1 Wayne Road Dam Removal and Habitat Restoration Project Lower Rouge River, Michigan NOAA/GLRI Final Report NOAA Grant Number: NA11NMF September, 2013 Project Partners: 719 Griswold, Suite 820 Detroit, MI

2 Wayne Road Dam Removal and Habitat Restoration Project National Oceanic Atmospheric Administration (NOAA)/Great Lakes Restoration Initiative Grant Final Report NOAA Grant Number: NA11NMF NOAA Grant Number: Grantee: NA11NMF Alliance of Rouge Communities Award Amount: $1,033,536 Project Location: Stream: Property Owner: Adjacent to the City of Wayne Municipal Building 3355 South Wayne Road, Wayne, Michigan Latitude: Longitude: Rouge River Wayne County Report prepared by: 2200 Commonwealth Blvd., Suite 300 Ann Arbor, MI NOAA/GLRI Final Report, September 12, 2013 Wayne Road Dam Removal and Habitat Restoration Project i

3 TABLE OF CONTENTS 1.0 INTRODUCTION PROJECT BACKGROUND Design PROJECT IMPLEMENTATION Contract Documents and Contractor Selection Construction and Construction Oversight Grant Administration Public Involvement Citizen Concerns Presentations Press Releases Education Materials FOTR workshops and Canoe Trips Media Coverage Public Opening Event Pre and Post Construction Monitoring Fish Monitoring Morphology Monitoring Benthic Monitoring PROJECT RESULTS Primary Goals LIST OF FIGURES Figure 1 1: Rouge River Watershed Location Figure 2 1: Project Location Map Figure 4 1: Performance Measures Figure 4 2: Waterways Affected by Wayne Road Dam Removal LIST OF APPENDICES Appendix A: As Built Drawings Appendix B: Public Education Materials Appendix C: Wayne Road Dam Removal Monitoring Report NOAA/GLRI Final Report, September 12, 2013 Wayne Road Dam Removal and Habitat Restoration Project ii

4 1.0 INTRODUCTION The Wayne Dam Removal and Habitat Restoration Project is located within the City of Wayne on the Lower Branch of the Rouge River. The project was funded by a NOAA GLRI Grant to the Alliance of Rouge Communities (ARC), in partnership with Wayne County. This project consisted of the construction of the Wayne Dam removal, and stream and habitat restoration. Located in Southeast Michigan, the Rouge River Watershed shown in Figure 1 1 is a heavily urbanized and industrialized area that includes portions of three counties and encompasses 48 communities and a population of over 1.5 million. The watershed is a designated Area of Concern (AOC) under the Great Lakes Water Quality Agreement (GLWQA), and is characterized by nine Beneficial Use Impairments (BUIs), including three associated with fish and wildlife habitat (i.e., Degraded Fish and Wildlife Populations, Degradation of Benthos, Loss of Fish and Wildlife Habitat). Prior to implementation of the project, the dam acted as a barrier to fish passage as well as Figure 1 1: Rouge River Watershed Location promoted the accumulation of sediment and debris behind the dam, which contributed to the degradation of the reach of river. The ARC proposed the project to aid in the advancement of the Rouge River AOC delisting efforts. The project outputs included: 1) Wayne Road Dam was removed and fish passage for multiple species were restored by reconnecting 11 miles of the Rouge River and over 110 miles of tributaries with the Great Lakes system; 2) Rock structures and bank stabilization improved fish and wildlife habitat, benefiting key aquatic species and natural communities; 3) Great Lakes aquatic and terrestrial habitats were restored and protecting by re connecting the river to the Great Lakes system. The implementation of the project has improved the riparian corridor and hydrologically reconnected approximately 123 miles of river and tributaries to the Great Lakes system for the first time in over a century. The river hosts a variety of fish species in the vicinity of the dam, including variety of warm water species (e.g., smallmouth bass, northern pike, walleye, suckers, darters, minnow, sunfishes). All of these species have been benefitted as a result of the implementation of this project. NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

5 Wayne Road Dam prior to project implementation Restored reach NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

6 2.0 PROJECT BACKGROUND The project is located in the City of Wayne, Michigan, underneath, and within the vicinity of the Wayne Road Bridge, over the Lower Rouge River (see Figure 2 1). The structural height of the dam was approximately three feet, with a hydraulic height of approximately 2.5 feet. The dam spanned the entire 80 foot width of the stream, effectively creating a hydrologic barrier for the movement of fish between the Great Lakes system via the Detroit River and the upstream reaches of the river. Removal of the Wayne Road Dam reconnected this reach of the river to the Great Lakes system for the first time in over a century. Historically, in 1910, the Village of Wayne government began on a water supply system to provide fire protection. The construction included building a dam on the Rouge River just west of Washington Street (now Wayne Road) along with an open reservoir to pump water into a pump house and water main to supply water to 80 fire hydrants in the downtown area. The water supply system was a great improvement in fire fighting as the fire department could now connect fire hoses to the hydrants, an improvement over the hand pump engine. The system was complete and in operation by By 1939, the City of Detroit Water Board took over the Wayne water system, and all water was then purchased from Detroit. Detroit made improvements to the system and the pump house and the dam was no longer used. Construction of this dam over a century ago, as well as a legacy of subsequent activities (i.e., land use, shoreline development, point and non point source pollution, storm water runoff) have contributed to compromised water quality; loss of fish; benthos and wildlife health; habitat and populations, and loss of a natural flow regime. Project Location Figure 2 1: Project Location Map NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

7 2.1 DESIGN The design phase of the project was completed in the summer of 2011 within funding from the Rouge River National Wet Weather Demonstration Project (Rouge Project) grant. This included data collection, design, permit application assembly and contract document preparation. Data collection began in the winter, 2010/2011. A survey of the dam, its vicinity as well as 25 cross sections along the river reach was conducted. The survey data was used in the design permit, and construction documents. The cross sectional data was used in the design to help make informed design decisions of in channel changes and to create a hydraulic model. Using the survey data and hydraulic model, the design was conducted based on analytical, empirical and natural channel design concepts that reflect proven modern urban stream restoration practices. The objective was to restore the natural flow patterns of the Lower Rouge River as a result of the dam removal without the need for operational and maintenance activities to maintain this natural flow. The design included the removal of the majority of the concrete weir structure, leaving a small width of concrete on either edge to protect the integrity of the Wayne Road Bridge and avoid creating an overwide channel in the vicinity of the existing dam. In addition to the removal of the dam, the design included the removal of the in stream island downstream of the dam and reconstruction of a more stable single flow channel with bankfull benches, installation of an engineered riffle/ boulder cascade to protect existing infrastructure and facilitate fish passage and bank stabilization. Grade control structures, other than the riffle/ boulder cascade were considered. The riffle/ boulder cascade was chosen based on modeling and evaluation of the expected sediment transport due to a predicted increase in the energy grade line slope and shear stress. It was suspected that the existing bridge and sanitary sewer infrastructure immediately upstream of the dam would be impacted in the very short term by a headcut migrating upstream from the scour hole located downstream of the dam. Therefore, the engineered riffle/ boulder cascade was proposed to extend from upstream of the sanitary sewer lines, under the Wayne Road bridge and past the existing water main. The structures were designed and intended to be permanent and do not require maintenance or operation after proper installation. The grade control structures were designed for fish passage, using the swim speed for walleye. The bankfull bench and removal of the island together were proposed to alleviate the erosive velocities on the adjacent banks and restore natural flow to this reach of the river. Both the bed and banks of the engineered riffle, along with the constructed bankfull benches were proposed to be armored to prevent erosion. The rock proposed was sized using industry accepted equations. In addition to protection of the banks and bed, the rock provides attachment sites for macro invertebrates and feeding and spawning habitat for fish. The resulting design (see Appendix A) was completed and the Joint MDEQ/ USACE permit application was submitted and permits received. Proposed design NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

8 3.0 PROJECT IMPLEMENTATION In the fall of 2011, a NOAA GLRI grant was awarded to the Alliance of Rouge Communities (ARC) for preand post construction monitoring, contract documents, contractor selection, construction, grant administration, and public involvement for the dam removal and habitat restoration. The following provides a summary of the grant activities, by task: 3.1 CONTRACT DOCUMENTS AND CONTRACTOR SELECTION The ARC entered into an Inter Agency Agreement (IAA) with Wayne County (one of its members) to contract for the construction activities associated with the implementation. After receipt of the State of Michigan permit, ARC Staff worked with Wayne County to finalize the contract documents for bidding. The project was released for bidding on March 28, 2012, with a mandatory pre bid conference on April 11, Bids were due on April 24, After bids were received, a bid tab was developed and reviewed and the lowest bidder s references were checked. ECT (as ARC Staff) then issued a contractor recommendation letter to the County. In June, 2012 Wayne County approved to award the construction contract to Inland Lakes Landscaping Corporation. 3.2 CONSTRUCTION AND CONSTRUCTION OVERSIGHT The construction activities for the project were initiated with a pre construction meeting on July 16, Following the meeting the contractor began mobilization on July 23, 2012 and construction continued through November. Construction of the project went generally as planned and on schedule. Two noteworthy unexpected items were encountered and addressed: While removing debris upstream of the bridge a sanitary siphon was discovered. It was determined that, in order to complete the riffle as planned, the sanitary siphon had to be relocated. A design for the siphon relocation was completed and the siphon was relocated prior to riffle placement. The other unexpected item was two stormwater outfalls at the north bank downstream of the bridge. When work began, the two outfalls were discovered and determined to be below the top of the proposed bankfull bench elevation. Therefore, the outfalls were extended to outlet at the face of the rock toe of the bankfull bench. Neither of these items caused a delay in the construction schedule. A detailed summary of the monthly activities is presented below: July, 2012 The contractor completed the audio visual recording of the project site to establish a record of existing conditions. Wayne County permits were acquired. Installation of the construction staking and soil erosion and sediment control measures began. Also during July the project sign was installed and removal of the log jam began. Project Sign NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

9 August, 2012 Throughout the month of August, the contractor cleared the island downstream of the dam as well as the proposed access route west of Wayne Road, south of the river. Clearing operations on the island downstream of the dam Clearing operations for west access route Log Jam Removal (Upstream Side of Wayne Road Bridge, view looking south) NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

10 The water level behind the dam was lowered by notching the dam incrementally. When the water level was lowered the rest of the spillway was then removed. Notched spillway Notching of spillway Spillway removal Spillway removal View of downstream side of dam during removal NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

11 Also during August removal of the log jam and debris upstream of the dam and the bridge continued. On August 8, 2012, A 6 inch sanitary siphon was found at or just below the bed of the river. It was determined that this siphon and another 6 inch sanitary relief siphon would need to be lowered in order to accomdate the removal of the dam, installation of the riffle and provide adaquate cover to protect the utilities. NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

12 September With the dam removed, work continued on the Wayne Road Dam Removal Project as follows: The rock for the riffle was placed under the bridge. A 6 thick layer of smaller stone was placed first and overtopped by larger rock. North half of riffle under the bridge, view looking east. Note smaller stone near the bridge abutment and larger rock in the stream channel. The smaller stone will eventually be covered with larger rock that will slope up against the abutments South half of riffle under the bridge, view looking northeast The rock for the riffle was also placed downstream of the bridge. Riffle, view looking down from bridge deck NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

13 Construction of the stone toe began under the bridge and extended downstream View of north abutment, looking northwest View looking west View looking northwest NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

14 View looking west South rock toe downstream of bridge North rock toe downstream of bridge NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

15 Sand bankfill was placed behind the stone toe. Geotextile fabric was used between the stone toe and the sand backfill. South bench, just downstream of the bridge, view looking west View looking west, note sand backfill behind a portion of the stone toe Proposed storm pipe was installed at an existing outfall to extend the pipe through the proposed bankfull bench to the stream channel. Storm sewer outfall at north bank downstream of the bridge NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

16 A portion of the existing island was excavated. It will eventually be completely removed. Island, view looking east October Throughout the month of October, work continued on the bankfull benches downstream of the bridge: October 5, 2012: View from bridge looking downstream (east). Note: portion of rock placed and sand backfill. October 11, 2012: View from bridge looking downstream (east). Note: topsoil placed overtop of sand backfill. NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

17 October 24, 2012: View from bridge looking downstream (east). Note: rock at north bench complete With the construction of the north bankfull bench, two storm sewer extensions and outlets were installed. North bankfull bench, downstream of bridge, view looking northwest. Note: two newly installed stormwater outfalls NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

18 On October 5, 2012 the directional driller mobilized to conduct the replacement of the sanitary sewer siphon. Directional drill equipment mobilized on the north bank, upstream of the bridge On October 6, 2012, the new sanitary sewer siphon was installed. NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project Directional drilling

19 Following the drilling, new structures were installed and old structures were removed and the pipes were connected. New structure on the south bank Diversion pipe used during sewer connection work Sanitary sewer connection work at north bank NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

20 With the sanitary sewer siphon and structure in place, the old pipes were flushed and removed. Excavation for the riffle and sediment removal upstream of the bridge was completed. Beginning in November, the final elements were completed at the bankfull benches. Trees were installed at the bankfull benches; the benches were seeded and erosion control blanket was placed; and live stakes Excavating upstream of the bridge. Note old sanitary sewer pipe in staging area were installed. Concurrent with bank full bench completion, other final elements were completed, including in stream boulder placement, and general site restoration Damaged curbs and sidewalks were replaced, and access areas were restored. A preliminary site walk through was held on November 26, 2012, with a follow up walk through on December 17, Final restoration will occur in the spring along with parking lot replacement. Site visits continued in March, 2013 to observe effects of the winter season on the site conditions. Tree installation: The tree locations were flagged prior to installation. November 5, 2012: View from bridge looking downstream (east). Most of rock toe complete, topsoil placed, tree locations flagged NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

21 November 8, 2012: trees onsite November 14, 2012: View from bridge looking downstream (east) November 16, 2012: View from bridge looking downstream (east), tree planting complete NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

22 Bankfull bench restoration: With tree planting complete, seed was placed and erosion control blanket was installed on the bankfull benches. Then, live stakes were installed. November 19, 2012: View from downstream end of constructed south bench looking upstream (west) and erosion control blanket installation November 21, 2012: View from downstream end of constructed south bench looking upstream (west) and live stakes installation NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

23 November 26, 2012: View from downstream end of constructed south bench looking northwest with erosion control blanket and live stakes installed In stream boulders: Concurrently with the tree, erosion control blanket and live stake installation, the in stream boulders were placed. November 21, 2012: View from under bridge looking upstream (west) Note: in stream boulders December 5, 2012: East face of bridge, looking west Note: in stream boulders NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

24 December 17, 2012: West face of bridge, view looking northeast, note in stream boulders Site restoration: Final restoration activities were completed. November 14, 2012: View from bridge looking upstream at south bank. (southwest). Rock toe and shaping of top of bank December 5, 2012: South bank upstream (west) of the bridge. Note: rock toe, graded top of bank, erosion control blanket, trees, straw mulch NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

25 December 5, 2012: Area south of downstream (west) end of south bench. Restored: Graded, trees planted, area seeded and straw mulch placed December 5, 2012: Access area west of Wayne Road, note trees and straw mulch December 17, 2012: Area south of downstream (east) end of south bench, view looking southwest toward City of Wayne City Hall. Note: restored area and constructed stairs NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

26 December 17, 2012: North bank upstream (west) of bridge, note rock stabilization, erosion control blanket, straw mulch December 17, 2012: View from bridge looking downstream (east) March 5, 2013: View from bridge looking downstream (east) NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

27 March 22, 2013: View from downstream end of constructed south bench looking northwest April 11, 2013: View from bridge looking downstream (east) after sequence of rain events, note, bankfull benches overtopped NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

