Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 The instructor is trained and assessed by a competent person.

Size: px
Start display at page:

Download "Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 The instructor is trained and assessed by a competent person."

Transcription

1 Risk Assessment of 3G Swing Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 The instructor is trained and assessed by a competent person. The instructor is monitored frequently to ensure compliance with procedures. All participants are provided with a suitable climbing harness. The instructor explains how to fit the harness correctly and checked before assent that the harness is fitted correctly. At all times whilst on the activity the participant is connected to a safety rope using a suitable climbing knot and karabiners. The instructor monitors the group to make sure the activity is undertake safely Participants are clipped in to the paragliding seats as well as being attached to a safety rope Dynamic rope is used to absorb any falls Equipment Failure All 5 All Equipment is to be checked before the set up of the activity. Items deemed to be faulty are to be removed from use, tagged with the fault and placed in the quarantine box. Daily inspection to be completed and signed. Monthly inspections to be completed and logged Annual inspection carried out by technical advisor. Inappropriate / unsupervised All 5 Seats taken away or raised up when not in use. use Accessing ladders are to be locked away, when not in use. Signs stating no admittance to unauthorised personnel on activity fencing. Page of 6

2 Risk Assessment of 3G Swing Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Only qualified instructors to operate critical components such as Pro-traction and Three ring circus. Equipment taken down and locked away when not in use Access staples start above the height of the ladder Falling objects All 5 Participants are to remove all objects from their pockets before using the activity. As stated in the safety briefing Shoes are tied tight (no sandals allowed). Helmets must be worn by all participants and spectators in the area. Participants are warned not to stand directly in front of the swing except in safe zone behind fence. No participants or other untrained persons in area when instructor is accessing the pole which has the pulley suspended from it. Participants must not stand under the seats when they have been hauled up Group behaviour All 3 Group leaders are to ensure that the group is under control at all times. Instructor is to stop the session if the participant s behaviour is dangerous. In the safety briefing groups are told what is expected of them Entrapment All 3 Loose jewellery to be removed, long hair tied back and loose clothing to be secured. Instructor to be trained in correct lowering technique. Participant is to keep clear of the pro-traction whilst pulling the rope. Cones are in place around the Pro Traction to stop Page of 6

3 Risk Assessment of 3G Swing Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 people, going to close. No one is to pull the rope running down the pole towards the pro traction Instructor is responsible for controlling the second pro traction Participants are instructed to stop pulling before they reach the second pro traction. All slack rope created as swing rises it is to be placed into a barrel at the end of the pull walkway. Pulley retrieval rope must be secured back to structure pole. Running is prohibited Structure failure All 5 Daily visual inspections of structure carried out during set up and logged. Detailed monthly structure checks carried out and recorded. Areas of concerns to be inspected by technical advisor. Full inspection carried out annually by a competent person. Strangulation Participants 5 Loose items of clothing (e.g. necker s) are removed. Before starting to raise seats instructor ensure no ropes are going to cause an issue to those participating in the activity Ensure the central pipe is held aloft by the participant before trying to stop, do not stop the swing with the central pipe. Ensure ground area is free from obstructions before releasing the swing. No loops are left in the safety rope Instructor to make sure there are no loops of rope in the hauling system Page 3 of 6

4 Risk Assessment of 3G Swing Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Release cord is clipped up high to keep it away from participants Impact from Swing All 5 Ensure all ground participants and spectators are clear of swing area prior to instructing that the participants can release the swing. Participants must not release the swing until told to do so following a countdown from the instructor in charge. Instructors when stopping the swing are to approach the swing slowly from the rear. Anyone wanting to take pictures from the front of the swing must do from behind the fence. Groups are told during their safety briefing where they can and cannot stand when the swing is moving Only the instructors are allowed to stop the swing When pulling the rope the group stay away from Instructor impact with ground the swinging area Instructor 5 All instructors trained and assessed by a competent person. All instructors when accessing are to have a primary fall arrest in place at all times. Work positioning equipment is not to be used as a fall arrest. Staples are not to be used as an anchor point (Advised by ERCA). Staples may be used for work positioning (Advised by ERCA). Instructors are provided with the correct PPE and training on safe accessing techniques. Page 4 of 6

5 Risk Assessment of 3G Swing Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Exposure / hypothermia / sunburn All 3 Participants and instructors to wear correct clothing for the weather conditions. Advise participants to consume plenty of water and wear sun cream if applicable. Adverse Weather All 5 Activity is to STOP if thunder/lightning is detected Activity can continue 30 minutes after last peel of thunder. Activity is not to run in winds over 40mph by visual reference (whole trees moving). Wind speed check with anemometer Wind speed checked using met office website http// Falls, slips and trips All Ensure all participants are wearing suitable footwear. All slack rope created as swing raises is to be placed into a barrel at the end of pull walkway No running is permitted in the activity area. Closed toes must be worn by all participants Injury from Moving ropes All 4 Participant cannot run when they are pulling the rope Participants must face the same way that they are pulling the rope Excess rope is put in to a barrel, When resetting the swing the barrel is moved in to the coned area, so when the ropes Is moving people are not standing close to it. Area where the entrapment points are and the most friction is coned off to stop people going in to this area Any slack loops that form within the pulley system. Are pulled out by the instructor Scared Participants Participants 3 The Participants set their own goal of how high they Page 5 of 6

6 Risk Assessment of 3G Swing Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 are going to go from ( Challenge by Choice Goal ) Rescue method in place if a person becomes too scared Participants are in control of when the swing is realised Participant emotional state is monitored by the instructor Support is give where needed Pro traction not on / failure All 4 Instructor that clips the participants in check the pro traction is on after the other instructor has said they have put it on Swing is on a separate safety system other than the hauling rope Instructors are trained and accessed by a competent person Protraction is only used as a back up to the rope Second pro traction is in place as a back up Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory 3 Medium, injury would stop casualty continuing with Medium, control measures adequate activity 4 Serious injury requiring medical attention, i.e. broken High, control measures need further consideration bone, deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 6 of 6

7 Risk Assessment of All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Equipment Failure All 5 All Equipment is to be checked before the set up of the activity. Items deemed to be faulty are to be removed from use, tagged with fault and placed in the quarantine box. Daily inspection to be completed and signed. Monthly inspections to be completed and logged. Regular maintenance is carried out on all equipment Falling from a height Participants 5 All instructors are trained and assed by a competent person All instructors are monitored regularly to ensure compliance with procedures All participants are provided with a suitable climbing waist and chest harness. Participants are provided with a suitable climbing helmet. The instructor explains how to fit the harness correctly and checks harness before accent that the harness is fitted correctly. At all times whilst climbing the participant is connected to a safety rope using a suitable climbing knot. Safety rope is connected to a ground anchor belay system The instructor monitors the group to make sure no one climbs before the instructor has checked their equipment and safety rope. The group is shown how to belay, either the five point or bell ringing technique depending on the Page of 5

8 Risk Assessment of All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 group s competency and age. Gri Gri s are used so that there is a degree of safety back up. Safety knots are put in to the rope by the instructor, at intervals as an extra safety back up The instructor monitors the group whilst they are belaying. The instructor is responsible for lowering a participant from the activity. Dynamic ropes are used to absorb any falls Inappropriate use All 5 Ropes taken down or tied up when not in use. Tracers replace ropes when not it use and are tired up about the level of a ladder. Accessing ladders are to be locked on racking, when not in use. Area is fenced off to show there is no access The climbing holds do not start until you are above the height of a ladder Signs around the area telling people No admittance to unauthorised personnel There is a chain across the gate way to show people there is no entry. All 5 Participants are to remove all objects from their Falling objects pockets before using the activity. Shoes are tied tight (no sandals allowed). All participant and spectators in the fenced area must wear a helmet at all times. Participants must not stand directly underneath people that are climbing. Group behaviour All 3 Group leaders are to ensure that the group is under control at all times. Instructor is to stop the session if the participant s behaviour is deemed dangerous. Page of 5

9 Risk Assessment of All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Group is told in the safety briefing that they must listen and follow all instructions Entrapment Participant 3 Loose jewellery to be removed, long hair tied back and loose clothing to be secured. Instructor is trained in correct rescue technique. The climber s rope is kept tight. Participant must stay on the corner, of the platform that their rope is on, so ropes do not become crossed Instructor will give direction on how to uncross ropes if they become crossed. Participants are lowered one at a time or on opposite sides of the platform. Structure failure All 5 Daily visual inspections of structure carried out during set up and logged. Detailed monthly structure checks carried out and recorded. Areas of concerns to be inspected by technical advisor. Full inspection carried out once a year by the technical advisor. Strangulation Participants 5 Ensure correct belay technique is used to avoid slack rope. Loose items of clothing (e.g. Necker s) are removed. Avoid ropes wrapping round each other, explain to participants to follow the rope up the apparatus. Participant need to stay on their corner of the platform at all times Exposure / hypothermia / All 3 Participants and instructors to wear correct sunburn clothing for the weather conditions. Advised participants to consume plenty of water and wear sun cream if applicable. Page 3 of 5

