1 CITY OF COLWOOD MINUTES OF COLWOOD CYCLING ADVISORY COMMITTEE MEETING Thursday September 8, 5:00p.m Wishart Road Colwood BC Council Chambers DATE: Thursday September 8, 5:00p.m. Committee Adoption: March 6, 2017 To Council: March 27, 2017 ATTENDING Members PRESENT Engineer Planning Technician REGRETS Councillor Lilja Chong Councillor Jason Nault Shaun Eden Judith Cullington Helen Lockhart Dennis Carlson 1. APPROVAL OF THE AGENDA MOVED BY: JUDITH CULLINGTON That the agenda for the Colwood Cycling Advisory Committee meeting of Thursday Sept. 8th 2016 be approved as presented. 2. ADOPTION OF THE MINUTES 2.1. Minutes CAC - July 4, 2016 MOVED BY: JUDITH CULLINGTON That the minutes of the Colwood Cycling Advisory Committee meeting of Monday July 4, 2016 be adopted as presented.
2 3. OLD BUSINESS 3.1. Development Permit Application # DP Onni Group City Centre 1913 Sooke Road and 1889 Island Highway. The committee reviewed the recommendations made at the meeting of July 4, 2016 and made some further adjustments. City Engineer, Michael Baxter pointed out that although the CAC had been approached by the Planning Department for input, as this is a Development Permit Application the Director of Planning would have the final decision on recommendations made to the Developer. MOVED BY: COUNCILLOR NAULT That the following recommendations be made to the Planning and Land use Department for the Onni Group City Centre Development Permit Application #DP : Improve Sooke Road frontage by adding bus/bike lanes and a wheelchair accessible bus stop, and cycling connection through the site to Belmont Road. Access directly off Sooke Road for bikes and pedestrians between buildings 1 & 4. Ensure unobstructed access to underground bike parking (plans show pillars in-front of the storage entrances. Review options for bikes getting to underground parking without traffic interaction e.g. to avoid bikes going down ramps, can they use the elevators? Or is a separation possible on the actual ramp? Integrate with transit on the edge of the site (BC Transit plan to have a rapid transit on Island Hwy/Goldstream, where is stop to service this and bring transit users to the site; plus 61/52 buses travel along Sooke Road, needs fully accessible transit stop with shelter. Consider secure covered bicycle parking for multi-modal transportation with buses in visible area of development. Reconstruct Sooke and Goldstream intersection for extra pedestrian crossing and wheelchair accessibility. Reconstruct Sooke and Goldstream intersection for extra pedestrian crossing and wheelchair accessibility. Add traffic lights at Jerome/Colwood Crescent and Sooke Road and investigate options for allowing cyclist activation of this light.
3 Provide covered bike parking on ground level in front of buildings. Provide ground level outlets for electric bikes and motorized wheelchairs as well as EVs. Provide continuous sidewalks from Sooke Road to Colwood Crescent and Jerome Road and connected walkways throughout the development. It looks like there are no sidewalks planned for the eastern Jerome Road frontage. The drawing should make it clear whether this section of road is expected to be a Woonerf where pedestrians and cyclists travel in the same area as motor vehicles. If it is not, there should be some consideration for pedestrian movements along this section of road, e.g. a public access statutory right of way to the crosswalk near the future trail connection. Provide sidewalk on the Belmont Road frontage. Consider providing prominent and appealing stairs in the residential lobbies of the buildings for access to the other floors to encourage stair use instead of elevator use. 4. NEW BUSINESS 4.1. RZ Goldstream Avenue - The Landmark Dennis Carlson, Planning Technician advised that the re-zoning involves the parcel identified as the Dairy Site Park and the idea is to relocate the heritage Dairy House onto the Park. They will be required to have underground bike storage for 250 bikes plus bike rack for six bikes at the entrance to each building. Building 'C' will be commercial space. The Committee discussed various recommendations and agreed that these should be circulated for fine tuning with a final review at the next CAC meeting of Monday October 3, Councillor Day noted that the language used in a recommendation is important, for example, Accessible parking is the term usually favoured when referring to parking spots instead of wheelchair parking. She further noted that the Disability Committee had a preference for brushed cement wherever possible on sidewalks as the smoother the surface the better.
