Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU

Size: px
Start display at page:

Download "Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU"

Transcription

1 Managed motorways Seminar Traffic Management and Control June 8 th 2017, Thon Hotel Bristol, Oslo Arvid Aakre Traffic Engineering Research Centre Department of Civil and Environmental Engineering, NTNU arvid.aakre@ntnu.no Content Introduction Terminology; Managed motorway, Capacity and Productivity Brief summary of the Motorway Capacity Guide Measurement results Recommended values for design Future work Some comments on Norwegian and Nordic conditions 1

2 Introduction - background Motorway Capacity Guide Part 1: Metropolitan Managed Motorways (Draft May 2017) Authors: John Gaffney and Hendrik Zurlinden, VicRoads, Melbourne, Australia Introduction Melbourne motorway network Melbourne is the capital of Victoria southeast in Australia Area ~ km 2 (~ Oslo + Akershus + Østfold) Population ~ 4.6 mill (~ Slightly less than Norway) Motorway network covers 7% of the urban arterial road lane kms 40% of the urban arterial road travel (increasing) M1 corridor from west to east of the map is about 70 km 2

3 Introduction - M1 Corridor 70 km motorway corridor Total entering volume ~ vehicles a day More than 1 million trips each day (1.2 persons per vehicle) Speed limits and enforcement Australian urban motorways have a maximum speed limit of 100 km/h A very active and strict enforcement regime In Victoria the tolerance is only +3 km/t -> relative small speed differences 3

4 Managed motorways A managed motorway is a motorway which uses different traffic management measures to enhance quality of traffic flow Examples of such measures are variable speed limits, ramp metering, hard shoulder running, traffic information, alternative routes, ITS measures, lane signals, traffic data collection and monitoring, incident detection etc John Gaffney: «A congested motorway is a poorly managed motorway» Capacity «The maximum sustainable flow rate at which vehicles or perons can be expected to traverse a point or uniform segment of a lane or roadway during a specified time period under given roadway, geometric, traffic, environmental and control conditions» (HCM 2016) Capacity values are measured at active bottlenecks and determined on the basis of systematical analysis of data to capture the effect of systematic and random fluctuations under a wide range of demand patterns 4

5 Capacity Capacity should be based on long-term measurements Should not use short term traffic counts on a single day Each dot above is a one hour measurement Factors impacting on capacity Cross section Lane and shoulder width Visibility Alignment Gradient Curvature Sags and crests Traffic Vehicle type distribution Location Share of commuters Other Merge, diverge, weaving Auxiliary lanes Acceleration, deceleration lanes Traffic management Ramp metering Maintenance Work zones Enforcement regime Driver behaviour Headways Braking Lane changing activity Compliance with road rules 5

6 Productivity Productivity is defined as the product of traffic speed and traffic flow Unit is vehicle-kilometers travelled on a road segment per time unit High productivity is achieved when both traffic flow and traffic speed are maintained near maximum values Efficient energy use align closely with the point where the motorway operates at maximum productivity Productivity is a good measure for efficiency, safety as well as environmental conditions Measurements Please remember, a flow rate of 1800 veh/hour means: an average time headway (front-front) of 2 seconds An average time gap (front-back) of about 1.8 sec (depending on speed and vehicle length) 6

7 Measurements No interaction between sections; elimination of downstream bottlenecks (above) Interaction between sections, no elimination of downstream bottlenecks (below) Recommended values for design Design values are typical about 90% of observed capacity See also more complex theoretical methods and models 7

8 Managed motorway probability for breakdown Managed motorway probability for breakdown 8

9 Design of unmanaged and managed motorways Design of unmanaged motorways (above) Design of managed motorways (below) Future work and investigations Merging, diverging and weaving Differences between unmanaged and managed motorways Capacity loss and recovery Congestion and safety Lane changing activity and capacity Effect of geometric parameters and heavy vehicles 9

10 What about Norwegian / Nordic conditions? Swedish guidelines are reviewed in the Australian Motorway Capacity Guide together with the US (HCM), UK, German and Dutch guidelines We have limited experiences with Norwegian conditions, but the values from Australia seems to be useful also in Norway Norwegian motorways have a very limited degree of management There is a large potential for improvement Thank you for your attention Arvid Aakre NTNU Traffic Engineering Research Centre Norwegian University of Science and Technology Trondheim, NORWAY arvid.aakre@ntnu.no 10

