U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0
|
|
- Virginia Powers
- 5 years ago
- Views:
Transcription
1 Winston-Salem Urban Area Metropolitan Planning Organization 2035 Fiscally Constrained Long Range Transportation Plan 2015 Street and Highway Project List Mileage Existing Proposed Regional Federal STIP Project Project Project Cross- Cross- Signifi- Functional Number Name Limits (Segment) Section Section cance Class U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0 New 4 lane w/bike and U-4909 Union Cross Road (SR 2643) Widening from Wallburg Road (SR 2691) to Sedge Garden Road (SR 2632) lane 4-6 lane divided w/bike and Collector U-2923 SR 2747 (Clemmonsville Road) SR 3011 (Old Salisbury Rd) to South Main St. Widen to Multi-Lanes lane 3 lane w/ Collector U-2826A & B US 52 I-40 Bypass to Proposed rthern Beltway (Western Loop) Interchange. A. Replace bridge. 256 and. 257 over rfolk Souther Railroad. B. Widen and Upgrade Roadway and Interchanges. (Rams Drive (SR 4326) To Martin Luther King Jr., Drive (US 311)). Construct Improvements to allow the use of Existing Shoulder as Travel Lanes and other operational improvements (1.2) 4 lane freeway 6 lane freeway Carver School Road Extension Baux Mountain Road (SR 1946) to Old Walkertown Road (SR 2456) 0.8 New 3 lane w/bike and U-2925 Salem Creek Connector Salem Avenue to SR 4325 (Martin Luther King, Jr. Drive) Widen to Multi-Lanes with Part on New Location. 1.0 New 4 lane divided w/bike and U-2800 SR 2601 (Macy Grove Road) Industrial Park Drive to SR 1005 (Old US 421). Widen to Multi- Lanes, Part on New Location and Convert Grade Separation at I-40 Business to an Interchange. 1.9 (0.4) Build Interchange; 4 lane divided w/bike and U-5512 Piney Grove Road (SR 1969) Nelson Street to rth Main Street (NC 150) lane 4 lane Collector Collector/
2 Winston-Salem Urban Area Metropolitan Planning Organization 2035 Fiscally Constrained Long Range Transportation Plan Street and Highway Project List Mileage Existing Proposed Regional Federal STIP Project Project Project Cross- Cross- Signifi- Functional Number Name Limits (Segment) Section Section cance Class U-2827B U-2579 B & G Business 40 (US 421) Improvements Winston-Salem rthern Beltway, Eastern Section (Future I-74) I-40 Bypass to west of US 158 (East of Church Street to west of Fourth Street ) US 52 to US 311. Multi-Lane Freeway on New Location. (Business 40 to US 158 and Business 40 to Interstate 40 and Hastings Hill Road bridge) 1 4 lane Piney Grove Road (SR 1969) N. Main Street (NC 150) to Linville Springs Road (SR 2030) 2 lane 4 lane with Interchange Improvements 17.1 New 4-6 lane freeway Interstate 3 lane w/bike and Collector
3 Winston-Salem Urban Area Metropolitan Planning Organization 2035 Fiscally Constrained Long Range Transportation Plan Street and Highway Project List Mileage Existing Proposed Regional Federal STIP Project Project Project Cross- Cross- Signifi- Functional Number Name Limits (Segment) Section Section cance Class SR 3973 (rth Point Boulevard) to SR 1672 (Hanes Mill Road U-2924 SR 4000 (University Parkway) 2.7 (rth)) Add Additional Lanes except for US 52 Bridge The Great Wagon Road/Lewisville- Clemmons Road Lewisville-Vienna Road (SR 1308) to Shallowford Road (SR 1173) 1.1 Extension N. Main St./Piney Grove Rd. Connector rth Main Street (NC 150) to Piney Grove Road (SR 1969) 0.9 I-911 Interstate 40 R-2577A US 158 R-2568C NC 109 West of NC 801 (exit 180) to west of SR Pavement Rehabilitation and Construct fifth and sixth lanes. (Coordinate with I- 2102) Multi-Lanes rth of US 421/Business 40 in Winston-Salem to US 220 (Part A to NC 66).Widen to Multilanes. South of I-85 Business in Thomasville to I-40/US 311 in Winston- Salem. Widen to Multi-Lanes with Bypass of Wallburg. Some New Location. SR 1005 (East Mountain Street) to NC 150 (rth Main Street). Multi- Lane Facility on New Location. 