1 Cryogenic Engineering Conference C2-B-03 Spallation Neutron Source Cryogenic System Installation D.R. Hatfield, D.E. Richied, M.P. Howell, Oak Ridge National Laboratory D.M. Arenius, V. Ganni, Thomas Jefferson National Accelerator Facility September 24, 2003

2 CHL Helium Purifier System Helium Storage Tank System Helium Process Piping Helium Compressor System 4.5K Cold Box 2.1K Cold Box Utility System 2

3 CHL Equipment Layout 3

4 HeliumGas Stora ge Pipin g Heli umgas pipingto 8 tan ks (Trinity supplied) with 8 valve rac ks (Jlab supplie d) Cross-over pipin g rack (Jlab supplie d) High pressure heliumunloadin gsta tion (Jlab supplied) Pi pin g t o purif ie r c old box (J lab supplie d), 2 rec ov e ry c ompre ssor s (Jlab supplie d), an dthe interface to the cross- over pipin g rac k C ompr e ssor R oom Pi pin g Heli umgas pipingto/fromth e ma in c o mpre ssor s ( PH PK supplie d) to the trench pipingan dto the South wall piping Oil pipingto the c ompre ssors an d oi l mana ge men t pi pin g to the trench pi pin g an dto the South wall pipin g Wa te r pi pin g to/fromthe c ompre ssor s t o th e tre nch pi pin g an d ex ten sion s to CTF (future) an dto the c old box room Heli umgas pipingto/fromth e gas managemen t va lve rac k (J lab supplie d) to the trench piping Heli umpi pin g ex ten sion s with isolation valves to CTF in the trench pi pin g 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 Syste mbre a kdo wn continued South Wall Pipin g Heli umgas pipingto/fromth e c ompre ssor r oo m pi pi n gan dto/fromthe cold b ox rooman dto the oil re moval eq uipment (Jlab supplie d) Oil pipingfrom the oil re moval eq uipme n t t o the c ompre ssor r oom pi pin g Heli umgas pipingto/fromth e a mb ient va porizer (Jlab supplie d) in te rfacin gbetween the c old b ox and c ompre ssors an dto the va poriz e r va lve rac k 3 atmheliumsuppl y di strib ution C old Box RoomPiping 4.5K Main C old Box Rigging and installation of the 4.5K cold box (supplied by Linde BOC) Reassembly of the cold box and removal of shipping braces (Linde) Helium gas piping to/from the cold box to the compressors via south wall piping system Helium gas piping to the recovery compressors for cool down and cleanup of the system and the beds in the cold box and the 3 atm helium supply 12

13 13

14 14

15 15

16 16

17 17

18 Syste mbre a kdo wn continued Instrument air and water piping to the cold box Sub-Atmospheric Cold Box (2.1K Cold Box) Rigging and installation of the 2.1K cold box (Jlab supplied) Rigging and installation of frequency converters and magnetic bearing cabinets (Jlab supplied) and power cables Loading cold compressors and adjusting (SNS/Jlab/Air Liquide) Leak check of the cold box vacuum shell Helium gas piping to recovery compressors for cleanup/cool down of the system and 3 atm supply Vacuum piping connections Instrument air and water piping Suppl y an dreturn Expan sion Cans Rigging and installation of the Supply expansion can Rigging and installation of the Return expansion can Guard vacuum piping connections to the vacuum pump skid (Jlab supplied) Relief and cool down piping connections to the return expansion can 18

19 19

20 20

21 System Breakdown continued Guard Vacuum System Rigging and installation of the vacuum pump skid (Jlab supplied) Piping to the vacuum skid from the tunnel piping Instrument air and water piping Utility Equipment LHe dewar, U-tubes (Jlab supplied) LN2 dewar (Chart supplied) and the LN2 distribution piping (Jlab supplied) Instrument air system (Jlab supplied) Water piping to/from and in the cold box room to the compressor room Recovery compressors (Jlab supplied) Purifier cold box (Jlab supplied) U-Tubes (Jlab supplied) Test Heaters (Jlab supplied) for system verification 21

22 22

23 23

24 24

25 25

26 26

27 27

28 Pi pin g an dequi pment Pac kages Heliumgas storage pipin g C ompre ssor roo m pi pin g South wall piping C old box r oom pi pin g Utility pipin g In stallation General Specification No A-0010 Rev-02 (General pipin g specification for SNSCHL heli umga s, oil remov a l, gua rd vacuum, in str u men t a ir an dcooling water pipingsyst e ms) is used to control all the wa rmpi pin g Detailed specifications are use d to con trol each of th e in sta lla ti on pac kages listed above F or Syste ma cce pta nce, the f oll owin gin stallation Checks an d Ce rtif ica ti on s are to be performed on each installation packa ge Cleanline ss certification Number of times the system has been evacuated and backfilled with nitrogen 28

29 System Acceptance - continued Final moisture content in the cold trap (should be none) The ultimate vacuum at the pump in the connected system The vacuum pump blank off (ultimate) pressure Pressure test certification Is the pressure test complete as per the specification? Leak test certification Is the leak test complete as per the specification? Safety check certification Are all the relief devices verified for their set pressure? Are all the relief devices installed? Are all the temporary plugs removed? QA department check certification Are all the QA requirements met for this sub system? Safety Committee check certification Are all the safety requirements met for this sub system, which includes mechanical and electrical? 29

