MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)

Size: px
Start display at page:

Download "MANERI DAM D/S VIEW. Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK)"

Transcription

1 COMPREHENSIVE REHABILITATION / REPAIR OF MANERI DAM IN DIST. UTTARKASHI MANERI DAM D/S VIEW Er. SANDEEP SINGHAL Director (Projects) UJVN Limited, Dehradun, (UK) sandysinghal14@hotmail.com

2 ABSTRACT Severe floods in the rivers of Uttarakhnad in August 2012 and June 2013 badly damaged some hydro-electric power projects mainly in Bhagirathi and Alaknanda river valleys. Spillway of Maneri Bhali Stage I dam was damaged severely due to rolling boulders which resulted in heavy leakages downstream. In order to arrest leakages, temporary arrangements such as caulking of gates were undertaken. After the monsoon of 2014, comprehensive rehabilitation/repair of Maneri Dam was planned after studying damages of similar nature and treatment measures at other hydro electric projects. The spillway no-01 & 02 were extremely damaged, therefore the repair works of these spillways were planned on priority basis in two phases:

3 Repair work from the sill beam of stop log gates to the 2.00 mts downstream of sill beam of radial gates were planned by taking minimum shutdown of Power House. Repair work in entire spillway glacis from 2.00 mts downstream of sill beam of radial gate were planned in running power house condition. Repair of entire roller bucket and realignment of the downstream training wall were also planned subsequently. PROJECT BRIEF Maneri Bhali Stage-I (90 MW) Hydro electric scheme was planned in 1960s to harnesses the potential energy of water flowing down river Bhagirathi between Maneri and Uttarkashi. The power house of this project is generating approx. 455 MU energy annually (average generation from to ) since October, 1984.

4 This Scheme comprises of:- A 39 m high and 127 m long Concrete Gravity Dam across river Bhagirathi near Maneri with four numbers spillways gates of size 13 m width & m high separated by 2m thick piers. The spillway gates are radial type fitted with electrically operated hoists. The energy dissipation is allowed by providing slotted roller bucket. Intake structure comprises of three bays 9.00 m. wide with all weather channel on the left flank. A sedimentation tank with 08 hoppers 15.00m wide x m length X 5.75 m deep, in 2 rows is provided to remove silt particles which are passed back to the river downstream of the dam through silt flushing tunnel.

5 A km long and 4.75 m diameter circular concrete lined power tunnel. A 69 m high and 11 m diameter underground surge shaft of restricted office type along with 316 m long and 6m diameter upper expansion chamber, 89.5 m long and 6m diameter lower expansion chamber. About 456 m long single steel lined penstock of 3.8 m diameter having three branches of 2.5 m diameter just upstream of the power house A surface power station near Uttarkashi, housing three Francis turbines of 30 MW capacity each, i.e. total installed capacity of 90 MW. The firm power is MW.

6 The design discharge of the power station is 71.4m 3 /s. The difference in elevation between the barrage and the power station affords a design head of metres and gross head of 180 metres. Open tailrace channel about 120 m long joins river Bhagirathi at Uttarkashi EXTENT OF DAMAGES i ) Damages observed in Spillway gate no. 01 & 02:- The sill beam of stop log gate and radial gate were washed out in approximately 6.00 m & 8.00 m length (out of 13 m) respectively. The flange of the remaining sill beams was completely damaged.

7 As both the sill beam were washed out in some length, therefore a cavity of about 6 m-7 m in length (along the piers) having a depth upto 2.00 m was created in between radial gate and stop log gate. The flood also damaged the spillway glacis on the right side and in the d/s of radial gate beam throughout its length & upto roller bucket in 3.00 m width with a varying depth of maximum m. ii ) Damages observed in Spillway gate no. 03 & 04:- Third National Dam Safety Conference The concrete in between stop log gate and radial gate was eroded due to high flood. The maximum depth of the erosion was in range of 0.25 m to 0.70 m. The profile of spillway glacis was also damaged from 0.25 m to 0.80 m in depth.

8 Photograph 01 (Damages in gate no-1) Third National Dam Safety Conference

9 STUDY OF DAMAGES Considering the past history of damages in Maneri Bhali Stage-I dam following were the major reasons of damages: i. There is no check dam or hydro power project dam upstream of Maneri Dam, due to these rolling boulders in monsoon period hit the Maneri dam directly. ii. Third National Dam Safety Conference In the upstream side there is a turn in the river and shortest radius of the turn is towards the gate no.1. Due to this rolling boulders in monsoon season pass more through bay no. 1 in comparison to other spillways bays. iii. The width of roller bucket is converging towards downstream, therefore the training walls obstruct the desirable flow pattern and consequently damages occurred in the spillway structure and roller bucket.

10 REHABILITATION/REPAIR WORKS EXECUTED IN GATE NO. 01&02 The damaged sill beams of bay no 01, 02 & 03 were removed and replaced with the new ones of the same size. The spillway glacis were repaired with M60 grade concrete and 20 mm thick MS steel plate was fixed over the repaired surface. Activities Performed During Closure Period Third National Dam Safety Conference Detailed planning of execution of repair works of three spillway bays from sill beam of stoplog gate to 2m d/s of sill beam of radial gate within minimum possible time was done. A period 36 days starting from 02/12/2014 to 07/01/2015 was finalized for closing the Power House of MB-I HEP located at Tiloth in District Uttarkashi. Following activities were performed in sequential order to complete the works: Creation of bund in front of spillway bay 1, 2 & 3 to divert water through spillway no. 4.