Signal control and driver behaviour

Signal control and driver behaviour Signal control and driver behaviour Traffic signal conference at Teknologidagene 2017 26 th of October 2017, Clarion Hotel and Congress, Trondheim Arvid Aakre Traffic Engineering Research Centre Department

More information

CAPACITY, LEVEL OF SERVICE, FUNDAMENTALS OF HIGHWAY CAPACITY ANALYSIS

CAPACITY, LEVEL OF SERVICE, FUNDAMENTALS OF HIGHWAY CAPACITY ANALYSIS CAPACITY, LEVEL OF SERVICE, FUNDAMENTALS OF HIGHWAY CAPACITY ANALYSIS 1. GENERAL Transportation facilities can be classified into two categories of flow: uninterrupted and interrupted. Uninterrupted-flow

More information

Lane changing and merging under congested conditions in traffic simulation models

Lane changing and merging under congested conditions in traffic simulation models Urban Transport 779 Lane changing and merging under congested conditions in traffic simulation models P. Hidas School of Civil and Environmental Engineering, University of New South Wales, Australia Abstract

More information

2009 PE Review Course Traffic! Part 1: HCM. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University

2009 PE Review Course Traffic! Part 1: HCM. Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University 2009 PE Review Course Traffic! Part 1: HCM Shawn Leight, P.E., PTOE, PTP Crawford Bunte Brammeier Washington University sleight@cbbtraffic.com Topic Areas Highway Capacity Manual Highway Capacity Analysis

More information

Evaluating Roundabout Capacity, Level of Service and Performance

Evaluating Roundabout Capacity, Level of Service and Performance Roundabouts with Metering Signals ITE 2009 Annual Meeting, San Antonio, Texas, USA, August 9-12, 2009 Evaluating Roundabout Capacity, Level of Service and Performance Presenter: Rahmi Akçelik rahmi.akcelik@sidrasolutions.com

More information

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999

Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999 Alberta Infrastructure HIGHWAY GEOMETRIC DESIGN GUIDE AUGUST 1999,1'(; A ACCELERATION Data on acceleration from stop D-29 Effects of grade D-35 Intersections D-97, D-99 Lanes D-97, F-5, F-7, F-15, F-21,

More information

Roundabout Design 101: Roundabout Capacity Issues

Roundabout Design 101: Roundabout Capacity Issues Design 101: Capacity Issues Part 2 March 7, 2012 Presentation Outline Part 2 Geometry and Capacity Choosing a Capacity Analysis Method Modeling differences Capacity Delay Limitations Variation / Uncertainty

More information

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02

1 VicRoads Access Management Policies May 2006 Ver VicRoads Access Management Policies May 2006 Version 1.02 1 VicRoads Access Management Policies May 2006 Ver 1.02 VicRoads Access Management Policies May 2006 Version 1.02 2 VicRoads Access Management Policies May 2006 Ver 1.02 FOREWORD FOR ACCESS MANAGEMENT

More information

Automatisch rijden, het gedrag van bestuurders en verkeersstromen

Automatisch rijden, het gedrag van bestuurders en verkeersstromen Automatisch rijden, het gedrag van bestuurders en verkeersstromen Bart van Arem EVU Symposium, 9 september 2016, Postillion Hotel Amersfoort Veluwemeer Rivium Buses (Rotterdam) 2013: DAVI on the road 2016:

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University

Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University JCE 3460 Traffic! Shawn Leight, P.E., PTOE, PTP CBB Transportation Engineers + Planners ITE International President Washington University sleight@cbbtraffic.com Primary Traffic References AASHTO Green

More information

Geometric and Trafc Conditions Summary

Geometric and Trafc Conditions Summary 2 Geometric and Trafc Conditions Summary m, RETHNKNG -94 APPENDX T2 GEOMETRC AND TRAFFC CONDTONS SUMMARY ntroduction This memorandum summarizes the geometric and traffic conditions within the Rethinking

More information

Appendix 9.A - Interchanges Figure 9-A-1 Four-leg Interchanges between Expressways

Appendix 9.A - Interchanges Figure 9-A-1 Four-leg Interchanges between Expressways 374 The Guidelines for Road Design Appendix 9.A - Interchanges Figure 9-A-1 Four-leg Interchanges between Expressways 375 The Guidelines for Road Design Figure 9-A-2 Three-leg Interchanges between Expressways

More information

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report

ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS. Final Report Preparedby: ENHANCED PARKWAY STUDY: PHASE 2 CONTINUOUS FLOW INTERSECTIONS Final Report Prepared for Maricopa County Department of Transportation Prepared by TABLE OF CONTENTS Page EXECUTIVE SUMMARY ES-1