28 3.3 GRANT ADMINISTRATION Throughout the project, the ARC completed status and financial reports and other documentation required by the agency. This document is the final report and was completed under this task. 3.4 PUBLIC EDUCATION AND INVOLVEMENT The Alliance of Rouge Communities began public education activities for this grant as soon as the notice of the award was announced and are summarized below CITIZEN CONCERNS Concerns were raised by a resident of the City of Wayne regarding the project in December, With the assistance of the ARC contractor, Wayne County prepared a letter response responding to all questions and concerns raised by the resident. All concerns were addressed and the resident had no further issues with the project. In August, 2012, concerns were raised by the City of Wayne during the start of construction because citizens were seen crossing the construction barriers. The ARC contractor prepared a statement that was posted on the City of Wayne s website warning the public against these actions and advising them to watch the construction from the Wayne Road bridge over the dam PRESENTATIONS Presentations were given to various groups to educate them on the project including: 8/24/11 GLRI Grant projects presentation including the Wayne Rd. Dam Removal and Restoration Project given to the Alliance of Rouge Communities. 10/4/11 Project presentation given to the City of Wayne City Council. 4/26/12 Public meeting held at the City of Wayne Public Library with presentations by Wayne County, Friends of the Rouge (FOTR) and the Alliance of Rouge Communities. The public meeting was attended by 25 people. The presentation, which is included in Appendix B, was also posted on the ARC s website. 12/2012 A presentation, which is included in Appendix B, was given to the ARC members explaining the restoration project and updating members on the progress to date. 7/2013 A poster presentation at the National Conference on Ecosystem Restoration conference in Chicago highlighted the Wayne Rd. Dam removal and restoration project PRESS RELEASES The following press releases were written in response to the project: 9/20/11 ARC press release announcing the funding award which is included in Appendix B. 10/5/11 FOTR press release announcing the canoe trip on the Rouge River that was inspired by the project and announcing a public trip on October 29, /21/11 FOTR press release announcing the Rouge canoe expedition as a success. 5/31/13 Wayne County press release announcing the public opening event on June 7, NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

29 3.4.4 EDUCATION MATERIALS Once the award was announced a fact sheet was created to explain the project to ARC members and other interested parties and was also on the ARC website at The fact sheet is included in Appendix B. Additionally, a fact sheet describing various federal grant activities, conducted by the ARC, including this NOAA/GLRI project, was created as part of a public education fact sheet about the ARC. The fact sheet was distributed in a variety of ways and at a variety of ARC public education events, which included ARC rain barrel sales ( ), seedling distribution events ( ) and public education workshops conducted by the ARC, such as homeowner native gardening workshops, green infrastructure workshops and various community meetings. To date, approximately 6,000 fact sheets have been distributed to the general public from In July, 2013 a permanent sign was designed and installed at the bridge overlooking where the dam once was. It explains the project and benefits to the river FOTR WORKSHOPS AND CANOE TRIPS A class was planned for May 9, 2012 when the weather would be warm enough to offer a hands on component and it was scheduled for the Wayne City Hall located next to the Wayne Road Dam. The purpose for the workshop was to teach municipal employees and other interested residents how to open the river for canoeing without damaging the river with heavy machinery or removing too much wood that provides habitat. Evaluations were very positive for the class and the group exercise showed us how most people understood the concept of minimal treatment of logjams. There were two official work days held following the workshop one on May 19, 2012 with nine attendees and one on August 25, 2012 with 20 attendees. Logjam Opening Class attendees were all invited to the work days. This work and some additional days that were inspired by the project resulted in 4.17 miles of river being opened, from Commerce Court to Venoy Road. Two public canoe trips were held; one on October 29, 2011 and one on October 13, Heavner Canoe Rental provided rental canoes for both trips. The 2011 trip had 18 participants and the group paddled from Wayne Road to Inkster Road. Al Heavner, the owner of Heavner Canoe Rental announced to the group that they were working with Wayne County Parks to open canoe rentals on Newburgh Lake in NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

30 Canoeists were given an option to canoe to Venoy Road or go all the way to Inkster Road. All chose to do the whole route. There were many logjams that had not been opened and the trip took about four hours. The Saturday Oct. 13, 2012 trip was publicized through Friends of the Rouge networks and a press release distributed. The Detroit Free Press contacted Friends of the Rouge and asked if a preview tour could be arranged as they were unable to attend on Saturday. Bill, Kurt and Sally took a reporter and photographer on a shortened version of the trip on the Wednesday prior. This resulted in an article in the Friday paper that led to more interest and registrations. Past trips had all started at Wayne Road but this was not possible due to the continued dam deconstruction. Commerce Court was the most easily accessible upstream access point. This launch is somewhat problematic because it is on private property but we were able to obtain permission from the owners through Wayne County and Wayne County offered to open the building so we could use the restrooms. The take out was to be at Venoy Road. In past years we had canoed all the way to Inkster Road but this would take too long if we started at Commerce Court. The day of the trip was cool (40s) and threatened rain but 49 people still showed up. This was by far the largest number of canoes and kayaks on the Rouge River in recent history. The route was completely open but challenging due to the twists and turns MEDIA COVERAGE The following newspaper articles were published: 9/28/11 Detroit News article announcing the grant award 5/15/12 Detroit Free Press article titled $1M project to open lower Rouge to Great Lakes 6/9/13 Observer Eccentric article titled Happy day: Wayne celebrates dam removal regarding the public opening event that was held on June 7, 2013 which is included in Appendix B PUBLIC OPENING EVENT On June 7, 2013 the ARC held a public opening event at the project site on the grounds of the City of Wayne City Hall. The event celebrated the removal of the Wayne Rd. Dam and restoration of the Lower Rouge fishery. The event was attended by 45 citizens and elected officials. A press release was sent announcing the event through Wayne County. Speakers included Mayor Haidous, City of Wayne, Wayne County Executive Robert Ficano, Congressman John Conyers, ARC Chair Kevin Buford and John Bratton from NOAA. Handouts included the NOAA/GLRI fact sheet, information on canoe rental availability now that canoeing is possible with the dam removed and a map showing the waterways affected by the removal of the dam. Informational boards showing photos of the dam removal and stream restoration at different stages of construction (included in Appendix B) were prepared and were given to the City of Wayne to display in their City Hall at the end of NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

31 the public opening event. There were table top displays by Friends of the Rouge and Wayne County. In addition, there was a live macroinvertebrate sampling demonstration which is used to gage the health of the river. Heavner Canoe Rental was also on site and gave free canoe rides to those attending the event. Photos from the June 7, 2013 public opening celebration NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

32 3.5 PRE AND POST CONSTRUCTION MONITORING Pre and post construction monitoring occurred as part of the project. The details of these activities are provided in the Wayne Road Dam Removal Monitoring Report (included as Appendix C). However, a summary is also provided here for reference FISH MONITORING Fish community results were inconclusive, but suggested that the fish community diversity upstream of the dam increased between 2012 pre removal sampling and 2013 post removal sampling. This increase could be due to greater connectivity to downstream reaches. The inconclusive results are due primarily to high variability between pre and post construction sampling results that is most likely caused by different habitat conditions and environmental conditions linked to weather patterns. Although sampling was conducted at the same time of year in 2012 and 2013, weather patterns were much different between the two years during and prior to the sampling periods. Therefore, the timing of spawning runs was different. In 2013, sampling was conducted during the peak of white sucker spawning activity, as indicated by the higher numbers of white sucker captured (Appendix C: Table 1 and 2), particularly in Reach 6. The variability in sampling reaches, and from pre to post removal, was evident by the inconsistent similarities in fish community diversity: adjoining reaches were significantly different, but were not significantly different to one or more of the other reaches sampled (Appendix C: Table 5). These differences are not due to the dam removal, but due to differences and similarities in habitat and fish distribution at the time of sampling. Fish Monitoring Nonetheless, fish community sampling revealed some important facts about fish abundance and distribution that do suggest the dam removal affected fish distribution. Most notably, the number of white sucker captured in Reach 1 (upstream reference reach) increased from 19 prior to dam removal to 68 after dam removal. Habitat in Reach 6 did not change after dam removal. Therefore, this result suggests that upstream white sucker movement was formerly restricted by the Wayne Road Dam. Following dam removal, white sucker preferentially moved upstream of the dam seeking habitat required for various life stages. Interestingly enough, the number of white sucker captured in Reach 6 (downstream reference) decreased from 36 prior to dam removal to 16 after dam removal. Again, those contrasting results suggest preferential upstream movement by white sucker. While the fish community assemblages of Reaches 2 and 4 were not strongly similar based on Sorenson s similarity index, there were several species common to both reaches and the diversity index for the two Reaches were not significantly different during post removal sampling. This result indicates that the channel realignment and restoration immediately downstream of the former dam location produced habitat preferred by fish and that fish were able to move freely between the two reaches. The constructed riffle is an important component of the channel restoration following dam removal because it protects utilities and infrastructure, but also because it has the potential to provide an important type of habitat that is not abundant in the Lower Rouge River. Therefore, the riffle was sampled during post removal monitoring. Sampling results demonstrate the high value of the created NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

33 riffle habitat to fish of the Lower Rouge River. The Shannon Wiener diversity index was higher than any other reach sampled; with a species richness of 20 and effective number of species of In addition, two species with high affinity for riffle habitat, Johnny darter and central stoneroller, were captured in the riffle. More stonerollers were captured in the constructed riffle than any other reach. In addition, 32 white sucker were captured in the riffle, a significant finding given white sucker were actively spawning in the river during the postremoval sampling. Monitoring results clearly show that the constructed riffle is providing important and valuable habitat for fishes. Clipped White Sucker captured upstream of the former dam site Use of a mark recapture technique successfully demonstrated that target fish species could freely move between downstream reaches and upstream reaches. A white sucker marked in 2012 downstream of the Wayne Road Dam in Reach 6 (downstream reference) was recaptured in 2013 after dam removal in Reach 2. Furthermore, the fish community diversity upstream of the dam in Reach 2 was similar to the diversity downstream of the dam in Reaches 4 and 5, although the assemblage was slightly different. This indicates that the improved habitat and access to Reach 2 (former impounded reach has improved and the number of species using habitat located immediately upstream of the dam has increased due to greater connectivity MORPHOLOGY MONITORING Channel cross section surveys pre and post removal shows that headcutting and sedimentation have not occurred upstream or downstream of the former dam location. Dam removal can lead to deposition of sediment on the bed downstream of dams and erosion of the bed upstream of dams that results in formation of a headcut that propagates upstream. Appreciable decrease or increase in bed elevations were not observed at any of the cross sections surveyed prior to and after dam removal. Observed changes were minor and due to natural variability in sediment transport processes BENTHIC MONITORING Post construction macroinvertebrate monitoring was completed in the spring of 2012 at the constructed riffle. A total of five different families of macroinvertebrates and two different mollusk families were collected from the constructed riffle. The most abundant were midges (Chironomidae) (77%) and net spinning caddisfly (Hydropsychidae) (20%). The other three families collected were found in low abundances, comprising of 1% or less of the total sample collection. In the spring of 2013, a Michigan Clean Water Corps (MiCorps) stream quality index (SQI) was conducted at two sites within the project area, one directly upstream and one directly downstream of the constructed riffle at the former dam site. The SQI scores are rated as : >48 is Excellent, is Good, is Fair, and <19 is Poor. The upstream site went from a poor rating to a fair rating following removal of the dam (16 to 28), and the downstream site remained at a fair rating following removal. The SQI rating, as quantified using macroinvertebrate data from this project, resulted in a score of 16 (Poor). While this number is lower than the previously mentioned scores, it falls within the long term trend seen at either MiCorps station. Full results from the long term SQI studies can be found in Appendix C. NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

34 4.0 PROJECT RESULTS4.0 PROJECT RESULTS 4.1 PRIMARY GOAL The primary goal of this project was to remove the Wayne Road Dam and improve the habitat and water quality of the Rouge River and support the delisting of the AOC s Benthos and Fish and Wildlife Habitat BUIs as shown in Figure 4 1. This was accomplished by, removing the existing dam, removing the existing in stream island, and restoring a stable channel with grade control structure and bankfull benches. The projected goals were: 1) Wayne Road Dam was removed and fish passage for multiple valued species was restored by reconnecting 11 miles and over 110 tributary miles of the Lower Rouge River with the Great Lakes system as shown in Figure 4 2; 2) Rock structures and bank stabilization improved fish and wildlife habitat, benefiting key aquatic species and natural communities; and 3) Great Lakes aquatic and terrestrial habitats were restored and protecting by re connecting the river to the Great Lakes system. Figure 4 1: Performance Measures Objective/ Goal Description Stream miles made accessible upstream of project site Measure Baseline Project Target Actual To Date Miles 0 >12 >12 Explanation Removal of dam opened the upstream to 11 miles of the main stem and over 110 miles of tributaries (See Figure 4 2) Channel width Feet Channel width was measured after construction and was determined to vary from 55 to 60 feet. Overall channel slope % Maximum channel slope % Post construction measurements determined an overall slope of 0.12 Post construction measurements determined a maximum channel slope of 0.3 through the riffle profile. Maximum jump height Feet With the dam removed, the jump is height is 0. Target fish species upstream of project site Present/ absent Sunfish wh. Sucker dace minnow sp. Present Present Based on post construction monitoring, removal of the dam has retained target fish species. Fish diversity increases upstream of project site # of species present 5 >15 21 Based on post construction monitoring, it was determined that at the constructed riffle and upstream of project site 21 species were found. Macroinvertibrate species upstream of project site Present/ absent Present Present Present Based on post construction monitoring, midges and net spinning caddis fly were present. NOAA/GLRI Final Report, September 12, Wayne Road Dam Removal and Habitat Restoration Project

35 Figure 4 2: Waterways Affected by Wayne Road Dam Removal NOAA/GLRI Final Report, August 19, Wayne Road Dam Removal and Habitat Restoration Project

36 With the implementation of this project, these outputs were achieved. The dam has been removed and fish passage has been restored. Fish and wildlife habitat has improved as shown in the pre and post construction monitoring. Aside from the project outputs, the implementation of the Wayne Road Dam and Habitat Restoration Project provided an outcome of making progress toward eliminating the Benthos and Fish and Wildlife BUI s for the AOC. Bank before restoration Bank stabilization after restoration Before removal and restoration After removal and restoration NOAA/GLRI Final Report, August 19, Wayne Road Dam Removal and Habitat Restoration Project

37 APPENDIX A AS BUILT DRAWINGS

38

39

40

41

42

43 APPENDIX B PUBLIC EDUCATION MATERIALS

44 4/26/2012 ROUGE RIVER REPORT CARD Noel Mullett, Wayne County Rouge River Report Card The Rouge River communities, residents and partners continue to address watershed issues Water quality and ecosystem health continues to improve Community projects are beginning to establishing a healthier balance between green and gray infrastructure. 1

45 4/26/2012 Alliance of Rouge Communities The ARC is comprised of 35 communities, three counties, including Wayne County, 2 education institutions and partners, such as Friends of the Rouge. The ARC supports activities such as water quality monitoring, public education activities and special projects including green infrastructure, such as native plant grow zones, tree plantings, rain barrel sales, habitat (green infrastructure) restoration. Water Quality and Ecosystem Health Dissolved Oxygen concentrations are improving across the watershed. % of DO > 5 mg/l Percent of DO Values Greater than 5 mg/l 4 Continuously Monitored Locations