4 lane divided; 5 lane 6 lane divided New 3 lane w/bike and New 2 lane divided w/bike and Other Principal Arterial lane freeway 6 lane freeway Interstate 18.8 (4.5) 2 lane lane 4 lane divided w/ 4 lane divided w/bike and New 4 lane divided w/bike and Other Principal Arterial Minor Arterial U-4734 Macy Grove Road Extension (rth) 1.9 (1.5) U-2579 AA, Winston-Salem rthern Beltway, Eastern Section US 52 to US 311. Multi-Lane Freeway on New Location. (Bus. 40/US AB, C, D, E, (Future I-74) 421 to US 311 and US 158 to US 52) F 17.1 New 4-6 lane freeway Interstate U-2729 SR 1672 (Hanes Mill Road) Museum Dr to SR 4000 (University Pkwy). Widen to a Multi-Lanes 5 lane w/bike and lane with Curb and Gutter. Collector/ U-2707 SR 3000 (Idols Road Extension) SR 2999 (Hampton Road) to US 158 (S. Stratford Road) Two-Lane New 2 lane w/bike and 2.3 Shoulder Section on New Location. Collector Interstate 40 US 311 to Guilford County lane freeway 6 lane freeway Interstate Business I-40 (US 421) Interchange at Big Mill Farm Road Hopkins Road to S. Main Street 1.1 Ebert/Stratford Connector New alignment from Ebert Road to South Stratford Road (US 158) 2.0 Forum Parkway Connector Forum Parkway (SR 3955) to University Parkway (NC 66) 0.4 US 158 (Clemmons Road) Lewisville-Clemmons Road (SR 1103) to Harper Road (SR 1101) and from Yadkin River Bridge to Baltimore Road (SR 1630) lane MLK Jr. Drive Extension Trade Street to rthwest Boulevard lane New Interchange, 2 lane divided w/bike and New 3 lane w/bike and New 2 lane w/bike and 3 lane w/bike and New 4 lane divided w/bike and Minor Arterial
4 Winston-Salem Urban Area Metropolitan Planning Organization 2035 Fiscally Constrained Long Range Transportation Plan Street and Highway Project List Mileage Existing Proposed Regional Federal STIP Project Project Project Cross- Cross- Signifi- Functional Number Name Limits (Segment) Section Section cance Class U-3617 R-2577B US 158 U-2826 US 52 SR 2045 East Mountain Street/Old US 421, SR 1005, SR 1008 NC 66 in Kernersville to SR 2001 (Winthrop Street) in Guilford County. Widen to Multi-Lanes. 2.8 (1.5) 2 lane Williams Road (SR 1173) at US 421 Williams Road Bridge over US lane Peace Haven/Styers Ferry Road Conn. Lewisville-Clemmons Road (SR 1103) to Lasater Road (SR 1100) 1.5 Glenn Hi Road Extension Union Cross Road (SR 2643) to NC 66 R-3823 Stokes County Connector Mutli-Lanes rth of US 421/I-40 Business in Winston-Salem to US 220 (Part B - NC 66 to Guilford County Line). Widen to a Multi- Lanes. I-40 Bypass to Proposed rthern Beltway (Western Loop) Interchange. Widen and Upgrade Roadway and Interchanges. US 52 (King) to US 311 (Walnut Cove). Two Lanes Utilizing Existing Secondary Roads Where Possible, Some New Location (7.1) 2 lane lane freeway 4 lane divided w/bike and Widen Bridge to multilanes w/bike and New 2 lane w/bike and New 4 lane divided w/bike and 4 lane divided w/ 6 lane Interstate with auxillary lanes Collector/ Minor Arterial Collector 15.0 New 2 lane w/ bike Other Principal Arterial/Minor Arterial I-4924 I-73 - I-74 Connector (Regional Airport Connector) rthern Beltway/West Mountain Street to Guilford County 6.9 New 4 lane freeway R-2247 Winston-Salem, rthern Beltway (Western Loop). R-2247A R-3610 NC 801 Winston-Salem, rthern Beltway (Western Loop) U-2730 NC 65 (Bethania-Rural Hall Road) Winston-Salem rthern Beltway - Western Section. Interstate-40 to US 52. Four Lane on New Location. Winston-Salem rthern Beltway, US 158 (South Stratford Road) to I- 40. Four Lane on New Location. From Peoples Creek Road (SR 1650) at Advance to US 158 South of I-40. Upgrade Roadway from SR 1650 to SR 1624, Multi-Lane Roadway from SR 1624 to US 158. US 52 to NC 66 in Rural Hall. Widen to 5-lanes, US 52 to SR 3983 (rthridge Park Dr) and to 3-lanes, SR 3983 (rthridge Park Dr) to NC New 4 lane freeway 1.9 New 4 lane freeway lane lane 4 lane divided w/bike and 3-5 lane w/bike and US 311 Connector I-40 to Business I New 4 lane divided w/bike and Business Interstate 40 (US 421) rthern Beltway to Guilford County lane freeway 6 lane freeway Peace Haven/Styers Ferry Rd. Conn. Lewisville-Clemmons Road (SR 1103) to Peace Haven Road (SR 1891) 1.8 New 2 lane w/bike and Proposed Minor Arterial/ Major Collector Minor Arterial