11 Dismantling damaged mild steel sheets previously placed over spillway concrete profile. Damaged & remaining sill beams of stop log gate and radial gate were removed. Dismantling of concrete so as to get a minimum thickness of 250 mm of new concrete and a cover of 200 mm over the reinforcement. Drilling hole of 600 mm depth and 32 mm dia in staggered manner in parent concrete for fixing anchors. Fixing 25 mm dia Fe 500 TMT bars in drill hole with grouting material for anchorage of reinforcement as well as dowel bars for fixing of MS plates. The reinforcement was laid with 20 mm dia 150 c/c keeping the top cover of 200 mm. Where the cavity was more than 80 cm deep, reinforcement was provided in intermediate layers also keeping the top cover & bottom cover of 200 mm.

12 Applying bonding coat (BASF make) between old and new concrete. Laying of concrete (ACC make Drycrete of M80 grade) in cavity between sill beam of stoplog gate and radial gate. Fixing sill beams i.e. ISMB 300 (300 X 140) confirming to IS: 2062 (E250) with 20mm SS plate for Stop Log gates and Radial gates. Laying concrete (ACC make Drycrete of M80 grade) up to final level as per the profile. Fixing MS sheet (20mm thick with yield strength of 450 MPA) over the prepared concrete surface. Grouting between steel plate and concrete by cutting notes through the steel plate & fixing the cut plate after grouting.

13 To complete the repair works of spillway no 01 & 02 within stipulated period, all the pre-requisites such as manpower, material etc. were arranged before start of work. The works were taken up in 3 shifts continuously. The works were completed within 36days and Power House was restarted thereafter. Repair Works in Spillway Glacis Repair works in spillway glacis is carried out from 2m d/s of radial gates during power house running condition. All activities were same as stated above only instead of M80 Drycrete, M-60 grade concrete was used. Concrete Mix Design Adopted For Works Based on IS: and IS: mix design for concrete is derived as below: a) Cement = 450 kg/m3 b) Water = 157 kg/m3 c) Silica fume = 25 kg/m3 d) Fine Aggregate = 598 kg/m3

14 e) Coarse Aggregate = 1269 kg/m3 f) Chemical Admixture = kg/m3 Third National Dam Safety Conference The 28 days crushing strength of trial mix proportions for target M-60 grade of concrete was achieved as 68.9 N/mm 2. Photograph 02 (Temporary Bund for channelization of river)

15 Photograph 03 (Laying concrete in gate no-02) Photograph 04 (Grouting of MS Plate of gate no-2)

16 REHABILITATION/REPAIR WORKS PROPOSED IN SPILLWAYS NO 03 & 04; ENTIRE ROLLER BUCKET AND TRAINING WALLS:- During execution of repair work of spillway no.1&2, the entire slotted type roller bucket and training walls were also examined and it was found that the slots of roller buckets are completely damaged. Both side training wall were also found damaged very badly (Photograph no.05). Photograph 05 (Training wall)

17 Deep cavities ranging between 1.00 m to 4.00 m in front of all the four bays of roller bucket were also found, Photograph no. 6 Photograph 06 (Cavity in Roller Bucket)

18 Proposed Repair of Spillway Glacis No 03 & 04 It has been proposed by CWC and World Bank to repair one spillway glacis with M90 grade concrete and the other with M90 grade concrete along with steel fibres. The remaining procedure of repairing will be same as executed in spillway no. 1&2. Mix design for M90 grade concrete will be provided by National Council for Cement and Building Materials (NCCBM), Ballahabgargh (Haryana). Proposed Repair of Roller Bucket It has been proposed by CWC and World Bank to repair the entire roller bucket with M90 grade concrete along with steel fibres as per the actual profile. The repair work will be started as soon as mix design is available from NCCBM.

19 CONCLUSIONS AND DISCUSSION Repairing works of spillway glacis no. 1&2 were carried out by using M-60 grade concrete and fixing MS steel plate over prepared profile followed by cement grouting. The MS plates of spillway glacis no.1&2 are found intact after passing the monsoon of 2015 & 2016 The repair works of spillway glacis no 03 & 04 as proposed above are in progress and the performance of M 90 grade concrete with and without steel fibres will be examined after the monsoon of On examination of these three different types of repair works conclusion can be drawn as to which method is the most suitable for repairing of spillway glacis and for roller bucket.

