MEDIUM (Branch Chief) LOW (Line Supervisor)

Size: px
Start display at page:

Download "MEDIUM (Branch Chief) LOW (Line Supervisor)"

Transcription

1 Form (Nov. 2011) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT RISK MANAGEMENT WORKSHEET Southern Nevada District - BLM 1. Organization and Location Red Rock/Sloan Field Office BLM/ Las Vegas/NLCS/LLNVS Operation / Task Canyon Clean-Up 4. Beginning Date: 01/01/ Prepared by (Name / Duty Position) Calvet Howell/Park Ranger/Volunteer Coordinator 5. Ending Date: Indefinite 2. Page 1 of 6 6. Date Prepared 10/07/ Identified Hazards 9. Assess the Controls: (May Be Filled in By Getting scratched or stuck by plants. Wear gloves, long-sleeve shirt, and long pants. Volunteers will be advised to wear long sleeves and pants. Gloves will be provided to all volunteers who participate. Team leads will remind volunteers to wear their gloves during project activities. 14. Remaining Level After Control Measures Are Implemented: (CIRCLE HIGHEST REMAINING RISK LEVEL) LOW (Line Supervisor) MEDIUM (Branch Chief) HIGH (District Manager) ETREMELY HIGH (Must be State Director/Associate) 15. RISK DECISION AUTHORITY: (Approval/Authority Signature Block) (If Initial Level is Medium, High or Extremely High, Brief Decision Authority at that level on Controls and Control Measures used to reduce risks) (Note: if the person preparing the form signs this block, the signature indicates only that the appropriate risk decision authority was notified of the initial risk level, control measures taken and appropriate resources requested; and that the risk was accepted by the decision authority.) (Signature)

2 Back strain/injury. Know your weight lifting capacity and get help if needed. Lift using leg muscles. Keep back straight. Allergic reaction to plants. Wear gloves, long-sleeve shirt, and long pants. Volunteers will be asked if they have any know allergies to the local plants. Team leaders will instruct volunteers the proper way to lift and lower heavy objects. Volunteers will be advised to wear long sleeves and pants. Gloves will be provided to all volunteers who participate. All team leads will be required to attend a safety briefing the day before and the day the event. Gloves will be handed out at registration. Team leads will remind volunteers to wear their gloves during weed removal. Other hazards Poisonous plants Insects/animals Broken glass, cans, garbage Local safety personnel will provide the team an overview of other hazards the participants may be exposed to and offer remedies that routinely help ensure that participants are not exposed to these hazards. Be careful where you place your hands and feet. Also, be aware of plants used for replanting that are sharp or thorny. Coordinate with the local safety person to ascertain the hazards the team may be exposed to. Entry into areas will not be made until routine and known non-routine hazards are identified and the risks mitigated. Illegal drug activities Hostile people Lightning and Thunderstorms Law enforcement will be used as appropriate and be provided by the BLM LEOs and local police. Heavy rain, hail, and lightening occur only occur in the mature stages of a thunderstorm. Keep informed; know what the storm is doing. Involvement of the local safety person may include safety briefing to the team as well as coordination of law enforcement. When there is no shelter, avoid tall objects such as lone trees. If only isolated trees are nearby or if you are in open country, the best protection is to make yourself as small a target as possible. Drop to your knees, bend forward with your hands resting on your 2

3 knees, and keep a distance of twice the height of the nearest tree between you and the tree. Advise team members that if they feel an electrical charge, if their hair stands on end, or their skin tingles, a lightning strike may be imminent. Bug bites or stings. Wear gloves, long-sleeve shirt, and long pants. Wear bug repellent. Survey area and avoid areas with high concentration of bees and/or ants. Volunteers will be advised to wear long sleeves and pants. Gloves will be provided to all volunteers who participate. Gloves will be handed out at registration. Team leads will remind volunteers to wear their gloves during weed removal. Team leads will survey the project site and avoid areas that have high concentrations of bees or ants. Working around spiny/pointed plants. Working on uneven ground, steep slope. Weather Hot/Cold Cactus and other desert plants have sharp leafs and or spines. Working around them improperly may result in injury. Ensure the volunteers are briefed on safe handling techniques, including the use of tools. Wear proper boots. Watch where you step. Side step up or down the slope. Plant your feet and ensure a stable footing and body position prior to doing any labor. In hot weather wear a long sleeved shirt, hat, sunglasses, and sun block. Have and drink an ample amount of water to prevent dehydration. Do not over exert in high temperatures and take ample rest Conduct a tool safety briefing on site prior to work. Use proper tools, and PPE s; Heavy Gloves, eye protection, hat and proper footwear. Ensure not flip flops are wore. Work boots with high tops should be worn. Demonstrate proper step techniques and stable work positions. All team members will monitor not only their own condition but that of their team mates. Conducted on site by project supervisor. Project supervisor must ensure people use PPE s and use proper movement and work techniques up and down slope. On site supervisor to make the observations using the buddy check system. Monitor fluid intake of each person working the site. 3

