1 ABN: Pollution Incident Response Management Plan for Duncans Quarry 3281 Gwydir Highway, Jackadgery 2460 Prepared and Approved by: Philip McLennan Managing Director Date: 17 November 2017 Postal Address: PO Box 7, SOUTH GRAFTON NSW 2460, Office located at: 10 Duncans Lane, SOUTH GRAFTON NSW 2460 Phone: , Mobile: , Facsimile: ,

2 DOCUMENT HISTORY Document Ref: Revision Number 5 Document Status: Originator/s: Distribution List: Draft Phil McLennan, Kim Painter & Justine Webber Name Philip McLennan Kim Painter Position Managing Director & Assistant Site Supervisor/Production Manager Administration, Safety & Compliance Manager Comment/Feedback/ Sign-off Register Justine Webber Safety/Compliance Coordinator Revision Number Release Date 0 29/06/ /06/ /08/ /08/ /11/ /11/2017 Comment/Notes PIRMP from 2015 used as reference material for 2017 review. Further review of and amendments made to Draft PIRMP. Further review of and amendments made to Draft PIRMP. Further review of and amendments made to Draft PIRMP. Final DRAFT ready for confirmation and testing. Checking of final Draft PIRMP confirming information included was accurate and up to date. Consideration was also given to ensuring that PIRMP was able to be implemented at Duncans Quarry, 3281 Gwydir Hwy, Jackadgery in an effective manner. Final amendments made accordingly after the testing of PIRMP. Prepared / Authorised By Justine Webber Justine Webber Justine Webber Kim Painter & Justine Webber Justine Webber Phil McLennan & Kim Painter Distribution Sent to EPA Date: Made publicly available through Date: website: Page 2 of 22

3 Contents INTRODUCTION... 4 DETAILS OF SITE AND SITE OPERATIONS... 5 EMERGENCY RESPONSE AGENCIES... 6 DESCRIPTION AND LIKELIHOOD OF HAZARDS... 7 POLLUTING MATERIALS STORED OR USED AT THE SITE... 9 POLLUTION INCIDENT RESPONSE MINIMISING HARM TO PERSONS ON / NEAR THE SITE Emergency Management Key Responsibilities (pre-emergency) Emergency Management Methods Chief Emergency Controller (during and post-emergency) Staff, Employees and Contractors Emergency Warning and Communications System Fire-Fighting Appliances Location of Extinguishers Incident and Accident Reporting First Aid Equipment Locations EMERGENCY RESPONSE AND EVACUATION PLAN Discovering a dangerous situation If evacuation is decided If emergency services are not required First aid Media liaison Communication plan with relevant parties Emergency equipment LIST OF RELEVANT DOCUMENTS AND PROCEDURES ATTACHMENTS (see following pages) Page 3 of 22

4 INTRODUCTION This (PIRMP or Plan ) has been prepared in accordance with requirements set out in Part 5.7A of the Protection of the Environment Operation Act 1997 (POEO Act), (7 July 2017), and Part 3A of the Protection of the Environment Operations (General) Regulation 2009 (19 May 2017). The sits within the overarching Duncans Quarry Safety Management System (SMS). This plan is kept on file in the office at Duncans Quarry, 3281 Gwydir Highway, Jackadgery. Its contents shall be familiar to all workers, and permanent subcontractors at Duncans Quarry. The plan is to be reviewed and amended as required by changes in operations, or failure of the plan or any elements of the plan, in the event of an emergency. The current induction process for workers and visitors covers emergency procedures including pollution incidents. The Mine Operator will be responsible for the worker training and the ongoing maintenance of the PIRMP. The objectives of the PIRMP are to: ensure comprehensive and timely communication about a pollution incident to staff on site, the Environmental Protection Authority, Clarence Valley Council, NSW Ministry of Health, SafeWork NSW, and Fire and Rescue NSW as well as people outside the facility who may be affected by the impacts of a pollution incident. minimise and control the risk of a pollution incident at the facility by identifying risks and developing actions to minimise and manage those risks. ensure that the plan is properly implemented by trained staff, identifying persons responsible for implementing it, and ensuring that the plan is regularly tested for accuracy, currency and suitability. The legislative requirements are set out in the relevant sections of the POEO Act and Regulation. In summary, this PIRMP must address: 1. Description and likelihood of hazards; 2. Pre-emptive actions (control measures) to be taken; 3. Inventory of pollutants; 4. Safety equipment; 5. Contact details; 6. Communications with adjoining properties and the community; 7. Minimising harm to persons on/near the site; 8. Site Plan/s; 9. Actions to be taken during or immediately after a pollution incident; 10. Staff training. The Managing Director, or authorised representative, of is responsible for the worker training, and the ongoing review and maintenance of the PIRMP. A copy of this PIRMP has been forwarded to the EPA and made publicly available on McLennan Earthmoving Pty Limited website Page 4 of 22

5 DETAILS OF SITE AND SITE OPERATIONS The site known as Duncans Quarry is located at 3281 Gwydir Highway, Jackadgery 2460, 32.8km west of Grafton. The operator of the site is, and the site office phone number is: (02) The EPA Licence No. for the site is: All compliance conditions relevant to this site are detailed in the Licence document. Activities at the site include extraction through blasting (conducted by blasting contractors), excavation, crushing, screening, pre-coating, pug milling, stockpiling of quarry materials and loading of quarry material delivery trucks. The active plant on site consists of: Wheel loaders Skid steer loaders Tip trucks Water carts Articulated dump trucks Excavators Forklifts Dozers Cone crushers Jaw crushers Mobile crushers Screening plant Wheeled conveyor Sand washing plant Graders Service trucks Elevated work platform Pugmill Hard hose irrigator Water pumps Multiple utes The number of workers/personnel on site consists of 4 25 people, including subcontractors working on site, as well as McLennan Earthmoving trucks and subcontractor trucks entering and leaving site. The site comprises of the following areas: Roads, silt dams, sediment dams and water dam areas Granite pit working area Argillite pit working area Pre-coat area Pugmilling area Machinery, crusher & screening areas (wet plant area & dry plant areas) Stockpile loading and unloading areas Weighbridge Visitor parking, assembly and office areas Crib room and facilities Page 5 of 22

6 Machinery sheds Storage sheds Mechanical store room and workshop Control room on western side and switchboard on the eastern side for dry plant 2 storage containers (ISO and silo) 1 diesel fuelling station The site plan (refer Figure 1), shows the location of administration office, visitor parking, machinery sheds, weighbridge, drainage/sediment traps, stockpiles areas, wet and dry plant areas and emergency assembly area. EMERGENCY RESPONSE AGENCIES If a pollution incident occurs the Managing Director or authorised representative of McLennan Earthmoving Pty Limited will contact the following emergency authorities immediately: Environmental Protection Authority (EPA) PO Box A290 Sydney South NSW 1232 Phone: Fire and Rescue NSW (Hazmat) PO Box A249 Sydney South NSW 1232 Phone: or Note: If the situation warranted calling 000 as a first point of notification, you do not need to ring Fire and Rescue NSW Clarence Valley Council (CVC) Locked Bag 23 Grafton NSW 2460 Phone: NSW Ministry of Health Locked Mail Bag 961 North Sydney NSW 2059 Phone: SafeWork NSW Locked Bag 2906 Lisarow NSW 2252 Phone: Other emergency agencies that may need to be contacted depending on the type and severity of the incident are: Police Rural Fire Service Hospital Ambulance State Emergency Service Page 6 of 22

