Project changes are summarized below and highlighted in yellow on the attached copy of the TIP. Federal Aid Type. Federal Funds
|
|
- Beverly Gordon
- 5 years ago
- Views:
Transcription
1
2 Jason Bottjen Arizona Department of Transportation 206 South 17 th Ave., 301B Phoenix, AZ 87 Via: Re: FY Sun Corridor MPO TIP Amendment #5 Dear Jason: Attached is a copy of Amendment #5 for the FY Sun Corridor MPO TIP. The Sun Corridor MPO requests that the FY amendment be reviewed and processed by. Project changes are summarized below and highlighted in yellow on the attached copy of the TIP. FY2017 TIP ID Sponsor Project Name DOT HSIP15 015C SR87/Randolph Rd Intersection Improvements Project Location SR87 at MP128.89, Randolph Rd Federal Aid Type Federal Funds State Match Total HSIP 618,509 31, ,000 Action Increase Federal Funds and State Match Because the changes to the TIP involve funding only, no action is required by the Sun Corridor MPO Technical Advisory Committee (TAC) and Executive Board. However, they will be formally informed of the Administrative TIP Amendment on the following dates. MEETINGS DATE LOCATION SCMPO TAC February 23, 2016 Casa Grande SCMPO Executive Board March 14, 2017 Coolidge Should you have any questions or corrections, please feel free to give me a call. Sincerely, Jason Hafner, Transportation Planner Sun Corridor MPO Serving Casa Grande, Coolidge, Eloy and Pinal County Sun Corridor MPO 211 N Florence St., Ste. 103, Casa Grande, AZ
3 2017 CSG HSIP C Florence Blvd, Pedestrian Safety Improvements, in Casa Grande Florence Blvd, approx. 1,000 ft. West of Camino Mercado, in Casa Grande 0 Construction Installation of Pedestrian Hybrid Beacon (PHB), pedestrian refuge island, fencing (railing), crosswalk striping, signage Urban Principal and lighting Other 4 4 HSIP 351, ,569 T C Casa Grande Main St. Improvements in Central Ave from Main St. SZ130 01C CLG 1601C Coolidge Coolidge to 1st Street 0.6 Re Construction Urban Collector 2 2 STP 1,332,653 80,553 1,413,206 Construction Installation to ELY HSIP Upgrade Regulatory Upgrade Regulatory Signs SH646 01C 012C Eloy Signs Various Locations in ELOY 0 including Hardware Various 0 0 HSIP 159, ,048 Toltec Rd; Battaglia Rd Toltec Rd; Battaglia Rd 01D ELY 1601D Eloy I10, Eloy I10, Eloy 0.7 Design Pavement Preservation Urban Collector 2 2 STP 139,490 8, ,922 PNL HSIP15 Various Locations in Procurement Sign Upgrade and SH645 01C 014C Pinal County Sign Upgrade PINAL COUNTY 0 Retroreflectometer Various 0 0 HSIP 148, ,024 DOT HSIP15 SR87 at Ruins Dr., MP Construction Install New Traffic Principal H C 011C Safeway Traffic Signal in Coolidge 1 Signal and Raised Median Arterial 2 2 HSIP 521,580 3, ,000 SMP STP 16 Sun Corridor 2017 HPMS Data HPMS2 MPO Collection Various Locations 0 Traffic Counts Various 0 0 STP 51,000 51,000 F006901D DOT 1701D I10; MP209 MP219 I10; MP209 MP Design Safety Improvements Interstate 6 6 HSIP,000,000 01D DOT 1702D Wash Bridge #355 SR 87 at MP Design Scour Retrofit Major Collector 4 4 FA 225, ,000 H C DOT HSIP15 015C SR87/Randolph Rd Intersection Improvement SR 87 at MP , Randolph Rd. 0 Construction Left Turn Lane and Intersection Lighting Principal Arterial 2 2 HSIP 618,509 31, ,000 TOTAL FOR ,047,373 92,404 31,491 3,819, Main Street Frontier Rd. to SZ058 01C ELY 15 01C Eloy Main Street Reconstruction Battaglia Dr. 1 Re Construction Urban Collector 4 2 STP 2,495, ,865 4,302,201 6,948,949 MCG Hwy; N Bianco Rd Maricopa Casa Grande Hwy; N Bianco Rd Russell Rd, 01D CSG 17 01D Casa Grande Russell Rd, Casa Grande Casa Grande 6 Design Pavement Preservation Minor Arterial 2 2 STP 280,000 16, ,925 SMP STP 16 HPMS2 Sun Corridor MPO 2018 HPMS Data