20 The repair work of training wall is also in progress and the obstruction in water paths will be removed to get the desirable flow conditions so as to reduce the impact of rolling boulder. REFRENCES i. Indian Standard code ii. Indian Standard code iii. Indian Standard code iv. Indian Standard code v. Indian Standard code

21 Thank You

Components of a Barrage

Components of a Barrage Components of a Barrage Definition The only difference between a weir and a barrage is of gates, that is the flow in barrage is regulated by gates and that in weirs, by its crest height. Barrages are costlier

More information

JAP Additional Information Sheet

JAP Additional Information Sheet JAP Additional Information Sheet Block 15: Purpose and Need The USACE purpose of the project is to provide a safe and reliable whitewater park for the recreational public in a city park, which will provide

More information

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN

DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN DAIVÕES DAM SPILLWAY: A NOVEL SOLUTION FOR THE STILLING BASIN Elsa Alves *, Felix Hernando and Rafael Chacón * Laboratório Nacional de Engenharia Civil (LNEC) Av. do Brasil, 101, 1700-066 Lisboa, Portugal

More information

TECHNICAL MEMORANDUM 002 EMORANNO. 001

TECHNICAL MEMORANDUM 002 EMORANNO. 001 TECHNICAL MEMORANDUM 002 EMORANNO. 001 To: Jack Synder, P.E. EES Consulting From: Mort McMillen, P.E. Paul Larson, SE Date: October 13, 2010 Project: Cc: Taylor Bowen Subject: Technical Memorandum (TM)

More information

Module 4 Hydraulic Structures for Flow Diversion and Storage

Module 4 Hydraulic Structures for Flow Diversion and Storage Module 4 Hydraulic Structures for Flow Diversion and Storage Lesson 3 Design of Barrage Appurtenant Structures and Rules for Barrage Operation Instructional objectives On completion of this lesson, the

More information

As temporary grade control facilities along waterways until final stabilization is established.

As temporary grade control facilities along waterways until final stabilization is established. Check Dams (CD) EC-12 Description Check dams are temporary grade control structures placed in drainage channels to limit the erosivity of stormwater by reducing flow velocity. Check dams are typically

More information

Design and Construction of Cerro Del Águila Gravity Dam in Peru

Design and Construction of Cerro Del Águila Gravity Dam in Peru Design and Construction of Cerro Del Águila Gravity Dam in Peru Sayah S. M. 1, Bianco V. 2, Ravelli M. 1, and Bonanni S. 2 1, Lombardi Engineering Limited, 6648 Minusio, Switzerland, selim.sayah@lombardi.ch

More information

Lecture 10 : Sewer Appurtenances

Lecture 10 : Sewer Appurtenances 1 P age Module 8 : Sewer Appurtenances Lecture 10 : Sewer Appurtenances 2 P age The structures, which are constructed at suitable intervals along the sewerage system to help its efficient operation and

More information

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY

LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY FLOW RELEASES DOWNSTREAM OF THE LESOTHO HIGHLANDS WATER PROJECT (LHWP) STRUCTURES (April 2003 to September 2003) TOWER ON MALIBAMATŠO RIVER @ KAO MARCH 2004 OPERATIONS,

More information

Outlet Structures T-12

Outlet Structures T-12 Description This section provides guidance and details for outlet structures for use primarily with BMPs utilizing sedimentation, (i.e., extended detention basins (EDBs), retention ponds, and constructed

More information

FORMAT FOR SENDING COMMENTS. Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS (Second revision of IS 6531)

FORMAT FOR SENDING COMMENTS. Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS (Second revision of IS 6531) FORMAT FOR SENDING COMMENTS Last Date for Comment is 0 November 009 E-Mail ID for sending comments: rrdash@bis.org.in Document No.: Doc WRD 14 (495)C Title: CRITERIA FOR DESIGN OF CANAL HEAD REGULATORS

More information

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM

DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM DESIGN OF BELL-MOUTH SPILLWAY AT BARVI DAM Akshay Haldankar 1, Mahesh Bhadra 2, Rahul Harad 3, Darpan Kapre 4, Dipali Patil 5 1,2,3,4 Under graduate,dept. of Civil Engineering, DRIEMS Neral. 5Assistant

More information

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision

Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision Ermenek Dam and HEPP: Spillway Test & 3D Numeric-Hydraulic Analysis of Jet Collision J.Linortner & R.Faber Pöyry Energy GmbH, Turkey-Austria E.Üzücek & T.Dinçergök General Directorate of State Hydraulic

More information

5th International Symposium on RCC Dams General Introduction

5th International Symposium on RCC Dams General Introduction OVERVIEW OF THE DESIGN, CONSTRUCTION, MATERIALS AND INNOVATIVE INSTRUMENTATION FOR ROLLER COMPACTED CONCRETE DAMS By Engr. Ch. Foad Hussain 1 Introduction to the Author Engr. Chaudhry Foad Hussain has

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

Minimum Standards for Driveway Construction Village of Bear Creek

Minimum Standards for Driveway Construction Village of Bear Creek Minimum Standards for Driveway Construction Village of Bear Creek An exception to the following requirements may only be granted by city council. The needs of each drainage system are considered independently,

More information

Exercise (3): Open Channel Flow Rapidly Varied Flow

Exercise (3): Open Channel Flow Rapidly Varied Flow Exercise (3): Open Channel Flow Rapidly Varied Flow 1) A hydraulic jump exists in a trapezoidal channel having a bed width of 7 m and side slope of 1:1. The flowing discharge is 25 m 3 /sec. Construct

More information

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010.

