1 ENGINEERING OPERATING STANDARD EOS ASSESSING THE RISK TO THE PUBLIC FROM DISTRIBUTION NETWORK ASSETS Network(s): Summary: EPN, LPN, SPN This standard implements the standard for the ESQC Regulations 2002 and details the procedure for assessing the risk that Distribution present to the public. Author: Lee Speakman Approver: Jeremy Wright Date: 02/11/2017 This document forms part of the Company s Integrated Business System and its requirements are mandatory throughout UK Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset Management. If you have any queries about this document please contact the author or owner of the current issue. Applicable To UK Power Networks External Asset Management G81 Website Capital Programme UK Power Networks Services Connections Contractors Health & Safety ICPs/IDNOs Legal Meter Operators Network Operations Procurement Strategy & Regulation Technical Training THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE

2 Revision Record Version 13.1 Review Date 02/11/2022 Date 08/10/2018 Author Lee Strachan Why has the document been changed Minor version update What has been changed References to EMP changed to EMS Version 13.0 Review Date 02/11/2022 Date 18/09//2017 Author Lee Speakman Why has the document been changed Periodic Review, updated to add Cable Pit mitigations to document. What has been changed Section 1 - clarification of ESQCR risk assessment requirements Section 2 - references added to link box inspection guide & cable pit inspector s guide Section 3 update to substation risk assessment Section minor update to OHL diagrams Section changed urban locations to low risk for link boxes per SAP/inspectors guide Section all link boxes shall have a blanket installed and recorded in the Asset Register. Removed inspection frequency and referred to EMS Section 6 - added for cable pit risk and mitigations Section 9 - updated diagram Version 12.0 Review Date 04/09/2017 Date 10/07/2015 Author Jeremy Wright Why has the document been changed Update advising action / consideration to be taken where there is refusal to allow access to a site by a customer What has been changed Section 7, text added below flow diagram Version 11.0 Review Date 04/09/2017 Date 20/05/2015 Author Garry Gordon Why has the document been changed Updated to incorporate EBP into the document and link box risk matrix updated What has been changed Content of EBP Correct classification for ESQCR key risk K9 has been incorporated into document as section 4.3. Sections 5.1.2, and have been updated with the current link box risk matrix and reporting guidelines Version 10.0 Review Date 04/09/2017 Date 26/08/2014 Author Jeremy Wright Why has the document been changed Periodic review What has been changed Section updated to include Central London Area. References to Ellipse change to UK Power Networks Asset Register throughout document. Version 9.1 Review Date Date 09/01/2013 Author Lee Strachan Reviewed for publication onto G81 website UK Power Networks 2018 All rights reserved 2 of 36

3 Version 9.0 Review Date Date 01/03/2012 Author Sinéad Hogan ESQCR Risk assessment for LV Link Boxes added Version 8.0 Review Date Date 13/04/2011 Author Craig Jeffrey Ground mounted substation and Overhead Line ESQCR Risk assessment section updated. Document reclassified from an EI to an EOS. Version 7.0 Review Date Date 02/11/2010 Author Martin Payne Reviewed and updated to give greater clarification on how mitigation should be implemented at overhead and ground mounted locations. Version 6.0 Review Date Date 30/05/2007 Author Gemma Hill The treatment of High Risk new ground mounted substation locations clarified Version 5.0 Review Date Date 18/04/2007 Author D Elphick Introduction of revised procedure for ground mounted secondary, primary and grid substation risk assessment. Incorporates common asset register. Version 4.0 Review Date Date 09/11/2004 Author D Elphick Incorporation of rationalised risk assessment form for ground mounted distribution substations, primary and grid substation risk assessment form, review of overhead risk ratings and clarification on criteria for redesign of new build high risk sites. Version 3.0 Review Date Date 20/07/2004 Author Martin Payne Re-assessment of location risks Version 2.0 Review Date Date 05/04/2004 Author D Elphick Revised for the introduction of new equipment Version 1.0 Review Date Date 06/11/2003 Author D Elphick New document UK Power Networks 2018 All rights reserved 3 of 36

4 Contents 1 Introduction Scope Ground Mounted Substations ESQCR Risk Assessment Construction of a Risk Assessment for Ground Mounted Substations Ground Mounted Equipment Type and Enclosure Assessment Ground Mounted Substation Location Risk Assessment Overall Risk Rating for Ground Mounted Substation Sites Management of the Output from the Risk Assessment Recording of Key Risks at Ground Mounted Substation Sites Trespass Use of Micro/Compact/ Pad Mount Substations Risk Mitigation for Ground Mounted Assets Mandatory Level of Mitigation Additional Mitigation Requirements Overhead Lines Construction of a Risk Assessment for Overhead Lines Overhead Line Equipment Risk Assessment Overhead Line Location Risk Assessment Overall Risk Rating for Overhead Lines Recording of Key Risks for an Overhead Line Guidance for the reporting of K9 Key Risk: Risk Mitigation for Overhead Lines Additional Mitigation Requirements LV Underground Link Boxes Construction of a Risk Assessment for LV Underground Link Boxes LV Underground Link Box Location Risk LV Underground Link Box Equipment Risk Risk Rating Matrix Management of the Output from the Overall Risk Rating Key Risks Risk Mitigation for LV Link Boxes Cable Pits Construction of a Risk Assessment for Cable Pits Cable Pit Location Risk Cable Pit Equipment Risk UK Power Networks 2018 All rights reserved 4 of 36

5 6.1.3 Risk Rating Matrix Management of the Output from the Overall Risk Rating Key Risks Risk Mitigation for Cable Pits Risk Assessment for New Assets Ground Mounted Sites Overhead Lines New Installations Existing Network Underground Link Boxes/Cable Pits Return of Completed Risk Assessments Managing Mitigation of Risks Risk Assessment Forms Tables Table 1 - Substation Equipment/Enclosure Risk... 8 Table 2 - Substation Location Risk... 9 Table 3 - Substation ESQCR Risk Assessment Table 4 - Substation Key Risks and Mitigation Table 5 - Non Structural Mitigation Table 6 - Structural Mitigation Table 7 - Substation Land Usage Mitigation Table 8 - Overhead Line Equipment Risks Table 9 - Overhead Line Location Risk Assessment Table 10 - ESQCR Risk Rating Matrix Table 11 - Overhead Lines Key Risks and Mitigation Table 12 - Non Structural Mitigation Table 13 - Structural Mitigation Table 14 - Overhead Lines High Risk Location Mitigation Table 15 - Overhead Lines Medium Risk Location Mitigation Table 16 - Overhead Lines Low Risk Location Mitigation Table 17 - LV Link Box Location Risks Table 18 - Link Box Equipment Risk Table 19 - Link Box Risk Ratings Table 20 Link Box Key Risks Table 21 - Cable Pit Location Risks UK Power Networks 2018 All rights reserved 5 of 36

6 Table 22 - Cable Pit Equipment Risk Table 23 - Cable Pit Risk Ratings Table 24 - Cable Pit Key Risks UK Power Networks 2018 All rights reserved 6 of 36

7 1 Introduction Under the Electricity Safety Quality and Continuity Regulations (ESQCR) 2002, including 2006 amendment (which replaced the Electricity Supply Regulations 1988) risk assessments must be carried out on substation sites and overhead lines to assess the risk of interference, vandalism or unauthorised access to the asset by the public. The ESQCR define a substation as: Any premises or part thereof which contain equipment for either transforming or converting energy to or from high voltage (other than transforming or converting solely for the operation of switching devices or instruments) or for switching, controlling or regulating energy at high voltage, but does not include equipment mounted on a support to any overhead line. The ESQCR define an overhead line as: Any electricity line which is placed above ground and in the open air. Whilst there is no specific requirement in the ESQCR. UK Power Networks will also apply a similar risk rating to underground link boxes and cable pits which are designed for connecting, accessing or switching underground cables. 2 Scope The following gives guidelines on how to apply the risk assessment to substations, overhead line sites, link boxes and cable pits. These guidelines are in accordance with the DTI publication Guidance on the ESQCR. This standard only applies to overhead lines, substations, link boxes and cable pits as defined above. Further guidance can be found in the relevant UK Power Networks inspector s guide. The Substation Inspectors Handbook The Overhead Line Inspectors Handbook Inspection of Link Boxes (EMS ) Cable Pit Inspectors Guide (EMS ) UK Power Networks 2018 All rights reserved 7 of 36

8 3 Ground Mounted Substations ESQCR Risk Assessment 3.1 Construction of a Risk Assessment for Ground Mounted Substations The overall risk assessment value is built from three components: The Equipment type. The security of the Enclosure to the equipment. The Location of the site (Proximity to areas that may affect its likelihood of trespass) Ground Mounted Equipment Type and Enclosure Assessment The equipment type and enclosure are taken together to create a combined equipment/enclosure risk for the site based on a Low, Medium, High or Very High result. The high level output of this can be seen in Table 1. Table 1 - Substation Equipment/Enclosure Risk VERY HIGH RISK HIGH RISK MEDIUM RISK LOW RISK Exposed live conductors Within any surround less than 2.4m high Exposed live conductors Within a palisade / expamet / outdoor brick surround at least 2.4m high Exposed live conductors Situated in an indoor substation / GRP enclosure Metal enclosed switchgear or equipment Situated in indoor substation or GRP enclosure Exposed live conductors Within a chain-link, railing or close-board surround Exposed live conductors No surround Fully enclosed switchgear or equipment No surround Metal enclosed switchgear or equipment Within a palisade / expamet / outdoor brick surround less than 1.8m high Metal enclosed switchgear or equipment Within a chain-link / railing / close-board surround less than 1.8m high Compact/Micro/Pad substations Mount Without additional surround Note: A further disaggregated view of the above can be found in Table 3. Metal enclosed switchgear or equipment Within a palisade / expamet / outdoor brick surround greater than 1.8m high. Metal enclosed switchgear or equipment Within a chain-link / railing / close-board surround greater than 1.8m high Compact/Micro/Pad Mount substations Within additional surround UK Power Networks 2018 All rights reserved 8 of 36

