VARIOUS ROUTES Miscellaneous 7691 Culpeper District-wide $2,635 CULR PRIMARY TECHNOLOGY VARIOUS ROUTES A-1

3 MPO TIP Report MPO 5/22/28 5:18:43 PM Construction : Safety/ITS/Operational Improvements System UPC Jurisdiction / Name / Description Street(Route) Estimate Interstate 7683 Culpeper District-wide $ CULR INTERSTATE SIGNS DISTRICTWIDE VARIOUS ROUTES Interstate Interstate Interstate Interstate Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Miscellaneous Primary Albemarle County 64 $14,542 RTE 64 - UPGRADE SEWER SYSTEM - ONLY EB REST AREA AT REST AREA 3E Albemarle County 64 $3,754, RTE 64 - UPGRADE SEWER SYSTEM - ONLY WB REST AREA FROM: AT IVY REST AREA TO: MM 113 WB (AT REST AREA 3W) Albemarle County 64 $1,24,154 RTE 64 - WIDEN WESTBOUND EXIT APPROACH LANES AT 5TH ST. AT 5TH STREET (.1 MI) Albemarle County 64 $3,141,197 RTE I-64 - SHADWELL-EBL EXIT INSTALL DUAL LTLS TO WB RTE 25 AT ROUTE 25 (.1 MI) Culpeper District-wide $ DISTRICTWIDE GUARDRAIL FY7 HSIP - CULR DISTRICT Culpeper District-wide $ DISTRICTWIDE ROADSIDE SAFETY - CULR FY7 HSIP Culpeper District-wide $35,8 DISTRICTWIDE ROADWAY SAFETY ASSESSMENT - CULR FY7 HSIP Culpeper District-wide $ DISTRICTWIDE RUMBLE STRIPS - CULR FY7 HSIP 8143 Culpeper District-wide $ DISTRICTWIDE SHOULDER IMPROVEMENT - CULR FY7 HSIP Culpeper District-wide $ DISTRICTWIDE TRAFFIC MARKINGS - CULR FY7 HSIP Culpeper District-wide $ DISTRICTWIDE TRAFIC SIGNALS AND ITS - CULR FY7 HSIP Culpeper District-wide $ DISTRICTWIDE TRAFFIC SIGNS - CULR FY7 HSIP 8448 Install Trans. Critical Incident Mobile Data Coll. Device From: In To: FY7 SAFETEA-LU Earmark Project A-3

4 MPO TIP Report MPO 5/22/28 5:18:43 PM Construction : Safety/ITS/Operational Improvements System UPC Jurisdiction / Name / Description Street(Route) Estimate Miscellaneous Culpeper District-wide $ HSIP District-wide High Risk Rural Roads Culpeper Culpeper District High Risk Rural Roads Safety Improvements Miscellaneous Primary Primary Primary Albemarle County 9999 $ HSIP Proactive Safety Projects County of Albermarle Albemarle County Safety Improvements 1892 Albemarle County 22 $2,867,421 RTE 22 - REALIGN INTERSECTION FROM:.9 MILE EAST ROUTE 25 TO:.254 MILE EAST ROUTE 25 (.245 MI) Albemarle County 29 $6, RTE 29 - CORRIDOR AND ACCESS MANAGEMENT STUDY FROM: GREENBRIER ROAD TO: GREENE COUNTY LINE (1. MI) 6396 Albemarle County 25 $7,61 RTE 25 - SHOULDER WIDENING/PAVING FROM: INTERSTATE ROUTE I-64 (EASTERLY INTERCHANGE) TO: ALBEMARLE/FLUVANNA COUNTY LINE Albemarle County JARMAN GAP ROAD (691) $658, RTE WIDEN AND PAVE SHOULDERS FROM: RTE. 684 TO:.597 MI. E. RTE. 684 (.597 MI) Albemarle County NORTHERN FREE STATE ROAD (631) $4,2, RTE NEW LOCATION STUDY - ONLY FROM: ROUTE 631 (.1 MILE SOUTH NORFOLK SOUTHERN RAILWAY) TO: ROUTE 29 (.55 MILE NORTH SOUTH FORK RIVANNA RIVER) (3.8 MI) 887 Albemarle County OLD IVY ROAD (61) $6,82,8 RTE 61 - WIDEN TO 4 LANES ( & PARTIAL RW IN SSYP) FROM: ROUTE 25 TO: ROUTE 29 BYPASS (.72 MI) Construction : Transportation Enhancement/Byway/Non-Traditional System UPC Jurisdiction / Name / Description Street(Route) Estimate Enhancement 8715 Albemarle County LEWIS & CLARK EDUCATIONAL CENTER $187,5 Albermarle County - Lewis & Clark Educational Center FROM: Construction of educational center with parking, TO: trails, and ferry service connecting existing trails Project "grouped" see STIP Item T-1868 for obligations Enhancement T1868 Statewide STIP $71,938,28 ENHANCEMENT S - STATEWIDE (STIP) Primary Funding identified to be obligated statewide as projects are identified Albemarle County $1,4, DESTRIAN/BICYCLE ACCESS TO MONTICELLO & PARK/ARBORETUM AT THE THOMAS JEFFERSON PARKWAY (PHASE II) Project "grouped" see STIP Item T-1868 for obligations A-4

5 MPO TIP Report MPO 5/22/28 5:18:43 PM Construction : Transportation Enhancement/Byway/Non-Traditional System UPC Jurisdiction / Name / Description Street(Route) Estimate Primary Albemarle County $5, THOMAS JEFFERSON PARKWAY COMPLETION PHASE FROM: STONE BRIDGE AND TUNNEL CROSSING OF ROUTE 53 TO PROVIDE TO: ACCESS FOR DESTRIANS, VEHICLES AND CYCLISTS. Project "grouped" see STIP Item T-1868 for obligations Primary Albemarle County $3, ALBEMARLE COUNTY - HISTORIC CROZET STREETSCAPING FROM: STREETSCA IMPROVEMENTS, UNDERGROUNDING OF UTILITIES, TO: RIOD LIGHTING AND LANDSCA Project "grouped" see STIP Item T-1868 for obligations Albemarle County 1427 $3,44 RTE RAISED MEDIAN XWALKS, RESTRI, LIGHTING, ETC. FROM: ROUTE 631 (RIO ROAD) TO: ROUTE 866 (GREENBRIER DRIVE) (.93 MI) Albemarle County GEORGETOWN ROAD (656) $2,18,313 RTE SPOT IMP., SIDEWALK & SAFETY FEATURES FROM: ROUTE 654 TO: ROUTE 743 (.86 MI) 513 Albemarle County $16, LANDSCAPING & CONSTRUCTION OF BICYCLE LANES & SIDEWALKS AIRPORT ROAD CORRIDOR Project "grouped" see STIP Item T-1868 for obligations $89,76 RIVANNA GREENBELT EXTENSION FROM: DESTRIAN, BICYCLE AND ADA ACCESSIBLE TRAIL CONNECTING TO: RIVANNA GREENBELT TO N PARK AND DARDEN TOWE PARK $1,88,6 PRESERVE THE SIGNIFICANT HISTORIC ELEMENTS OF COURT SQUARE Enhancement obligations "grouped" see STIP Item T-1868 for obligations 6696 $6, RIVANNA GREENBELT TRAIL - PHASE II FROM: PARKING AREA, HARD SURFACE TRAIL, PIIC SHELTERS TO: AND LANDSCAPING Project "grouped" see STIP Item T-1868 for obligations $ CHARLOTTESVILLE TRANSIT CENTER AND VISITOR CENTER FROM: IMPROVEMENTS TO THE EAST END OF THE DOWNTOWN MALL, TO: INCLUDING A TRANSIT AND VISITOR CENTER Project "grouped" see STIP Item T-1868 for obligations Maintenance : Preventive Maintenance and System Preservation System UPC Jurisdiction / Name / Description Street(Route) Estimate Miscellaneous T4152 Statewide SOPS $341,997,979 PREVENTATIVE MAINTENANCE AND SYSTEMS ORATIONS Funding Identified to be Obligated Statewide as Projects are Identified A-5

6 MPO TIP Report MPO 5/22/28 5:18:43 PM Maintenance : Preventive Maintenance for Bridges System UPC Jurisdiction / Name / Description Street(Route) Estimate Miscellaneous T3748 SOPS $184,481,671 BRIDGE SAFETY INSCTION REHABILITATION AND RECONSTRUCTION Funding Identified to be Obligated Statewide as Projects are Identified Maintenance : Traffic and Safety Operations System UPC Jurisdiction / Name / Description Street(Route) Estimate Miscellaneous T3746 SOPS $127,389,29 TRAFFIC AND SAFETY ORATIONS Funding Identified to be Obligated Statewide as Projects are Identified A-6