Attached as Exhibit B-2 is BC Hydro's presentation from the Stave Falls Spillway Gates Project Workshop held on January 18, 2010. BChydro CD FOR GEf\lE IONS B-2 Joanna Sofield Chief Regulatory Officer Phone: (604) 623-4046 Fax: (604) 623-4407 bchydroregulatorygroup@bchydro.com January 19, 2010 Ms. Erica M. Hamilton Commission Secretary

More information

7.Site Note Poders in Labutta Township Labutta North Polder Shansu Sluice Gate - Shansu sluice locates in Labutta (North) polder, it is about 1.5 km n

7.Site Note Poders in Labutta Township Labutta North Polder Shansu Sluice Gate - Shansu sluice locates in Labutta (North) polder, it is about 1.5 km n 7.Site Note Poders in Labutta Township Labutta North Polder Shansu Sluice Gate - Shansu sluice locates in Labutta (North) polder, it is about 1.5 km north direction from Labutta town. - Sluice gate is

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-7 SUB-STATION SY NO-225, NEAR RAYACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

FP McCann Tunnels and Shafts 1

FP McCann Tunnels and Shafts 1 FP M c Cann FP McCann Tunnels and Shafts 1 The McCann range of shaft and tunnel products have been developed to meet the requirements of the latest industry standards which include the British Tunnelling

More information

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE

REPORT GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE REPORT ON GEO-TECHNICAL INVESTIGATION FOR THE PROPOSED BLOCK-1 SUB-STATION SY NO-44, NEAR KYATAGANACHERLU VILLAGE CLIENT: KARNATAKA SOLAR POWER DEVELOPMENT CORPORATION BANGALORE 0 GEO-TECHNICAL INVESTIGATION

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Check Dams DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Though not generally considered

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 8 - LAC QUI PARLE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 6391 CSAH NO. 33 OVER THE MINNESOTA RIVER DISTRICT 8 - LAC QUI PARLE COUNTY OCTOBER 22, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 DESCRIPTION OF SALUDA HYRDOELECTRIC PROJECT EXHIBIT A AUGUST 2008 Prepared by: SOUTH CAROLINA

More information

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA

SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC PROJECT FERC PROJECT NO. 516 PROJECT DESCRIPTION EXHIBIT A DECEMBER 2007 Prepared by: SOUTH CAROLINA ELECTRIC & GAS COMPANY

More information

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Fly Ash Reservoir II Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

pdf WATER RETICULATION STANDARD VENTILATION LOUVRE BOXES SINGLE AND DOUBLE DUCT SYSTEMS

pdf WATER RETICULATION STANDARD VENTILATION LOUVRE BOXES SINGLE AND DOUBLE DUCT SYSTEMS Drawing Index Name Doc.No Document Description 2001979.061H.pdf 2001979.061 WATER RETICULATION STANDARD SCOUR VALVE CHAMBER WITH CIRCULAR COVER AND FRAME SHEET NO1 OF 2 2001979.062F.pdf 2001979.062 WATER

More information

Scott Dam Spillway Comparing Physical Model Study Results

Scott Dam Spillway Comparing Physical Model Study Results Scott Dam Spillway Comparing Physical Model Study Results Darren Hinton, P.E., Ph.D., Seattle Laboratory Manager, Northwest Hydraulic Consultants, USA Brian Hughes, M.A.Sc., P.E., Principal, Northwest

More information

19.1 Problem: Maximum Discharge

19.1 Problem: Maximum Discharge 19.1 Problem: Maximum Discharge In partially full channel having an equilateral triangular cross section, the rate of discharge is Q = KAR/3 in which K is a constant, A flow area, R is the hydraulic mean

More information

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms.

Design and Installation of two Permanent Booms at La Romaine-2 to resist Ice, retain Debris and serve as Safety Booms. CGU HS Committee on River Ice Processes and the Environment 18 th Workshop on the Hydraulics of Ice Covered Rivers Quebec City, QC, Canada, August 18-20, 2015 Design and Installation of two Permanent Booms

More information

Design a grit chamber for population with water consumption of 135 LPCD.

Design a grit chamber for population with water consumption of 135 LPCD. 1 Example:1 Design a grit chamber for population 50000 with water consumption of 135 LPCD. Solution Average quantity of sewage, considering sewage generation 80% of water supply, is = 135 x 50000 x 0.8

More information

Homework of chapter (3)

Homework of chapter (3) The Islamic University of Gaza, Civil Engineering Department, Fluid mechanics-discussion, Instructor: Dr. Khalil M. Al Astal T.A: Eng. Hasan Almassri T.A: Eng. Mahmoud AlQazzaz First semester, 2013. Homework

More information

BARRIER OFFSET 0" A 6" 6" A 12" 12" A 26" A 26" 3A OR 4A L OR S * ** L OR S L OR S

BARRIER OFFSET 0 A 6 6 A 12 12 A 26 A 26 3A OR 4A L OR S * ** L OR S L OR S ACCEPTABLE (TCB) TYPES AND ANCHORING DETAILS BASED ON UNDERLYING SURFACE TYPE AND BARRIER OFFSET FROM DROP-OFF BARRIER OFFSET UNDERLYING SURFACE 0" A 6" 6" A 12" 12" A 26" A 26" TCB TYPE DETAIL TCB TYPE

More information

VORTEX REGULATOR Type WAB (UCY / CY-F / CE/V)

VORTEX REGULATOR Type WAB (UCY / CY-F / CE/V) VORTEX REGULATOR Type WAB (UCY / CY-F / CE/V) UCY series, CY series, CE/V series, OP series Conical vortex regulator Type WAB-UCY (wet installation) Vertical vortex regulator Type WAB- CE/V (wet installation)