10 Risk Assessment of All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Adverse Weather All 5 No one is allowed to go off the ground if there is thunder, and / or lightning No one can go off the Ground for 30 minutes after the last clap of thunder The activity cannot run if the wind is gusting 40mph or above (visual trees moving) Wind speed check using a hand held anemometer Wind speed checked using http// Falls, slips and trips All Ensure all participants are wearing suitable footwear. Participants are instructed not to run in the activity area. Participants are warned about tip hazards in the area. Participants warned the platform may be slippery when wet. Collision with other activity All 4 Both all aboard s must not run at the same time. users Ensure activity when not in use has ropes tied back out of way. Participants are not allowed to jump off the platform they can only step off to reduce the amount of swing Participants are lowered slowly Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory 3 Medium, injury would stop casualty continuing with activity Medium, control measures adequate Page 4 of 5

11 Risk Assessment of All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 4 Serious injury requiring medical attention, i.e. broken bone, High, control measures need further consideration deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 5 of 5

12 Risk Assessment of Archery Centre Gilwell park Date 0//05 Completed by Joe Brown Location for Activity Gilwell park Indoor range Review Date End of December 06 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Unauthorised access All 4 The Range is constructed in an appropriate area for the nature of the activity. The range is marked so that no one can access it without knowing they are stepping onto an archery range. Signs are posted around the area warning of the dangers of entering the area when it is in use. Area kept locked off and fenced whilst not in use. All equipment is removed after the session. Between sessions equipment is locked away Main hall of lid is locked when there is not a session in progress or an instructor present. Misuse of Bow s All 4 Make sure that the bows are not taken off the Shooting line. The participants do not have access to the bow when they are not being supervised. Participants are instructed not to approach the bow useless told to do so by the instructor. Participants are instructed not to dry fire the bows. When participants are using the bow they must have a GNAS certified instructor with them in charge of the range. Participants are instructed to keep the bows pointing down range at all times. Misuse of Arrows All 4 Guests are instructed to make sure the arrows are pointing down range. Participants are shown how to correctly load the arrow onto the bow. Any spare arrows are removed from the shooting line when the instructor collects arrows that have been fired. The instructor makes sure that all the arrows issued are collected back in at the end of the session. Page of 3

13 Risk Assessment of Archery Centre Gilwell park Date 0//05 Completed by Joe Brown Location for Activity Gilwell park Indoor range Review Date End of December 06 String hitting the arm Participant Participants are instructed on the correct way to hold the bow, with the wrist bent. Participants are provided with a bracer for their arm. Instructor monitors during the session Arrows in the target or on the Participant 3 Participants are instructed to make sure they walk to the side ground of the range not down the middle whilst approaching the targets. Participants are to make sure that they pick up any arrows off the floor first, then remove those from the target. No one is allowed to run in the range Equipment failure All 3 All equipment is inspect and logged each month All equipment is checked before each session and any defected equipment is removed from operation, logged and placed in the quarantine box. Group behaviour All 3 Group leaders are to ensure their group are under control at all times. Groups are told in the safety briefing to listen to and follow all instructions If the behaviour of individuals/group endanger the safety of themselves or others the session will be terminated Falls/Slips/Trip All Participants and instructors are to wear closed footwear. All obstacles should be moved before activity starts. Participants are instructed not to run and move around carefully. Participants are warned about the ground conditions Being hit by arrow All 5 Instructor undertakes GNAS qualification or Scout Archery Permit and will be made aware of risks associated with archery. Safety guidelines are given to participants and must be followed at all times. Waiting/shooting areas defined and explained to all. Page of 3

14 Risk Assessment of Archery Centre Gilwell park Date 0//05 Completed by Joe Brown Location for Activity Gilwell park Indoor range Review Date End of December 06 Barrier is put across the dead ground behind the targets to prevent access during sessions. The Fast Stop or Halt command will be given if anything strays onto the range Range design will follow guidelines set out by Archery GB Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory 3 Medium, injury would stop casualty continuing with Medium, control measures adequate activity 4 Serious injury requiring medical attention, i.e. broken High, control measures need further consideration bone, deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 3 of 3

15 Risk Assessment of Archery Centre Gilwell park Date 0//05 Completed by Joe Brown Location for Activity Gilwell park Outdoor range Review Date End of December 06 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Unauthorised access All 4 The Range is constructed in an appropriate area for the nature of the activity. The range is marked so that no one can access it without knowing they are stepping onto an archery range. Signs are posted around the area warning of the dangers of entering the area when it is in use. Area kept locked off and fenced whilst not in use. All equipment is removed after the session. Between sessions equipment is locked away Misuse of Bow s All 4 Make sure that the bows are not taken off the Shooting line. The participants do not have access to the bow when they are not being supervised. Participants are instructed not to approach the bow useless told to do so by the instructor. Participants are instructed not to dry fire the bows. When participants are using the bow they must have a GNAS certified instructor with them in charge of the range. Participants are instructed to keep the bows pointing down range at all times. Misuse of Arrows All 4 Guests are instructed to make sure the arrows are pointing down range. Participants are shown how to correctly load the arrow onto the bow. Any spare arrows are removed from the shooting line when the instructor collects arrows that have been fired. The instructor makes sure that all the arrows issued are collected back in at the end of the session. Participants are not issued arrows until they are standing on the shooting line. Page of 3

16 Risk Assessment of Archery Centre Gilwell park Date 0//05 Completed by Joe Brown Location for Activity Gilwell park Outdoor range Review Date End of December 06 String hitting the arm Participant Participants are instructed on the correct way to hold the bow, with the wrist bent. Participants are provided with a bracer for their arm. Instructor monitors during the session Arrows in the target or on the Participant 3 Participants are instructed to make sure they walk to the side ground of the range not down the middle whilst approaching the targets. Participants are to make sure that they pick up any arrows off the floor first, then remove those from the target. No one is allowed to run in the range Equipment failure All 3 All equipment is inspect and logged each month All equipment is checked before each session and any defected equipment is removed from operation, logged and placed in the quarantine box. Group behaviour All 3 Group leaders are to ensure their group are under control at all times. Groups are told in the safety briefing to listen to and follow all instructions If the behaviour of individuals/group endanger the safety of themselves or others the session will be terminated Falls/Slips/Trip All Participants and instructors are to wear closed footwear. All obstacles should be moved before activity starts. Participants are instructed not to run and move around carefully. Participants are warned about the ground conditions Being hit by arrow All 5 Instructor undertakes GNAS qualification and is aware of risks associated with archery. Safety guidelines are given to participants and must be followed at all times. Waiting/shooting areas defined and explained to all. The Fast Stop or Halt command will be given if anything strays onto the range Page of 3

17 Risk Assessment of Archery Centre Gilwell park Date 0//05 Completed by Joe Brown Location for Activity Gilwell park Outdoor range Review Date End of December 06 Range design will follow guidelines set out by Archery GB Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory 3 Medium, injury would stop casualty continuing with Medium, control measures adequate activity 4 Serious injury requiring medical attention, i.e. broken High, control measures need further consideration bone, deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 3 of 3

18 Page of 4 Last saved on 8-Jan-6 Bomb Hole Emergency Action Plan 06

19 Page of 4 Emergency Procedures Last saved on 8-Jan-6 RIDDOR The Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 995, by the Health and Safety Executive require that all public accidents are reported. This is determined as; Work-related deaths Major Injuries Over three day injury Work related diseases Dangerous Occurrences Near Misses If the instructor on duty feels that an incident falls into this category they must complete The Scout Associations Incident/Accident Form and make the Duty Manager aware so a RIDDOR report can be completed. Incident forms can be found in the Activity Centre Office. Incident Forms The Scout Association has a policy of reporting any incidents and near misses that have the potential to result in an accident including verbal abuse, harassment and child protection issues. Incident forms are located in the Activity Centre Office. Serious Injury/Drowning The following is the procedure for the Instructors on session for serious injury or drowning at Gilwell Park. The on water instructor will shout for the bank side instructor. The bank side instructor will blow three whistles and radio for a lead instructor 3. The bank side instructor will then assist in the evacuation of the bomb hole 4. The on water instructor will paddle to the casualty and keep them calm (if casualty has sustained injury or unconscious then airway must be maintained) 5. When lead instructor arrives they will assist in the rescuing of the casualty 6. Call Emergency Services if required by radioing the reception or calling from the Bomb Hole and conveying the details a. Location