7 B. VDOT FY Six Year Improvement Program All Projects Albemarle County

8 FY Six-Year Improvement Program All Projects District: County: Road System: All ALBEMARLE All

9 FY Six-Year Improvement Program Statewide Funding Allocation Summary ('s) Statewide System Fund Source Name FY29 FY21 FY211 FY212 FY213 FY214 Interstate Interstate Federal State Match 2, ,344 Bond Match State Bond Match Bridge Replacement Federal Federal Formula STP Federal State Bond Match Formula Federal State State Match Unpaved Road Funds State 1, , , ,836 1, , , ,615 1, , , ,162 1, , , , , ,8 Federal Formula STP Federal State Bond Match Local Project Contributions Local Match Primary Formula State SAFETEA-LU Earmarks Federal State Match Formula Federal State State Match ,59 1, , , , , , , , , , , ,459 Grand 14,78 11,13 9,587 12,21 7,539 B-3 6/2/28

10 CULR DISTRICT B-4 6/2/28

11 FY Six-Year Improvement Program CULR DISTRICT Funding Allocation Summary ('s) CULR DISTRICT System Fund Source Name FY29 FY21 FY211 FY212 FY213 FY214 Interstate Interstate Federal State Match 2, ,344 Bond Match State Bond Match Bridge Replacement Federal Federal Formula STP Federal State Bond Match Formula Federal State State Match Unpaved Road Funds State 1, , , ,836 1, , , ,615 1, , , ,162 1, , , , , ,8 Federal Formula STP Federal State Bond Match Local Project Contributions Local Match Primary Formula State SAFETEA-LU Earmarks Federal State Match Formula Federal State State Match ,59 1, , , , , , , , , , , ,459 Grand 14,78 11,13 9,587 12,21 7,539 B-5 6/2/28

12 FY Six-Year Improvement Program Interstate CULR DISTRICT ROUTE: 64 UPC NO.: FO RTE 64 - UPGRADE SEWER SYSTEM - ONLY EB REST AREA AMD handling; improvements will be delayed per District. Interstate STREET NAME: ESTIMATED COST ('s) 15 DESCRIPTION: AT REST AREA 3E RW SCO OF WORK: REST AREA TO 15 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: IM Interstate: Federal: Interstate Maintenance (IM) - Interstate Interstate: State Match: Interstate State Match REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 Complete 214 ROUTE: 64 UPC NO.: FO RTE 64 - UPGRADE SEWER SYSTEM - ONLY WB REST AREA AMD handling; improvements will be delayed per District. Interstate STREET NAME: JURISDICTION: DESCRIPTION: ESTIMATED COST ('s) 3 RW Albemarle County FROM: AT IVY REST AREA TO: MM 113 WB (AT REST AREA 3W) SCO OF WORK: REST AREA TO 3 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: IM Interstate: Federal: Interstate Maintenance (IM) - Interstate Interstate: State Match: Interstate State Match REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 Complete 214 B-6 6/2/28

13 FY Six-Year Improvement Program Interstate CULR DISTRICT ROUTE: 64 UPC NO.: RTE 64 - WIDEN WESTBOUND EXIT APPROACH LANES AT 5TH ST. FY7 PTF funds AC for possible future federal conversion. Interstate STREET NAME: JURISDICTION: DESCRIPTION: Albemarle County AT 5TH STREET (.1 MI) ESTIMATED COST ('s) 425 RW 779 SCO OF WORK: MINOR WIDENING TO 1,24 LENGTH:.1 MI STRUCTURE NO.: SUFFICIENCY RATING: NH Interstate: Federal: Interstate Maintenance (IM) - Interstate Interstate: Federal: Federal NHS - Interstate REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY FY214 Interstate: State Match: Interstate State Match Interstate: State Match: NHS State Match Underway FY ROUTE: UPC NO.: STREET NAME: JURISDICTION: DESCRIPTION: FO RTE I-64 - SHADWELL-EBL EXIT INSTALL DUAL LTLS TO WB RTE 25 Albemarle County AT ROUTE 25 (.1 MI) Interstate ESTIMATED COST ('s) 6 RW 2,541 SCO OF WORK: MINOR WIDENING TO 3,141 LENGTH:.1 MI STRUCTURE NO.: SUFFICIENCY RATING: NH Interstate: Federal: Federal NHS - Interstate REQUIRED ALLOCATIONS ('s) 48 FY29 FY21 FY211 FY212 FY213 2,1 FY214 Interstate: State Match: Interstate State 46 5 Match Interstate: State Match: NHS State Match ,51 Underway FY B-7 6/2/28

14 FY Six-Year Improvement Program Primary CULR DISTRICT ROUTE: 22 UPC NO.: 1892 RTE 22 - REALIGN INTERSECTION Primary Hazard Elimination Safety - & RW only. to be funded by others. STREET NAME: ESTIMATED COST ('s) 45 DESCRIPTION: FROM:.9 MILE EAST ROUTE 25 TO:.254 MILE RW 1,118 EAST ROUTE 25 (.245 MI) SCO OF WORK: SAFETY/TRAFFIC ORS/TSM TO 1,568 LENGTH:.245 MI STRUCTURE NO.: SUFFICIENCY RATING: STP Primary Formula: Federal: Primary Formula - EB(MG) : Culpeper Primary Formula: Federal: Primary Formula - STP : Culpeper Primary Formula: State Match: Primary Formula - Match : Culpeper Primary Formula: State: Primary Formula - State : Culpeper Primary Formula: State: Other State Match - Culpeper Safety Funds: Hazard Elimination: Hazard Elimination REQUIRED ALLOCATIONS ('s) ,354 FY29 FY21 FY211 FY212 FY213 FY214 Complete Complete B-8 6/2/28

15 FY Six-Year Improvement Program Primary CULR DISTRICT ROUTE: 29 UPC NO.: 1616 RTE 29 - BYPASS - & RW ONLY FO Primary Cost includes property management. Balance to be provided by rent receipts. STREET NAME: ESTIMATED COST ('s) 13,435 DESCRIPTION: FROM: 1.12 KILOMETERS NORTH ROUTE 29 TO:.8 RW 33,732 KILOMETER NORTH RIVANNA RIVER (1.4 KM) SCO OF WORK: NEW CONSTRUCTION TO 47,167 LENGTH: 1.4 KM STRUCTURE NO.: SUFFICIENCY RATING: STP Minimum Guarantee: Federal: Equity Bonus (MG) - Primary : Culpeper National Highway System Allocations: Federal: Non-Interstate NHS - Primary : Hampton Roads National Highway System Allocations: Federal: Non-Interstate NHS - Primary : Culpeper National Highway System Allocations: State Match: Non-Interstate NHS Match - Primary : Hampton Roads National Highway System Allocations: State Match: Non-Interstate NHS Match - Primary : Culpeper Non-Formula: State Match: State Match Non-Formula - Culpeper Primary Formula: Federal: Primary Formula - EB(MG) : Culpeper Primary Formula: Federal: Primary Formula - STP : Culpeper Primary Formula: State Match: Primary Formula - Match : Culpeper Primary Formula: State: Primary Formula - State : Culpeper Primary Formula: State: Other State Match - Culpeper Project Contributions: Various Sources: Project Contributions - Misc REQUIRED ALLOCATIONS ('s) 7,68 2,988 11, ,581 6,651 6,789 3, ,92 1,849 47,167 FY29 FY21 FY211 FY212 FY213 FY214 Complete Underway 214 B-9 6/2/28

16 FY Six-Year Improvement Program Primary CULR DISTRICT ROUTE: 29 UPC NO.: RTE 29 - CORRIDOR AND ACCESS MANAGEMENT STUDY Only Primary STREET NAME: JURISDICTION: DESCRIPTION: ESTIMATED COST ('s) 6 RW Albemarle County FROM: GREENBRIER ROAD TO: GREENE COUNTY LINE (1. MI) SCO OF WORK: STUDIES ONLY TO 6 LENGTH: 1. MI STRUCTURE NO.: SUFFICIENCY RATING: Formula: State Planning Funds: State Planning Funds: Culpeper Formula: Federal/State: Federal/State - Albemarle PROGRAM NOTE: S REQUIRED ALLOCATIONS ('s) 3 3 FY29 FY21 FY211 FY212 FY213 FY214 6 $3k provided from secondary allocations (Meadow Creek Pkwy - PH.2 UPC 12981). (Edited previous to reflect these funds.) $3, Programed in Primary Plan Underway 214 ROUTE: 29 UPC NO.: RTE 29 - CORRIDOR IMPROVEMENTS ( ONLY) State funds - AC for future federal conversion. only. Primary STREET NAME: ESTIMATED COST ('s) 2,814 DESCRIPTION: FROM: POLO GROUNDS ROAD TO: AIRPORT ROAD RW (2.1 MI) SCO OF WORK: MAJOR WIDENING TO 2,814 LENGTH: 2.1 MI STRUCTURE NO.: SUFFICIENCY RATING: Primary Formula: State: Primary Formula - State : Culpeper S REQUIRED ALLOCATIONS ('s) 2,814 FY29 FY21 FY211 FY212 FY213 PROGRAM NOTE: $4, transferred to UPC to cover deficit. DKw 3/16/6 FY214 Underway 214 B-1 6/2/28