4 Traffic light at Whitehead Place and Goldstream should have a signal for cyclist activation Short term, above ground bike parking should be visible, well lit, covered and located near the front of the development. Short term bike storage at the Park would be better at the entrance instead of to the rear of the area. Underground bike storage area should include a Bike Kitchen. The Planner indicated that access from the back of the site to the Galloping Goose would not be possible due to steep grades. Wheelchair/scooter/pedestrian access from Goldstream Ave and circulation throughout the development needs to be made clear, e.g. the sidewalk from Goldstream Ave to Building B looks very narrow. All sidewalks should be wide enough for two wheelchairs to pass each other. Any decorative sidewalk pattern in the park should consider surface texture for people with mobility issues. Some stone patterns can be very bumpy for people in wheelchairs or scooters. Handicap parking spots should be specified RZ Wale Road - Seniors Housing Complex Dennis Carlson advised that this was a Vacant Rezoning Application for a 100 unit Seniors Care facility adjacent to the Westshore Lodge. A pathway will link the property to the Galloping Goose and if the Rezoning is approved a Development Permit will be required. The committee felt that seniors on scooters will want direct access to Thriftys, banks, pharmacy, etc and my use the direct route which is through the Midas Plaza area, this should be discouraged as it is a heavily used, uncontrolled traffic area. Dennis advised that seniors would be encouraged to use Wale Road and the Galloping Goose and the main entrance and sidewalk provided and the to come and go. The Committee discussed various recommendations and agreed that these should be circulated for fine tuning with a final review at the next CAC meeting of Monday October 3, It would be preferable for the link between this development and the Midas Plaza to be multi-use. There was concern that the plan shown would not be safe for motorised scooters because of a tight corner. Only sidewalk provided within the internal driveway is in-front of Phase 1. It is shortsighted to be building Senior s Accommodation without sidewalks. A woonerf may be the best option for internal, multi-use transportation and access between neighbouring properties. More information should be provided about creating some community space with the Westshore Lodge. Long term bike parking should be provided. Possible users of it are staff who service seniors and provide activities.
5 More information should be provided about how to access Westshore Lodge. Will there be a connection through to Westshore Lodge without coming out of the building? Seniors Housing Complex residents and visitors have the option to use Wale Road or the Galloping Goose to come and go and not travel the Midas Parking lot. Although not part of this project, Westshore Lodge should try to connect to the Galloping Goose at some point. This could allow for a possible walking loop with connection to the Galloping Goose. Short term, exterior bike parking should be provided for visitors. Consider parking & charging area for scooters as an alternative to charging only in units or storage areas. 5. NEXT MEETING 5.1. The next meeting of the Colwood Cycling Advisory Committee is scheduled for Monday October 3, 2016 at 5:00p.m. Member Judith Cullington asked about the upcoming OCP and input via Public Engagement, if there would be outreach through groups like the Cycling Committee and should this item be added to the agenda for the next CAC meeting for their review and recommendations. Michael Baxter encouraged everyone to attend the Seaside Fair at Fort Rodd Hill on Sunday September 18, ADJOURNMENT MOVED BY: COUNCILLOR DAY That the meeting of the Colwood Cycling Advisory Committee of Thursday September 8, 2016 adjourn at 6:04 p.m. APPROVED AND CONFIRMED CERTIFIED CORRECT
7/23/2017 VIA . Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811
7/23/2017 VIA EMAIL Michael Hanebutt City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: 65 th Street Apartments (DR17-220) Dear Mr. Hanebutt:
More informationHARRISON STREET/OAKLAND AVENUE COMMUNITY TRANSPORTATION PLAN
HARRISON STREET/OAKLAND AVENUE Community Workshop #4: Draft Plan Review December 3, 2009 D E S I G N, C O M M U N I T Y & E N V I R O N M E N T INTRODUCTIONS Key Project Staff: Alisa Shen, Project Manager,
More informationSee Figure 38, Existing Nonmotorized Connections.