7 DESCRIPTION AND LIKELIHOOD OF HAZARDS Potential pollution hazards on the site include chemical and fuel spills, dust emissions and water contamination. The follow table provides a summary of the hazards, the likelihood, and the control measures that are in place. HAZARD DESCRIPTION LIKELIHOOD CONTROL MEASURES Large fuel spill Moderate Fuel Tank is double bunded. Fuel or hazardous material is used for its intended use only (as specified on the Safety Data Sheets (SDS)). SDS are reviewed and available for reference for the correct clean up procedures. Maintenance activities are to be undertaken on a concrete slab, where practicable. Refuelling of plant is done from a service vehicle fuel tank on a concrete slab, where practicable. Vehicles are maintained in good condition, and as per manufacturers specifications. Good housekeeping and tidy work areas are maintained to help prevent accidents and spills. Stored chemicals leakage and/or spillage causing contamination Low Bitumen pre-coat is stored in covered concrete and block bunded area with a spill capacity of twice the capacity of the holding tank. Hazardous materials are stored in a covered area and on appropriate drip trays where practicable. Fuel or hazardous material is used for its intended use only (as specified on the SDS). SDSs are reviewed and available for reference for the correct handling and clean up procedures. Good housekeeping and tidy work areas are maintained to help prevent accidents and spills. Refer also to the Safety Data list for chemicals stored on site. Fire Moderate/Low Flammable and combustible liquids are stored in an undercover area on appropriate drip/spill containment trays. Refuelling is undertaken only in designated areas. Provision of appropriate spill kits, and staff trained in their use. SDS are reviewed and available for reference for the correct fire prevention and fighting procedures. Good housekeeping and tidy work areas are maintained to help prevent accidents and spills. Fire extinguishers are provided on all items of plant and throughout the site, and staff are trained in their use. Staff and visitors to the site are instructed in the emergency procedures and evacuation points during their site induction. Due to the nature of the surrounding bushland, fire from external sources are a higher risk than fire within the quarry area. Duncans Quarry water carts are kept filled, and can attend and put out small spot fires that are close to boundary of quarry before they have time to develop. Page 7 of 22

8 HAZARD DESCRIPTION LIKELIHOOD CONTROL MEASURES Fire Moderate/Low Personnel driving to and from the quarry remain alert to bush fires and report to the local fire authority any site that appears to have become ignited. Discharge of water with elevated suspended solid levels Low Settling time is provided for stormwater within the site stormwater management structures (retention basins). Clean and contaminated runoff is segregated by bund walls. Sediment control measures are implemented and maintained. Dust emissions from operations & vehicle movements General waste generated on site incorrectly managed and entering the surrounding environment High Low Hardstand areas and roads are kept in a damp state with the use of a water truck, with more frequency during windy conditions. Use of the water truck is logged, and records retained on site. Stockpiles are regularly watered down with sprinklers and the water trucks, with more frequency during windy conditions. Plant that causes extreme dust emissions are watered down via sprinkler systems while in operation. Operators work within enclosed plant cabins, with air conditioning and/or ventilation in operation. Loads are covered during transport. PPE - dust face masks are available for all operators, personnel and visitors to site. PPE - Full face respirators are available for staff working in extreme dust situations and all staff have attended a toolbox training session on the correct fitting and use of dust protection. General waste and recycling bins are provided at the office and lunch room, and these are emptied in to the appropriate skip bins as necessary. Large skip bins are emptied by JR Richards as required. Waste not appropriate to skip bins is taken to Council Landfill as necessary. Waste oil from machinery maintenance is stored correctly and disposed of at an oil recycler. Unserviceable machinery parts are reused or recycled where possible or waste metal sold to scrap metal merchant. No waste automotive batteries are stored on site. Page 8 of 22

9 POLLUTING MATERIALS STORED OR USED AT THE SITE The following is a list of the type of material, how it is stored and pollution incident prevention measures. Material Diesel Regular (unleaded) petrol Assortment of oils and lubricants Bitumen pre-coat Cement Powder Cement/Slag Hydrated Lime Slag/Lime Quantity and Storage Location There is one bunded diesel tank on site, with 65,000 litres capacity. Service vehicles with diesel fuel tanks with capacity of up to 400 litres are used for refuelling excavators, dump trucks etc. Very little petrol is kept on site, about 5 litres maximum, in a small jerry can for small engines such as chainsaws. Stored in machinery shed. Stored in service vehicles, in sealed containers. Stored in bunded concrete area. Stored in ISO (18 tonne) and a horizontal silo - 30 tonne capacity. Preventative Measures In the event of a spill, bund area to prevent runoff and use spill absorbent material from Spill Station Control Kit available on site. Fire extinguishers are on all items of plant, and in all service vehicles and located at several locations around site (signposted). Machines/plant are turned off during refuelling. Petrol jerry can is kept closed and kept in a secure cool maintenance shed area. Stored in lockable sheds. In the event of a spill, bund area to prevent runoff and use spill absorbent material from Spill Station Control Kit to coat and clean up spilled substance. Service vehicles carry small amounts of oils, lubricants etc. These are in tubes, cans and other sealed containers. If containers/lids sustain damage and are unable to be properly closed, those containers are disposed of in the relevant waste disposal manner. Bitumen pre-coat is stored in covered concrete and block bunded area with a spill capacity of twice the capacity of the holding tank Signage indicate contents of the ISO & Silo. Most recent delivery dockets indicate the immediate contents of the tanks. Workers in direct contact with either product during loading/unloading wears the appropriate dust mask, long sleeves, long pants, hard hat, eye protection and gloves. These products are delivered by specialist contractors who are responsible for the loading in to the silo and ISO. Safety procedures are followed to ensure minimal contact with both products. Page 9 of 22

10 SITE PLAN Duncans Quarry 3281 Gwydir Highway 2460 Figure 1: Site Layout Plan Glen Innes Grafton Page 10 of 22

11 POLLUTION INCIDENT RESPONSE If a spill or leak of polluting material occurs, the Spill Control procedure (EM-13) displayed on the noticeboard at the office shall be followed. A copy of the Spill Control Procedure (EM-13) is attached. All personnel working at Duncans Quarry shall become familiar with these steps. Detailed below are steps to be taken in the event of a spill or leak of polluting material: 1. Assess the situation; follow all health and safety precautions warranted by the material and circumstances. 2. If there is reason to believe that the release of polluting material threatens the health or safety of employees, surrounding residents or properties, evacuate the facility and notify the appropriate local emergency response agencies listed in this plan and follow their instructions. 3. If there is reason to believe that the polluting material has or may reach waterways via drains, sewers, surface runoff or soils on site, immediately contact the EPA on phone: Follow their instructions for containing or cleaning up the material. 4. Take steps to minimize the release of polluting material to the environment. This can include but is in no way limited to the following measures: a) DO NOT FLUSH SPILLS WITH WATER UNLESS DIRECTED TO DO SO BY EPA or FIRE & RESCUE NSW. b) Shut off valves, plug leaks, pump tanks etc. to stop the release. c) Absorb the material using sand or other material. d) Plug drainage inlets/outlets. e) Redirect flows to a holding area if possible. f) Excavate contaminated soils. 5. Clean up all contaminated material. Clean out catch basins, tanks or basins contaminated by the material. Excavate contaminated soils or absorbent material. Follow instructions given by EPA staff for final clean up action. 6. Properly store, label and document the wastes for disposal. 7. Notify Clarence Valley Council that a spill or leak has occurred and plan for disposal of waste material. 8. Clean and service all emergency equipment. Replenish supplies of absorbent material, etc. recommend and perform maintenance on containment systems. 9. Complete a McLennan Earthmoving Incident/Hazard and report a full account of the incident including date, time, volume, material and response taken. 10. The EPA must be notified of any reportable incident immediately by phone and a provide a written advice within 7 days of the incident, with the following information: a) Site name and location. b) Description and volume of material involved. c) Time and date of spill or leak. d) Assessment of damage and response taken. e) Remedial action planned, or assistance needed. 11. Review PIRMP for changes needed to make it more effective. Page 11 of 22