17 FY Six-Year Improvement Program Primary CULR DISTRICT ROUTE: EN UPC NO.: REMOVE OVERHEAD LINES-INSTALL RIOD STREET LIGHTS Primary NonMPO STREET NAME: ESTIMATED COST ('s) JURISDICTION: Scottsville 313 DESCRIPTION: IMPLEMENT A STREETSCA PLAN RW 33 1,564 SCO OF WORK: ENVIRONMENTALLY RELATED TO 1,91 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) 2,155 FY29 FY21 FY211 FY212 FY213 FY214 Complete Complete Underway 214 ROUTE: EN4 UPC NO.: ALBEMARLE COUNTY - HISTORIC CROZET STREETSCAPING Complete schedule required. Primary STREET NAME: ESTIMATED COST ('s) 132 DESCRIPTION: FROM: STREETSCA IMPROVEMENTS, RW 1,662 UNDERGROUNDING OF UTILITIES, TO: RIOD 1,323 LIGHTING AND LANDSCA SCO OF WORK: ENVIRONMENTALLY RELATED TO 3,118 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations REQUIRED ALLOCATIONS ('s) 3 FY29 FY21 FY211 FY212 FY213 FY ROUTE: EN94 UPC NO.: DESTRIAN/BICYCLE ACCESS TO MONTICELLO & PARK/ARBORETUM Primary STREET NAME: ESTIMATED COST ('s) 22 DESCRIPTION: AT THE THOMAS JEFFERSON PARKWAY (PHASE II) RW 1,72 SCO OF WORK: ENVIRONMENTALLY RELATED TO 1,94 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) 1,4 FY29 FY21 FY211 FY212 FY213 FY214 Complete Underway 214 B-11 6/2/28

18 FY Six-Year Improvement Program Primary CULR DISTRICT ROUTE: EN96 UPC NO.: THOMAS JEFFERSON PARKWAY COMPLETION PHASE Primary STREET NAME: ESTIMATED COST ('s) 39 DESCRIPTION: FROM: STONE BRIDGE AND TUNNEL CROSSING OF RW ROUTE 53 TO PROVIDE TO: ACCESS FOR 254 DESTRIANS, VEHICLES AND CYCLISTS. SCO OF WORK: TO 293 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) 5 FY29 FY21 FY211 FY212 FY213 FY214 Underway 214 B-12 6/2/28

19 FY Six-Year Improvement Program CULR DISTRICT ROUTE: EN98 UPC NO.: 513 LANDSCAPING & CONSTRUCTION OF BICYCLE LANES & SIDEWALKS STREET NAME: ESTIMATED COST ('s) 16 DESCRIPTION: AIRPORT ROAD CORRIDOR RW 144 SCO OF WORK: ENVIRONMENTALLY RELATED TO 16 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) 16 FY29 FY21 FY211 FY212 FY213 FY214 Complete Complete Underway 214 ROUTE: 2 UPC NO.: RTE 2 - BRIDGE REPLACEMENT Construction Initiative Project - Matching funds included in quarterly payment - Schedule being developed. No Local Match per 25 Budget Amendment. STREET NAME: 9TH STREET NE ESTIMATED COST ('s) JURISDICTION: 753 DESCRIPTION: FROM: GARRETT STREET/LEVY AVENUE TO: EAST RW 5 MARKET STREET (.3 MI) 7,942 SCO OF WORK: BRIDGE REPLACEMENT TO 9,195 LENGTH:.3 MI STRUCTURE NO.: SUFFICIENCY RATING: BR Federal Formula STP: Federal: Federal Formula STP - : Local Project Contributions: Local Match: Formula Local Match - Federal : Locally Administered and Funded: State Match: State Match Qrtly Paymt - Formula: Federal: Formula - STP : Formula: Federal: Formula - EB(MG) : Formula: Federal: Formula - Bridge : Formula: State Match: Formula - Match : PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) , FY FY21 FY211 3, ,68 1,83 Local Priority , PRCB 3E9 FIRST CITIES FY212 FY ,141 1,15 FY214 Underway 214 B-13 6/2/28

20 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 29 UPC NO.: RTE 29 - FONTAINE AVENUE - 3 LANES Partial & RW only. STREET NAME: FONTAINE AVENUE ESTIMATED COST ('s) JURISDICTION: 1,232 DESCRIPTION: FROM:.116 KILOMETER WEST WCL RW 1,597 CHARLOTTESVILLE TO: JEFFERSON PARK AVENUE (.761 KM) SCO OF WORK: RECONSTRUCTION TO 2,829 LENGTH:.761 KM STRUCTURE NO.: SUFFICIENCY RATING: STP Federal Formula STP: Federal: Federal Formula STP - : Local Project Contributions: Local Match: Formula Local Match - Federal : Formula: Federal: Formula - STP : Formula: State Match: Formula - Match : PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) FY29 FY21 1, V3, PRC, Local Priority 6 3E3 FY211 FY212 FY213 FY214 Complete Underway FY ,88 ROUTE: UPC NO.: RTE. 29/25 BYPASS INTERCHANGE IMP (HYDRAULIC RD - BARRACKS) New Project State funds - AC for future federal conversion STREET NAME: Emmet Street ESTIMATED COST ('s) JURISDICTION: 517 DESCRIPTION: FROM:.42 mi south of N.C.L. TO: RW Intersection at Hydraulic Road (.42 MI) 4,183 SCO OF WORK: RECONSTR. W/O ADDED CAPACITY TO 4,7 LENGTH:.42 MI STRUCTURE NO.: SUFFICIENCY RATING: STPREVSH Primary Formula: State: Primary Formula - State : Culpeper Revenue Sharing Funds: Local Match: Local Match Revenue Sharing Funds: State Match: State Match REQUIRED ALLOCATIONS ('s) 1,32 1, 1, 3,32 FY FY21 FY211 FY212 FY213 FY214 Underway FY B-14 6/2/28

21 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: RTE 25 BYPASS - CONSTRUCT INTERCHANGE FO Construction Initiative Project - Matching funds included in quarterly payment. SAFETEA-LU matching funds included in quarterly payment. Schedule to be revised by the City. STREET NAME: ROUTE 25 BYPASS ESTIMATED COST ('s) JURISDICTION: 3,871 DESCRIPTION: AT MCINTIRE ROAD/MEADOW CREEK PARKWAY RW 5,867 (.5 MI) 19,98 SCO OF WORK: RECONSTRUCTION TO 29,645 LENGTH:.5 MI STRUCTURE NO.: SUFFICIENCY RATING: STP Locally Administered and Funded: Local Funds: Local Funds - Locally Administered and Funded: State Match: State Match Qrtly Paymt - SAFETEA-LU Earmarks: Federal: TIP - SAFETEA-LU Earmarks: Federal: HPP-F - Formula: Federal: Formula - STP : REQUIRED ALLOCATIONS ('s) 6 2,99 1,4 17,41 25 FY29 1, ,25 FY21 21,975 6,61 1,471 PROGRAM NOTE: , PRC, B64, Local Priority 4B. FY211 FY212 FY213 1,471 FY214 Complete Underway FY ROUTE: EN5 UPC NO.: CHARLOTTESVILLE MULTI-USE TRAIL $1, transfer from cancelled # Transfer approved by Culpeper CTB member. NonMPO STREET NAME: ESTIMATED COST ('s) JURISDICTION: 3 DESCRIPTION: FROM: TRANSIT CENTER TO: THE RIVANNA RIVER RW TRAIL 3 SCO OF WORK: ENVIRONMENTALLY RELATED TO 33 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations Transportation Enhancement Funds: Local Funds: Local Funds for Enhancement Projects REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FY21 FY B-15 6/2/28