4 Lifting/Carrying Heavy or awkward loads Biohazard and Blood Borne Pathogen exposure. Environmental hazards: Dust and wind Dust induced blindness, chapped skin. breaks. In cold weather wear layered clothing. Keep warm, but do not overheat and sweat. Wear water resistant and breathable clothing. In severe cold temperature keep out of the wind. Hot weather: Sun/wind burn, Dehydration, Heat exhaustion, and Heat stroke. Cold weather: Sun/wind burn, Chilblains, Frostnip, Frostbite, and Hypothermia. During the course of the events heavy or awkward materials must be moved to the work site. When lifting or carrying heavy/awkward loads use proper lifting techniques, (use your legs, not your back). Get help to carry the object if needed. Report locations when found, for properly trained personnel to remove. Use proper hand washing with soap and water after handling of all wastes. Sanitize equipment used in cleaning, label all contaminated equipment until it can be sanitized. Dust and wind are constant hazards: dress appropriately and consider carrying eye drops to mitigate the effects of dust in the eyes. Team leader will ensure that water is made available for all team members, that rest breaks are scheduled, and that the team is aware of their heat stress. Ensure proper PPE s are being worn (dressed for the weather). Use Sunscreen. Layered clothing. Ensure enough water is being taken in by everybody. Demonstrate proper lifting techniques and proper tool safety during the safety briefing. Training and personal protection and knowledge. Adhering to OSHA Standard 2 CFR All team members must protect themselves in the event of high winds and dust, by wearing the proper personal protection equipment and proper clothing. Supervisor assures employee has been trained and understands appropriate and safe field procedures in severe weather conditions. Conducted on site by the project supervisor. Supervisor assures that the employee has the training and personal protection equipment. Supervisor ensures employees are trained, supervisor/crew leaders ensure compliance. 4

5 Environmental hazards: Poisonous snakes Snakebite Environmental hazards: Fire Untrained personnel in an active fire zone. Using hand tool such as shovels, trash grabbers and rakes. If a poisonous snake is encountered: retreat. In the event of snakebite, follow first-aid procedures and transport the victim to the hospital immediately. If a recently ignited fire is observed, contact Dispatch with the location in Township & Range, and Section and retreat from the area. Use proper tools and ensure they are in good condition for the project. Use tools properly, and be aware of your surroundings at all times. Ensure the volunteers are briefed on proper tool etiquette and safe handling techniques. Be careful of sharp edges on all tools. When a tool is not use make sure they are placed in a safe manner with sharp end down. Wear gloves to prevent blisters. Major Medical. Breaks, concussions, strokes, heart attacks, etc 5 All team members will need to watch where they put their hands and feet. Supervisors will brief team members the best they can on snake habitats. All team members must understand they are not trained to fight fires and that they must adhere to the safety regulations and retreat to the nearest safety area. Team leads will demonstrate the proper and safe use of hand tools to the volunteers. Team leads and volunteers will read manufacturer s instructions on tool use. Use the proper tool for the job. Hand Tools 29 CFR Ensure the people who are coming to work are able do the job. Maintain a stocked first aid kit, and have first aid trained personnel on site. Ensure proper communications and be aware of your surroundings. Supervisor ensures employees are trained, supervisor/crew leaders ensure compliance. Supervisor/crew leaders ensure employees are in compliance. Supervisor assures the employees and team leads are trained and understands safe and appropriate hand tool use. All team leads will be required to attend a safety briefing the day before and the day the event. Ensure all safety briefings have been conducted and they are being followed. The site supervisor will carry a charged portable radio on their person at all times, and be in contact with the Visitor Center. They will also know how to contact LAME Dispatch via radio and activate the 911 sequence when required. Minor Medical Cuts, abrasions, sprains, and back Maintain a stocked first Ensure all safety briefings

6 aches. aid kit, and have first aid trained personnel on site. have been conducted and they are being followed. Driving POV Ensure the drivers are legally insured, licensed drivers, and do not appear to be under the influence of medications, or other substances. Drive posted speed limits, maintain safe following distance, wear seat belts, and minimize driver distractions. Reduce speed on nonpaved roads; check in and out with Visitor Center staff. On site supervisor ensures the drivers are legally insured, licensed drivers, and do not appear to be under the influence of medications, or other substances. Ensure the operators have checked the vehicles for operational safety. Project manager conducts visual inspection of drivers and vehicle paperwork. Project manager conducts visual inspection of POV s to be used. Driving GOV s to work sites Drive posted speed limits, maintain safe following distance, wear seat belts, and minimize driver distractions. Reduce speed on non-paved roads; check in and out with Visitor Center staff. BLM Manual Handbook Topic 4 Motor and Equipment Safety Annual inspections, monthly inspections, proper servicing, peruse vehicle inspection before driving, require Defensive Driving training, and off road driving training. Supervisor assures employee is trained and certified. In house and online training. Use buddy system when possible going to remote sites. 6

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Visual Bridge Inspection Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:

More information

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC

A Health & Safety Risk Management Tool that you can use today. Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC A Health & Safety Risk Management Tool that you can use today Scott Norman, CIH, CSP Health & Safety Program Manager Bay West LLC I m a safety geek What are the hazards of your work environment? Who is

More information

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE Name Department Initial Orientation Date Supervisor Review Instructions: Check off each section once you have read and discussed it with your Supervisor. EMPLOYEE SAFETY ORIENTATION - PHYSICAL PLANT, RESIDENCE

More information

Date of Site Visit: Project Site Location: Contract Number: Task Order Number: Contractor s Name: Contractor s Address: Prepared by: Signature: Date:

Date of Site Visit: Project Site Location: Contract Number: Task Order Number: Contractor s Name: Contractor s Address: Prepared by: Signature: Date: U.S. ARMY ENGINEERING AND SUPPORT CENTER, HUNTSVILLE (USAESCH) ABBREVIATED ACCIDENT PREVENTION PLAN (AAPP) NOTE: For Site Visits only. (Please type or print) Date of Site Visit: Project Site Location:

More information

MINOR (Associate/Assistant Mgr. / Branch Chief)

MINOR (Associate/Assistant Mgr. / Branch Chief) Form 1112-5 (May 2012) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT RISK MANAGEMENT WORKSHEET 1. Organization and Location: Bureau of Land Management / Grand Junction Field Office

More information

Example Outdoor Education Risk Assessment

Example Outdoor Education Risk Assessment 1. General information Type of activity: Location: Date(s): Time(s): Adult to student ratio: Nearest Hospital A&E (including tel. number): For rural settings Site grid reference: OS map sheets: Mobile

More information

Risk Assessment Form

Risk Assessment Form Risk Assessment Form School Activity Risk Assessment conducted by: Consultation occurred with: (names & role) Description of activity being assesses Batchelor Outdoor Education Centre Bush Walking Michelle

More information

EMA, Inc. SITE SAFETY PLAN

EMA, Inc. SITE SAFETY PLAN EMA, Inc. SITE SAFETY PLAN A. SITE DESCRIPTION JOB NAME: JOB NUMBER: DATE: PLAN REVISION NUMBER: SITE ADDRESS: Additional Site / Project Information: B. SCOPE OF WORK 1. 2. 3. 4. 5. 6. C. ONSITE ORGANIZATION

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Traineeship Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE: / /

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT AUGER / POST HOLE DIGGER Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

What is an induction? Contribute to OH&S Processes

What is an induction? Contribute to OH&S Processes What is an induction? Session 2 Contribute to OH&S Processes Types of Induction New Employee Induction Site Inductions Equipment Inductions Activity 2.1 Induction Description What is a Hazard? Session

More information

Possible Outcomes of inadequate climatic cold management:

Possible Outcomes of inadequate climatic cold management: COMPOSITE RISK MANAGEMENT (COLD WEATHER INJURY PREVENTION) A comprehensive cold weather injury prevention and management program will follow the principles of composite risk management by identifying hazards,

More information

OFFICE OF STATE HUMAN RESOURCES

OFFICE OF STATE HUMAN RESOURCES OFFICE OF STATE HUMAN RESOURCES NUMBER: PPE-1 TOTAL PAGES: 8 SUBJECT: Personal Protective Equipment Program Effective Date: Revision Date: Revision #: RELATED LEGISLATION: The purpose of this program is

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT WATER PUMP - PETROL Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

HOW-TO CONDUCT A WEEKLY SAFETY MEETING

HOW-TO CONDUCT A WEEKLY SAFETY MEETING HOW-TO CONDUCT A WEEKLY SAFETY MEETING 1. Hold the meeting on the job, preferably where everyone can sit and relax. 2. Hold the meeting at the beginning of the shift, right after lunch, or after a break.

More information

Guide to Safety in the Science Classroom

Guide to Safety in the Science Classroom ECC Health & Science Building Guide to Safety in the Science Classroom SC 1000 Laboratory Safety for Students East Central College 1964 Prairie Dell Road ~ Union, Missouri 63084 Phone: (636) 584-6500 ~

More information

Cold Weather Safety Program

Cold Weather Safety Program Title: Cold Weather Safety program Effective Date: 12/6/2014 Control Number: THG_0052 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015 Cold Weather Safety Program CONTENTS I. INTRODUCTION

More information

Hooded Plover Volunteer Risk Assessment Matrix

Hooded Plover Volunteer Risk Assessment Matrix Task / Project Title Hooded Plover Monitoring, Nest Protection, Chick Wardening Date of Assessment 5.12.2013 Site / Location Victorian & South Australian coastline Permit to Work Requirement Date of Site

More information

Safety Plan for Sole Proprietors

Safety Plan for Sole Proprietors Safety Plan for Sole Proprietors SAFETY POLICY Safety Policy for (Company Name) It is the policy of that safety is a number one priority and to provide as safe a workplace as possible for all of our colleagues

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SWMS No. 09 SEED COECTION Barung andcare Assoc Inc 38A Coral St, Maleny Qld, 4552 Tel: 07 5494 3151 Email: info@barunglandcare.org.au ABN: 48 562 796 065 VERSION CONTRO Original version Date of this version

More information

Personal Protective Equipment

Personal Protective Equipment Personal Protective Equipment General This section addresses eye, face, head, hand and foot protection. respiratory and hearing protection. Separate programs exist for Employees will be provided personal

More information

Laboratory Personal Protective Equipment & Hazard Assessment Tool

Laboratory Personal Protective Equipment & Hazard Assessment Tool Laboratory Personal Protective Equipment & Hazard Assessment Tool This form must be completed by the person in charge of the laboratory, with the guidance of the Chemical Hygiene Officer to conduct a laboratory

More information

PERSONAL PROTECTIVE EQUIPMENT FOR CHEMICAL EXPOSURES

PERSONAL PROTECTIVE EQUIPMENT FOR CHEMICAL EXPOSURES Page 1 of 5 1.0 PURPOSE: Use of an appropriate ensemble of personal protective equipment (PPE) creates a second line of defense against exposure to hazardous chemicals. Engineering controls, such as fume