5 Winston-Salem Urban Area Multi-Modal Long Range Transportation Plan FY Transportation Improvement Program List of Exempt Projects - Revised June 4, 2012 STIP Exempt Project Title Project Description Number Category Street and Highway Projects Interstate 40* Pavement Rehabilitation I Interstate 40 Pavement Rehabilitation I Interstate 40 Pavement Rehabilitation I Interstate 40 Maintenance Preservation I US 52 (Future I-285) Pavement and Shoulder Rehabilitation and guardrails Upgrade to Interstate standards R US 52 and Various Federal Aid Routes Resurfacing R-5174A Winston-Salem MPO Interim Signal System Improvements U Winston-Salem MPO Roadway improvements and safety enhancements on Federal Aid Routes U NC 150 in Davidson County Safety Project - Center turn lane 0.2 mi. Mt. Olivet Church Rd to shopping center W Gumtree Road (SR 2692) Sawmill Road (SR 2693) and Reid Road (SR 4203) Realign intersections W Winston-Salem MPO Install Rumble Strips, Guardrail, Lighting Improvements at selected locations W Various Locations in the MPO Intersection Improvements - See attached STP-DA project list U Winston-Salem MPO Interim Traffic System Upgrades - Phase II C-5142B Winston-Salem MPO Upgrade of City-Wide Signal System C Hanes Mall Boulevard at S. Stratford Road (US 158) Traffic control devices to improve safety - cameras C-4981A Hanes Mill Road at University Parkway Traffic control devices to improve safety - cameras C-4981B Silas Creek Parkway at Yorkshire Road Traffic control devices to improve safety - cameras C-4981C Peace Haven Road at US 421 Traffic control devices to improve safety - cameras/closed loop system C-4981D Bridge Projects US 421 Replace Bridges over Muddy Creek (also listed as B-4507) R-2247CC US 52 Rehabilitate Bridges over Tobaccoville Road (SR 1620) B US 52 Rehabilitate Bridges over Little Yadkin River B Frye Bridge Road Replace Bridge over Muddy Creek B Spainhour Mill Road Replace Bridge over Little Yadkin River B Akron Drive Replace Bridge over rfolk and Western Railroad B Salisbury Street Replace Bridge over Business I-40 B Hastings Hill Road Replace Bridge over Tributary of Salem Creek B Glade Street Replace Bridge over Peters Creek B Old Greensboro Road Replace Bridge over Lowrey Mill Creek B Reynolds Park Road Replace Bridges over Salem and Brushy Fork Creeks B Sprague Street Replace Bridge over rfolk-southern Railroad B vack Street Replace Bridge over Mill Creek B West First Street Replace Bridge over rfolk-southern Railroad B Broad Street Replace Bridge over Salem Creek B High Point Road Replace Bridge over Abbotts Creek B Country Club Road Replace Bridge over Silas Creek Parkway B Lasater Road Replace Bridge over Blanket Creek B Winston-Salem MPO Division 9 Purchase Order Contract Bridge Replacement BD Winston-Salem MPO Division 9 Screen and Evaluate Potential Federal Bridge Replacements BD Winston-Salem MPO Division 9 Screen and Evaluate Potential State Bridge Replacements BD
6 Winston-Salem Urban Area Multi-Modal Long Range Transportation Plan FY Transportation Improvement Program List of Exempt Projects - Revised June 4, 2012 STIP Exempt Project Title Project Description Number Category Mitigation Projects Ecosystem Ehancement Program Project Mitigation EE Fleet Replacement Replace 2 gasoline powered fleet vehicles with CNG C WSTA Bus Replacement Funds flexed to FTA for bus expansion with hybrid vehicles C WSTA Bus Replacement Funds flexed to FTA for bus replacement with hybrid vehicles C Piedmont Authority for Regional Transportation Funds flexed to FTA for bus replacement with hybrid vehicles C Bicycle and Pedestrian Projects Various Locations in the MPO Greenway and Sidewalk Projects U Brushy Fork Creek Build New Greenway EB Salem Creek Greenway Extension EB Piedmont Greenway Trail Phase Greenway EB Muddy Creek/Cedar Trail Greenway Connection Greenway EB Enhancement Projects Various Locations in the MPO Streetscape Improvements in the Winston-Salem Urban Area MPO EL Planning Projects Winston-Salem Urban Area MPO Planning Supplement (formerly U-9999D) U Winston-Salem Urban Area DA Funds Reserved for future programming U rth-south Connector, US 311 to NC 68 Freeway on a New Location FS-0707B Triad Air Awareness Program Education and Information Services for the Triad C