22 FY Six-Year Improvement Program CULR DISTRICT ROUTE: EN95 UPC NO.: 1685 RUGBY ROAD BICYCLE AND DESTRIAN IMPROVEMENTS STREET NAME: ESTIMATED COST ('s) JURISDICTION: 134 DESCRIPTION: FROM: PHASE III - WIDENING OF RUGBY ROAD FOR RW BICYCLE LANE AND TO: SIDEWALK 783 SCO OF WORK: TO 917 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) 8 FY29 FY21 FY211 FY212 FY213 FY214 Complete Underway 214 ROUTE: U UPC NO.: 2529 MCINTIRE ROAD EXTENDED- 2 LANES Cooperative project with other system(s). Local funds to be provided by the City from their Construction Initiative payment. Revised schedule required. STREET NAME: MCINTIRE ROAD ESTIMATED COST ('s) JURISDICTION: 3,4 DESCRIPTION: FROM: ROUTE 25 BYPASS AT MCINTIRE ROAD TO: RW 2,421 MELBOURNE ROAD INTERSECTION (.86 KM) 7,69 SCO OF WORK: NEW CONSTRUCTION TO 13,511 LENGTH:.86 KM STRUCTURE NO.: SUFFICIENCY RATING: Local Project Contributions: Local Match: Formula Local Match - State : Formula: State: Formula - State : PROGRAM NOTE: S REQUIRED ALLOCATIONS ('s) 189 9,254 FY ,625 FY21 FY211 FY212 FY , FY214 9,443 1,658 1,67 82 ALSO UPC U-14-V2, PRC, Local Priority 4A. Local funds removed as requested by LAD. Underway Complete Underway 214 B-16 6/2/28

23 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: U JEFFERSON PARK AVENUE - BRIDGE REPLACEMENT STREET NAME: JEFFERSON PARK ESTIMATED COST ('s) JURISDICTION: 1,643 DESCRIPTION: APPROACHES & BRIDGE OVER RW 1,16 NORFOLK-SOUTHERN RAILROAD (.199 KM) 5,659 SCO OF WORK: BRIDGE REPLACEMENT TO 8,463 LENGTH:.199 KM STRUCTURE NO.: SUFFICIENCY RATING: BR/STP REQUIRED ALLOCATIONS ('s) FY29 Federal Formula STP: Federal: Federal Formula STP - : 1, Federal Formula STP: State Bond Match: Federal Formula - Bond Match : Local Project Contributions: Local Match: 146 Formula Local Match - Federal : Formula: Federal: Formula STP : Formula: Federal: Formula - 4,28 Bridge : Formula: State Match: 1,4 Formula - Match : Formula: State: Formula State : 7, PROGRAM NOTE: U-14-V9, PRC, B67, Local Priority 2 FY21 FY211 FY212 FY213 FY214 Complete Underway FY ROUTE: UPC NO.: U CITY OF CHARLOTTESVILLE TRANSIT TRANSFER CENTER City of to provide right-of-way (est. $5,). City to determine location. Construction Initiative Project - Matching funds provided in quarterly payment. Schedule to be established. STREET NAME: TRANSFER CENTER ESTIMATED COST ('s) JURISDICTION: 4 DESCRIPTION: (ADMINISTERED BY DRPT) RW 2,1 SCO OF WORK: TO 2,5 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: Locally Administered and Funded: State Match: State Match Qrtly Paymt - Minimum Guarantee: Federal: Equity Bonus (MG) - : PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) 25 1, FY29 1,25 U , PRC, Local Priority 1B FY21 FY211 FY212 FY213 FY ,25 B-17 6/2/28

24 FY Six-Year Improvement Program CULR DISTRICT ROUTE: U UPC NO.: 6233 HILLSDALE DRIVE CONNECTOR - 2 LANE only, accruing funds for RW. Construction Initiative Project - Matching funds included in quarterly payment STREET NAME: HILLSDALE DRIVE ESTIMATED COST ('s) JURISDICTION: 3,139 DESCRIPTION: FROM: GREENBRIER DRIVE TO: HYDRAULIC ROAD RW (.85 MI) SCO OF WORK: NEW CONSTRUCTION TO 3,139 LENGTH:.85 MI STRUCTURE NO.: SUFFICIENCY RATING: STP REQUIRED ALLOCATIONS ('s) FY29 Federal Formula STP: Federal: Federal Formula STP - : 1,19 Local Project Contributions: Local Match: 3 Formula Local Match - Federal : Locally Administered and Funded: Local 16 Funds: Local Funds - Locally Administered and Funded: State 168 Match: State Match Qrtly Paymt - Formula: Federal: Formula STP : Formula: Federal: Formula - 1,71 EB(MG) : 3,139 PROGRAM NOTE: U , PRC, Local Priority 5 FY21 FY211 FY212 FY213 FY214 Underway FY213 FY UPC NO.: DESCRIPTION: CITY OF CHARLOTTESVILLE - FORMULA CITY PAYMENT TO BE DISTRIBUTED IN QUARTERLY PAYMENTS - Construction Initiative. State funds do not include 2% Match or SAFETEA-LU match. Federal Formula STP: State Bond Match: Federal Formula - Bond Match : SAFETEA-LU Earmarks: State Match: TIP Match - SAFETEA-LU Earmarks: State Match: HPP-F Match - Formula: State Match: Formula - Match : Formula: State: Formula - State : REQUIRED ALLOCATIONS ('s) , FY , FY21 FY211 FY212 FY , ,555 1,313 1,519 1,634 1,68 1,51 1,779 1,539 PROGRAM NOTE: Previous funds removed: $735,325; $3,28,782; and $1,438,189. FY B-18 6/2/28

25 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: RTE 66 - RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD Gravel Road - No R/W $698,8 transferred from Rt. 72 STREET NAME: DICKERSON ROAD ESTIMATED COST ('s) 487 DESCRIPTION: FROM: ROUTE 85 TO: ROUTE 13 (1.99 MI) RW 272 3,3 SCO OF WORK: RECONSTRUCTION TO 3,789 LENGTH: 1.99 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) 1,8 FY29 FY21 FY211 FY212 FY213 FY214 Underway FY ROUTE: 66 UPC NO.: BRIDGE REPLACE DICKERSON RD OVER NORTH FORK RIVANNA RIVE Revised schedule required. STREET NAME: ESTIMATED COST ('s) 693 DESCRIPTION: BRIDGES AND APPROACHES RW 126 4,25 SCO OF WORK: BRIDGE REPLACEMENT TO 5,69 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: BROS Bond Match: State Bond Match: Bond Match - Bridge Replacement: Federal: BROS - REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY FY214 FY21 FY214 FY ,726 B-19 6/2/28

26 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 66 UPC NO.: BRIDGE REPLACEMENT DICKERSON ROAD OVER JACOBS RUN Additional funds to be provided by the System. Revised schedule required. STREET NAME: ESTIMATED COST ('s) 258 DESCRIPTION: BRIDGE AND APPROACHES RW 126 1,79 SCO OF WORK: BRIDGE REPLACEMENT TO 2,174 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: BROS Bond Match: State Bond Match: Bond Match - Bridge Replacement: Federal: BROS - REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY FY214 FY211 FY213 FY ,831 ROUTE: UPC NO.: ROUTE 68 - GRADE, DRAIN & PAVE STREET NAME: HAPPY CREEK RD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 645 TO: ROUTE 646 (1.1 MI) RW 14 SCO OF WORK: RECONSTRUCTION TO 19 LENGTH: 1.1 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY NonMPO FY ROUTE: UPC NO.: RTE ORATE HATTON FERRY - BUDGET ITEM STREET NAME: HATTON FERRY ESTIMATED COST ('s) DESCRIPTION: ORATING BUDGET RW SCO OF WORK: RECONSTRUCTION TO LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: Formula: Federal/State: Federal/State - Albemarle S REQUIRED ALLOCATIONS ('s) 4 FY29 FY21 FY211 FY212 FY213 FY214 Formula: State: Formula - Telecommunications : Albemarle SSYP - Incidental: Federal: All B-2 6/2/28