More information

Farnsfield Parish Council Risk Assessment Litter Picking

Farnsfield Parish Council Risk Assessment Litter Picking Farnsfield Parish Council Risk Assessment Litter Picking Organisation: FARNSFIELD PARISH COUNCIL Date of Assessment: June 2016 Name of Assessor: Rachel Waterfield Date of Review: June 2017 No 1 Physical

More information

Appendix C Health and Safety Guidelines for investigators

Appendix C Health and Safety Guidelines for investigators 38 Appendix C Health and Safety Guidelines for investigators Introduction Investigations must be conducted in a safe manner. This document provides an overview of the health and safety guidelines investigators

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT LOADING AND UNLOADING VEHICLES Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

MAFES Horticultural Facilities AREA-SPECIFIC SAFETY TRAINING GUIDANCE

MAFES Horticultural Facilities AREA-SPECIFIC SAFETY TRAINING GUIDANCE MAFES Horticultural Facilities AREA-SPECIFIC SAFETY TRAINING GUIDANCE Each University of Maine employee, Faculty, graduate student, and undergraduate shall take the University of Maine Basic Safety Training

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT C H A P T E R 9 PERSONAL PROTECTIVE EQUIPMENT 9.1. General Personal protective equipment (PPE) when properly used and maintained saves lives and reduces injury and illness. PPE includes equipment for eyes,

More information

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc.

CONSTRUCTION SAFETY PROGRAM FOR. Golder Acoustics Inc. CONSTRUCTION SAFETY PROGRAM FOR Golder Acoustics Inc. TABLE OF CONTENTS Topic... Page Safety and Health Policy... 2 Safety and Health Objectives... 3 Job Site Inspections... 4 Contractor Safety Administrator...

More information

Safe Work Method Statement

Safe Work Method Statement Company Name: Safe Work Method Statement Site Address: Other Details: Contractor: Activity/Trade: Electrician Date: TASKS List the tasks required to perform the activity in sequence carried out. Entry

More information

1.1 OHS Policy and Responsibilities

1.1 OHS Policy and Responsibilities 1.1 OHS Policy and Responsibilities At Canadian Rope Access Specialists Inc. safety is our primary concern and the health and safety of our employees, clients and contractors is of paramount importance

More information

WORK METHOD STATEMENT TERMITE PROTECTION

WORK METHOD STATEMENT TERMITE PROTECTION ORGANISATION DETAILS Organisation Name: Gedoun Constructions Pty Ltd Contact Name: Joe Gedoun ACN/ABN: 52 284 873 581 Contact Position: Director Address: PO Box 1138, Townsville QLD 4810 Contact Phone

More information

Job Hazard Analysis Analysis by:

Job Hazard Analysis Analysis by: Job Analysis Possible s or Task Machinery e.g. Mowers Chainsaws Grinders Floor polisher Power tools Weed trimmers Sweepers Snow blowers Hedge trimmer Tiller Auto scrubbers Burnishers Ford tractor Sand

More information

PERSONAL PROTECTIVE EQUIPMENT

PERSONAL PROTECTIVE EQUIPMENT 13.0 The purpose of this program is to ensure that, where applicable, the appropriate and necessary personal protective equipment (PPE) is selected and provided to employees to protect from illness or

More information

University of Vermont Department of Physical Plant Personal Protective Equipment Program

University of Vermont Department of Physical Plant Personal Protective Equipment Program University of Vermont Department of Physical Plant Personal Protective Equipment Program REVISED AND DISTRIBUTED BY: THE UNIVERSITY OF VERMONT DEPARTMENT OF PHYSICAL PLANT TRAINING AND COMPLIANCE OFFICE

More information

ASSOCIATED DOCUMENTS:

ASSOCIATED DOCUMENTS: Medtronic ENT Rev. C Ref. 9.0 Page 1 of 5 1.0 PURPOSE: 1.1. The personal protective equipment (PPE) program is provided to decrease exposure to job-related hazards. This program identifies responsibilities,

More information

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents

Effective Date: 24-April-2017 Version: 6 Page: 1 of 8 TITLE: SAF-370, PERSONAL PROTECTIVE EQUIPMENT GUIDELINES. Table of Contents 24-April-2017 Version: 6 Page: 1 of 8 Table of Contents 1.0 Introduction... 2 1.1 Purpose... 2 1.2 Scope... 2 1.3 Definitions... 2 1.4 Responsibilities... 3 Environmental Health and Safety Office (EHSO),

More information

TASK DAY RISK ASSESSMENT FORM

TASK DAY RISK ASSESSMENT FORM TASK DAY RISK ASSESSMENT FORM Assessment date Location and Activity details: Site Address Step One - Identify the activity and hazards Consider the activity or work area and identify if any of the hazards

More information

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs

JOB SAFETY ENVIRONMENT ANALYSIS (JSEA) Working With In Situ Testing Rigs Personnel Involved Manager Project Operators Assistant Notes re Operator/Off-Sider Training Allan McConnell In situ testing is a niche business with very few rigs in Australia. There are no specific training

More information

NC DWM Underground Tank Section SITE HEALTH AND SAFETY PLAN

NC DWM Underground Tank Section SITE HEALTH AND SAFETY PLAN NC DWM Underground Tank Section SITE HEALTH AND SAFETY PLAN A. General Information Site Name ID # Location Proposed Date of Investigation: Date of Briefing: Date of Debriefing: Nature of Visit (check one):

More information

Environmental Health & Safety Policy Manual

Environmental Health & Safety Policy Manual Environmental Health & Safety Policy Manual Issue Date 8/24/2009 Updated: 5/8/2018 Policy # EHS-400.03 Personal Protective Equipment 1.0 PURPOSE: In order to protect the health of employees and students,

More information

Manual Handling Procedure

Manual Handling Procedure Manual Handling Procedure Table of Contents 1 Purpose... 3 2 Scope... 3 3 Definitions... 3 4 Responsibilities... 3 4.1 Managers And Supervisors... 3 4.2 Workers (Employees, Contractors And Visitors)...