20 Page 3 of 4 b. Age c. Injury d. Conscious e. Breathing f. Bleeding Last saved on 8-Jan-6 7. Complete Accident/Incident report form. The following is the procedure by the Duty Manager/Reception Staff/Duty Instructor for serious injury or drowning at Gilwell Park. The lead instructor responding to the radio message will make their way over to the bomb hole. The lead instructor will convey to the Duty Manager what additional resources are required. 3. The Duty Manager will then provide these resources 4. If the Bomb Hole session is out of hours the reception will inform the Duty instructor by phone. The Duty instructor will make their way immediately to the bomb hole. The Reception Staff/Duty Manager will then raise additional resources are required. 5. Call Emergency Services if required by radioing the reception or calling from the Bomb Hole and conveying the details a. Location b. Age c. Injury d. Conscious e. Breathing f. Bleeding 6. Complete Accident/Incident report form. Note that the Emergency Services should only be contacted from the bomb hole if the reception is un-manned or not contactable. In this case the call can be made from the bomb hole, but the Duty Manager must be informed at the earliest convenience. Minor Injuries The following is the procedure by the duty instructor for minor injury or incident at Gilwell Park. The casualty can be towed to the side of the bomb hole and taken off the water by the bank side instructor and the group leader. The bank side instructor can raise assistance by using their personal radio 3. Treat injury or deal with incident accordingly 4. Report using an Incident/Accident form and report to Duty Manager

21 Page 4 of 4 Last saved on 8-Jan-6 First Aid Boxes They are Located. In the Kayak shed. In the Activity Centre Office BOMB HOLE EVACUATION & CLEARING PROCEDURE TO CLEAR THE BOMB HOLE In the event of an emergency a member of staff will blow three whistles. Upon hearing three whistles Exit the Bomb Hole in a safe and orderly manner Proceed to the area in front of the kayak shed Wait for further direction from a member of staff Go to Camp Square if it is unsafe to stay at the assembly point EVACUATIONS. In the event of an incident (Fire, Gas Leak, Explosion/Risk) at the bomb hole requiring evacuation of the bomb hole area, the duty manager should be informed immediately and a member of staff or the duty instructor shall coordinate the evacuation of the bomb hole.. In the event of a site evacuation, which will be made known by the single pitched horn evacuation alarm, the bank side instructor shall co-ordinate the evacuation of the bomb hole.

22 Risk Assessment of Climbing Outdoor Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 All instructors are trained and assessed by a competent person All instructors are regularly monitored to ensure procedures are complied with. All participants are provided with a suitable climbing harness. All participants are provided with a suitable climbing helmet. The instructor explains how to fit the harness correctly and checked before assent that the harness is fitted correctly. At all times whilst climbing the participant is connected to a safety rope using a suitable climbing knot. Safety rope is connected to a ground anchor belay system The instructor monitors the group to make sure no one climbs before the instructor has checked their equipment and safety rope. The group is shown how to belay, either the five point or bell ringing technique depending on the groups competency and age. Gri Gri s are used so that there is a degree of safety back up. Safety knots are put in to the rope by the instructor, at intervals as an extra safety back up The instructor monitors the group whilst they are belaying. The instructor is responsible for lowering the participant from the activity. Dynamic rope is used to absorb shock from any Page of 5

23 Risk Assessment of Climbing Outdoor Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 falls. Objects falling from a height All 4 All participants and spectators in the area must be wearing a helmet. During monthly inspections, we check to make sure everything is secure such as SRB. All participants make sure that they have removed everything from their pockets before they put on their climbing harness. Instructors explain that helmets must be worn at all time whilst they are in the climbing area. In the safety briefing instructor says everyone in the area need to wear a helmet Participants and spectators are instructed not to stand directly below a climber. Equipment Failure All 4 All equipment is inspected monthly and a record kept of any faults found. All equipment is checked by the instructor prior to being used. All structures are check by the technical adviser annually. All equipment is check each month by a competent person Any faulty equipment found is logged and removed from use Slips and trips All All equipment not being used is put away in the store. All participants are instructed to wear appropriate footwear. No open toed shoes Participants are made aware of the belay points on the ground Participants are instructed not to run when in the area Participants are warned the wall may be slippery Page of 5

24 Risk Assessment of Climbing Outdoor Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 when wet. Entrapment Participant Before the session participants are told to tie long hair back, remove any dangling jewellery from their ears or around their neck and wrists. Any lose items of clothing are removed or tucked in. Ropes are kept tight during the activity Groups are told to keep their hands away from the Gri Gri when they are belaying Participants are instructed not to use the metal leading bolts on the wall as hand holds Instructor monitors ropes to make sure no loops are forming. Unsupervised use Participant 4 The area is fenced off and has a locked gate which remains locked whilst the activity is not in use All equipment is removed when not in use Strains or sprains and other injuries Ropes are taken down Participants 3 Before the participant takes part in the activity, you need to take part in a warm up activity/ game. Instructors tell the group to be careful whilst on the activity and then monitor them to make sure they are using the activity in the correct way All staff members are first aid trained. The activity area has a first aid kit in it and all staff have a radio if they require extra assistance. Extreme weather All 4 If thunder is heard or lightning is seen then the activity stops immediately, activity will continue 30 minutes after last thunder heard. All participant will be lowered to the ground If there are high winds of 40 mph or above, then the activity will stop and anybody off the ground would be lowered down. During the summer participants are advised to make sure they have a drink with them. Page 3 of 5

25 Risk Assessment of Climbing Outdoor Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 Instructors are told to monitor the participants during hot and cold times to make sure they are not being affected by the conditions. Wind speed checked using a hand held anemometer Wind speed is check at Structure Failure All 5 Daily visual inspections of structure carried out during set up and logged. Detailed monthly structure checks carried out and recorded. Areas of concerns to be inspected by a competent person. Annual inspection undertaken by technical adviser. Participant miss behaving All 4 The instructor gives the group a safety brief at the beginning of the session out lining the rules the group need to follow. The group leader is responsible for the group s behaviour whilst they are on the activity. If the participant behaviour is deemed dangerous by the instructor the sessions will be stopped Use of bouldering wall Participants 4 The instructor is to show the group the correct spotting position. Participant are told not to climb above the top of the wall Participants are warned the holds might spin Signs are on the wall warning participants that the holds might spin Wall structure is check each month Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory Page 4 of 5

26 Risk Assessment of Climbing Outdoor Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 3 Medium, injury would stop casualty continuing with activity Medium, control measures adequate 4 Serious injury requiring medical attention, i.e. broken bone, High, control measures need further consideration deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 5 of 5

27 Risk Assessment of Crate Stacking Centre Gilwell park Date06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Falling from a height Participants 5 All instructors are trained and assessed by a competent person All staff members are periodically monitored to ensure compliance with procedures. All participants are provided with a suitable climbing harness. All participants are provided with a suitable climbing helmet. The instructor explains how to fit the harness correctly and checks before assent that the harness is fitted correctly. At all times whilst climbing the participant is connected to a safety rope using a suitable climbing knot. The instructor monitors the group to make sure no one climbs before the instructor has checked their equipment and safety rope. The group is shown how to belay, either the five points or bell ringing technique depending on the groups competency and age. Safety rope is connected to a ground anchor belay system Gri Gri s are used so that there is a degree of safety back up. Safety knots are put in to the rope by the instructor, at intervals as an extra safety back up The instructor monitors the group whilst they are belaying. The instructor is responsible for lowering a participant from the element Participants wear a chest harness so that they cannot fall if they invert The participant must not stand on crates to pass up more crates. A hauling system is proved for moving crates from the ground up. Semi static rope is used to absorb any falls. Page of 5

28 Risk Assessment of Crate Stacking Centre Gilwell park Date06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 Objects falling from a height All 4 All participants and spectators must be wearing a helmet whilst inside the activity area During monthly inspections, we check to make sure everything is secure such as SRB. All participants make sure that they have removed everything from their pockets before they put on their sit harness. Participants are instructed to move away from the stack of crates when not placing a crate for the participants that are ascending. All participants are to keep back and be facing the crates at all time to avoid falling crates. If the crate tower is being push over, it must be pushed away from the belayers and where the group are standing. Participants must not stand directly under some one that is climbing Exposure / Hypothermia and All 3 Staff and participants urged to make sure they have suitable Sunburn clothing prior to the activity. Both staff and clients to drink plenty of water. Instructor will monitor groups condition during the session Equipment Failure All 4 All equipment is inspected monthly and a record kept of any faults found. All equipment is checked by the instructor prior to being used. All structures are check annually by a competent person. Any faulty equipment found is logged and removed from use Regular maintenance is carried out on all equipment Slips and trips All All equipment not being used is put away in the store. All participants are instructed to wear appropriate footwear, no open toed footwear. Participants are made aware of the belay bags on the ground The participant must not stand on crates to pass up more crates. Participants must not run in the activity area Page of 5