12 NOTES: In all cases if spillage is on or near water, prevent the spread of the product using a suitable barrier. Complete information regarding the physical properties, chemical names and required safety precautions can be found in the Safety Data Sheets (SDS) located at the site. MINIMISING HARM TO PERSONS ON / NEAR THE SITE Emergency Management Key Responsibilities (pre-emergency) The Managing Director (or his delegate) is responsible for: The effectiveness and accuracy of the Emergency Plan and Emergency Guidelines Procedures. Maintenance of staff training in emergency preparedness, emergency information lists and emergency-related plant and equipment necessary for emergency response and/or evacuation. Co-ordination of evacuation exercises (drills). Post-emergency / exercise review. Emergency Management Methods The Site has an Emergency Plan. A complete copy of the Plan shall be retained on site, and is displayed in the Administration Office. This plan forms part of the overarching Duncans Quarry Safety Management System. Chief Emergency Controller (during and post-emergency) The Emergency Controller for Duncans Quarry is: Managing Director Phil McLennan Ph: Responsibilities include: Immediately responding to any emergency (or having a nominated delegate who can do so). Ascertaining the nature of the emergency and determining appropriate actions. Ensuring the appropriate emergency services have been notified. Co-ordinating the deployment of staff and any internal specialist resources. Where safe to do so take steps to contain or control the hazard. Co-ordinating post-incident recovery strategies. Staff, Employees and Contractors Responsibilities include: Attendance of any emergency preparedness training. In the event of emergency event, report all emergency incidents to the Managing Director. Follow instructions given in the event of an emergency. Co-operate with emergency personnel in the event of an emergency. When safe to do so take steps to contain or control the hazard. Page 12 of 22

13 Emergency Warning and Communications System UHF Radios in all plant, weighbridge and vehicles, mobile phones. Verbal communication with staff. Duncans Quarry is equipped with emergency sirens, which are to be used during an emergency In the event of a failure of the radio, landline telephone, emergency warning system and messages may be relayed via mobile phone or runner/driver. Fire-Fighting Appliances The site facilities are equipped with various fire-fighting appliances which are strategically located throughout the site offices and plant as per the Emergency Response Plan. Location of Extinguishers Fire extinguishers are found in the following locations: On mobile plant and in the site office. In the machinery sheds The equipment shall comply with the relevant Australian Standards and be appropriately signposted. Fire-fighting equipment shall be regularly checked and serviced. This will involve both internal inspections as well as test and tagging by certified tester. The Managing Director (or his delegate) acts as the Fire Warden for this site. Incident and Accident Reporting If an injury is sustained to an employee, contractor or visitor, or an incident occurs, the following contingencies have been put into place: If an ambulance is required, one will be called for immediately and 1 st aid applied until they arrive. There are trained and accredited First Aid Officers on site and present during normal business hours. The contact number of the First Aid Officer is displayed at the Site office. All injuries shall be reported to the Managing Director (or his delegate) immediately and recorded on the Register of Injury Form (SF-3.10) as soon as practicable after injury. All injuries will also be investigated immediately, and corrective actions instigated in accordance with McLennan Earthmoving s Health and Safety Management System. First Aid Equipment Locations Site Office (includes defibrillator) In the Dry Plant Control Room In all vehicles In most items of mobile plant Page 13 of 22

14 EMERGENCY RESPONSE AND EVACUATION PLAN Discovering a dangerous situation In the case of an uncontrollable fire, or immediate life-threatening hazard, if it is obvious that it is not safe to manage the situation yourself or with help of other personnel, immediately contact Emergency Services on 000 or 112 (mobile) and provide them with the details of the emergency. Answer the operator's questions as calmly and clearly as you can. Address: 3281 GWYDIR HIGHWAY, JACKADGERY NSW 2460 Nearest Cross Road: Purgatory Creek Road, Jackadgery NSW 2460 Contact Name 1: Give the operator YOUR name and contact number. The person who contacts the Emergency Services is the 1 st Contact and MUST stay on the phone to the services until teams have been deployed or you have been advised that it is clear to disconnect from the call. Contact Name 2: Phil McLennan If the situation is not immediately life threatening or out of control and it is necessary, deploy other personnel on site to administer first aid (if trained), shut down plant, remove plant from the area and contact Phil McLennan to advise of situation while you stay on the phone to the emergency services until they arrive on site. Report to the person in charge of the emergency services immediately upon their arrival to site. Once emergency services arrive on site, follow their instructions to ensure best safety results for all personnel on site, as well as minimising potential pollution incidents. If evacuation is decided If the safety delegate decides an evacuation is necessary, "emergency, emergency, emergency" is to be called over the UHF channel 34 and then over UHF channel 40 (to ensure that all personnel on site as well as those entering or leaving are advised of evacuation), while the emergency alarms are being activated. All personnel are to move quickly to the Emergency Assembly Point on the left of the weighbridge (heading toward site exit). Do not waste time collecting documents or personal items. If you are unable to get to the Emergency Assembly Point, make contact via UHF radio or phone contact to advise your health status and location, and then take all available steps to ensure your safety until Emergency Services can get to you. The safety delegate is responsible to ensuring personnel on site are accounted for; nobody is to reenter the site until Emergency Services have deemed it to be safe. In the event of a missing person, the emergency services controller will authorise a search only if it is safe to do so. Under no circumstances will anybody carry out an unauthorised search. Page 14 of 22

15 If emergency services are not required FIRE: If you discover a fire, assess the surrounding area for additional ignition points, then if it is safe to do so, quickly put the fire out, using either a fire extinguisher or if small area only, a fire blanket. Once the immediate threat of fire is over, contact Manager or other available personnel to come to the location and confirm that the fire hazard is eliminated, and any potential re-ignition points have been cleared away from fire site. Hazardous situation: If you discover a potentially hazardous situation, report immediately to safety delegate or Manager and let them know if you require assistance to safely remove the hazard. If you are unable to decide about how to manage the situation, but it is not an emergency, ask other personnel to come to site to assess the situation. Once the situation has been assessed, take whatever action is necessary to safely remove the hazard. Advise Phil McLennan: of the situation. In all the above scenarios, a Hazard/Incident Report is to be filed (SF-03.06) and reviewed by safety delegate and management, and safe work procedures and site housekeeping are to be reviewed to reduce risk of recurrence. First aid If First Aid assistance is required contact the relevant First Aid attendant. First Aid attendant lists can be found in the Site office. Any injured people who can be moved safely should be taken to the nearest assembly area (whichever is more appropriate) for treatment. Those people who are trapped or unable to be removed immediately must be protected, and given First Aid on the spot (providing it is safe to do so). Media liaison No person other than the following can authorise or divulge any information to the media: Phil McLennan Managing Director Any form of contact from the media should be referred to the Managing Director, under all circumstances. Communication plan with relevant parties In the event of an emergency, depending on the wind and weather conditions, surrounding properties may be able to hear the emergency sirens, but there is no residential property in the immediate vicinity of the quarry. The adjoining land is mostly vacant land. Emergency equipment The site is maintained and operated to minimise the possibility of a fire, explosion or release of polluting materials. The following communications, fire protection, spill control and clean up equipment are available on site in case of an emergency. This equipment is inspected and maintained as necessary to ensure its proper operation, if / when a pollution incident should occur. Two Way Radio maintenance as required Portable Fire Extinguishers inspected annually or as needed First Aid Kits replenished as required and inspected annually Water hose available and water trucks kept filled Spill Station Control Kit Hand shovels Page 15 of 22

16 STAFF TRAINING The current induction process for workers and visitors covers training and awareness of emergency procedures including management of pollution incidents. A training program on hazardous waste and polluting materials management has been incorporated into the company s emergency response training programme and is updated as necessary. All new employees and relevant contractors will receive training in the PIRMP. Refresher training of existing employees and relevant contractors will be undertaken every 2 years. LIST OF RELEVANT DOCUMENTS AND PROCEDURES Environmental Protection Licence (Ref # 13248) McLennan Earthmoving Management System Overview, Incorporating Quality, Safety & Environment (refer Smarter Safety portal) Site Hazardous Materials Register & SDS file (refer Smarter Safety Portal) Various company SWP s and SWMS s (refer Smarter Safety Portal) ATTACHMENTS (see following pages) Environmental Protection Licence (Ref # 13248) EM-13 Spill Control Emergency Guidelines Procedure (WHS-04) Company Incident Report Form (SF-03.06) Page 16 of 22

