1 MALDON DISTRICT LOCAL HIHWAY PANEL Approved Works Programme June 2018 Update The following report provides an update on the current position of all of the schemes which the Maldon District Local Highway Panel (LHP) had recommended for inclusion in the 2018/19 Works Programme. The Approved Works Programme is shown in two parts, firstly those schemes for delivery within the 2018/19 financial year and secondly those schemes which are within the rolling programme for future delivery. The scheme finish dates have been allocated year quarters until such a time that we have an accurate month for delivery and the road space has been booked, whereupon the month can be shown. For the information of the Panel our Safer Roads team have not identified any Safer Roads schemes within Maldon District which need to be delivered in 2018/19. Members are also reminded that the costs supplied are estimates only and there is the possibility that a final scheme cost could change significantly dependant on issues which may arise especially during detailed design and construction. The estimated scheme costs on the Rolling Programme/Potential Scheme List have been reviewed and adjusted as necessary to reflect this. 2018/19 Capital budget summary Capital Budget Summary 2018/19 Ref. Item Amount 1 Capital Budget 2018/19 200,000 2 Safer Roads Schemes for 2018/ Schemes commissioned for 2018/19 165,500 4 Schemes re-profiled from 2017/18 to 2018/19 35,000 5 Schemes in Rolling Programme 23, /19 Capital Budget still to allocate 0 Page 1 of 6

2 Blank Page Page 2 of 6

3 Maldon District Local Highway Panel - Approved Works Programme 2018/19 Schemes Key Completed Cancelled Update Ref Cost Code Scheme Parish Finish Scheme Category Scheme Stage Works Description Allocated Budget Comments Approved Schemes - Prioritised for delivery in 2018/19 1 LMAL B1010 Lower Burnham Road, Althorne - Improvements Althorne Quarter 3 Total Scheme Improvements to speed limit repeater signs (size/frequency) with ateway Treatment 13,500 2 LMAL Waterside Road, Bradwell on Sea - HV Signage improvements Bradwell on Sea Aug-18 Total Scheme Improvements to HV signs to prevent goods vehicles being unable to turn around at end of road 4,500 3 LMAL Adjacent White Lyons/Bradwell Church, High Street, Bradwell on Sea - Improvements Bradwell on Sea Quarter 4 Design Waiting restrictions - Narrow carriageway and parked vehicles causing congestion issues 4,000 4 LMAL Southminster Road (Old Heath to Mangaps Manor), Burnham on Crouch - Walkable verge Burnham on Crouch Quarter 3 Feasibility Study Feasibility Study into walkable verge 4,000 5 LMAL B1026 Maldon Road, oldhanger - Speed limit repeater sign improvements oldhanger Jun-18 Total Scheme Increased number of speed limit repeater signs 8,500 Planned to be done by Direct Delivery team 6 LMAL Tiptree Road, reat Braxted - Improvements reat Braxted Quarter 3 Total Scheme Improvements to speed limit repeater signs (size/frequency) 5,000 7 LMAL B1010 Fambridge Road, Hazeleigh - Village ateways Hazeleigh Quarter 3 Total Scheme Village ateway improvements 14,000 8 LMAL Four sites Heybridge - Village ateways Heybridge Quarter 3 Design Post and Rail style gateway features 3,000 9 LMAL Lower Burnham Road 600m west of j/w Rectory Lane, Latchingdon - Vehicle restraint system Latchingdon Quarter 4 Total Scheme Safety measures to prevent vehicles entering pond 10, LMAL Lea Lane, Little Braxted - Improvements Little Braxted Apr-18 Implementation ateway signage treatments 4,500 Completed by Direct Delivery team 11 LMAL Lea Lane (school House to War Memorial), Little Braxted - Pedestrians in Road signage Little Braxted Aug-18 Total Scheme Install Pedestrians in Road signage 6, LMAL Wantz Road (Between j/w Queens Street to j/w High Street), Maldon - One-way/Residents Parking Scheme Maldon Aug-18 Implementation One-way road to allow Residents Parking Scheme 25, LMAL Fambridge Road, Maldon (Limebrook Way RAB to Royal Oak PH) - Footpath Maldon Quarter 3 Design Detailed design of footpath 7, LMAL Imperial Avenue, Maylandsea - Passenger Transport Mayland Sep-18 Passenger Transport Total Scheme Bus cage 1,500 Page 3 of 6

4 Maldon District Local Highway Panel - Approved Works Programme 2018/19 Schemes Key Completed Cancelled Update Ref Cost Code Scheme Parish Finish Scheme Category Scheme Stage Works Description Allocated Budget Comments Approved Schemes - Prioritised for delivery in 2018/19 (Continued) 15 LMAL Recreation round, Fambridge Road, North Fambridge - Improvements North Fambridge Jun-18 Total Scheme Playground warning signs 4,500 Completed - Existing Playground warning signs totally obscured by vegetation. Vegetation cut back and more 30mph repeater signs installed 16 LMAL Fambridge Road (Lower Burnham Road to Rectory Road), North Fambridge - Study into provision of footway North Fambridge Quarter 3 Feasibility Study Feasibility study to consider provision of new footway/walkable verge 4, LMAL B1010 Fambridge Road (The Wash to Roundbush P/H), Purleigh - Improvements Purleigh Quarter 3 Feasibility Study Feasibility study into speed reduction measures 4, LMAL Hackmans Lane, Cock Clarks - Improvements Purleigh Sep-18 Total Scheme Bend warning/chevron sign improvements with "Max speed 30mph" sub-plates as necessary 5, LMAL High Street, Southminster - Repeater sign improvements Southminster Jun-18 Total Scheme Improvements to 20mph speed limit repeater signs (size/frequency) 6,500 Completed by Direct Delivery team 20 LMAL Hagg Hill Stow Maries - Improvements Stow Maries Sep-18 Total Scheme Unsuitable for HV signage 5, LMAL Church Street, Tollesbury - Dropped kerbs Tollesbury Quarter 3 Implementation Dropped kerbs to improve access to bus stop 8, LMAL Parish Rooms, Church Street, Tollesbury - Pedestrian access improvements Tollesbury Quarter 3 Implementation Create pedestrian access to Parish Rooms - kerbing and resurfacing 17, LMAL Brook Road/Tolleshunt D'Arcy Road, Tolleshunt Knights - Speed limit repeater signs Tolleshunt Knights Jun-18 Total Scheme Improvements to speed limit repeater signs (size/frequency) 8,500 Planned to be done by Direct Delivery team 24 LMAL Beckingham Street/Tolleshunt D'Arcy Road, Tolleshunt Major - Speed signage improvements Tolleshunt Major Jun-18 Total Scheme Improvements to existing speed limit repeater signs (size/frequency) 5,000 Planned to be done by Direct Delivery team 25 LMAL Witham Road/the Street, Wickham Bishops - Priority Working/Build Outs Wickham Bishops Quarter 3 Feasibility Study Feasibility study into priority working/build outs. Also consideration of closing School Road/The Street junction and making Back Lane one-way from Five Corners junction 10, LMAL Lodge Road, Woodham Mortimer - Improvements Woodham Mortimer Sep-18 Total Scheme Unsuitable for HV signage 5, LMAL Herbage Park Road/Church Hill/Rectory Road, Woodham Walter - Speed limit repeater sign improvements Woodham Walter Sep-18 Total Scheme Improvements to speed limit repeater signs (size/frequency) 6,500 Page 4 of 6

5 Maldon District Local Highway Panel - Approved Works Programme 2018/19 Schemes Key Completed Cancelled Update Ref Cost Code Scheme Parish Finish Scheme Category Scheme Stage Works Description Allocated Budget Comments Approved Schemes - Prioritised for Rolling Programme 29 LMAL Tiptree Road, reat Braxted - Improvements reat Braxted Rolling Programme Total Scheme 30mph repeater signage improvements 5,000 Dec 2017 Panel decision that scheme should remain on Rolling Programme 30 LMAL Footpath 4 (Kelvedon Road to oat Lodge Road), reat Totham - PRoW reat Totham Rolling Programme Public Rights of Way Total Scheme Surface improvements - Planings/timber edging for 200m 4,000 Dec 2017 Panel decision that scheme should remain on Rolling Programme 31 LMAL Witham Road j/w Lea Lane, Little Braxted - HV signage Little Braxted Rolling Programme Feasibility Study Feasibility study/signage review of HV signage to A12 3,000 Dec 2017 Panel decision that scheme should remain on Rolling Programme 32 LMAL Limebrook Way j/w Wantz Road, Maldon - Improvements Maldon Rolling Programme Feasibility Study Feasibility study into signage improvements A414 to Hythe Quay and Parking at Promenade Park 3,000 Dec 2017 Panel decision that scheme should remain on Rolling Programme 33 LMAL Outside The Lower Plume School, Mill Road, Maldon - Passenger Transport Maldon Rolling Programme Passenger Transport Total Scheme Replacement bus shelter 6,500 Dec 2017 Panel decision that scheme should remain on Rolling Programme 34 LMAL The Street (The Sun & Anchor PH to The Star PH), Steeple - Edge of carriageway road markings Steeple On Hold Total Scheme Install edge of carriageway road markings 2,000 Dec 2017 Panel decision scheme On Hold - Pending resolution of Capital Carriageway Resurfacing scheme through this section of The Street Page 5 of 6