9 3.1.2 Ground Mounted Substation Location Risk Assessment This covers the actual location of the substation and the nature of activities carried out. Table 2 - Substation Location Risk Location Risk Code Title Description HIGH RISK S1 Trespass Sites Sites with signs of trespass S2 Schools School areas including playgrounds S3 Travellers Sites Permanent site for travelling people S4 Children s play areas Both official and unofficial play areas S5 Caravan Caravan and chalet sites S6 Derelict/Unoccupied Areas Derelict industrial site/quarry/land fill/neglected areas S7 Vandalism Areas with evidence of vandalism S8 MEDIUM RISK Public Land Note: This category only applies to Pad Mounted sites Areas of public land where the substation is not visible from roadways or paths S9 Road Side Situated at the side of a road/driveable track LOW RISK SA Rural Rural location SB Private Private land SC Secure Sites Within secure buildings SD Commercial Retail and Commercial premises/industrial area UK Power Networks 2018 All rights reserved 9 of 36

10 3.2 Overall Risk Rating for Ground Mounted Substation Sites Table 3 is to be used for deriving the overall risk and shows mandatory mitigation measures. ESQCR states that for each of their substations, assess the foreseeable risk of danger from interference, vandalism or unauthorised access, having regard to both the nature of the equipment and use of the surrounding land and classify the degree of the risk. UK Power Networks shall assess the nature of the equipment test by considering both the equipment and the security of its enclosure which will result in the equipment / enclosure risk. The use of the surrounding land test will be taken from the substation location risk defined in Section 3.1.2, Table 2. Furthermore, ESQCR Guidance (Publication reference URN 02/1544) states Duty holders should take the two tests into account for each of the assets and establish their risk assessment for substation. The overall risk classification should be determined from the higher of the outcomes of each of the two tests. A single measure of the risk assessment is required. The first column identifies the equipment type risk, either High risk equipment incorporating exposed live conductors, Medium risk equipment which is fully enclosed switchgear or equipment where no live conductors are exposed and Low risk Compact/ Micro/Pad Mount Substations which have been designed for use without an enclosure where no live conductors are exposed. The second column contains the enclosure/surround type and the third column its enclosure security rating from 1 to 5, with 5 providing the least protection and 1 providing the highest level of protection. The fourth column shows the overall Equipment / Enclosure Risk for the selected combination of Equipment and Enclosure. The output matches Table 1. In accordance with paragraph 2 in Section 3.2 the overall substation risk is determined from the higher outcome of the equipment / enclosure risk and the location risk. In UK Power Networks Asset Register numbers will be used to define the relevant risk values. In accordance with Company standard, 1 is optimum condition, in this case Low risk and 5 represents worst case Very High. It should be noted that it is extremely unlikely that any examples of Very High are to be found on the network. UK Power Networks 2018 All rights reserved 10 of 36

11 Table 3 - Substation ESQCR Risk Assessment Equipment Risk Enclosure/Surround Type Enclosure Security Rating Equipment / Enclosure Risk Overall Substation Risk No Surround 5 3. High Risk Exposed Live Conductors Chain Link/Close Board/Railing Surround <1.8m 4 Palisade/Brick/Expamet Surround < 1.8m V.High Chain Link/Close Board/Railing Surround m Palisade/Brick/Expamet Surround mm 3 Chain Link/Close Board/Railing Surround 2.4m Palisade/Brick/Expamet Surround 2.4m 2 High GRP Enclosure 1 Medium Indoor Substation Enclosure V.High 3 and/or 4 High Medium M0 V.High 3 and/or 4 High Medium M0 V.High 3 and/or 4 High,, 0 High, No Surround 5 V.High V.High 3 and/or 4 V.High 3 and/or 4 V.High 3 and/or 4 2. Medium Risk Fully Enclosed Switchgear or Equipment Chain Link/Close Board/Railing Surround <1.8m Palisade/Brick/Expamet Surround < 1.8m Chain Link/Close Board/Railing Surround m Chain Link/Close Board/Railing Surround 2.4m Palisade/Brick/Expamet Surround mm 4 3 Medium Medium M0 Medium M0 High, Palisade/Brick/Expamet Surround 2.4m 2 GRP Enclosure Indoor Substation Enclosure 1 Low Low M0 Medium M0 High - / 1. Low Risk Compact / Micro / Pad Mount Substation No Surround 5 Medium Medium - M0 Medium - M0 High - 4 Chain Link/Close Board/Railing Surround <1.8m Palisade/Brick/Expamet Surround < 1.8m Chain Link/Close Board/Railing Surround m Chain Link/Close Board/Railing Surround 2.4m Palisade/Brick/Expamet Surround mm Palisade/Brick/Expamet Surround 2.4m 2 GRP Enclosure Indoor Substation Enclosure Note, the current UK Power Networks Asset Register does not contain a rating for the Equipment / Enclosure Risk. The Equipment Risk, Enclosure Security Rating and Substation Location Risk are stored and Overall Substation Risk is calculated directly Low Low - M0 Medium - M0 High - / Low Substation Location Risk Medium Substation Location Risk High Substation Location Risk Management of the Output from the Risk Assessment The relevant UK Power Networks Network Operations unit shall be responsible for the monitoring of returned risk assessments to address sites identified as Very High and taking action to address the risk level. A Very High result must be reviewed and action taken as soon as is reasonably practicable to reduce the risk. This may be a temporary mitigation measure, where appropriate. A High result requires a plan of works to mitigate the risk of the site. In addition to the risk assessment, a record shall be made of the key risk identified at the site, which shall be recorded in the UK Power Networks Asset Register. Any additional security measures already installed at the site shall also be recorded in the UK Power Networks Asset Register. This may be used to mitigate the result of the risk assessment depending on the level of risk identified. For substations, risk assessments shall be filled in by all staff that carry out substation inspections. The results will be collected either by using electronic hand held devices or on paper and the results will be entered into the UK Power Networks Asset Register by the Asset Registration Team. UK Power Networks 2018 All rights reserved 11 of 36

12 UK Power Networks Asset Management and the relevant UK Power Networks Network Operations unit shall decide on the plan of works necessary at sites identified as a High or Very High risk overall in order to deal with the identified risks. 3.3 Recording of Key Risks at Ground Mounted Substation Sites An on-site inspection will be carried out to determine whether there are any key risks on site: A key risk is any situation which has the ability to assist in gaining entry to a substation compound, may assist in breaching an anti-climbing device or which, due to its length or size, may enable a breach of the safety clearance to overhead line conductors or open busbars in a substation compound e.g. stack of pallets, wall, vehicle, building, damaged fence, haystack, fishing rods, scaffold poles, metal ladders, metal pipes, farm vehicles, etc. If any key risks represent a danger to the public they shall be reported immediately to UK Power Networks Network Operations who will undertake appropriate corrective action. UK Power Networks Operations shall mitigate the key risk as per Table 4 and the mitigation carried out shall be recorded in the UK Power Networks Asset Register. Table 5, Table 6 and Table 7 give guidance of the types of mitigation to be carried out. Table 4 - Substation Key Risks and Mitigation Code Title Description Mitigation of Risk K1 NONE No additional hazards to the substation M0 K3 CLIMBING AID Any device, tree or vegetation that by its position would enable a person to gain access to the substation. e.g. hedges, ivy, walls, fence, pallet stack, unauthorised private signs, lamp columns, sign posts, vehicles K5 LONG OBJECTS Long objects being stored or used that could infringe within the safety clearance of the substation. e.g. scaffold poles, ladders, boat masts, fishing rods, 2,, 2 K6 MAN MADE STRUCTURES Temporary Buildings/stacks/vehicles that enable a person standing on them to gain access into the site,, 2 or Structural Mitigation K8 VANDALISM/ TRESPASS Destructive vandalism or proof of unauthorised access to secure enclosures e.g. broken fence, broken padlock, litter, graffiti,,, 0, 1 KA OBSCURED SAFETY SIGN Safety Sign obscured. e.g. vegetation, private signs, M8, 2 KB FLY TIPPING Rubbish being dumped on site, 1 KC DRUGS USAGE Drugs being used on, or adjacent to, site, 0, 1 UK Power Networks 2018 All rights reserved 12 of 36