46 4/26/2012 Water Quality and Ecosystem Health The Lower Rouge Branch has improved the most since 1994 with an average improvement of 0.22mg/L/year. DO (mg/l) 16 Improvement in DO of 0.22 mg/l per year 14 P < improvement/yr Jan-94 Apr-94 Jun-94 Sep-94 Dec-94 Mar-95 Jun-95 Sep-95 Dec-95 Mar-96 Jun-96 Sep-96 Dec-96 Mar-97 Jun-97 Sep-97 Dec-97 Mar-98 Jun-98 Sep-98 Dec-98 Mar-99 Jun-99 Sep-99 ALL L05 Daily Averages DO Wet and Dry May - October Dec-99 Feb-00 May-00 Aug-00 Nov-00 Feb-01 May-01 Aug-01 Nov-01 Date Feb-02 May-02 Aug-02 Nov-02 Feb-03 May-03 Aug-03 Nov-03 Feb-04 May-04 Aug-04 Nov-04 Feb-05 May-05 Aug-05 Oct-05 Jan-06 Apr-06 Jul-06 Oct-06 State Minimum Standard L05 Dry L05 Wet All Linear (All) DO data were not collected in 2007 Jan-07 Apr-07 Jul-07 Oct-07 Jan-08 Apr-08 Jul-08 Oct-08 Jan-09 Apr-09 Water Quality and Ecosystem Health Flow is stabilizing and/or improving across the watershed. 3

47 4/26/2012 Water Quality and Ecosystem Health Rouge Macroinvertebrate data is showing signs of improvement Community Projects (Local Funding) Through funding from Wayne County, ARC members are implementing a variety of projects to improve the Lower Branch of the Rouge River. Along the Lower Rouge River, these projects include: Inkster: CSO Outfall L49 Sewer Separation and Relief Sewer Separation and Relief Sewer to Andover Pump Station Construction of CSO Retention treatment basin at Middlebelt Road Canton: Lower Rouge River Recreational Trail and Bridges Wayne County Parks: Lower Rouge Parkway: Five (5) acres of native plantings in Inkster and Westland 4

48 4/26/2012 Community Projects (Local Funding) Thanks to funding from a variety of federal sources, Wayne County and ARC members are implementing projects to restore beneficial uses to the river, such as improved habitat. They are: Danvers Dam Removal in Farmington Hills; Creation of 25 acres of natural areas in Wayne County Parks and Detroit and restoration of a wetland in Southfield; The installation of 2,350 trees in 12 communities and Wayne County to replace trees lost to the Emerald Ash Borer, and Removal of the Wayne Road Dam. Wayne Road Dam The MDNR 1998 Fisheries Assessment identified the Wayne Road Dam as a major impediment to restoring fish and wildlife habitat in the Rouge River. The river hosts a variety of fish in the vicinity of the dam, including trout in upstream areas and warm water species, such as smallmouth bass, northern pike and walleye downstream of the dam. Removing the dam would reconnect approximately 17 miles of the Rouge River to the Detroit River and the Lake Erie ecosystem. 5

49 4/26/2012 Wayne Road Dam NOAA Grant In 2011, the ARC received a $1 Million grant from NOAA to remove the Wayne Road Dam. Project Partners ARC, Wayne County, City of Wayne and Friends of the Rouge. Project Components monitoring before and after, public outreach, dam removal and stream restoration Construction to begin this June. Comparison of Potential Target Species vs. Actual Species Present in the Lower Rouge River Number of Species Total Potential Fishes Actual Species Present 0 LO1 LO6 LUS1 LO5 LO2 Fellows Creek 6

50 4/26/2012 Ecological Targets: Northern Pike Novi Northern Pike Northville Livonia Southfield Detroit Canton Dearborn Ecological Targets: Rock Bass Novi Northern Rock Bass Northville Livonia Southfield Detroit Canton Dearborn 7

51 4/26/2012 Ecological Targets: Smallmouth Bass Novi Northern Smallmouth Bass Northville Livonia Southfield Detroit Canton Dearborn Ecological Targets: Channel Catfish & Walleye Novi Channel Catfish Northville Livonia Southfield Detroit Walleye Canton Dearborn 8

52 4/26/2012 Friends of the Rouge 2011 Lower Canoe Expedition October 7-9, 2011 Canton to Dearborn: Beck Road to Fairlane Estate Sally Petrella, Friends of the Rouge This is funded in part by a GLRI/NOAA grant to the Alliance of Rouge Communities (Wayne Road Dam Removal and Habitat Restoration Project, NA11NMF ). Canoe Expedition Purpose To examine anddocumentdocument the potential for a recreational canoe route on the Lower Rouge as it flows through Canton, Wayne, Westland, Dearborn Heights and Dearborn 9

53 4/26/2012 The Route The Expeditioners Kurt Kuban Bill Craig Jeff Vallender Matt Mullholland Sally Petrella Sue Thompson 10

54 4/26/2012 Day One: Beck Road to Lilley Rd Day One: Friday October 7, 2011 Expeditioners: Kurt Kuban, Bill Craig, Jeff Vallender, Sue Thompson, Sally Petrella, Matthew Mulholland plus Bob Belair, Joe Mantey and Joe the walker 10:19 am Launch 11

55 4/26/2012 Day One: Friday October 7, :37 am: First logjam & Joe the walker 11:39 am Limbo time Day One: Friday October 7, :16 am - Gorgeous scenery 1:17 pm Lunch stop at Lilley Road 12

56 4/26/2012 Day One: Friday October 7, :08 pm - Dryad s saddle mushroom 2:09 pm Back to the logjams Day One: Friday October 7,

57 4/26/2012 Day One: Friday October 7, :05 pm - Canton s Lower Rouge Trails 3:06 pm Kurt and Matt determined it is easier to walk the trails Day One: Friday October 7, :33 pm 4:49 pm Almost to Lilley Rd and our pull out for the night 14

58 4/26/2012 Day One: Beck Rd to Lilley Rd Day One Accomplishments: 2.4 miles/ 6:45 hours of canoeing = 0.36 mph 60 large logjams Beck Rd to Canton Center 1 mile/3 hours = 0.33 mph Canton Center to Lilley Rd 1.5 mile/4 hours = mph Day Two: Lilley Rd to Wayne Rd Lilley Rd to Commerce Court 15

59 4/26/2012 Day Two: Saturday Oct. 8, 2011 Expeditioners: Kurt Kuban, Bill Craig, Jeff Vallender, Sue Thompson, Sally Petrella, Matthew Mulholland plus Dan Wright 10:00 am Lilley Rd launch 10:34 am An old sunken boat rumored to once have been used to open logjams Day Two: Saturday Oct. 8, :39 am Walkers in Canton 10:41 am Awesome scenery near Haggerty 16

60 4/26/2012 Day Two: Saturday Oct. 8, :56 am I :00 am I-275 walking trail bridge Day Two: Saturday Oct. 8, :39 am 11:54 am Kurt, Matt and Dan catch up 17

61 4/26/2012 Day Two: Saturday Oct. 8, :30 pm Fellows Creek confluence 12:41 pm American toad Day Two: Saturday Oct. 8, :48 pm Lunch back of Wayne County office 3:34 pm Large logjam 18

62 4/26/2012 Day Two: Lilley Rd to Wayne Rd Commerce Court to Wayne Road Day Two: Saturday Oct. 8,

63 4/26/2012 Day Two: Saturday Oct. 8, 2011 Day Two: Saturday Oct. 8,

64 4/26/2012 Day Two: Saturday Oct. 8, 2011 Day Two: Saturday Oct. 8, :49 pm 5:49 pm 21

65 4/26/2012 Day Two: Saturday Oct. 8, 2011 Day Two: Lilley Rd to Wayne Rd Day Two Accomplishments: 2 miles/ 5:25 hours of canoeing = 0.38 mph 33 large logjams/33 small = 66 total Wildlife Seen: 1 American toad 1 Cooper s hawk many wood ducks 1 mink 22

66 4/26/2012 Day Three: Wayne Rd to Fairlane Estate Part 1: Wayne Rd to Inkster Rd Day Three: Sunday Oct. 9, 2011 Expeditioners: Kurt Kuban, Bill Craig, Jeff Vallender, Sue Thompson, Sally Petrella, Matthew Mulholland 10:04 am high school student Chelsea 10:22 am Wayne Road Dam 23

67 4/26/2012 Day Three: Sunday Oct. 9, :34 am Female wood duck 10:52 am Sleeping raccoon Day Three: Sunday Oct. 9, :16 am Mushrooms after giant logjam 11:19 am Virginia creeper 24

68 4/26/2012 Day Three: Sunday Oct. 9, :24 am Hillside 11:31 am Outfall Day Three: Sunday Oct. 9, :55 am Bridge in Eloise property 11:57 am Golf course bridge 25

69 4/26/2012 Day Three: Sunday Oct. 9, :26 pm Inkster Wetlands 4:01 pm Giant snapping turtle Day Three: Wayne Rd to Fairlane Estate Part 2: Inkster to Fairlane Estate 26

70 4/26/2012 Day Three: Sunday Oct. 9, :10 pm Dearborn Hills Golf Course 5:51 pm Just past Outer drive bridge Day Three: Sunday Oct. 9, :02 pm Military St bridge 7:09 pm The confluence with the Main Rouge and the end of the trip 27

71 4/26/2012 Day Three: Wayne Rd to Fairlane Estate Day Three Accomplishments: 8 miles/ 7:45 hours of canoeing = 1.03 mph 25 large logjams/20 small = 45 Wildlife Seen: Many Wood ducks 2 Raccoon 1 Snapping turtle 4 White-tailed deer Old beaver sign Total Trip: miles of river/19:45 hours/ 8 people 171 logjams Public Canoe Trip: Oct. 29, 2011 Opening the route prior 28

72 4/26/2012 Public Canoe Trip: Oct. 29, 2011 Alan Heavner, owner of Heavner Canoe Rental, announces his intent to work out an agreement with Wayne County to provide canoe rentals and programming in the Rouge River watershed. Conclusion & Challenges Conclusion: The Lower Rouge has excellent potential for recreational canoeing Water levels are high enough for canoeing year round due to YCUA discharge Most of the route is public land (parkland and forested) Route is accessible to a large metropolitan area Challenges Fallen trees prevent passage for much of the route Water quality, though improving, can be a concern Rouge River carries stigma due to years of pollution 29

73 4/26/2012 Next Steps FOTR to hold a hands-on logjam opening class for municipal workers and volunteers on May 9 Dam removal this year will provide passage for fish and canoes Heavner Canoe Rental is planning trips for the Lower Rouge WAYNE ROAD DAM PROJECT John O Meara, P.E. Alliance of Rouge Communities 30

74 4/26/2012 Wayne Road Dam - Project Background Dam installed in late 1800 s (anecdotal evidence) Project identified by Rouge River AOC PAC as a priority project for restoring fish & wildlife habitat to the Rouge River watershed Design completed by ARC through partial funds from a Rouge Grant in Construction funding secured from NOAA 2011 Great Lakes Restoration Initiative Grant The Project Will: Reconnect 17 miles of the Lower Rouge River (125 miles of its tributaries) back to the Great Lakes and restore fish passage by removing the Wayne Road dam Insure that the streambed remains stable and protect integrity of the bridge and utilities Stabilizethe the streambank immediately upstream of the dam (north bank) and downstream of the dam (north bank) 31

75 4/26/2012 Existing Conditions Existing Conditions 32

76 4/26/2012 Project Improvements Removal and disposal of upstream impounded sediment Dam removal Engineered riffle/boulder cascade construction Realignment of downstream channel Removal of instream island Construction of bankfull benches on both sides of channel to protect banks from erosive forces Bank erosionrepair repair upstream of dam Woody debris removal Proposed Conditions 33

77 4/26/2012 Riffle and Bankfull Bench Examples Project Timeline Site Investigation & Design COMPLETED MDEQ Permitting COMPLETED Construction Documents COMPLETED Pre construction Monitoring COMPLETED Bidding On going Construction July October 2012 Post Construction Monitoring Spring

78 4/26/2012 Pre-Construction Monitoring Fish monitoring conducted at three transects, 2 upstream of the dam, 1 downstream Fish collection was conducted by electro shocking and netting Specimens were identified, counted and released Pre-Construction Monitoring Results 19 total fish species, 234 specimens captured Dominant species were Creek Chub, White Sucker, and Emerald Shiner Found 1 Great Lakes Steelhead downstream of the dam % of Total Catch Catch Results Species White Sucker Creek Chub Emerald Shiner 35

79 4/26/2012 Electro-shocking crew Steelhead captured downstream of the dam Construction Impacts Intermittent Lane Closures Construction Access Areas Public Access to City Hall City Hall Parking Park Access Limited 36

80 8/26/2013 Project Location 1

81 8/26/2013 Project Overview Issue Impeding fish passage Sediment accumulation Island disrupting natural sediment transport Island causing flow impingement Erosion Solution Sediment Removal Dam Removal Island Removal Channel Restoration/ Stabilization Project cost $1.12 million ARC: $57,550 RPO grant: $57,550 NOAA (GLRI) grant: $1 million Design Existing Conditions Existing Conditions 2

82 8/26/2013 Design Proposed Conditions Proposed Conditions Design Sediment Removal and Dam Removal 3

83 8/26/2013 Design Riffle and Bank Stabilization Design Island Removal and Channel Realignment 4

84 8/26/2013 Design Revegetation Plan Implementation 5

85 8/26/2013 Implementation Site Prep Implementation Dam Demolition 6

86 8/26/2013 Implementation Sanitary Siphon Implementation Riffle 7

87 8/26/2013 Implementation Riffle Implementation Rock Toe 8

88 8/26/2013 Implementation Rock Toe and Bankfull Benches Implementation Rock Toe and Bankfull Benches 9

89 8/26/2013 Implementation Island Removal Island removal occurred concurrent with bankfull bench construction. Implementation 10

90 8/26/2013 Implementation Bank Stabilization Implementation Bank Stabilization 11

91 8/26/2013 Implementation Planting WAYNE DAM REMOVAL 12

92 September 20, 2011 PRESS RELEASE Contact: James W. Ridgway Executive Director, Alliance of Rouge Communities Alliance of Rouge Communities receives $1 million to restore fish passage in the Lower Rouge River A major environmental project in the City of Wayne is another step toward the full restoration of the Rouge River. The Alliance of Rouge Communities (ARC) has received a $1 million federal grant to remove the Wayne Road Dam in the City of Wayne and restore the fishery in the Lower Rouge River. The two-year grant was awarded to the ARC by the National Oceanic and Atmospheric Administration (NOAA), which provides financial and technical assistance to remove dams and barriers, construct fish passage, clean up marine debris, restore coastal wetlands, and remove invasive species in the region. The Wayne Road Dam Removal and Habitat Improvement Project will restore fish passage for migratory species such as salmon, walleye, northern pike and small mouth bass, while stabilizing and improving shoreline habitat. The project will also reconnect 22 miles of the Lower Rouge River with the Great Lakes. The Wayne Road Dam was identified by the Michigan Department of Natural Resources as a major impediment to restoring fish and wildlife habitat in the Rouge River s Lower Branch. The Lower Branch of the Rouge River begins in Superior Township and flows through such communities as Canton Township, Wayne, Westland, Inkster, Dearborn Heights and Dearborn. Over the past twenty years, the restoration of the Rouge River is simply unbelievable, said James Ridgway, ARC Executive Director. This project is yet another example of how the Rouge Communities can work miracles when they work together for the betterment of our river. The people of the City of Wayne and all of the residents of the Rouge Watershed are lucky to have the type of leadership willing to take the long view and continue to improve our quality of life, one project at a time. Partners working with the ARC on this project are Wayne County, the City of Wayne, Friends of the Rouge and the Rouge RAP Advisory Council. The Wayne Road Dam project is the latest in a series of projects conducted by local communities and Wayne County to improve water quality and restore habitat and recreational uses in the Rouge River s Lower Branch. Those projects include the Rouge Recreational Trail in Canton Township, five acres of native prairie being installed in Wayne County s Lower Rouge Parkway, and the City of Dearborn s habitat

93 restoration in Ford Field and sewer separation projects to reduce the amount of untreated sewage going to the Rouge River. The Alliance of Rouge Communities (ARC), a 501(c)(3) voluntary public watershed entity currently comprised of 35 municipal governments, Wayne, Oakland and Washtenaw counties and Henry Ford Community College. The purpose of the ARC is to provide an institutional mechanism to encourage watershed-wide cooperation and mutual support to meet water quality permit requirements and more importantly, to restore beneficial uses of the Rouge River to the area residents. The ARC grant is one of eight projects funded with $5 million in NOAA grants to support habitat restoration throughout the Great Lakes Areas of Concern. NOAA s Restoration Center is funding three shovel-ready projects and five engineering and design projects. This allows NOAA to support both current efforts to restore the Great Lakes as well as future projects that, once implemented, will have significant benefits to Great Lakes restoration.