Nonmotorized Connections Existing Nonmotorized Connections Pedestrian, vehicle and bike traffic access and movements are confined primarily to Penny Drive on campus. Due to the steep slope along the length
More informationNon-Motorized Transportation 7-1
Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel
More informationGovernance and Priorities Committee Report For the July 2, 2015 Meeting
CITY OF VICTORIA For the July 2, 2015 Meeting To: Governance and Priorities Committee Date: From: Subject: Brad Dellebuur, A/Assistant Director, Transportation and Parking Services Executive Summary The
More informationScarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017
Scarlett Road Bridge & Road Improvements Lambton Park Community School - Gymnasium Tuesday November 28 th, 2017 PROJECT LOCATION 2 SCARLETT ROAD BRIDGE Constructed in 1912, the bridge carries 4 active
More informationMemorandum. Sunday, July 13, Saturday, July 19, 2014
Memorandum To: David Lowin, Brooklyn Bridge Park Corporation From: Daniel Schack, AICP, PTP Date: Re: Brooklyn Bridge Park Pier 5/6 Loop Road Traffic Study Project No: 14-01-2407 At the request of Brooklyn
More informationEl Camino Real Specific Plan. TAC/CAC Meeting #2 Aug 1, 2018
El Camino Real Specific Plan TAC/CAC Meeting #2 Aug 1, 2018 Land Use Alternatives Goals and Tradeoffs Parks & open space Housing Retail & services Civic spaces Parking Community gathering spaces 3 Alternatives
More informationWelcome! Public Open House on UBC s Transportation Plan
1 Welcome! Public Open House on UBC s Transportation Plan Public open house hours: to When it comes to on-campus transportation, what do you think is working well and what are some opportunities for improvement?
More informationNiantic Center Elementary School
Niantic Elementary School is located in the Northwest corner of the intersection of West Main Street and East Pattagansett Road, as so noted on the Facility Location Map. location Overview: The site is
More informationCalifornia Department of Transportation, District 4. Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016
California Department of Transportation, District 4 Sloat Boulevard Project Skyline Blvd. to 19 th Ave. Community Update January 13, 2016 Agenda Welcome and introductions Project overview, history and
More informationComplete Streets. Designing Streets for Everyone. Sarnia
Complete Streets Designing Streets for Everyone Sarnia Complete Streets ~ Sarnia ~ 2018 Introduction Our City is made up of a network of streets that we use to go for a walk, cycle to work, drive to the
More information11/28/2016 VIA
11/28/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd., 3 rd Floor Sacramento, Ca 95811 RE: Natomas Corporate Center Commercial Building
More informationAGENDA ITEM SUMMARY March 5, 2019 City Council
Agenda Item 20 AGENDA ITEM SUMMARY March 5, 2019 City Council STAFF Amanda Mansfield, Transportation Planner Paul Sizemore, FC Moves Senior Manager Chris Van Hall, Legal SUBJECT Items Relating to Regulating
More informationDecember 15, City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1
December 15, 2017 City of Ottawa Planning and Growth Management Branch 110 Laurier Ave. W., 4 th Floor Ottawa, ON K1P 1J1 Attention: Mr. Wally Dubyk, C.E.T. Project Manager, Infrastructure Approvals Dear
More informationWelcome to the Quebec Alternatives Analysis Public Meeting
Welcome to the Public Meeting Please sign in. Public Comment Please fill out a comment card and tell us what you think. Check back or comment any time at: www.quebecalternatives.com Project Area Technical
More informationTonight is for you. Learn everything you can. Share all your ideas.
Strathcona Neighbourhood Renewal Draft Concept Design Tonight is for you. Learn everything you can. Share all your ideas. What is Neighbourhood Renewal? Creating a design with you for your neighbourhood.