More information

Compliance Requirements

Compliance Requirements Compliance Requirements The compliance requirements for OSHA s Personal Protective Equipment regulations are very straightforward, and logical. GENERAL REQUIREMENTS (29 CFR 1910.132) The general OSHA Personal

More information

Doc #: 1000-AD Revision: - HEAT/COLD STRESS AWARENESS POLICY. Author(s): Tammie Lavoie, John Dunlop

Doc #: 1000-AD Revision: - HEAT/COLD STRESS AWARENESS POLICY. Author(s): Tammie Lavoie, John Dunlop Doc #: 1000-AD-015-0018 Revision: - HEAT/COLD STRESS AWARENESS POLICY Author(s): Tammie Lavoie, John Dunlop TABLE OF CONTENTS REVISION HISTORY... 3 1.0 INTRODUCTION... 4 2.0 PROGRAM FOCUS... 4 3.0 HAZARDS

More information

Personal Protective Equipment

Personal Protective Equipment Northland Community & Technical College June 1, 2017 Personal Protective Equipment Safety Officer Cory Feller Chemical Hygiene Officer Kristel Kizer Telephone: 218-683-8633 1 Personal Protective Equipment

More information

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN

Safe Work Method Statement LRB TREE SERVICES 6 Behland St, Kearneys Spring QLD, 4350 ABN JOB NO: PROJECT: DATE: 1/1/2018 SWMS NO: SWMS 001.1 PREPARED BY: LUKE BLINCO REVISED BY: ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: MINIMUM PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIREMENTS

More information

BSO Plus ANNUAL SAFETY REFRESHER 2015

BSO Plus ANNUAL SAFETY REFRESHER 2015 The BSO Plus Safety Refresher is an annual checkpoint designed from the content in BSO Plus. Completing this refresher is a requirement for the Basic Safety Recertification (BSR) course, so please ensure

More information

Pre-control risk estimate. Likelihood Risk

Pre-control risk estimate. Likelihood Risk Activity Consequence s mitigation measures Site Access & Egress Slips, trips & falls al injury by falling. Sprains & broken bones. Site operatives 3 4 12 Ensure access to site is kept clear of plant &

More information

Keep Lancing Lovely RISK ASSESSMENT FOR LITTER PICKS ON MONKS RECREATIONAL GROUND IN LANCING, WEST SUSSEX

Keep Lancing Lovely RISK ASSESSMENT FOR LITTER PICKS ON MONKS RECREATIONAL GROUND IN LANCING, WEST SUSSEX Community Group: KEEP LANCING LOVELY Date of Assessment: 16th MAY 2016 Name of Assessor: ANDREW BROOK Date of Review: 16th H MAY 2016 1 Sharp Objects Glass, needles, nails etc. e.g. Needle stick injury

More information

FIELDWORK RISK ASSESSMENT FORM

FIELDWORK RISK ASSESSMENT FORM FIELDWORK RISK ASSESSMENT FORM SECTION 1: GENERAL DETAILS AND APPROVAL FIELDWORK DETAILS Fieldwork type: Undergraduate Postgraduate Research Other: Fieldwork description: Subject name (if applicable):

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-02 Task: Concreting, Formwork and Steel Fixing This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia)

More information

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College

HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College HAZARDOUS WASTE OPERATIONS AND EMERGENCY RESPONSE PLAN Kenyon College PURPOSE The purpose of this Emergency Response Plan is to plan for and execute an organized response to hazardous waste spills or releases

More information

Climbing & Abseiling Activity Plan

Climbing & Abseiling Activity Plan Climbing & Abseiling Activity Plan CONTENTS Outcomes... 2 Activity... 2 2.1 Outline... 2 2.2 Equipment... 2 2.3 Communication... 3 2.4 First Aid... 3 People... 4 3.1 Activity Instructor... 4 3.2 School

More information

Contractor OHS Induction. AOHS-05-GUI September 2016

Contractor OHS Induction. AOHS-05-GUI September 2016 Contractor OHS Induction AOHS-05-GUI-002 8 September 2016 1 About AQWEST AQWEST is a Government Trading Enterprise responsible for supplying drinking water to Bunbury. Formed in 1906 as the Bunbury Water

More information

31. COTTON CHIPPING THE HAZARD. Picture HAZARD IDENTIFICATION. Picture

31. COTTON CHIPPING THE HAZARD. Picture HAZARD IDENTIFICATION. Picture 31. COTTON CHIPPING The aim of this document is to provide guidance to farm managers / owners on the hazards to health and safety associated with cotton chipping, assessment of the risks associated with