94 WAYNE ROAD DAM REMOVAL AND RIVER RESTORATION November 2010 July 2013 Rouge Program Office (RPO) Round X Grant: $ 57,500 Removing the Wayne Road Dam is one of the most important dam removal projects in the Rouge River Watershed. RPO Round X Required Match: $ 57,500 The MDNR 1998 Fisheries Assessment identified the Wayne Road Dam as a major National Oceanic and $1,033,536 impediment to restoring fish and wildlife habitat in the Rouge River. Removing the Atmospheric Administration (NOAA) Grant: dam would reconnect the Rouge River to the Detroit River and the Lake Erie ecosystem. Total Project Cost: $1,148,536 Removal of the Wayne Road Dam was also a priority project for the Rouge RAP Advisory Council in order to implement the 2008 Delisting Targets for Fish and Wildlife Habitat and Population Beneficial Use Impairments for the Rouge River Area of Concern. Wayne Road Dam (City of Wayne, Wayne County) The Wayne Road Dam is located in the City of Wayne and on the Lower Branch of the Rouge River which flows through Superior, Salem, Canton, Van Buren and Plymouth townships and the cities of Wayne, Westland, Romulus, Garden City, Inkster, Dearborn Heights and Dearborn before joining the Main Branch of the Rouge River. The river hosts a variety of fish in the vicinity of the dam, including trout in upstream areas and a variety of warm water species. (e.g., smallmouth bass, northern pike, walleye, sunfish) downstream of the dam. The MDNR 1998 Fisheries Assessment suggested that removing or providing fish passage at this site would be extremely helpful in enhancing fish communities in the Lower Rouge River by reconnecting the Rouge to the Detroit River and Lake Erie ecosystem. Removal of the Wayne Road Dam would reconnect approximately 17 miles of river to the Great Lakes system for the first time in over a century. The draft Rouge River Watershed Management Plan (2008) was more direct. A discussion of impairments in the Lower 2 Subwatershed section stated that the size and diversity of the fish community in the Lower 2 Subwatershed is constrained by the dam at Wayne Road which prevents fish passage within the subwatershed and from Lake Erie. Under the RPO Round X Grant an Engineering Design and State MDEQ Permit was completed. Construction and monitoring of the project will be completed under the NOAA Grant. The project will remove the dam and restore fish passage. In addition to the removal of the dam the project removes an instream island downstream of the dam and reconstructs a more stable single flow channel with bankfull benches, installs an engineered riffle/boulder cascade to protect existing infrastructure and facilitate fish passage, and provides for bank stabilization. For More Information Contact: Alliance of Rouge Communities Phone: James Ridgway, P.E., Executive Director info@allianceofrougecommunities.com 719 Griswold St., Suite 820, Detroit, Michigan Website:

95 Construction Plan for Wayne Road Dam Removal

96

97 PEOPLE, PRIDE AND PROGRESS Alliance of Rouge Communities OURS TO PROTECT Working together, restoring the river WAYNE ROAD DAM REMOVAL July - August 2012 Grant #: NA11NMF Removal of log jams. WAYNE - MICHIGAN 1869 Clearing operations. Lowering of water level at the dam by notching the dam. Removal of the dam sill. September 2012 he roc for the rif e was placed under the bridge. A thic layer of smaller stone was placed rst and overtopped by larger rock. Sand bank ll was placed behind the stone toe. eote tile fabric was used between the stone toe and the sand back ll. Storm pipe was installed at e isting outfall to e tend the pipe through the proposed bankfull bench to the stream channel. A portion of the e isting island was e cavated. t was eventually completely removed. October 2012 Bankfull bench construction view looking upstream towards bridge Work continued on the bankfull benches downstream of the bridge With the construction of the north bankfull bench, two storm sewer e tensions and outlets were installed. Directional drill equipment mobilized on the north bank, upstream of the bridge. November May 2013 ree planting locations were agged prior to installation With tree planting complete, seed was placed and erosion control blanket was installed on the bankfull benches. Then, live stakes were installed. Concurrently with the tree, erosion control blanket and live stake installation, the in-stream boulders were placed. Replacing parking lot.

98 APPENDIX C WAYNE ROAD DAM REMOVAL MONITORING REPORT

99 Wayne Road Dam Removal Monitoring Report NOAA Grant Number: NA11NMF September, 2013 Project Partners: 719 Griswold, Suite 820 Detroit, MI

100 TABLE OF CONTENTS 1. INTRODUCTION Project Background Monitoring Overview NOAA Funded Pre- and Post-construction Monitoring METHODS Fish Community Sampling Reach Descriptions Sampling Dates Data Analysis and Statistics Mark-Recapture Macroinvertebrate Community Morphology RESULTS Fish Community Pre-removal Fish Collection Summary Post-Removal Fish Collection Summary Discussion Mark-Recapture Macroinvertebrate Community Morphology CONCLUSIONS Fish Community Fish Passage Morphology TABLES FIGURES

101 1. INTRODUCTION 1.1 PROJECT BACKGROUND The Wayne Road Dam was identified as an impediment to free fish movement in the Lower Rouge River by the Michigan Department of Natural Resources in a 1998 Fisheries Assessment and the 2008 Rouge River Watershed Management Plan (2008). Removal of the dam was also identified as a priority project by the Rouge Remedial Action Plan Advisory Council for delisting beneficial use impairments (the dam is located in the Rouge River Area of Concern). Dams are known to restrict Great Lakes potadromouos fish species migrations upstream to natal spawning habitat and restrict resident fish access to important habitat types located upstream or downstream of a dam. The Alliance of Rouge Communities was awarded a grant by the National Oceanic and Atmospheric Administration (NOAA) under the Great Lakes Restoration Initiative funding in to remove the dam. Engineering, design, and permitting were completed under a grant from the Rouge River Program Office under the Rouge River Wet Weather Demonstration Project. Removal of the dam and restoration of the Lower Rouge River began in July 2012 and was completed in November The dam was completely removed to grade after sediment was excavated from the upstream side of the dam. Due to the presence of utilities under the riverbed upstream and downstream of the dam, a rock riffle was constructed over the bed using 18 inches of gravel and cobble. A large sediment island located downstream of the dam was removed and the channel was reconstructed to bankfull dimensions as a single channel, including bankfull floodplain benches on both sides of the channel. The restored reach was located in a gentle meander, so the channel cross-section was designed as a scour pool. 1.2 MONITORING OVERVIEW NOAA FUNDED PRE- AND POST-CONSTRUCTION MONITORING. River morphology was surveyed at multiple cross-sections, macroinvertebrates were collected, and fish were collected before and after dam removal. The purpose of monitoring was to verify fish passage and study fish and maroinvertebrate community response to dam removal and channel restoration. This report presents the methods and results used during monitoring. 1

102 2. METHODS 2.1 FISH COMMUNITY Fish were collected from the Lower Rouge River at six river reaches, three of which were sampled prior to and after dam removal in An additional three reaches were sampled in 2013 after dam removal to better understand project effects on the Lower Rouge River. Fish were collected at all stations and during all sampling events using a Smith-Root GPP5.0 and shore fishing equipment mounted on a tote barge with one exception: electrofishing was not possible upstream of the dam prior to removal due to the lack of boat access and water depth that prevented wading. Two mini-fyke nets and two large fyke nets were deployed upstream of the dam prior to removal in an attempt to assess the fish community within that river reach. The nets were set in the middle of the river with leads perpendicular to flow and the shoreline, facing opposite directions, and approximately 200 to 250 feet between nets. Collected fish were placed in holding tanks located on the tote barge, counted, identified to species, and released. Due to the length of river sampled and number of fish captured, fish were processed two or more times within a sampling reach depending on the number of fish captured SAMPLING REACH DESCRIPTIONS Prior to removal of the Wayne Road Dam, fish were collected at three reaches to establish baseline conditions. An upstream (Reach 1) and downstream reach (Reach 6) were selected as reference stations because they contained representative lotic habitat are located beyond the influence of the dam. The middle location, Reach 2, was within the impounded reach of Lower Rouge River upstream of the Wayne Road Dam; it represented ecological responses to immediate impact from the project activities. Three additional sampling reaches were chosen to assess changes in fish community structure following the removal of the Wayne Road Dam. Two of the reaches were sampled because the habitat was directly altered by the restoration work. A third station was sampled immediately downstream of the project reach for comparison. The locations of all six sampling reaches are shown in Figure 1 and described below. 2

103 Reach 1: Located upstream of the project site (upstream site from pre-monitoring). Transect length was approximately 600 ft due to an impassible log jam at the upstream end up the reach. Reach 2: This site was located upstream of the constructed riffle where the previous dam was located. The sampling reach began at the upstream end of the start of the riffle and ended approximately 600ft upstream due to the presence of an impassible log jam. Reach 3: This reach was located within the riffle constructed under Wayne Road following removal of the Wayne Road Dam from its downstream to upstream limits and from embankment to embankment. Reach 4: This sampling reach began at the downstream end of the constructed riffle and ended at the downstream end of the project site where stream channel realignment and restoration ended. Reach 5: This reach began at the downstream end of the project site and ended at the 2nd Street Bridge. Reach 6: This reach is located downstream of the project site (downstream site from pre-monitoring). Transect length was between ft, due to an impassible log jam located at the upstream end of the reach SAMPLING DATES Prior to dam removal fish were collected at Stations 1 (upstream reference station), 2 (impounded reach immediately upstream of the dam), and 6 (downstream reference station) on April 5, 2012, and April 19, 2012, and April 4, 2012 respectively. After dam removal fish were collected at all six stations on April 23, May 2, and May 10, DATA ANALYSIS AND STATISTICS The following data analyses and statistics will be used to evaluate changes and differences in fish community structure pre- and post-removal and between sampling reaches. Fish community diversity (Shannon-Weiner index), species richness (number 3

104 of species), catch-per-effort, and species composition will be determined to compare the fish community of the historic channel before and after dam removal. Similarity between the pre- and post-construction historic channel fish communities will be evaluated using Sørensen s similarity index. The equations that will be used to calculate each of these community indices or metrics provided below. Shannon-Wiener index of Diversity H p i log p i Where: H Shannon-Wiener Index pi proportion of species i Catch per Effort CPE n T Where: CPE catch per effort (#/minute) n total number of individuals or sample size (catch) T sampling time in minutes (effort) Species Composition SC i n i n Where: SCi species composition of species i ni number of species i n total number of individuals or sample size Sørensen s Similarity Index 2c n n 1 2 Where: β Sørensen s Similarity Index (0-1, dimensionless) c number of species common between sample stations n1 number of species in station 1 sample n2 number of species in station 2 sample 4

105 The Shannon-Wiener diversity index has been used extensively in the scientific literature to evaluate the difference in biological diversity over time or between sampling stations/treatments. Hutcheson (1970) is credited with developing a t-test for the Shannon-Wiener Index as noted and cited by Poole (1974) and Magurran (2004). The variance of the Shannon-Wiener index (varh ), degrees of freedom (df), and t-statistic are calculated using the equations below from Hutcheson (1970). Hutcheson s t-test for the Shannon-Wiener Index will be used with α=0.10 to test for statistically significant differences between the pre- and post-construction fish community diversity and between sampling reaches. Variance var H ' p i ln 2 pi pi n ln p i 2 s 1 2 2n Where: varh variance of the Shannon-Wiener Index (H ) pi proportion of species i ln natural log s number of species n number of individuals of all species t-statistic t H' H' 1 varh' varh' Where: varh 1 variance of the Shannon-Wiener Index (H ) for community 1 varh 2 variance of the Shannon-Wiener Index (H ) for community 2 n1 number of individuals for community 1 n2 number of individuals for community 2 2 var H ' 1 var H ' 2 2 H ' var H ' df 2 Degrees of Freedom var 1 2 n1 n2 Where: H 1 Shannon-Wiener Index for community 1 H 2 Shannon-Wiener Index for community 2 varh 1 variance of the Shannon-Wiener Index (H ) for community 1 5

106 varh 2 variance of the Shannon-Wiener Index (H ) for community 2 The Shannon-Wiener Index and statistical testing described above can show a significant difference between communities at station or over time (i.e. pre- to post site restoration) based on taxonomic diversity. However, the index cannot adequately characterize the difference or quantify the magnitude of the difference. To further evaluate differences and change within fish communities of the historic channel before and after dam removal, the other community indices proposed and a conversion of the Shannon-Wiener Index will be used as described below. When the number of species in a community doubles, the community diversity intuitively doubles. This is not the case with the Shannon-Wiener Index, which is highly non-linear. A very large change in true diversity within a community can be represented by a very small change in the Shannon-Wiener Index, thereby masking the true magnitude of the change. Banos (2006) suggests a means of converting the Shannon-Wiener Index from a measure of entropy to a true measure of diversity expressed as the effective number of species. The effective number of species is the number of species with equal frequency that would result in a Shannon-Wiener index of a certain value. Banos (2006) equates it to true diversity. Mathematically, Banos (2006) defines the effective number of species as the exponential of the Shannon Index [exp(h ) or eh ; the base of the natural logarithm raised to the power of H ]. The effective number of species is proportional to the number of equally common species in a community. If the number of equally common species in a community doubles, the measure of diversity used should also intuitively double. As the Shannon-Wiener index measures it, diversity is high when there is a high number of species in the community with high equitability (i.e. evenness). Therefore, a high effective number of species equates to high diversity and vice-versa. It is useful to convert the Shannon-Wiener index to the effective number of species because it allows an assessment of the magnitude of difference/change in addition to the statistical significance of that difference/change when used to compare two communities or compare diversity over time in response to a change/disturbance/experimental treatment within a system. 6