13 3.4 Trespass In the UK Power Networks Asset Register, the functional location Risk and Settings table has a Trespass flag to record if a site has been trespassed. If a substation inspection returns that the site has been trespassed this attribute will be populated Y to record the fact. This attribute will then remain populated for the life of the substation. While carrying out substation inspections: For secondary substations, if there is evidence of trespass then the site shall be subject to four additional inspections at a frequency of 90 days between each. For primary and grid substations if there is evidence of trespass the site shall be subject to the following additional inspection cycle of four inspections. A 15 day frequency for the first two and then 30 days for the next two. If four of these additional inspections consecutively report no further sign of trespass, then the site shall return to its normal inspection regime as defined in the appropriate UK Power Networks Engineering document. If during the additional inspection cycle the site is found to have been trespassed again, the additional inspection cycle shall return to the beginning and start again. A site that has been trespassed shall be considered for additional security measures and/or a re-design of the enclosure to prevent further instances. Every effort shall be made to remove evidence of trespass e.g. graffiti, found on inspection, to avoid confusion at the next inspection and initiating a further inspection cycle. 3.5 Use of Micro/Compact/ Pad Mount Substations The Department of Business Innovation & Skills formerly known as (The Department of Trade and Industry) have provided guidance on the use and placement of micro/compact substations. They are acceptable for use without additional security if, the location is a Low or Medium risk and they are positioned to avoid road accidents. In other than these situations, if it is proposed to use a micro/compact/pad mount substation, then an additional level of security shall be utilised in the form of a GRP enclosure or other approved enclosure. 3.6 Risk Mitigation for Ground Mounted Assets Mitigation of High and Very High risk sites is required not only to satisfy the requirements of the ESQCR but also to protect members of the public from harm. The types of mitigation which can be carried out on substations fall into two categories. These are: Non Structural Mitigation - Mitigation work which does not involve structural changes to the asset, such as those in Table 6, can be regarded as non-structural mitigation and shall be carried out at the time of the inspection or be passed to UK Power Networks Network Operations to carry out. Structural Mitigation - Mitigation work which involves structural changes to the asset (or site), such as those in Table 7, shall be regarded as structural mitigation and shall be passed to UK Power Networks Network Planning in order for a re-design of the asset (or site) to be carried out. Work which is required following a re-design will be passed to UK Power Networks Network Operations or UK Power Networks Capital Programmes to carry out. UK Power Networks 2018 All rights reserved 13 of 36

14 3.6.1 Mandatory Level of Mitigation Depending on the type of enclosure and the nature of the equipment that is being secured, the minimum levels of mitigation which shall be adopted for a substation site are shown in Table Additional Mitigation Requirements For the purposes of this mitigation, it has been assumed that all assets have been built to the relevant standards. Table 5, Table 6 and Table 7 show the types of mitigation that should be considered for a site to mitigate the risks imposed due to the combination of location and key risks. Table 5 will typically be used by Inspectors as mitigation guidance while Table 6 will typically be used by UK Power Networks Network Planning as mitigation guidance. In practice, each location will have to be judged on its own merits with particular attention being paid to the practicability of the various mitigation options. Note: These tables are not exhaustive and are a general guide only, if an Inspector decides that extra mitigation is required to minimise the risk then it shall be carried out. All mitigation work carried out shall be recorded in the UK Power Networks Asset Register. Table 5 - Non Structural Mitigation Non Structural Mitigation No Mitigation Required Enhanced Warning Signage Enhanced Anti-climbing Guard Public Safety Visit Vegetation/Rubbish Clearance Supplementary Inspections High Security Locks Remove Infringement Temporary Repair Remove Graffiti Requires Structural Mitigation Possible Risk Mitigation Mitigation Code M0 M UK Power Networks 2018 All rights reserved 14 of 36

15 Table 6 - Structural Mitigation Possible Risk Mitigation Structural Mitigation Security Surveillance (CCTV, Security Observation, Alarms etc) Upgrade Lighting Install Palisade Fencing/Gate/Visibility Panel Install Perimeter Fencing/Gate/Visibility Panel Install Expamet Fencing/Gate/Visibility Panel Re-design Switchgear Re-design Enclosure Install Crash Barrier Remove/decommission Plant Mitigation Code Table 7 - Substation Land Usage Mitigation Land Usage Codes S1 S2 S3 S4 S5 S6 S7 S8 S9 SA SB SC SD Trespass Sites Schools Travellers Sites Children s Play Areas Caravan Sites Derelict Areas Vandalism Public Land Road Side Rural Areas Private Land Secure Sites Commercial M8 0 1 M8 M8 0 M8 M8 M8 0 1 M UK Power Networks 2018 All rights reserved 15 of 36

16 4 Overhead Lines 4.1 Construction of a Risk Assessment for Overhead Lines The overall risk assessment value is built from two components: 1. The Equipment Risk (Nature and situation of equipment). 2. The Location Risk (Nature and situation of surrounding land). The overall risk classification is determined using the matrix in Table 10. The risk classification is determined from the higher of the outcome of each of the two tests. This covers the nature of the design of equipment, the risk of contact with live equipment if a third party had access to the site or conductors by whatever means. The risk rating for this is stored in the UK Power Networks Asset Register for each equipment type and used to determine the mitigation required on site Overhead Line Equipment Risk Assessment The equipment risk refers to the risk the equipment presents to the public by its characteristics and its particular situation. Inspectors shall establish the equipment risk from Table 8 below: Table 8 - Overhead Line Equipment Risks HIGH RISK MEDIUM RISK LOW RISK 132/33kV Tower with cable terminations 33kV/HV Plant without ACD Service Not up to specification (see handbook) 132/33kV Tower 132/33kV/HV Pole Line Bare 33kV/HV Narrow Based Towers Bare 33kV/HV Plant with ACD HV Free Standing Sub LV Pole line Bare LV Pole Narrow Based Towers Bare Service Insulated 33kV/HV Pole Line Covered HV Pole Line Screened 33kV/HV Narrow Based Towers Covered LV Pole Line Insulated LV Pole Line ABC LV Narrow Based Towers Insulated LV Narrow Based Towers ABC Service Concentric Service Duplex/Triplex Service ABC UK Power Networks 2018 All rights reserved 16 of 36

17 4.1.2 Overhead Line Location Risk Assessment The location risk refers to the nature and situation of the equipment and takes a view of the risk of danger from interference with the equipment, in consideration with the environment. Inspectors shall establish the location risk from Table 9. Table 9 - Overhead Line Location Risk Assessment Code Title Description HIGH RISK Location Risk L1 FISHING AREA Fishing, ponds/lakes and rivers L2 RECREATIONAL Play area/village green/playing fields/clay shoots/pub gardens/tennis courts/scout camps/horse riding/village commons/picnic areas/allotments/war games and wildlife parks/ woodland where there is evidence of children at play L3 SAILING AREA Sailing lake. L4 CAMPING AREA Caravan and camp sites and gypsy camps L5 SCHOOL School grounds and sports fields official L6 L7 DOMESTIC (HV AND BARE LV MAINS) DERELICT LAND UN-SECURED Private gardens/holiday homes/housing estates. Derelict industrial site/quarry/land fill that do not have security company managing access on site L8 TRAVELLERS SITES Permanent site for travelling people LW WATERWAYS Navigable waters. LQ QUARRY Includes sand and gravel extraction/ storage areas MEDIUM RISK LD DOMESTIC (Insulated LV Mains and services) Private gardens/holiday homes/housing estates. L9 FARM YARD Farmyard equipment being used in enclosed area. LC COMMERCIAL Retail and commercial premises/industrial area LL DERELICT LAND SECURED Derelict industrial site/quarry/land fill that have security company managing access on site LF FLYING Airfield/hang gliding/parascending area LS WOODLANDS Location of multiple trees growing adjacent to the line LX ORCHARDS Orchards/hop fields/commercial nurseries and vineyards LG GOLF COURSES Commercially run golf club LOW RISK LP FOOTPATH Footpath/car park LR ROADS Metalled surfaced roads. LZ RAILWAYS Railways, tramways, rope ways etc. LY COMMON LAND/PASTURE Land accessed by members of the public or land that animals are grazed on LA ARABLE Agricultural crops UK Power Networks 2018 All rights reserved 17 of 36

18 4.2 Overall Risk Rating for Overhead Lines In order to arrive at the risk rating of the equipment the Inspector shall: Record the Location Risk as High Medium or Low. Record the Equipment Risk as High Medium or Low. By using the matrix the overall risk rating of the site shall be ascertained. The ESQCR state The overall risk classification should be determined from the higher of the outcomes of each of the two tests. The site shall be inspected to determine whether there are any Key Risks and if these are identified the actions necessary to mitigate the risk are detailed in Table 11. A record of the Location Risk, Equipment Risk and Overall Risk Rating shall be ascertained on site and recorded within the UK Power Networks Asset Register. The type Highest Location Risk shall be recorded with the highest risk rating used to determine the overall risk rating. If multiple high risk sites occur at the same location (i.e. such as a fishing lake adjacent to a play area) then all site risks must be recorded. Table 10 - ESQCR Risk Rating Matrix Overall Risk Rating High Risk Equipment High High Very High Medium Risk Equipment Medium Medium High Low Risk Equipment Low Medium High Low Risk Location Medium Risk Location High Risk Location UK Power Networks 2018 All rights reserved 18 of 36