7 Winston-Salem Urban Area Multi-Modal Long Range Transportation Plan FY Transportation Improvement Program List of Exempt Projects - Revised September 12, 2012 Public Transportation Projects - Piedmont Authority for Regional Transportation Expansion Buses Additions to fleet TA-4991A Replacement Buses Hybrid Bus Replacement (Flexed CMAQ C-5213) TA-4991B Replacement Vans Davidson County (Flexed CMAQ C-5215) TA Safety and Security TG Safety and Security 1% Set aside TS Operating Assistance TO Planning Assistance 5303/5304 Funds TP Operating Assistance JARC TM Operating Assistance JARC TM Operating Assistance JARC TM Congestion Mitigation Regional Air Quality Awareness Program C Congestion Mitigation Regional Air Quality Awareness Program C Replacement Vans STP-DA TBD Preventive Maintenance/ Operating Assistance STP-DA TBD Public Transportation Projects - Piedmont Authority for Regional Transportation - Unfunded Projects Fixed Guideway East West Corridor - Preliminary Engineering TE-4708AU Fixed Guideway East West Corridor - Phase 2 TE-4708BU Service Vehicles Supervisor Tow Support TG-5241U Technology Vehicle Tracking, passenger information, data communications TT-5209U Public Transportation Projects - Winston Salem Transit Authority Replacement Buses Paratransit Low Floor TA Replacement Buses Hybrid Vehicle replacement Flexed from STP-DA TA-4795A Replacement Buses Hybrid Vehicle replacement Flexed from CMAQ TA-4795A Replacement Buses Hybrid Vehicle Purchase Flexed from CMAQ TA Routine Capital Item Bus Stop Improvements flext from STP-DA, and Spare Parts, Passenger Amenities and Building Maintenance TG Routine Capital Item Spare Engine Parts TG-4805B Operating Assistance disabled TL Operating Assistance General public in rural areas TR Safety and Security Min 1% set aside TS Safety and Security General safety and security TG-5124s Technology Vehicle Tracking, passenger information, data communications TT Job Access Reverse Commute Planning and Operating Cost TM New Freedom Capital and/or Operating Cost TN Operating Assistance TO Public Transportation Projects - Winston Salem Transit Authority - Unfunded Projects Replacement Buses TA-4795A Union Station Winston-Salem Intermodal Facility TD Service Vehicles Supervisor tow support TG-5249U Preventive Maintenance Fixed Route TG Winston Salem Urban Area MPO Exempt Project List Public Transportation Page 1
8 Public Transportation Program Planning Assistance Winston-Salem MPO TP Public Transportation Projects - Davidson Expansion Light Transit Vehicle TA Routine Capital TG Operating Assistance Employment Transportation TJ Administration TK Operating Assistance Elderly and Disabled Persons TL Operating Assistance General Public in Rural Areas TR Public Transportation Projects - Forsyth, Guilford, Watagua, Wilkes, and Yadkin Counties Intercity Bus Greensboro to Boone, Coach America TI Public Transportation Projects - Davie, Stokes, Surry and Yadkin Counties Replacement Van Yadkin Valley Economic Development District (YVEDD) TA Replacement Van Mini - YVEDD TA Expansion Light Transit Vehicle - YVEDD TA Replacement Light Transit Vehicle - YVEDD TA Routine Capital Yadkin Valley Economic Development District (YVEDD) TG Operating Assistance Employment Transportation - YVEDD TJ Administration Yadkin Valley Economic Development District (YVEDD) TK Operating Assistance Elderly and Disabled Persons - YVEDD TL Operating Assistance General Public in Rural Areas - YVEDD TR Public Transportation Projects - Statewide Regional Planning Assistance Research Support Activities TP Regional Technology Vehicle Tracking, Passenger Info, Data Communications, Traffic Signal Priority, Maintenance Software TT Regional Tecnology Administration - ITRE TT-9702A Statewide Training Support Services Rural, Small Urban and paratransit Operations TS-4900A SubRegional State Administration Oversight and Planning Assistance for Rural Area General Public Transit Services TK-4900Z SubRegional State Administration JARC TM SubRegional State Administration New Freedom TN SubRegional State Administration Federal Elderly and Disabled Persons Assistance Program TV Winston Salem Urban Area MPO Exempt Project List Public Transportation Page 2