More information

SAFE WORK METHOD STATEMENT SWMS No Version

SAFE WORK METHOD STATEMENT SWMS No Version SAFE WORK METHOD STATEMENT SWMS No Version Company Name: Hunter Readymixed Concrete Pty Ltd 00 004 Location: Thornton Cessnock Tea Gardens Gateshead ABN: 6 076 08 695 SWMS Developed By: Duane Harrison

More information

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS)

WHS OHS HAZARD REGISTER (SITE AND OFFICE OPERATIONS) WHS 017 - WHS 017 Hazard Register - Version 5.0 April 20 Doc No: WHS 017 Effective Date: 04/04/20 1 WORKING WITH EARTHMOVING PLANT/ TRUCKS/SITE VEHICLES COLLISIONS OTHER PLANT EQUIPMENT SITE VEHICLES PERSONNELL

More information

SAFE WORK METHOD STATEMENT

SAFE WORK METHOD STATEMENT SAFE WORK METHOD STATEMENT EXCAVATION OR TRENCHING Prepared for Client: Rural Construction & Maintenance Pty Ltd Project No: 1 Site: 660 Great Ocean Road, Bellbrae Date Prepared: 29/07/2015 1. RESPONSIBILITIES

More information

Potential risk of injury to staff

Potential risk of injury to staff Register Fire, Earthquake - other Emergencies Manual Handling and Repetitive Work Repetitive, Forceful Work Poor Housekeeping Not Wearing PPE (Personal Protective Equipment) Potential risk of injury to

More information

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #16 RECOMMENDED GUIDELINES FOR SAFETY WITH PYROTECHNIC SPECIAL EFFECTS

INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #16 RECOMMENDED GUIDELINES FOR SAFETY WITH PYROTECHNIC SPECIAL EFFECTS INDUSTRY WIDE LABOR-MANAGEMENT SAFETY COMMITTEE SAFETY BULLETIN #16 RECOMMENDED GUIDELINES FOR SAFETY WITH PYROTECHNIC SPECIAL EFFECTS Safety Bulletin #16 This Safety Bulletin applies to pyrotechnic materials

More information

Use of Biosafety II cabinets

Use of Biosafety II cabinets RISK ASSESSMENT FORM Use this form to assist you to complete risk assessments for hazardous activities and processes. Any serious or ongoing hazards should be reported via RiskWare to ensure that appropriate

More information

Risk Assessment for Team Builders

Risk Assessment for Team Builders Risk Assessment for Team Builders Reviews Completed By Revision Date Approved By Approval Date R Shanks 19/07/2018 A Daykin 19/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5

PERSONAL PROTECTIVE EQUIPMENT PROGRAM INTERNAL AND EXTERNAL PAGE: 1 DEPARTMENT: ALL OF: 5 INTERNAL AND EXTERNAL PAGE: 1 1.0 OBJECTIVE The Federal Occupational Safety and Health Administration (OSHA) requirements for personal protective equipment (PPE) are presented in 29 CFR 1910.132 General

More information

Swimming Pool Risk Assessment - Management Plan

Swimming Pool Risk Assessment - Management Plan Swimming Pool Assessment - Management Plan Activity Content The Swimming Pool provides a group the opportunity to engage in unstructured aquatic activity including free swim time and recreational pool

More information

Health and safety policy

Health and safety policy Health and safety policy This is the statement of general policy and arrangements for: Overall and final responsibility for health and safety is that of: Day-to-day responsibility for ensuring this policy

More information

Emergency Action Plan Information and Procedures

Emergency Action Plan Information and Procedures Emergency Action Plan Information and Procedures Elements of Risk Management: 1. Identification Prior to hosting an event, traveling to a competition, or competing in any other activity clubs should work

More information

Cranbrook & District Angling Club. Water Venues. Risk Assessments

Cranbrook & District Angling Club. Water Venues. Risk Assessments Cranbrook & District Angling Club Water Venues Assessments February 208 / / / / Venue: Saw Lodge Farm Lakes Assessor: Dave Sherwood TechIOSH RMaPS Date: February 208 Assessment No: at Working farm Electric

More information

Method Statement Author

Method Statement Author Plan Bee Limited 3.3 Etna Industrial estate Clamp Road Motherwell Scotland ML2 7XQ Tel: 01698580572 Method Statement Method Statement Details Method Statement Number 7 Method Statement Date Monday 3rd

More information

STANDARD OPERATING PROCEDURE (SOP): URETHANE

STANDARD OPERATING PROCEDURE (SOP): URETHANE TEMPLE UNIVERSITY A Commonwealth University Environmental Health & Radiation Safety (EHRS) STANDARD OPERATING PROCEDURE (SOP): URETHANE LABORATORY/USER INFORMATION Principal Investigator (PI): Phone #

More information

Safe Work Procedures Abandoned Waste Collection

Safe Work Procedures Abandoned Waste Collection Safe Work Procedures Abandoned Waste Collection Purpose To provide staff members who collect abandoned garbage with guidelines for the identification of waste items which could be potentially hazardous;

More information

Volunteer Agreement MOU

Volunteer Agreement MOU R8 ATC (Att. 2C), Page 1 of 6 Modified March 2013 Department of the Interior National Park Service 1. WORK PROJECT/ACTIVITY Trailwork Volunteer Agreement MOU 2490-05-001 2. LOCATION 3. UNIT Appalachian