19 4.3 Recording of Key Risks for an Overhead Line An on-site inspection will be carried out to determine whether there are any key risks on site: A key risk is any situation which has the ability to assist in breaching an Anti-climbing device or which, due to its length or size, may enable a breach of the safety clearance to overhead line conductors e.g. stack of pallets, wall, building, vehicle, haystack, fishing rods, scaffold poles, metal ladders, metal pipes, farm vehicles, etc. If any key risks represent an immediate danger to the public it shall be reported immediately to the relevant UK Power Networks Network Operations unit who will undertake appropriate corrective action. UK Power Networks Network Operations shall mitigate the key risk as shown in Table 11 below. The mitigation carried out shall be recorded in the UK Power Networks Asset Register. Structural mitigation would include carrying out tasks like replacing bare conductors with insulated ones, under-grounding the overhead network, relocating the overhead line or removing it. Table 11 - Overhead Lines Key Risks and Mitigation Code Title Description Mitigation of Risk K1 NONE No additional hazards to overhead line M0 K3 CLIMBING AID Any device or vegetation that by its position would enable a person to gain accesses to a pole or tower e.g. hedges, ivy, walls, fence, pallet stack, unauthorised private signs, 2 K4 KITE/ AEROPLANE FLYING Where there is risk of contact with the overhead line by the flying of kites or aeroplanes.,,, K5 LONG OBJECTS Long objects being stored or used that could infringe within the safety clearance of the line e.g. scaffold poles, ladders, boat masts, fishing rods,,,, 2 K6 MAN MADE STRUCTURES Temporary Buildings/animal shelters/hay stacks that infringe or enable a person standing on them to infringe upon the safety clearance of the line,,,, 2 or 0 K7 AERIALS All types of aerials including TV and amateur radio masts that could infringe upon the safety clearance of the line. K8 VANDALISM Destructive vandalism or proof of unauthorised access to secure enclosures e.g. broken fence, broken padlock, litter, graffiti K9 VEHICLE/ MACHINERY CONTACT Vehicle or machinery that by its location infringes, or by its position allows access to infringe upon the safety clearance of the line (This key risk shall only be recorded if there is evidence of electrical infringement or if there is evidence of frequent movement of vehicles or machinery under the line which could infringe safety clearance).,,, 2,,, 0, 1,,,,,, 2 KA OBSCURED SAFETY SIGN Safety sign obscured e.g. vegetation, private signs M8, 2, 3 UK Power Networks 2018 All rights reserved 19 of 36

20 4.3.1 Guidance for the reporting of K9 Key Risk: When carrying out line patrols it is necessary to determine if there are any Key Risks present. K9 is the Key Risk that covers vehicle/machinery contact and is defined as: Vehicle or machinery that by its location, position or use, allows the safety clearance of the line to be infringed (This Key Risk shall only be recorded if there is evidence of electrical infringement or if there is evidence of frequent movement of vehicles or machinery under the line which could infringe safety clearance). This standard implements the standard for the ESQC Regulations 2002 and details the procedure for assessing the risk that Distribution present to the public. Scenario 1: Vehicle seen operating occasionally under line (e.g. harvesting), safety clearance to overhead line not compromised. Action: Report on line patrol script/form K1 not K9. Scenario 2: Vehicle seen operating occasionally or frequently under line, safety clearance to overhead line compromised. Action: Report on line patrol script/form K9. Report to AIRLine; advise driver on site to stop working. Follow up with GS6 visit. UK Power Networks 2018 All rights reserved 20 of 36

21 Scenario 3: Evidence of a vehicle operating occasionally under line. Action: Report on line patrol script/form K1 not K9 Scenario 4: Vehicle seen operating frequently under line. Action: Report on line patrol script/form K9. UK Power Networks 2018 All rights reserved 21 of 36

22 Scenario 5: Evidence of vehicle(s) operating frequently under line which could compromise safety clearance. Action: Report on line patrol script/form K9. UK Power Networks 2018 All rights reserved 22 of 36

23 4.4 Risk Mitigation for Overhead Lines Mitigation of High and Very High risk sites is required not only to satisfy the requirements of the ESQCR but also to protect members of the public from harm: Non Structural Mitigation - Mitigation work which does not involve structural changes to the asset, such as those in Table 12, can be regarded as non-structural mitigation and will be carried out at the time of the inspection or be passed to UK Power Networks Network Operations to carry out. Structural Mitigation - Mitigation work which involves structural changes to the asset over and above those set out in Table 12 can be regarded as structural mitigation and shall be passed to UK Power Networks Network Planning in order for a re-design of the asset to be carried out, once the asset has been re-designed the work will be passed to UK Power Networks Network Operations or UK Power Networks Capital Programmes to carry out. Mandatory Level of Mitigation For Low and Medium risk locations, all overhead wood pole assets shall have one Danger of Death sign fitted. For High and Very High risk locations, all overhead wood pole assets shall have at two Danger of Death signs fitted. Each shall be on a different side of the pole. For Low and Medium risk locations, all tower lines shall have a minimum of two Danger of Death signs fitted. Each shall be on a different side of the tower. For High and Very High risk locations, all tower lines shall have a minimum of four Danger of Death signs fitted. Each shall be on a different side of the tower Additional Mitigation Requirements For the purposes of this mitigation, it has been assumed that all assets have been built to the relevant standards. Table 14, Table 15 and Table 16 give guidance on the types of mitigation which should be considered for a site in order to mitigate the risks imposed due to the combination of land usage and key risks. Table 12 shall typically be used by Inspectors as mitigation guidance while Table 13 shall typically be used by Network Planning as mitigation guidance. In practice, each location will have to be judged on its own merits with particular attention being paid to the practicability of the various mitigation options. Note: These tables are not exhaustive and are a general guide only. If an Inspector decides that extra mitigation is required to minimise the risk then it shall be carried out. All mitigation work carried out shall be recorded in the UK Power Networks Asset Register. UK Power Networks 2018 All rights reserved 23 of 36

24 Table 12 - Non Structural Mitigation Possible Risk Mitigation Non Structural Mitigation No Mitigation required Enhanced Warning Signage Enhanced Anti-climbing Guard Warning Posters Leaflet/Letter Drop Visit by UK Power Networks Public Safety Team GS6 Information Pack High Visibility Line Marker Vegetation Clearance Supplementary Patrols High Security Locks Security Surveillance Remove Infringement Install High Level Danger Sign Requires Structural Mitigation Mitigation Code M0 M Table 13 - Structural Mitigation Structural Mitigation ABC Conductor Permanent Shrouding Shroud Plant Re-Conductor with BLX (CCC) Underground Re-locate Asset Remove Asset Catenary cable Possible Risk Mitigation Mitigation Code UK Power Networks 2018 All rights reserved 24 of 36

25 Table 14 - Overhead Lines High Risk Location Mitigation LAND USAGE CODE L1 L2 L3 L4 L5 L6 L7 L8 LW LQ High EQUIPMENT RISK Fishing Areas Recreational Sailing Area Camping Area School Domestic (HV and Bare LV mains) Derelict Land (Unsecured) Travellers Site Waterways Quarry 132/33kV Tower with cable terminations 33kV/HV Plant without ACD Service not to specification (see handbook) INSTALL ACD (ANTI-CLIMBING DEVICE) REPLACE SERVICE Medium Low 132/33kV Tower 132/33kV/HV Pole line (Bare) 33kV/HV Narrow based Tower (Bare) 33kV/HV Plant with ACD HV Free standing Substation LV Pole line (Bare) LV Pole/Narrow based Tower (Bare) Service (Insulated) 33kV/HV Pole line (covered) HV Pole line (Screened) 33kV/HV Narrow based Tower (covered) LV Pole line (Insulated) LV Pole line (ABC) LV Narrow based Tower (Insulated) LV Narrow based Tower (ABC) Service (Concentric) M0 M0 Service ( Duplex/Triplex) M0 M0 Service (ABC) M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 UK Power Networks 2018 All rights reserved 25 of 36

26 Table 15 - Overhead Lines Medium Risk Location Mitigation LAND USAGE CODE L9 LC LD LL LF LS LX LG EQUIPMENT RISK Farm Yard Commercial Domestic Insulated (LV) Derelict Land (secured) High Flying Woodlands Orchards Golf Courses 132/33kV Tower with cable terminations 33kV/HV Plant without ACD Service not to specification (see handbook) INSTALL ACD (ANTI-CLIMBING DEVICE) REPLACE SERVICE Medium Low 132/33kV Tower 132/33kV/HV Pole line (Bare) 33kV/HV Narrow based Tower (Bare) 33kV/HV Plant with ACD HV Free standing Substation LV Pole line (Bare) LV Pole/Narrow based Tower (Bare) M0 M0 M0 Service (Insulated) M0 M0 33kV/HV Pole line (covered) HV Pole line (Screened) 33kV/HV Narrow based Tower (covered) LV Pole line (Insulated) M0 LV Pole line (ABC) M0 LV Narrow based Tower (Insulated) M0 LV Narrow based Tower (ABC) M0 Service (Concentric) M0 M0 Service ( Duplex/Triplex) M0 M0 M0 M0 M0 M0 M0 Service (ABC) M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 M0 UK Power Networks 2018 All rights reserved 26 of 36