More information01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS
01. VICINITY OF GREENBRAE POC: EXISTING CONDITIONS Existing Bus Stop Existing US101 On-ramp Existing POC Old Redwood Highway Rich Street City ROW Environmental Study Limit Industrial Way NO DESIGNATED
More informationFunctional, Preliminary Design and Detailed Design
Functional, Preliminary Design and Detailed Design Main Street (Echo Drive to the Rideau River), Lees Avenue (Main Street to Chestnut Street), and Rideau River Drive (Main Street to 130m south of Main
More informationWhat Is a Complete Street?
Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for
More informationChapter 2: Standards for Access, Non-Motorized, and Transit
Standards for Access, Non-Motorized, and Transit Chapter 2: Standards for Access, Non-Motorized, and Transit The Washtenaw County Access Management Plan was developed based on the analysis of existing
More informationBicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013
Bicycle and Pedestrian Advisory Committee (BPAC) November 21, 2013 OVERALL LAND USE CONCEPT Overall Broadway Valdez District: 95.5 acres (35.1 acres right-of ways + 60.4 acres developable land) Plan Subareas:
More informationHYATTSVILLE TRANSPORTATION PLAN. City Council Update March 19, 2018
HYATTSVILLE TRANSPORTATION PLAN City Council Update March 19, 2018 AGENDA PROJECT GOALS DATA COLLECTION WHAT WE LEARNED NEXT STEPS PROJECT GOALS Identify bicycle and pedestrian needs of the city Evaluate
More informationCHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS
CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...
More informationBETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY
DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR
More informationCity of Charlottesville Bicycle and Pedestrian Master Plan Update
City of Charlottesville Bicycle and Pedestrian Master Plan Update September 17, 2014 I. Welcome and meeting overview II. Project status update III. Network overview IV. Break-out groups Pedestrian Network
More informationCITY OF ALBANY TRAFFIC AND SAFETY COMMISSION
CITY OF ALBANY TRAFFIC AND SAFETY COMMISSION City Hall - Council Chambers 1000 San Pablo Avenue, Albany, CA 94706 Wednesday, November 30, 2016, 7:00 PM 1. CALL TO ORDER The meeting was called to order
More informationMulti-Modal Traffic Analysis. Parisi and Associates
Mill Valley to Corte Madera Bicycle and Pedestrian Corridor Study Appendix D: Multi-Modal Traffic Analysis Prepared by Parisi and Associates August 2009 Appendix D - Multi-Modal Traffic Analysis Table
More informationA CHANGING CITY. of Edmonton, it is essential that it reflects the long-term vision of the City.
A CHANGING CITY By the year 2040, Edmonton will be home to more than 1 million people. To accommodate growth and support a healthy and compact city, we need a new approach to development/redevelopment
More informationMASTER BICYCLE AND PEDESTRIAN PLAN
VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.
More informationSAFE ROUTES TO SCHOOL
SAFE ROUTES TO SCHOOL Edgewood Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries Enrollment
More informationPre-Construction Meeting
Pre-Construction Meeting Wednesday, March 21 Drop-in from 5 9pm Please visit displays for project information, talk to staff, and ask questions! Edmonton.ca/SouthsideBikeRoutes Objectives & Project Scope
More informationCorporate. Report COUNCIL DATE: May 25, 1998 NO: R1500 REGULAR COUNCIL. TO: Mayor & Council DATE: April 27, 1998
R1500 : Traffic Safety at 25 Avenue and 128 Street Intersection Corporate NO: R1500 Report COUNCIL DATE: May 25, 1998 REGULAR COUNCIL TO: Mayor & Council DATE: April 27, 1998 FROM: General Manager, Engineering
More informationDuwamish Way-finding and CTR Report
V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail
More informationSAFE ROUTES TO SCHOOL
SAFE ROUTES TO SCHOOL Forest Ridge Elementary School Existing Conditions and ACTION PLAN > Oak Creek - Franklin Joint School District Table of Contents CONTEXT Enrollment Boundaries
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency
More informationDavid Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA
June 13, 2016 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 959811 RE: Fire Station 14 (DR16-128) Dear Mr.