30 Helium Gas Storage Piping Connect the 8 helium storage gas tanks and the other associated valve racks and piping as follows Prepare the gas tanks per specification A-0020 Rev-00 (SNS Direction for Helium Gas Storage Area) Install the piping per specification A-0011 Rev-00 (SNS CHL Helium Gas Storage System Piping Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 30

31 Compressor Room Piping Connect the 6 helium compressors, gas management and the other associated piping as follows Install the piping per specification A-0012 Rev-00 (SNS CHL Helium Compressor Room Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 31

32 South Wall Piping Connect the helium compressor piping to the oil removal and then to the 4.5K cold box piping and the other associated piping as follows Install the piping per specification A-0013 Rev-01 (SNS CHL South Wall Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 32

33 Cold Box Room Piping Connect the 4.5K cold box, 2.1K cold box, guard vacuum system and the other associated piping as follows Install the piping per specification A-00xx Rev-0x (SNS CHL xxxxxx Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 33

34 Utility Piping Instrument air system Install the piping per specification A-00xx Rev-0x (SNS CHL xxxxxx Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group Guard Vacuum system Install the piping per specification A-00xx Rev-0x (SNS CHL xxxxxx Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 34

35 Utility Pipin g - c ontinued LN2/ GN2 syste m In sta ll the pipingper specification A-00xx Rev-0x ( SN SCHL xxxxxx Pi pin g Syste m Specification) Clean the syste mas stated in the above specifications Compl e te th e pre ssur e check a n dlea k chec k a s sta te d in the ab ove specifications Pr ovide th e in sta lla ti on check a n dthe six ce rtif ica ti on s to the commissioning group Purifier Purif ie r c old box Install the piping per specification A-00xx Rev-0x (SNS CHL xxxxxx Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 35

36 Utility Piping - continued Recovery compressor Install the piping per specification A-00xx Rev-0x (SNS CHL xxxxxx Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group LHe Dewar Install the piping per specification A-00xx Rev-0x (SNS CHL xxxxxx Piping System Specification) Clean the system as stated in the above specifications Complete the pressure check and leak check as stated in the above specifications Provide the installation check and the six certifications to the commissioning group 36

Cryogenics The Basics. Lesson 2 D. Kashy

Cryogenics The Basics. Lesson 2 D. Kashy Cryogenics The Basics Lesson 2 D. Kashy Lecture 1 Review Lesson 1 - Objectives Looked at common liquids and gases to get a feeling for their properties Looked at Nitrogen and Helium Discussed Pressure

More information

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming,

INTRODUCTION. The Quantum Technology system has the following advantages:, as it does not need plastic gas-bags which are volume-consuming, 1 INTRODUCTION Quantum Technology is a leading scientific equipment supplier. For the last thirty years we served our customers by tailoring our products to each customer s unique requirements. Quantum

More information

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM

RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM RHIC CRYOGENIC SYSTEMS MAINTENANCE PROGRAM Brookhaven National Laboratory Major Plant Equipment Categories / Locations Compressor Refrigerator Service Buildings The Maintenance program is based on the

More information

Helium recovery at the National High Magnetic Field Laboratory

Helium recovery at the National High Magnetic Field Laboratory IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Helium recovery at the National High Magnetic Field Laboratory Related content - Helium recovery and purification at CHMFL J Li,

More information

JLab Cryogenic Plant Capacities

JLab Cryogenic Plant Capacities JLab Cryogenic Plant Capacities March 26, 2010 Rao Ganni http://www.jlab.org/div_dept/dir_off/ccr/ Thomas Jefferson National Accelerator Facility Cryogenic Plant Locations & Interconnecting Transfer Lines

More information

Dilution Refrigerator manual

Dilution Refrigerator manual Dilution Refrigerator manual Jaseung Ku November 24, 2011 Abstract This document provides a practical guide to dilution refrigerator operation and describes technical details about the hardware. It is

More information

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00

D R A F T. Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13. Version 1.00 D R A F T Operating Procedures for the NPDGamma Liquid Hydrogen Target at the BL 13 Version 1.00 October 06, 2010 Operating Procedures for the NPDGamma Liquid Hydrogen Target V1.00 6/10/10 2 Table of Content

More information

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005

RDK-408D2 Cold Head. Technical Manual. SHI-APD Cryogenics Inc Vultee Street Allentown, PA U.S.A. Revision A: September 2005 RDK-408D2 Cold Head Technical Manual SHI-APD Cryogenics Inc. 1833 Vultee Street Allentown, PA 18103-4783 U.S.A. Revision A: September 2005 (Reference SHI Manual: December 18, 2003 266404A CD32ZZ-160A)

More information

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1

Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat. Version 5.1 Project: Novel Electron Bubble Particle Detector Procedure for Operating Columbia (Nevis) LHe Electron Bubble Chamber Cryostat Version 5.1 (Using side filling line) Hand Processed Changes HPC No. Date

More information

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35

DRAFT. Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Operating Procedures for the NPDGamma Liquid Hydrogen Target V0.03 11/26/05 1 DRAFT Operating Procedures for the NPDGamma Liquid Hydrogen Target in TA-53, Building MPF-35 Version 0.03 November 26, 2005

More information

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS

JANIS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS OPERATING INSTRUCTIONS FOR SUPERCONDUCTING MAGNET CRYOSTATS INTRODUCTION The Janis Research Company's Superconducting Magnet/Cryostat System is one of the most versatile tools available to the scientist

More information

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No

Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System. Dwg. No Rev. ECO Description Checked Approval Date 01 32- Release M. Smith Vacuum Pumpdown and Venting Procedure, CRaTER Thermal Vacuum System Dwg. No. 32-06003.05 Revision 01 June 18, 2007 1 1. Introduction 1.1.