29 Risk Assessment of Crate Stacking Centre Gilwell park Date06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 Entrapment Participant Before the session participants are told to tie long hair back. They are also instructed to remove any dangling jewellery from their ears or around their neck and wrists. Any lose items of clothing are removed. Participants are shown common areas of entrapment on the crates and how to avoid such an issue. When placing creates they must be careful of their own and other people fingers The instructor will monitor, the climbers to make sure that their ropes do not become tangled up with one another Ropes are kept tight Hauling rope is move out of the way when lowering participants. Unsupervised use Participant 4 Crates are lock inside the crates shed when the activity is not being used Ropes are taken down or tied up. Tracers replace ropes when not in use Tracers are tied out the way when not in use All equipment is removed when it s not in use The area is fenced off to deter people, from going in the area Chain gate is closed when not in use Ladders removed and locked up when not in use Strangulation Participant 5 Ropes are kept tight so loops do not form Loose clothing is removed or restrained. All harnesses are checked before a participant starts to climb Instructor monitors the climbers to make sure they do not cross the ropes Hauling system is tied back when not in use Participants are advised not to cross their rope Instruction is given if ropes do become crossed. Strains or sprains and other Participants 3 Before the participant takes part in the activity, you need to injuries take part in a warm up activity/ game. Instructors tell the group to be careful whilst on the activity and then monitor them to make sure they are using the activity in Page 3 of 5

30 Risk Assessment of Crate Stacking Centre Gilwell park Date06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 the correct way All staff are first aid trained. The activity are has a first aid kit in it and all staff have a radio if they require extra assistance. Extreme weather All 4 If thunder is heard or lightning is seen then the activity stops immediately, the activity may continue 30 minutes after thunder last heard. All participants are lowered to the ground If there are high winds, 40mph or above then the activity will stop and anybody off the ground would be lowered down. Wind speed check using a hand held anemometer Wind speed checked using http// Structure Failure All 5 Daily visual inspections of structure carried out during set up and logged on sheets. Detailed monthly structure checks carried out and recorded. Areas of concerns to be inspected by technical advisor. Full inspection annually by a competent person. Participant miss behaving All 4 The instructor gives the group a safety brief at the beginning of the session out lining the rules the group need to follow. The group leader is responsible for the group s behaviour whilst they are on the activity. If the groups behaviour is deemed dangerous then the instructor will stop the session Impact with Crates All 3 Participants are told to move away when not passing crates. All are to concentrate at all times. Helmets are to be worn at all times. Crates are to be passed up when participants cannot reach any longer by the use of a hauling system Instructor will make sure the belay bags are as far away from the towers as possible If the crate tower is pushed over then it must be pushed away for the belayers and the rest of the group If tower is about to fall the instructor will advise the group where to move to. Page 4 of 5

31 Risk Assessment of Crate Stacking Centre Gilwell park Date06/0/06 Completed by Sophie Barker Location for Activity Gilwell park Review Date January 07 Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory 3 Medium, injury would stop casualty continuing with activity Medium, control measures adequate 4 Serious injury requiring medical attention, i.e. broken bone, High, control measures need further consideration deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 5 of 5

32 Risk Assessment of Double All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Equipment Failure All 5 All Equipment is to be checked before the set up of the activity. Items deemed to be faulty are to be removed from use, tagged with fault and placed in the quarantine box. Daily inspection to be completed and signed. Monthly inspections to be completed and logged. Regular maintenance is carried out on all equipment Falling from a height Participants 5 All instructors are trained and assed by a competent person All instructors are monitored regularly to ensure compliance with procedures All participants are provided with a suitable climbing waist and chest harness. Participants are provided with a suitable climbing helmet. The instructor explains how to fit the harness correctly and checks harness before accent that the harness is fitted correctly. At all times whilst climbing the participant is connected to a safety rope using a suitable climbing knot. Safety rope is connected to a ground anchor belay system ( either chain or sand bag) The instructor monitors the group to make sure no one climbs before the instructor has checked their equipment and safety rope. The group is shown how to belay, either the five point or bell ringing technique depending on the Page of 5

33 Risk Assessment of Double All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 group s competency and age. Gri Gri s are used so that there is a degree of safety back up. Safety knots are put in to the rope by the instructor, at intervals as an extra safety back up The instructor monitors the group whilst they are belaying. The instructor is responsible for lowering a participant from the activity. Dynamic ropes are used to absorb any falls Inappropriate use All 5 Ropes taken down or tied up when not in use. Tracers replace ropes when not it use and are tired up about the level of a ladder. Accessing ladders are to be locked on racking, when not in use. Area is fenced off to show there is no access The climbing holds do not start until you are above the height of a ladder Signs around the area telling people No admittance to unauthorised personnel There is a chain across the gate way to show people there is no entry. All 5 Participants are to remove all objects from their Falling objects pockets before using the activity. Shoes are tied tight (no sandals allowed). All participant and spectators in the fenced area must wear a helmet at all times. Participants must not stand directly underneath people that are climbing. Group behaviour All 3 Group leaders are to ensure that the group is under control at all times. Instructor is to stop the session if the participant s behaviour is deemed dangerous. Page of 5

34 Risk Assessment of Double All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Group is told in the safety briefing that they must listen and follow all instructions Entrapment Participant 3 Loose jewellery to be removed, long hair tied back and loose clothing to be secured. Instructor is trained in correct rescue technique. The climber s rope is kept tight. Participant must stay on the corner, of the platform that their rope is on, so ropes do not become crossed Instructor will give direction on how to uncross ropes if they become crossed. Participants are lowered one at a time or on opposite sides of the platform. Participants on corresponding side of different poles will be lowered at different times Participants are instructed to stay on their own poles at all times Structure failure All 5 Daily visual inspections of structure carried out during set up and logged. Detailed monthly structure checks carried out and recorded. Areas of concerns to be inspected by technical advisor. Full inspection carried out once a year by the technical advisor. Strangulation Participants 5 Ensure correct belay technique is used to avoid slack rope. Loose items of clothing (e.g. Necker s) are removed. Avoid ropes wrapping round each other, explain to participants to follow the rope up the apparatus. Participant need to stay on their corner of the platform at all times Participants are instructed to stay on their own Page 3 of 5

35 Risk Assessment of Double All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 Exposure / hypothermia / sunburn poles at all times. All 3 Participants and instructors to wear correct clothing for the weather conditions. Advised participants to consume plenty of water and wear sun cream if applicable. Adverse Weather All 5 No one is allowed to go off the ground if there is thunder, and / or lightning No one can go off the Ground for 30 minutes after the last clap of thunder The activity cannot run if the wind is gusting 40mph or above (visual trees moving) Wind speed check using a hand held anemometer Wind speed checked using http// Falls, slips and trips All Ensure all participants are wearing suitable footwear. Participants are instructed not to run in the activity area. Participants are warned about tip hazards in the area. Participants warned the platform may be slippery when wet. Collision with other activity All 4 Participants are instructed and monitored to make users sure that they do not try and swap poles Participants are lowered at different times to each other Belay points are separated to make sure that participants area safe distance from each other Ropes are kept tight to reduce the risk of large swings if the participant falls from the element Participants are not allowed to jump off the platform they can only step off to reduce the Page 4 of 5

36 Risk Assessment of Double All Aboard Centre Gilwell Park Date 06/0/06 Completed by Sophie Barker Location for Activity Gilwell Park Review Date January 07 amount of swing Participants are lowered slowly Severity Factor & Remaining Risk Assessment Level Severity Description Residual Risk Description Very low, i.e. Splinters Very low, minimal risk, control measures more than adequate Minor injury, i.e. Cut, Grazing Low, control measures satisfactory 3 Medium, injury would stop casualty continuing with activity Medium, control measures adequate 4 Serious injury requiring medical attention, i.e. broken bone, High, control measures need further consideration deep cut 5 Extremely harmful, very serious injury or fatality Very high, intolerable, stop activity Page 5 of 5

37 Risk Assessment of Free fall Centre Gilwell park Date 5/0/06 Completed by Sophie Barker Location for Activity 3G Swing Compound Review Date January 07 Hazards Who may be harmed? Risk Control Measures in Place Remaining Risk Equipment failure All 5 All Equipment is checked before the set-up of the activity. Items deemed to be faulty are removed from use, tagged with the fault and placed in the quarantine box. Daily inspection to be completed and signed. Monthly inspections to be completed and logged Falling from a height Participants 5 All instructors trained and assessed by a competent person. All instructors monitored regularly to ensure procedures are followed correctly All participants are provided with a suitable climbing waist and chest harness. The instructor explains how to fit the harness correctly and checked before assent that the harness is fitted correctly. At all times whilst climbing the participant is connected to a safety rope using a suitable climbing knot and karabiners. The instructor monitors the group to make sure no one climbs before the instructor has checked their equipment and safety rope. When participants are climbing to or from the platform they are belayed by the instructor using a top down belay system When a participant gets to the top of the platform they are connected straight to the free fall device by waist and secondary chest attachment points safety rope Then accent rope can be disconnected leaving Page of 5