6 Blank Page Page 6 of 6

7 MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the Maldon District Local Highways Panel. In order for the design teams to programme the works as efficiently as possible the Panel will again be asked to start to develop their 2019/20 Approved Works Programme at the December 2018 meeting. At this stage we would ask the Panel to review the schemes on the current Potential Scheme List, to consider those they may wish to fund in the future and to remove any that the Panel would not wish to fund. There are currently potential schemes with an estimated cost of 215,000 as shown in the summary below - Page 1 of 10

8 MALDON DISTRICT LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (Version 28) On the Potential Schemes List the RA column acknowledges the status of the scheme request as shown below: RA Status A R V Description of RA status The scheme has been validated as being feasible and is available for Panel consideration The scheme has been commissioned for a feasibility study which needs completing before any Panel consideration A scheme which is against policy or where there is no appropriate engineering solution A scheme request has been received and is in the initial validation process Page 2 of 10

9 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Total Value of schemes 105,000 Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RA 1 B1021 Bradwell Road, Mill End Bradwell on Sea management improvements Speed of traffic in 30mph limit Bradwell on Sea Total scheme LMAL ,500 Validation - Posted speed limit 30mph, South bound 36.4mph & North bound 37.1mph. Recommendation - Vehicle Activated Sign and speed limit repeater signs 2 Cedar rove, Burnham on Crouch Footway improvements Accessibility issues on footways Burnham on Crouch Total scheme LMAL TBC In validation V 3 Eves Corner B1021 Southminster Road j/w Mill Road/reen Lane, Burnham on Crouch management improvements Vehicles losing control and causing property damage Burnham on Crouch Total scheme LMAL TBC In validation V 4 Maldon Road/Hall Road/Walden House Road/Prince of Wales Road, reat Totham Parking improvements at junctions Parking causing problems at junctions reat Totham Total scheme LMAL TBC In validation V 5 The Causeway/The Square/The Street, Heybridge RAB improvements Queuing traffic on RAB blocks road Heybridge Total scheme LMAL ,000 Validation - Recommends Keep Clear road marking at Holloway Road junction 6 Site 1 - oldhanger Road, Site 2 - Broad Street reen, Site 3 - The Causeway, Site 3- The Causeway, Site 4 - Heybridge Approach, Site 5 - Langford Road, Site 6 - Scraley Road Heybridge Heybridge - Village gateway treatments (post/rail) To highlight parish boundary to drivers Heybridge Implementation LMAL TBC Validation - recommends gateway features only at Site 1, Site 2, Site 4, Site 5. ateways not recommended at Site 3 and Site 6. Awaiting results of design A 7 Near Plantpak, Burnham Road, Latchingdon management improvements Speed of traffic prior to 30mph speed limit Latchingdon Total scheme LMAL NA Validation - Results of traffic speed survey - 60mph speed limit - South bound 43.2mph & North bound 45.1mph. ood speed compliance with posted speed limit R Page 3 of 10

10 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Total Value of schemes 105,000 Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RA 8 Plains Road, reat Totham to Little Totham Change in speed limit Speed of traffic Little Totham Total scheme LMAL TBC In validation V 9 Fambridge Road (Limebrook Way RAB to Royal Oak Public House), Maldon Walkable verge/footway Lack of footway between small hamlet/public house and Maldon Town Maldon Implementation LMAL TBC Liaison on-going regarding nearby potential development. Design in 2018/19 A 10 Market Hill j/w High Street, Maldon Improved signage to Car Parks No signage at top of hill to direct traffic to Car Parks Maldon Total scheme LMAL NA Validation - Whilst there is no signage at the top of Market Hill directing traffic to car parks. There is parking in either direction along the High Street which is signed, so any visitor taking either direction will be able to find a car park. Also there are a lot of existing signs at the top of Market Hill and there is a current drive by DfT to reduce sign clutter. R 11 Keats Close, Maldon Measures to stop verge damage by vehicles Vehicles routinely damaging verges Maldon Total scheme LMAL TBC In validation V 12 Main Road, Mundon management improvements Speed of traffic through Village Mundon Total scheme LMAL TBC In validation V 13 Church Hill/The Street, Purleigh Kerbing of verge Parked cars causing verge damage Purleigh Total scheme LMAL TBC In validation - Parish Council considering partfunding V 14 Old Heath Road, Southminster management improvements and request for Quiet Lane status Speed of traffic on narrow rural road Southminster Total scheme LMAL TBC In validation - Awaiting outcomes of trial of five Quiet Lane schemes across the County V 15 Woodham Road/The Street, Stow Maries management improvements Speed of traffic through Village Stow Maries Total scheme LMAL TBC In validation - Woodham Road - 30mph - East bound 35.4mph & West bound 37.4mph, The Street - 30mph - Southwest bound 39.5mph & Northeast bound 37.8mph V Page 4 of 10

11 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Total Value of schemes 105,000 Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RA 16 Kelvedon Road nr j/w Maypole Road, Tolleshunt Knights Vehicle Activated Sign/Speed Indicator Device Speed/volume of traffic Tolleshunt Knights Total scheme LMAL Awaiting LHP scheme request form 17 Factory Hill/Brook Road/D'Arcy Road, Tolleshunt Knights - TMI Mini-roundabout improvements Concerns around operation of miniroundabout Tolleshunt Knights Feasibility LMAL ,000 Validation recommends feasibility study. Dec 17 Panel decision to remove scheme from Approved Works Programme and return to Potential Scheme List 18 Beckingham Street/Tolleshunt D'Arcy Road, Tolleshunt Major Junction improvements Existing bennett junction causing issues Tolleshunt Major Total scheme LMAL ,000 From Feasibility Study Parish Council preferred Option 2, Standard T-junction with pedestrian island at estimated cost 125,000. Scheme would require acquisition of land. Following site meeting with Parish Council representatives in October 2017 Parish indicate Option 1 Standard T-junction estimated cost 45,000 could meet their needs subject to final design. 19 Mill Lane j/w Beckingham Street, Tolleshunt Major HV Signage improvements Road not suitable for HV's Tolleshunt Major Feasibility LMAL ,000 Validation - Existing 7.5 tonne weight limit signage in place and "Unsuitable for HV" sign. Recommendation is for signage review of HV directional signage to ensure vehicles use preferred route via School Road. Dec 17 Panel decision to remove scheme from Approved Works Programme and return to Potential Scheme List 20 Church Road (Holt Drive to Blacksmiths Lane) and Arbour Lane (Blacksmiths Lane to range Road), Wickham Bishops Footways Lack of pedestrian access to the Village Library Wickham Bishops Total scheme LMAL ,000 Validation - recommendation is for Feasibility Study to cover obtaining any land necessary for footway construction and also pedestrian/vehicle counts to assess potential usage and any conflict. Construction costs could be significant. Dec 17 Panel decision to remove scheme from Approved Works Programme and return to Potential Scheme List 21 B1018 Langford Road, Wickham Bishops Carriageway improvements Width of road when two vehicles try to pass Wickham Bishops Studies LMAL ,000 Validation - "B" road and PR2, width restriction contrary to policy as its main function is movement of traffic. Suggestion is to review Warning Signs and Road Markings indicating hazards and narrow sections of road Page 5 of 10