Recommendations. Implementation
Recommendations This report documents the development of the Winston-Salem MPO CTP as shown in Figure 2-1. This chapter presents recommendations for each mode of transportation in the MPO. Implementation
More informationSTREET AND HIGHWAY PLAN
STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets
More informationTITLE VI AND ENVIRONMENTAL JUSTICE PLAN
WINSTON-SALEM URBAN AREA TITLE VI AND ENVIRONMENTAL JUSTICE PLAN APPENDIX Prepared by: The Winston-Salem Department of Transportation DRAFT 2008 Winston-Salem Urban Area Environmental Justice Plan Winston-Salem
More informationRoute / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT Division(s) MPO(s) / RPO(s) County(s) TIP #
9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 1 B171621 38.99 2.00 BikePed Needs Peters Creek Parkway Sidewalk
More informationchapter four implementation
chapter four implementation 4.1 Overview Photo by Christine Rucker Photography. The text and images in this chapter describe how the City of Winston-Salem and its partners can turn the vision of a connected
More informationchapter three new bike network
chapter three new bike network 3.1 Overview Based on an examination of the existing conditions (Chapter 2) and an understanding of the communityʼs vision and goals for improved cycling opportunities (Chapter
More informationBasalt Creek Transportation Refinement Plan Recommendations
Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for
More informationATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009
Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116
More informationARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY
ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,
More informationWINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM. Greg Errett City of Winston-Salem DOT September 14, 2011
WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM Greg Errett City of Winston-Salem DOT September 14, 2011 Presentation Outline History MPO Expansion/Changes Current Plans State of Active Transportation
More informationNorth Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary
Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare
More informationAPPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES
1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237
More informationNew Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007
New Measure A Expenditure Categories DEFINITIONS OF ELIGIBLE EXPENDITURES Adopted March 8, 2007 City Street and County Road Maintenance Program The preservation and keeping of public street and road rights-of-way
More informationWinston Salem MPO Transportation Update Thursday, February 15, 2018
s Under 17BP.9.C.2 (DI00174) Replace Culvert No. 133 on Ellison Creek at SR 1170 (Dull Rd) in Forsyth County Oct. 25, 2017 March 23, 2018 (observation period for vegetation until Oct. 12, 2018) Availability
More informationTransportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners
Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation
More informationChapter 6 Transportation Plan
Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised
More informationChapter 5 Future Transportation
Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,
More informationFY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,
More information2012 PRIORITY TRANSPORTATION PROJECTS
0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county
More informationWinston Salem MPO Transportation Update Thursday, September 20, 2018
Thursday, September 20, 2018 17BP.9.R.99 (Old B-5152) (DI00181) 2018CPT.09.01.10291.1 2018CPT.09.02.20291.3 2018CPT.09.05.10341 2018CPT.09.06.20341 (C204140) 2020CPT.09.13.20342 (DI00209) B-4746 38518.3.1
More informationAPPENDIX B: FUNDING MATRIX
APPENDIX B: FUNDING MATRIX 101752 B - 1 FEDERAL SAFETEA-LU -- Congestion Mitigation and Air Quality Improvement Program (CMAQ) SAFETEA-LU -- Surface Transportation Program (STP)/Congestion Mitigation and
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.