More information

Annex E Bridge Pier Protection Plan

Annex E Bridge Pier Protection Plan Annex E Bridge Pier Protection Plan Table E1 Bridge Types and Locations Table E2 Flow Conditions For River Sections Figure E1 Bridge Abutment Protection Figure E2 Bridge Pier Protection Figure E3 Central

More information

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION

COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION COST EFFECTIVE STORAGE CAPACITY INCREASE FOR ALUMINA TAILINGS DISPOSAL AREA THROUGH SPILLWAY OPTIMISATION Abstract Lonie I * Tailings and Dams, GHD Brisbane, QLD, Australia Queensland Alumina Limited operates

More information

Ajay Industrial Corporation Limited. Since 1961 AFRIDEV DEEP WELL HAND PUMP. A basic need of the community

Ajay Industrial Corporation Limited. Since 1961 AFRIDEV DEEP WELL HAND PUMP. A basic need of the community Since 1961 Ajay Industrial Corporation Limited AFRIDEV DEEP WELL HAND PUMP A basic need of the community DEEP WELL HAND PUMP AFRIDEV I N T R O D U C T I O N Ajay is an industrial organisation of 50 years

More information

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00)

Bids MAY 24, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $7,500,000.00) General Info Number: PROJECT NO. 43-18-02 Description: BRIDGE DECK REPAIR AND REHABILITATION PERRYSBURG-HOLLAND ROAD OVER THE OHIO TURNPIKE, M.P. 59.0 HESSVILLE ROAD OVER THE OHIO TURNPIKE, M.P. 84.4 LUCAS

More information

The SAG type flat, rubber-steel, balance ropes

The SAG type flat, rubber-steel, balance ropes ROPES The SAG type flat, rubber-steel, balance ropes Application of the SAG ropes: The SAG type, flat, rubber-steel balance ropes, further on called the SAG ropes, are used for shaft transport at mines

More information

MF ER

MF ER Page 1 of 59 Newfoundland and Labrador Hydro Lower Churchill Project Pre-Feed Engineering Services Muskrat Falls Hydroelectric Project MF1050 Spillway Design Review FINAL Document No: 722850-MF1050-40ER-0001-00

More information

ADA Training Standard Plans

ADA Training Standard Plans ADA Training Standard Plans SCREEN READABLE VERSION IS IN THE MAKING AND WILL BE MADE AVAILABLE SOON 2018 MnDOT 2 Standard Plans 2017 Overview Overview PROWAG and Curb Ramp Basics Curb Ramp Types ADA Curb

More information

Hours / 100 Marks Seat No.

Hours / 100 Marks Seat No. 17421 21415 3 Hours / 100 Marks Seat No. Instructions : (1) All Questions are compulsory. (2) Answer each next main Question on a new page. (3) Illustrate your answers with neat sketches wherever necessary.

More information

22. Specialty Valves.

22. Specialty Valves. 22. Specialty Valves. a. Types of Specialty Valves. 1) Use of the following specialty valves is covered in this section: Altitude Valve, Pressure Reducing Valve, Pressure Relief Valve, Swing Check Valve,

More information

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT

BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI. Capt. MVR MURTHY ABSTRACT BEACH NOURISHMENT BY RAINBOWING FOR THE VISAKHAPATNAM PORT TRUST BY DCI Capt. MVR MURTHY ABSTRACT The coastal city of Visakhapatnam had a long wide beach. Over past three decades, this beach has progressively

More information

The basic patterns of drill holes employed in opencast mines are

The basic patterns of drill holes employed in opencast mines are The basic patterns of drill holes employed in opencast mines are Square Pattern Staggered (or) Triangular pattern Single row blasting pattern Multi blasting pattern Wedge cut pattern Diagonal blasting

More information

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018

EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 EXAMPLES (OPEN-CHANNEL FLOW) AUTUMN 2018 Normal and Critical Depths Q1. If the discharge in a channel of width 5 m is 20 m 3 s 1 and Manning s n is 0.02 m 1/3 s, find: (a) the normal depth and Froude number

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 7635 CSAH 4 OVER THE BEAVER RIVER ST. LOUIS COUNTY JUNE 18, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC. JOB

More information

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION

STRUCTURE 65-B PURPOSE SPILLWAY OPERATION STRUCTURE 65-B This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated vertical lift gates and a reinforced concrete lock structure with two pairs of sector

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 1 PINE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 58551 CSAH NO. 41 OVER THE KETTLE RIVER DISTRICT 1 PINE COUNTY JULY 28, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS,

More information

The Challenge of Wave Scouring Design for the Confederation Bridge

The Challenge of Wave Scouring Design for the Confederation Bridge 13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. John s, NL, Canada MARCH 2013 Paper Code. (13 - walsh) The Challenge

More information

CLAIBORNE LOCK AND DAM PERTINENT DATA

CLAIBORNE LOCK AND DAM PERTINENT DATA CLAIBORNE LOCK AND DAM PERTINENT DATA GENERAL Location Clarke, Monroe, & Wilcox Counties, Alabama; Alabama River, river mile 72.5 Drainage area Millers Ferry to Claiborne sq. mi. 836 Total drainage area

More information

Perched Box Caisson Overview. January 2014

Perched Box Caisson Overview. January 2014 Perched Box Caisson Overview January 2014 Why perched box caissons? Perched box caissons are used to construct the portion of the river piers that will support the steel arch spans Construction can occur