12 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Total Value of schemes 105,000 Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RA 22 Tiptree Road, Wickham Bishops Footway to link new development to Witham Road Lack of footway Wickham Bishops Total scheme LMAL TBC In validation V 23 A414 Maldon Road, Woodham Mortimer management improvements Speed of traffic and pedestrian access across A414 to bus stops Woodham Mortimer Total scheme LMAL NA In validation - Results of traffic speed survey A414 60mph speed limit - (1) West Lodge Road - East 48.9mph & West 49.4mph, (2) East Rectory Lane - East 50.9mph & West 52.8mph (3) East Bryants Lane - East 46.8mph & West 47.6mph. PV² survey data - A414 near Post Office Road x108 & A414 near Conduit Lane x108 - Sites would not meet criteria for a signalised crossing R 24 Tom Tit Lane nr j/w A414 Maldon Road, Woodham Mortimer Request for Unsuitable for HV signage HV use of lane Woodham Mortimer Total scheme LMAL TBC In validation V 25 West Bowers Road j/w Stivvy Road, Woodham Walter Cycle route signage Lack of sign for National Cycle Network Route1 Woodham Walter Total scheme LMAL ,500 Validation - recommends signage for NCN1 at either end of Stivvy Road Page 6 of 10

13 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Walking Total Value of schemes 6,000 Ref Location Description Problem Requested by Parish Scheme stage Cost Code Estimated cost Comments RA 1 B1010 Chelmsford Road (Spar Lane to Edgeware Veterinary Practice), Purleigh Extension of existing footway Lack of safe route for pedestrians Parish Council Purleigh Feasibility LMAL ,000 Validation - recommendation for feasibility study into footway/walkable verge, with pedestrian video survey and road safety audit. Though implementation costs could be around 50k. Dec 17 - Panel decision to return scheme from Approved Works Programme back to Potential Schemes List Page 7 of 10

14 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Passenger Transport Total Value of schemes 34,000 Ref Location Description Problem Requested by Parish Scheme stage Cost Code Estimated cost Comments RA 1 Burnham Road, Latchingdon Wooden bus shelter Stop ID 1500LATCH2 - metal shelter needs replacing (Parish Council owned Shelter) Parish Council/Passenger Transport Team Latchingdon Total scheme LMAL ,000 Validated by Passenger Transport team 2 Fambridge Road, Maldon New bus stop poles/flags/timetables Nine bus stops need clearly identifying, some flags on lamp columns Passenger Transport Maldon Total scheme LMAL ,000 Validated by Passenger Transport team 3 Fambridge Road, North Fambridge Wooden bus shelter Stop ID 1500IM North Fambridge Shelter - replacement needed Passenger Transport Team North Fambridge Total scheme LMAL ,000 Validated by Passenger Transport team 4 The Avenue, North Fambridge Wooden bus shelter Stop ID 1500IM Ferry Corner Shelter - replacement needed Passenger Transport Team North Fambridge Total scheme LMAL ,000 Validated by Passenger Transport team Page 8 of 10

15 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Public Rights of Way Total Value of schemes 70,000 Ref Location Description Problem Requested by Parish Scheme stage Cost Code Estimated cost Comments RA 1 Byway 32 Purleigh (Roundbush Road to How reen Road) Improve drainage, rebuild surface, install heavy duty removable bollards Southern end of byway badly rutted and is often impassable. There is also a Public Rights of Way Purleigh Total scheme LMAL ,000 seasonal TRO in place to restrict access. Validated by Public Rights of Way team - Dec 17 - Panel decision to return scheme from Approved Works Programme back to Potential Schemes List 2 Handley's Lane, between Kelvedon Road and Handley's Lane roadway, Wickham Bishops Surface improvements to byway to allow all year round usage Byway often inaccessible due to flooding /surface condition Parish Council Wickham Bishops Total scheme LMAL ,000 Validation - Estimated costs re-evaluated by PROW team - Surfacing to northeast section (not to adoptable standards) 10,000 and middle section levelled/finished with planings 35,000 Page 9 of 10

16 MALDON DISTRICT LOCAL HIHWAY PANEL - POTENTIAL SCHEME LIST (VERSION 28) Blank Page Page 10 of 10

17 Maldon District Local Highway Panel - Section 106 Programme 2018/19 Schemes Key Completed Cancelled Update Ref Cost Code Scheme Parish Finish Scheme Category Scheme Type Works Description Comments Wycke Hill - Upgrade to Real Time Passenger Information Maldon Jun-18 Passenger Transport Design To upgrade the existing Bus Stop Real Time Passenger Information In progress Fullbridge, Maldon - Upgrade crossing Maldon Quarter 3 Feasibility Study to upgrade crossing on Station Road between the bridge and the river - between Fullbridge Roundabout towards Maldon Town Centre. In progress Page 1 of 2

18 Blank Page Page 2 of 2

19 REF Parish/Ward Road Name Location Type of Work Required 1 MAL Woodham Mortimer SOUTHEND ROAD Opposite range Cottages Vegetation trimming 2 MAL Burnham-On-Crouch MARSH ROAD Alley to the rear of The Leas, tree on verge in Marsh Road Vegetation trimming Comments Vegetation encroaching onto carriageway, 15m in length Tree encroaching onto property of no.50 The Leas Confirm Number Date Completed /02/ /02/18 3 MAL Heybridge OAK ROAD Side of 35 Colchester road Vegetation trimming Weed growth over footway /01/18 4 MAL Maldon BROOKE SQUARE Slabbed area at end Vegetation trimming Weed growth through slabs /01/17 5 MAL Maldon MILL ROAD 6 MAL Heybridge HOLLOWAY ROAD Between Maldon Museum and Maldon Promenade Park. Opp 131 for 50m towards Maypole Road opp 143 Sign cleaning Slightly misaligned give way sign /10/17 Vegetation trimming 7 MAL Purleigh THE STREET Opposite Rye House Vegetation trimming 50x0.3 veg and detritus encroaching on footway siding, rowth encroaching onto carriageway, 10m in length /01/ /01/18 8 MAL Tollesbury VALKYRIE CLOSE End of close Other (explain in notes) 10m brambles and detritus on Footway /01/18 9 MAL Heybridge MAPLE AVENUE Side of 46 garage area Vegetation trimming 10 MAL Tolleshunt D'Arcy BECKINHAM ROAD Os 16 Vegetation trimming Moss, veg, grass, soil encroaching on carriageway 12x0.7 nettles and detritus on footway In front of hedge, possible siding /01/ /01/18 11 MAL Heybridge CRESCENT ROAD Between 65/67 entrance to reen Lane Vegetation trimming Vegetation encroaching on footway /01/18 12 MAL Heybridge CRESCENT ROAD Junction Langford Road Vegetation trimming Vegetation encroaching on footway /01/18 13 MAL reat Totham SPRIN LANE Os 20 Vegetation trimming Mares tail coming through footway /01/18 14 MAL reat Totham SPRIN LANE Side of 16 Vegetation trimming Mares tail coming through footway /01/18 15 MAL reat Totham SPRIN LANE Os 4/ 6 Vegetation trimming Mares tail coming through footway /01/18 16 MAL reat Totham STAPLERS HEATH From oat Lodge Road to 88 Vegetation trimming rowth encroaching on footway /02/18 17 MAL Tollesbury WOODROLFE ROAD 18 MAL Maldon ROYAL COURT on the corner of Mell Road and Woodrolfe Road At end past 4 and parking area near bollards Sign cleaning Brackets loose on Marina sign, sign swinging out slightly and low /01/18 Vegetation trimming 8x1 soil and weed growth on footway /01/18 19 MAL Maldon COLERIDE ROAD Side of 43 Vegetation trimming 25m weeds and brambles on footway /10/17 20 MAL Wickham Bishops TIPTREE ROAD Near good acre 22 Other (explain in notes) 21 MAL Asheldham TILLINHAM ROAD Between pit cottage and Deansbrook farm Log 4m on verge, Moved further back by inspector, requires removal /02/18 Sign cleaning Public weighbridge sign dirty /01/18 22 MAL Heybridge DOUBLEDAY DRIVE Side of power station Vegetation trimming 5x0.5 siding required, mud and grass /01/18 23 MAL Maldon FULLBRIDE Os Fullbridge church Sign cleaning 24 MAL Maldon FULLBRIDE Outside units before church Sign cleaning 25 MAL Heybridge Maldon District Highway Rangers - Works Summary January to March 2018 FRESHWATER CRESCENT Sign facing wrong way, should be towards Tesco Tank tourist sign turned round, realigned by inspector but requires tightening /01/ /01/18 From Opp 12 to hall bridge rise Vegetation trimming Approx. 100m bushes / weeds over footway /02/18 Page 1 of 8