More informationDriving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter
Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter BUSINESS 40 IMPROVEMENT PROJECT AUGUST 31, 2018 DRIVING TO THE DOWNTOWN HEALTH PLAZA DURING BUSINESS
More informationWinston Salem MPO Transportation Update Thursday, January 18, 2018
Winston Salem MPO Transportation Update Thursday, January 18, 2018 TIP / WBS No. Description Let Date Completion Date Status Cost Projects Under Contractor Project Administrator Comments 17BP.9.C.2 (DI00174)
More informationAPPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD
APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR
More informationCOMPLETE STREETS A STEP FORWARD ITE District 10/FSITE Annual Meeting November 3, 2015
COMPLETE STREETS A STEP FORWARD 2015 ITE District 10/FSITE Annual Meeting November 3, 2015 About Lakeland Incorporated: 1885 Population: 100,728 Area: Approx. 75 sq. mi Major Employers: Publix, Lakeland
More informationFY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE
More informationBluffdale/ UDOT South High-T Intersection Project Type Operations
Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South
More informationProject Description Form 8EE
Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:
More informationTRASBURG RANSPORTATION
TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION
More informationTIP. TIP Amendments for Consideration in January, 2019
2018 2027 IP IP Amendments for Consideration in January, 2019 FNDING FNDING DESCRIPION FNDING FNDING DESCRIPION ADAP Appalachian Development L Local ransportation Assistance Program APD Appalachian Development
More informationSTATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 008-0 Austin District NOVEMBER 007 Quarterly Revisions CAMPO Capital Area Metropolitan Planning Organization October 5, 007 Mr. Robert Daigh, P.E. District
More informationMCTC 2018 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV13.xlsx
MCTC 8 RTP SCS and Madera County RIFP Multi-Modal Project Eval Criteria GV.xlsx Madera County Transportation Commission Regional Transportation Plan / Sustainable Communities Strategy Multi-Modal Project
More informationRoute 29 Solutions Projects
Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four
More informationFY Regional Transportation Improvement Program
FY2014-2018 Regional Transportation Improvement Program Basic Project List (All Values in Thousands of Dollars) All costs in current dollars Project Name Key # Year Project Cost 10th Avenue Bridge, Caldwell
More informationAttachment One. Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program
Attachment One Integration of Performance Measures Into the Bryan/College Station MPO FY 2019 FY 2022 Transportation Improvement Program Introduction Begun as part of the Moving Ahead for Progress in the
More informationNevada s Transportation Infrastructure and Future Transportation Needs
Nevada s Transportation Infrastructure and Future Transportation Needs Susan Martinovich, P.E. Director Interim Legislative Committee on Transportation Nov. 13, 2007 State Transportation Board of Directors
More informationCity of Gainesville Transportation/Roadway Needs PROJECT SUMMARY
A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St
More informationCity of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A
A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table
More informationSecondary Road Program
Secondary Road Program Joint Legislative Transportation Oversight Committee October 5, 2012 1 Secondary Roads Program The Big Picture The Secondary Road System Needs and Project Types Paved and Unpaved
More informationState Highway 44/State Street High Capacity Corridor
Background State Highway 44/State Street runs from I-84 in Canyon County through parts of the cities of Middleton, Star, Eagle, and Garden City to downtown Boise. It is a commuter route from several communities
More informationLinking Transportation and Health in Nashville & Middle Tennessee
Linking Transportation and Health in Nashville & Middle Tennessee Fit Nation New Orleans CPPW Mentoring Grant Built Environment Program May 14, 2011 Local Transportation Planning Framework Federal U.S.