17 ATTACHMENTS Section 55 Protection of the Environment Operations Act 1997 Environment Protection Licence Licence Licence Details Number: Anniversary Date: Licensee 15-June MCLENNAN EARTHMOVING PTY LIMITED PO BOX 7 SOUTH GRAFTON NSW 2460 Premises DUNCANS QUARRY GWYDIR HIGHWAY JACKADGERY NSW 2460 Scheduled Activity Extractive activities Fee Based Activity Land-based extractive activity Region Scale > T annual capacity to extract, process or store North - North Coast NSW Govt Offices, 49 Victoria Street GRAFTON NSW 2460 Phone: (02) Fax: (02) PO Box 498 GRAFTON NSW 2460 Page 17 of 22

18 INTEGRATED MANAGEMENT SYSTEM MANUAL QUALITY-WORK HEALTH & SAFETY-ENVIRONMENT Revision No: 003 Revision Date: 20/10/16 Document No: EM-13 SPILL CONTROL Procedure This procedure shall be followed to ensure McLennan Earthmoving Pty Ltd meets its Community responsibilities towards the Environment by responding appropriately to any spill likely to create environmental damage. In order to undertake effective spill control and clean up, it is important to; Be prepared Control the spill Contain the spill Clean up the spill Ensure workers are properly trained Be Prepared As a contingency, the following recommendations regarding spill control should be adopted. Regularly inspect and maintain hoses and fuel lines on plant and equipment for leaks or damage before they burst or fail. Ensure a spill kit or alternative material is available on site to use in the event of a spill. At the site induction all personnel should be made aware of the location of the spill kit or clean up materials. Advise the site supervisor if a spill occurs. If a spill is too large or you are unable to clean it up or it has resulted in a significant environmental impact, the EPA should be contacted to advise the company on the appropriate method of clean up. The client should also be notified where required. Workers must wear and be trained in appropriate Personal Protective Equipment before undertaking any clear up. Identify the material/substance & how best to respond before commencing work. Do NOT enter confined spaces to respond to a spill without responding to the above. Control the Spill If a spill occurs, identify the source and assess whether it can be controlled (stopped) in a safe manner. Contain the Spill Stop the spill from spreading. This can be done using absorbent materials such as sand. Clean Up the Spill Soak up the spill with absorbent material and ensure the surface is left clean. (Absorbent, particulate, sand and earth should not be used to absorb spills in water. Absorbent booms and pads can be obtained which are especially designed for water spills). Material used to clean up the spill should be disposed of accordingly. Material used to clean up the spill should be placed in a drum labelled Spill Kit Waste. When this drum is full it should be removed from site as prescribed waste. Refer to Work Instruction Disposal of Prescribed Waste. In some instances an EPA licensed tanker may be required to vacuum up the liquid. Replacement of Spill Kit Contents The contents of the spill kit should be replaced as soon as possible to ensure materials are available in the event of another spill occurring. Controlled Document Authorised & Approved by Management Page 1 of 1 Page 18 of 22

19 INTEGRATED MANAGEMENT SYSTEM MANUAL QUALITY-WORK HEALTH & SAFETY-ENVIRONMENT Document No: WHS-04 EMERGENCY GUIDELINES PROCEDURE Revision No: 003. Revision Date 20/10/2016 Procedure Being prepared for emergency situations will ensure that any damage, injury, trauma or other consequences are minimised. Both internal and external emergency situations can affect the safety of staff and clients of McLennan Earthmoving Pty Ltd. Internal emergencies are those that endanger staff and clients whilst at McLennan Earthmoving Pty Ltd premises and include; fire, sabotage and bomb threat, medical emergencies and hazardous material spills. External emergencies are those that occur outside of McLennan Earthmoving Pty Ltd premises but are still a part of the working environment. External emergencies include road traffic accidents, or an emergency on the job site. Whilst workers/contractors are working on a client site they should follow all rules relating to emergencies as per client guidelines. Process: Internal Emergency Office Report emergency situation immediately to your supervisor. Supervisor will assess the emergency and phone for emergency services if required. External Emergency Report emergency situation immediately to your Team Leader or if alone you will need to make the emergency call. Team Leader will assess the emergency and phone for emergency services if required. Whilst 000 should be dialled in the first instance, 112 may be a helpful secondary resource if you are out of your network operator's coverage area but within the coverage area of another network. If an emergency occurs and you are alone (eg vehicle accident) you will need to advise your supervisor of the emergency as soon as it is practicable after the incident and when it is safe to do so. If working on a client site report all emergencies immediately to site manager. If the accident/incident is a Workcover NSW reportable incident the accident/incident site must be preserved until a Workcover NSW inspector arrives or directs otherwise. Some important points to remember when dialling emergency numbers: Answer the call taker s questions as calmly and clearly as you can and stay on the line until they advise you it is ok to hang up. The call taker may ask for your call back number so they can contact you again whilst the emergency service is on its way to you. Page 19 of 22

20 Once an emergency has been reported: Establish the direction from which the emergency vehicle will be coming from. Station a responsible person at a suitable site to guide the emergency vehicle to the accident site. If necessary, prepare a safe path for the emergency vehicle. Medical Emergency (additional information in the First Aid procedure) First Aid officer to initiate usual first aid procedures. Make the injured person as comfortable as possible without moving them until the ambulance arrives. Use the Priorities of Patient Management (refer to First Aid procedure.) The First Aid officer is in charge of the casualty until the emergency services rive. Fire Emergency (additional information in the Fire Protection procedure) Use fire extinguisher to contain fire only if safe to do so. Move all site personal to a safe area and await fire brigade. Gas Cylinder Emergency Turn off cylinder valves- only if safe to do so- evacuate the area and wait for emergency services instructions. Power Line Emergency Follow the emergency guidelines set down in procedure for Overhead Electrical Wires Environmental Emergency Response In the event of a Spill or contamination of product causing reaction. Assess damage/injury..contain spill if safe to do so; Evacuate the area if necessary and await emergency services. Emergency Services Contacts Emergency services contacts (Emergency Phone Numbers sheet SF-3.14) will be displayed near all phones. Material/Product Spill. Hazardous material/dangerous goods spills may occur on sites. In the event that a hazardous material/dangerous good is spilt the Manager must be contacted immediately. Attempt to clean up spill with spill kit, only if safe to do so. Contact the emergency services on 000 if required. Provide as much information about the hazardous material/dangerous good as possible. If the spill is a suspected flammable material; Remove any ignition sources. Evacuate all persons in immediate danger and await instruction from the fire brigade. Do not attempt to re- enter the affected areas until all clear is given. The nature of the spill should be assessed and it s potential for entry into water courses. Spill kits may be used to prevent this from happening. Depending on the type, size and location of spill it may be a legal requirement to inform the following authorities; Fire Service. Police. Environmental Protection Agencies (only contacted by management). Page 20 of 22