27 Table 16 - Overhead Lines Low Risk Location Mitigation LAND USAGE CODE LP LR LZ LY LA EQUIPMENT RISK Footpath Roads High Railways Common land/pasture Arable 132/33kV Tower with cable terminations 33kV/HV Plant without ACD Service not to specification (see handbook) M0 M0 M0 M0 INSTALL ACD (ANTI-CLIMBING DEVICE) REPLACE SERVICE 132/33kV Tower M0 M0 M0 M0 132/33kV/HV Pole line (Bare) M0 M0 M0 M0 33kV/HV Narrow based Tower (Bare) M0 M0 M0 M0 Medium 33kV/HV Plant with ACD M0 M0 M0 M0 HV Free standing Substation LV Pole line (Bare) M0 M0 M0 M0 LV Pole/Narrow based Tower (Bare) M0 M0 M0 M0 Service (Insulated) M0 M0 M0 M0 33kV/HV Pole line (covered) M0 M0 M0 M0 HV Pole line (Screened) M0 M0 M0 M0 33kV/HV Narrow based Tower (covered) M0 M0 M0 M0 LV Pole line (Insulated) M0 M0 M0 M0 Low LV Pole line (ABC) M0 M0 M0 M0 LV Narrow based Tower (Insulated) M0 M0 M0 M0 LV Narrow based Tower (ABC) M0 M0 M0 M0 Service (Concentric) M0 M0 M0 M0 Service ( Duplex/Triplex) M0 M0 M0 M0 Service (ABC) M0 M0 M0 M0 UK Power Networks 2018 All rights reserved 27 of 36

28 5 LV Underground Link Boxes 5.1 Construction of a Risk Assessment for LV Underground Link Boxes The overall risk assessment value is built from the Location Risk (Nature and situation of the site) and the Equipment Risk. The overall risk rating is determined using Table 19 in Section This covers the nature of the design of equipment, the risk of contact with live equipment if a third party had access to the site or if the link box was to fail by whatever means. The risk rating for this is stored in the UK Power Networks Asset Register for each link box and used to determine the mitigation required LV Underground Link Box Location Risk The risk refers to the potential risk the link box presents to the public by its location. Inspectors shall establish the risk from Table 17 below. Table 17 - LV Link Box Location Risks Location Risk Code Title Description HIGH RISK UA ENHANCED ZONE City of London and West End UB MEDIUM RISK VERY HIGH PEDESTRIAN AREA Any medium or low risk area which is subject to consistent high pedestrian traffic or gatherings. eg Major rail, tube or bus stations, City or large town centre shopping areas. UC RECREATIONAL Within or adjacent to a play area, pub, cafe, restaurant or public attraction UD TRANSPORT Within 10m of public access to Rail, Underground or DLR station, bus or tram stop or busy car park. UE SCHOOL Outside a school, in an area where children and parents are likely to gather LOW RISK UF URBAN Footpaths or verges in residential or built up areas UG NON-RESIDENTIAL Non-residential footpaths or verges UH SECURE SITE Within a secure location UI RURAL Rural location UJ ROADS Surfaced roads UK PRIVATE Private land UK Power Networks 2018 All rights reserved 28 of 36

29 5.1.2 LV Underground Link Box Equipment Risk The level of risk shall be determined by the type of link box installed, the number of outgoing ways and the age of the link box at the site. Table 18 - Link Box Equipment Risk Equipment Risk Material No. of Ways Age HIGH RISK COMPOUND 4 or more ways 50 years or more COMPOUND 4 or more ways Less than 50 years COMPOUND Less than 4 ways 50 years or more COMPOUND Less than 4 ways Less than 50 years MEDIUM RISK LOW RISK RESIN 4 or more ways Less than 50 years RESIN Less than 4 ways Less than 50 years High Compound(All) Medium Resin(4 way or more) Low Resin(less than 4 way) Risk Rating Matrix The overall link box risk rating shall be determined by combining the location risk with the equipment risk for all sites using the matrix below. Table 19 - Link Box Risk Ratings High Risk Equipment Medium Risk Equipment Low Risk Equipment Overall Risk Rating Medium High Very High Medium Medium High Low Medium Medium Low Risk Location Medium Risk Location High Risk Location UK Power Networks 2018 All rights reserved 29 of 36

30 5.1.4 Management of the Output from the Overall Risk Rating For LV link boxes, risk assessments shall be filled in by all staff that carry out LV link box inspections. The results will be collected at the next scheduled inspection either by using electronic hand held devices or on paper reporting forms and the results will be entered into the UK Power Networks Asset Register. In addition to the risk assessment, a record shall be made if a key risk is identified at the site, which shall also be recorded in the UK Power Networks Asset Register Key Risks An on-site inspection will be carried out to determine whether there are any key risks on site. Table 20 Link Box Key Risks Code Title Description K1 NONE No additional hazards K8 THIRD PARTY DAMAGE Intentional Third Party Damage or proof of unauthorised access to link box enclosures GP GAS PRESENT Evidence of gas present Risk Mitigation for LV Link Boxes All link boxes regardless of overall risk shall be have a blanket installed and recorded in the Asset Register. The overall risk, location risk or deployed mitigations may impact the link box inspection frequency. This shall be confirmed in EMS Inspection and Maintenance Frequency Schedule. UK Power Networks 2018 All rights reserved 30 of 36

31 6 Cable Pits 6.1 Construction of a Risk Assessment for Cable Pits The overall risk assessment value is built from the Location Risk (Nature and situation of the site) and the Equipment Risk. The overall risk rating is determined using Table 23 in Section This covers the nature of the design of equipment, the risk of contact with live equipment if a third party had access to the site or if the Cable Pit was to fail by whatever means. The risk rating for this is stored in the UK Power Networks Asset Register for each cable pit and used to determine the mitigation required Cable Pit Location Risk The risk refers to the potential risk the Cable Pit presents to the public by its location. Inspectors shall establish the risk from Table 21 below. Table 21 - Cable Pit Location Risks Location Risk Code Title Description HIGH RISK UA ENHANCED ZONE City of London and West End UB MEDIUM RISK VERY HIGH PEDESTRIAN AREA Any medium or low risk area which is subject to consistent high pedestrian traffic or gatherings. eg Major rail, tube or bus stations, City or large town centre shopping areas. UC RECREATIONAL Within or adjacent to a play area, pub, cafe, restaurant or public attraction UD TRANSPORT Within 10m of public access to Rail, Underground or DLR station, bus or tram stop or busy car park. UE SCHOOL Outside a school, in an area where children and parents are likely to gather LOW RISK UF URBAN Footpaths or verges in residential or built up areas UG NON-RESIDENTIAL Non-residential footpaths or verges UH SECURE SITE Within a secure location UI RURAL Rural location UJ ROADS Surfaced roads UK PRIVATE Private land UK Power Networks 2018 All rights reserved 31 of 36

32 6.1.2 Cable Pit Equipment Risk The level of risk shall be determined by the number of joints within the cable pit in accordance with Table 22. Table 22 - Cable Pit Equipment Risk Equipment Risk Number of Joints Joint Risk Equipment Risk 3 or more High High 2 Medium Medium 1 Low Low 0 Low Low Risk Rating Matrix The overall Cable Pit risk rating shall be determined by combining the location risk with the equipment risk for all sites. Table 23 - Cable Pit Risk Ratings High Risk Equipment Medium Risk Equipment Low Risk Equipment Overall Risk Rating Medium High Very High Medium Medium High Low Medium Medium Low Risk Location Medium Risk Location High Risk Location UK Power Networks 2018 All rights reserved 32 of 36

33 6.1.4 Management of the Output from the Overall Risk Rating For Cable Pits, risk assessments shall be filled in by all staff that carry out Cable Pit inspections. The results will be collected at the next scheduled inspection either by using electronic hand held devices or on paper reporting forms and the results will be entered into the UK Power Networks Asset Register. In addition to the risk assessment, a record shall be made if a key risk is identified at the site, which shall also be recorded in the UK Power Networks Asset Register Key Risks An on-site inspection will be carried out to determine whether there are any key risks on site. Table 24 - Cable Pit Key Risks Code Title Description K1 NONE No additional hazards K8 THIRD PARTY DAMAGE Intentional Third Party Damage or proof of unauthorised access to cable pit GP GAS PRESENT Evidence of gas present AP ASBESTOS PRESENT Evidence of asbestos present i.e. asbestos wraps around joints Risk Mitigation for Cable Pits Mitigation must be carried out where the overall risk rating is very high, high, medium or a key risk (K8 or GP) is recorded at the site. Where a cable pit is rated very high, high or medium risk, the pit should be infilled with sand, or a vented/non-vented/hinged cover should be installed and recorded in the Asset Register. The overall risk, location risk or deployed mitigations may impact the cable pit inspection frequency. This shall be confirmed in EMS Inspection and Maintenance Frequency Schedule. UK Power Networks 2018 All rights reserved 33 of 36

34 7 Risk Assessment for New Assets 7.1 Ground Mounted Sites At the design stage for new sites, a risk assessment calculation as defined in Section 3 of this document shall be performed. All new installations shall be designed such that the overall risk is less than Very High. Where a High risk location cannot be avoided, the equipment and enclosure risks shall both be designed to be Low risk unless there is significant justification on technical or cost grounds. 7.2 Overhead Lines At the design stage, a risk assessment calculation as defined in Section 4 of this document shall be performed New Installations All new installations should produce a risk assessment that is less than High. Any proposed new installation that initially produces a High or Very High risk assessment shall be redesigned before construction, to ensure that the resultant risk assessment is reduced Existing Network When an existing overhead line network is to be structurally altered, every opportunity, where reasonably practicable, shall be taken to ensure the risk rating of the altered assets is not a High value. A Very High risk situation is unacceptable under any circumstances and shall be redesigned to reduce the risk rating. 7.3 Underground Link Boxes/Cable Pits At the design stage, an ESQCR risk rating calculation as defined in Section 6 shall be performed. Where practically possible, every effort should be made to avoid installing a link box and cable pit in a high risk location. 8 Return of Completed Risk Assessments Risk assessments completed at the design stage shall be retained with the project file until the scheme is confirmed as proceeding at which time it will be forwarded to the relevant UK Power Networks Asset Registration Team to update the UK Power Networks Asset Register. Risk assessments completed as part of routine patrol/inspection shall be returned as part of the process and entered into the UK Power Networks Asset Register by the approved process in force. UK Power Networks 2018 All rights reserved 34 of 36