More information

Self-drilling hollow anchor bolts and accessories

Self-drilling hollow anchor bolts and accessories Self-drilling hollow anchor bolts and accessories Application During the constructions of underground works, it is very common to encounter soft rock, fractured zone and large deformation due to high ground

More information

Chutes Part 2: Synthetic linings

Chutes Part 2: Synthetic linings s Part 2: Synthetic linings DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [2] [1] s can

More information

NOVEMBER 2006 FLOOD DOWNSTREAM OF THE KATSE DAM STRUCTURE

NOVEMBER 2006 FLOOD DOWNSTREAM OF THE KATSE DAM STRUCTURE THE LESOTHO HIGHLANDS DEVELOPMENT AUTHORITY (LHDA) NOVEMBER 2006 FLOOD DOWNSTREAM OF THE KATSE DAM STRUCTURE Effects of the November 2006 Flood THE DAMAGE CAUSED BY THE FLOOD AS IT PROPAGATES DOWNSTREAM

More information

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS.

Sediment Basin 7E-12. Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures BENEFITS. 7E-12 Design Manual Chapter 7 - Erosion and Sediment Control 7E - Design Information for ESC Measures Sediment Basin BENEFITS Flow Control Erosion Control Sediment Control Runoff Reduction Flow Diversion

More information

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling

VSL MINING & TUNNELING SYSTEMS VSL. mining and tunneling VSL MINING & TUNNELING SYSTEMS VSL mining and tunneling VSL Mining & Tunneling Bolt systems VSL offers three type of bolting system for the mining & Tunnelling industry VSL-S Solid Threaded bolts. Continuous

More information

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

Operations and Instruction Manual Might Swivel Model # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn Operations and Instruction Manual Might Swivel Model # 00238 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Description: Zinc plated forged heat treated steel, Special design gives

More information

Greenup Lock Filling and Emptying System Study

Greenup Lock Filling and Emptying System Study Fourth LACCEI International Latin American and Caribbean Conference for Engineering and Technology (LACCET 2006) Breaking Frontiers and Barriers in Engineering: Education, Research and Practice 21-23 June

More information

TCML operate and control the 146 Km Railway line from Lake Magadi to Konza.

TCML operate and control the 146 Km Railway line from Lake Magadi to Konza. REQUEST OF A QUOTATION TO CARRY OUT STRUCTURAL ASSESSMENT OF BRIDGES, VIADUCT, BOX CULVERTS AND DRAINAGE STRUCTURES ON THE LAKE MAGADI AND KONZA RAILWAY LINE. Tata chemicals Magadi Limited, transport a

More information

Anchor Component Material Standard Mechanical Properties

Anchor Component Material Standard Mechanical Properties SECTION 4.1 PAGE 1 / 5 l description The UCAN sleeve anchor is a light-medium duty anchor ideal for applications in concrete, hollow block and brick. It is a mechanical expansion anchor assembled with

More information

FITTINGS AND VALVES Düker Plunger Valve RKV Type 7015 Professional control of flow rates, reservoir levels and pressures Safe, hygienic and durable!

FITTINGS AND VALVES Düker Plunger Valve RKV Type 7015 Professional control of flow rates, reservoir levels and pressures Safe, hygienic and durable! FITTINGS AND VALVES Düker Plunger Valve RKV Type 7015 Professional control of flow rates, reservoir levels and pressures Safe, hygienic and durable! 1 The New Düker Plunger Valve Type 7015 St Plunger valves

More information

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK

TYPICAL CONTRACTION JOINT PLAN TYPICAL EXPANSION JOINT PLAN T LOCATION AND DETAIL OF JOINTS FOR SIDEWALK CURB EXPANSION JOINTS (TYP) BOULEVARD 5 t /4 TOOLED EDGES EXPANSION JOINTS (TYP) CONTRACTION JOINTS (TYP) 2 m (TYP) BOULEVARD CURB EXPANSION JOINTS (TYP) EVERY 6 m PLAN TYPICAL CONTRACTION JOINT CURB 12

More information

NUMERICAL AND PHYSICAL MODELING

NUMERICAL AND PHYSICAL MODELING POINTE DU BOIS GENERATING STATION SPILLWAY REPLACEMENT PROJECT NUMERICAL AND PHYSICAL MODELING Kara Hurtig, Northwest Hydraulic Consultants, North Vancouver, BC, Canada David S. Brown, KGS Group, Winnipeg,

More information

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM

Schedule for Culvert Works in or on the Bed or Bank of a Watercourse PLEASE READ THIS PAGE BEFORE COMPLETING THE APPLICATION FORM 10A Schedule for Culvert Works in or on the Bed or Bank of a Watercourse This form is to be used for applications to use, erect, place, extend, alter or replace a culvert in or on the beds or banks of

More information

Structurals Rationalised sizes of Beams/Joists, Channels and Angles

Structurals Rationalised sizes of Beams/Joists, Channels and Angles Structurals Rationalised sizes of Beams/Joists, Channels and Angles Section Dimensions Sectional Weight Length mm kg/m m Beams/Joists Beams Durgapur Steel Plant 175 x 85 x 5.8 19.6 Std length 200 x 100

More information

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00)