More information

Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility. Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006

Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility. Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006 Fermilab MTF Cryogenic System & Vertical RF Cavity Test Facility Yuenian Huang, on behalf of Fermilab, TD/TID May 11, 2006 1 Magnet Test Facility (MTF) Tevatron magnet test stands Testing temperature range

More information

Specifications of Cryogenic vacuum jacketed valves

Specifications of Cryogenic vacuum jacketed valves TECHNICAL SPECIFICATIONS OF STORES AND DRAWINGS. SECTION - C Technical Specifications for Supply of Cryogenic Vacuum ed Control Valves Specifications of Cryogenic vacuum jacketed valves Contents 1 INTRODUCTION

More information

Gianluca Gemme LN2 DISTRIBUTION PLANT

Gianluca Gemme LN2 DISTRIBUTION PLANT Gianluca Gemme LN2 DISTRIBUTION PLANT Design parameters Cryogen Liquid Nitrogen Volume 200 l (one trap) Heat load 300 W (one trap) Trap cold mass 500 Kg Number of traps 4 Liquid nitrogen input 7.10 l/h

More information

Microscopy Cryogenic WORKSTATION. Performance by Design

Microscopy Cryogenic WORKSTATION. Performance by Design CRYO Microscopy Cryogenic WORKSTATION Optical cryostat for use in microscopy and spectroscopy Performance by Design RC102-CFM Microscopy Cryostat offers fast cooldown, high efficiency, excellent temperature

More information

Safety in Cryogenic Operations at RHIC *

Safety in Cryogenic Operations at RHIC * Safety in Cryogenic Operations at RHIC * Anthony Nicoletti, Dewey Lederle, Ahmed Sidi-Yehklef, Tom Tallerico, Roberto Than, Joe Tuozzolo Collider-Accelerator Department Brookhaven National Laboratory Upton,

More information

Cryogenics of SRF Spoke Cavity Development at SMTF

Cryogenics of SRF Spoke Cavity Development at SMTF Cryogenics of SRF Spoke Cavity Development at SMTF Michael White SRF Development Technical Division Fermi National Accelerator Laboratory May 11, 2006 Overview of Topics SMTF Overview CTF Cryogen Supply

More information

Thomas Jefferson National Accelerator Facility Newport News, Virginia, 23606, USA

Thomas Jefferson National Accelerator Facility Newport News, Virginia, 23606, USA PROCESS OPTIONS FOR NOMINAL 2-K HELIUM REFRIGERATION SYSTEM DESIGNS P. Knudsen, V. Ganni Thomas Jefferson National Accelerator Facility Newport News, Virginia, 23606, USA ABSTRACT Nominal 2-K helium refrigeration

More information

Earlier Lecture. In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System.

Earlier Lecture. In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System. 17 1 Earlier Lecture In the earlier lecture, we have seen Kapitza & Heylandt systems which are the modifications of the Claude System. Collins system is an extension of the Claude system to reach lower

More information

v. Size shall be specified on drawings.

v. Size shall be specified on drawings. SPECIFICATION FOR VACUUM INSULATED PIPING Part 1 General 1. Submittals a. After award of contract and before executing any manufacturing, shop drawings and specifications shall be submitted to the customer

More information

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents

HOT OILING OPERATIONS ALL HSE PRC 172. Approved By: Manager, HSE Performance Assurance. Table of Contents Owner: HSE Performance Assurance ALL HSE PRC 172 Approved By: Manager, HSE Performance Assurance Retention Code: CG01 CA Revised: March 2015 Review Frequency: Five years or less Table of Contents 1.0 Purpose...

More information

Current Leads for Cryogenic Systems

Current Leads for Cryogenic Systems Current Leads for Cryogenic Systems American Magnetics Inc. s (AMI) Vapor Cooled Current Leads provide reliable and consistent electrical current transfer from room temperature (300K) to a Liquid Helium

More information

Magnet and RF Cavity Test Stand Design. Tom Peterson, SLAC USPAS January, 2017

Magnet and RF Cavity Test Stand Design. Tom Peterson, SLAC USPAS January, 2017 Magnet and RF Cavity Test Stand Design, SLAC Outline Test dewars and test stands Saturated bath test dewars Double bath test dewars SRF test cryostats SRF cryomodule test stands Horizontal magnet test

More information

TURBO OXYGEN NITROGEN PLANT

TURBO OXYGEN NITROGEN PLANT TURBO OXYGEN NITROGEN PLANT WITH LATEST ROTARY AIR COMPRESOR PICTORIAL FLOW CHART OF THE LOW PRESSURE TURBO AIR SEPARATION PLANT FOR OXYGEN & NITROGEN. SALIENT FEATURES EASY TO INSTALL VERY LOW POWER CONSUMED