Activity Risk Assessments. Level of risk assessment. Contents

Activity Risk Assessments. Level of risk assessment. Contents Activity Assessments This document contains outline details of the risk assessments in place at Youlbury Scout Activity Centre. It does not necessarily include the most up to date versions of risk assessments

More information

Activity Risk Assessments. Level of risk assessment. Contents

Activity Risk Assessments. Level of risk assessment. Contents Activity Assessments This document contains outline details of the risk assessments in place at Youlbury Scout Activity Centre. It does not necessarily include the most up to date versions of risk assessments

More information

Climbing Area. Review Completed by: Jamie Brunt Approved By: Steve Allard Date: June 2012

Climbing Area. Review Completed by: Jamie Brunt Approved By: Steve Allard Date: June 2012 Topic/Activity/Issue: Climbing Area Page: 1 of 5 TASK/ OPERATION: Operating Climbing Wall Operating Procedure Developed by: Steve Allard Manager Paccar Scout Camp Approved By: Steve Allard Date: 23/11/10

More information

General Risk Assessment for Climbing, Bouldering and Abseiling

General Risk Assessment for Climbing, Bouldering and Abseiling General Risk Assessment for Climbing, Bouldering and Abseiling Activity: Climbing, Abseil and Bouldering Activity Session What are the hazards? Who at risk? What are the risks? Ankle injuries, head injuries

More information

RISK MANAGEMENT PLAN Outdoor Education

RISK MANAGEMENT PLAN Outdoor Education Homestead Avenue Collaroy Beach NSW 2097 PO Box 11 Collaroy Beach NSW 2097 ABN: 63 968 822 144 RISK MANAGEMENT PLAN Outdoor Education The Collaroy Centre 2004. Revised 2006 Generic Lightening Natural Hazards;

More information

High Ropes Management Plan

High Ropes Management Plan High Ropes Management Plan Lutanda Mt Victoria School: Year: Dates: Program: Supervising Staff: Activity Context High Ropes is fun way to challenge participants in their confidence, teamwork, decision

More information

Risk Assessment Mobile Climbing Wall

Risk Assessment Mobile Climbing Wall Risk Assessment Mobile Climbing Wall Primary Assessor: Nick Lake SPA Approved By: Nick Lake SPA (Partner), Neil Harrington (Partner) Date Completed: 1 st April 2008 Last Review Undertaken: 31 st March

More information

RAMS information for HangDog Indoor Climbing Centre

RAMS information for HangDog Indoor Climbing Centre RAMS information for HangDog Indoor Climbing Centre Prepared by HangDog Adventures Ltd Revised 24 February 2018 1 Main Climbing Area Hazard Consequence Potential Harm Eliminate Isolate Minimise Action

More information

Abseiling Risk Management Plan Lutanda Yarramundi

Abseiling Risk Management Plan Lutanda Yarramundi Abseiling Risk Management Plan Lutanda Yarramundi School: Year: Dates: Program: Supervising Staff: Activity Context Abseiling at Lutanda Yarramundi is located on the activity tower on the wall facing the

More information

Risk Assessment Ground Belay

Risk Assessment Ground Belay Assessment Ground Belay Baseline Site Specific Vulnerable Person Temporary Produced by: Leigh Phillips Date of issue: 05/01/2018 Review date: 01/01/2019 Operating notes: Ground belay should be understood

More information

Risk Assessment Ground Belay

Risk Assessment Ground Belay Assessment Ground Belay Baseline Site Specific Vulnerable Person Temporary Produced by: Leigh Phillips Date of issue: 17/01/2019 Review date: 17/01/2020 Operating notes: Ground belay should be understood

More information

Rock Climbing Risk Management Plan Lutanda Yarramundi

Rock Climbing Risk Management Plan Lutanda Yarramundi Rock Climbing Risk Management Plan Lutanda Yarramundi School: Year: Dates: Program: Supervising Staff: Activity Context The rock climbing wall at Lutanda Yarramundi is located next on the side of the Activity

More information

RISK ASSESSMENT Indoor Abseiling

RISK ASSESSMENT Indoor Abseiling GENERIC x SITE SPECIFIC OTHER DATE OF ISSUE 1 st September 2016 REVIEW DATE 31 st August 2017 VERSION 1.0 NO OF PAGES 5 PRODUCED BY Danny Griffith AUTHORISED BY: Andy Howard DEFINITION: Climbing Wall is

More information

Use of the Climbing wall at Pendle Vale College. Method statement and risk assessment

Use of the Climbing wall at Pendle Vale College. Method statement and risk assessment Use of the Climbing wall at Pendle Vale College Method statement and risk assessment Updated June 2015 Using the Climbing Wall The climbing wall is to be used only under supervision from member of staff

More information

Whitchurch Bowmen Risk Assessment for Target Archery

Whitchurch Bowmen Risk Assessment for Target Archery Whitchurch Bowmen Risk Assessment for Target Archery This document covers all club activities related to shooting bows and arrows as described by GNAS rules of shooting. Any activity not covered by this

More information

Activities Risk Management Guide 2018

Activities Risk Management Guide 2018 Activities Risk Management Guide 2018 22 Bon Accord Track Harrietville VIC 3741 www.feathertopchalet.org.au 1 Contents Risk Management Statement... 3 Policy Statement... 3 Risk Management Procedure...

More information

RISK ASSESSMENT Outdoor Abseiling

RISK ASSESSMENT Outdoor Abseiling GENERIC X SITE SPECIFIC OTHER DATE OF ISSUE 1 st September 2016 REVIEW DATE 31 st August 2017 VERSION 1.0 NO OF PAGES 5 PRODUCED BY Danny Griffith AUTHORISED BY: Andy Howard DEFINITION: Climbing Wall Rock

More information

University of Lincoln Students Union Annual Risk Assessment for Activities

University of Lincoln Students Union Annual Risk Assessment for Activities University of Lincoln Students Union Annual Assessment for Activities Activity Details Activity Name Climbing Date Of risk Assessment Completion 05/06/16 Assessment Review Date 22/10/16 Ongoing Assessment

More information

Abseiling Risk Management Plan

Abseiling Risk Management Plan Abseiling Risk Management Plan Lutanda Mt Victoria School: Year: Dates: Program: Supervising Staff: Activity Context Abseiling at Lutanda Mt Victoria involves descending a natural rock face at Mt York,

More information

Control Control Owner Residual Risk I L Score I L Score

Control Control Owner Residual Risk I L Score I L Score Activity: Crate Climbing RISK ASSESSMENT FORM: - CRATE CLIMBING No Hazard Inherent 1 Activity Leaders 5 5 125 Supervisor is 18 years old or over. have insufficient of participant. skills to run the No

More information

Session plan and risk assessment. Climbing

Session plan and risk assessment. Climbing Session plan and risk assessment Climbing Session Length: 165 minutes (2h45) Instructor / participant ratio: 1:12 Session Aim: To provide a safe, fun and interesting introduction to the sport. To introduce

More information

2017 Water Safety Manual. Presented by:

2017 Water Safety Manual. Presented by: 2017 Water Safety Manual Presented by: 1 WATER EMERGENCY SAFETY PLAN This Water Emergency Safety Plan was developed to aid in the response to injuries or illnesses on the water during the Partners In Education

More information

RISK ASSESSMENT FOR GO APE CONTINUOUS BELAY

RISK ASSESSMENT FOR GO APE CONTINUOUS BELAY SUBJECT: Continuous Belay RISK ASSESSMENT NUMBER: 01 Reviewed by: Operations Team and Health and Safety Manager February 2016 REVIEW DATE: February 2017 SER HAZARD LHD CON 001a Falling to the ground or

More information

Grizedale Zip Trekking Adventure Risk Assessment

Grizedale Zip Trekking Adventure Risk Assessment Grizedale Zip Trekking Adventure Risk Assessment SUBJECT: Zip Trekking RISK ASSESSMENT NUMBER: ZT/01/2017 Reviewed by: Operations Team/Site Manager and Health and Safety Manager Febuary 2018 REVIEW DATE:

More information

GENERIC AALA ACTIVITIES RISK ASSESSMENT

GENERIC AALA ACTIVITIES RISK ASSESSMENT No. P01: Out of Classroom Page 1 of 8 Appendix 5: Generic AALA Activities Assessment APPENDIX 5: GENERIC AALA ACTIVITIES RISK ASSESSMENT This appendix contains the Assessment for Generic Activities AALA