Bids DECEMBER 21, 2018 AT 2:00 P.M. (EASTERN) (Estimated Cost: $4,700,000.00) General Info Number: PROJECT NO. 43-19-03 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE RAMP OVER STATE ROUTE 420 M.P. 71.4, SOUTH BILLMAN ROAD OVER OHIO TURNPIKE M.P. 75.2, WOOD AND

More information

A5.1 Permitted activities

A5.1 Permitted activities Section A5 Transportation A5.1 Permitted activities A5.1.1 Activities within roads Note: Refer to Section D for the definition of road (a) Any activity associated with the movement of traffic and the functioning

More information

THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM

THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM THE DON DISTRICT SALMON FISHERY BOARD RIVER DON DRAFT GRAVEL MANAGEMENT PLAN NEWE DAM Introduction The Newe Dam at Strathdon is situated on the upper reaches of the river Don catchment area, Grid Reference

More information

Broadly speaking, there are four different types of structures, each with its own particular function:

Broadly speaking, there are four different types of structures, each with its own particular function: 3 The selection of structures 3.1 Introduction In selecting a suitable structure to measure or regulate the flow rate in open channels, all demands that will be made upon the structure should be listed.

More information

Made in the USA. For Fall Protection Only. SafeLok Part Description

Made in the USA. For Fall Protection Only. SafeLok Part Description Operations and Instruction Manual SafeLok Anchorage - Model # 4011 IM-0051 REV A Portable Concrete and Steel Anchorage Connector ANSI Z359.1-07 5,000 lbs / 22kn Made in the USA The 3/4 Fall Protection

More information

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS

ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS ROLLER COMPACTED CONCRETE DESIGN AND CONSTRUCTION FOR INTERMODAL TERMINALS James N. McLeod, P.Eng. Regional Manager - Rail Adam Laughlin, EIT Project Engineer Telephone: (780) 486-7000 Fax: (780) 486-7070

More information

NORDEX. Foundations. Nordex N117/3000

NORDEX. Foundations. Nordex N117/3000 Foundations Nordex N117/3000 Nordex Energy GmbH, Langenhorner Chaussee 600, 22419 Hamburg, Germany All rights reserved. Observe protection notice ISO 16016. K0801_042963_EN Revision 00, 2013-02-04 1 /

More information

coolaroo.com Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions.

coolaroo.com Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions. Protection all year round Installing your new Coolaroo all weather sail is simple, following our step-by-step instructions. Features Provides 100% UV block Water resistant M ade with UV stabilised knitted

More information

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page

Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Alaska Resources Library & Information Services Susitna-Watana Hydroelectric Project Document ARLIS Uniform Cover Page Title: Watana Project, Briefing document on RCC considerations SuWa 109 Author(s)

More information

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS

RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER DRILLING WELLS TABLE OF CONTENTS RULES OF THE OIL AND GAS PROGRAM DIVISION OF WATER RESOURCES CHAPTER 0400-52-06 DRILLING WELLS TABLE OF CONTENTS 0400-52-06-.01 Drilling Equipment 0400-52-06-.03 Casingheads 0400-52-06-.02 Blowout Prevention

More information

Brick & Concrete. Expandet ESI Xtreme Pro Injection Mortar ADVANTAGES. ACCESSORIES Wide range of accessories. INSTALLATION:

Brick & Concrete. Expandet ESI Xtreme Pro Injection Mortar ADVANTAGES. ACCESSORIES Wide range of accessories. INSTALLATION: Expandet ESI Xtreme Pro Injection Mortar Expandet ESI Xtreme Pro is the professional all round bonded anchor solution that provides expansion free, safe and fast anchorage of threaded rod, socket anchors

More information

WYDOT CONCRETE MIX DESIGN PROCEDURE

WYDOT CONCRETE MIX DESIGN PROCEDURE WYDOT CONCRETE MIX DESIGN PROCEDURE Scope: This procedure documents the requirements for obtaining a concrete mix design or referencing an approved mix design from the WYDOT Materials Program, and the

More information

Spillway with improved dissipation efficiency - side dissipation beams

Spillway with improved dissipation efficiency - side dissipation beams Spillway with improved dissipation efficiency - side dissipation beams Dušan Ciuha Jurij Mlanik IBE, Consulting Engineers Institute for Hydraulic Research Hajdrihova 4 Hajdrihova 28 Ljubljana Ljubljana

More information

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam.

Suitable Applications Check dams may be appropriate in the following situations: To promote sedimentation behind the dam. Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Dredging Keeping Our Underwater Highways Open

Dredging Keeping Our Underwater Highways Open Dredging Keeping Our Underwater Highways Open Sedimentation Material that falls to the bottom of a liquid is called sediment. If enough sediment deposits to build a shallow spot on the river or ocean bottom,

More information

1 SafeClaw Anchorage Connectors

1 SafeClaw Anchorage Connectors Operations and Instruction Manual Model #4077 Portable Concrete Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn OHSA 1910.66 & 1926.502 Effective: 01/2012 Expires: 01/2022 IM-0050 REVA 1 SafeClaw Anchorage

More information

User Instruction Manual

User Instruction Manual User Instruction Manual Dual Sliding Beam Anchor Model # GF-DSBA-BA01202 Model # GF-DSBA-BA01802 Model # GF-DSBA-BA02402 WWW.GFORCE-SAFETY.COM Tacklestore Ltd Unit R1D Rockingham Gate Cabot Park, Poplar