21 Sabotage and Bomb Threat A bomb warning is a notice received by any means of an explosive or any other hazardous device having been placed to cause risk or damage to McLennan Earthmoving Pty Ltd business. All bomb threats are to be treated seriously. Necessary actions and precautions must be taken to minimise danger to the public, workers and the premises until the risk has been removed or until the warning has been proven to be unfounded. Quick and accurate communications are essential. Staff who may have to handle initial communications will be thoroughly familiar with these procedures. Members of the press, other news media and the public must not be admitted into the area in which the bomb etc. may be located. Sabotage and Bomb Alerts The person taking the call should: Remain calm. If possible, attract their Supervisor/ Manager s attention or share the call with another person. Take notes during phone call. If possible keep the caller talking by asking questions to continue the conversation, such as: When will it go off? Hour or time remaining? Where located? What kind of bomb? Why did the person choose this location? Complete the Bomb Threat Report (SF-03.1) noting: Male/ Female voice; Accent/ voice pitch/ noticeable remarks; Background noise- if any. All information attained must be passed to the supervisor/ manager immediately. Supervisor/ Manager to arrange evacuation of area and will notify the Police, Bomb Squad etc. Emergency Evacuation Plans Emergency evacuation plans and procedures will be displayed in the offices of McLennan Earthmoving Pty Ltd and on the Health & Safety Notice Boards. Emergency Drill Emergency drills are essential for all staff, clients and subcontractors to practice safe exiting McLennan Earthmoving Pty Ltd offices as quickly and safely as possible. Emergency drills are a necessary precaution and will be held at irregular intervals. At least 1 emergency drill will be held per year. An emergency evacuation plan detailing the emergency assembly area will be posted at all exits of buildings and on the notice board. The manager/fire warden will signal the commencement of an emergency drill. On hearing the signal staff/clients will be required to exit their work station/ work area in an orderly fashion, moving quickly and quietly to the emergency evacuation assembly area and should listen for additional instructions given by the manager. Staff and clients are to remain at the assembly area until the manager/fire warden has given the all clear. Once the all clear is given staff/clients should return promptly to their work area. On completion of the Emergency Evacuation Drill the Operations Manager and fire warden will assess the efficiency of the drill and detail results on the Practice Evacuation Report SF These reports will be used to make necessary changes to evacuation procedures to ensure their effectiveness in operation and to document that an emergency drill has been completed. Page 21 of 22

22 INTEGRATED MANAGEMENT SYSTEM MANUAL QUALITY-WORK HEALTH & SAFETY-ENVIRONMENT Revision No: 003 Revision Date: 20/10/16 Document No: SF-03.6 INCIDENT / HAZARD REPORT Name, address, licence number of driver(s) involved: Details of property damage: DETAILS OF THE PERSON COMPLETING THIS FORM Name: Signature: Contact number: Date: INVESTIGATION List contributing factors: List corrective action to prevent recurrence of incident: If required, was the incident reported to Workcover (if so, provide details)? If vehicle accident, is an insurance claim being submitted (if so, please attach a copy of the claim form)? Investigators name: Signature: Position: Date: Page 22 of 22

PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN PETERSONS QUARRY POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Prepared for: Quarry Solutions Pty Ltd Date: September 2016 File Ref: documents / 1837_610_004r2 Page i Document Control Job Details Ref no.:

More information

Bogo Operations Pollution Incident Response Management Plan

Bogo Operations Pollution Incident Response Management Plan Bogo Operations Pollution Incident Response Management Plan Rhyolite Hard Rock Aggregate Quarry 134 Paynes Road BOOKHAM NSW 2582 PO Box 426 COWRA NSW 2794 p: 02 6227 7260 p: 02 6345 4253 e: info@bogoquarry.com.au

More information

Pollution Incident. Response. Management Plan

Pollution Incident. Response. Management Plan Pollution Incident Response Management Plan Revised 2016 0 Pollution Incident Response Management Plan 1. Purpose & Scope. 2 2. Process 2 2.1 Definition of a pollution incident. 2 2.2 Description & likelihood

More information

Pollution Incident Response Management Plan Austrak Wagga Wagga

Pollution Incident Response Management Plan Austrak Wagga Wagga - 1/16 Workplace Name: Location: Dampier St, Bomen NSW Document Ref. PIRMP Wagga Wagga Effective Date : Nov 2012 Revision Revision Date Description Reviewed Approved 01 Nov. 2012 Development for License

More information

Emergency Response Plans

Emergency Response Plans PO Box 2114 Woonona East NSW 2517 (WOLLONGONG) PTY LTD Ph: 0417 420 760 Fax: 02 4283 2216 A/H: 02 4283 7727 EPA Licence: 11788 ABN: 57 079 336 799 Unit 11 Lot 1 York Place Woonona NSW 2517 Emergency Response

More information

Pollution Incident. Response. Management Plan

Pollution Incident. Response. Management Plan Pollution Incident Response Management Plan Revised JULY 2018 0 Pollution Incident Response Management Plan 1. Purpose & Scope. 2 2. Process 2 2.1 Definition of a pollution incident. 2 2.2 Description

More information

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN Harwood Slipway Pty Ltd 162 (Lot 1 DP128593 and Lot 2 DP536378) River Road, Harwood Island NSW Coffey Geotechnics Pty Ltd ABN 93 056 929 483 1/18 Hurley Drive

More information

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN

SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN SPILL CONTINGENCY AND EMERGENCY RESPONSE PLAN All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, without the written

More information

Pollution Incident Response Management Plan (PIRMP)

Pollution Incident Response Management Plan (PIRMP) Pollution Incident Response Management Plan (PIRMP) Honeycomb Drive, Eastern Creek NSW EPA Licence No. 494 Crushing, Screening or Separating Plan approved by: Name Title Approved Katie McElhone Regional

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan 27 Foundation Rd, Truganina 3029 Nov 2016 Contents 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. Pollution Incident Response Management Plan 1 What is "the

More information

Pollution Incident Response Management Plan EMU PLAINS ROOFING. Version Five: 18 April Emu Plains Roofing PIRMP-V5. 1 of 36

Pollution Incident Response Management Plan EMU PLAINS ROOFING. Version Five: 18 April Emu Plains Roofing PIRMP-V5. 1 of 36 Pollution Incident Response Management Plan EMU PLAINS ROOFING Version Five: 18 April 2017 Emu Plains Roofing PIRMP-V5 1 of 36 DOCUMENT CONTROL SHEET Rev. Date Prepared by Approved By Revision Details

More information

CAPRAL LIMITED PENRITH SITE

CAPRAL LIMITED PENRITH SITE CAPRAL LIMITED PENRITH SITE ENVIRONMENTAL EMERGENCY PLAN & POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN April 2017 Table of Contents REFERENCE DOCUMENTS... 4 1. INTRODUCTION... 5 1.1 SITE INFORMATION...

More information

MINE SAFETY MANAGEMENT SYSTEM Pollution Incident Response Management Plan

MINE SAFETY MANAGEMENT SYSTEM Pollution Incident Response Management Plan BERRIMA COLLIERY MINE SAFETY MANAGEMENT SYSTEM Document No: Revision No: Authorised: Berrima Colliery V7 Public Version Regional Environment Manager NSW/ACT Table of Contents 1 Objectives... 3 2 Document

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Issue date: July 2013 Page 1 of 9 Contents 1. PREVENTATIVE MECHANISMS: 1(a) Hazards to health and the environment Page 3 1(b) Pollutant Inventory Page 4 1(c)

More information

SUPAGAS PTY LTD POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

SUPAGAS PTY LTD POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN SITE: INGLEBURN CONTENTS 1 INTRODUCTION 4 1.1 Background... 4 1.2 Aim of the Emergency Response Plan... 4 1.3 Definition of a Pollution Incident... 4 2 OBJECTIVES

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

Faculty/School: Pharmacy Initial Issue Date: Oct 2016

Faculty/School: Pharmacy Initial Issue Date: Oct 2016 Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate corrective actions

More information

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS

Section J. How to develop safety elements for project safety management system. How to develop safety elements for project SMS Section J How to develop safety elements for project safety management system 1. Once the project management has developed or adopted a safety policy, it needs to develop safety elements to meet the objectives

More information

Pollution Incident Response Management Plan PEATS RIDGE QUARRY. Version Eight: 18 th July Peats Ridge Quarry PIRMP_V8.