35 9 Managing Mitigation of Risks The mitigation requirements for a site should preferably be carried out at the time of the inspection but in all cases the proposed mitigation must be carried out as soon as possible to avoid the risk of accident/injury from the risks posed by the site. Work is prioritised within UK Power Networks Network Operations, Planning and Delivery based on ESQCR Risk Rating and Key Risks. A general guide for mitigation management can be found in Figure 1. Figure 1 - General guide for mitigation management UK Power Networks 2018 All rights reserved 35 of 36

Low Voltage Electricity System Safety Rules & Associated Safety Guidance

Low Voltage Electricity System Safety Rules & Associated Safety Guidance Annex J To Loughborough University Facilities Management (FM) Health and Safety Policy Low Voltage Electricity System Safety Rules & Associated Safety Guidance 1. Introduction a. These Safety Rules are

More information

CITB Construction site safety update

CITB Construction site safety update D: High risk activities Underground and overhead services This text replaces the text from the current GE700 2015, Section D, Chapter D08, Underground and overhead services, pages 133 to 136. 8.6 Overhead

More information

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures

SAFETY QUALITY TECHNOLOGY. Guidance on Safe Isolation Procedures SAFETY QUALITY TECHNOLOGY Guidance on Safe Isolation Procedures Introduction Every year, people working on construction sites suffer electric shock and burn injuries some of which, tragically, are fatal.

More information

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard.

Field Instruction. Protect Horizon Power employees and contractors from a potential hazard. 2.15 Temporary Safety Barriers and/or Warning Signs Purpose This instruction sets out the minimum requirements for the installation and erection of temporary safety barriers and/or warning signs to: Protect

More information

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title:

Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: Corporate Electricity High Voltage SOP Document Control Summary Status: Replacement for Electricity High Voltage SOP v1.0 Version: V1.1 Date: July 2017 Author/Title: Owner/Title: John Biggs/Estates Officer

More information

Working with Grantors

Working with Grantors Working with Grantors Introduction Welcome to this Grantors Code of Practice. SSE s core purpose is to provide the energy that people need in a reliable and sustainable way. A key component of this is

More information

PSSI 6 Demarcation of Work Areas in Substations

PSSI 6 Demarcation of Work Areas in Substations 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical), setting down the requirements in those situations where it is necessary

More information

GAS PIPELINE SAFETY GUIDE.

GAS PIPELINE SAFETY GUIDE. GAS PIPELINE SAFETY GUIDE. Date of issue 27/02/2017 Date of next review 27/02/2018 Page 1 Vector Limited 2017 Gas Pipeline Safety Guide February 2017 CONTENTS CONTENTS...2 WORKING SAFELY... 3 Your Legal

More information

User Information Sheet 015

User Information Sheet 015 User Information Sheet 015 Formerly LPGA Guidance NO.84 March 2007 Inspection and Maintenance of LPG Pipework at Commercial and Industrial Premises 1. Introduction LPG pipework may, under certain conditions,

More information

Energy Networks Management Safety Procedures DEFINITIONS

Energy Networks Management Safety Procedures DEFINITIONS 1. SCOPE Throughout the Energy Networks Management Safety Procedures (MSP s), terms printed in bold type are as defined in the ScottishPower Safety Rules (Electrical and Mechanical) 4 th Edition. Most

More information

List all key terms and acronyms used in the procedure, and their definitions.

List all key terms and acronyms used in the procedure, and their definitions. Purpose The purpose of this procedure is to provide guidelines for electrical safety in general within Seqwater in compliance with the Electrical Safety Act 2002, Industry Codes of Practice, Regulations,

More information

Safe work method statements

Safe work method statements Information about Safe work method statements How to prepare and use a safe work method statement (SWMS) for high risk construction work (HRCW) and who needs to prepare one. October 2018 Key concepts Hazard

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

Policy Redesign Project. Plant Safety Policy. Table of Contents

Policy Redesign Project. Plant Safety Policy. Table of Contents Policy Redesign Project All policies and procedures are being reviewed as part of this project. This document is pending review, but remains in effect until the review is carried out. Plant Safety Policy

More information

CYCLING TIME TRIALS The national governing body for CYCLING time trials

CYCLING TIME TRIALS The national governing body for CYCLING time trials CYCLING TIME TRIALS The national governing body for CYCLING time trials www.ctt.org.uk SOUTH DISTRICT COUNCIL COURSE DETAILS FOR START SHEETS & RISK ASSESSMENT INDEX Guidance Notes for Event Promoters

More information

Prevention of Falls and Working at Heights

Prevention of Falls and Working at Heights Workplace Safety Schools Cleaning Prevention of Falls and Working at Heights It is the policy of the Company to avoid working at heights above 2 metres wherever practical. When avoidance is not an option,

More information

Part B Design Guidance / Principles _

Part B Design Guidance / Principles _ Part B Design Guidance / Principles www. landlab.co.nz Queenstown Town Centre Public Realm Design Guidelines Version 7 14 June 2018 Page 006 B1 Design Guidance & Best Practice The Queenstown Town Centre

More information

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction

COUNCIL POLICY. Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction COUNCIL POLICY Road Reserve and Footpath Document No: CPL260.5 Approval Date: 23 March 2010 Obstruction Approved By: Council Review Date: 31 December 2013 Responsible Officer: Version No: 02 General Manager

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

TLILIC2001 Licence to Operate a Forklift Truck

TLILIC2001 Licence to Operate a Forklift Truck Learner Name: Learner ID: Learner Contact Number: Learner Email Address: Date Training Commenced: This Book Contains: Course Information. Review Questions. The following review questions are to be completed

More information

Our Approach to Managing Level Crossing Safety Our Policy

Our Approach to Managing Level Crossing Safety Our Policy Our Approach to Managing Level Crossing Safety Our Policy Our policy towards managing level crossing risk is: that we are committed to reducing the risk at level crossings where reasonably practicable

More information

16.1 Introduction Pedestrian. signage strategies

16.1 Introduction Pedestrian. signage strategies 16 Measures to guide pedestrians Measures to guide pedestrians Types of pedestrian signage and design Other methods to guide or channel pedestrians 16.1 Introduction All road users need helpful guidance

More information

Residential Swimming pools

Residential Swimming pools City of Republic Community Development Department Residential Swimming pools REVISION DATE: JANUARY 2017 Swimming Pool Safety Definitions: Barrier Requirements: A) Application All swimming pools over 24

More information

This Procedure details the procedures to be followed in order to achieve Safety from the System when:

This Procedure details the procedures to be followed in order to achieve Safety from the System when: 1 SCOPE This Procedure details the procedures to be followed in order to achieve Safety from the System when: using Insulated Tools within the Vicinity Zone or the Live Zone, when carrying out Tree Work

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

Support Infrastructure

Support Infrastructure GUIDANCE NOTE 06 Support Infrastructure 96 COMMUNITY CRICKET FACILITY GUIDELINES VERSION SEPTEMBER 2015 SECTION 2 Guidance Note 06 Support Infrastructure INTRODUCTION Outside of the main playing, training

More information

NEASHAM PARISH COUNCIL Risk Assessment relating to Neasham Village Green (approved by Council on 6 November 2017)

NEASHAM PARISH COUNCIL Risk Assessment relating to Neasham Village Green (approved by Council on 6 November 2017) SEVERITY Risk matrix Definitions LIKELIHOOD 1 2 3 4 5 1 1 2 3 4 5 2 2 4 6 8 10 3 3 6 9 12 15 4 4 8 12 16 20 5 5 10 15 20 25 Site description: Neasham Village Green is an open area of grassland in the middle

More information

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access

Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Infrastructure Requirements for Personal Safety in Respect of Clearances and Access Synopsis This document sets out the design, construction and maintenance requirements for means of access onto, along

More information

WAIROA DISTRICT COUNCIL P

WAIROA DISTRICT COUNCIL P WAIROA DISTRICT COUNCIL P +64 6 838 7309 W www.wairoadc.govt.nz F +64 6 838 8874 p PO Box 54, Wairoa 4160, Hawke s Bay E consents@wairoadc.govt.nz A Coronation Square, Queen Street, Wairoa INFORMATION

More information

Review of Guidelines for Cycleway Safety Fencing

Review of Guidelines for Cycleway Safety Fencing Review of Guidelines for Cycleway 1.0 PURPOSE 1.1 This document is meant to provide a review of available reference documents for determining appropriate fencing requirements for cycleway paths and shared

More information

How to plan an event. Step 1: First things first. Step 2: How to make it all happen?