More information

hydro-pac, inc. Low-Pressure Gas Compressors 1500 to 6000 PSI

hydro-pac, inc. Low-Pressure Gas Compressors 1500 to 6000 PSI hydro-pac, inc. LX-SERIES Low-Pressure Gas Compressors 1500 to 6000 PSI hydro-pac, inc. LX-SERIES Features Hydro-Pac LX-SERIES Gas Compressors feature: Oil-free non lubricated gas pistons and cylinders

More information

Working with Cryogenic Liquids

Working with Cryogenic Liquids Standard Operating Procedure (SOP) Working with Cryogenic Liquids BUILDING: PREPARED BY: ROOM: REVISION DATE: Experimental Process Brief Description of the Operation/Experiment: Specialized Training Instructions:

More information

Table of Contents Want full page pictures with most important parts labeled in the beginning.

Table of Contents Want full page pictures with most important parts labeled in the beginning. 1 Table of Contents Want full page pictures with most important parts labeled in the beginning. Precool Procedures (Perform before cooling down): 1. Check N2 and 4He gas tanks to be sure that there is

More information

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators

NPDGamma LH2 Target OJT Lesson Plan: Senior Operator for the NPDGamma LH2 Target Operators 0. Introduction Object of this on-the-job Training (OJT) Lesson Plan is to train Senior Operators for the NPDGamma LH2 target system. After successful of this OJT and authorization by line management Senior

More information

Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety. Eric Sun. October 12, Experiment Readiness Review of Physics Division.

Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety. Eric Sun. October 12, Experiment Readiness Review of Physics Division. Hall C SHMS Q2, Q3, and Dipole: Magnet Pressure Safety Eric Sun 1 Outline Cryogenic Control Reservoir Relief Valves Rupture Discs Parallel Relief Plates Independent Sizing Calculation Pressure Safety of

More information

A Brief Introduction to Helium Liquefaction At ITER

A Brief Introduction to Helium Liquefaction At ITER ITER Cryogenic System LHe PLANTS A Brief Introduction to Helium Liquefaction At ITER ITER Organization PLANT ENGINEERING DIVISION CRYOGENIC SECTION LHe PLANTS TRO: Eric FAUVE A Brief Introduction to to

More information

Vacuum. Dry Turbo Pumping Stations. Roughing Pumps for 1 K Helium Pots and Lambda Refrigerators. Hermetically Sealed Pumps for He3 Recirculation

Vacuum. Dry Turbo Pumping Stations. Roughing Pumps for 1 K Helium Pots and Lambda Refrigerators. Hermetically Sealed Pumps for He3 Recirculation Cryogenics Vacuum Dry Turbo Pumping Stations Roughing Pumps for 1 K Helium Pots and Lambda Refrigerators Hermetically Sealed Pumps for He3 Recirculation Oils, Filters and Traps Valves, Fittings and Adaptors

More information

Customer Responsibilities

Customer Responsibilities Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

First Experimental Data of the Cryogenic Safety Test Facility PICARD

First Experimental Data of the Cryogenic Safety Test Facility PICARD First Experimental Data of the Cryogenic Safety Test Facility PICARD C. Heidt, A. Henriques, M. Stamm and S. Grohmann 26 th International Cryogenic Engineering Conference 2016 in New Delhi, India KIT,

More information

SNS BL-13B NPDGamma Experiment

SNS BL-13B NPDGamma Experiment SNS BL-13B NPDGamma Experiment Hydrogen Supply to Cryogenic Target, Relief and Vent System Design Review April 7, 2010 C-156 9:00 10:30 PM Hydrogen System Block Diagram Diagram of Major System Components

More information

Active Pulse Pressure Compensator APPC

Active Pulse Pressure Compensator APPC PRODUCT DESCRIPTION: Design layout Cabinet mounted Active Pulse Pressure Compensator system. The system is installed to reduce/ eliminate surge pressure in firewater system caused by late fire pump start

More information

EHS Laboratory Guidance: Cryogenic Material

EHS Laboratory Guidance: Cryogenic Material EHS Laboratory Guidance Cryogenic Liquids 1 Introduction/Purpose Cryogenic liquid is defined by the Idaho Fire Code as having a boiling point of less than -90º C (-130º F) at 14.7 psia (1 bar). All cryogenic

More information

CRYOGENIC EXPERTS, INC. World Wide Web Toll Free FOR CEXI Phone (805) Facsimile (805)

CRYOGENIC EXPERTS, INC. World Wide Web   Toll Free FOR CEXI Phone (805) Facsimile (805) CRYOGENIC EXPERTS, INC. World Wide Web http://www.cexi.com E-mail cexi@cexi.com Toll Free 1-800-FOR CEXI Phone (805) 981-4500 Facsimile (805) 981-4501 I. Installation Instructions Installation And Operating

More information

TECHNICAL SPECIFICATION. SPC-1 Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-1 Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-1 Stirling Process Cryogenerator Reference 80 8013 00 Issue Date August 1, 2015 1. INTRODUCTION This document contains detailed technical information and specifications for

More information

Cryogenic Materials Operating Procedure and Safety Requirements

Cryogenic Materials Operating Procedure and Safety Requirements VERSION 2.0 JANUARY 2, 2018 Cryogenic Materials Operating Procedure and Safety Requirements UNC CHARLOTTE 9201 UNIVERSITY CITY BLVD., CHARLOTTE, NC 28223 1 I. Overview of Liquid Nitrogen and other Cryogenic