More information

RISK Assessment & Management Plan

RISK Assessment & Management Plan Provider Outdoor Learning Schools CIC Location: Cherry Garth Assessment Ref: OLS/001/Archery Assessment by: C.Carr Last Assessment:: 02/07/13 of risk Arrows Archery Target shooting through using arrows

More information

Archery Risk Management Plan Lutanda Yarramundi

Archery Risk Management Plan Lutanda Yarramundi Archery Risk Management Plan Lutanda Yarramundi School: Year: Dates: Program: Supervising Staff: Activity Context The archery range at Lutanda Yarramundi is located next to River Lodge on the left end

More information

RSP1.1 Single pitch rock climbing and abseiling on outcrops and crags using. RSP2.1 The learning outcome will vary depending on Particiapnt needs and

RSP1.1 Single pitch rock climbing and abseiling on outcrops and crags using. RSP2.1 The learning outcome will vary depending on Particiapnt needs and Specific Safety Procedures Single Pitch Rock Climbing and Abseiling RSP1 Description: RSP1.1 Single pitch rock climbing and abseiling on outcrops and crags using top or bottom safety ropes. RSP1.2 Indoor

More information

RISK ASSESSMENT Outdoor Climbing Wall

RISK ASSESSMENT Outdoor Climbing Wall GENERIC X SITE SPECIFIC OTHER DATE OF ISSUE 1 st September 2016 REVIEW DATE 31 st August 2017 VERSION 1.0 NO OF PAGES 6 PRODUCED BY Danny Griffith AUTHORISED BY: Andy Howard DEFINITION: Rock Climbing is

More information

Proficiency Statements Vertical Stage 1- Introductory Skills Plan

Proficiency Statements Vertical Stage 1- Introductory Skills Plan Proficiency Statements Vertical Stage 1- Introductory Skills I can dress myself for a rock activity. I know not to break or damage trees when climbing them I know what to do if I get lost at an activity

More information

SAREA TOP ROPE INSTRUCTOR PERSONAL CLIMBING ASSESSMENT

SAREA TOP ROPE INSTRUCTOR PERSONAL CLIMBING ASSESSMENT Candidates name:... Location:... Assessor/s name/s:... Date:...... /..... /....... Time started:... Time finished:... Weather conditions:... Note: There are 3 components of the SAREA Top Rope Instructor

More information

Off Ground Training Syllabus Trainer Manual. Version 3 November 2011 (Skype Version)

Off Ground Training Syllabus Trainer Manual. Version 3 November 2011 (Skype Version) Off Ground Training Syllabus Trainer Manual. Version 3 November 2011 (Skype Version) providing technical advice to Ropeworks Developments Ltd 7 Marine Road Colwyn Bay Conwy LL29 8PH ian@ropeworks.co.uk

More information

Rock Climbing Review date December 2013

Rock Climbing Review date December 2013 Rock Climbing Review date December 2013 Risk Assessments Rock Activities Including: weaselling, scrambling, abseiling and indoor climbing wall Contained in the following pages are the risk assessments

More information

RISK ASSESSMENT Indoor Climbing Wall

RISK ASSESSMENT Indoor Climbing Wall GENERIC X SITE SPECIFIC OTHER DATE OF ISSUE 1 st September 2016 REVIEW DATE 31 st August 2016 VERSION 1.0 NO OF PAGES 6 PRODUCED BY Danny Griffith AUTHORISED BY: Andy Howard DEFINITION: Climbing Wall is

More information

GENERIC AALA ACTIVITIES RISK ASSESSMENT

GENERIC AALA ACTIVITIES RISK ASSESSMENT No. L2P: Assessments for Educational Activities Page 1 of 8 Appendix 4: Generic AALA Activities Assessment APPENDIX 4: GENERIC AALA ACTIVITIES RISK ASSESSMENT This appendix contains the Assessment for

More information

Installation and Operating Instructions

Installation and Operating Instructions Rollgliss Rescue Kit Installation and Operating Instructions IMPORTANT: Rescuers of people suspended at height must always protect themselves from the risk of injury and falls. This kit is a highly effective

More information

Important Information for Activity Supervisors RAMS (Risk Assessment & Method Statement)

Important Information for Activity Supervisors RAMS (Risk Assessment & Method Statement) Important Information for Activity Supervisors (Risk Assessment & Method Statement) Activity location maps for all campsites can be downloaded at onebigadventure.org.nz or can be found in the One Big Adventure

More information

Grizedale Zip Trekking Adventure Risk Assessment

Grizedale Zip Trekking Adventure Risk Assessment Grizedale Zip Trekking Adventure Risk Assessment REVIEWED BY: Operations Team/Site Manager/Health & Safety Manager February 2016 NEXT REVIEW: February 2017 Assessing risks is simple in principle. It involves

More information

Mountain Bike Risk Management Plan

Mountain Bike Risk Management Plan Mountain Bike Risk Management Plan Lutanda Mt Victoria School: Year: Dates: Program: Supervising Staff: Activity Context Riding Mountain bikes is a fun way to challenge participants in their confidence,

More information

All Wedderburn Christian Campsite s Safe Operating Procedures and activity curricula have been developed with reference to these documents.

All Wedderburn Christian Campsite s Safe Operating Procedures and activity curricula have been developed with reference to these documents. SAFETY STATEMENT & RISK ASSESSMENT Wedderburn Christian Campsite is an organisation committed to providing a safe environment for all participants in its outdoor programmes. Wedderburn Christian Campsite

More information

Risk Assessment for Rock Climbing

Risk Assessment for Rock Climbing Risk Assessment for Rock Climbing Reviews Completed By Revision Date Approved By Approval Date R Shanks 24/07/2018 D Davidson 24/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

Generic Risk Assessments Reviewed 15 th December 2016 Matt Smith JCA Compliance & Operations Manager

Generic Risk Assessments Reviewed 15 th December 2016 Matt Smith JCA Compliance & Operations Manager Generic Risk Assessments 2017 Risk Assessment Overview What is a risk assessment? A risk assessment is the careful analysis of a hazards ability to cause harm/injury/loss to any Travel Class staff, clients,

More information

Climbing & Abseiling Activity Plan

Climbing & Abseiling Activity Plan Climbing & Abseiling Activity Plan CONTENTS Outcomes... 2 Activity... 2 2.1 Outline... 2 2.2 Equipment... 2 2.3 Communication... 3 2.4 First Aid... 3 People... 4 3.1 Activity Instructor... 4 3.2 School

More information

Grizedale Zip Trekking Adventure Risk Assessment

Grizedale Zip Trekking Adventure Risk Assessment Grizedale Zip Trekking Adventure Risk Assessment SUBJECT: Zip Trekking RISK ASSESSMENT NUMBER: ZT/01/2017 Reviewed by: Operations Team/Site Manager and Health and Safety Manager February 2017 REVIEW DATE:

More information

Cambridge East School Activities at Camp Raglan 2018

Cambridge East School Activities at Camp Raglan 2018 In line with the Health and safety at work act 2015 and the Vulnerable children act 2014 Camp Raglan PO Box 6, Raglan Phone 07 825 8068 / Fax 07 825 7091 Email: campraglan@cbm.org.nz Website: www.cbm.org.nz

More information

RISK ASSESSMENT FOR GO APE CONTINUOUS BELAY

RISK ASSESSMENT FOR GO APE CONTINUOUS BELAY SUBJECT: Continuous Belay RISK ASSESSMENT NUMBER: CB/01/2017 Reviewed by: Operations Team and Health and Safety Manager February 2017 REVIEW DATE: February 2018 Assessing risks is simple in principle.