Collection Various Locations 0 Traffic Counts Various 0 0 STP 36,000 36,000 Burris Road to Five Point SR84 Burris Road to Five H C 011C Intersection Point Intersection 2 Pave Pres Major Collector 2 2 FA 2,093,000 2,093,000 H C 021C I10; SR 87 to Picacho Peek MP Construction Interstate 4 6 STP 85,000,000 85,000,000 F006901C DOT 1701C I10; MP209 MP219 I10; MP209 MP Safety Improvements Dust Mitigation Interstate 6 6 HSIP 4,048,000 4,048,000 LTAP STP TOTAL FOR ,953, ,789 4,302,201 98,423, D ELY 1702D Eloy Blvd SR87, Eloy Blvd SR87, Eloy 2 Design Pavement Preservation Urban Collector 2 2 STP 144,000 8, ,704 01C ELY 1701C Eloy Toltec Rd; Battaglia Rd I10, Eloy Toltec Rd; Battaglia Rd I10, Eloy 0.7 Pavement Preservation Urban Collector 2 2 STP 391,032 23, ,668 H C 031C I10 Early to I8 MP 196 MP Construction Interstate 4 6 STP 40,000,000 40,000,000 01C DOT 1702C Wash Bridge #355 SR 87 at MP Design Scour Retrofit Major Collector 4 4 FA 150, ,000 TOTAL FOR ,685,532 32,340 40,717,872 1
4 C CSG 17 01C Casa Grande 2021 MCG Hwy; N Bianco Rd Russell Rd, Casa Grande Maricopa Casa Grande Hwy; N Bianco Rd Russell Rd, Casa Grande 6 Pavement Preservation Minor Arterial 2 2 STP 1,250,000 75,557 1,325,557 TOTAL FOR ,250, 75,557 1,326,057 01C ELY 1702C Eloy Blvd SR87, Eloy Blvd SR87, Eloy 2 Pavement Preservation Urban Collector 2 2 STP 516,792 31, ,030 LTAP STP TOTAL FOR ,292 31, , LTAP STP 2023 TOTAL FOR ,618,045 LTAP STP 2024 TOTAL FOR 2023 LTAP STP TOTAL FOR LTAP STP TOTAL FOR
5 FY REGION SPONSOR NAME SITE NAME PROJECT LOCATION URBAN/SMA LL URBAN/RUR AL TRANSIT PROJECTS PROJECT DESCRIPTION FTA TYPE FEDERAL FUNDS LOCAL MATCH OTHER FUNDS TOTAL COST Services, Inc Casa Grande Casa Grande/MPO Small Urban Maxivan No Lift to replace VIN # ,200 2,800 28,000 Services, Inc Casa Grande Casa Grande/MPO Small Urban Maxivan No Lift to replace VIN # ,200 2,800 28,000 Services, Inc Casa Grande Casa Grande/MPO Small Urban Maxivan No Lift to replace VIN # ,200 2,800 28,000 Horizon Health and Wellness Inc Casa Grande Casa Grande/MPO Small Urban ADA Accessible Ford Transit to Replace VIN ,875 5,431 54,306 Horizon Health and Wellness Inc Casa Grande Casa Grande/MPO Small Urban Minivan No Ramp to Replace VIN ,428 2,270 22,698 Cotton Express / CART Coolidge Coolidge/MPO Rural FY2016 Administrative, Integrity, Operating and Capital , ,850 1,159,983 TOTAL FOR TRANSIT 917, ,951 1,320,987 4
PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS
PUBLIC NOTICE ON A PROPOSED AMENDMENT TO THE FY 2016-2035 SUN CORRIDOR METROPOLITAN PLANNING ORGANIZATION LISTING OF TRANSPORTATION PROJECTS The Sun Corridor Metropolitan Planning Organization (Sun Corridor
More informationOperations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No
Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationAnnual Listing of Obligated MPO Projects
Thurston Regional Planning Council Annual Listing of Obligated MPO Projects CY 2015 March, 2016 2424 Heritage Court SW, Suite A, Olympia, WA 98502 360.956.7575 www.trpc.org About TRPC, established in 1967,
More informationSIOUX FALLS MPO 2018 OBLIGATED TRANSPORTATION IMPROVEMENT PROJECTS
TOTAL LETTING DATE AWARD DATE NOTES Interstate Maintenance s 2.00 IM 0020(155) 04X N McCook Minnehaha 0.0 Mitchell Region on I90 Scour Protection $873,000 $960,000 Cancelled $0 $0 Minor Arterial 1.00 Minor
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationRoadway Project Recommendations:
Northwest RTPO Regional Transportation Improvement Program Recommendations (RTIPR) for NMDOT District 6 (Cibola, McKinley) & District 5 (San Juan) 2018-2023 for 5 Year STIP (FY 2018 through FY 2023) way