More information

Customer Responsibilities

Customer Responsibilities Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

TECHNICAL SPECIFICATION. SPC-4 Stirling Process Cryogenerator

TECHNICAL SPECIFICATION. SPC-4 Stirling Process Cryogenerator TECHNICAL SPECIFICATION SPC-4 Stirling Process Cryogenerator Reference 80 8043 00 Issue Date August 1, 2015 1. INTRODUCTION This document contains detailed technical information and specifications for

More information

Review of the Hall B Gas System Hardware. George Jacobs

Review of the Hall B Gas System Hardware. George Jacobs of the Hardware George Jacobs DSG Staff 2 Hall B Gas Utilities for detectors Drift Chamber (DC) Low Threshold Cherenkov Counter (LTCC) Micromegas Vertex Tracker (MVT) Forward Tagger (FT) Ring Imaging Cherenkov

More information

CRYO INDUSTRIES. Liquid Helium Research Dewars

CRYO INDUSTRIES. Liquid Helium Research Dewars Liquid Helium Research Dewars Liquid Helium Research Dewars Cryo Industries Liquid Helium Research Dewars are finely designed and manufactured using the highest quality materials. A Liquid Helium reservoir

More information

LIQUID HELIUM SAFETY DOCUMENTS CV/APRILIO

LIQUID HELIUM SAFETY DOCUMENTS CV/APRILIO LIQUID HELIUM SAFETY DOCUMENTS CV/APRILIO Department of Physics and Astronomy University of Sheffield These notes and instructions form the generic Safe Working Practice for the use of liquid helium Liquid

More information

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane

Detector Carrier Gas Comments Detector anode purge or reference gas. Electron Capture Nitrogen Maximum sensitivity Nitrogen Argon/Methane Gas requirements Gases for packed columns The carrier gas you use depends upon the type of detector and the performance requirements. Table 520-1 lists gas recommendations for packed column use. In general,

More information

Fires and Explosions: What You Need to Know to Prevent Them

Fires and Explosions: What You Need to Know to Prevent Them Fires and Explosions: What You Need to Know to Prevent Them CSChE PSM Symposium Edmonton, Alberta 2007 Gerry Phillips, GC Phillips Consulting Ltd. Norman Nibber, Independent Risk Control Objectives Understand

More information

EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC MAGNETS

EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC MAGNETS EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 388 EXPERIENCE WITH A PRE-SERIES SUPERFLUID HELIUM TEST BENCH FOR LHC

More information

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure

In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure PPMS Service Note 1099-412 In Response to a Planned Power Outage: PPMS EverCool II Shut Down and Re-start Procedure Introduction: Loss of electricity to the PPMS EverCool II should not cause damage to

More information

Linde Cryogenics. Helium Recovery Systems.

Linde Cryogenics. Helium Recovery Systems. Linde Cryogenics. Helium Recovery Systems. 02 Contents. 3 Introduction 4 Recovery Compressor Options 6 Installation Recovery Piping and Fittings Kits 6 Model 500A Automatic External Helium Purifier 7 Purity

More information

RC102 & RC110 Sample in Vacuum Continuous Flow Cryogenic Workstation Cryostats

RC102 & RC110 Sample in Vacuum Continuous Flow Cryogenic Workstation Cryostats RC102 & RC110 Sample in Vacuum Continuous Flow Cryogenic Workstation Cryostats www.cryoindustries.com INDUSTRIES RC102 & RC110 Sample in Vacuum Continuous Flow Cryogenic Workstation Cryostats Designed

More information

Helium Management of the ESS Target and Monolith Systems

Helium Management of the ESS Target and Monolith Systems Helium Management of the ESS Target and Monolith Systems P. Nilsson, R. Linander, A. Lundgren, C. Kharoua, P. Sabbagh, F. Plewinski, F. Mezei and E. Pitcher European Spallation Source ESS AB, SE-22100

More information

GUARD TANK PRESSURIZATION FOR TRANSPORT

GUARD TANK PRESSURIZATION FOR TRANSPORT Stanford University P0801 Rev. January 18, 2001 Operation No. GRAVITY PROBE-B PAYLOAD TESTING PROCEDURE GUARD TANK PRESSURIZATION FOR TRANSPORT P0801 Rev- January 18, 2001 Prepared by Jim Maddocks Cryogenic

More information

PH I LI PS TECH N'ICAL REVIEW

PH I LI PS TECH N'ICAL REVIEW PH L PS TECH N'CAL REVEW VOLUME 29, 1968, No. 7 The Philips helium liquefier G. J. Haarhuis The single-stage gas-refrigerating machine, described in this journal in 1954, provided a simple and efficient

More information

The Model L1410 can be counted on for many years of trouble-free, reliable operation.

The Model L1410 can be counted on for many years of trouble-free, reliable operation. LINDE CRYOGENICS TECHNICAL MEMORANDUM Model L1410 Helium Liquefier System Linde Cryogenics, A Division of Linde Engineering North America Inc. has distinguished itself as the world s premier supplier for

More information

Customer Responsibilities

Customer Responsibilities Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas

Compressed Gas Properties. Introduction. Compressed Gas Properties. Definition of a Compressed Gas 1. Properties of gases 2. Cylinders 3. Storage of Gases 4. Regulators 5. Cryogenic Liquids Introduction All compressed gases by definition can be hazardous Know the properties of the gases you are working

More information

R-410A 50% R-32 50% R-125.