More informationWhy invest in the 1 Street S.W. Corridor?
Why invest in the 1 Street S.W. Corridor? This project is an investment in the Beltline Community and Calgary s economy. It is anticipated that The City s investment along this corridor will help with
More informationPROJECT SUMMARY ALBERTA STREETSCAPE PROJECT
ALBERTA STREETSCAPE PROJECT Revitalizing a Street Rebuilding a Community Realizing a Dream PROJECT SUMMARY December 2001 Project Background In 1998 and 1999, the Alberta Street community was engaged in
More informationAPPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016
APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of
More informationBuilding Great Neighbourhoods BELLEVUE AND VIRGINIA PARK
Building Great Neighbourhoods BELLEVUE AND VIRGINIA PARK This is Meeting 2 Unfortunately, some residents in Bellevue and Virginia Park received the wrong information for this public open house (Meeting
More informationNJDOT Complete Streets Checklist
Background The New Jersey Department of Transportation s Complete Streets Policy promotes a comprehensive, integrated, connected multi-modal network by providing connections to bicycling and walking trip
More informationTypical Cross Section: DOWNTOWN (Observer Highway - 8th Street)
Typical Cross Section: DOWNTOWN (Observer Highway - 8th Street) DRAFT SEPTEMBER 23, 14 1 Washington Street Typical Block Downtown Typical Block: DOWNTOWN (Observer Highway - 8th Street) New crosswalks
More information5/7/2013 VIA . RE: University Village Safeway Expansion (P13-019)
5/7/2013 VIA EMAIL David Hung, Associate Planner Community Development Department, Current Planning Division City of Sacramento 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: University Village
More informationBikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN
Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of
More informationRE: Park Plaza Walgreens (P12-016)
12/5/2014 VIA EMAIL David Hung, Associate Planner City of Sacramento Community Development Department 300 Richards Blvd., 3rd Floor Sacramento, CA 95811 RE: Park Plaza Walgreens (P12-016) Dear Mr. Hung:
More informationMajor Bike Routes 102 Avenue Workshop April 21, 2015
Major Bike Routes 102 Avenue Workshop April 21, 2015 Our Purpose Today Provide context on how Major Bike Routes fit into Edmonton s future Share information on what we heard in our last phase, and how
More informationTraffic Safety Advisory Committee - Proposed 2015 Initiatives
City of Richmond Report to Committee To: Public Works and Transportation Committee Date: December 23,2014 From: Victor Wei, P. Eng. File: 01-0100-30-TSAD1- Director, Transportation 01/2014-Vo101 Re: Traffic
More informationExisting Transportation System
< Open for Additional Text Transportation System Existing Transportation System This section describes vehicular transportation associated with Children s. transportation are described in a separate section
More informationTRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION
TRAFFIC CALMING GUIDE FOR TORONTO CITY OF TORONTO TRANSPORTATION SERVICES DIVISION CITY OF TORONTO TRANSPORTATION SERVICES DIVISION 2016 TRAFFIC CALMING GUIDE FOR TORONTO TABLE OF CONTENTS Introduction
More informationWest Village Mobility & Integration
West Village Mobility & Integration PRESENTED TO TOPCA Town Hall November 9, 2017 [7189-21] Port Credit 2 West Village + Mobility AWalkable Community A CompleteCommunity A SustainableCommunity 3 Mobility
More informationDISTRIBUTION: Electronic Recipients List TRANSMITTAL LETTER NO. (17-01) MINNESOTA DEPARTMENT OF TRANSPORTATION. MANUAL: Road Design English Manual
DISTRIBUTION: Electronic Recipients List MINNESOTA DEPARTMENT OF TRANSPORTATION DEVELOPED BY: Design Standards Unit ISSUED BY: Office of Project Management and Technical Support TRANSMITTAL LETTER NO.