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationExecutive Summary. September 3, 2014
D Executive Summary September 3, 2014 Study Background and Purpose Citizens for Picture Rocks is a community advocacy group representing the Picture Rocks Fire Department, Pima County Sheriff s Department,
More information2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage
2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000
More informationAttachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program
Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17
More informationAcknowledgements. Mr. David Nicol 3/23/2012. Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division
Daniel Camacho, P.E. Highway Engineer Federal Highway Administration Puerto Rico Division Acknowledgements Mr. David Nicol Director, FHWA Office of Safety FHWA Office of Safety http://safety.fhwa.dot.gov/provencountermeasures/
More informationMemo. Introduction. Memphis STP Pedestrian Sidewalk Project
Memo Memphis STP Pedestrian Sidewalk Project To: Kyle Wagenshutz, City of Memphis From: Matthew Berkow, Collin Chesston, and Anne Eshleman, Alta Planning + Design Date: June 2014 Re: Photo Inventory Introduction
More informationNew Jersey Department of Transportation. Complete Streets Summit Shukri Abuhuzeima NJDOT-Local Aid
New Jersey Department of Transportation Complete Streets Summit 10-24-2017 Shukri Abuhuzeima NJDOT-Local Aid Grant Resources State Funded Programs Funding Levels Funding appropriated for FY 2017 State
More informationHennepin County Transportation Department
Hennepin County Transportation Department Complete Streets Design and Implementation Prepared for the Complete Streets Task Force Craig Twinem, P.E. Design Division Manager Tom Johnson, P.E. Transportation
More informationFLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7 DISTRICT WIDE BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT AND IMPROVEMENT PLAN TRANSIT SAFETY ASSESSMENT SR 55/US 19 AT 80 TH AVE N DRAFT JUNE
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: August 25, 2016 TO: FROM: ACTION TRANSMITTAL No. 2016-47 Technical Advisory Committee TAC Funding and Programming Committee
More informationCreating the Future Bruce B Downs Blvd
Creating the Future Bruce B Downs Blvd How things look today May not be how things look in the future. Bruce B Downs PD&E Study 2003 Construction programmed 2009, Palm Springs to Pebble Creek Tampa Rail
More informationCHAPTER 3: CIRCULATION
CHAPTER 3: CIRCULATION 2025 ENERAL PLAN Circulation Element The Circulation Element addresses multimodal transportation improvements to roads and infrastructure serving motorists, transit patrons, pedestrians,
More informationEXECUTIVE SUMMARY REGIONALLY SIGNIFICANT ROUTES FOR SAFETY AND MOBILITY REGIONALLY SIGNIFICANT ROUTES SEPTEMBER 2008 PARTNERING FOR SAFETY & MOBILITY
REGIONALLY SIGNIFICANT ROUTES REGIONALLY SIGNIFICANT ROUTES FOR SAFETY AND MOBILITY EXECUTIVE SUMMARY PARTNERING FOR SAFETY & MOBILITY SEPTEMBER 2008 Kimley-Horn Kimley Kimley-Horn and and Associates,
More informationComplete Streets Training. Georgia Municipal Association June 27, 2016
Complete Streets Training Georgia Municipal Association June 27, 2016 Overview What are CS? GDOT s Policy Case Study 2 What are Complete Streets? According to the National Complete Streets Coalition, complete
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: January 5, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-04 Transportation Advisory Board TAC Funding & Programming Committee
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationAppendix 3 Roadway and Bike/Ped Design Standards
Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.
More informationPEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS
PEDESTRIAN SAFETY IMPROVEMENT EVALUATION GUIDELINE FOR UNCONTROLLED CROSSINGS Traffic Safety Engineering Division Updated: April 2018 EXECUTIVE SUMMARY NDOT Traffic Safety Engineering Division developed
More informationMPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017
MPO Staff Report MPO Technical Advisory Committee: December 13, 2017 MPO Executive Board: December 20, 2017 RECOMMENDED ACTION: Consider HSIP Candidate Projects for the FY2019-2022 TIP as Being Consistent
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More informationIf a person walks within this focus area, these are examples of the places he or she could walk to or from:
Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City
More informationF L E T C H E R A V E N U E
Jan. 29, 2014 Introduction F L E T C H E R A V E N U E FDOT Local Agency Program (LAP) Project FPN: 428214-1-58-01 CIP 63090 Hillsborough County, Traffic Engineering, PWD Stake holders and partners are
More informationUPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS
UPTOWN REGIONAL BIKE CORRIDORS PROJECT SAN DIEGO ASSOCIATION OF GOVERNMENTS SUMMARY REPORT: COMMUNITY UPDATE MEETING February 6, 2014 6 8:30 p.m. Roosevelt Middle School Library 3366 Park Blvd, San Diego
More informationComplete Streets Funding Program Project Prioritization Plan
Funding Program Project Prioritization Plan Location and Type Needs South Street Crosswalk Installation Stripe a new formalized crosswalk across South Street at the Anne T. Dunphy School pedestrian path
More informationINDOT Complete Streets Guideline & Policy
INDOT Complete Streets Guideline & Policy INTRODUCTION The Complete Streets guidelines build upon multiple efforts and promote a multimodal transportation system that is integrated and sustains land use
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2015-13 DATE: March 18, 2015 TO: FROM: Transportation Advisory Board Technical Advisory Committee PREPARED
More informationCottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement
Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More informationAmericans with Disabilities Act Transition Plan for Public Right-of-Way Improvements
Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3
More information2019 Federal Transportation Improvement Program
VEN051211 Ventura SCCAB VEN051211 CAX63 L NON-EXEMPT 0 Description: PTC 4,417 Agency CAMARILLO LAS POSAS ROAD FROM VENTURA BLVD TO PLEASANT VALLEY ROAD WIDEN FROM 2 TO 6 LANES CITY FUNDS 4,417 4,417 4,417
More informationUpdated There is no park access points beyond the limit of the phase I work. roadway to be constructed Viewport has been along full limits of the park
The signs will be installed as Temporary signs the color (Orange/White) have been added to the plans. Need to specify color to be used for stripes. Closures that may be in place for extended periods need
More informationREGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES
REGIONAL BICYCLE AND PEDESTRIAN DESIGN GUIDELINES November 16, 2011 Deb Humphreys North Central Texas Council of Governments Bicycle and Pedestrian Advisory Committee Snapshot of the Guide 1. Introduction
More informationCITY OF SPOKANE VALLEY Request for Council Action
CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.
More informationSafety Effectiveness of Pedestrian Crossing Treatments
Portland State University PDXScholar TREC Friday Seminar Series Transportation Research and Education Center (TREC) 10-13-2017 Safety Effectiveness of Pedestrian Crossing Treatments Christopher Monsere
More informationPROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from
PROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from Fritz Cove Rd to Seaview Ave, for consistency with locally adopted plans and ordinances.