How to plan an event. Step 1: First things first. Step 2: How to make it all happen? As an event organiser, you have a legal responsibility to ensure the health, safety and welfare of all those involved in your event - all employees, volunteer helpers and contractors as well as members

More information

Development and Evolution of an Asset Management Organization

Development and Evolution of an Asset Management Organization Development and Evolution of an Asset Management Organization Art Kruppenbacher Manager Asset Management October 21, 2015 About the Iberdrola Group Headquartered in Spain 109-year history 28,000 employees

More information

PSSI 3 High Voltage Metal-Enclosed Switchgear

PSSI 3 High Voltage Metal-Enclosed Switchgear 1. SCOPE This Safety Instruction applies the principles established by the ScottishPower Safety Rules (Electrical and Mechanical) and Company Safety Instructions to achieve Safety from the System for personnel

More information

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008

Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 Amendments to Essex Highway Maintenance Strategy Maintenance Policy and Standards April 2008 The following amendments to the wording of the maintenance strategy apply following the revised maintenance

More information

Power Unit 075. Maintain Substation Circuit Breakers

Power Unit 075. Maintain Substation Circuit Breakers Power Unit 075 Maintain Substation Circuit Breakers The specification details the required skills, knowledge and behaviours to establish competence to carry out the maintenance of high voltage power circuit

More information

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition

NORTHERN POWERGRID. Distribution Safety Rules 2015 Edition NORTHERN POWERGRID Distribution Safety Rules 2015 Edition These rules shall be read in conjunction with the Operational Practice Manual and/or indicated Operational Guidance. Refer to the index for supplementary

More information

Telco Antennas SWMS Working At Height Above 2m

Telco Antennas SWMS Working At Height Above 2m Telco Antennas SWMS Working At Height Above 2m A SWMS shall be developed for a task where the risk has been assessed as Medium or Higher Division: Date: SWMS No: (e.g. Installation, Engineering Workshop)

More information

Swimming Pool Requirements

Swimming Pool Requirements Swimming Pool Requirements 8040 S. 6th Street Oak Creek, WI 53154 (414) 766-7000 www.oakcreekwi.org Revised: August 8. 2017 PERMITS A permit from the Inspection Department is required prior to putting

More information

A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT

A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT A GUIDE TO WRITING A RISK ASSESSMENT FOR A BMAA EVENT BMAA 2017 Writing an event Risk Assessment BMAA Guidance What is an event Risk Assessment? An event Risk Assessment (RA) is a document that shows that

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

The Safe System Approach

The Safe System Approach There are very few areas of public discussion and sentiment which generate as much consensus as road safety. Everyone wants safer roads for all users, and road safety is a key priority for governments,

More information

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO

SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO SSR Competency Assurance Guidance Booklet No.2 (SSR Summary for Contractors CP) Revision 0 October 2014 HSEQ Department, TRANSCO Disclaimer: This document is for general guidance and awareness purposes

More information

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1

Safety Guidelines for Live Entertainment and Events I Part 2. Hazard Identification and Risk Management 1 Safety Guidelines for Live Entertainment and Events Part 2. Hazard Identification and Risk Management Contents Disclaimer... 1 1. Principles of Risk Management... 2 2. The Risk Management Process... 2

More information

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings

RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings RAILWAY LEVEL CROSSING CHECKLIST Road Safety Review of Railway Crossings Location: Crossing No. Date of On-Site Inspection: (Day) / / (Night) / / Weather: CHECKLIST 5. - GENERAL TOPICS Level of control

More information

Pedestrian Level Crossings Design and Installation

Pedestrian Level Crossings Design and Installation Discipline: Engineering (Track & Civil) Category: Standard Pedestrian Level Crossings Design and Installation ETD-16-03 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard XDS

More information

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors

Field Instruction. Stringing new bare conductors above or below live bare overhead conductors 5.10 Stringing, Tensioning and Sagging Conductors/Cables Purpose The purpose of this instruction is for all Horizon Power workers who undertake the stringing and tensioning of bare overhead conductors

More information

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA

: Electric Power Generation, Transmission, and Distribution. Region IV - OSHA 1910.269: Electric Power Generation, Transmission, and Distribution Region IV - OSHA Scope This standard covers the operation and maintenance of electric power generation, control, transformation transmission,

More information

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION

TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION TOWN/VILLAGE OF LIMA POOL PERMIT APPLICATION Type of Permit: Hot Tub Above ground In Ground Permit Number: Permit Fee: Address of Proposed Work: Town Zoning district: (Check one) Village Zoning district:

More information

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395

Safety Standards Acknowledgement and Consent (SSAC) CAP 1395 Safety Standards Acknowledgement and Consent (SSAC) CAP 1395 Contents Published by the Civil Aviation Authority, 2015 Civil Aviation Authority, Aviation House, Gatwick Airport South, West Sussex, RH6 0YR.

More information

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee.

Working at Height. Policy and Procedures. Author: Beth Webster Assistant Safety Advisor. On behalf of School Safety Committee. Working at Height Policy and Procedures Author: Beth Webster Assistant Safety Advisor Authorised by: Issued by: John Stephenson Safety Office On behalf of School Safety Committee Review Date: NO LATER

More information

Three Springs Design Guidelines Fencing and Wall Standards

Three Springs Design Guidelines Fencing and Wall Standards Three Springs Design Guidelines Fencing and Wall Standards Original Adopted: June 12, 2006 Minor Amendment: December 2012 Minor Amendment: March 23, 2017 TABLE OF CONTENTS: FENCING AND WALLS 1.0 INTRODUCTION

More information

Design Measures taken, or being taken to eliminate or reduce the hazard

Design Measures taken, or being taken to eliminate or reduce the hazard Part B: CDM 2007 MMFD Procedures Hazard Elimination and Management Schedule Project Title: Managed Motorways All Lanes Running (MM-ALR) Job No.: 1039092 Design Discipline: IAN161/12 Prepared By: Emma Clutterbuck

More information

Auckland Transport Code of Practice 2013

Auckland Transport Code of Practice 2013 P age 234 9 Roadside Restraint Devices 9.1 Scope This chapter includes the following: Road Safety Barrier Systems Fences Railings Bollards Sight Rails It excludes: Fences and restraints required within

More information

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work.

Field Instruction. This instruction outlines the minimum requirements for all Horizon Power workers who undertake Vegetation Management Work. 10.6 Management Work Purpose This instruction outlines the minimum requirements for all Horizon Power workers who undertake Management Work. Scope The scope of this instruction is to inform all Horizon

More information

DRAFT INTERIM ADVICE NOTE 150/17

DRAFT INTERIM ADVICE NOTE 150/17 DRAFT INTERIM ADVICE NOTE 150/17 Guidance on Alternative Temporary Traffic Management Techniques for Relaxation Works on Dual Carriageways Summary Guidance for temporary traffic management (TTM), on the

More information

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and

Bulletin Swimming pool, hot tub and spa installations Rules , , , , , and Bulletin 68-7-11 Swimming pool, hot tub and spa installations Rules 68-000, 68-056, 68-058, 68-064, 68-068, 68-302 and 68-404 Scope (1) Swimming pools - general (2) Grounding & bonding (a) Bonding for

More information

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS

LEVEL 2 CERTIFICATE OF COMPETENCE IN THE SAFE USE AND OPERATION OF MOBILE ELEVATED WORK PLATFORMS NPTC Registered Charity No. 1096429 NATIONAL AGRICULTURAL CENTRE STONELEIGH PARK, WARWICKSHIRE CV8 2LG Tel: 024 7669 6553 Fax: 024 7669 6128 Email: information@nptc.org.uk LEVEL 2 CERTIFICATE OF COMPETENCE

More information

(Health, Safety, and Welfare)

(Health, Safety, and Welfare) An Appreciation of The Construction (Health, Safety, and Welfare) Regulations 1996 Course Notes Mark Mallen Health and Safety Manager Fenlock Hansen Ltd October 2002 The Construction Regs 1996: Version

More information

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016

Ormiston Academies Trust. Ormiston Horizon Academy. Working at Height Policy October 2016 Ormiston Academies Trust Ormiston Horizon Academy Working at Height Policy Project/job number: Author: Sharlene Smith/Handsam Date: 25/10/16 Contributors: Sharlene Smith Version number: 1.1 Reviewed by:

More information

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031)

IEC April Authorized Sole Agent : PT. Wisma Niagatama Perkasa. Phone : (031) Fax. : (031) IEC 62271-200 April 2004 Authorized Sole Agent : PT. Wisma Niagatama Perkasa Phone : (031) 5041242 Fax. : (031) 5044580 IEC 62271-200 Introduction Scope This standard specifies requirements for factory-assembled

More information

APPENDIX A: Risk Assessment for all activities at Farm

APPENDIX A: Risk Assessment for all activities at Farm APPENDIX A: Risk Assessment for all activities at Farm Sheet No...of...... Drafted by Nick Laister Date of Revision: January 08 Location: Southcombe, Chipping Norton Heading: General Organisation L C R

More information

SWIMMING POOL REQUIREMENTS

SWIMMING POOL REQUIREMENTS PERMITS A permit from the Inspection Department is required prior to putting up a permanent pool. A permit is required for permanent pools, such as the following: SWIMMING POOL REQUIREMENTS The pool is

More information

Work Health and Safety Risk Management Procedures

Work Health and Safety Risk Management Procedures Work Health and Safety Risk Management Procedures Table of Contents 1. Governing Policy 2. Purpose 3. Scope 4. Definitions 5. Responsibilities 6. Risk Management Process 6.1. Process summary 6.2. Hazard

More information

Minimum Safety Requirements for Contractors Working on Railway Property

Minimum Safety Requirements for Contractors Working on Railway Property Minimum Safety Requirements for Contractors Working on Railway Property Effective_ April 1, 2007 Introduction Canadian Pacific is committed to provide a Safe and Healthy working environment for all Railway

More information

LEVEL CROSSING SIGHTING DISTANCES

LEVEL CROSSING SIGHTING DISTANCES Ref No: HGR-A0458 Issue No: 01 Issue Date: September 2012 HERITAGE RAILWAY ASSOCIATION GUIDANCE NOTE LEVEL CROSSING SIGHTING DISTANCES for Footpath and Vehicular User-Worked Crossings Purpose This document

More information

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group

Q&A for Safety Code. Prepared by the HAUC-UK Safety Code working group Q&A for Safety Code Prepared by the HAUC-UK Safety Code working group 1 What is the latest version of the Safety Code? At the time of writing, the last time any amendments were made to the Safety Code

More information

Selection of Electrical PPE Tables

Selection of Electrical PPE Tables Selection of Electrical PPE Tables Instructions Table 1 - Starting with Table 1, select the task you plan to do (right-hand column) and the condition of the equipment you will be working on, (center column).