20 REF Maldon District Highway Rangers - Works Summary January to March 2018 Parish/Ward Road Name Location Type of Work Required Comments Confirm Number Date Completed 26 MAL Heybridge HALL BRIDE RISE Whole length Vegetation trimming Approx. 20m bushes / weeds over footway /02/18 27 MAL Heybridge ELM AVENUE 28 MAL Bradwell-On-Sea SOUTH STREET Where independent footways cross outside electricity substation rear of 10 fir From point plotted round bend to Opp Telephone exchange Footway drainage channel cleaning Vegetation trimming 29 MAL Mayland KATONIA AVENUE Side of 38 Vegetation trimming Blocked gully and large amount silt debris surrounding Hedge and brambles encroaching f/way 49.5m X 0.8m forcing pedestrians to walk in carriageway Vegetation encroaching footway and moss covering surface, 12.6m X 1.6m /02/ /01/ /01/18 30 MAL Mayland DERBY CLOSE Side of 30 Vegetation trimming Weeds encroaching f/way, 7.0m X 0.6m /01/18 31 MAL Mayland TERN CLOSE Opp 24 Vegetation trimming Vegetation encroaching c/way, 6.3m X 0.8m /01/18 32 MAL Maldon ROYAL COURT From 12 to 15 Vegetation trimming Weed growth through blocks /01/18 33 MAL Maldon CROSS ROAD Side of 8 Vegetation trimming Weeds encroaching on footway /10/17 34 MAL Maldon CROSS ROAD Os 4/5 Vegetation trimming weeds growing through slabs /10/17 35 MAL Maldon BROOKE SQUARE Rear of 14 in alleyway and side of 1 Brooke Square Vegetation trimming 6m weeds /10/17 36 MAL Maldon BURNS CLOSE Side of 6 Vegetation trimming 15x0.6 moss / weeds / detritus on footway /10/17 37 MAL Maldon BURNS CLOSE Side of 10 Vegetation trimming 30m Weed growth Adj fences /10/17 38 MAL Maldon KEATS CLOSE Side of 19 Vegetation trimming Overgrown vegetation along kerb line of parking bays 39 MAL reat Totham TOTHAM HILL REEN OS 2-4 Vegetation trimming 30x1 moss / weeds over footway siding /01/18 40 MAL Ulting THE CAUSEWAY Lay by opp footbridge Other (explain in notes) Fallen branches in middle of lay by, 3.5m x 2.0m /02/18 41 MAL reat Totham BROOK CLOSE Side of 33 foster road Vegetation trimming 22x0.5 grass over footway siding /02/18 42 MAL Woodham Walter BROOK CLOSE O/s Holbroc Vegetation trimming Moss on corner of f/way, 2.3m X 2.1m /02/18 43 MAL Woodham Walter BROOK CLOSE O/s Holbroc Vegetation trimming Moss covering f/way, 4.0m X 1.0m /02/18 44 MAL Woodham Mortimer MALDON ROAD On grass island of layby Other (explain in notes) Broken kerbs laying in long grass /02/18 45 MAL Mayland TERN CLOSE Between lamp column and garage of no 1 Vegetation trimming Veg encroaching f/way and driveway of no 1, 13.5m x 0.6m /01/18 46 MAL Burnham-On-Crouch HERMES DRIVE Adj 6 Vegetation trimming Moss on rear edge of f/way, 3.0m x 0.2m /02/18 47 MAL Burnham-On-Crouch FALKLANDS ROAD Side of 36 Vegetation trimming Moss across f/way, 2.0m x 1.0m /02/18 48 MAL Burnham-On-Crouch FALKLANDS ROAD O/s 30 Vegetation trimming Moss on rear edge of f/way, 4.0m x 0.3m /02/18 49 MAL Burnham-On-Crouch FALKLANDS ROAD Between Vegetation trimming Moss on rear edge of f/way, 3.0m x 0.3m /02/18 50 MAL Burnham-On-Crouch REMEMBRANCE AVENUE Adj Lamp Column 1 Vegetation trimming Veg encroaching f/way, 3.0m x 0.5m /02/18 Page 2 of 8

21 REF Maldon District Highway Rangers - Works Summary January to March 2018 Parish/Ward Road Name Location Type of Work Required Comments Confirm Number Date Completed 51 MAL Burnham-On-Crouch BRICKWALL CLOSE Side of 9 Vegetation trimming Moss on rear edge of f/way, 20.0m x 0.2m /02/18 52 MAL Burnham-On-Crouch BRICKWALL CLOSE O/s 21 to 23 Vegetation trimming Moss on rear edge of f/way, 20.0m x 0.2m /02/18 53 MAL Maldon FULLBRIDE Os the Toll House Sign cleaning End of cycle route sign dirty /02/18 54 MAL Maldon FULLBRIDE Os 2 near Sunny Sailor P/H Footway drainage channel cleaning footway open drainage channel silted up /02/18 55 MAL Maldon FULLBRIDE Os fulmar house on lamp column 4 Sign cleaning Cycling triangle sign misaligned /02/18 56 MAL Maldon Lambourne rove Whole length of road Vegetation trimming Cut back vegetation/weeding 08/02/18 57 MAL Woodham Mortimer SOUTHEND ROAD Opposite range Cottages Vegetation trimming 58 MAL Burnham-On-Crouch MARSH ROAD Alley to the rear of The Leas, tree on verge in Marsh Road Vegetation trimming Vegetation encroaching onto carriageway, 15m in length Tree encroaching onto property of no.50 The Leas /02/ /02/18 59 MAL Heybridge OAK ROAD Side of 35 Colchester road Vegetation trimming Weed growth over footway /01/18 60 MAL Maldon BROOKE SQUARE Slabbed area at end Vegetation trimming Weed growth through slabs /01/17 61 MAL Maldon MILL ROAD 62 MAL Heybridge HOLLOWAY ROAD Between Maldon museum and Maldon promenade park. Opp 131 for 50m towards maypole road opp 143 Sign cleaning Slightly misaligned give way sign /10/17 Vegetation trimming 63 MAL Purleigh THE STREET Opposite Rye House Vegetation trimming 64 MAL Tollesbury VALKYRIE CLOSE End of close Other 65 MAL Heybridge MAPLE AVENUE Side of 46 garage area Vegetation trimming 66 MAL Tolleshunt D'Arcy BECKINHAM ROAD Os 16 Vegetation trimming 50x0.3 veg and detritus encroaching on footway siding rowth encroaching onto carriageway, 10m in length 10m brambles and detritus on Footway RANERS Moss, veg, grass, soil encroaching on carriageway 12x0.7 nettles and detritus on footway In front of hedge, possible siding /01/ /01/ /01/ /01/ /01/18 67 MAL Heybridge CRESCENT ROAD Between 65/67 entrance to green lane Vegetation trimming Vegetation encroaching on footway /01/18 68 MAL Heybridge CRESCENT ROAD Junction Langford Road Vegetation trimming Vegetation encroaching on footway /01/18 69 MAL reat Totham SPRIN LANE Os 20 Vegetation trimming Mares tail coming through footway /01/18 70 MAL reat Totham SPRIN LANE Side of 16 Vegetation trimming Mares tail coming through footway /01/18 71 MAL reat Totham SPRIN LANE Os 4/ 6 Vegetation trimming Mares tail coming through footway /01/18 72 MAL reat Totham STAPLERS HEATH From goat lodge Rd to 88 Vegetation trimming rowth encroaching on footway /02/18 73 MAL Tollesbury WOODROLFE ROAD 74 MAL Maldon ROYAL COURT On the corner of Mell Road and Woodrolfe Road At end past 4 and parking area near bollards Sign cleaning Brackets loose on Marina sign, sign swinging out slightly and low /01/18 Vegetation trimming 8x1 soil and weed growth on footway /01/18 75 MAL Maldon COLERIDE ROAD Side of 43 Vegetation trimming 25m weeds and brambles on footway /10/17 Page 3 of 8