107 Species composition will be used as a side-by-side comparison of fish assemblages. That is, the percent composition or abundance for all species between two communities will be compared side-by-side to illustrate compositional differences in the communities. Consideration of habitat preferences and species rarity/absence will be considered in the analysis to highlight differences in the communities that could be attributed to the effects of dam removal on aquatic habitat within the historic channel. Sørenson s Similarity Index will be used to assess similarity between communities. Sorenson s provides an estimate of the percent similarity between species assemblages based on presence-absence data. More overlap in species between two communities will result in a higher index value, meaning the two communities are similar. Two communities with the same species assemblage will be 100% similar (i.e. index value of 1). 2.2 MARK-RECAPTURE Sucker species (Catostomidae) were used as representative and important fish species to assess fish passage. Some sucker species are potadromous (migrate from large fresh water bodies into rivers to spawn) while others are resident (spend their entire lives in the river system). Suckers are an important ecological species and provide a recreational sport fishery. Suckers do not jump and have poor swimming ability similar to other warm water species such as walleye and bass. Consequently, they are not able to navigate barriers like the Wayne Road Dam. The anal fin was clipped on all sexually mature suckers captured downstream of the dam prior to construction. This method creates a distinct mark that allows fish captured prior to dam removal to be identified after dam removal. After the dam was removed all suckers captured upstream of the dam were inspected for the anal fin clip. Capturing a fin-clipped sucker upstream of the dam after removal would indicate that fish in the Lower Rouge River can freely move from downstream reaches to upstream reaches and vice-versa. 2.3 MACROINVERTEBRATE COMMUNITY Macroinvertebrates were collected from the constructed riffle located at the former dam site using methods described in Michigan s Procedure 51, a macroinvertebrate index of 7

108 biological integrity (IBI). The IBI was not used, however, as sampling was biased by collecting from a riffle habitat only. However, the sampling method was used to standardize sampling effort. The riffle was sampled for 60 minutes using a D-frame dip net with a 500 micron net to capture macroinvertebrates dislodged from rocks and debris found in the riffle. Organisms were dislodged by kicking finer substrates and handwiping rock surfaces while the dip was held downstream. Rocks were also removed from the riffle and hand-picked for organisms. Samples were preserved in 80% denatured ethyl alcohol for later identification. Merrit and Cummins (1996) and Voshell (2002) were used as necessary to sort and identify organisms to the family level. The Wayne County Water Quality Management Division (WQMD) conducts annual macroinvertebrate monitoring in the Lower Rouge River watershed. This ongoing monitoring effort was used to assess project results. Two monitoring sites, within the Rouge River Lower 2 sub-watershed are located near the dam removal project: LR-6 (Woody Debris Management 201 site) is immediately upstream of the dam removal project and LR-3 is downstream of the project at Goudy Park. Benthic macroinvertebrate collection, record keeping and water quality ratings were performed in accordance with procedures established by the Michigan Clean Water Corps (MiCorps) and Friends of the Rouge (FOTR). Through these procedures a Stream Quality Index (SQI) is determined by the number and type of different organisms found in the sample. A higher proportion of sensitive organisms such as mayflies and caddisflies and or a high number of different organisms results in a higher score. The SQI is given a rating: a score >48 is Excellent, is Good, is Fair, and <19 is Poor. Prior to dam removal macroinvertebrates were collected at both stations on April 25, Following dam removal macroinvertebrates were collected at both stations on May 1, MORPHOLOGY Thirty cross-sections were surveyed by a Registered Land Surveyor prior to removal of the dam. The pre-removal cross-section data were used to develop a hydraulic model using HEC-RAS, to determine morphological dimensions of the channel, determining the bed slope, and for developing construction drawings. Fifteen of those cross-sections were resurveyed following dam removal. Figure 2 shows the location of the crosssections that were chosen for post-removal surveying and monitoring. Cross-sections were chosen to represent boundary conditions upstream and downstream of the project 8

109 and based on expected outcomes. Cross-sections were also chosen to represent the project area where direct alterations were made and where indirect changes were possible both upstream and downstream of the project. Pre-removal and post-removal cross-section data were plotted in Microsoft Excel and visually compared. 3. RESULTS 3.1 FISH COMMUNITY PRE-REMOVAL FISH COLLECTION SUMMARY Pre-construction catch data are summarized in Table 1. The total fishing effort was 75 minutes of electrofishing and four net-nights, resulting in capture of 205 fish representing 18 species. White sucker, creek chub, and emerald shiner were the most frequently captured species. Results for reach pre-removal reach are discussed below Reach 1, Upstream Reference Site The upstream reach (Reach 1) was located at the CSX railroad crossing located approximately 1.1 miles upstream of Wayne Road and continued upstream from the railroad. The sampling effort was seperated into two sections shocked individually to decrease fish holding times and reduce fish stress. The reach was shocked a total of 27 minutes with a catch per unit effort (CPUE) of 2.44 fish per minute. A total of 67 specimens were collected representing 9 species. The dominant species were creek chub (37%) and white sucker (13%) Reach 6, Downstream Reference Site The sampling effort within downstream reach (Reach 6) was divided into four separate sections which were shocked individually to decrease holding times and reduce fish stress. The reach was shocked a total of 47 minutes yielding a catch per unit effort (CPUE) of 2.78 fish per minute. During this time, 132 specimens were collected, representing 18 species. The dominant species were white sucker (Catostomus commersonii, 27%), emerald shiner (Notropis atherinoides, 27%), and creek chub (Semotilus atromaculatus, 17%). Nine white suckers and one northern hogsucker (Hypentelium nigricans) were fin clipped prior to release. 9

110 Reach 2, Impounded Reach The impounded site (Reach 2) could not be sampled with electrofishing gear due to poor access and deep water. Fyke nets were used instead. Of the four fyke nets deployed, only the 2 large fyke nets captured fish. A total of six specimens were collected representing five species. The species collected were creek chub, bluegill (Lepomis macrochirus), fathead minnow (Pimephales promelas), green sunfish (Lepomis cyanellus), and white sucker POST-REMOVAL FISH COLLECTION SUMMARY Post-removal catch data are summarized in Table 2. Total post-monitoring fish sampling time was minutes resulting in capture of 490 individuals representing 27 species, and a CPUE of The dominant species collected during post-removal sampling were white sucker (34%), gizzard shad (16%), and striped shiner (9%). There were three species not collected during post-removal sampling that were collected during preremoval sampling: goldfish (Carassius auratus), longnose dace (Rhinichthys cataractae), and smallmouth bass (Micropterus dolomieu). Conversely, there were 11 species collected after removal that were not collected before removal: black bullhead (Ameiurus melas), bluntnose minnow (Pimephales notatus), bowfin (Amia calva), common carp (Cyprinus carpio), central mudminnow (Umbra limi), gizzard shad, logperch (Percina caprodes), northern pike (Esox Lucius), quillback carpsucker (Carpoides cyprinus), spottail shiner (Notropis hudsonius), and striped shiner Reach 1, Upstream Reference Reach Reach 1 sampling resulted in capture of 77 individual fishes representing 14 different species were collected at the upstream reach (Reach 1) on May 2, The area was sampled for 29 minutes resulting in a CPUE of 2.65 fish per minute. The most frequently collected species by number included white sucker (Catasomus commersonii, 21%), fathead minnow (Pimephales promelas, 18%) and pumpkinseed (Lepomis gibbosus, 17%) Reach 2, Former Impounded Reach A total of 46 individuals were collected representing 11 species on April 23, The reach was sampled for 14 minutes resulting in a CPUE of 3.32 fish per minute. The dominant species collected were white sucker (65%), with creek chub (Semotilus 10

111 atromaculatus) and gizzard shad (Dorosoma cepedianum) making up a very small percentage of the next abundant species (6.5% combined). One white sucker with a fin clip was captured within this upstream reach, indicating potadromous fish species within the Rouge River are capable of migrating through the constructed riffle and confirm that the project fish passage objective has been achieved Reach 3, Constructed Riffle This sampling reach was sampled on two separate occasions, on April 23 and May 10, The reach was divided into left and right sides (in relation to the bridge pilings) and catch data were combined, both sampling sides and days. A total of 113 individuals representing 20 species (the highest species diversity for all sampling reaches) were collected with a CPUE of 3.33 fish per minute. The dominant species collected were white sucker (28%), gizzard shad (17%), green sunfish (Lepomis macrochirus) and pumpkinseed (11%). There were two species collected that either had the highest abundance in this reach or were only found within this reach, both of which have an affinity for riffle habitat. There were seven central stonerollers collected within this reach, which was the highest amount collected than any other reach. Also, this reach contained the only Johnny darters collected during post-monitoring sampling Reach 4, Downstream of Riffle A total of 44 individuals representing 7 different species were collected just downstream of the project riffle to the end of the project area on May 10, The dominant species collected within this area were gizzard shad (36%), white sucker (30%), green sunfish and pumpkinseed (11%). The reach was sampled for approximately 7.3 minutes with a CPUE of 6.06 fish per minute Reach 5, Downstream of Project Site This sampling reach was sampled on May 10, 2013 for approximately 12 minutes with a CPUE of 3.80 fish per minute. A total of 47 individuals were collected representing 11 different species. The dominant species collected were gizzard shad (34%), white sucker (15%), green sunfish and pumpkinseed (11%). 11

112 Reach 6, Downstream Reference Reach This sampling reach was sampled on May 2, 2013 and was separated into 2 separate reaches to reduce holding times for fishes. Results were then combined. A total of 163 individuals were collected representing 13 different species. The reach was sampled for a total time of approximately 38 minutes with a CPUE of 4.27 fish per minute. The dominant species collected at this site were white sucker (42%), striped shiner (Luxilus chrysocephalus, 20%), and gizzard shad (13%) DISCUSSION Table 3 provides a list of species captured in the pre- and post-removal sampling. There were three species not collected during post monitoring sampling that were collected during pre-monitoring sampling: goldfish (Carassius auratus), longnose dace (Rhinichthys cataractae), and smallmouth bass (Micropterus dolomieu). Conversely, there were 11 species collected during post monitoring that were not collected during pre-monitoring sampling: black bullhead (Ameiurus melas), bluntnose minnow (Pimephales notatus), bowfin (Amia calva), common carp (Cyprinus carpio), central mudminnow (Umbra limi), gizzard shad, logperch (Percina caprodes), northern pike (Esox Lucius), quillback carpsucker (Carpoides cyprinus), spottail shiner (Notropis hudsonius), and striped shiner. Post removal sampling resulted in capture of 27 species versus just 18 species during pre-removal sampling. In 2013, the constructed riffle located at the former dam site contained the highest species richness (20) of all sites sampled (Table 2). At this site, two species which have a high affinity for riffle habitats were found in the constructed riffle: three Johnny darters and seven central stonerollers. More central stonerollers were captured in the constructed riffle than any other reach sampled both pre- and post-removal. The constructed riffle and the former impounded site combined had 21 species and 159 individuals (catch per unit effort CPUE 3.33 fish per minute), which is more species rich but comparable in terms of individual numbers as the downstream reference reach (Reach 6). Prior to dam removal Reach 6 had a higher Shannon-Wiener index than Reach 1 with an effective number of species 1.4 times higher (Table 4). However, after dam removal Reach 1 had a higher diversity index with an effective number of species 1.6 times 12

113 higher. Based on Hutcheson s t-test, the differences in diversity between the reaches both pre- and post-removal is significant (Table 5). This is likely due to the variance in habitats present at each site as well as seasonal differences in fish utilization (e.g., differences in spawning times for some species) and weather patterns in 2012 versus The pre- and post-removal fish community at Reach 1 and 6 were also significantly different based on the Shannon-Wiener diversity index and Hutcheson s t-test (Table 5). The effective number of species in Reach 6 decreased from 7.92 to 5.85 from pre- to post-removal (Table 4). The Reach 1 effective number of species increased from 5.51 to It is possible that the upstream reference station fish community became more diverse as a result of greater connectivity with downstream habitats. However, sampling cannot explain the decrease in diversity in Reach 6. Removal of the dam should not have caused the decrease in diversity. Sites directly affected by the removal of the dam (Reaches 2, 3, and 4) also differed from one another in diversity during post-construction monitoring (Tables 4 and 5). Despite this, results from the Hutcheson s t-test for diversity showed that fish community diversity at three sampling reaches near the project site (Reaches 2, 4, and 5) were not significantly different from either the upstream or downstream reference site (Reach 1 or 6) (Table 5). However, Sorenson s index (Table 4) indicates that while the diversity between two of those stations is not significantly different, the fish communities are not very similar (index value well below 1.0). Interestingly, the post-removal diversity index of the former impoundment reach (Reach 2) was not significantly different than the reach just downstream of the constructed riffle (Reach 4), although the similarity index is low. Still, the similar diversities in Reach 2 and 4 suggests that fish movement was not impeded by the constructed riffle and the restored reach of the Rouge River contained suitable habitat for native fish species. The effective number of species (eh ; true diversity) can be used to evaluate the magnitude of difference in diversity (Table 4). The highest effective number of species correlates to the highest Shannon-Wiener diversity and vice-versa. The fish community of the constructed riffle in Reach 3 was the most diverse reach sampled with an effective number of species of The reach with the lowest diversity index and effective 13

114 number of species was the former impounded site (Reach 2) with However, this may be a result of sampling after dam removal during the peak of the white sucker run, which accounted for 65% of the total catch. This is also evidenced by this site containing the lowest species evenness of all sites sampled (0.59). 3.2 MARK-RECAPTURE One fin-clipped white sucker was captured upstream of the former Wayne Road Dam location in sampling Reach 2, the former impounded reach, on April 23, 2013 (Figure 3). The fish was fin clipped in 2012 in Reach 6, the downstream reference station prior to dam removal. Recapture of this marked fish upstream of the former dam location verifies that target fish species are now able to freely move within the Lower Rouge River. 3.3 MACROINVERTEBRATE COMMUNITY A total of five different families of macroinvertebrates and two different mollusk families were collected from the constructed riffle (Table 6). The most abundant aquatic insect families were Chironomidae (77%) and Hydropsychidae (20%). The other three families collected were found in low abundance, comprising 1% or less of the total sample collection. Because a reference riffle was not available within the Rouge River, it is unknown if this riffle diversity is comparable to other natural riffles. The most abundant macroinvertebrate, Chironomidae, are typically considered to be pollution tolerant. Simuliidae (black fly) and Heptageniidae (mayfly) are considered to be moderately pollution tolerant. It is possible the lack of diversity found is a result of the poor water quality found within this section of the Rouge River and not because the constructed riffle lacked appropriate substrate. Regardless, the results indicate that the riffle is providing habitat for macroinvertebrates. As water quality continues to improve in the Lower Rouge River watershed, the riffle should become a productive macroinvertebrate habitat. In the spring of 2013, a Michigan Clean Water Corps (MiCorps) stream quality index (SQI) was conducted at two sites within the project area, one directly upstream and one directly downstream of the constructed riffle at the former dam site. The SQI scores are rated as : >48 is Excellent, is Good, is Fair, and <19 is Poor. The upstream site went from a poor rating to a fair rating following removal of the dam (16 to 28), 14

115 and the downstream site remained at a fair rating following removal. The SQI rating, as quantified using macroinvertebrate data from this project, resulted in a score of 16 (Poor). While this number is lower than the previously mentioned scores, it falls within the long-term trend seen at either MiCorps station. Full results from the long-term SQI studies can be found in Appendix A. 3.4 MORPHOLOGY Plotted cross-section data are presented as Figures 4 through 18. The channel cross sections were mostly unchanged at sites outside of the immediate project area, with the exception of XS2, XS3, and XS14. Bed elevations were similar pre and postconstruction in these locations, however the channel has narrowed up at XS2 and migrated North at XS3, which is located in a meander bend. Differences in cross sectional shape at XS14 are likely due to a lack of data points in the pre-construction survey. Cross sections immediately upstream of the Wayne Road dam (XS4 XS9) had minimal changes to the cross sectional geometry. Cross sections immediately downstream of the Wayne Road dam (XS10, XS11, and XS12) represent the portion of the river which was altered. Alterations included removal of an inner channel bar, construction of a floodplain bench, and installation of riprap bank stabilization measures. Cross-sections located at the boundaries of the surveyed area (Sites 1 and 15) did not see changes in cross section shape or bed elevation. 4. CONCLUSIONS 4.1 FISH COMMUNITY Fish community results were inconclusive, but suggested that the fish community diversity upstream of the dam increased between 2012 pre-removal sampling and 2013 post-removal sampling. This increase could be due to greater connectivity to downstream reaches. The inconclusive results are due primarily to high variability between pre- and post-construction sampling results that is most likely caused by different habitat conditions and environmental conditions linked to weather patterns. Although sampling was conducted at the same time of year in 2012 and 2013, weather patterns were much different between the two years during and prior to the sampling periods. Therefore, the timing of spawning runs was different. In 2013, sampling was conducted during the peak of white sucker spawning activity, as indicated by the higher 15