More information

US 69 RELIEF ROUTE STUDY

US 69 RELIEF ROUTE STUDY US 69 RELIEF ROUTE STUDY Jacksonville, Texas PUBLIC MEETING #2 May 29 th, 2018 Welcome to the public meeting for the US 69 Relief Route Study in Jacksonville. This is the second public meeting for this

More information

Evaluation and further development of car following models in microscopic traffic simulation

Evaluation and further development of car following models in microscopic traffic simulation Urban Transport XII: Urban Transport and the Environment in the 21st Century 287 Evaluation and further development of car following models in microscopic traffic simulation P. Hidas School of Civil and

More information

Variables influencing lane changing behaviour of heavy vehicles

Variables influencing lane changing behaviour of heavy vehicles Variables influencing lane changing behaviour of heavy vehicles Sara Moridpour 1, Majid Sarvi 1, Geoff Rose 1 and Euan Ramsay 1,2 1 Institute of Transport Studies, Monash University 2 Department of Transport,

More information

RE: 2007 NPA Text (Clean Version)

RE: 2007 NPA Text (Clean Version) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 20 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 RE: 2007 NPA Text (Clean Version) P. 230, Lines 29-30 SECTION 3B.04 White Lane Line Pavement Markings

More information

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities

MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities MUTCD Part 6G: Type of Temporary Traffic Control Zone Activities 6G.01 Typical Applications Each temporary traffic control (TTC) zone is different. Many variables, such as location of work, highway type,

More information

Module 5: Navigating Roadways

Module 5: Navigating Roadways Module 5: Navigating Roadways Topic 1: Intersections 1. One out of FATAL crashes occur at intersections. 2. Label the intersection warning signs: 3. When possible, begin searching seconds ahead of the

More information

Analysis of Weaving, Merging, and Diverging Movements CIVL 4162/6162

Analysis of Weaving, Merging, and Diverging Movements CIVL 4162/6162 Analysis of Weaving, Merging, and Diverging Movements CIVL 4162/6162 Weaving, Diverging, Merging Segments Weaving one movement must cross the path of another along a length of facility without the aid

More information

Capacity and Level of Service LOS

Capacity and Level of Service LOS Chapter 21 Capacity and Level of Service LOS 21.1 Introduction Often it is required to ascertain how much a transport facility can accommodate. Such information is useful in the design of traffic facility.

More information

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS

Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Dr. Naveed Anwar Executive Director, AIT Consulting Affiliated Faculty, Structural Engineering Director, ACECOMS Overview Highway Functions and Classifications Highway Design Components Design Control

More information

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017

How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 How Might Connected Vehicles and Autonomous Vehicles Influence Geometric Design? October 10, 2017 Overview Design Vehicle Design Driver Potential Geometric Impacts of Autonomous Vehicles Connected Vehicles

More information

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor

Planning Daily Work Trip under Congested Abuja Keffi Road Corridor ISBN 978-93-84468-19-4 Proceedings of International Conference on Transportation and Civil Engineering (ICTCE'15) London, March 21-22, 2015, pp. 43-47 Planning Daily Work Trip under Congested Abuja Keffi

More information

Roundabouts in Australia: the state of the art on models and applications

Roundabouts in Australia: the state of the art on models and applications Roundabouts in Australia: the state of the art on models and applications Seminar Presentation One-day International Meeting on Roundabouts Università di Pisa - Corso di TECNICA del TRAFFICO, Livorno,

More information

Safe roads for cyclists: an investigation of Australian and Dutch approaches

Safe roads for cyclists: an investigation of Australian and Dutch approaches Safe roads for cyclists: an investigation of Australian and Dutch approaches Joel Docker 1 and Marilyn Johnson 2 1 Department of Civil Engineering, Monash University, Australia 2 Institute of Transport

More information

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications

Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications Figure 3B-1. Examples of Two-Lane, Two-Way Marking Applications A - Typical two-lane, two-way marking with passing permitted in both directions B - Typical two-lane, two-way marking with no-passing zones

More information

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018

Northern Virginia Express Lanes Design Challenges and Solutions. IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Northern Virginia Express Lanes Design Challenges and Solutions IBTTA Maintenance and Roadway Operations Workshop June 25, 2018 Virginia Express Lanes Overview 60 miles of managed lanes (4 projects) Long