More information

Evaluating Surge Potential in CSO Tunnels

Evaluating Surge Potential in CSO Tunnels 14 Evaluating Surge Potential in CSO Tunnels Karen E. Ridgway Tunnels are being proposed to control combined sewer overflow (CSO) in numerous cities in the United States and Canada. The tunnels are intended

More information

International Journal of Advanced Engineering Technology E-ISSN

International Journal of Advanced Engineering Technology E-ISSN Research Article PERFORMANCE OF ELEVATED WATER TANKS SUJECTED TO WIND FORCES Dr. Hirde Suchita K. 1, ajare Asmita A. 2, Hedaoo Manoj N. 3 Address for Correspondence 1 Professor in Applied Mechanics, Govt.

More information

Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA

Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA Logue Brook Dam Outlet Works Upgrade Sofia Vargas, Dams Engineer, GHD, Perth WA Robert Wark, Technical Director Dams, GHD, Perth WA Logue Brook Dam, 130 km south east of Perth, was completed in 1963 and

More information

Wave Energy. ME922/927 Wave energy

Wave Energy. ME922/927 Wave energy Wave Energy ME922/927 Wave energy 1 Global ocean wave energy resource 102 48 38 15 15 24 50 97 32 49 19 18 25 33 92 70 38 19 17 21 50 12 38 34 14 40 43 78 20 41 18 10 37 72 84 48 Annual average in kw/m

More information

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION

STRUCTURE S-65 PURPOSE SPILLWAY OPERATION STRUCTURE S-65 This structure is a reinforced concrete, gated spillway with discharge controlled by three cable operated, vertical lift gates, and a reinforced concrete lock structure with two pairs of

More information

h o l l o w poles for foundat i o n s

h o l l o w poles for foundat i o n s TTT Products Limited Feb 2016. 1 of 6 The MultiPole advantage Introducing the TTT MultiPole an incredibly versatile pole due to its unique hollow core. The MultiPole is a multifunctional pole suitable

More information

Reinstatement of sub-base and base (roadbase) in non-bituminous materials

Reinstatement of sub-base and base (roadbase) in non-bituminous materials This unit covers the requirements that you must meet when reinstating sub-base and base (roadbase) in. You must ensure that you act in accordance with all current specifications and procedures and that

More information

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL

CAISSONS SECTION Section CAISSONS. Part 1-GENERAL Section 02380-CAISSONS Part 1-GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam

CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University. Final Exam CVEN 311 Fluid Dynamics Fall Semester 2011 Dr. Kelly Brumbelow, Texas A&M University Final Exam 8 pages, front & back, not including reference sheets; 21 questions An excerpt from the NCEES Fundamentals

More information

Grit chambers are basin to remove the inorganic particles to prevent damage to the pumps, and to prevent their accumulation in sludge digestors.

Grit chambers are basin to remove the inorganic particles to prevent damage to the pumps, and to prevent their accumulation in sludge digestors. Home Lecture Quiz Design Example Grit Chambers Types of Grit Chambers Aerated Grit Chamber Principle of Working of Grit Chamber Design of Grit Chambers Primary Sedimentation Grit Chambers Grit chambers

More information

Digester Processes. 1. Raw Sludge Pumping System

Digester Processes. 1. Raw Sludge Pumping System Digester Processes 1. Raw Sludge Pumping System Removes accumulated sludge from the primary clarifiers, pumped through 1 of 2 pipes either 150 or 200mm in diameter (Fig. 1.1). Fig 1.1 Pipes feeding Digesters

More information

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019.

Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) The Wairoa wastewater treatment system requires a replacement consent by May 2019. MEMORANDUM Job No.10292 To: From: Jamie Cox, Wairoa District Council Angela Lane, Lowe Environmental Impact / Karen Akuhata (WDC) Date: 11 September 2017 Subject: Task A2I2 Current Outfall Pipe Description

More information

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT

PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. Push Pier Systems PN #MBPPT PUSH PIER SYSTEMS STABILITY. SECURITY. INTEGRITY. PN #MBPPT Push Pier Systems About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair and new construction

More information

Hoover Dam. Hoover Dam A Reading A Z Level M Leveled Book Word Count: 527 LEVELED BOOK M

Hoover Dam. Hoover Dam A Reading A Z Level M Leveled Book Word Count: 527 LEVELED BOOK M A Reading A Z Level M Leveled Book Word Count: 527 LEVELED BOOK M Connections Writing Write a paragraph about the importance of. Include a main idea and at least three supporting details from this book

More information

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed

RoadNews 14 // September VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed VÖGELE pavers rehabilitate race track in Brno, Czech Republic. Paving at Top Speed Seite 1/11 Job Site Details 1/2 Rehabilitation

More information

Paper RCC Jack Jetty and Bamboo Submerged Vanes Application for Navigation Fairway in Ganga River of India

Paper RCC Jack Jetty and Bamboo Submerged Vanes Application for Navigation Fairway in Ganga River of India Paper 173 - RCC Jack Jetty and Bamboo Submerged Vanes Application for Navigation Fairway in Ganga River of India SHARMA NAYAN; NAYAK ANUPAMA Professor, Indian Institute of Technology Roorkee India Email:

More information