116 numbers of white sucker captured (Table 1 and 2), particularly in Reach 6. The variability in sampling reaches, and from pre- to post-removal, was evident by the inconsistent similarities in fish community diversity: adjoining reaches were significantly different, but were not significantly different to one or more of the other reaches sampled (Table 5). These differences are not due to the dam removal, but due to differences and similarities in habitat and fish distribution at the time of sampling. Nonetheless, fish community sampling revealed some important facts about fish abundance and distribution that do suggest the dam removal affected fish distribution. Most notably, the number of white sucker captured in Reach 1 (upstream reference reach) increased from 19 prior to dam removal to 68 after dam removal. Habitat in Reach 6 did not change after dam removal. Therefore, this result suggests that upstream white sucker movement was formerly restricted by the Wayne Road Dam. Following dam removal, white sucker preferentially moved upstream of the dam seeking habitat required for various life stages. Interestingly enough, the number of white sucker captured in Reach 6 (downstream reference) decreased from 36 prior to dam removal to 16 after dam removal. Again, those contrasting results suggest preferential upstream movement by white sucker. While the fish community assemblages of Reaches 2 and 4 were not strongly similar based on Sorenson s similarity index, there were several species common to both reaches and the diversity index for the two Reaches were not significantly different during post-removal sampling. This result indicates that the channel realignment and restoration immediately downstream of the former dam location produced habitat preferred by fish and that fish were able to move freely between the two reaches. The constructed riffle is an important component of the channel restoration following dam removal because it protects utilities and infrastructure, but also because it has the potential to provide an important type of habitat that is not abundant in the Lower Rouge River. Therefore, the riffle was sampled during post-removal monitoring. Sampling results demonstrate the high value of the created riffle habitat to fish of the Lower Rouge River. The Shannon-Wiener diversity index was higher than any other reach sampled; with a species richness of 20 and effective number of species of In addition, two species with high affinity for riffle habitat, Johnny darter and central stoneroller, were 16

117 captured in the riffle. More stonerollers were captured in the constructed riffle than any other reach. In addition, 32 white sucker were captured in the riffle, a significant finding given white sucker were actively spawning in the river during the post-removal sampling. Monitoring results clearly show that the constructed riffle is providing important and valuable habitat for fishes. 4.2 FISH PASSAGE Use of a mark-recapture technique successfully demonstrated that target fish species could freely move between downstream reaches and upstream reaches. A white sucker marked in 2012 downstream of the Wayne Road Dam in Reach 6 (downstream reference) was recaptured in 2013 after dam removal in Reach 2. Furthermore, the fish community diversity upstream of the dam in Reach 2 was similar to the diversity downstream of the dam in Reaches 4 and 5, although the assemblage was slightly different. This indicates that the improved habitat and access to Reach 2 (former impounded reach has improved and the number of species using habitat located immediately upstream of the dam has increased due to greater connectivity. 4.3 MORPHOLOGY Channel cross-section surveys pre- and post-removal shows that headcutting and sedimentation have not occurred upstream or downstream of the former dam location. Dam removal can lead to deposition of sediment on the bed downstream of dams and erosion of the bed upstream of dams that results in formation of a headcut that propagates upstream. Appreciable decrease or increase in bed elevations were not observed at any of the cross-sections surveyed prior to and after dam removal. Observed changes were minor and due to natural variability in sediment transport processes. 17

118 5. TABLES 18

119 Table 1. Fish catch data from pre-removal surveys of the Rouge River in the vicinity of the Wayne Road Dam, Wayne, MI Downstream Reference (Reach 6) Upstream Reference (Reach 1) Impounded Reach (Reach 2) Total Captured Species Number Clipped Number Number Blacknose Dace Blackside Darter 4 4 Bluegill Central Stoneroller Common Shiner Creek Chub Emerald Shiner Fathead Minnow Goldfish 1 1 Green Sunfish Johnny Darter 1 1 Longnose Dace 1 1 Northern Hogsucker Pumpkinseed Round Goby 7 7 Smallmouth Bass 1 1 Steelhead 1 1 White Sucker Total

120 Table 2. Fish catch data from post-removal surveys of the Rouge River in the vicinity of the Wayne Road Dam, Wayne, MI. Species Reach 1 Reach 2 Reach 3 Reach 4 Reach 5 Reach 6 Total Total % Black Bullhead Blacknose Dace Blackside Darter Blue x Pumpkinseed Bluegill Bluntnose Minnow Bowfin Central Mudminnow Central Stoneroller Common Carp Common Shiner Creek Chub Emerald Shiner Fathead Minnow Gizzard Shad Green Sunfish Johnny Darter Logperch Northern Hogsucker Northern Pike Pumpkinseed Quillback Round Goby Spottail Shiner Steelhead Striped Shiner White Sucker Total Number Total Species

121 Table 3. Total species list from pre- and post- monitoring at Wayne Road Dam, Wayne, Michigan. Pre- Post- Common Name Scientific Name Monitoring Monitoring Black Bullhead Ameiurus melas Blacknose Dace Rhinichthys atratulus Blackside Darter Percina maculata Blue x Pumpkinseed Bluegill Lepomis macrochirus Bluntnose Minnow Pimephales notatus Bowfin Amia calva Central Mudminnow Umbra limi Central Stoneroller Campostoma anomalum Common Carp Cyprinus carpio Common Shiner Luxilus cornutus Creek Chub Semotilus atromaculatus Emerald Shiner Notropis atherinoides Fathead Minnow Pimephales promelas Gizzard Shad Dorosoma cepedianum Goldfish Carassius auratus Green Sunfish Lepomis cyanellus Johnny Darter Etheostoma nigrum Logperch Percina caprodes Longnose Dace Rhinichthys cataractae Northern Hogsucker Hypentelium nigricans Northern Pike Esox lucius Pumpkinseed Lepomis gibbosus Quillback Carpiodes cyprinus Round Goby Neogobius melanostomus Smallmouth Bass Micropterus dolomieu Spottail Shiner Notropis hudsonius Steelhead Oncorhynchus mykiss Striped Shiner Luxilus chrysocephalus White Sucker Catostomus commersonii Total Species

122 Table 4. Diversity statistics for all sampling sites during pre and post construction monitoring at the Wayne Road Dam project site. Sampling Reach Shannon- Weiner Index (H ) Species Evenness Effective Number of Species (e H ) Reach 6, Dns reference Reach 1, Ups reference Reach 1, Ups reference Reach 2, Impounded reach Sampling Period Preconstruction Postconstruction Reach 3, Constructed riffle Reach 4, Dns riffle Reach 5, Dns prect Reach 6, Dns reference

123 Table 5. Cross-wise comparisons of the sampling reaches using the Sørensen s Similarity Index and Hutcheson s t-test. Bold text indicates statistical significance (α = 0.1). The designation R indicates reference site. Cross-wise Comparison Reference Reaches (Reaches 1 and 6) Pre-removal Reach 1 v. Reach 6 (ups. Reference v. dns. Reference) Post-removal Reach 1 v. Reach 6 (ups. Reference v. dns. Reference) Reach 6 Pre- v. Post-removal (downstream reference pre/post) Reach 1 Pre- v. Post-removal (upstream reference pre/post) Former Impounded Reach (Reach 2) Post-removal Reach 2 v. Reach 1 (former impoundment v. ups. Reference) Post-removal Reach 2 v. Reach 6 (former impoundment v. dns. Reference ) Downstream Riffle (Reach 4) Post-removal Reach 4 v. Reach 1 (downstream of riffle v. ups. Reference) Post-removal Reach 4 v. Reach 6 (downstream of riffle v. dns. Reference) Downstream Project Site (Reach 5) Post-removal Reach 5 v. Reach 1 (downstream of project site v. ups. Reference) Post-removal Reach Downstream R * Downstream of Project Site Sørensen s Similarity df Hutcheson s t-value Upstream of Riffle * Downstream of Riffle

124 Table 6 Macroinvertebrate colonization of the constructed riffle located at the former Wayne Road dam site, Wayne, MI. Macroinvertebrates were collected for 60 minutes using methods described in the Michigan Procedure 51. Order Family Number Annelida Oligochaeta 1 Bivalve Corbiculidae 1 Diptera Chironomidae 159 Diptera Simuliidae 1 Ephemeroptera Heptageniidae 1 Mollusca Gastropoda 2 Trichoptera Hydropsychidae 42 Total

125 6. FIGURES 25

126 Figure 1. Location of fish community sampling reaches in the vicinity of the former Wayne Road Dam, Wayne, Michigan. 26

127 Figure 2. Location of channel cross-sections used to monitor morphological changes in the Lower Rouge River in response to removal of the Wayne Road Dam, Wayne, Michigan. 27

128 Figure 3. Fin-clipped white sucker (Catostomus commersoni) marked in Reach 6 downstream of the Wayne Road Dam on April 4, 2012 and recaptured in Reach 2 upstream of the Wayne Road Dam on April 23,

129 655 XS1 650 Pre-Construction Post-Construction Elevation (ft.) Distance (ft.) Figure 4. Cross-section profile XS1 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 655 XS2 650 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 5. Cross-section profile XS2 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 29

130 655 XS3 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 6. Cross-section profile XS3 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 655 XS4 650 Pre-Construction Post-Construction Elevation (ft.) Distance (ft.) Figure 7. Cross-section profile XS4 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 30

131 655 XS Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 8. Cross-section profile XS5 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 655 XS6 650 Pre-Construction Post-Construction Elevation (ft.) Distance (ft.) Figure 9. Cross-section profile XS6 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 31

132 XS7 650 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 10. Cross-section profile XS7 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 655 XS8 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 11. Cross-section profile XS8 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 32

133 655 XS9 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 12. Cross-section profile XS9 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 655 XS10 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 13. Cross-section profile XS10 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 33

134 655 XS11 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 14. Cross-section profile XS11 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 655 XS12 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 15. Cross-section profile XS12 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 34

135 650 XS13 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 16. Cross-section profile XS13 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 650 XS14 Elevation (ft.) Pre-Construction Post-Construction Distance (ft.) Figure 17. Cross-section profile XS14 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 35

136 650 XS Pre-Construction Post-Construction 640 Elevation (ft.) Distance (ft.) Figure 18. Cross-section profile XS15 of the Lower Rouge River before and after removal of the Wayne Road Dam. See Figure 2 for cross-section locations. 36

137 APPENDIX A Wayne County MiCorps Monitoring Report 37

138 Introduction The physical removal of the Wayne Road Dam and river bank restoration was initiated in July 2012 and completed by December Benthic macroinvertebrate monitoring was one of the parameters selected to determine habitat improvement at the location. Sites upstream and downstream of the Wayne Road Dam were assessed to determine benthic macroinvertebrate water quality before and after the dam removal project. This report was prepared by the Wayne County Water Quality Management Division (WQMD) as a summary of the benthic macroinvertebrate monitoring associated with the project. Procedure Benthic macroinvertebrate collection, record keeping and water quality ratings were performed in accordance with procedures established by the Michigan Clean Water Corps (MiCorps) and Friends of the Rouge (FOTR). Through these procedures a Stream Quality Index (SQI) is determined by the number and type of different organisms found in the sample. A higher proportion of sensitive organisms such as mayflies and caddisflies and or a high number of different organisms results in a higher score. The SQI is given a rating: a score >48 is Excellent, is Good, is Fair, and <19 is Poor. Statistical analysis is performed on the data at sites that have more than three years of data per season. The data for spring and fall are analyzed separately due to different sampling conditions associated with the separate seasons. The trend is considered significant if the p-value is less than A positive slope indicates an upward trend (scores increasing) and a negative slope indicates a downward trend (scores decreasing). Collection Sites and Dates Two monitoring sites, within the Rouge River Lower 2 subwatershed, are specific to the dam removal project: LR-6 (Woody Debris Management 201 site) is immediately upstream of the dam removal project and LR-3 is downstream of the project at Goudy Park. Table -1 is a summary of the collection dates for the pre and post monitoring of the Spring/Fall benthic monitoring and winter stonefly sampling events relative to the dam removal project. Table 1: Macroinvertebrate Collection Dates Pre Dam Removal Post Dam Removal Spring 4/25/2012 Spring 5/1/2013 Fall 10/11/12 Fall NA Winter Stonefly 1/26/12 Winter Stonefly 2/4/2013 Results WQMD performed Winter Stonefly Searches in January/February 2012 and The stonefly search is a simple presence or absence survey for this water quality sensitive species. In 2012, WQMD sampled three sites in the Lower Rouge River watershed (LR-6 LR-10, and LR-12). No stoneflies were found. WQMD again sampled three sites on the Lower Rouge in 2013 (LR-3, LR-6, & LR-10). No stoneflies were found.

139 Wayne Road Dam Removal Benthic Study Page 2 of 7 Sample Site ID Table 2 is a summary of the Spring Stream Quality Index (SQI) scores for the Lower 2 for macro-invertebrate samples collected by Friends of the Rouge volunteers and Wayne County staff. Figure 1 is a long term macroinvertebrate trend analysis of Rouge Lower 2 for the spring. The trend is slightly negative but not significant. Table 2: Spring Lower 2 Sites & Scores Spring 2005 Spring 2006 Spring 2007 Spring 2008 Spring 2009 Spring 2010 Spring 2011 Spring 2012 Spring 2013 Trendline (+/ ) Significant Yes/No LR No 27 LR No 23 LR No 19 LR No 30 LR No 35 Site Baseline (1st 3- Yrs ) Average LR No 26 LR No 20 Year Average Figure 1: Spring Lower 2 Data Trend Table 3 is a summary of the Fall Stream Quality Index scores for the Lower 2 for macroinvertebrate samples collected by Friends of the Rouge volunteers and Wayne County staff. Figure 2 is a long term macroinvertebrate trend analysis of Rouge Lower 2 for the fall. The trend is again slightly negative but not significant.

140 Wayne Road Dam Removal Benthic Study Page 3 of 7 Table 3: Fall Lower 2 Sites & Scores Sample Site ID Fall 2005 Fall 2006 Fall 2007 Fall 2008 Fall 2009 Fall 2010 Fall 2011 Fall 2012 Trendlin e (+/ ) Significan t Yes/No Site Baseline (1st 3-Yrs) Average LR No 23 LR No 33 LR No 25 LR No 23 LR No 32 LR No 28 LR No 21 Year Average Figure 2: Fall Lower 2 Data Trend Table 4 is a summary of the SQI scores pre and post dam removal for the upstream and downstream sites for the seasons.