22 REF Maldon District Highway Rangers - Works Summary January to March 2018 Parish/Ward Road Name Location Type of Work Required 76 MAL Wickham Bishops TIPTREE ROAD Near oodacre 22 Other (explain in notes) 77 MAL Asheldham TILLINHAM ROAD Between Pit Cottage and Deansbrook Farm Comments Log 4m on verge, Moved further back by inspector, requires removal Confirm Number Date Completed /02/18 Sign cleaning Public weighbridge sign dirty /01/18 78 MAL Heybridge DOUBLEDAY DRIVE Side of power station Vegetation trimming 5x0.5 siding required, mud and grass /01/18 79 MAL Maldon FULLBRIDE Os Fullbridge church Sign cleaning 80 MAL Maldon FULLBRIDE Outside units before church Sign cleaning 81 MAL Heybridge FRESHWATER CRESCENT Sign facing wrong way, should be towards Tesco Tank tourist sign turned round, realigned by inspector but requires tightening /01/ /01/18 From Opp 12 to Hall Bridge Rise Vegetation trimming Approx. 100m bushes / weeds over footway /02/18 82 MAL Heybridge HALL BRIDE RISE Whole length Vegetation trimming Approx. 20m bushes / weeds over footway /02/18 83 MAL Heybridge ELM AVENUE Outside electricity substation rear of 10 Fir Tree Walk Footway drainage channel cleaning 84 MAL Heybridge FIR TREE WALK From OS 10 to LC 5, by 3 way junction Vegetation trimming 85 MAL Bradwell-On-Sea SOUTH STREET From point plotted round bend to Opp Telephone exchange Vegetation trimming 86 MAL Mayland KATONIA AVENUE Side of 38 Vegetation trimming Blocked gully and large amount silt debris surrounding Approx. 60m veg and leaf mulch over whole footway Hedge and brambles encroaching f/way 49.5m X 0.8m forcing pedestrians to walk in carriageway Vegetation encroaching footway and moss covering surface, 12.6m X 1.6m /02/ /12/ /01/ /01/18 87 MAL Mayland DERBY CLOSE Side of 30 Vegetation trimming Weeds encroaching f/way, 7.0m X 0.6m /01/18 88 MAL Mayland TERN CLOSE Opp 24 Vegetation trimming Vegetation encroaching c/way, 6.3m X 0.8m /01/18 89 MAL Maldon ROYAL COURT From 12 to 15 Vegetation trimming Weed growth through blocks /01/18 90 MAL Maldon CROSS ROAD Side of 8 Vegetation trimming Weeds encroaching on footway /10/17 91 MAL Maldon CROSS ROAD Os 4/5 Vegetation trimming Weeds growing through slabs /10/17 92 MAL Maldon BROOKE SQUARE Rear of 14 in alleyway and side of 1 Brooke Square Vegetation trimming 6m weeds /10/17 93 MAL Maldon BURNS CLOSE Side of 6 Vegetation trimming 15x0.6 moss / weeds / detritus on footway /10/17 94 MAL Maldon BURNS CLOSE Side of 10 Vegetation trimming 30m Weed growth Adj fences /10/17 95 MAL Burnham-On-Crouch THAMES WAY Back of 9-11 Trent Close Vegetation trimming Footway completely overgrown by brambles, 20.0m X 1.2m /02/18 96 MAL reat Totham TOTHAM HILL REEN OS 2-4 Vegetation trimming 30x1 moss / weeds over footway siding /01/18 97 MAL Burnham-On-Crouch MAPLE WAY Side of 92 Maple Way to 6 Chelmer Way Vegetation trimming rowth rear edge footway, 10.0m X 0.9m /02/18 98 MAL Burnham-On-Crouch MEDWAY Between Opp Vegetation trimming Weeds and moss encroaching f/way rear edge, 21.0m X 0.9m /02/18 99 MAL Burnham-On-Crouch MAPLE WAY O/s Vegetation trimming Moss rear edge of f/way, 10.0m X 0.4m /02/ MAL Heybridge OLDHANER ROAD Opp Calotte Hall Other (explain in notes) Debris / stones on footway /02/18 Page 4 of 8

23 REF Maldon District Highway Rangers - Works Summary January to March 2018 Parish/Ward Road Name Location Type of Work Required Comments Confirm Number Date Completed 101 MAL Ulting THE CAUSEWAY Lay by opp footbridge Other (explain in notes) Fallen branches in middle of lay by, 3.5m x 2.0m /02/ MAL Heybridge LAWLIN AVENUE Opp surgery side of flats Vegetation trimming 12.5x0.2 weeds and detritus on footway /02/ MAL Heybridge HERON WAY OS 14 Vegetation trimming Weed growth through footway /02/ MAL Heybridge COOPERS AVENUE Side of 1 (No Suggestions) drive Vegetation trimming Footway damaged by plants / weeds /02/ MAL Heybridge CRESCENT ROAD Side of 2 Elizabeth Way Vegetation trimming 7x0.5 weeds back of footway /02/ MAL reat Totham BROOK CLOSE Side of 33 Foster Road Vegetation trimming 22x0.5 grass over footway siding /02/ MAL Woodham Walter BROOK CLOSE O/s Holbroc Vegetation trimming Moss on corner of f/way, 2.3m X 2.1m /02/ MAL Woodham Walter BROOK CLOSE O/s Holbroc Vegetation trimming Moss covering f/way, 4.0m X 1.0m /02/ MAL Woodham Mortimer MALDON ROAD On grass island of layby Other (explain in notes) Broken kerbs laying in long grass /02/ MAL Heybridge STOCK CHASE 111 MAL Mayland TERN CLOSE End of our section rear of pardoned Opp works entrance Between lamp column and garage of no 1 Vegetation trimming 8m weeds encroaching on footway /02/18 Vegetation trimming Veg encroaching f/way and driveway of no 1, 13.5m x 0.6m /01/ MAL Burnham-On-Crouch HERMES DRIVE Adj 6 Vegetation trimming Moss on rear edge of f/way, 3.0m x 0.2m /02/ MAL Burnham-On-Crouch FALKLANDS ROAD Side of 36 Vegetation trimming Moss across f/way, 2.0m x 1.0m /02/ MAL Burnham-On-Crouch FALKLANDS ROAD O/s 30 Vegetation trimming Moss on rear edge of f/way, 4.0m x 0.3m /02/ MAL Burnham-On-Crouch FALKLANDS ROAD Between Vegetation trimming Moss on rear edge of f/way, 3.0m x 0.3m /02/ MAL Burnham-On-Crouch REMEMBRANCE AVENUE Adj Lamp Column 1 Vegetation trimming Veg encroaching f/way, 3.0m x 0.5m /02/ MAL Burnham-On-Crouch BRICKWALL CLOSE Side of 9 Vegetation trimming Moss on rear edge of f/way, 20.0m x 0.2m /02/ MAL Burnham-On-Crouch BRICKWALL CLOSE O/s 21 to 23 Vegetation trimming Moss on rear edge of f/way, 20.0m x 0.2m /02/ MAL Maldon FULLBRIDE Os the Toll House Sign cleaning End of cycle route sign dirty /02/ MAL Maldon FULLBRIDE Os 2 near Sunny Sailor P/H Footway drainage channel cleaning footway open drainage channel silted up /02/ MAL Maldon FULLBRIDE Os fulmar house on lamp column 4 Sign cleaning Cycling triangle sign misaligned /02/ MDC 549 Chelmsford Other (explain in notes) Collect van from lookers Chelmsford after service 123 MDC 550 Chelmsford Other (explain in notes) Drop off van for oil leak repair 20/02/ MDC 551 Maldon PROMENADE PARK Various Other (explain in notes) Assisting maintenance with driving tractor loading pallets 125 MDC 552 Southminster STATION ROAD Various Other (explain in notes) Install dog bin with bandit straps 21/02/18 19/02/18 21/02/18 Page 5 of 8