More information

Roundabouts along Rural Arterials in South Africa

Roundabouts along Rural Arterials in South Africa Krogscheepers & Watters 0 0 Word count: 00 text + figures = 0 equivalent words including Title and Abstract. Roundabouts along Rural Arterials in South Africa Prepared for: rd Annual Meeting of Transportation

More information

SECTION 12 ROAD MARKINGS AND DELINEATION

SECTION 12 ROAD MARKINGS AND DELINEATION SECTION 12 ROAD MARKINGS AND DELINEATION (Blank Page) MANUAL OF TRAFFIC SIGNS AND MARKINGS - Part III: Motorways and Expressways 12-1 12.1 GENERAL 12.1.1 INTRODUCTION The markings and delineation details

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing

TRAFFIC AND SAFETY NOTE 608A. Spacing for Commercial Drives and Streets. To Promote a Uniform Practice in Determining Access Spacing TRAFFIC AND SAFETY NOTE 608A SUBJECT: PURPOSE: Spacing for Commercial Drives and Streets To Promote a Uniform Practice in Determining Access Spacing COORDINATING UNIT: Geometric Design Unit INFORMATION:

More information

Geometric Design Tables

Geometric Design Tables Design Manual Chapter 5 - Roadway Design 5C - Geometric Design Criteria 5C-1 Geometric Design Tables A. General The following sections present two sets of design criteria tables - Preferred Roadway Elements

More information

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways

A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Traffic Operations Method for Assessing Automobile and Bicycle Shared Roadways A Thesis Proposal By James A. Robertson Submitted to the Office of Graduate Studies Texas A&M University in partial fulfillment

More information

DESIGN BULLETIN #66/2010

DESIGN BULLETIN #66/2010 DESIGN BULLETIN #66/2010 Highway Geometric Design Guide Chapter B, Climbing Lane Warrants for Two Lane Undivided and Four Lane Divided Highways - Revised Summary This Design Bulletin is being issued as

More information

AN APPROACH FOR ASSESSMENT OF WEAVING LENGTH FOR MID-BLOCK TRAFFIC OPERATIONS

AN APPROACH FOR ASSESSMENT OF WEAVING LENGTH FOR MID-BLOCK TRAFFIC OPERATIONS International Journal for Traffic and Transport Engineering, 215, 5(4): 442-45 UDC: 625.739 DOI: http://dx.doi.org/1.778/ijtte.215.5(4).8 AN APPROACH FOR ASSESSMENT OF WEAVING LENGTH FOR MID-BLOCK TRAFFIC

More information

Evaluation summary of Pilot trial with Hard Shoulder Running on the Hillerød Motorway

Evaluation summary of Pilot trial with Hard Shoulder Running on the Hillerød Motorway Date 30 August 2016 Contact Claus Lund Andersen Mail clla@vd.dk Phone +45 7244 3333 Document 14/15723-56 Page 1/5 Evaluation summary of Pilot trial with Hard Shoulder Running on the Hillerød Motorway Summary

More information

Roadway Design Manual

Roadway Design Manual Roadway Design Manual Manual Notice Archive by Texas Department of Transportation (512) 302-2453 all rights reserved Manual Notice 2009-1 From: Manual: Mark A. Marek, P.E Roadway Design Manual Effective

More information

Transportation Master Plan Advisory Task Force

Transportation Master Plan Advisory Task Force Transportation Master Plan Advisory Task Force Network Alternatives & Phasing Strategy February 2016 BACKGROUND Table of Contents BACKGROUND Purpose & Introduction 2 Linking the TMP to Key Council Approved

More information

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY

1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY 1609 E. FRANKLIN STREET HOTEL TRAFFIC IMPACT STUDY EXECUTIVE SUMMARY Prepared for: The Town of Chapel Hill Public Works Department Traffic Engineering Division Prepared by: HNTB North Carolina, PC 343

More information

Introduction to Roundabout Analysis Using ARCADY

Introduction to Roundabout Analysis Using ARCADY Introduction to Roundabout Analysis Using ARCADY Toronto SimCap User Group Technical Event and ITE Toronto Section Social Event July 22, 2014 Phil Weber, P.Eng. GHD Inc. (The Home of Ourston Roundabout

More information

BICYCLE NETWORK CRASH REPORT

BICYCLE NETWORK CRASH REPORT BICYCLE NETWORK CRASH REPORT 2012-2016 Prepared July 2017 1. Executive Summary With more than 50,000 members, Bicycle Network is Australia s largest bike riding organisation. Through our advocacy, membership,

More information

TABLE OF CONTENTS LIST OF FIGURES. Figure Title

TABLE OF CONTENTS LIST OF FIGURES. Figure Title TABLE OF CONTENTS Table of Contents... 1 List of Figures... 1 Chapter Forty-two... 2 42-1.0 STOPPING SIGHT DISTANCE... 2 42-1.01 Theoretical Discussion...2 42-1.02 Passenger Car Stopping Sight Distance...