More information

Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain

Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain Development, implementation and use of the All Level Crossing Risk Model (ALCRM) Alan Symons Network Rail Infrastructure Ltd Great Britain 1 Level Crossing Facts (Great Britain) Over 7000 in active use

More information

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths Road Asset Technical Accord - RATA The Centre of Excellence for Road Asset Planning in the Waikato Region Department of Internal Affairs Mandatory Non-Financial Performance Measures 2013 Roads and Footpaths

More information

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy

To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety

More information

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper April Section A - All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper April 2013 Section A - All questions carry equal marks. Answer all three questions. Show all calculations. Q.1 The electrical installation in a small food retail outlet is scheduled

More information

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , ,

ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR CFR , , ELECTRICAL (COMPREHENSIVE) SAFETY PROGRAM REGULATORY STANDARD: OSHA - 29 CFR 1910.331 335-29 CFR 1926.302, 1926.416, 1926.417 BASIS: The National Safety Council estimates that there are at least 300 deaths

More information

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations.

C&G 2395 Exam Paper June Section A-All questions carry equal marks. Answer all three questions. Show all calculations. C&G 2395 Exam Paper June 2013 Section A-All questions carry equal marks. Answer all three questions. Show all calculations. 1. The electrical installation in an industrial unit is scheduled for a periodic

More information

Report to Cabinet. 18 May 2016

Report to Cabinet. 18 May 2016 Agenda Item 8 Report to Cabinet 18 May 2016 Subject: Presenting Cabinet Member: Proposed CCTV Enforcement of Traffic Contraventions in a Bus Lane (Key Decision Ref. No. HE030) Highways and Environment

More information

Safety, Health and Environment Angler Safety

Safety, Health and Environment Angler Safety Safety, Health and Environment Angler Safety A Guide to Risk Assessment Supporting a Reduction in the Default 30 metre Angling Exclusion Zone The Guide is NOT intended to be used by individuals as a guide

More information

Electrical Safety in the Food Industry

Electrical Safety in the Food Industry Health and and Safety Executive Electrical Safety in the Food Industry John Chamberlain HM Principal Specialist Inspector (Electrical & Control Systems) Manchester CROWN COPYRIGHT What I ll cover Legal

More information

Understanding health and safety in gas utilisation

Understanding health and safety in gas utilisation Level: 3 Credit value: 11 URN: M/502/8461 Unit aim This unit aims to provide learners with the knowledge and understanding of the general health and safety requirements for working in the gas industry.

More information

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana.

SAFETY DIRECTIVE. 2.0 DEPARTMENTS AFFECTED This directive applies to all departments and employees of the Town of Marana. SAFETY DIRECTIVE Title: Safety Signs and Accident Prevention Tags Issuing Department: Town Manager s Safety Office Effective Date: September 1, 2014 Approved: Gilbert Davidson, Town Manager Type of Action:

More information

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019

SAEMA Document No. SDN Original Issue Date: April 2017 Revision Reference: Revision Date: Not later than end of April 2019 ------------------------------------------------------------------------------------------------------------------------------------- SAEMA Document No. SDN. 14000 Original Issue Date: April 2017 Revision

More information

Regional Commercial District Summary of Allowable Uses

Regional Commercial District Summary of Allowable Uses Regional Commercial District Summary of Allowable Uses (Please refer to Section 18-160 for the most up-to-date list: Section 18-160) Accessory Uses Accessory outside display of merchandise Accessory outside

More information

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP.

Field Instruction. The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. 2.7 Safety Requirements When Working from an EWP Purpose The purpose of this instruction is to inform all Horizon Power workers of the safety requirements when working from a EWP. Scope The scope of this

More information

Fencing your spa or swimming pool

Fencing your spa or swimming pool Fencing your spa or swimming pool A guide to understanding your responsibilities as a pool owner. Contents Introduction to fencing your spa or swimming pool...2 Definitions...3 I m building a new pool

More information

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell:

Energy Control. Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: cell: Energy Control Suite 2A, 55 Frid Street Hamilton, ON L8P 4M3 office: 905.577.0303 cell: 905.977.0210 consultant@staffaid.ca www.staffaid.com Safety, Energy Control, Power Lockout & Function Test Procedures

More information

APPELLANT S STATEMENT OF CASE

APPELLANT S STATEMENT OF CASE TOWN & COUNTRY PLANNING ACT 1990 (AS AMENDED) APPEAL BY FOCUS INTERNATIONAL CHRISTIAN CENTRE (FICC) AGAINST REFUSAL OF PLANNING PERMISSION BY THE LONDON BOROUGH OF HILLINGDON PLANNING PERMISSION IS SOUGHT

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

PROCEDURES FOR STANDBY

PROCEDURES FOR STANDBY 1 SCOPE This Procedure details both the circumstances in which standby shall be provided and the responsibilities borne by the Standby Man in such circumstances. 2 ISSUE RECORD This is a maintained/controlled

More information

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE

ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE ARTIFICIAL GRASS PITCH INTRODUCTORY GUIDE Rugby Football Union 1 INTRODUCTION The last 15 years has seen major innovations in the development of artificial turf surfaces for sport. Most significant for

More information

University Safety Policy Supplement

University Safety Policy Supplement Occupational Health and Safety Service, Kings Gate Newcastle upon Tyne NE1 7RU Tel 0191 208 6274 Document History University Safety Policy Supplement Lone working Approved October 2006 Re-ratified October

More information

PRO Lifting Operations

PRO Lifting Operations MS&L Procedure PRO-4.5-0001-1-06 Lifting Operations Document Owner: Bill Kruesi HSSE Manager - Asset Mgmt. Owen Quake ANZ Engineering Authority Approved By: Bill Kruesi HSSE Manager - Asset Mgmt. Control

More information

Fencing your spa or swimming pool

Fencing your spa or swimming pool Fencing your spa or swimming pool A guide to understanding your responsibilities as a pool owner. Contents Introduction to fencing your spa or swimming pool...2 Definitions...3 I m building a new pool

More information

Risk Assessment Form

Risk Assessment Form Risk Assessment Form School Activity Risk Assessment conducted by: Consultation occurred with: (names & role) Description of activity being assesses Batchelor Outdoor Education Centre Artificial Climbing

More information

Rights of Way Enforcement Procedure for Land Managers

Rights of Way Enforcement Procedure for Land Managers Rights of Way Enforcement Procedure for Land Managers November 2006 Contents 1. Introduction 2. Infringements 2.1 Disturbance to the surface of a right of way 2.2 Obstructions 2.3 Structures 3. Enforcement

More information

PERMANENT POOLS. Location

PERMANENT POOLS. Location Community Development Department 211 Walnut Street - PO Box 426 Neenah, WI 54957-0426 Phone: (920) 886-6130 Fax: (920) 886-6129 Web site: www.ci.neenah.wi.us PERMANENT POOLS A pool is any man-made structure,

More information

2017 Temporary traffic control guidelines for pedestrians. v.2

2017 Temporary traffic control guidelines for pedestrians. v.2 2017 Temporary traffic control guidelines for pedestrians v.2 Temporary Traffic Control Guidelines for Pedestrians (2017) The safety and mobility of pedestrians, cyclists and motorists must be considered

More information

Safety Essentials. Mandatory rules for our high risk activities

Safety Essentials. Mandatory rules for our high risk activities Mandatory rules for our high risk activities Remember... Only undertake activities for which you are trained, competent and authorised to do Before you start a job take a step back, think about all the

More information

TRAFF IC CALMING POLICY

TRAFF IC CALMING POLICY TRAFF IC CALMING POLICY Policy No: 45396 Approved by Council 28 May 2008 C11/05/08 Further amendment by Council 22 June 2011 vide c08/06/11 Contents 1 Problem Statement 1 2 Desired Outcomes 2 3 Strategic

More information

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers

SUPPLIER HEALTH AND SAFETY. Supporting a healthy and safe working environment for our people and customers SUPPLIER HEALTH AND SAFETY Supporting a healthy and safe working environment for our people and customers Document Template Control Prepared by Georgina East May 2017 Date Approved by May 2017 Mark Beder

More information

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT

Purpose. Scope. Process flow OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT SYDNEY TRAINS SAFETY MANAGEMENT SYSTEM OPERATING PROCEDURE 07: HAZARD LOG MANAGEMENT Purpose Scope Process flow This operating procedure supports SMS-07-SP-3067 Manage Safety Change and establishes the

More information