Pollution Incident Response Management Plan PEATS RIDGE QUARRY. Version Eight: 18 th July Peats Ridge Quarry PIRMP_V8. Pollution Incident Response Management Plan PEATS RIDGE QUARRY Version Eight: 18 th July 2017 Peats Ridge Quarry PIRMP_V8 1 of 35 DOCUMENT CONTROL SHEET Rev. Date Prepared by Approved By Revision Details

More information

Section 38 Brieser Construction SH&E Manual

Section 38 Brieser Construction SH&E Manual Brieser Construction SH&E Manual April 2015 The purpose of this plan is to document spill prevention and response requirements. Spill Prevention https://brieserconstruction.sharepoint.com/safety/safety/safety

More information

Appendix 4C - Sample SWMS Trenching

Appendix 4C - Sample SWMS Trenching Appendix 4C - Sample SWMS Trenching SAFE WORK METHOD STATEMENT SWMS Reference : Insert document number : Version A Date : Workplace / Project : Company Address: Work Activity / Job / Task or Process :

More information

HAZARDOUS INCIDENT SITE SAFETY PLAN

HAZARDOUS INCIDENT SITE SAFETY PLAN HAZARDOUS INCIDENT SITE SAFETY PLAN NOTE: A site-specific Site Safety Plan must be developed and implemented for each site where investigators may potentially be exposed to hazardous substances while conducting

More information

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY

CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY CONTRACTOR WHS HAZARD STANDARD HAZARDOUS CHEMICALS EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition

More information

CONTRACTOR SAFETY INDUCTION HANDBOOK

CONTRACTOR SAFETY INDUCTION HANDBOOK CONTRACTOR SAFETY INDUCTION HANDBOOK As a valued contractor for Total Group we would ask that you read and carefully consider the details included in this document. Total Group carry out work for a number

More information

In an emergency the safety of all personnel and the public is of priority.

In an emergency the safety of all personnel and the public is of priority. P272 : Emergency Planning & Response This DOCUMENT and any linked FORMS have been created to provide specific requirements under the Amalgamated Operating System. For additional information and guidance,

More information

WHS CONTRACTOR INFORMATION PACKAGE

WHS CONTRACTOR INFORMATION PACKAGE WHS CONTRACTOR INFORMATION PACKAGE Introduction This information package provides Informa exhibitors and contractors with important information that will be required to plan and manage work on all stages

More information

2.23 Pollution Incident Response Management Plan W

2.23 Pollution Incident Response Management Plan W 2.23 Pollution Incident Response Management Plan W This Pollution Incident Response Management Plan (PIRMP) has been prepared for the Airport East Precinct, Mascot (NSW) Project (the Project) and should

More information

How severely could the risk hurt someone?

How severely could the risk hurt someone? Safe Work Method Statement No: WMS-08 Task: Install Drainage This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Pollution Incident Response Management Plan HALL QUARRY. Version Seven: 31st August Hall Quarry PIRMP_V7. 1 of 37

Pollution Incident Response Management Plan HALL QUARRY. Version Seven: 31st August Hall Quarry PIRMP_V7. 1 of 37 Pollution Incident Response Management Plan HALL QUARRY Version Seven: 31st August 2017 Hall Quarry PIRMP_V7 1 of 37 DOCUMENT CONTROL SHEET Rev. Date Prepared by Approved By Revision Details 01 20 Aug

More information

Health and Safety Policy

Health and Safety Policy Snowflake School Policy Reviewed September 2018 To be reviewed September 2019 Roy English Health and Safety Policy 1. STATEMENT OF INTENT The Trustees of Snowflake School will take steps to meet their

More information

Risk Analysis- Sulfuric Acid

Risk Analysis- Sulfuric Acid Sulfonation of LAB with 98% Sulfuric Acid Risk Analysis- Sulfuric Acid Being exothermic reaction, Sulfonation reaction has the potential hazard of causing serious accident. Detailed systematic HAZOP study

More information

Spill response Procedure

Spill response Procedure Spill Response Procedure 1. Introduction A number of materials with the potential to be hazardous to the environment are used and stored at the University. This procedure defines the emergency procedures

More information

Work Activity (e.g. Road Work): Work Location:.

Work Activity (e.g. Road Work): Work Location:. Working with Cranes Work Activity (e.g. Road Work): Work Location:. GENERAL INFORMATION Hinchinbrook Shire Council Lannercost Street Ingham Qld, 4850 ABN 46 291 971 168 Ph: 47764610 All personnel conducting

More information

Pollution Incident Response Management Plan EMU PLAINS QUARRY. Version Eight: 5 th July Emu Plains Quarry PIRMP-V8. 1 of 39

Pollution Incident Response Management Plan EMU PLAINS QUARRY. Version Eight: 5 th July Emu Plains Quarry PIRMP-V8. 1 of 39 Pollution Incident Response Management Plan EMU PLAINS QUARRY Version Eight: 5 th July 2017 Emu Plains Quarry PIRMP-V8 1 of 39 DOCUMENT CONTROL SHEET Rev. Date Prepared by Approved By Revision Details

More information

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine

Release: 1. UEPOPL002A Licence to operate a reciprocating steam engine Release: 1 UEPOPL002A Licence to operate a reciprocating steam engine UEPOPL002A Licence to operate a reciprocating steam engine Modification History Not applicable. Unit Descriptor Unit Descriptor 1)

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY WYMONDHAM RUGBY FOOTBALL CLUB HEALTH AND SAFETY POLICY Wymondham RFC Version 1 Revision 4 Wednesday, 27 July 2016 Page 1 1. Health and Safety Policy Statement In accordance with the regulations detailed

More information

Awaba Waste Pollution Incident & Emergency Response Plan

Awaba Waste Pollution Incident & Emergency Response Plan Procedure Awaba Waste Pollution Incident & Emergency Response Plan Table of Contents Table of Contents... 1 Awaba Waste Pollution Incident & Emergency Response Plan... 2 Purpose... 2 Site Description...

More information

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual)

GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) GUIDELINES FOR SLUG DISCHARGE MANAGEMENT PLAN (Abstract from EPA Guidance Manual) 1. An IU Slug Control Plan must include sufficient general information to enable the POTW to: (1) categorize and restrict

More information

Bitumen Delivery Driver Inductions Eurobitume UK

Bitumen Delivery Driver Inductions Eurobitume UK Bitumen Delivery Driver Inductions Eurobitume UK The information in this module is given in good faith and belief in its accuracy at the time of publication, but does not imply any legal liability or responsibility

More information

Emergency Response Policy

Emergency Response Policy EIS for 2010-2029 FSP Section 14-170 October 1, 2001 Emergency Response Policy The Tembec Forest Resource Management Pine Falls Operations is committed to the highest level of emergency preparedness to

More information

Work Health & Safety Event Safety Checklist Small Event

Work Health & Safety Event Safety Checklist Small Event Note: This checklist relates to the Bedford Park site and contains information specific to that site. Other sites can use the checklist but may need to adapt the information. This documentation must be

More information

Two phases have been established for the classification of incidents to help in determining the appropriate course of action;

Two phases have been established for the classification of incidents to help in determining the appropriate course of action; 1.0 CLASSIFICATION OF AN EMERGENCY SITUATION Two phases have been established for the classification of incidents to help in determining the appropriate course of action; Alert phase, and Emergency phase.