More information

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS

TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS TECHNICAL NOTE THROUGH KERBSIDE LANE UTILISATION AT SIGNALISED INTERSECTIONS Authors: Randhir Karma NDip: Eng (Civil) B. Tech Eng (Civil) M Eng (Hons) (Transportation) Auckland Traffic Service Group Manager

More information

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION

7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.0 FREEWAYS CONGESTION HOT SPOT PROBLEM & IMPROVEMENT PROJECT ANALYSIS & DEFINITION 7.1 INTRODUCTION & METHODOLOGY FEASIBILITY REPORT Congestion hot spot problem locations have been assessed using the

More information

Safety Impacts: Presentation Overview

Safety Impacts: Presentation Overview Safety Impacts: Presentation Overview The #1 Theme How Access Management Improves Safety Conflict Points The Science of Access Management By Treatment Studies Themes for Texas Access Management Improve

More information

Traffic Control Devices

Traffic Control Devices 533372 Highway Engineering Traffic Control Devices Traffic Control Devices o The media by which traffic engineers communicate with drivers o Every traffic law, regulation, or operating instruction must

More information

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation

Let s Make I-40 Better Action Team. Friday, March 29, 2019 Hosted by RTP Foundation Let s Make I-40 Better Action Team Friday, March 29, 2019 Hosted by RTP Foundation RTA Welcome Geoff Lang, MetLife, RTA Chair Jim Beley, The Umstead Hotel & Spa, RTA regional travel experience chair NCDOT

More information

An Easier Commute. Learn how to use I-77 Express to save you time.

An Easier Commute. Learn how to use I-77 Express to save you time. An Easier Commute Learn how to use I-77 Express to save you time PUBLIC-PRIVATE PARTNERSHIP I-77 Express is the first-ever toll lane public-private partnership with NCDOT I-77 Mobility Partners is financing,

More information

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay

unsignalized signalized isolated coordinated Intersections roundabouts Highway Capacity Manual level of service control delay Whether unsignalized or signalized, isolated or coordinated, you can use TransModeler to simulate intersections with greater detail and accuracy than any other microsimulation software. TransModeler allows

More information

Off-road Trails. Guidance

Off-road Trails. Guidance Off-road Trails Off-road trails are shared use paths located on an independent alignment that provide two-way travel for people walking, bicycling, and other non-motorized users. Trails specifically along

More information

Managed Motorways Experience from the UK

Managed Motorways Experience from the UK Managed Motorways Experience from the UK Author David Kamnitzer (dkamnitzer@ibigroup.com) Director, IBI Group Project Manager of IBI Group s technical advisor commission for the Highways Agency s Managed

More information

Rural design meeting Oslo, 2011

Rural design meeting Oslo, 2011 Rural design meeting Oslo, 2011 Randi Eggen Norwegian Public Road Administration (NPRA) Traffic Safety, Environment and Technology Department Section: Transport Planning Participants Germany: Netherlands:

More information

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA

Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA Active Traffic Management and Part-Time Shoulder Use in Montgomery County, PA PENN STATE TESC SESSION 8B MOVING PENNDOT AND PTC FORWARD DECEMBER 8, 2017 Agenda Define Active Traffic Management and describe

More information

General Design Factors

General Design Factors Chapter 3: 3-1.0 Introduction General Design Factors Mn/DOT s goals include encouraging and accommodating safe bicycling. From a design perspective, these goals are achieved by first having an understanding

More information

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS

1.3.4 CHARACTERISTICS OF CLASSIFICATIONS Geometric Design Guide for Canadian Roads 1.3.4 CHARACTERISTICS OF CLASSIFICATIONS The principal characteristics of each of the six groups of road classifications are described by the following figure

More information

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures

3 ROADWAYS 3.1 CMS ROADWAY NETWORK 3.2 TRAVEL-TIME-BASED PERFORMANCE MEASURES Roadway Travel Time Measures ROADWAYS Approximately 6 million trips are made in the Boston metropolitan region every day. The vast majority of these trips (80 to percent, depending on trip type) involve the use of the roadway network