More informationTRANSPORTATION TRAINING TOPICS. April 6, 2010
TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA
More informationGoodlettsville Bicycle and Pedestrian Plan Executive Summary
Goodlettsville Bicycle and Pedestrian Plan July 2010 In Cooperation with the Nashville Area Metropolitan Planning Executive Organization Summary Introduction Progressive and forward thinking communities
More informationFI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway
TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for
More information2017 (FY 21,22,23) Ohio CMAQ Project Selection
2017 (FY 21,22,23) Ohio CMAQ Project Selection Executive Committee September 14, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit Authorities
More informationTransportation Committee Project Priority List
Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000
More informationMulti Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY
Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities
More informationFlorida Department of Transportation District Four. I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE
1 Florida Department of Transportation District Four I-95 at 6 th Avenue Interchange Improvements FDOT PM - Fernando Morales, PE Presentation Outline Overview of Planning and Programming I-95 Interchange
More informationCounty of Fairfax, Virginia. Department of Transportation
Fairfax County Parkway History 2 Planning began 50 years ago 1960s Washington s Regional Transportation Plan Recommends improved north/south travel Construct Capital Beltway and outer beltway Outer beltway
More informationLegislative Update Williamsburg Residency
Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:
More informationSTUDY ADVISORY COMMITTEE. October 8, 2015
STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming
More information2017 (FY 21,22,23) Ohio CMAQ Prioritization
2017 (FY 21,22,23) Ohio CMAQ Prioritization Intermodal Coordinating Committee September 12, 2017 Eligible Applicants Cities Counties Port Authorities Transportation Improvement Districts (TID) Transit
More information4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC
4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study
More informationMUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)
B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek
More informationMOUNTAIN HOUSE SPECIFIC PLAN I 9.1 INTRODUCTION ASSUMPTIONS TRANSPORTATION FACILITIES TRANSPORTATION IMPROVEMENTS PHASING 9.
CHAPTER NINE: TRANSPORTATION AND CIRCULATION 9.1 INTRODUCTION 9.1 9.2 ASSUMPTIONS 9.1 9.3 TRANSPORTATION FACILITIES 9.1 9.4 TRANSPORTATION IMPROVEMENTS PHASING 9.3 LIST OF FIGURES LIST OF TABLES Figure
More informationSarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016
All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan
More informationProject Description Tier Goal Previous SPOT Rank
Durham City and County Adopted FY 2014-2020 Transportation Improvement Program Local Priority List TCC 5/25/2011 Attachment 7A Highway Project Description Tier Goal Previous SPOT Rank A B C D E F G H I
More informationLegislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension
Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate
More informationRoute 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.
28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT
More informationINDEX. Geometric Design Guide for Canadian Roads INDEX
Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines
More informationHigh Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey
High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,
More informationTABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.
TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationWYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways
WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to
More informationREGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012
WEST CENTRAL FLORIDA MPO CHAIRS COORDINATING COMMITTEE REGIONAL PRIORITIES Presentation to the Tampa Bay Regional Collaboration Committee September 10, 2012 TRANSPORTATION REGIONAL INCENTIVE PROGRAM (TRIP)
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects
Cape May-Lewes Ferry 00377A 00377A This project will provide for the rehabilitation of the approach roads and signage for the Cape May- Lewes ferry. Other roadside features will be upgraded to meet present
More informationBus Rapid Transit Plans
Twin Cities Region Bus Rapid Transit Plans ULI Minnesota Workshop Connecting Bus Rapid Transit to the Community December 15, 2009 John Levin Director of Service Development Metro Transit Metropolitan Area
More informationTransportation Corridor Studies: Summary of Recommendations
Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field
More informationCulpeper District. Albemarle County Monthly Report October, 2011
Culpeper District Albemarle County Monthly Report Special Issues FY2013 Revenue Sharing Program - If you wish to participate in the Revenue Sharing Program for the fiscal year starting July 1, 2012, applications
More informationDulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation
Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements
More informationA. LETTERS OF SUPPORT ON THE WYTHE CREEK ROAD WIDENING PROJECT
ITEM #19: CORRESPONDENCE OF INTEREST A. LETTERS OF SUPPORT ON THE WYTHE CREEK ROAD WIDENING PROJECT Attached are five letters to Mayor Hunt of Poquoson in support of the Wythe Creek Road widening project.
More informationWYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)
WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION
More informationState Highway 16 Kuna-Mora Road to Ada/Gem County Line
Background Update! (February 2018): This project has been partially funded; see below. State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents
More informationGeneral Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701
General Plan Circulation Element Update Scoping Meeting April 16, 2014 Santa Ana Senior Center, 424 W. 3rd Street, Santa Ana, CA 92701 Meeting Agenda 1. Purpose of Scoping Meeting 2. Project Overview 3.