More information

B S Glass Ltd Safety procedures- outsourced Workplaces

B S Glass Ltd Safety procedures- outsourced Workplaces B S Glass Ltd Jan 17 B S Glass Ltd Safety procedures- outsourced Workplaces Index - - - - - - - - Page No On Site safety - - - - - - - - - - - - - - - - - - - Content 3. 1.00 Health and Safety Mission

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

EMA, Inc. SITE SAFETY PLAN

EMA, Inc. SITE SAFETY PLAN EMA, Inc. SITE SAFETY PLAN A. SITE DESCRIPTION JOB NAME: JOB NUMBER: DATE: PLAN REVISION NUMBER: SITE ADDRESS: Additional Site / Project Information: B. SCOPE OF WORK 1. 2. 3. 4. 5. 6. C. ONSITE ORGANIZATION

More information

2.0 Management Systems and Documentation

2.0 Management Systems and Documentation SHE Rules BOW142.3 1.0 Introduction This document details the safety, health and environment rules that apply to anyone accessing Arqiva sites and describes the standards of performance expected. This

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

SAFETY AND OSHA GUIDELINE CURRICULUM

SAFETY AND OSHA GUIDELINE CURRICULUM SAFETY AND OSHA GUIDELINE CURRICULUM CertiLearn - Non-Industrial OSHA Safety Guidelines These courses are ideal for any small business or non-industrial environment Safety Basics In this course you will

More information

BICETSER RUFC HEALTH & SAFETY POLICY

BICETSER RUFC HEALTH & SAFETY POLICY BICESTER RUGBY FOOTBALL CLUB HEALTH & SAFETY POLICY 2016 HEALTH & SAFETY POLICY HEALTH AND SAFETY POLICY Health and Safety Policy Statement In accordance with the regulations detailed under the Management

More information

SOP. Working in Confined Spaces

SOP. Working in Confined Spaces Purpose This procedure outlines the requirements for the management of entry into confined spaces in all work areas with the intention of minimising risks to health and safety from any potential hazards

More information

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/

Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041. Name Date Signature. Author Geoff Selfe 25/01/2016. Reviewed Solomon Site 25/01/ Potable Water Truck Safe Work Procedure PTES_HSE_SWP_041 Name Date Signature Author Geoff Selfe 25/01/2016 Reviewed Solomon Site 25/01/2016 ----- Approved Michael Garkaklis 25/01/2016 Key Safety Acts Complete

More information

Meuangvang Development Co.LTD Standard Working Procedure 012 Hydrocarbon Spill Response

Meuangvang Development Co.LTD Standard Working Procedure 012 Hydrocarbon Spill Response 1. Application To provide a standard work practice for as required in accordance with Meuangvang Development Co Ltd Safety Management Program 2. Revision Schedule Rev # Old Section Ref New Section Ref

More information

Health & Safety Contractor rules

Health & Safety Contractor rules Health & Safety Contractor rules Contents 1. Introduction... 1 2. The legal bit explaining our terminology... 1 2.1 Legal requirements... 1 3. Our health and safety requirements... 1 3.1 Access to BT premises...

More information

Boral Building Products. Pollution Incident Response Management Plan Narooma. Version 1 Revision 4: 13 th October 2016

Boral Building Products. Pollution Incident Response Management Plan Narooma. Version 1 Revision 4: 13 th October 2016 Boral Building Products Pollution Incident Response Management Plan Narooma Version 1 Revision 4: 13 th October 2016 Narooma PIRMP Version 1 Revision 4 1 of 28 Site Map Operational areas with potential

More information

SOPAN O & M COMPANY PVT. LTD.

SOPAN O & M COMPANY PVT. LTD. Introduction: The purpose of this health, safety and environmental (HSE) manual is to inform YOU about the factors affecting your personal safety during the time you are working with our clients. Study

More information

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030

SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 SAFE WORK METHOD STATEMENT WORKING IN CONFINED SPACE HSE NET NAT SWMS APAND00030 HIGH RISK APT AM Holdings Pty. Ltd. [ABN] 95124754383 Principal Contractor (PC) APA Group Level 19, HSBC Building 580 George

More information

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading

Instructions for the Use of the Excel Spreadsheet. There are Three tabs at the bottom of this worksheet. Instructions tab is the one you are reading Instructions for the Use of the Excel Spreadsheet There are Three tabs at the bottom of this worksheet Instructions tab is the one you are reading H&S Plan Tab The Plan Tab is the front cover pages of

More information

Introduction to Emergency Response & Contingency Planning

Introduction to Emergency Response & Contingency Planning & Contingency Planning Rationale Why is it important for you to learn this material? Designed for those who may witness a release, this is an introductory course designed to help ensure those who are likely

More information

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN

SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH M ABN SH&E Work Method Statement Concrete Cutting & Drilling Fast Cut Qld Pty Ltd, 91 Basalt, GEEBUNG PH 07 3265 6537 M 0411 756 719 ABN 45 081 359 613 OHS-FRM-100 Rev 11 (07/18) Page 1 SH&EWMS No.: F-C-QLD-30

More information

GUIDANCE FOR MANAGING THE RISKS ASSOCIATED WITH END OF LIFE LPG VEHICLES

GUIDANCE FOR MANAGING THE RISKS ASSOCIATED WITH END OF LIFE LPG VEHICLES GUIDANCE FOR MANAGING THE RISKS ASSOCIATED WITH END OF LIFE LPG VEHICLES NSW QUAD BIKE SAFETY IMPROVEMENT PROGRAM SNAPSHOT 2016 17 Disclaimer This publication may contain information about the regulation

More information

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200

WORK HEALTH SAFETY MANAGEMENT SYSTEM First Aid Policy & Procedure WHS2200 Issued by: WHS Effective Date: 1 Oct 13 Rev: A Page 1 of 7 1. Purpose Hockey NSW is committed to preventing work -elated injuries and illness from occurring, however, if an accident or injury occurs, Hockey

More information

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and

! Subpart D - Contingency Plans and Emergency Procedures (40 CFR to ) (EPA regulations adopted by NJDEP); and APPENDIX D EMERGENCY PROCEDURES IN PUBLIC SECONDARY SCHOOLS IN THE EVENT OF A CHEMICAL SPILL There are five major sources of regulations that are potentially applicable to emergencies involving a chemical

More information

Emergency Response Plan Supervisor Version

Emergency Response Plan Supervisor Version Emergency Response Plan Supervisor Version Emergency Response Planning means having the right information, training and equipment to respond safely when an injury or other unexpected event occurs. Minor

More information

Fire Safety Hot Work Permit Policy/ Procedures

Fire Safety Hot Work Permit Policy/ Procedures Fire Safety Hot Work Permit Policy/ Procedures INTRODUCTION Serious fires frequently occur during maintenance and construction operations, where work is proceeding on either machinery, plant or the fabric

More information

Safe Work Method Statement (SWMS)

Safe Work Method Statement (SWMS) Safe Work Method Statement (SWMS) Organisation Details : Organisation Name Northern Plumbing Contact ABN 17 15 41 4 Position Director Address 47 Thomas Street Edgeworth 85 Phone Number 0411 10 4 Project

More information

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal, Overview In accordance with the Quattro Ports Safety, Health and Environmental Policy - Safety First is paramount to Quattro Ports. Our employees and contractors are our most important asset and their

More information

Accident/Incident Reporting and Investigation Procedures

Accident/Incident Reporting and Investigation Procedures Accident/Incident Reporting and Investigation Procedures Policy reference Workplace Health and Safety Policy Procedure reference Workplace Health and Safety Risk Assessment Procedures Procedure It is imperative

More information

Drum / cylinder handling

Drum / cylinder handling Page 1 of 8 Drum / cylinder handling This Technical Measures Document covers the storage and handling of toxic and flammable substances in drums and cylinders and refers to relevant codes of practice and

More information

Best Practice Guideline EMERGENCY PROCEDURE FOR A QUARRY

Best Practice Guideline EMERGENCY PROCEDURE FOR A QUARRY Best Practice Guideline EMERGENCY PROCEDURE FOR A QUARRY www.aspasa.co.za February 2015 Aspasa has developed a draft procedure to provide the basis for an effective emergency procedure for a quarry. This

More information

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN).