More information

ROUNDABOUT MODEL COMPARISON TABLE

ROUNDABOUT MODEL COMPARISON TABLE Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA www.sidrasolutions.com Management Systems Registered to ISO 9001 ABN 79 088 889 687 ROUNDABOUT MODEL COMPARISON TABLE Prepared by

More information

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis

Subject: Solberg Avenue / I-229 Grade Separation: Traffic Analysis MEMORANDUM Transportation Bill Troe, AICP Jason Carbee, AICP 12120 Shamrock Plaza Suite 300 Omaha, NE 68154 (402) 334-8181 (402) 334-1984 (Fax) To: Project File Date: Subject: Solberg Avenue / I-229 Grade

More information

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh)

METHODOLOGY. Signalized Intersection Average Control Delay (sec/veh) Chapter 5 Traffic Analysis 5.1 SUMMARY US /West 6 th Street assumes a unique role in the Lawrence Douglas County transportation system. This principal arterial street currently conveys commuter traffic

More information

Characteristics of. Entering & Exiting High Speed Considerations

Characteristics of. Entering & Exiting High Speed Considerations Mod 6 Characteristics of Expressways Entering & Exiting High Speed Considerations Characteristics of an Expressway Controlled access (limited entry and exit) High speed (up to 65 mph) Divided by a barrier

More information

MOVEABLE BARRIER. Congestion Management Solutions

MOVEABLE BARRIER. Congestion Management Solutions MOVEABLE BARRIER Congestion Management Solutions 1 Portland area morning congestion (AM) 2 Portland area afternoon congestion (PM) 3 30 year planning - Portland Area 100% Growth over 30 years 4 Movable

More information

An Investigation of Freeway Capacity Before and During Incidents

An Investigation of Freeway Capacity Before and During Incidents An Investigation of Freeway Capacity Before and During Incidents Cuie Lu and Lily Elefteriadou Department of Civil and Coastal Engineering University of Florida March 4, 2011 Outline Database and Analysis

More information

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL

Tools for safety management Effectiveness of risk mitigation measures. Bernhard KOHL Tools for safety management Effectiveness of risk mitigation measures Bernhard KOHL Contents Background Tools for risk-based decision making Safety measures Illustration of methodical approach Case studies

More information

MoPac South: Impact on Cesar Chavez Street and the Downtown Network

MoPac South: Impact on Cesar Chavez Street and the Downtown Network MoPac South: Impact on Cesar Chavez Street and the Downtown Network Prepared by: The University of Texas at Austin Center for Transportation Research Prepared for: Central Texas Regional Mobility Authority

More information

Highway Capacity and LOS. Reading Assignment: pgs

Highway Capacity and LOS. Reading Assignment: pgs Highway Capacity and LOS Reading Assignment: pgs. 170-200 We know from the previous section that traffic flows fairly well when Demand < Capacity. However, when demand approaches capacity, we begin to

More information

ROUNDABOUT MODEL COMPARISON TABLE

ROUNDABOUT MODEL COMPARISON TABLE Akcelik & Associates Pty Ltd PO Box 1075G, Greythorn, Vic 3104 AUSTRALIA info@sidrasolutions.com Management Systems Registered to ISO 9001 ABN 79 088 889 687 ROUNDABOUT MODEL COMPARISON TABLE Prepared

More information

aasidra for Roundabouts INTRODUCTION

aasidra for Roundabouts INTRODUCTION aasidra for Roundabouts INTRODUCTION Rahmi Akçelik Director, Akcelik & Associates Pty Ltd Adjunct Professor, Monash University Mark Besley Director, Akcelik & Associates Pty Ltd TRB Roundabout Conference

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

THE EFFECT OF WEAVING MANEUVERS ON OPERATION OF A FREE RIGHT-TURN LANE AT RAMP TERMINALS. A Thesis MINCHUL PARK

THE EFFECT OF WEAVING MANEUVERS ON OPERATION OF A FREE RIGHT-TURN LANE AT RAMP TERMINALS. A Thesis MINCHUL PARK THE EFFECT OF WEAVING MANEUVERS ON OPERATION OF A FREE RIGHT-TURN LANE AT RAMP TERMINALS A Thesis by MINCHUL PARK Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment

More information

4/27/2016. Introduction

4/27/2016. Introduction EVALUATING THE SAFETY EFFECTS OF INTERSECTION SAFETY DEVICES AND MOBILE PHOTO ENFORCEMENT AT THE CITY OF EDMONTON Karim El Basyouny PhD., Laura Contini M.Sc. & Ran Li, M.Sc. City of Edmonton Office of