More informationStakeholders Advisory Working Groups (SAWGs) Bridge and Bike / Pedestrian SAWG (#15)
Presentation Bridge and Bike / Pedestrian SAWG (#15) Tappan Zee Bridge/I-287 Corridor Project December 8, 2009 Slide 1. This is the title slide for the Tappan Zee Bridge Joint Stakeholders Advisory Working
More information9/21/2016 VIA . RE: The Knot (DR16-270)
9/21/2016 VIA EMAIL Garrett Norman, Assistant Planner City of Sacramento Community Development Department 300 Richards Boulevard, 3 rd Floor Sacramento, CA 95811 RE: The Knot (DR16-270) Dear Mr. Norman:
More informationMcKenzie Interchange Project Fall 2015 Engagement. Appendix 2: Engagement Materials and Feedback Form
Fall 2015 Engagement Appendix 2: Engagement Materials and Feedback Form Welcome to the McKenzie Interchange Project Open House! Purpose of Open House To provide you with information regarding the project
More information3/20/2015 VIA . Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811
3/20/2015 VIA EMAIL Teresa Haenggi, Associate Planner Community Development Department 300 Richards Blvd. Sacramento, CA 95811 RE: Ice Blocks (P14-062) Dear Ms. Haenggi: WALKSacramento has reviewed the
More informationTable of Contents Introduction. 2 Purpose of the Plan...2 The Benefits of Walking and Bicycling...3 Vision and Goals of the Plan...
BICYCLE AND This plan was created through a grant from the Healthy Communities Program with the cooperation of the City of Cynthiana, Cynthiana Main Street, Cynthiana-Harrison County-Berry Joint Planning
More informationCOMPLETE STREETS CHECKLIST City of Philadelphia The City of Philadelphia's Complete Streets policies are designed ensure that city streets are safe, comfortable and convenient for people of all ages and
More information6.4 RECOMMENDED IMPROVEMENTS
6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides
More informationFields of St. Croix HOA Meeting. October 27, 2016
Fields of St. Croix HOA Meeting October 27, 2016 Welcome! Why are we here? Update on Manning Avenue Phase 2 Project: Project Design Schedule Project Background Importance of Manning Avenue: Primary north-south
More informationPISMO BEACH COUNCIL AGENDA REPORT
PISMO BEACH COUNCIL AGENDA REPORT Agenda Item 8.E SUBJECT/TITLE: TRAFFIC SAFETY COMMITTEE RECOMMENDATIONS TO CITY COUNCIL RECOMMENDATION: Adopt a Resolution approving the Traffic Safety Committee s recommendation
More informationPrinceton Avenue and Spruce Street Transportation and Site Access Enhancements Project
Princeton Avenue and Spruce Street Transportation and Site Access Enhancements Project Mercer County Planning Division AECOM Transportation (formerly DMJM Harris) January 29, 2009 Agenda Project Status
More informationSouthview Blvd & 3 rd Avenue Improvement Project. Public Open House December 4, to 7pm
Southview Blvd & 3 rd Avenue Improvement Project Public Open House December 4, 2014 5 to 7pm Southview Blvd & 3 rd Avenue Public Information Meeting Agenda Presentation 5:30 to 6:15 pm Purpose of Project
More informationAccommodating Pedestrians in the Work Zone
Accommodating Pedestrians in the Work Zone Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However,
More informationCycle Track Design Best Practices Cycle Track Sections
Design Best Practices Sections It is along street segments where the separation and protection methods of cycle tracks offer more comfort than conventional bicycle lanes, and are more attractive to a wide
More informationNOTICE OF PREPARATION. Environmental Programs 3331 North First Street, Building B-2 San Jose, CA