More informationGandy Connector: Travel Demand. Policy Committee August 2013
Gandy Connector: Travel Demand Policy Committee August 2013 What options to the Gandy Elevated Lanes exist? What are the current conditions? Who s using Gandy Blvd? What s currently planned? What s been
More informationACTION TRANSMITTAL No
Transportation Advisory Board of the Metropolitan Council of the Twin Cities ACTION TRANSMITTAL No. 2014-63 DATE: September 5, 2014 TO: Funding & Programming Committee PREPARED BY: Joe Barbeau, Senior
More informationMESILLA VALLEY METROP
METROPOLITAN PLANNING ORGANIZATION SERVING LAS CRUCES, DOÑA ANA COUNTY, AND MESILLA P.O. BOX 20000 LAS CRUCES NM 88004 PHONE (575) 528-3222 FAX (575) 528-3155 http://mesillavalleympo.org MESILLA VALLEY
More informationCity of Grand Forks Staff Report
City of Grand Forks Staff Report Committee of the Whole November 27, 2017 City Council December 4, 2017 Agenda Item: Federal Transportation Funding Request Highway Safety Improvement Program Submitted
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationClosing Plenary Session
TRAFFIC SAFETY CONFERENCE Closing Plenary Session June 9, 2017 Las Colinas, TX Order of Report Out June 9, 2017 Las Colinas, TX Distracted Driving Prioritized Countermeasures Countermeasure 4a Systemically
More informationThis page intentionally left blank.
This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area
More informationPinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report
Pinellas County Metropolitan Planning Organization (MPO) 2014 Crash Data Report MPO Board July 8, 2015 2 Crash Data Collection Motorcycle drove between stopped cars, ran a red light and collided with a
More informationSloat Blvd. Pedestrian Safety Improvement Project
Sloat Blvd. Pedestrian Safety Improvement Project Department of Public Works Project team and background Budget Schedule Scope of work Sloat Blvd - Everglade Drive Sloat Blvd - Forest View Drive Sloat
More informationCORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION
CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION 301 SW 4 th Street, Suite 240 Corvallis, Oregon 97333 Phone: 541-758-1911 Fax: 541-758-1903 www.corvallisareampo.org PROJECT ADVISORY COMMITTEE (PAC) Friday,
More informationNEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING
NEW BRAUNFELS SEGUIN AREA REGIONAL TRANSPORTATION DRAFT PLAN NEW BRAUNFELS CITY COUNCIL MEETING February 13, 2012 This regional transportation plan will: 1. Review existing plans for the cities and counties,
More informationWashington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd.
Washington County SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. SW Beaverton-Hillsdale Hwy. & SW Scholls Ferry Rd. Washington County The SW Beaverton-Hillsdale Hwy & SW Scholls Ferry Rd. focus area
More informationLynchburg District Update
Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active
More information444 North Capitol Street NW, Suite 249, Washington, DC (202) Fax: (202) ERRATA
Larry L. Butch Brown, Sr., President Executive Director, Mississippi Department of Transportation John Horsley, Executive Director 444 North Capitol Street NW, Suite 249, Washington, DC 20001 (202) 624-5800
More informationMAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report
Page 1 MAG Town of Cave Creek Bike Study Task 6 Executive Summary and Regional Significance Report August 1, 2012 MAG Project #481 Page 2 Task 6 Executive Summary and Regional Significance Report Introduction
More informationCORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION
CORVALLIS AREA METROPOLITAN PLANNING ORGANIZATION 301 SW 4 th Street, Suite 240 Corvallis, Oregon 97333 Phone: 541-758-1911 Fax: 541-758-1903 www.corvallisareampo.org PROJECT ADVISORY COMMITTEE (PAC) Thursday,
More informationSaint Cloud APO. US 10 Pedestrian Corridor Report
Saint Cloud APO US 10 Pedestrian Corridor Report The contents of this report reflect the views of the St. Cloud Area Planning Organization, which is responsible for the facts, and the accuracy of the data
More informationSouthcote Road Improvements Class Environmental Assessment Study
1 Southcote Road Improvements Class Environmental Assessment Study Public Information Centre #1 May 24, 2018 Study Area 2 3 Welcome The Ancaster Transportation Master Plan (2011) outlined a long range
More informationADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT
ADA Training Accessible Pedestrian Signal (APS) 2018 MnDOT APS and ADA APS is not currently an ADA Standard and is provided at the discretion of the Title II entity APS is recognized in the MnMUTCD, but
More informationComplete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER
Complete Streets Policy DAVID CRONIN, P.E., CITY ENGINEER Complete Streets City Commission adopted a Complete Streets policy in 2012 Complete Streets are road networks that are designed for all users:
More informationMultimodal Design Guidance. October 23, 2018 ITE Fall Meeting
Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT
More informationFY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION. June 26, 2015
FY 2017 FY 2021 PRIORITY PROJECT LIST ADOPTION June 26, 2015 s (PPLs) RMP Roadways PPL RMP Bicycle and Pedestrian PPL RMP Strategic Intermodal System (SIS) PPL Transportation Systems Management (TSM) PPL
More informationRVMPO RTP Project List February 21, 2017
Ashland 120 Laurel St. RR Crossing R/R Xing improvements, surface improvements (175ft, 0.03 Miles) short $ 813,552 160 Hersey St: N. Main to Oak St Sidewalk Sidewalk Construction (1,760ft, 0.33 Miles)
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More informationSBCAG STAFF REPORT Federal Transportation Improvement Program. MEETING DATE: January 19, 2017 AGENDA ITEM: 5E
SBCAG STAFF REPORT SUBJECT: 2017 Federal Transportation Improvement Program MEETING DATE: January 19, 2017 AGENDA ITEM: 5E STAFF CONTACT: Anne Jensen RECOMMENDATION: Adopt Resolution 17-01 approving Amendment
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P to M.P. 1.95)
ROAD SAFETY AUDIT (RSA) Barbur Blvd: SW Capitol Hwy to SW Naito Parkway (M.P. 6.30 to M.P. 1.95) SWNI Meeting November July 18, 2016 19, 2015 Portland, Oregon BARBUR ROAD SAFETY AUDIT FHWA RSA Process
More informationAccess Management Regulations and Standards
Access Management Regulations and Standards January 2014 Efficient highway operation Reasonable property access Concept of Access Management The way to manage access to land development while preserving
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationPEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES
PEDESTRIAN ACCOMMODATIONS DPS 201 AT INTERCHANGES UNDERSTANDING THE ISSUES Intersections of freeway ramp terminals at crossroads are the most critical components of an interchange Challenge: balance mobility
More informationComplete Streets: Planning, Policy & Performance
Complete Streets: Planning, Policy & Performance Tell Us About Your CS Experiences Successes Hardships Funding Politics Safety Not every street needs to be complete, but every mode needs a complete network.
More informationBOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY
7B BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY PLACEMENT: REQUESTS AND PRESENTATIONS PRESET: TITLE: FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) PRESENTATION RECONSTRUCTION OF SR-76 (SW KANNER HIGHWAY)
More informationMankato/North Mankato Area Planning Organization Technical Advisory Committee
Mankato/North Mankato Area Planning Organization Technical Advisory Committee Thursday, October 20, 2016 1:30PM Intergovernmental Center, The Minnesota Valley Room, (Behind Elevators 1 st Floor IGC) 10
More informationPEDESTRIAN CROSSING TREATMENTS
PEDESTRIAN CROSSING TREATMENTS BEST PRACTICES Presented by: Doug Enderson, P.E., PTOE Cody Salo, P.E. 1 PRESENTER INTRODUCTIONS Doug Enderson, P.E., PTOE Ped Crossing Experience: ADA Design-Build ADA Inventory
More informationBalancing Operation & Safety for Motorized and Non-Motorized Traffic
Balancing Operation & Safety for Motorized and Non-Motorized Traffic Brian Willham, PE, PTOE Iowa Director - MOVITE June 30, 2014 Learning Objectives: When & Why should we measure the performance of complete
More informationChicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements
Chicago Safe Routes to High School (SRHS) Kelly High School Recommended Improvements March 18, 2014 Presentation Outline Goals Related Programs Project Location/Area Existing Conditions Improvement Types
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District
More informationSD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN By Josh Larson McLaury Engineering Inc.