27 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 631 UPC NO.: 253 RTE LANE ON 2 LANE ROW; 4 LANE ON RELOCATED RIO ROAD Revenue Sharing - $3,521,454 State Fund - $2,798,327 - $6,319,781 STREET NAME: Meadow Creek Parkway - Rio Road ESTIMATED COST ('s) 3, DESCRIPTION: FROM: INTERSECTION MELBOURNE ROAD TO:.863 RW 1,925 MILE NORTH OF NORFOLK SOUTHERN RAILWAY 16,548 (1.371 MI) SCO OF WORK: NEW CONSTRUCTION TO 3,473 LENGTH: MI STRUCTURE NO.: SUFFICIENCY RATING: Revenue Sharing Funds: Local Match: Local Match Revenue Sharing Funds: State Match: State Match Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle PROGRAM NOTE: S REQUIRED ALLOCATIONS ('s) 3,17 3,17 21, FY29 46 FY21 FY211 FY212 FY213 FY214 28, from M. Kerley 3/12/8 agreeing for this project to remain state funded. Revenue sharing allocations posted to ISYP 1/29/7. Complete Complete Underway 214 2,265 ROUTE: UPC NO.: RTE NEW LOCATION STUDY - ONLY STREET NAME: Northern Free State Road ESTIMATED COST ('s) 4,2 DESCRIPTION: FROM: ROUTE 631 (.1 MILE SOUTH NORFOLK RW SOUTHERN RAILWAY) TO: ROUTE 29 (.55 MILE NORTH SOUTH FORK RIVANNA RIVER) (3.8 MI) SCO OF WORK: STUDIES ONLY TO 4,2 LENGTH: 3.8 MI STRUCTURE NO.: SUFFICIENCY RATING: Revenue Sharing Funds: Local Match: Local Match Revenue Sharing Funds: State Match: State Match Formula: Federal/State: Federal/State - Albemarle PROGRAM NOTE: S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Rev.Shar.funds allocated 1/3/6. All 61 funds except expenditures transferred to NAT. Underway FY ,718 B-21 6/2/28

28 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 64 UPC NO.: 7252 RTE 64 - RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) Rural Rustic Road Exception at Railroad Bridge NonMPO STREET NAME: GILBERT STATION ESTIMATED COST ('s) 1 DESCRIPTION: FROM: END OF HARD SURFACE TO: RAILROAD RW BRIDGE (1.2 MI) 157 SCO OF WORK: RESURFACING TO 157 LENGTH: 1.2 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) Unpaved Road Funds: State: 157 Formula - Unpaved Roads : Albemarle PROGRAM NOTE: grade, drain and surface treat FY29 FY21 FY211 FY212 FY213 FY214 Complete Complete 214 ROUTE: 643 UPC NO.: RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACE ROAD $1, from Rte. 72 STREET NAME: RIO MILLS ROAD ESTIMATED COST ('s) 378 DESCRIPTION: FROM: ROUTE 29 TO: 1.1 MILES WEST ROUTE 29 RW 126 (1.1 MI) 2,193 SCO OF WORK: RECONSTRUCTION TO 2,697 LENGTH: 1.1 MI STRUCTURE NO.: SUFFICIENCY RATING: Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle PROGRAM NOTE: S REQUIRED ALLOCATIONS ('s) Grade, Drain & Surface Treat FY FY21 FY211 FY212 FY FY214 Underway FY214 FY B-22 6/2/28

29 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 647 UPC NO.: RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD Gravel Road $2, from Rte. 72 NonMPO STREET NAME: MAXFIELD ROAD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 22 TO: END OF STATE MAINTENANCE RW (.8 MI) 18 SCO OF WORK: RECONSTRUCTION TO 185 LENGTH:.8 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) Unpaved Road Funds: State: 185 Formula - Unpaved Roads : Albemarle PROGRAM NOTE: Grade, drain and surface treat FY29 FY21 FY211 FY212 FY213 FY214 Complete Underway 214 ROUTE: 649 UPC NO.: RTE BRIDGE & APPROACHES OVER NORFOLK SOUTHERN RR Complete schedule required. Additional funds to be provided by the System. NonMPO STREET NAME: ESTIMATED COST ('s) 55 DESCRIPTION: FROM:.1 NORTH OF ROUTE 819 TO: (STRUCTURE RW 2 #649) (.2 MI) 1,75 SCO OF WORK: BRIDGE REPLACEMENT TO 2,5 LENGTH:.2 MI STRUCTURE NO.: SUFFICIENCY RATING: BR Formula: Federal/State: Federal/State - Albemarle REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 PROGRAM NOTE: FY7 PTF funds transferred to UPC77321 per S&B funding 3/3/7 12 FY214 FY B-23 6/2/28

30 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: RTE SPOT IMP., SIDEWALK & SAFETY FEATURES Revenue Sharing - $ 2, Revenue Sharing - $ 2, S Revenue Sharing - $ 6, 2-3 STREET NAME: GEORGETOWN ROAD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 654 TO: ROUTE 743 (.86 MI) RW 1,5 1,18 SCO OF WORK: SAFETY/TRAFFIC ORS/TSM TO 3,18 LENGTH:.86 MI STRUCTURE NO.: SUFFICIENCY RATING: STP/REVS Revenue Sharing Funds: Local Match: Local Match Revenue Sharing Funds: State Match: State Match Formula: Federal/State: Albemarle Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle REQUIRED ALLOCATIONS ('s) , ,658 FY29 FY21 FY211 FY212 FY213 FY214 Underway FY29 FY ROUTE: UPC NO.: ROUTE WALNUT LEVEL RD. FROM Rte 81 TO Rte 765 STREET NAME: WALNUT LEVEL ROAD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 81 TO: ROUTE 765 (1.6 MI) RW 14 SCO OF WORK: RECONSTRUCTION TO 145 LENGTH: 1.6 MI STRUCTURE NO.: SUFFICIENCY RATING: Formula: Federal/State: Albemarle Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) FY FY21 FY211 FY212 FY213 NonMPO FY214 FY29 FY B-24 6/2/28

31 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: ROUTE BLUFTON ROAD - FROM RT. 81 TO DEAD END STREET NAME: BLUFTON ROAD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 81 TO: DEAD END (1.9 MI) RW 85 SCO OF WORK: RECONSTRUCTION TO 9 LENGTH: 1.9 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY NonMPO FY ROUTE: UPC NO.: RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD STREET NAME: MIDWAY ROAD ESTIMATED COST ('s) 34 DESCRIPTION: FROM: ROUTE 635 TO: ROUTE 824 (.42 MI) RW 169 SCO OF WORK: RECONSTRUCTION TO 23 LENGTH:.42 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FY B-25 6/2/28

32 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 691 UPC NO.: RTE WIDEN & IMPROVE ALIGNMENT 2-lane W/SW & Bike Lanes NonMPO STREET NAME: JARMAN GAP ROAD ESTIMATED COST ('s) 1,69 DESCRIPTION: FROM:.597 Mi. E. IINT. ROUTE 684 TO: ROUTE 24 RW 5,944 (.89 MI) 7,21 SCO OF WORK: RECONSTRUCTION TO 14,655 LENGTH:.89 MI STRUCTURE NO.: SUFFICIENCY RATING: STP Federal Formula STP: Federal: Federal Formula STP - : Albemarle Federal Formula STP: State Bond Match: Federal Formula - Bond Match : Albemarle Revenue Sharing Funds: Local Match: Local Match Revenue Sharing Funds: State Match: State Match Formula: Federal: Formula - STP : Albemarle Formula: Federal: Formula - EB(MG) : Albemarle Formula: Federal: Formula - IM to STP : Albemarle Formula: Federal/State: Federal/State - Albemarle Formula: State Match: Formula - Match : Albemarle Formula: State: Formula - Telecommunications : Albemarle REQUIRED ALLOCATIONS ('s) 2, , ,757 FY29 1, ,832 FY21 FY211 FY212 FY213 1,232 1,257 1,283 1, , ,819 1,93 1,922 FY214 Complete Underway FY ,369 ROUTE: UPC NO.: RTE WIDEN AND PAVE SHOULDERS STREET NAME: JARMAN GAP ROAD ESTIMATED COST ('s) 658 DESCRIPTION: FROM: RTE. 684 TO:.597 MI. E. RTE. 684 (.597 MI) RW SCO OF WORK: MINOR WIDENING TO 658 LENGTH:.597 MI STRUCTURE NO.: SUFFICIENCY RATING: REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FY B-26 6/2/28

33 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: ROUTE 74 - GRADE, DRAIN & PAVE STREET NAME: FORTUNE LANE ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 715 TO: DEAD END RW 199 SCO OF WORK: RECONSTRUCTION TO 24 LENGTH:. MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) FY29 5 FY21 FY211 FY212 FY213 NonMPO FY ROUTE: 78 UPC NO.: RTE 78 - BRIDGE & APPROACHES OVER CSX RAILROAD Complete schedule required. NonMPO STREET NAME: ESTIMATED COST ('s) 54 DESCRIPTION: FROM: (.9 MILE SOUTH OF ROUTE 738) TO: RW 252 STRUCTURE #684 (.2 MI) 1,961 SCO OF WORK: BRIDGE REPLACEMENT TO 2,717 LENGTH:.2 MI STRUCTURE NO.: SUFFICIENCY RATING: BROS Bond Match: State Bond Match: Bond Match - Bridge Replacement: Federal: BROS - Formula: Federal: Formula - Bridge : Albemarle Formula: State Match: Formula - Match : Albemarle REQUIRED ALLOCATIONS ('s) FY FY21 FY211 FY212 FY , ,452 FY214 Underway FY211 FY ROUTE: UPC NO.: RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) STREET NAME: OLD GREEN MTN RD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 6 TO: ROUTE 723 (2.2 MI) RW 212 SCO OF WORK: RESURFACING TO 217 LENGTH: 2.2 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) 22 FY29 FY21 FY211 FY212 FY213 NonMPO FY214 Underway FY B-27 6/2/28