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

Regional Transportation Needs Within Southeastern Wisconsin

Regional Transportation Needs Within Southeastern Wisconsin Regional Transportation Needs Within Southeastern Wisconsin #118274 May 24, 2006 1 Introduction The Southeastern Wisconsin Regional Planning Commission (SEWRPC) is the official areawide planning agency

More information

Grade Separated Intersection

Grade Separated Intersection Grade Separated Intersection Lecture Notes in Transportation Systems Engineering Prof. Tom V. Mathew Contents 1 Overview 1 2 Classification of Intersection 2 2.1 Grade Separated Intersection...........................

More information

Gap Acceptance, and Traffic Safety Analysis On U-Turn Median OpeningsOf Arterial Roads

Gap Acceptance, and Traffic Safety Analysis On U-Turn Median OpeningsOf Arterial Roads Al-Taei: Gap Acceptance, and Traffic Safety AnalysisOn U-Turn Gap Acceptance, and Traffic Safety Analysis On U-Turn Median OpeningsOf Arterial Roads Dr. Abdul Khalik Al-Taei Assistant Prof. Trans Engineering

More information

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE

CHAPTER 3A. GENERAL PAGE CHAPTER 3B. PAVEMENT AND CURB MARKINGS PAGE Virginia Supplement to the 2009 MUTCD Revision 1 Page TC-3-1 PART 3. MARKINGS CHAPTER 3A. GENERAL PAGE Section 3A.01 Functions and Limitations Section 3A.02 Standardization of Application Section 3A.03

More information

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones.

Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13. Brief Description: Guidance for the use and placement of pull-off area in work zones. 6 - G2 Subject: Use of Pull-off Areas in Work Zones Page: 1 of 13 MdMUTCD REF. NO. None Date Issued: 09/09 Effective Date: 09/09 Brief Description: Guidance for the use and placement of pull-off area in

More information

Rural Highway Overtaking Lanes

Rural Highway Overtaking Lanes Rural Highway Overtaking Lanes Kah Wai Ng School of Civil and Resource Engineering, University of Western Australia Song Wang School of Mathematics and Statistics, University of Western Australia Doina

More information

This page intentionally left blank.

This page intentionally left blank. This page intentionally left blank. COMMUNITY Coweta Community Overview Coweta Coweta, a residential community located in Wagoner County, is a suburb of Tulsa situated southeast of the metropolitan area

More information

COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE. Peter Karantonis 1 and David Gonzaga 2

COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE. Peter Karantonis 1 and David Gonzaga 2 ICSV14 Cairns Australia 9-12 July, 2007 COMPARING WEEKLY AND WEEKDAY AVERAGED TRAFFIC DATA WHEN MODELLING TRAFFIC NOISE Peter Karantonis 1 and David Gonzaga 2 1 Renzo Tonin & Associates (Qld) Pty Ltd L20,

More information

INTERSECTIONS AT GRADE INTERSECTIONS

INTERSECTIONS AT GRADE INTERSECTIONS INTERSECTIONS 1 AT GRADE INTERSECTIONS INTERSECTIONS INTERSECTIONS = INTERRUPTED FACILITIES Definitions and key elements An intersection is defined as an area where two or more roadways join or cross.

More information

Toll Rate Public Hearing

Toll Rate Public Hearing Toll Rate Public Hearing I-77 Express Toll Rate Hearing September 13, 2018 AGENDA AND HOUSEKEEPING Speaker Signup Bathrooms/Exits Facebook Live Introductions Thanks and Recognition 6:30-6:35 6:35-6:55

More information

BASIC FREEWAY CAPACITY STUDIES Definitions

BASIC FREEWAY CAPACITY STUDIES Definitions Definitions A freeway is a divided highway facility having two or more lanes in each direction for the exclusive use of traffic with full control of access and egress. Freeway is the only facility that

More information

York Region Population and Employment Growth

York Region Population and Employment Growth March 1, 2016 1 York Region Population and Employment Growth York Region needs to comply with The Provincial Growth Plan and new forecasts introduced to 2036 and 2041 2 Regional Official Plan Review York

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division

Southside Road. Prepared for: City of St. John s Police & Traffic Committee. Prepared by: City of St. John s Traffic Division Southside Road Prepared for: City of St. John s Police & Traffic Committee Prepared by: City of St. John s Traffic Division January 2007 Southside Road - Traffic Report Page 1 of 9 BACKGROUND: th At the