24 REF Maldon District Highway Rangers - Works Summary January to March 2018 Parish/Ward Road Name Location Type of Work Required 126 MDC 553 Maldon PROMENADE PARK Various Other (explain in notes) Comments Assisting maintenance with driving tractor loading pallets Confirm Number Date Completed 127 LMAL reat Totham MORTON ROAD FW to Catchpole Road between 15/13 Vegetation trimming Veg and weeds encroaching on Footway /03/ LMAL Maldon BURNS CLOSE Os 10 Vegetation trimming Weed growth through slabbed area /10/ LMAL Maldon BURNS CLOSE Side and rear of 6 in alleyway Vegetation trimming Weed growth blocking alleyway /10/ LMAL Mayland THE DRIVE Opposite 60 Vegetation trimming School warning sign obscured by vegetation /04/ LMAL Maldon TEMPLE WAY Side of 83 start of bridleway Vegetation trimming Hawthorne hedge encroaching on Footway /04/ LMAL Maldon TEMPLE WAY Junction Heybridge Approach Vegetation trimming Tree off shoots encroaching on Footway /04/ LMAL reat Totham CATCHPOLE LANE Between 46 and Foster Road Vegetation trimming 134 LMAL Burnham-On-Crouch THAMES WAY Back of 9-11 Trent Close Vegetation trimming 100m bushes / trees encroaching on Carriageway FLAIL? F/way completely overgrown by brambles, 20.0m X 1.2m 22/02/ /03/ /02/ LMAL Burnham-On-Crouch MAPLE WAY Side of 92 Maple Way to 6 Chelmer Way Vegetation trimming rowth rear edge footway, 10.0m X 0.9m /02/ LMAL Burnham-On-Crouch MEDWAY Between Opp Vegetation trimming Weeds and moss encroaching f/way rear edge, 21.0m X 0.9m /02/ LMAL Burnham-On-Crouch MAPLE WAY O/s Vegetation trimming Moss rear edge of f/way, 10.0m X 0.4m /02/ LMAL Maldon MUNDON ROAD South of Poulson Close at the junction Vegetation trimming 40m veg obscuring visibility exiting junction. FLAIL? /03/ LMAL Tollesbury ORCHARD CLOSE OS 1 Vegetation trimming 24x0.6 moss on Footway /03/ LMAL reat Braxted LEA LANE 141 LMAL reat Braxted LEA LANE From Braxted Park Road to layby, road side of ditch on verge both sides From Braxted Park Road to Lea lane cottage Vegetation trimming Vegetation trimming Hedge and brambles encroaching / collapsing onto Carriageway FLAIL? Hedge / tree line encroaching on Carriageway FLAIL /03/ /03/ LMAL Maldon ABBOTSMEAD Side of 45 Vegetation trimming 50x0.5 nettles / veg over Footway /04/ LMAL Heybridge THE ORCHARD Side of 39 the crescent down to no. 1 Vegetation trimming 35x1 block paving weed growth, veg obstructing Footway area of Carriageway /03/ LMAL reat Totham KINS ROAD Opp 25 Vegetation trimming 30x0.5m weeds and plants on footway /03/ LMAL oldhanger MALDON ROAD Outside the houses 18 to 30 Maldon Road Vegetation trimming Hedge obstructing view from hall estate FLAIL? /04/ LMAL Heybridge ELM AVENUE OS 14/16 in alleyway to Colchester Road Vegetation trimming 25m weeds across Footway /03/ LMAL Heybridge ELM AVENUE 148 LMAL Heybridge STOCK CHASE Rear of down access road, both sides End of our section rear of pardoned Opp works entrance Vegetation trimming 50m weeds and self set small trees starting to encroach On Carriageway /03/18 Vegetation trimming 8m weeds encroaching on Footway /02/ LMAL Burnham-On-Crouch MALDON ROAD Opp 105 Vegetation trimming Thorny branches encroaching f/way 9.0m x 0.8m /03/ LMAL Maldon ABBOTSMEAD Side of 45 Abbots Mead Vegetation trimming 35x0.5 siding required as nettles grow from the detritus /04/18 Page 6 of 8

25 REF Maldon District Highway Rangers - Works Summary January to March 2018 Parish/Ward Road Name Location 151 LMAL Maldon footpath 1 Maldon Rear of Morrison's and side of nursery Little Rascals Type of Work Required Comments Confirm Number Date Completed Vegetation trimming 50x1 both sides weeds over Footway / cycleway /11/ LMAL reat Totham COLCHESTER ROAD Opp hope springs no.34 Vegetation trimming 25x1 veg over Footway /03/ LMAL Tollesbury WOODROLFE ROAD Opp toilets Vegetation trimming Approx. 60m veg encroaching on Footway /03/ LMAL Tollesbury WOODROLFE ROAD OS the Marina Opp Oyster Business Park 155 LMAL Mayland ORCHARD DRIVE O/s 42 Vegetation trimming 156 LMAL Cold Norton VICTORIA ROAD Side of 4 Brennan close Vegetation trimming Vegetation trimming 7x0.5x4m veg over Carriageway /03/18 Hedge & tree branches encroaching c/way, 7.0m x 3.0m, Low overhanging branches across c/way, 16.0m x 2.5m /04/ /04/ LMAL Mayland THRUMBLE CLOSE Opp Between 1-3 Vegetation trimming Veg encroaching half of f/way, 40.0m x 1.1m /04/ LMAL Tollesbury WEST STREET 159 LMAL Heybridge LANFORD ROAD Between village gateway and Prentice 21x1.5m bush encroaching on Carriageway and Vegetation trimming /03/18 Hall Lane heading out of village obstructing pedestrian use of verge FLAIL? Opp Rectory between RAB and Crescent Other (explain in notes) Large branch on verge requires removal /01/18 Road 160 LMAL reat Totham COLCHESTER ROAD Between Mill Road and no. 20 Vegetation trimming 15x0.5m veg over footway /03/ LMAL Burnham-On-Crouch BARNMEAD WAY O/s 2a Vegetation trimming Moss rear edge of f/way, 11.0m x 0.3m, /02/ LMAL reat Braxted LEA LANE Opp Lea Lane fruit farm on bend Vegetation trimming Approx. 60m hedge and brambles road side of ditch encroaching on carriageway FLAIL? /03/ LMAL Burnham-On-Crouch ESSEX ROAD O/s Booth Place Vegetation trimming Veg encroaching f/way, 15.0m x 0.4m /02/ LMAL Stow Maries THE STREET Opp The Stow Bullocks Other (explain in notes) Dirty bus stop sign /04/ LMAL Tollesbury THURSTABLE ROAD Junction Thurstable road Vegetation trimming 20 1 ivy over footway /03/ MDC 557 Tollesbury Woodrolfe Rd Hedge running up to car park and opposite side flail Vegetation trimming Hedge running up to car park and opposite side flail 167 MDC 558 Ulting Ulting lane Various Vegetation trimming Flailing all day sightlines 20/03/ MDC 559 Burnham Caravan park Various Vegetation trimming Flailing all day parks 21/03/ MDC 560 Tollesbury Thurstable close Various Vegetation trimming Cut back hedge and bushes at junction 23/03/ MDC 561 Wickham bishops Church Road Verge Other (explain in notes) Install dog bin and post on verge 29/03/ MDC 562 reat Braxted Cricket Pavilion Verge Other (explain in notes) Install dog bin and post on verge 29/03/ MDC 563 Maldon LOUCESTER AVENUE Various Vegetation trimming Reducing hedge encroaching on garden with chainsaw 173 MDC 564 Wickham Bishops The Street Footpath Vegetation trimming Flail, strim and edge footpath 09/04/18 19/03/18 03/04/18 Page 7 of 8

26 Blank Page Page 8 of 8

27 MALDON DISTRICT LOCAL HIHWAY PANEL - REVENUE SPEND SUMMARY 2018/19 Ref Scheme name Description Requested by Parish Allocated Budget date requested 1 Highway Rangers Service 2018/19 Various 72,000 01/04/ Plains Road, reat Totham to Little Totham Automatic Count (x2) Parish Council Little Totham /04/ VAS Rotation - Maldon District Rotation of VAS units (x3) - (Tillingham/Maldon/Woodham Walter), (Little Totham/Steeple) and (Tolleshunt Knights/Heybridge) Essex Highways Various 1,600 17/05/ Church Road, Tolleshunt Major Automatic Count (x2) Parish Council Tolleshunt Major /05/2018 Page 1 of 2

28 Blank Page Page 2 of 2

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme June 2018 Update The following report provides an update on the current position of all of the schemes which the Chelmsford City Local Highway

More information

6 th October I write in response to your request for information under the Freedom of Information Act 2000.