34 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 734 UPC NO.: RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) Rural Rustic Road STREET NAME: BISHOP HILL ROAD ESTIMATED COST ('s) 1 DESCRIPTION: FROM: ROUTE 795 TO: ROUTE 187 (.45 MI) RW 132 SCO OF WORK: RESURFACING TO 133 LENGTH:.45 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 Formula: State: 2 Formula - Telecommunications : Albemarle SSYP - Incidental: Federal: All 12 Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle PROGRAM NOTE: Grade, drain and surface treat Complete Complete 214 ROUTE: 743 UPC NO.: RTE BRIDGE & APPROACHES OVER NORTH FORK RIVANNA STREET NAME: ESTIMATED COST ('s) 526 DESCRIPTION: FROM:.11 Mi. W Int. Rte. 641 TO: Int. Rte. 641 (.11 RW 319 MI) 2,931 SCO OF WORK: BRIDGE REPLACEMENT TO 3,776 LENGTH:.11 MI STRUCTURE NO.: SUFFICIENCY RATING: BROS Bond Match: State Bond Match: Bond Match - Bridge Replacement: Federal: BROS - Priority Transportation Funds: State: Access PTF Formula: Federal: Formula - Bridge : Albemarle Formula: Federal/State: Federal/State - Albemarle Formula: State Match: Formula - Match : Albemarle REQUIRED ALLOCATIONS ('s) ,379 FY FY21 FY211 FY212 FY ,22 1,521 1,525 1,91 FY214 Underway FY29 FY ,215 B-28 6/2/28

35 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 744 UPC NO.: RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) Rural Rustic Road STREET NAME: HACKTOWN ROAD ESTIMATED COST ('s) 5 DESCRIPTION: FROM:.37 MILE NORTH ROUTE 25 TO: ROUTE 731 RW (.58 MI) 95 SCO OF WORK: RESURFACING TO 1 LENGTH:.58 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) Unpaved Road Funds: State: 1 Formula - Unpaved Roads : Albemarle PROGRAM NOTE: Grade, drain and surface treat FY29 FY21 FY211 FY212 FY213 FY214 Complete Underway 214 ROUTE: UPC NO.: RTE 76 -RURAL RUSTIC-GRADE, DRAIN, PAVE STREET NAME: RED HILL SCHOOL ROAD ESTIMATED COST ('s) 6 DESCRIPTION: FROM: ROUTE 29 TO: ROUTE 71 (.94 MI) RW 125 SCO OF WORK: RECONSTRUCTION TO 131 LENGTH:.94 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) 137 FY29 FY21 FY211 FY212 FY213 NonMPO FY214 Underway FY ROUTE: UPC NO.: ROUTE RURAL RUSTIC ROAD - GRADE, DRAIN & PAVE STREET NAME: ROSE HILL CHURCH ESTIMATED COST ('s) DESCRIPTION: FROM: ROUTE 732 TO: DEAD END (.75 MI) RW 86 SCO OF WORK: RECONSTRUCTION TO 86 LENGTH:.75 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) FY29 3 FY21 FY211 FY212 FY213 FY B-29 6/2/28

36 FY Six-Year Improvement Program CULR DISTRICT ROUTE: 769 UPC NO.: 7619 RTE RURAL RUSTIC ROAD (SURFACE TREAT NON-HARDSURFACE) Rural Rustic Road STREET NAME: ESTIMATED COST ('s) 6 DESCRIPTION: FROM: END OF MAINTENANCE TO: ROUTE 2 (1.4 RW MI) 18 SCO OF WORK: RESURFACING TO 186 LENGTH: 1.4 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) 269 FY29 FY21 FY211 FY212 FY213 FY214 Complete Underway 214 ROUTE: UPC NO.: RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD STREET NAME: DOCTORS CROSSING ESTIMATED COST ('s) 25 DESCRIPTION: FROM: ROUTE 6 TO: ROUTE 64 (2.1 MI) RW 92 1,431 SCO OF WORK: RECONSTRUCTION TO 1,548 LENGTH: 2.1 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FY29 FY ROUTE: UPC NO.: RTE RECONSTRUCT & SURFACE TREAT NON-HARDSURFACED ROAD STREET NAME: GILLUMS RIDGE RD ESTIMATED COST ('s) 26 DESCRIPTION: FROM: ROUTE 682 TO: ROUTE 78 (.9 MI) RW 1,99 SCO OF WORK: RECONSTRUCTION TO 1,35 LENGTH:.9 MI STRUCTURE NO.: SUFFICIENCY RATING: S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FY B-3 6/2/28

37 FY Six-Year Improvement Program CULR DISTRICT ROUTE: UPC NO.: ROUTE 86 - RURAL RUSITC ROAD - GRADE, DRAIN & PAVE STREET NAME: ESTES RIDGE RD ESTIMATED COST ('s) 5 DESCRIPTION: FROM: ROUTE 663 TO: DEAD END (.29 MI) RW 55 SCO OF WORK: RECONSTRUCTION TO 6 LENGTH:.29 MI STRUCTURE NO.: SUFFICIENCY RATING: Unpaved Road Funds: State: Formula - Unpaved Roads : Albemarle S REQUIRED ALLOCATIONS ('s) 5 FY29 FY21 FY211 FY212 FY213 NonMPO FY214 Underway FY UPC NO.: T1999 DESCRIPTION: CWI Albemarle NonMPO REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY ROUTE: 1427 UPC NO.: RTE RAISED MEDIAN XWALKS, RESTRI, LIGHTING, ETC. Bicycle/Pedestrian Improvement -HES limited to $296,265. per MMD. STREET NAME: JURISDICTION: DESCRIPTION: ESTIMATED COST ('s) 5 RW 294 Albemarle County FROM: ROUTE 631 (RIO ROAD) TO: ROUTE 866 (GREENBRIER DRIVE) (.93 MI) SCO OF WORK: SAFETY/TRAFFIC ORS/TSM TO 299 LENGTH:.93 MI STRUCTURE NO.: SUFFICIENCY RATING: STP REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 Safety Funds: Bike/Ped: Bike/Pedestrian 266 Formula: Federal/State: Federal/State - Albemarle 34 3 Complete Underway B-31 6/2/28

38 FY Six-Year Improvement Program CULR DISTRICT UPC NO.: T2367 DESCRIPTION: COUNTYWIDE PI & ENTRANCE INSTALLATION CHARGE FOR PIS AT PRIVATE ENTRANCES AND OTHER MINOR DRAINAGE IMPROVEMENTS. VARIOUS LOCATIONS IN COUNTY NonMPO REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle UPC NO.: T2368 DESCRIPTION: COUNTYWIDE RURAL ADDITIONS RURAL ADDITIONS - SECTION ROLLOVER OF FUNDS CAN BE FOR FIVE YEARS. VARIOUS LOCATIONS IN COUNTY NonMPO REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle UPC NO.: T2369 DESCRIPTION: COUNTYWIDE - SUBDIVISION PLAN REVIEW NonMPO SUBDIVISION PLAN REVIEW - INCLUDES MILESTONE INSCTION & INSCTION FOR FINAL ACCEPTANCE. VARIOUS LOCATIONS IN COUNTY REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle B-32 6/2/28

39 FY Six-Year Improvement Program CULR DISTRICT UPC NO.: T237 DESCRIPTION: COUNTYWIDE ENGINEERING & SURVEY NonMPO MINOR SURVEY & PRELIMINARY ENGINEERING FOR BUDGET ITEMS AND INCIDENTAL TY WORK. VARIOUS LOCATIONS IN COUNTY REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle UPC NO.: T2371 DESCRIPTION: COUNTYWIDE FERTILIZATION & SEEDING NonMPO FERTILIZATION AND SEEDING TO IMPROVE SLO STABILIZATION ON SECONDARY SYSTEM VARIOUS LOCATIONS IN COUNTY REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle UPC NO.: T2372 DESCRIPTION: COUNTYWIDE TRAFFIC SERVICES TRAFFIC SERVICES INCLUDE SECONDARY SED ZONES, SED STUDIES, OTHER NEW SECONDARY SIGNS VARIOUS LOCATIONS IN COUNTY NonMPO REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle PROGRAM NOTE: , , , ,247 1,33 1, B-33 6/2/28