More information

RISK ASSESSMENT FOR GO APE TREE TOP JUNIOR COURSE

RISK ASSESSMENT FOR GO APE TREE TOP JUNIOR COURSE SUBJECT: Tree Top Junior RISK ASSESSMENT NUMBER: 01 WRITTEN BY: Rob Davies REVIEW DATE: February 2014 SER HAZARD LHD CON WHO MIGHT BE HARMED EXISTING CONTROL MEASURES Falling to the ground or Continuous

More information

Zip-Line Kit Instructions

Zip-Line Kit Instructions 1 Zip-Lines Ireland - Zip-Line Kit Instructions DC001A Zip-Line Kit Instructions Thank you for your purchase of the ZLI Zip-line kit! This product was engineered to provide safe fun for all ages when the

More information

ADVENTURE EDUCATION HIGH ROPES

ADVENTURE EDUCATION HIGH ROPES ADVENTURE EDUCATION HIGH ROPES History and Overview Ropes courses could be found in the United States as early as the 1960s. Outward Bound was a leader in these types of adventure activities with their

More information

UNIVERSITY of OXFORD SPORTS DEPARTMENT. OXFORD UNIVERSITY RISK ASSESSMENT MOUNTAINEERING DATE: - May Who might be harmed

UNIVERSITY of OXFORD SPORTS DEPARTMENT. OXFORD UNIVERSITY RISK ASSESSMENT MOUNTAINEERING DATE: - May Who might be harmed UNIVERSITY of OXFORD SPORTS DEPARTMENT OXFORD UNIVERSITY RISK ASSESSMENT MOUNTAINEERING DATE: - May 2017 Who might be harmed General hazards HAZARD Risk Control Measure in place Further Risk reduction

More information

Risk Assessment: School Games Gymnastics

Risk Assessment: School Games Gymnastics Activity Level 3 Key Steps Gymnastics Location Diamond Gymnastics Club Date of Activity 22 nd & 23 rd May 2017 Venue Specific information Diamond Gymnastics is a working gym club and as such there will

More information

Kayaks. KCC Standard Operating Procedure. Activity Overview. Be Prepared:

Kayaks. KCC Standard Operating Procedure. Activity Overview. Be Prepared: Kayaks KCC Standard Operating Procedure Activity Overview Across the road from KCC facilities is the pond that we use for Kayaking. We have a selection of 12 sit on kayaks including one double and a triple

More information

Risk Assessment for Redpoint Climbing Centre & RedBloc Bouldering Centre

Risk Assessment for Redpoint Climbing Centre & RedBloc Bouldering Centre Risk Assessment for Redpoint Climbing Centre & RedBloc Bouldering Centre Date last updated: August 2017 (Review date August 18) Prepared by P Minal Approved by Philip Minal, centre manager. & Joby Maw

More information

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND WARNING! You must read and understand all of the following instructions before first use. If you do not, it could result in serious injury up to and including death. Any questions please call 309-691-9653.

More information

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator

POSITION OF PERSON COMPLETING REPORT: IN CONSULTATION WITH: David Radolovic POSITION: HSR/ Program Coordinator YMCA CENTRE: Parks Recreation Centre ASSESSMENT DATE: 04/08/2015 PROGRAM / AREA: Climbing Wall TASK / ITEM: Climbing Wall PERSON COMPLETING REPORT: Anthony Bates POSITION OF PERSON COMPLETING REPORT: Camping

More information

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND WARNING! You must read and understand all of the following instructions before first use. If you do not, it could result in serious injury up to and including death. Any questions please call 309-691-9653.

More information

Pre-control risk estimate. Likelihood Risk

Pre-control risk estimate. Likelihood Risk Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &

More information

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS!

DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS! ! WARNING DO NOT use any Alien Flier Zip Line Products or Accessories until you read and understand these SAFETY WARNINGS! A zip line can be very dangerous. Do not use this kit if you do not understand

More information

RISK ASSESSMENT SCALE

RISK ASSESSMENT SCALE Scottish Canoe Association Polo Committee RISK ASSESSMENT RISK ASSESSMENT SCALE Effects hazard scale: 3 MAJOR e.g. Death or major injury 2 SERIOUS e.g. Injuries where people may be f work for more than

More information

This document is intended to represent part of Map Adventures response to its responsibilities under the:

This document is intended to represent part of Map Adventures response to its responsibilities under the: INTRODUCTION This document is intended to represent part of Map Adventures response to its responsibilities under the: - Health & Safety at Work Act 1974 - Adventure Activities Licensing Regulations 1996

More information

Climbing Tower Training Manual. Updated May 2003

Climbing Tower Training Manual. Updated May 2003 Climbing Tower Training Manual Updated May 2003 Disclaimer The information in this manual is designed to be used in conjunction with a one-day training program at YMCA Camp St. Croix. The information contained

More information

The Trekking Company Ltd. Risk Assessments

The Trekking Company Ltd. Risk Assessments The Trekking Company Ltd. Risk Assessments These Risk Assessments are carried out by an appropriately qualified competent person. Revised January 2014 Index of Risk Assessments Outdoor Activities General

More information

Activity/Venue Identified Hazards Risk Factor Parties at Risk Current Safety Precautions Further Action

Activity/Venue Identified Hazards Risk Factor Parties at Risk Current Safety Precautions Further Action Mohawk Walk Fall off Swing into tree / onto ground Friction burns to hands / legs Splinters (wood) Splinters (wire) Tripping over roots / wire Damage to fingers Low Spotting all elements Clear briefing

More information

Paddle Australia Qualification Scheme Assessment Guidelines Whitewater Rescue Level 2 - Kayak

Paddle Australia Qualification Scheme Assessment Guidelines Whitewater Rescue Level 2 - Kayak Qualification Definition The holder of this award has demonstrated the ability to manage rescue situations from a kayak and gear retrieval in Grade 2 Whitewater. Skills All skills to be performed in Grade

More information

Risk Assessment for Low Ropes

Risk Assessment for Low Ropes Risk Assessment for Low Ropes Reviews Completed By Revision Date Approved By Approval Date R Shanks 23/07/2018 A Daykin 23/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au Risk

More information

BRIEFING CARD: BIG FLYING FOX

BRIEFING CARD: BIG FLYING FOX BRIEFING CARD: BIG FLYING FOX Aim: Overcome fears while having fun. Staff instruction & demonstration must be given before use A minimum of 2 supervisors is needed at all times Ensure loop on return rope

More information

Safety Management Plan

Safety Management Plan Safety Management Plan Version 1.1 2016 Contents Introduction 3 Organisational structure.... 3 Legislation and requirements 3 Health and safety goals 4 Responsibilities 4 Policies, guidelines and procedures.

More information

Worthing Swimming Club. Emergency Action Plan

Worthing Swimming Club. Emergency Action Plan Worthing Swimming Club Emergency Action Plan Applicable to: Worthing Aquarena (Extracts from Aquarena Pool Rules and Safety Procedures Manual amended for WSC activities) (These generally apply to all pools

More information

RESCUE TECHNICIAN PROFESSIONAL QUALIFICATION CHAPTER 5 SKILL STATION MENU GENERAL REQUIREMENTS/CORE COMPETENCIES

RESCUE TECHNICIAN PROFESSIONAL QUALIFICATION CHAPTER 5 SKILL STATION MENU GENERAL REQUIREMENTS/CORE COMPETENCIES RESCUE TECHNICIAN PROFESSIONAL QUALIFICATION CHAPTER 5 SKILL STATION MENU GENERAL REQUIREMENTS/CORE COMPETENCIES A SCENE CONTROL AND RESOURCE MANAGEMENT Mandatory Station B CONDUCTING A SEARCH Mandatory

More information

Risk Assessment for Team Builders

Risk Assessment for Team Builders Risk Assessment for Team Builders Reviews Completed By Revision Date Approved By Approval Date R Shanks 19/07/2018 A Daykin 19/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

Low Ropes and Adventure Course Risk Assessment

Low Ropes and Adventure Course Risk Assessment Low Ropes and Adventure Course Risk Assessment Activity Low Ropes and adventure course Activity Session What are the hazards? Inappropriate use and falling from the equipment Rope burns Over balancing

More information

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS

GUIDE 2002 HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS HEALTH AND SAFETY FOR ARTIFICIAL CLIMBING STRUCTURES AND OPERATIONS FOR DESIGNERS, MANUFACTURES, SUPPLIERS, OPERATORS AND USERS GUIDE 2002 WorkCover NSW Health and Safety Guide WorkCover Watching out for

More information

Land-Based Activities Risk Assessments

Land-Based Activities Risk Assessments Land-Based Activities Risk Assessments Activity Archery Owen Senior (GNAS) GNAS Leader 1:12 should be reduced to meet the needs of participants where appropriate - e.g. Personal injury E.g. Bruising to

More information

Mountaineering Code of Practice

Mountaineering Code of Practice Mountaineering Code of Practice It is recommended that members familiarize themselves with the following: http://www.thebmc.co.uk/category.aspx?category=8 TRAINING FITNESS SESSIONS All training sessions

More information

Curriculum Activity Risk Planner for Mid Ropes & Flying Fox

Curriculum Activity Risk Planner for Mid Ropes & Flying Fox Curriculum Activity Risk Planner for Mid Ropes & Flying Fox Reviews Complete By Revision Date Approved By Approval Date Kai Timm 3/6/2016 Libby Mensa 4/6/2017 R Shanks 6/4/2017 Head Office 171 Nojoor Road

More information

Infant Swing ( )

Infant Swing ( ) Infant Swing (04-0017) 1. Insert the yellow T-bar into the hole at the front of the swing. If you need to disengage the T-bar you can squeeze the 2 tabs together under the seat while pulling the T-bar