R-410A 50% R-32 50% R-125. R-410A R-410A Facts Ozone friendly- No Chlorine Replacement for R-22, NOT a drop in! Higher Pressure Range-50 to 75% higher than R-22 Requires Special Lubricants R-410A It s a Blended Refrigerant. 50%

More information

Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases.

Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases. CRYOGENICS SAFETY Introduction Cryogenics is the science of ultra low temperatures. Low temperatures are achieved by the liquefaction of gases. The gases which are most widely used in industry and research

More information

Pump out insert (condenser and still lines) overnight with turbo pump

Pump out insert (condenser and still lines) overnight with turbo pump Running the Dilution Fridge Before starting a run: Pump out insert (condenser and still lines) overnight with turbo pump Make sure LN and LHe traps are clean pump out with He4 rotary pump Start He3 rotary

More information

DD2 Site Preparation Checklist Hardware Site Preparation Specification

DD2 Site Preparation Checklist Hardware Site Preparation Specification Thank you for purchasing an Agilent instrument. To get you started and to assure a successful and timely installation, please refer to this specification or set of requirements. Correct site preparation

More information

ATL. Take Control of your Helium Supply. Advanced Technology Liquefier The next generation of helium recycling

ATL. Take Control of your Helium Supply. Advanced Technology Liquefier The next generation of helium recycling ATL Take Control of your Helium Supply Advanced Technology Liquefier The next generation of helium recycling Helium A Limited and Costly Resource Cryogenic researchers and technicians around the world

More information

GSE CAGING AND SPINUP BUFFER LINE INSTALLATION

GSE CAGING AND SPINUP BUFFER LINE INSTALLATION Stanford University Program Operation Order No. GRAVITY PROBE B PROCEDURE FOR PAYLOAD VERIFICATION GSE CAGING AND SPINUP BUFFER LINE INSTALLATION Sept. 28, 2000 Prepared by: B. Muhlfelder Approvals Program

More information

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King

Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Design Shift Horizontal Equipment in Oklahoma Scott King Facilities Review in Oklahoma Identified areas for improvement Design criteria is outdated for play types Vertical separation, cannot

More information

CO 2 and O 2 scrubbers

CO 2 and O 2 scrubbers CO 2 and O 2 scrubbers The CO2 scrubber Fruit breathes : it uses oxygen (O2) and produces carbon dioxide (CO2). If the concentration of carbon dioxide (carbonic acid) gets too high, the quality of the

More information

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards.

Compiled by: B Beard. Approved by: SH Carstens. Description of requirements and procedures for compact provers to be used as verification standards. 1. Scope Description of requirements and procedures for compact provers to be used as verification standards. 2. Reference documents Trade Metrology Act SANS1698 3. Policy A. BASIC REQUIREMENTS Compact

More information

Determining Free-Space Values for ASAP Series Micropore Analyses

Determining Free-Space Values for ASAP Series Micropore Analyses Application Note 104 Determining Free-Space Values for ASAP Series Micropore Analyses Many microporous materials, such as zeolites and activated carbons, trap and hold helium in their complex pore structures

More information

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual

WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, PHONE #: (970) FAX #: (970) TO-Clean Manual WSN: XXXXXX 101 ROME COURT FORT COLLINS, CO, 80524 PHONE #: (970) 221-9179 FAX #: (970) 221-9364 TO-Clean Manual Copyright 2008 by Wasson ECE Instrumentation, Inc. (SJC 02/05/2008) All rights reserved

More information

EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS

EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS EXPERIENCE WITH CRYOGENICS SAFETY, PROBLEMS AND SOLUTIONS Rajiv Sharma and Cryogenic Division SST-1 IPR, Gandhinagar 33rd DAE Safety & Occupational Health Professionals Meet at IPR, Gandhinagar, 23-25

More information

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N)

Exhibit 4. Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) 1 APPLICABILITY Exhibit 4 Determination of Static Pressure Performance of the Healy Clean Air Separator (Executive Orders VR-201-N and VR-202-N) Definitions common to all certification and test procedures

More information

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES

A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES A/C SYSTEM GENERAL DIAGNOSTIC PROCEDURES 1990 Nissan 240SX 1983-90 AIR CONDITIONING & HEAT General Servicing Diagnostic Procedures All Import Makes & Models Diagnosis is an important first step in A/C

More information

GDS OPERATING PROCEDURE

GDS OPERATING PROCEDURE SU/GP-B P0886 Rev A 4 September, 2002 STANFORD UNIVERSITY W.W. HANSEN EXPERIMENTAL PHYSICS LABORATORY GRAVITY PROBE B, RELATIVITY GYROSCOPE EXPERIMENT STANFORD, CALIFORNIA 94305-4085 GDS OPERATING PROCEDURE

More information

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Prepare Payload for Mass/CG Measurements and Condition Payload During Spin Balance Test

GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR. Prepare Payload for Mass/CG Measurements and Condition Payload During Spin Balance Test Stanford University GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR and Condition Payload During Spin Balance Test THIS DOCUMENT CONTAINS THE USE OF HAZARDOUS MATERIALS Rev. - Jan 20, 2003 Written

More information

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM

NEW PROGRAM! OIL AND GAS TECHNOLOGY PROGRAM NEW PROGRAM! PROGRAM Mechanical Maintenance MODEL H-IRT-1 Industrial Refrigeration Trainer MODEL H-RIG-1C Rigging Systems Trainer MODEL H-IMTS-1 Industrial Maintenance Training System MODEL H-FP-223-14

More information

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER CONSTANT PRESSURE SAMPLE CONTAINER

INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER CONSTANT PRESSURE SAMPLE CONTAINER INSTALLATION, OPERATION, AND MAINTENANCE MANUAL WELKER CONSTANT PRESSURE SAMPLE CONTAINER MODEL LS-14 DRAWING NUMBERS AD245.HCRN AD245CRN AD245CV MANUAL NUMBER IOM-131 REVISION Rev. D, 9/6/2016 TABLE OF

More information

SUMMARY AND RESULTS OF THE CRYOPLANT OPERATION FOR HERA

SUMMARY AND RESULTS OF THE CRYOPLANT OPERATION FOR HERA Proceedings of ICEC 22-ICMC 2008, edited by Ho-Myung CHANG et al. c 2009 The Korea Institute of Applied Superconductivity and Cryogenics 978-89-957138-2-2 SUMMARY AND RESULTS OF THE CRYOPLANT OPERATION

More information

Variable Temperature Storage Dewar Mount Inserts

Variable Temperature Storage Dewar Mount Inserts Variable Temperature Storage Dewar Mount Inserts All inserts are available for either Liquid Helium or Liquid Nitrogen Dewars! DStat - External cryostat with insert leg DStatMag - Super Conducting Magnet

More information

RECENT PROGRESS IN POWER REFRIGERATION BELOW 2 K FOR SUPERCONDUCTING ACCELERATORS

RECENT PROGRESS IN POWER REFRIGERATION BELOW 2 K FOR SUPERCONDUCTING ACCELERATORS RECENT PROGRESS IN POWER REFRIGERATION BELOW 2 K FOR SUPERCONDUCTING AELERATORS S. Claudet, CERN, Geneva, Switzerland Abstract As a result of technico-economical optimization and quest for increased performance,

More information

RULES PUBLICATION NO. 119/P

RULES PUBLICATION NO. 119/P RULES PUBLICATION NO. 119/P PERIODIC SURVEYS OF FUEL INSTALLATIONS ON SHIPS OTHER THAN LIQUEFIED GAS CARRIERS UTILIZING GAS OR OTHER LOW FLASH POINT FUELS 2019 January Publications P (Additional Rule Requirements)

More information

Oxygen Deficiency Hazard Safety Booklet

Oxygen Deficiency Hazard Safety Booklet Oxygen Deficiency Hazard Safety Booklet Central Helium Liquefier Complex Last Revision: July 2008 Many work areas at Jefferson Lab store or use compressed gasses, liquefied gasses, and volatile liquids.

More information

PURCHASE AND DELIVERY OF A HELIUM CLOSED-CYCLE OPTICAL CRYOSTAT. The present tender is only an unofficial translation provided as a courtesy.

PURCHASE AND DELIVERY OF A HELIUM CLOSED-CYCLE OPTICAL CRYOSTAT. The present tender is only an unofficial translation provided as a courtesy. ICMCB - CNRS 87 avenue du Docteur Albert Schweitzer 33608 Pessac Cedex France PURCHASE AND DELIVERY OF A HELIUM CLOSED-CYCLE OPTICAL CRYOSTAT Contenu 1. General context... 1 1.1. Project presentation...

More information

M-06 Nitrogen Generator (Nitrogen Making Machine)

M-06 Nitrogen Generator (Nitrogen Making Machine) Guideline No.M-06 (201510) M-06 Nitrogen Generator (Nitrogen Making Machine) Issued date: 20 th October, 2015 China Classification Society Foreword This Guideline is a part of CCS Rules, which contains

More information

Test Facilities Experiment Review

Test Facilities Experiment Review Please read the following regulations for experiments performed in the Test Facilities and fill in the Experiment Review form which is found at the end of this document. Test Facilities staff will use

More information

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd.

Short Introduction to Cryo-Pumps and Refrigerators. Dr Graham Rogers Leybold UK Ltd. Short Introduction to Cryo-Pumps and Refrigerators Dr Graham Rogers Leybold UK Ltd. Cryo Pumps Topics Physical principles of cryo-pumping Design and control of modern refrigerator cryo-pumps UHV and XHV

More information

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype

CO 2. (R744) Service Station Presentation. Contents. Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype (R744) Service Station Presentation Contents Goals Basic functions Specification Recovery R477 Vacuum Charge Safety Other features Prototype Page 1 (R744) Service Station Goals Usability Full automatic

More information

Storage and transfer of cryofluids

Storage and transfer of cryofluids Storage and transfer of cryofluids Christian Gianese Guilty 1: Arsène d Arsonval (1851-1940) He invented a glass container with double wall, the vacuum being done in the space between the outer and inner

More information

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas.