40 FY Six-Year Improvement Program CULR DISTRICT UPC NO.: T2373 DESCRIPTION: COUNTYWIDE RIGHT OF WAY ENGR. NonMPO USE WHEN IMPARTICAL TO ON A : ATTORNEY FEES and ACQUISITION COST. VARIOUS LOCATIONS IN COUNTY REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle Formula: State: Formula - Telecommunications : Albemarle UPC NO.: T2374 DESCRIPTION: COUNTYWIDE TRAFFIC CALMING NonMPO TRAFFIC CALMING MEASURES AS DETERMINED BY RESIDENCY AND DISTRICT TRAFFIC ENGINEER VARIOUS LOCATIONS IN COUNTY REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY Formula: Federal/State: Federal/State - Albemarle Formula: State: Formula - State : Albemarle UPC NO.: T2377 DESCRIPTION: FUTURE STATE MATCH - HES/RR SAFETY FUNDS PLANNED FOR HES/RR SAFETY S IN YR5-YR6. VARIOUS LOCATIONS IN COUNTY NonMPO PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FUTURE S 214 B-34 6/2/28

41 FY Six-Year Improvement Program CULR DISTRICT UPC NO.: T2376 DESCRIPTION: FUTURE UNPAVED FUNDS: YR4-YR6 FUNDS PLANNED FOR UNPAVED ROADS IN YR5-YR6 VARIOUS LOCATIONS IN COUNTY NonMPO PROGRAM NOTE: REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FUTURE S 214 UPC NO.: T2375 DESCRIPTION: FUTURE BUDGET ITEMS & PLANT MIX FUNDS PLANNED FOR INCIDENTAL CONSTRUCTION WORK IN YR3-YR6. VARIOUS LOCATIONS IN COUNTY NonMPO Formula: State: Formula - State : Albemarle PROGRAM NOTE: FUTURE S REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY FY B-35 6/2/28

42 FY Six-Year Improvement Program Miscellaneous CULR DISTRICT ROUTE: UPC NO.: HSIP Proactive Safety Projects County of Albermarle Miscellaneous New Project STREET NAME: ESTIMATED COST ('s) 61 DESCRIPTION: Albemarle County Safety Improvements RW 448 SCO OF WORK: SAFETY/TRAFFIC ORS/TSM TO 59 LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING: HSIP Highway Safety Improvements: Federal: HSIP - Highways Highway Safety Improvements: State Match: HSIP - State Match REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 FY29 FY B-36 6/2/28

43 FY Six-Year Improvement Program Enhancement CULR DISTRICT ROUTE: UPC NO.: EN Albermarle County - Lewis & Clark Educational Center Enhancement STREET NAME: Lewis & Clark Educational Center ESTIMATED COST ('s) 56 DESCRIPTION: FROM: Construction of educational center with parking, RW 2 TO: trails, and ferry service connecting existing trails 641 SCO OF WORK: ENVIRONMENTALLY RELATED TO 718 LENGTH: _ STRUCTURE NO.: SUFFICIENCY RATING: STP Transportation Enhancement Funds: Federal: STP - Enhancement Allocations Transportation Enhancement Funds: Local Funds: Local Funds for Enhancement Projects REQUIRED ALLOCATIONS ('s) FY29 FY21 FY211 FY212 FY213 FY214 Underway FY211 FY B-37 6/2/28

44 B-38 6/2/28

45 Appendix C. FY9-12 TIP Public Comment

Secondary System Albemarle County Construction Program Estimated Allocations

Secondary System Albemarle County Construction Program Estimated Allocations econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY29 FY21 FY211 FY212 FY213 FY214 econdary Unpaved Roads $642,951 $545,67 $596,222 $519,924 $44,932 $44,932 $3,186,28 TeleFee

More information

Culpeper District. Albemarle County Monthly Report October, 2011

Culpeper District. Albemarle County Monthly Report October, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Secondary System Albemarle County Construction Program Estimated Allocations

Secondary System Albemarle County Construction Program Estimated Allocations econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY2010 FY2011 FY2012 FY2013 FY2014 FY2015 econdary Unpaved Roads TeleFee $324,624 $324,624 $324,624 $324,624 $324,624 $324,624

More information

Culpeper District. Albemarle County Monthly Report September, 2011

Culpeper District. Albemarle County Monthly Report September, 2011 Culpeper District Albemarle County Monthly Report Special Issues FY Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list

Projects in bold are in the Development Area. Projects in bold and in italics are new on this year's priority list ALBEMARLE COUNTY PRIORITY LIST FOR SECONDARY ROAD IMPROVEMENTS 2004-05 Through 2009-10 [SOME PROJECTS MAY NOT BE COMPLETED AS PRIORITIZED DUE TO PROJECT COMPLEXITY AND/OR AVAILABLE FUNDING] APPROVED BY

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017)

Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017) Bicycle and Pedestrian Master Plan Status Update (as of Dec. 2017) In September 2015, the City Council adopted the Bicycle and Pedestrian Master Plan as an amendment to the City s Comprehensive Plan (2013).

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

Route 58 Corridor Development Fund

Route 58 Corridor Development Fund Corridor Development Fund Appropriation Act Item 448 B.3 (2016) Report to the Chairmen of the Committees on Senate Finance and House Appropriations Virginia Department of Transportation 1401 East Broad

More information

CHAPTER 5 TRANSPORTATION GOAL

CHAPTER 5 TRANSPORTATION GOAL CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1

Funding Sources Appendix I. Appendix I. Funding Sources. Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Virginia Beach Bikeways and Trails Plan 2011 Page I-1 Funding Sources Federal and state agencies provide funding for local bikeway and trail projects. Descriptions follow for programs that

More information

Rio Mills Rd/Berkmar Dr Extended Connection

Rio Mills Rd/Berkmar Dr Extended Connection SMART SCALE Application Rio Mills Rd/Berkmar Dr Extended Connection Status: Scored ID: F2-0000001408-R02 General Point of Contact Information Point of Contact Name Kevin McDermott Point of Contact Phone

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

Memorandum. From: Jakob zumfelde, Transportation Planner Date: November 7, 2018 Reference: Long Range Transportation Plan

Memorandum. From: Jakob zumfelde, Transportation Planner Date: November 7, 2018 Reference: Long Range Transportation Plan Charlottesville-Albemarle Metropolitan Planning Organization POB 1505, 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 phone info@tjpdc.org email Memorum To: MPO CTAC From: Jakob

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Reference 10: Transportation

Reference 10: Transportation Reference 10: Transportation This information is intended to provide greater detail and background information on items described in the Transportation Chapter of the Comprehensive Plan. Items in the reference

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District

More information

Viewing SMART SCALE Application

Viewing SMART SCALE Application Viewing SMART SCALE Application Route 15 Whites Ferry Road to Points of Rock Bridge Project Status: Submitted Organization: Loudoun County Project ID: 3593 Submitted: 08/06/2018 @ 3:18PM by Bob Brown Created:

More information

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association

NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 20, 2012 Garrett Moore VDOT District Administrator, Northern Virginia Paving Program 2012 This season's paving program will

More information

County of Fairfax, Virginia. Department of Transportation

County of Fairfax, Virginia. Department of Transportation Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway

More information

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County.

Attached for your reference please find project updates on ongoing VDOT construction projects in Southampton County. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i July 25, 2016 6. HIGHWAY MATTERS A. PLAN PROJECT UPDATES Attached for your reference please find project updates on ongoing VDOT construction projects

More information

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process.