6 th October I write in response to your request for information under the Freedom of Information Act 2000. Tel 01245 875863 Fax 01245 606660 Email ian.haines@maldon.gov.uk Our ref F09/0062 Your ref request-18132-b754aaa4 Mr C Simpson Whatdotheyknow.com DIRECTORATE OF COMMUNITY SERVICES HEAD OF ENVIRONMENT SERVICES

More information

COLCHESTER BOROUGH COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 14 TH December /18 POTENTIAL SCHEMES LIST

COLCHESTER BOROUGH COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIGHWAY PANEL 14 TH December /18 POTENTIAL SCHEMES LIST COLCHESTER BOROUH COUNCIL WITH ESSEX COUNTY COUNCIL LOCAL HIHWAY PANEL 14 TH December 2017 2017/18 POTENTIAL SCHEMES LIST Summary of schemes on current Potential s List: Potential s Budget Summary 18,500

More information

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management

Scheme Category. Traffic Management. Traffic Management. Implementation LBAS ,000. Traffic Management. Traffic Management. Traffic Management 90,000 Ref Location Description Requested by Scheme Category Scheme stage Cost Code Estimated cost Comments RA London Road, Wickford close to no 63 2 Twinstead, Wickford 3 4 5 6 7 B48 Westmayne / Ford

More information

Local Highway Panels Members Guide. 9 Public Rights of Way

Local Highway Panels Members Guide. 9 Public Rights of Way Local Highway Panels Members Guide 9 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction There are 3927km of (PROW) in Essex, and it is one of the most extensive networks in the country.

More information

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme /18

CHELMSFORD CITY LOCAL HIGHWAY PANEL Approved Works Programme /18 CHELMSFORD CITY LOCAL HIHWAY PANEL Approved Works Programme - 2017/18 At the September 2017 meeting of the Chelmsford City Local Highways Panel (LHP) the Panel decided to from a Sub-roup to consider scheme

More information

CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 36)

CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 36) CHELMSFORD CITY LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 36) This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the City Local Highways

More information

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane

SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane SLOUGH Stage 3 Road Safety Audit of A4 London Road, M4 J5 to Sutton Lane Exception Report Client Officer Rudo Beremauro Date 20 January 2015 RSA /Project Sponsor s Contents Section 3 Project Sponsor's

More information

TIP Scheme List Huntingdonshire

TIP Scheme List Huntingdonshire Scheme List 2018 - Huntingdonshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 265 T A1096 junction capacity enhancements Highway Capacity Improvements LTTS around

More information

Local Highway Panels Members Guide. 4 Signs & Road Markings

Local Highway Panels Members Guide. 4 Signs & Road Markings Local Highway Panels Members Guide 4 Signs & Road Markings 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Road Signs and Road Markings on the public highway are governed by legislation.

More information

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document

LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document LEA BRIDGE ROAD - A STREET FOR EVERYONE Public consultation document TELL US Bakers Arms to Leyton Green Road (Section D, E, F) Leyton Green Road to Whipps Cross Roundabout (Section G) YOUR VIEWS www.enjoywalthamforest.co.uk

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 2 West Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 2 - West Chelmsford Contents

More information

Lea Bridge Road A street for everyone Tell us

Lea Bridge Road A street for everyone Tell us Lea Bridge Road A street for everyone Tell us Public consultation document Section H your views 1 Lea Bridge Road: a street for everyone Introduction Mni-Holland is an exciting programme to improve walking

More information

Appendix 12 Parking on footways and verges

Appendix 12 Parking on footways and verges Appendix 12 Parking on footways and verges Legal position Parking on footways and verges whether wholly or partly is banned throughout London, unless signs are placed to allow parking. The ban requires

More information

Appendix 11 Barton Greenway Review

Appendix 11 Barton Greenway Review Appendix 11 Barton Greenway Review Nigel Brigham & Associates A report for 1 Introduction This report is based on fieldwork carried out in 2016 to review the Greenway network around Cambridge as shown

More information

Walk Description. Directions

Walk Description. Directions Title: Saffron Trail: Battlesbridge to Chelmsford Distance: 14¾ miles Time taken: 6 hours Start Point: Outside the Barge Inn, Battlesbridge OS Explorer Map: 175 & 183 Grid Ref.: TQ 780 947 Transport: Rail:-

More information

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2

Rhebogue Neighbourhood Greenway. Road Safety Audit Stage 2 Rhebogue Neighbourhood Greenway Road Safety Audit Stage 2 Report Number: 12/007/00/00057 July 2014 Mid West National Road Design Office Lissanalta House, Dooradoyle County Limerick Tel: 061 496 800 Fax:

More information

CYCLING TIME TRIALS The national governing body for CYCLING time trials

CYCLING TIME TRIALS The national governing body for CYCLING time trials CYCLING TIME TRIALS The national governing body for CYCLING time trials www.ctt.org.uk SOUTH DISTRICT COUNCIL COURSE DETAILS FOR START SHEETS & RISK ASSESSMENT INDEX Guidance Notes for Event Promoters

More information

Signage and condition of road and pavements on both sides of Chesil Street

Signage and condition of road and pavements on both sides of Chesil Street Signage and condition of road and pavements on both sides of Chesil Street Tuesday 26 July and Tuesday 2nd August 2016, both at 6 p.m. Audited by: Janet Berry, Angela Stevenson, Mike Slinn, Phil Gagg,

More information

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY

Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR. Consultation open from 24 September to 5 November 2018 SAY Public Consultation on Braintree Integrated Transport Package (ITP) HAVE YOUR SAY Consultation open from 24 September to 5 November 2018 Contents Introduction 3 Background 4 Springwood Drive Roundabout

More information

Bramshaw traffic calming proposal

Bramshaw traffic calming proposal - 1 - Bramshaw traffic calming proposal Initial options appraisal report July 2017 - 2-1. Project background Hampshire Country Council has commissioned Test Valley Borough Council to carry out an option

More information

MILTON ROAD LLF PROJECT UPDATE

MILTON ROAD LLF PROJECT UPDATE Greater Cambridge City Deal MILTON ROAD LLF PROJECT UPDATE 9 th May 2017 Project objectives Comprehensive priority for buses in both directions wherever practicable; Additional capacity for sustainable

More information

ROCHFORD LOCAL HIGHWAYS PANEL MEETING AGENDA

ROCHFORD LOCAL HIGHWAYS PANEL MEETING AGENDA ROCHFORD LOCAL HIGHWAYS PANEL MEETING AGENDA Date: Time: Venue: Chairman: Vice Chairman: Panel Members: Officers: Secretariat: 27 September 2018 14:00 Meeting Room 4 Civic Suite, 2 Hockley Road, Rayleigh,

More information

Local Highway Panels Members Guide. 5 Crossing Facilities

Local Highway Panels Members Guide. 5 Crossing Facilities Local Highway Panels Members Guide 5 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction On the Network where there are sufficient crossing opportunities most individuals are able to cross

More information

TIP Scheme List East Cambridgeshire

TIP Scheme List East Cambridgeshire C = cycling, W = walking, P = public transport, T = traffic and highway, S = safety 454 P Soham Railway Station Rail Improvement LTTS + 455 P Ely area rail infrastructure improvements Rail Improvement

More information

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure

18.1 Introduction Maintaining pedestrian-related Problems arising in the long term. infrastructure 18 Maintaining the pedestrian network Maintaining the pedestrian network Maintenance in the short and long term Planning for pedestrians during maintenance works 18.1 Introduction Both pedestrian-related

More information

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21

DESIGN CODE. Enterprise West Harlow London Road North Design Code 21 DESIGN CODE Enterprise West Essex @ Harlow London Road North Design Code 21 4 MAXIMUM BUILDING HEIGHTS 4.1 Table 4A sets out maximum building height standards for each character area within the LDO boundary.

More information

H&T. H O L L O W E L L & T E E T O N P A R I S H C O U N C I L

H&T. H O L L O W E L L & T E E T O N P A R I S H C O U N C I L H&T. H O L L O W E L L & T E E T O N P A R I S H C O U N C I L Web site: http://www.hollowellandteeton.org.uk/ Email: pc-clerk@hollowellandteeton.org.uk Re: Hollowell & Teeton Parish Council Mowing Areas

More information

Hitchin Nomads Cycling Club

Hitchin Nomads Cycling Club Hitchin Nomads Cycling Club Risk Assessment of Course Course Identification 1U/25 25 Miles - Southill / Old Warden Reviewed By Paul Riley Reviewed On 02/01/2018 Course Details https://www.plotaroute.com/route/346809

More information

Living Streets Community Street Audit Report Photo

Living Streets Community Street Audit Report Photo Living Streets Community Street Audit Report Photo Oldmeldrum March 2018 We are Living Streets Scotland, part of the UK charity for everyday walking. We want to create a walking nation where people of

More information

Question 14 Landscape and nature:

Question 14 Landscape and nature: Question 14 Landscape and nature: Do you think that we need any more footpaths or changes to existing ones? Please specify. [Written responses to the please specify question are recorded with abbreviations

More information

CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 34)

CHELMSFORD CITY LOCAL HIGHWAY PANEL POTENTIAL SCHEMES LIST (Version 34) CHELMSFOD CITY LOCAL HIHWAY PANEL POTENTIAL SCHEMES LIST (ersion 34) This Potential List identifies all of the requests which have been received for the consideration of the City Local Highways Panel.