EXPERIMENT XI. Careful!! Improper handling of the vacuum line may result in the release of SO 2 which is an irritating and suffocating gas. Chem 366-3 Page XI - 1 EXPERIMENT XI INFRARED SPECTRUM OF SO2 (S&G, 5th ed. Expt 36, 6th ed. Expt. 35) 1. Pre-Lab preparation. The description of this experiment has disappeared from the more recent editions

More information

UCI KCCAMS Facility. Graphitization protocol Hydrogen reduction method (organic samples) December 26, 2011

UCI KCCAMS Facility. Graphitization protocol Hydrogen reduction method (organic samples) December 26, 2011 UCI KCCAMS Facility Graphitization protocol Hydrogen reduction method (organic samples) December 26, 2011 SUMMARY Preconditioning the line 1. Remove the heaters from the reactors, record residual pressures,

More information

COMMISSIONING REPORT OF THE MUCOOL 5 TESLA SOLENOID COUPLED WITH HELIUM REFRIGERATOR

COMMISSIONING REPORT OF THE MUCOOL 5 TESLA SOLENOID COUPLED WITH HELIUM REFRIGERATOR FERMILAB-TM-2462-AD COMMISSIONING REPORT OF THE MUCOOL 5 TESLA SOLENOID COUPLED WITH HELIUM REFRIGERATOR MARCH - MAY 2010 ENGINEERING NOTE FERMILAB-TM-2462-AD Michael Geynisman Fermi National Accelerator

More information

UCI KCCAMS Facility. Graphitization protocol Hydrogen reduction method (carbonate samples) December 26, 2011

UCI KCCAMS Facility. Graphitization protocol Hydrogen reduction method (carbonate samples) December 26, 2011 UCI KCCAMS Facility Graphitization protocol Hydrogen reduction method (carbonate samples) December 26, 2011 SUMMARY Preconditioning the line 1. Remove the heaters from the reactors, record residual pressures,

More information

PRESSURIZED EQUIPMENT AND SYSTEMS

PRESSURIZED EQUIPMENT AND SYSTEMS SECTION 20 PRESSURIZED EQUIPMENT AND SYSTEMS 20.A GENERAL 20.A.01 Inspections and tests - general. a. Pressurized equipment and systems shall be inspected and performance tested before being placed in

More information

System Pressure Manager Standard & System Pressure Manager Plus

System Pressure Manager Standard & System Pressure Manager Plus System Pressure Manager Standard & System Pressure Manager Plus Installation, Commissioning & Servicing Instructions Note: THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING, COMMISSIONING,

More information

BUBBLER CONTROL SYSTEM

BUBBLER CONTROL SYSTEM BUBBLER CONTROL SYSTEM Description: The HDBCS is a fully automatic bubbler system, which does liquid level measurements in water and wastewater applications. It is a dual air compressor system with, air

More information

D C P L OXYGEN / NITROGEN PLANT

D C P L OXYGEN / NITROGEN PLANT D C P L OXYGEN / NITROGEN PLANT DCPL MED SERIES OXYGEN CYLINDER FILLING PLANTS (Industrial Oxygen & Medical Oxygen) O N 2 2 DCPL- MED- SERIES OXYGEN AIR COMPRESSOR / NITROGEN PLANTS AIR COMPRESSOR Air

More information

Procedure of Xenon Transfer

Procedure of Xenon Transfer Procedure of Xenon Transfer Feng Zhou,MIT CC: Martina Green February 28, 2005 In this write up, we discuss the procedure on how to transfer xenon to a designed gas storage vessel that supplies xenon to

More information

Pressurize Well to One Atmosphere with Probe Installed

Pressurize Well to One Atmosphere with Probe Installed Stanford University GRAVITY PROBE B PROCEDURE FOR SCIENCE MISSION DEWAR Pressurize Well to One Atmosphere with Probe Installed ECO 1089 September 25, 2000 Revised by Date Jim Maddocks Cryogenic Test Checked

More information

OPERATING PROCEDURES

OPERATING PROCEDURES OPERATING PROCEDURES 1.0 Purpose This element identifies Petsec s Operating Procedures for its Safety and Environmental Management System (SEMS) Program; it applies to all Petsec operations. Petsec is

More information

ECS Protector Nitrogen Inerting Vent (PAV-WN)

ECS Protector Nitrogen Inerting Vent (PAV-WN) ECS Protector (PAV-WN) U.S. Pat. No. 8,636,023, 9,526,933 and 9,717,935 B2 Specifications Stock Number: Service Pressure: Regulator Setting: System Connection: Temperature Range: Dimensions: Weight: Clear

More information

ES&H Manual Pressure and Vacuum Systems Safety Supplement

ES&H Manual Pressure and Vacuum Systems Safety Supplement Part 6: Pressure and Leak Testing QA/CI Dept. PS Committee/Chair 11/06/15 11/06/20 1.0 6:1 of 6 1 Pressure and Leak Testing The primary reason for pressure testing is to confirm the integrity of a pressure

More information

GAS SAFETY Information Bulletin

GAS SAFETY Information Bulletin GAS SAFETY Information Bulletin June 2016 G-03-11-ABSA [Rev2] Page 1 of 7 Fuel Gas Pressure Piping in Plants This bulletin has been jointly developed by Safety Services, the Pressure Equipment Sub- Council,

More information