NOTICE OF PREPARATION May 29, 2018 To: Reviewing Agencies and Organizations From: Santa Clara Valley Transportation Authority Environmental Programs 3331 North First Street, Building B-2 San Jose, CA 95134-1927
More informationCITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY
RMA-2015-ATM-038 CITY OF OTTAWA ROADWAY MODIFICATION APPROVAL UNDER DELEGATED AUTHORITY DATE: April 22, 2015 SUBJECT Approval of Roadway Modifications Recommended through an Area Traffic Management Study
More informationSR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016
SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility
More informationCOWETA HIGH SCHOOL AND EAST HIGHWAY 51
COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to
More informationSPRINGFIELD REVITALIZATION REPORT
SPRINGFIELD REVITALIZATION REPORT August 2015 Homewood Suites Springfield Town Center Promenade 2 SPRINGFIELD OVERVIEW This report covers recent development activity in the Springfield Commercial Revitalization
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project 2014/2015 BIKE ROUTE PLAN The City of Edmonton is planning a major bike route on the south side of Edmonton. This bike route is one part of a plan to provide citizens with transportation
More informationNanaimo Transportation Master Plan. Phase 1 Consultation Summary
Nanaimo Transportation Master Plan Phase 1 Consultation Summary Transportation Advisory Committee Meeting Wednesday December 12, 2012 Agenda Study Update Phase 1 Consultation Process Phase 1 Consultation
More informationIntroduction. Using the Checklist. TDM-Supportive Development Design and Infrastructure Checklist Version 1.0 (30 June 2017) City of Ottawa
Introduction The s Transportation Impact Assessment (TIA) Guidelines (specifically Module 4.1 Development Design) requires proponents of qualifying developments to use the City s TDM-Supportive Development
More informationCity of Wilsonville 5 th Street to Kinsman Road Extension Project
City of Wilsonville 5 th Street to Kinsman Road Walking Tour & Neighborhood Workshop Summary Report Public Outreach Overview On July 18 th, 2017, the City of Wilsonville hosted a neighborhood walking tour
More informationWhat is the status of the CPR Yards Crossing Study?
September 2015 Project Advisory Committee (PAC) Sectors RESIDENTS Centennial Community Improvement Association Dufferin Residents Association of Winnipeg William Whyte Residents Association LOCAL BUSINESS
More informationImprovements Infrastructure Gap Assessment and Improvements Street Striping
Infrastructure Project Proposal The federal-aid Safe Routes to School program funds infrastructure/engineering projects that fall into two categories: Design (available only to School Development Authority
More informationPROJECT FACT SHEET March 21, 2018
SITE CHALLENGES & PROJECT BACKGROUND In 2014, the City of Aspen identified the Castle Creek Bridge and Hallam Street corridor as a deficient link in Aspen s bicycle and pedestrian network. Safe and efficient
More informationPalou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015
Palou Complete Street Project Barneveld Avenue to Crisp Road Project overview and concept design Community Meeting #2 May 13, 2015 Agenda Welcome and introductions Project overview, history and goals Concept
More informationBallston Station Multimodal Study WMATA and Arlington County. Meeting Minutes
Date of Meeting: June 10, 2010 Location: Ballston Metrorail Station and NRECA Building 4301 Wilson Blvd, Arlington, VA Subject: Ballston Station Multimodal Study Stakeholder Meeting #1 Summary: This first
More informationMinutes of the regular meeting of the City of Birmingham Multi-Modal Transportation Board held June 19, 2014.