SD Highway 50 in Yankton (4 TH Street) Reconstruction Project NH 0050(99)381 PCN 6926 By Josh Larson McLaury Engineering Inc. Project Limits SD 50 from Broadway to Burleigh and from Marne Creek to Archery
More informationLARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54)
LARIMER COUNTY: ENGINEERING DOUGLAS ROAD (CR 54) INTRODUCTIONS * Pipeline 1041 Application Coordinator Todd Blomstrom Public Works Director Mark Peterson County Engineer Terry Gilbert Community Development
More informationCITY OF LANCASTER PROPOSED NEW PROJECTS
CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4
More informationRoosevelt Estates Neighborhood Improvements
Roosevelt Estates Neighborhood Improvements Transportation Alternatives Application May 5 th, 2016 Qualifying Activities Construction of on-road and off-road trail facilities for pedestrians, bicyclists,
More informationCMAQ DETAILED PROJECT LISTING REPORT ( FY 2001 )
Fiscal Year = 'By Fiscal Year' and Status Selection Criteria = 'All' and State = '' $943,000 Traffic Flow Improvements Downtown Traffic Management System (phase 2) Systems - Other 7 68 $800,000 Traffic
More informationKnox Street Complete Streets Project
Knox Street Complete Streets Project Meeting Purpose Get community feedback on two conceptual street design options Meeting Agenda Presentation (20 minutes) Project background and schedule Summary of preferences
More informationACTIA Programs Annual Compliance Report Reporting Year Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments
Bicycle and Pedestrian Safety Table 1: Summary of Expenditures and Accomplishments Note: Definitions for each drop down menu appear as Comments (scroll over the column title or in the Review mode, choose
More informationBrian D. Hare, P.E. Bureau of Design PennDOT PA APA Annual Conference Investing in a Sustainable Future October 5, 2009
Brian D. Hare, P.E. Bureau of Design PennDOT 2009 PA APA Annual Conference Investing in a Sustainable Future October 5, 2009 1 What is Smart Transportation? Photographer: heyjude. Used through license
More informationPhone: Fax: Project Reference No. (to be filled out by MassHighway):
Massachusetts Highway Department District 3 Project Need Form (PNF) This form is intended to provide preliminary information about the proposed project. It is not expected that all information that is
More information5. RUNNINGWAY GUIDELINES
5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved
More informationTable of Contents Nevada Highway Safety Improvement Program
NEVADA Page 1 of 50 Table of Contents Table of Contents... 2 Disclaimer... 3 Executive Summary... 4 Introduction... 5 Program Structure... 5 Program Administration... 5 Program Methodology... 9 Project
More informationSR/CR A1A PEDESTRIAN SAFETY & MOBILITY STUDY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION
SR/CR A1A PEDESTRIAN SAFETY & MOBILITY STUDY RIVER TO SEA TRANSPORTATION PLANNING ORGANIZATION 2016 Florida Section ITE Annual Summer Meeting June 24, 2016 Today s Presenters Lois Bollenback Executive
More informationTransportation Planning Division
Transportation Planning Division Presentation Outline Study Tasks Recap of Previous Meeting Stakeholder Interviews Data Collection Design Principles Tool Box Recommendations Schedule Moving Forward North
More informationNew Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007
New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way
More informationRE: Park Plaza Walgreens (P12-016)
12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationCity of Sammamish. Welcome. Issaquah-Fall City Road Improvements Project Phase I Design: 242nd Avenue SE to Klahanie Drive SE
Welcome Welcome to the third community meeting for the Issaquah-Fall City Road Improvements Project. AGENDA 6:00 p.m. Welcome and sign-in 6:10 p.m. Presentation 6:50 p.m. Open house Learn about the roadway
More information