More information

2009 Summit Harness 1 INDEX INSTRUCTIONS WARNING

2009 Summit Harness 1 INDEX INSTRUCTIONS WARNING 2009 Summit Harness WHEN HUNTING FROM A TREESTAND FALLS CAUSING INJURY OR DEATH CAN OCCUR ANY TIME AFTER LEAVING THE GROUND FOR THOSE REASONS ALWAYS WEAR A FALL ARREST SYSTEM (FAS) COMPRISING A FULL BODY

More information

Big Flying Fox. Risk Causal Factors Normal Operation Risk Management Emergency response

Big Flying Fox. Risk Causal Factors Normal Operation Risk Management Emergency response Big Flying Fox X NO -Rope burn, bruising, fractures. -Failing to use equipment as instructed, standing in way of chair. -Use proper procedures, keep children in designated safe areas. possible. Call First

More information

RISK ASSESSMENT FOR GO APE, ADVENTURE FOREST LIMITED

RISK ASSESSMENT FOR GO APE, ADVENTURE FOREST LIMITED FALLS FROM HEIGHT FROM THE HIGH WIRE ROPES COURSE RISK ASSESSMENT NUMBER 001 PART ONE WRITTEN BY: William Galbraith TO BE REVIEWED: March 2008 SER HAZARD LHD CON 1001 Falling to the ground or onto another

More information

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND

WARNING! WARNING! ALWAYS WEAR A TMA APPROVED FALL ARREST SYSTEM WHEN USING ANY TREESTAND WARNING! You must read and understand all of the following instructions before first use. If you do not, it could result in serious injury up to and including death. Any questions please call 309-691-9653.

More information

Dorset Waterpark Activity Risk Assessment

Dorset Waterpark Activity Risk Assessment Dorset Waterpark Activity Risk Assessment Date of Review Assessor 02.01.2018 Liz Turner Required Lifeguard Competence Lead RLLS Pool Lifeguard, Beach Lifeguard or Open Water Lifeguard or other equivalent

More information

PART 1 - GENERAL. Erina Archery Club has a Duty of Care to its members and visitors during archery events and other activities conducted by the club.

PART 1 - GENERAL. Erina Archery Club has a Duty of Care to its members and visitors during archery events and other activities conducted by the club. PART 1 - GENERAL Policy: Erina Archery Club has a Duty of Care to its members and visitors during archery events and other activities conducted by the club. Archery safety is a matter of exercising common

More information

Personal safety. PAGE 1 of 5

Personal safety. PAGE 1 of 5 UNIVERSITY of OXFORD SPORTS FEDERATION Safety Meeting: Company of Archers DATE: 2005/06 Activities usually carried out by the club. Archery Practice: Monday Thursday 2-4:30, Tuesday 7-8.30am, Sunday 6-7.30pm

More information

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision

SAFE WORK PROCEDURE. Location of Equipment Written By: Approved By: Date Created Last Revision Page 1 of 5 Location of Equipment Written By: Approved By: Date Created Last Revision School: Facilities & Operations Brent Vandenbosch Gordon Howe October 14, 2009 new Room: n/a Barry Hamilton HAZARDS

More information

Camp Barrabadeen Risk Assessment

Camp Barrabadeen Risk Assessment Activity description: Top Rope climbing Activity Dates Start: End: Persons doing Assessment Name : Jason Hodder Name : Position :Program anager Position : inimum Supervision and Qualifications Sufficient

More information

National Cave Rescue Commission Level 3 Student Preparation Guide

National Cave Rescue Commission Level 3 Student Preparation Guide National Cave Rescue Commission Level 3 Student Preparation Guide NCRC requires all students demonstrate basic skills prior to participation. Level 3 students will be tested on knot tying, single rope

More information

HYDROTHERAPY POLICY. Signature: Version: 1.0. Issue Date: March Next Review Date: March 2021

HYDROTHERAPY POLICY. Signature: Version: 1.0. Issue Date: March Next Review Date: March 2021 HYDROTHERAPY POLICY Category: Authorised By: Hydrotherapy Director for Schools Signature: Signed By: Author: Jarlath O Brien Hilary McDermott Version: 1.0 Status: Ratified Issue Date: March 2018 Next Review

More information

District Risk Assessment: Grass Sledging - Rhydd Covert Campsite

District Risk Assessment: Grass Sledging - Rhydd Covert Campsite HAZARD OBSERVED RISK BEFORE CONTROL MEASURES PERSONS AT RISK CONTROL MEASURES COMMENTS ACTIONS Lifting weighted objects Muscle strain When lifting and carrying sledges to and from store room Leaders Storage

More information

Summit Harness Instruction Booklet WHEN TO REPLACE YOUR SAFETY STRAP / HARNESS:

Summit Harness Instruction Booklet WHEN TO REPLACE YOUR SAFETY STRAP / HARNESS: Summit Harness Instruction Booklet - 2008 Please read carefully BEFORE using your new Summit Safety Harness. Congratulations You have purchased the finest commercially available hunting harness on the

More information

PRE-JUMP FOR FORT BRAGG UNITS OCTOBER 2016

PRE-JUMP FOR FORT BRAGG UNITS OCTOBER 2016 The first items I will discuss are the five points of performance. The first point of performance is proper exit, check body position, and count. Jumpers hit it. Upon exiting the aircraft, snap into a

More information

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b ROPE RESCUE EFFECTIVE: OCTOBER 2007

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b ROPE RESCUE EFFECTIVE: OCTOBER 2007 STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS 202.14b ROPE RESCUE EFFECTIVE: OCTOBER 2007 ROPE RESCUE Goals Objectives 1. To save and protect lives 2. To mitigate any hazardous conditions 1. Life safety

More information

Never exceed 70 inch pounds of torque on bolt, as this will collapse tubing wall. Never use ladder that bolt has been over tightened. USE INSTRUCTIONS

Never exceed 70 inch pounds of torque on bolt, as this will collapse tubing wall. Never use ladder that bolt has been over tightened. USE INSTRUCTIONS Use and Care instructions for M-210 and M-200 Millennium Series 20ft Stick Climber and M-202 cam buckle straps. By Hunting Solutions, Inc. M-200 and M-210 for use with M-100, M-25 and M-50 treestands only.

More information

Risk Assessment for Radio Rogaine

Risk Assessment for Radio Rogaine Risk Assessment for Radio Rogaine Reviews Completed By Revision Date Approved By Approval Date R Shanks 24/07/2018 A Daykin 24/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

Risk Assessment for Night Olympics

Risk Assessment for Night Olympics Risk Assessment for Night Olympics Reviews Completed By Revision Date Approved By Approval Date R Shanks 23/07/2018 A Daykin 23/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT

HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT HEALTH & SAFETY ARRANGEMENTS FOR MANAGEMENT OF WORK AT HEIGHT INTRODUCTION Cwmni CYNNAL recognises that accidents can arise from working at height. Falls from height can be a cause of injury and absence

More information

Rescue Technician: Rope Rescue I

Rescue Technician: Rope Rescue I Rescue Technician: Rope Rescue I Skill Sheet Package Based on NFPA 1006: Standard for Technical Rescue Professional Qualifications, 2013 Edition. Alabama Fire College August 2016 REVISED 02/10/2017 Alabama

More information

Ice Axe-Boot belay Freedom of the Hills p. 350 Watch:

Ice Axe-Boot belay Freedom of the Hills p. 350 Watch: Carabiner-Ice Axe Belay Freedom of the Hills pp.358-359 Watch: http://bit.ly/carabinericeaxebelay Also called the stomper belay, the carabiner-ice axe belay provides better security than a boot-axe belay

More information

Risk Assessment For : Ace Tones Entertainments Ltd

Risk Assessment For : Ace Tones Entertainments Ltd Assessment Name: Bungee Run Assessment Type: General Assessor Name: Lewis Slack Affected Site(s): Assessment Date: 29/05/2017 Review Period: Annually Approved By: Lewis Slack Review Date: 29/05/2018 Approved

More information

Archery. Reviews Complete By Revision Date Approved By Approval Date Kai Timm 16/6/2016 Libby Mensa 4/4/2017 Robbie Shanks 6/04/2017

Archery. Reviews Complete By Revision Date Approved By Approval Date Kai Timm 16/6/2016 Libby Mensa 4/4/2017 Robbie Shanks 6/04/2017 Archery Reviews Complete By Revision Date Approved By Approval Date Kai Timm 16/6/2016 Libby Mensa 4/4/2017 Robbie Shanks 6/04/2017 Mail Box 19, Sleeman Sports Complex 1763 Old Cleveland Road Chandler

More information

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071

Reliance Industries, LLC Operating instructions for the / Bolt-on D-Ring Anchorage. Model # 3071 Reliance Industries, LLC Operating instructions for the 3071-1 / 3071-2 Bolt-on D-Ring Anchorage Model # 3071 Reliance Industries, LLC PO Box 140008 Denver, CO 80214 Ph. (800) 488-5751 Ph. (303) 424-8650

More information