Memorandum. Purpose: To update the MPO CTAC on the status of the LRTP scenario evaluation process. Charlottesville-Albemarle Metropolitan Planning Organization POB 1505, 401 E. Water St, Charlottesville, VA 22902 www.tjpdc.org (434) 979-7310 phone info@tjpdc.org email Memorandum To: MPO CTAC From: Wood

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

CITY OF PORTSMOUTH PLANNING DEPARTMENT

CITY OF PORTSMOUTH PLANNING DEPARTMENT CITY OF PORTSMOUTH PLANNING DEPARTMENT MEMORANDUM TO: JOHN P. BOHENKO, CITY MANAGER FROM: JULIET T.H. WALKER, PLANNING DIRECTOR SUBJECT: BICYCLE / PEDESTRIAN PLAN PROGRESS UPDATE DATE: 3/13/2018 Background

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

Project Status Update

Project Status Update Project Status Update : Novato Boulevard, 4th & 3rd Streets, Sir Francis Drake Boulevard (3), and Miller Avenue Major roads projects target the most heavily traveled roads in Marin County for repairs,

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

The Year Ahead: Virginia Department of Transportation Northern Virginia District

The Year Ahead: Virginia Department of Transportation Northern Virginia District The Year Ahead: Virginia Department of Transportation Northern Virginia District Nicholas J. Roper, P.E. District Project Development Engineer Phone: (703)259-1953 Email: nicholas.roper@vdot.virginia.gov

More information

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS

SIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor

More information

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Miami County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Miami County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

Annual Listing of Obligated MPO Projects

Annual Listing of Obligated MPO Projects Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

Fairfax County Parkway Widening Fairfax County

Fairfax County Parkway Widening Fairfax County Get Involved VDOT representatives will review and evaluate information received as a result of this meeting. Please fill out the comment sheet provided in this brochure if you have any comments or questions.

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007

New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way

More information

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016

RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION FISCAL YEAR 2016 OBLIGATIONS REPORT JULY 1, JUNE 30, 2016 RADCLIFF/ELIZABETHTOWN METROPOLITAN PLANNING ORGANIZATION OBLIGATIONS REPORT JULY 1, 2015 - JUNE 30, 2016 DECEMBER 2016 LINCOLN TRAIL AREA DEVELOPMENT DISTRICT P. O. BOX 604 613 COLLEGE STREET ELIZABETHTOWN,

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Transportation Enhancements, Safe Routes to School, and Recreational Trails to Transportation Alternatives. Pamela Liston, October 30 th, 2013

Transportation Enhancements, Safe Routes to School, and Recreational Trails to Transportation Alternatives. Pamela Liston, October 30 th, 2013 Transportation Enhancements, Safe Routes to School, and Recreational Trails to Transportation Alternatives Pamela Liston, October 30 th, 2013 Transportation Alternatives Program These projects are intended

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Roadway Project Recommendations:

Roadway Project Recommendations: Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING

HOOPA DESIGN FAIR 4. IMPLEMENTATION PHASES & FUNDING 4. IMPLEMENTATION PHASES & FUNDING HOOPA DESIGN FAIR 4-1 4. IMPLEMENTATION PHASES & FUNDING Phase One Development 1. Implementation The Conceptual Plan recommends five concept elements to revitalize downtown

More information

Route 15 Congestion Report Findings

Route 15 Congestion Report Findings Route 15 Congestion Report Findings Briefing To Loudoun County Board of Supervisors May 18, 2016 1 Overview: Previous Studies: Route 15 Corridor, Leesburg to Maryland Route 15 Congestion Report: Between

More information

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report

MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Rio Intersection Traffic Restrictions Begin Monday

Rio Intersection Traffic Restrictions Begin Monday May 18, 2016 8 Rio Intersection Traffic Restrictions Begin Monday This special edition of the Route 29 Solutions e mail newsletter includes everything you need to know about the May 23 through September

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive

AGENDA REPORT. Issue: Discussion of potential improvements on Barnwell Road at Niblick Drive AGENDA REPORT To: From: By: Honorable Mayor and City Council Members Warren Hutmacher, City Manager Tom Black, Public Works Director Date: March 23, 2016 Agenda: March 28, 2016 WORK SESSION AGENDA: Barnwell

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

APPENDIX B: FUNDING MATRIX

APPENDIX B: FUNDING MATRIX APPENDIX B: FUNDING MATRIX 101752 B - 1 FEDERAL SAFETEA-LU -- Congestion Mitigation and Air Quality Improvement Program (CMAQ) SAFETEA-LU -- Surface Transportation Program (STP)/Congestion Mitigation and

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY (MAP-21) AND ODOT FUNDING PROGRAMS

MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY (MAP-21) AND ODOT FUNDING PROGRAMS MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY (MAP-21) AND ODOT FUNDING PROGRAMS AMATS ANNUAL MEETING - OCTOBER 12 TH 2012 MAP-21 Highlights Signed by President into P.L. 112-141 - July 6, 2012 Authorizes

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

Hampton Roads Pedestrian and Bicycle Advisory Committee

Hampton Roads Pedestrian and Bicycle Advisory Committee Hampton Roads Pedestrian and Bicycle Advisory Committee HRTPO Transportation Technical Advisory Committee November 6, 2013 Carl E. Jackson III, AICP Transportation Planning Specialist Hampton Roads District

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

Secondary Road Program

Secondary Road Program Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

City of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents

City of Redmond Transportation Improvement Program Adopted: September 16, 2014 Table of Contents City of Redmond 2015-2012 Transportation Improvement Program Adopted: September 16, 2014 Table of Contents 1. What is the Six-Year Transportation Improvement Program (TIP)?... 1 2. What is included in

More information

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017

Bicycle and Pedestrian Chapter TPP Update Overview. TAB September 20, 2017 Bicycle and Pedestrian Chapter TPP Update Overview TAB September 20, 2017 Bicycling & Walking in the Twin Cities Where are we now? The Bike-Pedestrian system Current trends New developments Where are we

More information

FUNDING SOURCES CHAPTER 6

FUNDING SOURCES CHAPTER 6 CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2

More information

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013) B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek

More information

Transportation Committee Project Priority List

Transportation Committee Project Priority List Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000

More information

Complete Streets. Designing Streets for Everyone. Sarnia

Complete Streets. Designing Streets for Everyone. Sarnia Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application

Route 28 Widening (PW County Line to Old. Old Centreville Road) Scored HB 2 Application Route 28 Widening (PW County Line to Old Centreville Road) Scored HB 2 Application Project Application ID: 432 General Project Information Project Title Route 28 Widening (PW County Line to Old Centreville

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by

Toward Zero Deaths. Regional SHSP Road Show Meeting. Virginia Strategic Highway Safety Plan. presented by Toward Zero Deaths Regional SHSP Road Show Meeting presented by Virginia Strategic Highway Safety Plan December 1, 2016 1 Welcome & Introductions Purpose of the Meeting Objectives & Key Outcomes Agenda»

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY

MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY MINERAL AVENUE CORRIDOR ASSESSMENT STUDY IMPLEMENTATION STRATEGY INTRODUCTION City Personnel Sign-in Sheet Comment Forms Please Write Down Any Feedback INTRODUCTION List of Topics for Presentation Study

More information

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming

THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS. Integrating Transportation Planning, Project Development, and Project Programming THE VDOT STARS PROGRAM AN OVERVIEW FOR DESIGNERS Integrating Transportation Planning, Project Development, and Project Programming March 21, 2017 AGENDA Program Overview Project Development Project Types

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Hennepin County Transportation Department

Hennepin County Transportation Department Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Fiscal Year 2017 Bicycle and Pedestrian Metric Report

Fiscal Year 2017 Bicycle and Pedestrian Metric Report Fiscal Year 2017 Bicycle and Pedestrian Metric Report November 2017 In 2015, the Virginia Department of Transportation s (VDOT) implementation of the 2004 Commonwealth Transportation Board s (CTB) Policy

More information

City of Wilsonville 5 th Street to Kinsman Road Extension Project

City of Wilsonville 5 th Street to Kinsman Road Extension Project City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour

More information

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017

CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017 CULPEPER DISTRICT TRANSPORTATION UPDATE / FALL 2017 From the District Engineer: In 2017, the Culpeper District successfully delivered several large projects that have been years in the making. In Culpeper

More information

FY Regional Transportation Improvement Program

FY Regional Transportation Improvement Program FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

Planned Improvements from Sector & Area Plans that have been added to the MTP

Planned Improvements from Sector & Area Plans that have been added to the MTP Appendix P Bikeway Projects in Currently Approved Plans Planned Improvements from Sector & Area Plans that have been added to the MTP Airport Viaduct Trail Connection to National Airport Implement a pedestrian/bicycle

More information

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County Executive Summary March 2015 Highway 49, Highway 351 and Highway 91 Improvements Feasibility Study Craighead County

More information

Street Paving and Sidewalk Policy

Street Paving and Sidewalk Policy City Commission Policy 600 Street Paving and Sidewalk Policy DEPARTMENT: Public Works DATE ADOPTED: June 7, 1995 DATE OF LAST REVISION: December 10, 2014 Policy No. 600.01 AUTHORITY: PASS City of Tallahassee-Leon

More information

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities

Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities Approved: Policy: 20-004(P) Responsible Office: Planning Gordon Proctor Director Policy on Accommodating Bicycle and Pedestrian Travel on ODOT Owned or Maintained Facilities I. POLICY STATEMENT: This policy

More information