More information

I-25 South Gap Project Monument to Castle Rock

I-25 South Gap Project Monument to Castle Rock I-25 South Gap Project Monument to Castle Rock Project Overview Castle Rock Town Council April 3, 2018 by Chuck Attardo I-25 South: Monument to C-470 An Important Corridor to Colorado Links the state s

More information

CITY OF SASKATOON COUNCIL POLICY

CITY OF SASKATOON COUNCIL POLICY ORIGIN/AUTHORITY Clause 1, Report No. 1-1980 and Clause 4, Report No. 22-1990 of the Works and Utilities Committee; Clause 6, Report No. 17-2004 of the Planning and Operations Committee; and Clause D5,

More information

Speed Limits in the Hoddle Grid

Speed Limits in the Hoddle Grid Speed Limits in the Hoddle Grid Recent History of speed limits March 2013 Docs # 7738485 1 Introduction Muncipalities have power to Erect speed limit signs BUT Municipalities DO NOT have the power to approve

More information

Assessing Level of Service for Highways in a New Metropolitan City

Assessing Level of Service for Highways in a New Metropolitan City Assessing Level of Service for Highways in a New Metropolitan City Ganesh Pawar Civil Engineering Department G. H. Raisoni College of Engineering Nagpur, India,4416 Dr. Bhalachandra Khode Civil Engineering

More information

Part-time Shoulder Use Guide

Part-time Shoulder Use Guide 1 Part-time Shoulder Use Guide FHWA Guide AASHTO SCOD, Baltimore, MD June 2016 DOTs Face Increasing Challenges 2 Performance Based Practical Design 3 PBPD is a decision making approach that helps agencies

More information

GUIDELINE: Roadside Worksites

GUIDELINE: Roadside Worksites Title: GUIDELINE: Roadside Worksites Version 1.0 Short description Relevant to Authority Responsible officer Responsible office A guideline on ensuring a safe method of works on or near roadways within

More information

Design Considerations for Complete Streets. The Kiewit Center for Infrastructure and Transportation

Design Considerations for Complete Streets. The Kiewit Center for Infrastructure and Transportation Design Considerations for Complete Streets Objective Provide design geometrics and features that accommodate balanced operations of bicycles, pedestrians and vehicles on a complete street Cul-de-sacs,

More information

Twin Cities Regional Bicycle System Study

Twin Cities Regional Bicycle System Study Twin Cities Regional Bicycle System Study Developing a Regional Bicycle Network Steven Elmer, Metropolitan Council Tony Hull, Toole Design Group LLC CTS Research Conference May 21, 2014 Introduction Study

More information

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA

Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA Addendum Developed by: The American Traffic Safety Services Association (ATSSA) 15 Riverside Parkway, Suite 100 Fredericksburg, VA 22406-1022 800-272-8772 This material is based upon work supported by

More information

THE MAGICAL PROPERTY OF 60 KM/H AS A SPEED LIMIT? JOHN LAMBERT,

THE MAGICAL PROPERTY OF 60 KM/H AS A SPEED LIMIT? JOHN LAMBERT, THE MAGICAL PROPERTY OF 60 KM/H AS A SPEED LIMIT? JOHN LAMBERT, MIEAust, CPENG 180 785, B.Eng (Agric), ARMIT (Mech). John Lambert and Associates Pty Ltd ABSTRACT Kloeden et al (1997) found that in a 60

More information

Toronto SimCap Toronto, ON, Canada, July 2014 SIDRA INTERSECTION 6. sidrasolutions.com sidrasolutions.com/forums youtube.

Toronto SimCap Toronto, ON, Canada, July 2014 SIDRA INTERSECTION 6. sidrasolutions.com sidrasolutions.com/forums youtube. Toronto SimCap Toronto, ON, Canada, July 2014 SIDRA INTERSECTION 6 sidrasolutions.com sidrasolutions.com/forums youtube.com/sidrasolutions Our company Multi-Award Winning Company 2010 Victorian Small Business

More information

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a

Introduction Roundabouts are an increasingly popular alternative to traffic signals for intersection control in the United States. Roundabouts have a HIGH-CAPACITY ROUNDABOUT INTERSECTION ANALYSIS: GOING AROUND IN CIRCLES David Stanek, PE and Ronald T. Milam, AICP Abstract. Roundabouts have become increasingly popular in recent years as an innovative

More information