More information

ACTIVITY Driving Motor Vehicles (on road) and Transport

ACTIVITY Driving Motor Vehicles (on road) and Transport ACTIVITY Driving Motor Vehicles (on road) and Transport Vehicle collision, road accident, fatigue, dehydration Appropriate drivers licence Obey Tasmanian Road Rules Take frequent breaks from driving to

More information

Safe Work Method Statement

Safe Work Method Statement Title Skid Steer Operation (Bobcat) SWMS No. 14 Authorized and email Signed by the (Managing Director / CEO / Partner / Proprietor) on Date 01/08 /2016 Safe Work Procedure for the Work:- Yes No Employees

More information

US Pipelines & Logistics Contractor Toolkit

US Pipelines & Logistics Contractor Toolkit US Pipelines & Logistics Contractor Toolkit Contents Q4 2016 Golden Rules spotlight Permit to work, hot work WYE? Working in cold weather HSSE safety share Hand safety Performing Authority duties Good

More information

EXPOSURE TO THE COLD. November 6, 2013

EXPOSURE TO THE COLD. November 6, 2013 EXPOSURE TO THE COLD November 6, 2013 WHAT IS COLD STRESS Cold stress is the transfer of body heat out to a colder environment When you are exposed to a cold environment, most of your body's energy is

More information

Responsibilities / Accountability

Responsibilities / Accountability Responsibilities / Accountability What we will cover Brief history of OPP safety program OPP s commitment to safety Safety responsibilities Accountability for safety Employee expectations History of Safety

More information

Laboratory Safety Training. Environmental Health and Safety

Laboratory Safety Training. Environmental Health and Safety Laboratory Safety Training Environmental Health and Safety Why You Need Lab Safety Training Hazardous materials and/or equipment. You need to understand the risks and how to mitigate them. OSU requires

More information

Contractor/Visitor Safety Orientation UNBC

Contractor/Visitor Safety Orientation UNBC Contractor/Visitor Safety Orientation UNBC 3333 University Way, Prince George, BC V2N 4Z9 Revised: October 2015 For All Emergencies call Security 250-960-7058 ***DO NOT DIAL 911*** Important UNBC Telephone

More information

How severely could the risk hurt someone? Low/Insignificant First aid

How severely could the risk hurt someone? Low/Insignificant First aid Safe Work Method Statement No: WMS-0 Task: Line Marking This WMS is submitted to: Project name and site address: Contact: Preparation of WMS by: Robert Raams Company: Enwon (Australia) Pty Ltd Authorised

More information

Fitness- for- Duty Medical Certification

Fitness- for- Duty Medical Certification YAKIMA COUNTY FIRE DISTRICT NO. 5 Fitness- for- Duty Medical Certification Employee Name: Rank or Position: PART A: INSTRUCTIONS TO EMPLOYEE Prior to returning to work, you must provide a Fitness- for-

More information

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal,

Safety, health and environment values that are expected of all persons who are working and visiting the Quattro Ports Port Kembla Grain Terminal, Overview In accordance with the Quattro Ports Safety, Health and Environmental Policy - Safety First is paramount to Quattro Ports. Our employees and contractors are our most important asset and their

More information

OUTDOOR ROCK CLIMBING ADVENTURES

OUTDOOR ROCK CLIMBING ADVENTURES Beginner/Intermediate Trip SPLORE OUTDOOR ROCK CLIMBING ADVENTURES Adventure Packet: Everything You ll Need to Know Climbing Outdoor Rock Climbing Adventures ½ to Full Day Adventure for Beginner/Intermediate

More information

QUEENSLAND UNIVERSITY OF TECHNOLOGY

QUEENSLAND UNIVERSITY OF TECHNOLOGY QUEENSLAND UNIVERSITY OF TECHNOLOGY SITE SPECIFIC SAFETY MANAGEMENT PLAN FOR SAMFORD HOUSE SAMFORD ECOLOGICAL RESEARCH FACILITY SAMFORD VALLEY 2007 Dylan Randall SN: 06305466 dylan.randall@student.qut.edu.au

More information

RANGE SAFETY BRIEFING FOR HUNTERS

RANGE SAFETY BRIEFING FOR HUNTERS RANGE SAFETY BRIEFING FOR HUNTERS Updated August 2014 Yuma Proving Ground 2 YPG Hunting Areas 3 3 Range Clearance Before entering YPG you must obtain a Range Clearance by calling Range Control at 328-2047

More information

Today s Talk: Mon Tue Wed Thu Fri Sat Sun

Today s Talk: Mon Tue Wed Thu Fri Sat Sun Today s Talk: Mon Tue Wed Thu Fri Sat Sun WORKER SAFETY - Head to Toe Personal Protective Equipment & Fatigue Management PERSONAL FATIGUE MANAGEMENT Fatigue is a state of physical or mental weariness that

More information

Risk Assessment Form. Date of risk assessment: Reviewed 26/04/17 Place/activity: School Visits Assessor s name: Kim Bellis

Risk Assessment Form. Date of risk assessment: Reviewed 26/04/17 Place/activity: School Visits Assessor s name: Kim Bellis Risk Assessment Form Date of risk assessment: Reviewed 26/04/17 Place/activity: School Visits Assessor s name: Kim Bellis Please Note: This risk assessment is a guidance sheet providing a general outline