141 Wayne Road Dam Removal Benthic Study Page 4 of 7 Table 4: Pre and Post dam removal SQI scores for LR-3 and LR-6 for each season Pre Dam Removal Post Dam Removal Site Location to dam Event SQI Score Event SQI Score LR-3 Downstream Spring April Spring May LR-3 Downstream Fall October Fall NA LR-6 Upstream Spring April Spring May LR-6 Upstream Fall October Fall NA Table 5 is a summary of the trend analysis for the upstream and downstream sites for each season. The trends at each site appear negative but are not statistically significant. Figure 3 is a long term macroinvertebrate trend analysis of the upstream site (LR-6) and downstream (LR-3) for the spring Table 5: Trend Summary Lower Rouge Dam Removal Sites Spring trend analysis project sites Site Slope p-value Significance LR No Trend LR No Trend Fall trend analysis project sites LR No Trend LR No Trend Note: The fall data is through fall 2012

142 Wayne Road Dam Removal Benthic Study Page 5 of 7 Figure 3: Data trends for LR3 and LR6 Benthic Macroinvertebrate sites Spring 2013

143 Wayne Road Dam Removal Benthic Study Page 6 of 7 Figure 4: Spring 2012 Results

Understanding the Impacts of Culvert Performance on Stream Health

Understanding the Impacts of Culvert Performance on Stream Health Understanding the Impacts of Culvert Performance on Stream Health Kristin Thomas Aquatic Ecologist Michigan Trout Unlimited Transportation and the Environment Conference 12/5/2018 Importance of adequately

More information

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project

Steelhead Society of BC. Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Steelhead Society of BC Presents: Thompson River Watershed Restoration and Enhancement Project #4 Nicola River Bank Stabilization and Enhancement Project Application for Funding December 2013 1.0 BACKGROUND

More information

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013

Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 Eastern Brook Trout Joint Venture Annual Report The Nature Conservancy 2013 2013 Annual Performance Report Enhancing Connectivity in the Ash-Black Rock Sub-basin of the West Branch Narraguagus River. Project

More information

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By:

FINAL REPORT. Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County. Submitted By: FINAL REPORT Yonkers Creek Migration Barrier Removal Project Wonderstump Road Del Norte County Submitted By: Del Norte County Community Development Department Yonkers Creek Migration Barrier Removal Project

More information

Advancing Fish Passage in the Menomonee River Watershed

Advancing Fish Passage in the Menomonee River Watershed University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9

Trout Unlimited Comments on the Scope of Environmental Impact Statement for the Constitution Pipeline Project, Docket No. PF12-9 October 9, 2012 Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE, Room 1A Washington, DC 20426 RE: Trout Unlimited Comments on the Scope of Environmental Impact Statement

More information

Massachusetts Stream Crossing Case Studies

Massachusetts Stream Crossing Case Studies Massachusetts Stream Crossing Case Studies Amy Singler Associate Director, River Restoration Program Carrie Banks River Continuity Coordinator Case Studies: Public Benefits: Movement of goods and people

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Conserving the Forests, Lakes and Streams of Northeast Michigan

Conserving the Forests, Lakes and Streams of Northeast Michigan 4241 Old US 27 South, Suite 2, Gaylord, Michigan 49735 (989) 448-2293 www.huronpines.org info@huronpines.org Prioritized Restoration Projects in the AuSable River Watershed Summer 2015 Update from Huron

More information

Michigan Dept. of Natural Resources Status of the Fishery Resource Report Page 1. Weber Lake Cheboygan County, T34N, R3W, Sec.

Michigan Dept. of Natural Resources Status of the Fishery Resource Report Page 1. Weber Lake Cheboygan County, T34N, R3W, Sec. Michigan Dept. of Natural Resources 2012-143 Status of the Fishery Resource Report Page 1 Weber Lake Cheboygan County, T34N, R3W, Sec. 31 Neal Godby, Fisheries Biologist Environment Weber Lake is a 28.5-acre

More information

Hydraulic Modeling of Stream Enhancement Methods

Hydraulic Modeling of Stream Enhancement Methods Hydraulic Modeling of Stream Enhancement Methods Matthew J. Curry John J. Levitsky Abstract Development within watersheds increases the amounts of runoff causing stream erosion and degradation of stream

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek.

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Luxemburg Creek. Minnesota F-29-R(P)-24 Area 315 Study 3 March 2016 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Luxemburg Creek 2015 Mark Pelham Sauk

More information

Stevens Creek Corridor

Stevens Creek Corridor O F F I C E O F T H E D I R E C T O R O F P U B L I C W O R K S Stevens Creek Corridor Creek Restoration Project Volume Three Project Update: Creek Photos, Before & After BY GAIL SEEDS - PROJECT MANAGER,

More information

Big Spring Creek Habitat Enhancement and Fishery Management Plans

Big Spring Creek Habitat Enhancement and Fishery Management Plans Big Spring Creek Habitat Enhancement and Fishery Management Plans November 5, 2012 Big Spring Events and Activities Center Newville, PA Charlie McGarrell Regional Habitat Biologist Pennsylvania Fish and

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project The Columbia Lake dam located 1/4 mile upstream of the Paulins Kill River's confluence with the Delaware River in Knowlton Township, Warren County has been proposed for

More information

COLUMBIA LAKE DAM REMOVAL PROJECT

COLUMBIA LAKE DAM REMOVAL PROJECT COLUMBIA LAKE DAM REMOVAL PROJECT Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS

PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS PROJECT TO INSTALL LARGE WOOD HABITAT STRUCTURES IN THE CARMEL RIVER USING CALIFORNIA DEPARTMENT OF FISH AND GAME GRANT FUNDS The Monterey Peninsula Water Management District (MPWMD), in cooperation with

More information

LAKE DIANE Hillsdale County (T8-9S, R3W, Sections 34, 3, 4) Surveyed May Jeffrey J. Braunscheidel

LAKE DIANE Hillsdale County (T8-9S, R3W, Sections 34, 3, 4) Surveyed May Jeffrey J. Braunscheidel Michigan Department of Natural Resources Status of the Fishery Resource Report No. 2003-4, 2003 LAKE DIANE Hillsdale County (T8-9S, R3W, Sections 34, 3, 4) Surveyed May 2001 Jeffrey J. Braunscheidel Environment

More information

Columbia Lake Dam Removal Project

Columbia Lake Dam Removal Project Columbia Lake Dam Removal Project Major Goals of the Columbia Lake Dam Removal: Reconnect 10 miles of the Paulins Kill River to the Delaware River, restoring natural flow regime and sediment transport.

More information

Appendix G Whitewater Recreation Flow Study Plan

Appendix G Whitewater Recreation Flow Study Plan Appendix G Whitewater Recreation Flow Study Plan Study Plan Whitewater Recreation Flow Study Grandfather Falls Hydroelectric Project FERC Project No. 1966 March 2013 An Integrys Energy Group Company Section

More information

Marty Boote Greg Gaulke, John O Meara

Marty Boote Greg Gaulke, John O Meara Marty Boote Greg Gaulke, John O Meara Project Overview Removal of 2 related dams on the Paw Paw River Removed November 2011 Incorporated fish passage and stream restoration Removal of the second dam restored

More information

Fossil Creek Native Fish Repatriation 2009 Implementation Plan Arizona Game and Fish Department

Fossil Creek Native Fish Repatriation 2009 Implementation Plan Arizona Game and Fish Department Fossil Creek Native Fish Repatriation 2009 Implementation Plan Arizona Game and Fish Department MONITORING: Annual monitoring is conducted for each species stocked, typically during late summer or early

More information

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries

Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries Illinois Lake Management Association Conference March 23, 2018 By Trent Thomas Illinois Department of Natural Resources Division of Fisheries Sources of Habitat Impairment Sedimentation Channelization

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

Jason Blackburn, Paul Hvenegaard, Dave Jackson, Tyler Johns, Chad Judd, Scott Seward and Juanna Thompson

Jason Blackburn, Paul Hvenegaard, Dave Jackson, Tyler Johns, Chad Judd, Scott Seward and Juanna Thompson Alberta Conservation Association (ACA) Date: 2014-2015 Project Name: Owl River Walleye and Aquatic Habitat Assessment Fisheries Program Manager: Peter Aku Project Leader: Tyler Johns Primary ACA staff

More information

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006

Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mid-Columbia Fisheries Enhancement Group Annual Report Fiscal Year 06: July 1, 2005 June 30, 2006 Mission Statement The mission of the Mid-Columbia Fisheries Enhancement Group is to restore self-sustaining

More information

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS

Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS Colusa Basin Drain Watershed Fish Stranding Tour Concept Paper Mike Hendrick and Brycen Swart NMFS On May 31, 2013 representatives from CDFW, USFWS, and NMFS went on a field tour to look at locations in

More information

Estimated on-the-ground start and end dates: 1 June October 2018

Estimated on-the-ground start and end dates: 1 June October 2018 A. Applicant Information Name of Organization: U.S. Army Corps of Engineers, Carlyle Lake 801 Lake Road, Carlyle, IL 62231 Contact Information: Robert Wilkins, Operations Manager, (618) 594-2484, Robert.Wilkins@usace.army.mil

More information

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS

(Revised February,2005) CULVERTS, BRIDGES, AND FORDS GUIDE TO STREAM CROSSINGS (Revised February,2005) CULVERTS, BRIDGES, AND FORDS Culverts, bridges, and fords are all methods used to cross-streams. Culverts are the most common stream crossing structure.

More information

Friends of the Detroit River Habitat Restoration Project Update

Friends of the Detroit River Habitat Restoration Project Update Friends of the Detroit River Habitat Restoration Project Update 11 Beneficial Use Impairments (BUIs) were originally identified to be associated with the Detroit River: 1. Restrictions on fish and wildlife

More information

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA

Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA Aquatic Organism Passage at Road-Stream Crossings CHUCK KEEPORTS FOREST HYDROLOGIST ALLEGHENY NATIONAL FOREST WARREN, PENNSYLVANIA TOPICS COVERED Aquatic Organism Passage (AOP) Benefits of AOP Crossings

More information

COA-F17-F-1343 YEAR END REPORT

COA-F17-F-1343 YEAR END REPORT DAVE MARSHALL SALMON RESERVE RESTORATION, MAINTENANCE, AND UPGRADES YEAR END REPORT Prepared for: Fish and Wildlife Compensation Program Prepared by: Edith Tobe, RPBio, Executive Director Box 1791, Squamish,

More information

Information for File # SEW

Information for File # SEW Information for File #2014-02744-SEW Applicant: Minnesota Department of Transportation (MnDOT), District 3; c/o Mr. Robert Nibbe Corps Contact: Sarah Wingert, U.S. Army Corps of Engineers, 180 5 th Street

More information

Chadbourne Dam Repair and Fish Barrier

Chadbourne Dam Repair and Fish Barrier Chadbourne Dam Repair and Fish Barrier Final Report for the Western Native Trout Initiative Prepared by: Carol Endicott Yellowstone Cutthroat Trout Conservation Biologist Montana Fish, Wildlife & Parks

More information

DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP)

DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP) DALE HOLLOW LAKE TROOPER ISLAND IMPROVEMENT PROJECT Proposal for Reservoir Fisheries Habitat Partnership (RFHP) A. Applicant Information: US Army Corps of Engineers, Dale Hollow Lake POC: Gregg Nivens

More information

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT

NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT NEVADA DEPARTMENT OF WILDLIFE STATEWIDE FISHERIES MANAGEMENT FEDERAL AID JOB PROGRESS REPORTS F-20-52 2016 Lake Tahoe Rainbow Trout Study WESTERN REGION NEVADA DEPARTMENT OF WILDLIFE, FISHERIES DIVISION

More information

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION

GRAND RAPIDS RESTORATION GRAND RAPIDS REVITALIZATION GRAND RAPIDS RESTORATION RETURNING THE RAPIDS TO THE GRAND WHY IS THIS PLACE CALLED GRAND RAPIDS? We have been asking for over 100- years, where are the rapids? WHY IS THIS PLACE CALLED GRAND RAPIDS? compare

More information

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Culvert Design for Low and High Gradient Streams in the Midwest. Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Culvert Design for Low and High Gradient Streams in the Midwest Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest Overview Culvert Design Considerations Hydraulic Terms Culvert Impacts Low

More information

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum

FISH PASSAGE IMPROVEMENT in California s Watersheds. Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds Assessments & Recommendations by the Fish Passage Forum FISH PASSAGE IMPROVEMENT in California s Watersheds The mission of the Fish Passage Forum is

More information

Huntington District. For More Information Contact (304)

Huntington District. For More Information Contact (304) Zoar Levee & Diversion Dam are located in the Muskingum River Basin highlighted in green to left. The Muskingum River Basin is the site of Ohio s first multiple purpose water management and land conservation

More information

Fish Friendly Crossings- Examples from Nash Stream

Fish Friendly Crossings- Examples from Nash Stream Fish Friendly Crossings- Examples from Nash Stream Maggie Machinist- North Regional Forester, Division of Forests and Lands. Nash Stream Nash Stream Forest is 40,000 acres, owned and managed by NH Division

More information

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011

APPENDIX C VEGETATED EMERGENCY SPILLWAY. VERSION 1.0 March 1, 2011 APPENDIX C VEGETATED EMERGENCY SPILLWAY VERSION 1.0 March 1, 2011 [NOTE: Could use a better photo more clearly showing the emergency spillway in the context of the dam.] SECTION C-1: DESCRIPTION OF PRACTICE

More information

MISSISSIPPI MAKEOVER A Plan for Restoration, Just Around the Bend

MISSISSIPPI MAKEOVER A Plan for Restoration, Just Around the Bend MISSISSIPPI MAKEOVER A Plan for Restoration, Just Around the Bend Interim Report Card 2013 Project coordinated by the Dakota County Soil and Water Conservation District and sponsored by the Minnesota Pollution

More information

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0

Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL. 26/02/2015 Version 2.0 Removal of natural obstructions to improve Atlantic Salmon and Brook Trout habitat in western NL 26/02/2015 Version 2.0 1 Table of Contents List of Tables... 2 Introduction... 3 Methods... 4 Preliminary

More information

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy

Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit * Thanks to The Nature Conservancy Joe Rathbun Michigan DEQ Water Resources Division Nonpoint Source Unit rathbunj@mi.gov * Thanks to The Nature Conservancy Road-stream intersections = 67,511 Culverts = 60,700 Bridges = 6,811 Perched Piping

More information

Fish Community. Fish Habitat, Streams and Rivers

Fish Community. Fish Habitat, Streams and Rivers Clear, Ston(e)y and White Lake Plan Fish Community The lakes support a cool/warm water fishery including muskellunge, walleye, largemouth and smallmouth bass, yellow perch, pumpkinseed, rockbass, blue

More information

P.O. Box 65 Hancock, Michigan USA fax

P.O. Box 65 Hancock, Michigan USA fax This PDF file is a digital version of a chapter in the 2005 GWS Conference Proceedings. Please cite as follows: Harmon, David, ed. 2006. People, Places, and Parks: Proceedings of the 2005 George Wright

More information

EcoLogic Memorandum. TO: Ben Brezell; EDR FROM: Mark Arrigo RE: Possible Impacts of Dredging Snooks Pond DATE: 6/4/07

EcoLogic Memorandum. TO: Ben Brezell; EDR FROM: Mark Arrigo RE: Possible Impacts of Dredging Snooks Pond DATE: 6/4/07 EcoLogic Memorandum TO: Ben Brezell; EDR FROM: Mark Arrigo RE: Possible Impacts of Dredging Snooks Pond DATE: 6/4/07 Background EDR P.C. (EDR) has been contracted by a landowner to assess the feasibility

More information

Justification for Rainbow Trout stocking reduction in Lake Taneycomo. Shane Bush Fisheries Management Biologist Missouri Department of Conservation

Justification for Rainbow Trout stocking reduction in Lake Taneycomo. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Justification for Rainbow Trout stocking reduction in Lake Taneycomo Shane Bush Fisheries Management Biologist Missouri Department of Conservation December 14, 2017 Lake Taneycomo was formed by the construction

More information

Rebirth of the Pigeon River: Song of the Morning Dam Removal Project

Rebirth of the Pigeon River: Song of the Morning Dam Removal Project Major funding for this project was provided by: Michigan Department of Natural Resources Aquatic Habitat Grant Program $293,000 Golden Lotus, Inc. $100,000 Great Lakes Fishery Trust $46,000 Pigeon River

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Fairhaven Creek 2000

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Fairhaven Creek 2000 Minnesota F-29-R(P)-17 Area 340 Study 3 April 2001 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Fairhaven Creek 2000 By Eric R. Altena

More information

The Blue Heron Slough Conservation Bank

The Blue Heron Slough Conservation Bank 1 The Blue Heron Slough Conservation Bank CONSERVATION BANKING July 19-23, 2010 CASE STUDY SERIES The Blue Heron Slough Conservation Bank (Washington) I. OVERVIEW & BACKGROUND: Location: Snohomish River

More information

Executive Summary. Map 1. The Santa Clara River watershed with topography.