Confined Spaces. This procedure applies to all workers of the Diocese of Maitland Newcastle (DoMN). Purpose To provide guidance in controlling the risks associated with confined spaces including identifying confined spaces, working in a confined space and issuing confined space entry permits. Scope This

More information

Hazardous substances in transit depots

Hazardous substances in transit depots NOVEMBER 2013 1 November 2013 Hazardous substances in transit depots Substances that are in transit and are awaiting delivery to their final destination are held at transit depots. This could include circumstances

More information

Memorandum of Understanding Operational Protocols

Memorandum of Understanding Operational Protocols Memorandum of Understanding Operational Protocols Between The Chief Fire Officer Association (Scotland) Representing the Scottish Fire and Rescue Services and The Scottish Environment Protection Agency

More information

DISASTER MANAGEMENT PLAN

DISASTER MANAGEMENT PLAN CHAPTER-VII DISASTER MANAGEMENT PLAN 7.1 INTRODUCTION 7.1.1 Definition A major emergency in a works is one, which has the potential to cause serious injury or loss of life. It may cause extensive damage

More information

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK

CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK CONSTRUCTSAFE TIER 1 HEALTH AND SAFETY COMPETENCY TEST FRAMEWORK ConstructSafe Project Team March 2018 Version 1.3 1 Table of Contents 1. Introduction... 3 2. Candidate minimum required knowledge... 3

More information

The Sample Company Pty Ltd

The Sample Company Pty Ltd Job Safety and Environmental Analysis (JSEA) / Safe Work Method Statement (SWMS) Part 1: Project and Task Identification Process Initiators of SWMSs are responsible for consulting the Project Supervisor,

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan Document Version 001 September 2015 Author Kathryn Odgers Manager Planning & Development North West Recycling Centre Revision Date March 2017 Document Version

More information

EQUIPMENT, AND SUPPLIES. Delivering Environmental, Industrial, and Emergency Solutions

EQUIPMENT, AND SUPPLIES. Delivering Environmental, Industrial, and Emergency Solutions BASIC SPILL PREPAREDNESS, EQUIPMENT, AND SUPPLIES Delivering Environmental, Industrial, and Emergency Solutions Training Objectives Response Strategies before Help Arrives What potential receptors surround

More information

Competency type. positions. All workers (including contractors), higher degree students and volunteers

Competency type. positions. All workers (including contractors), higher degree students and volunteers Appendix A Training Required for Work Health & Safety Training WHS general and/or site/work specific induction of the emergency procedures and assembly areas Local first aid provisions. of hazards and

More information

Creative Solutions for your compliance burdens

Creative Solutions for your compliance burdens The Dell Group, Inc. Creative Solutions for your compliance burdens Emergency Spill Response Team Development Hazardous Waste Operations and Emergency Response HAZWOPER OSHA 29 CFR 1910.120(q) Compliance

More information

Contractor handbook. Purpose

Contractor handbook. Purpose Page no: 1 / 6 Contractor handbook Purpose Mitie aims to ensure that the highest levels of performance are achieved by all persons working for us or on our behalf. We require the same level of performance

More information

LPG SAFETY INFORMATION. Kwik-Gas. Safety Manual. Less talk more energy

LPG SAFETY INFORMATION. Kwik-Gas. Safety Manual. Less talk more energy LPG SAFETY INFORMATION Kwik-Gas Safety Manual Less talk more energy CONTENTS Introduction to the Kwik-Gas program 2 Emergency and contact information 2 Emergency procedures 3 First aid Instructions for

More information

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992

RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 RISK ASSESSMENT A UNIVERSITY GUIDE TO PRACTICAL RISK ASSESSMENT UNDER THE MANAGEMENT OF HEALTH AND SAFETY AT WORK REGULATIONS 1992 PERSONNEL DIVISION REVIEWED AUTUMN 1999 CONTENTS Page 1 INTRODUCTION 1

More information

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD)

INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) INADVERTENT RETURN PLAN FOR HORIZONTAL DIRECTIONAL DRILLING (HDD) FACILITY OPERATOR: NextEra Energy Resources, LLC 700 Universe Boulevard Juno Beach, FL 33408 For Horizontal Directional Drilling Contents

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL SAFE -14 Page 1 of 8 U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL FUNCTION Safety TOPIC Hotwork Permit Program OBJECTIVE(S): GENERAL POLICY: To provide a work atmosphere that is conducive to

More information

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide)

Recommended Facilitator Notes: (read the following text out-loud to participants while showing this slide) Slide 1 Confined Space Entry for General Industry These materials have been developed based on applicable federal laws and regulations in place at the time the materials were created. The program is being

More information

FIRE HYDRANT TESTING METHOD STATEMENT.

FIRE HYDRANT TESTING METHOD STATEMENT. SUBJECT: TASK: FIRE HYDRANT INSPECTION & TESTING. 1. Location....1 2. The Scope of Works.... 1 3. Description of Task.... 1 4. Access & Egress to & from Work Area.... 2 5. Safety Hazard Identification....

More information

Harbour Town Gold Coast Site Induction

Harbour Town Gold Coast Site Induction Harbour Town Gold Coast Site Induction At Harbour Town Gold Coast we believe that safety is integral to the way we do business. We are committed to operating a safe environment for all where we are incident

More information

Health, Safety and Welfare Policy

Health, Safety and Welfare Policy Health, Safety and Welfare Policy This Policy is prepared in accordance with section 2(3) the Health and Safety at work etc. Act 1974, with the intention of promoting a safe working environment that will,

More information

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities.

Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such activities. 11/13/1995 4 5/20/2013 1 of 10 Authority and Scope Regulation: 29 CFR 1910.146 Scope: This plan applies to all personnel, including contractors, who enter or work in confined spaces, or supervise such

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry

CIVIL INFRASTRUCTURE HEALTH, SAFETY, AND ENVIRONMENT Describe protection of health, safety and environment in the civil infrastructure industry 1 of 8 level: 3 credit: 7 planned review date: October 2006 sub-field: purpose: Civil Works and Services This unit standard is a component of the selfregulation system for operations in the civil infrastructure.

More information

Pollution Incident Response Management Plan NULON PRODUCTS AUSTRALIA PTY LTD

Pollution Incident Response Management Plan NULON PRODUCTS AUSTRALIA PTY LTD NULON PRODUCTS AUSTRALIA PTY LTD Table of Contents 1. INTRODUCTION... 2 2. PURPOSE... 2 3. DEFINITIONS... 2. RELATIONSHIP WITH OTHER DOCUMENTS... 3 5. REGULATORY REQUIREMENTS... 3 6. RESPONSIBILITIES...

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Hot Work Document Number OHS-PROC-128 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro PS Mica

More information

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide

RIIWMG203D Drain and Dewater Civil Construction Site Learner Guide RIIWMG203D Drain and Dewater Civil Construction Site Table of Contents 1.1 Introduction... 3 1.1.1 Drainage and Dewatering... 3 1.2 Site Policies and Procedures... 5 1.3 Work Instructions... 6 1.3.1 Reading

More information

Safe Work Method Statement Tasks

Safe Work Method Statement Tasks Safe Work Method Statement Tasks SWMS Venue: Date Created: Address: Contact: Adelaide and surrounding suburbs 23 rd August 2017 27 Valetta Rd Kidman Park SA 5025 Daniel Renshaw CONTROLLED DOCUMENT Page

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine.

(2) but does not include a shaft, trench or tunnel that is a mine or is part of the workings of a mine. Health and Safety Procedure - Confined Spaces Section 1 - Background and Purpose (1) Confined spaces are, for the purposes of this procedure, defined as the following which is the definition under the

More information

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014.

Contractor Control Procedures. Contractor Control Procedures. Working Together. November Borders College 24/11/2014. Working Together Contractor Control Procedures November 2014 Borders College 24/11/2014 1 Working Together 1. Introduction This procedure aims to control the health and safety of contractors working on

More information

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL

IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL IGO GROUP SAFETY STANDARD 30 - WORKPLACE VENTILATION INDEPENDENCE GROUP NL CONTENTS 1. INTENT... 3 2. APPLICATION... 3 3. UNDERGROUND VENTILATION... 3 3.2 Underground Ventilation Officer... 3 3.3 Risk

More information