More informationCHAPTER 5 TRANSPORTATION GOAL
CHAPTER 5 TRANSPORTATION GOAL Create and sustain a transportation system that meets the demands for existing and future traffic; skillfully integrates existing and planned development; and provides a safe
More informationFY 2005 TRANSPORTATION CAPITAL PROGRAM
Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the
More informationInstitute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017
Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia
More informationProposed Project I 35 from Denton to Cooke County Line
Proposed Project I 35 from Denton to Cooke County Line The existing I 35 facility is four lanes from I 35E/I 35W to Farm to Market Road (FM) 3002. The purpose of the proposed project is to increase capacity
More informationModal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.
DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to
More informationJONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY
JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State
More informationFUNDING SOURCES CHAPTER 6
CHAPTER 6 6.1 BICYCLE 6.1.1 Local 6.1.2 Regional 6.1.3 State 6.1.4 Federal 6.1.5 Public Facilities 6.1.6 Bicycle Registration and Licensing Fees 6.1.7 Summary Table 6.1 of Bicycle Funding Sources 6 2 6.2
More information% of Sales Tax (net of Admin) First Year Amount. Metro State of Good Repair 2% $ 17 $ 350 $ 910 $ 1,140 $ 2,400
Attachment A Proposed One-Half Cent Sales Tax for Transportation Outline of Expenditure Categories 40-s: Fiscal (FY ) 2018-2057, Escalated Dollars (millions) DRAFT Program % of Sales Tax (net of Admin)
More informationHouma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION
APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP
More informationCirculation in Elk Grove includes: Motor vehicles, including cars and trucks
Circulation, as it is used in this General Plan, refers to the many ways people and goods move from place to place in Elk Grove and the region. Circulation in Elk Grove includes: Motor vehicles, including
More information2040 Long Range Plan Projects Draft October 2011
Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72
More informationActive Transportation Facility Glossary
Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike
More informationFI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE
Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7
More informationEXISTING PRIORITIES FUNDED FOR CONSTRUCTION LRTP
EXISTING PRIORITIES FUNDED FOR CONSTRUCTION Limits Description Status 1 415489 3 H1865 US HWY 301 FROM SR 674 TO BALM RD Widen 2 lanes to 6 lanes divided County / Construction Programmed 2016 2 405492
More information2040 RTP. Chapter 6: Investments in our Transportation Future
2040 RTP Chapter 6: Investments in our Transportation Future This chapter describes the transportation investments proposed for the San Benito region that support the goals and objectives of the Regional
More informationState Highway 16/McDermott Road Kuna-Mora Road to Ada/Gem County Line
Background State Highway 16 is the main commuter route from Gem County to the Treasure Valley. An increase in traffic and accidents on this highway have been a concern for several years, and the Idaho
More informationAPPENDIX D COST SUMMARY TABLES
APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to
More informationFDOT Treasure Coast Traffic Report
July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures
More informationDRAFT BUENA VISTA 2020 TRANSPORTATION PLAN
DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL
More informationMost Important Part of any Plan
Most Important Part of any Plan Objectives must be evaluated to determine if they have been achieved Achievement of Objectives: 10 of 13 Objectives Achieved 1 not achieved 2 not due yet Transportation
More informationAPPENDIX L: COST ESTIMATING TOOLS
APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders
More informationMadison Urban Area and Dane County. Bicycle Transportation Plan Summary. September Introduction. Bicycle Plan Scope and Planning Process
Bicycle Transportation Plan Summary Madison Urban Area and Dane County Introduction September 2000 Bicycling is an important mode of transportation in the Madison urban area and countywide that is available
More informationRoute 15 Congestion Report Findings
Route 15 Congestion Report Findings Briefing To Loudoun County Board of Supervisors May 18, 2016 1 Overview: Previous Studies: Route 15 Corridor, Leesburg to Maryland Route 15 Congestion Report: Between
More informationACTIVE TRANSPORTATION
ACTIVE TRANSPORTATION Mobility 2040 Supported Goals Improve the availability of transportation options for people and goods. Support travel efficiency measures and system enhancements targeted at congestion
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More information