Executive Summary. Map 1. The Santa Clara River watershed with topography. Santa Clara River Steelhead Trout: Assessment and Recovery Opportunities December 2005 Prepared By: Matt Stoecker and Elise Kelley, Ph.D. University of California, Santa Barbara Prepared For: The Santa

More information

Illinois State Water Survey

Illinois State Water Survey Illinois State Water Survey HYDROLOGY DIVISION SWS Contract Report 508 COMPARISON OF 1987 AND 1989 BED PROFILE SURVEYS OF THE LOWER CACHE RIVER by Richard Allgire Office of Sediment and Wetland Studies

More information

LIFE HISTORY DIVERSITY AND RESILIENCE

LIFE HISTORY DIVERSITY AND RESILIENCE LIFE HISTORY DIVERSITY AND RESILIENCE SPRING CHINOOK IN THE WILLAMETTE RIVER BASIN Kirk Schroeder Brian Cannon Luke Whitman Paul Olmsted Oregon Department of Fish and Wildlife Corvallis Research Lab Thanks

More information

Quemahoning Reservoir

Quemahoning Reservoir Pennsylvania Fish & Boat Commission Biologist Report Quemahoning Reservoir Somerset County May 2011 Trap Net, Gill Net and Electrofishing Survey Quemahoning Reservoir is an 899 acre impoundment located

More information

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort

Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Maryland Chapter Trout Unlimited Brook Trout Conservation Effort Photo by Matt Kline Portfolio of Recent Work MDTU Brook Trout Conservation Coordinator: Scott C. Scarfone, ASLA sscarfone@oasisdesigngroup.com

More information

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM

FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM FACT SHEET MCGREGOR LAKE RESTORATION HABITAT PROJECT POOL 10, UPPER MISSISSIPPI RIVER, WISCONSIN ENVIRONMENTAL MANAGEMENT PROGRAM LOCATION McGregor Lake is located within a mid-river island in Pool 10

More information

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP

FISHERIES BLUE MOUNTAINS ADAPTATION PARTNERSHIP FISHERIES A warming climate, by itself, substantially affects the hydrology of watersheds in the Blue Mountains. Among the key hydrologic changes projected under all scenarios for the 2040s and beyond

More information

Lower Dolores River Corridor Planning Meeting Jim White Colorado Division of Wildlife

Lower Dolores River Corridor Planning Meeting Jim White Colorado Division of Wildlife Lower Dolores River Corridor Planning Meeting Jim White Colorado Division of Wildlife Objectives Overview of cold and warm water fishes in the Dolores River including: Flow and Fish Management Distribution

More information

Okanagan Sockeye Reintroduction

Okanagan Sockeye Reintroduction Okanagan Sockeye Reintroduction Backgrounder Elders accounts, and other forms of Traditional Ecological Knowledge (TEK) tell us that many species of salmon once came into the Okanagan Valley and tell us

More information

Cat Island Chain Restoration

Cat Island Chain Restoration Cat Island Chain Restoration 1820s Fox River Military Road Map to Fort Howard 1845 Chart of Green Bay & Fox River Cat Island Chain - 1938 Cat Island Brown County Aerial Photography, 1938 Historic Western

More information

2017 Lake Winnebago Bottom Trawling Assessment Report

2017 Lake Winnebago Bottom Trawling Assessment Report 217 Lake Winnebago Bottom Trawling Assessment Report Adam Nickel, Winnebago System Gamefish Biologist, March 218 There were several highlights from the 217 Lake Winnebago bottom trawling survey, including

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California

Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California scanned for KRIS Abundance of Steelhead and Coho Salmon in the Lagunitas Creek Drainage, Marin County, California Prepared for: Marin Municipal Water District 220 Nellen Drive Corte Madera, California

More information

APPENDIX J HYDROLOGY AND WATER QUALITY

APPENDIX J HYDROLOGY AND WATER QUALITY APPENDIX J HYDROLOGY AND WATER QUALITY J-1 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed / Preliminary Creek Constructed Natural Channel Culvert J-2 Preliminary

More information

Alewife Brook, Cape Elizabeth, River Herring Monitoring Summary 2015

Alewife Brook, Cape Elizabeth, River Herring Monitoring Summary 2015 University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2-3-2016 Alewife Brook, Cape Elizabeth, River Herring Monitoring Summary 2015 Matt Craig University of

More information

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan

Assessment of Baseline Geomorphic Features at. Proposed Stream Crossings On The Proposed County Road 595. Marquette County, Michigan Assessment of Baseline Geomorphic Features at Proposed Stream Crossings On The Proposed County Road 595 Marquette County, Michigan Prepared for: Kennecott Eagle Minerals Company Marquette, Michigan Prepared

More information

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application

HEC 26 Aquatic Organism Passage Design Manual Evolution & Application HEC 26 Aquatic Organism Passage Design Manual Evolution & Application Sven Leon, P.E., Hydraulics Engineer Federal Highway Administration 2015 Alaska Fish Passage Meeting October 13 14, 2015 VTRC, Juneau,

More information

Chagrin River TMDL Appendices. Appendix F

Chagrin River TMDL Appendices. Appendix F Appendix F The following are excerpts from the Eastern Brook Trout Joint Venture s Conservation Strategy (Working Draft v.6), Conserving the Eastern Brook Trout: Strategies for Action Found at: http://www.easternbrooktrout.org/constrategy.html

More information

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement

Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement Assessing Ecosystem Impacts from Road Stream Crossings through Community Involvement Background Why is the NH Fish and Game Department interested in culverts? Block fish migration Reduce opportunities

More information

Fisheries Survey of White Rapids Flowage, Marinette County Wisconsin during Waterbody Identification Code

Fisheries Survey of White Rapids Flowage, Marinette County Wisconsin during Waterbody Identification Code Fisheries Survey of White Rapids Flowage, Marinette County Wisconsin during 25 Waterbody Identification Code 6343 Michael Donofrio Fisheries Supervisor Wisconsin Department of Natural Resources Peshtigo,

More information

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Three Mile Creek 2011

Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries. Stream Survey Report. Three Mile Creek 2011 Minnesota Department of Natural Resources Division of Fish and Wildlife Section of Fisheries Stream Survey Report Three Mile Creek 2011 By Joseph D. Stewig Montrose Area Fisheries Office TABLE OF CONTENTS

More information

Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments. Bill Holman, P.E. Stanley Consultants

Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments. Bill Holman, P.E. Stanley Consultants Applying Engineering Solutions to the Science of Protection and Enhancement of Aquatic Environments Bill Holman, P.E. Stanley Consultants Project Development PHASE STAGE TASKS PURPOSE I II III Investigation

More information

LAKE TANEYCOMO ANGLER CREEL SURVEY SUMMARY. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region

LAKE TANEYCOMO ANGLER CREEL SURVEY SUMMARY. Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region LAKE TANEYCOMO 2008-2009 ANGLER CREEL SURVEY SUMMARY Shane Bush Fisheries Management Biologist Missouri Department of Conservation Southwest Region February 1, 2013 Introduction Lake Taneycomo was formed

More information

FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA

FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA FISH PASSAGE ALTERNATIVES ANALYSIS ON PENNYPACK CREEK AT VERREE ROAD DAM AND ROOSEVELT BOULEVARD DAM PHILADELPHIA, PENNSYLVANIA Prepared for: One Parkway, 10 th Floor 1515 Arch Street Philadelphia, PA

More information

Nechako white sturgeon are an Endangered Species

Nechako white sturgeon are an Endangered Species Nechako white sturgeon are an Endangered Species There are likely less than 350 Nechako white sturgeon, and historically there were over 5000 in the Nechako Watershed. Endangered as per the Species at

More information

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1

Michigan Department of Natural Resources Status of the Fishery Resource Report Page 1 Michigan Department of Natural Resources 2007-33 Status of the Fishery Resource Report Page 1 Grand Sable Lake Alger County, T49N, R14W, Sec. Many Lake Superior watershed, last year surveyed 2004 James

More information

Report prepared for: Prepared by: January 2002 BEAK Ref

Report prepared for: Prepared by: January 2002 BEAK Ref AQUATIC ENVIRONMENTAL STUDY KANATA WEST CONCEPT PLAN Report prepared for: ROBINSON CONSULTANTS Prepared by: BEAK INTERNATIONAL INCORPORATED 14 Abacus Road Brampton, Ontario L6T 5B7 January 2002 BEAK Ref.

More information

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative

Kootenai River Habitat Restoration Program. Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Kootenai River Habitat Restoration Program Kootenai Tribe of Idaho - January 27, 2014 Presentation for Kootenai Valley Resource Initiative Decline of native species Kootenai River White Sturgeon ENDANGERED

More information

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report

San Lorenzo Valley Water District, Watershed Management Plan, Final Version Part I: Existing Conditions Report LIST OF FIGURES Figure 1-1. Map of the San Lorenzo River watershed Figure 2-1. The Santa Cruz Mountains Bioregion Figure 2-2. Protected areas within the San Lorenzo River watershed Figure 2-3. Primary

More information

SUMMARY REPORT FOR LAKE ST. MALO FISHERIES ASSESSMENT. Prepared for the St. Malo and District Wildlife Association

SUMMARY REPORT FOR LAKE ST. MALO FISHERIES ASSESSMENT. Prepared for the St. Malo and District Wildlife Association SUMMARY REPORT FOR LAKE ST. MALO FISHERIES ASSESSMENT Prepared for the St. Malo and District Wildlife Association Presented by August 25, 2014 Study dates thus far: Date Tasks February 16 Fishing derby;

More information

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL August 23 STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL performed by Lee E. Harris, Ph.D., P.E. Consulting

More information

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut

Stream Crossings I: Engineering and Design Approaches to Provide Fish Passage at Culvert Slipline Projects in Connecticut University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council

Annual Report for Fiscal Year and Future Plans for the Tillamook Bay Watershed Council Annual Report for Fiscal Year 2012-2013 and Future Plans for the Tillamook Bay Watershed Council A report prepared for the Tillamook County Board of Commissioners August 2013 Table of Contents: Recently

More information

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011.

Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011. Rehabilitation of Grimes Creek, a Stream Impacted in the Past by Bucket-lined Dredge Gold Mining, Boise River Drainage, July 2008 to August 2011. Pam Harrington TU,1020 W. Main Street Suite 440, Boise,

More information

STEELHEAD SURVEYS IN OMAK CREEK

STEELHEAD SURVEYS IN OMAK CREEK STEELHEAD SURVEYS IN OMAK CREEK 2002 Annual Report Prepared by Chris Fisher John Arterburn Colville Confederated Tribes Fish and Wildlife Department P.O. Box 150 Nespelem, WA 99155 Prepared for Project

More information

SARASOTA BAY ESTUARY PROGRAM OYSTER HABITAT MONITORING RESULTS: YEAR 1. Jay R. Leverone

SARASOTA BAY ESTUARY PROGRAM OYSTER HABITAT MONITORING RESULTS: YEAR 1. Jay R. Leverone SARASOTA BAY ESTUARY PROGRAM OYSTER HABITAT MONITORING RESULTS: YEAR 1 by Jay R. Leverone Mote Marine Laboratory 1600 Ken Thompson Parkway Sarasota, Fl 34236 to Gary Raulerson Sarasota Bay Estuary Program

More information

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River

Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Rhode Island Department of Environmental Management Division of Fish and Wildlife American Shad Habitat Plan for the Pawcatuck River Prepared by: Phil Edwards, Rhode Island Department of Environmental

More information

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report

Lower Coquitlam River Project Water Use Plan. Temperature Monitoring Lower Coquitlam River Project Year 2 Report Lower Coquitlam River Project Water Use Plan Temperature Monitoring Lower Coquitlam River Project Year 2 Report COQMON#6 Temperature Monitoring Study Lower Coquitlam River Study Period: Year 2-2007 Report

More information

Caro Impoundment, Tuscola County

Caro Impoundment, Tuscola County Caro Impoundment is a 200 acre impoundment of the Cass River located one mile south of the Village of Caro in Tuscola County. Caro Dam, originally constructed in 1906 for water supply to Michigan Sugar

More information

Firth Creek Habitat Enhancement Project 1993

Firth Creek Habitat Enhancement Project 1993 Firth Creek Habitat Enhancement Project 1993 A. R. Langston December 1993 PWFWCP Report No. 77 The Peace/Williston Fish & Wildlife Compensation Program is a cooperative venture of BC Hydro and the provincial

More information

Discussion on the Selection of the Recommended Fish Passage Design Discharge

Discussion on the Selection of the Recommended Fish Passage Design Discharge Discussion on the Selection of the Recommended Fish Passage Design Discharge Introduction The provision of fish passage is a requirement for most proposed culvert and bridge installations in Alberta, depending

More information

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson

WFC 50 California s Wild Vertebrates Jan. 11, Inland Waters (Lakes and Streams) Lisa Thompson Inland Waters: Lakes and Streams WFC 50 11 January 2011 Lisa Thompson Fisheries Extension Specialist Wildlife, Fish, & Conservation Biology Department University of California, Davis Take home messages

More information

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR

PROJECT OVERVIEW PROJECT AREA. FAHCE Fish Habitat Restoration Plan EIR PROJECT OVERVIEW PROJECT AREA FISH AND AQUATIC HABITAT COLLABORATIVE EFFORT (FAHCE) Fish Habitat Restoration Plan Project Area PROJECT OVERVIEW DOCUMENTS A Settlement Agreement Regarding Water Rights of

More information

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB

Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB Creation of Fish and Wildlife Habitat on the Closed Salmon Harbour Mine in Minto, NB M. Coleman 1, R. Rutherford 2, RA Currie 3 1 NB Power 2 Thaumas Environmental Consultants Ltd 3 RA Currie Ltd. Location

More information

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013

Five Counties Salmonid Conservation Program - Fish Passage Design Workshop. February 2013 Program - Aquatic Organisms and Stream Crossings Ecological Connectivity A watershed is a network of channels that drain a common boundary. Channel characteristics formed by interaction of precipitation,

More information

Searsville Dam Removal

Searsville Dam Removal Searsville Dam Removal A unique opportunity for all Presented by the Beyond Searsville Dam Coalition San Francisquito Creek flows into the San Francisco Bay near the Palo Alto Airport and Golf Course seen

More information

FINAL Caples Lake Fisheries Management Plan. Version 4.0

FINAL Caples Lake Fisheries Management Plan. Version 4.0 FINAL Caples Lake Fisheries Management Plan Version 4.0 August 15, 2008 Purpose The Caples Lake Fisheries Management Plan (Plan) outlines the stocking plan to reestablish a sport fishery in Caples Lake

More information

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho

Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Restoring the Kootenai: A Tribal Approach to Restoration of a Large River in Idaho Susan Ireland, Kootenai Tribe of Idaho Future of our Salmon Conference Technical Session August 2016 Healthy Floodplains,

More information