CITY OF BIRMINGHAM START-UP MEETING OF THE MULTI-MODAL TRANSPORTATION BOARD THURSDAY, JUNE 19, 2014 City Commission Room 151 Martin Street, Birmingham, Michigan Minutes of the regular meeting of the City
More informationFEEDBACK SURVEY #2: WHO PARTICIPATED
Attachment 2 - Summary of Public Opinion Survey Results Attachment 2 FEEDBACK SURVEY #2: WHO PARTICIPATED Online for public input from December 13, 2016 to May 4, 2017 Promoted through 30,000 flyers, sharing
More information5 Transit & Traffic. Overview
5 Transit & Traffic Overview Montgomery Place s roadways and overall traffic circulation are unique in the city due to the narrow streets and avenues with boulevards; however, no sidewalks or curbs in
More informationLaurier Segregated Bike Lane Pilot Project July 2013 update
Laurier Segregated Bike Lane Pilot Project July 2013 update Presentation Overview Background Pilot Monitoring Results Mitigation Recommendations Next Steps Laurier 2 Background Laurier Avenue Segregated
More informationHennepin Avenue Reconstruction Washington Avenue to 12 th Street
CITY OF MINNEAPOLIS Hennepin Avenue Reconstruction Washington Avenue to 12 th Street April 2016 1 Upcoming Opportunities Public Meeting #2 April 25, 2016 Minneapolis Central Library Doty Board Room Repeat
More informationCopenhagen Cycling Map. Red Lines Cycling facilities
Copenhagen Cycling Map Red Lines Cycling facilities Copenhagen Cycling Facilities Design Approaches Transportation without Pollution Copenhagen s Strategy Where Cycling is one of the top key activities
More information2014/2015 BIKE ROUTE PLAN 83 AVENUE PROTECTED BIKE LANE
About the Project The City of Edmonton is planning a major bike route on the southside of Edmonton. The Strathcona Bike Route will connect the communities of Strathcona, Garneau and the University area,
More informationAnniedale- Tynehead NCP Best Practices in Transportation Planning Summary
Anniedale- Tynehead NCP Best Practices in Transportation Planning Summary The City of Surrey Anniedale-Tynehead NCP Best Practices Transportation Summary This document provides a summary of the Bunt &
More informationComplete Streets Needs. Complete Streets Project Origin (planning documentation or supporting analysis)
Mobility MassDOT Program Project Prioritization Plan (Revised 3/31/16) Municipality Winchendon 7/25/2017 Location Needs Request Schedule 1 Development of roundabout at the intersection of Front Street
More informationRethinking Transportation
Rethinking Transportation We have some innovative ideas about a local transportation sharing network. car share and a bike share could mean that future residents would not need to own either a car or a
More informationNorth Avenue Corridor Study
North Avenue Corridor Study Advisory Committee Meeting #6 July 1, 2014 Agenda Concept Revisions based on Advisory Committee feedback Review of New Concept Scoring & Costs Concept Discussion/Questions Voting:
More informationSETTINGS AND OPPORTUNITIES MOBILITY & ACCESS
7 mobility & access how do people use el camino what is it like to drive on el camino/to park along el camino what is the pedestrian experience like what is the role of transit along the corridor what
More informationSustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012
Sustainable Mobility in Greater Sudbury NeORA Conference September 25, 2012 Presented by: David Shelsted, MBA, P.Eng., Director of Roads & Transportation Services The City s Transportation Network Approximately
More informationWatertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017
Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets
More informationAGENDA ITEM SUMMARY SPECIAL AGENDA ITEM NO. _1A_
AGENDA ITEM SUMMARY AGENCY: City Council MEETING DATE: June 25, 2012 DEPARTMENT: Community Dev PREPARED BY: T Spade DEPT. DIR. APPROVAL: MJ CITY MGR. APPROVAL: LR PRESENTED BY: T Spade TITLE: RECEIVE REPORT
More informationADA on Construction. Guidance for Section C Plan Preparers
ADA on Construction Guidance for Section C Plan Preparers Some impacts cannot be avoided and those impacts apply to residents, businesses, motorists, and pedestrians alike. However, good planning can minimize
More informationGlebe Neighbourhood Cycling Plan
Glebe Neighbourhood Cycling Plan Summary of Public Comments received after June 5 th Public Information Session Comment STUDY NETWORK CS9, CS8, E, E0 CS4, E CS4 CS8 E Suggestions for alternate cycling
More informationMake Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.
Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings
More information12/4/2016 VIA . RE: Grocery Outlet Del Paso (DR16-328)
12/4/2016 VIA EMAIL Ethan Meltzer, Assistant Planner City of Sacramento Community Development Department 300 Richards Blvd, 3 rd Floor Sacramento, CA 95811 RE: Grocery Outlet Del Paso (DR16-328) Dear Mr.
More informationPROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from
PROPOSAL: Review of Alaska DOT&PF project 68471, Glacier Highway reconstruction and pedestrian improvements from Fritz Cove Rd to Seaview Ave, for consistency with locally adopted plans and ordinances.
More informationAgenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN
PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations
More information