More information

CHAPTER 13: FIRST AID MEDICAL PROCEDURES

CHAPTER 13: FIRST AID MEDICAL PROCEDURES CHAPTER 13: FIRST AID MEDICAL PROCEDURES General Overview First aid cases include one-time treatment and subsequent observation of minor scratches, cuts, burns, splinters, and so forth, which do not ordinarily

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT M SAFETY PROVISIONS GOODS AND SERVICES CONTRACTS Page 1 of 6 RFP 16-PR-DEM-33 Comprehensive All-Hazards Risk Assessment The Contractor shall comply

More information

Activity Hazard Analysis (AHA) Activity/Work Task: New Ductwork Installation Overall Risk Assessment Code (RAC) (Use highest code) M

Activity Hazard Analysis (AHA) Activity/Work Task: New Ductwork Installation Overall Risk Assessment Code (RAC) (Use highest code) M Activity Hazard Analysis (AHA) Activity/Work Task: New Ductwork Installation Overall Risk Assessment Code (RAC) (Use highest code) Project Location: NCO Academy Building 5518 JBDL Contract Number: W912QR-12-C-0074

More information

1b. Slipping; tripping; getting knocked into by pedestrians.

1b. Slipping; tripping; getting knocked into by pedestrians. MAINTAINING AND REPAIRING HYDRAULIC AND TRACTION PASSENGER AND FREIGHT ELEVATORS AND HANDICAP EQUIPMENT Activity Hazard Identification Required Precautions 1. Walking to and from work site. 1a. Back ache;

More information

Risk Assessment for Radio Rogaine

Risk Assessment for Radio Rogaine Risk Assessment for Radio Rogaine Reviews Completed By Revision Date Approved By Approval Date R Shanks 24/07/2018 A Daykin 24/07/2018 171 Nojoor Road Twin waters QLD 4564 P: 1300 122677 Apexcamps.com.au

More information

ATC Volunteer Leadership Handbook Appendix 7. Appendix 7 Trail Crew Safety and Skills Training Policy

ATC Volunteer Leadership Handbook Appendix 7. Appendix 7 Trail Crew Safety and Skills Training Policy ATC Volunteer Leadership Handbook Appendix 7 Appendix 7 Trail Crew Safety and Skills Training Policy This policy applies to ATC Trail Crews and is recommended for all A.T. maintainers. It states: [E]ach

More information

PPE PERSONAL PROTECTIVE EQUIPMENT PROGRAM

PPE PERSONAL PROTECTIVE EQUIPMENT PROGRAM PPE PERSONAL PROTECTIVE EQUIPMENT PROGRAM April 2017 CONTENTS Section 1: Introduction... 1 Section 2: Purpose...1 Section 3: Roles and Responsibilities... 2 Section 4: Hazard Assessment and Equipment Selection...

More information

Potential hazards People at risk and how? Actions already in place Further action required Action by

Potential hazards People at risk and how? Actions already in place Further action required Action by Risk Assessment Flat Roof Repair Prepared by Oracle Managed Services For: BAM FM On: 24/02/2017 Review date: N/A Potential hazards People at risk and how? Actions already in place Further action required

More information

Approved for public release; distribution is unlimited.

Approved for public release; distribution is unlimited. EMERGENCY RESPONSE TO HAZARDOUS SUBSTANCE SPILLS AND RELEASES IN ARMY MILITARY TREATMENT FACILITIES TECHNICAL INFORMATION PAPER NO. 59-040-0915 PURPOSE. To provide compliance strategies for responding

More information

SAFE WORK METHOD STATEMENT Part B

SAFE WORK METHOD STATEMENT Part B SAFE WORK METHOD STATEMENT Part B SWMS No.: 01 WORK ACTIVITY DESCRIPTION: Door Installation All FORESEEABLE OHS & ENVIRONMENTAL HAZARDS & RISKS ASSOSSIATED WITH THE WORKS MUST BE ASSESSED & ALLOCATED CONTROLS

More information

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date

Pocklington Town Council Risk Assessment Christmas Festival Wednesday Assessor: Gordon Scaife Date Activity: Christmas Festival Wednesday Assessor: Gordon Scaife Date 16/07/2018 5 December Completed: Persons At Risk: PTC Staff, Volunteers & Public Reference: 180716 Public Events Review Date: 16/07/2019

More information

ACTIVITY: Succession studies and conservation (for A level Biology and Geography, conservation courses)

ACTIVITY: Succession studies and conservation (for A level Biology and Geography, conservation courses) SITE: Harlech Sand Dunes (SH31 to SH33) RHYD-Y-CREUAU ASSESSMENT - TO BE USED IN CONJUNCTION WITH THE RYC GENERIC ASSESSMENT ACTIVITY: Succession studies and conservation (for A level Biology and Geography,

More information

Selection, Care and Use of Chemical Protective Clothing. Jason Cole Director of R&D Kappler, Inc.

Selection, Care and Use of Chemical Protective Clothing. Jason Cole Director of R&D Kappler, Inc. Selection, Care and Use of Chemical Protective Clothing Jason Cole Director of R&D Kappler, Inc. Introduction OSHA Low Hanging Fruit Top Violations of OSHA Regulations # 1 - Failure to Perform Hazard Assessment

More information

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with?

1. What is the top priority when working on Canadian Pacific (CP) property? 2. When working on CP property what must all Contractors comply with? 1. What is the top priority when working on Canadian Pacific (CP) property? A. Production B. Safety C. Quality D. Project deadline 2. When working on CP property what must all Contractors comply with?

More information