More information

Process for managing parking on verges, footways and footpaths

Process for managing parking on verges, footways and footpaths Process for managing parking on verges, footways and footpaths Author: MG/NR Highways and Transport Environment Department Date: 28 July 2015 Version: 2.0 PARKING ON VERGES, FOOTWAYS AND FOOTPATHS Introduction

More information

10 SHERFORD Town Code

10 SHERFORD Town Code Key Fixes (Ref: Masterplan Book, section 4a. Land Use Budget and Key Fixes ) The Town Plan designs and allocates buildings, streets and spaces as accurately as possible in the understandable absence of

More information

Cycle Network Background Paper

Cycle Network Background Paper Cycle Network Background Paper The council is hoping to achieve a comprehensive cycle network including radial routes into town, routes across town N-S and E-W including safer junctions. The aim overall

More information

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP

PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP PAGHAM NEIGHBOURHOOD PLAN INFRASTRUCTURE GROUP SUMMARY OF FINDINGS AND PRIORITIES PARKING There was a high level of response to this topic which included many aspirations to provide car parking near to

More information

Consultation Report & Results August 2016

Consultation Report & Results August 2016 Queen Edith s Way Consultation Report & Results August 216 Summary The consultation on walking and cycling improvements along Queen Edith s Way took place from 2 June to 1 August 216. A total of 64 survey

More information

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport

The Cabinet Member for Highways & Streetscene. Aurang Zeb - Head of Highways & Transport LONDON BOROUGH OF RICHMOND UPON THAMES Cabinet Member Decision DATE: January 2012 REPORT OF: LEAD OFFICER: SUBJECT: WARDS: The Cabinet Member for Highways & Streetscene Aurang Zeb - Head of Highways &

More information

Background. Caversham a vision for the future. Joint public meeting arranged by:

Background. Caversham a vision for the future. Joint public meeting arranged by: Joint public meeting arranged by: Sharing our Streets Caversham a vision for the future and Caversham Traders Association This presentation followed a presentation by Simon Beasley, Network Manager for

More information

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS.

CHURCH ROAD. Public consultation document TELL US YOUR VIEWS. CHURCH ROAD Public consultation document YOUR TELL US VIEWS www.enjoywalthamforest.co.uk CHURCH ROAD Introduction Waltham Forest Council was one of three boroughs to be awarded 27million of funding from

More information

There will be a buffet lunch available for Panel Members and officers from 12.30

There will be a buffet lunch available for Panel Members and officers from 12.30 MEETIN OF THE CHELMSFORD LOCAL HIHWAYS PANEL 26 TH JANUARY 2016 COUNCIL CHAMBER, CHELMSFORD CITY COUNCIL COMMENCIN AT 13.00 There will be a buffet lunch available for Panel Members and officers from 12.30

More information

Infrastructure Policies

Infrastructure Policies Infrastructure Policies 1. Primary Healthcare Health facilities in Ashtead comprise, Ashtead Private Hospital, two GP surgeries at Gilbert House and St Stephens, two Dental practices, the Arch and Tudor

More information

MARKHOUSE ROAD IMPROVEMENTS

MARKHOUSE ROAD IMPROVEMENTS MARKHOUSE ROAD IMPROVEMENTS www.enjoywalthamforest.co.uk Waltham Forest is changing and we want you to be part of it. Thanks to a funding pot of 27million from Transport for London, we re delivering the

More information

REPORT ON TRANSPORT AND PARKING, 2017

REPORT ON TRANSPORT AND PARKING, 2017 NEIGHBOURHOOD DEVELOPMENT PLAN 2017 REPORT ON TRANSPORT AND PARKING, 2017 COMPILED BY: NEIGHBOURHOOD DEVELOPMENT PLAN STEERING COMMITTEE AND ROLVENDEN PARISH COUNCIL CONSULTANTS: TONY FULLWOOD ASSOCIATES,

More information

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment

Strategic Director for Environment. Enclosures Appendix A - Option drawings. Jamie Blake- Strategic Director for Environment Chipping Barnet Area Committee 9 July 2018 Title Report of Wards Status Urgent Key Cromer Road Request for 20mph Zone Strategic Director for Environment High Barnet Public No No Enclosures Appendix A -

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 5 South and East Chelmsford July - August 27 Chelmsford City Growth Package Contents Introduction 5 Army and Navy Roundabout Improvements:

More information

Audit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection

Audit No. RSA Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection Audit No. RSA 2199 Stage 1 Road Safety Audit Bermuda Park, Nuneaton Getting West Nuneaton Moving: Bermuda Connection 1 1.0 INTRODUCTION 1.1 This report results from a Stage 1 Road Safety Audit for a highways

More information

Danbury Words and pictures by Laurie Page of the Public Rights of Way team at Essex County Council.

Danbury Words and pictures by Laurie Page of the Public Rights of Way team at Essex County Council. Danbury Words and pictures by Laurie Page of the Public Rights of Way team at Essex County Council. An undulating walk from Danbury village to the bluebells at the National Trust property of Blakes Wood.

More information

SHOTLEY BRIDGE VILLAGE TRUST

SHOTLEY BRIDGE VILLAGE TRUST SHOTLEY BRIDGE VILLAGE TRUST Traffic & Parking Study - 2009 The Parking Lot, a focus group of the Shotley Bridge Village Trust, has undertaken this study. Evidence was gathered, through surveys during

More information

Rochford Local Highway Panel Meeting Agenda

Rochford Local Highway Panel Meeting Agenda Rochford Local Highway Panel Meeting Agenda Date: Thursday 23 rd March 2017 Time 2:00pm Venue: Civic Suite, 2 Hockley Road, Rayleigh, SS6 8EB Chair: Vice Chair: Panel Members: Other Attendees: Cllr Michael

More information

Contract for grass and undergrowth cutting in Sheviock Parish 2017/18.

Contract for grass and undergrowth cutting in Sheviock Parish 2017/18. The Bill Warren Room, Sheviock Memorial Hall, Crafthole, Torpoint, Cornwall, PL11 3DG Clerk: Mrs Linda Coles Telephone: 01503 232996 Email: sheviockpc@btinternet.com Contract for grass and undergrowth

More information

SCHOOL ROUTE AUDIT REPORT. St Peter s C of E Primary School, Farnham. 17 th January 2017

SCHOOL ROUTE AUDIT REPORT. St Peter s C of E Primary School, Farnham. 17 th January 2017 SCHOOL ROUTE AUDIT REPORT St Peter s C of E Primary School, Farnham. 17 th January 2017 CONTENTS Executive summary 3 Living Streets 4 Local Sustainable Transport Fund 4 Introduction 5 School route audit

More information

TRAFFIC ADVISORY LEAFLET

TRAFFIC ADVISORY LEAFLET TRAFFIC ADVISORY LEAFLET 2/04 Rural traffic calming: Bird Lane, Essex INTRODUCTION Many rural communities are concerned about traffic growth and high vehicle speeds. Local authorities have to balance the

More information

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT

CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT CHECKLIST 2: PRELIMINARY DESIGN STAGE AUDIT 2.1 General topics 2.1.1 Changes since previous audit Do the conditions for which the scheme was originally designed still apply? (for example, no changes to

More information

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High

High 2010 Medium 2010/11. PCT NHS Darlington Primary Care Trust HPC DBC DBC. High HPC. Med to High Hurworth Parish Plan 2010 Actions In this action plan cost ranges are: Low up to 499 Med - 500 to 4,999 High 5,000+ Very - Over 20,000 Hurworth Parish Council Darlington Borough Council MSG Middleton St

More information

Local Highway Panels Members Guide. 2 Speed and Traffic Management

Local Highway Panels Members Guide. 2 Speed and Traffic Management Local Highway Panels Members Guide 2 Speed and Traffic Management 2 Local Highway Panels (LHP) Members Guide 2016/17 1. Introduction Following the publication of the DfT guidance on setting local speed

More information

PCC PCC. Is this PCC land PCC have cut back from footway in past PCC

PCC PCC. Is this PCC land PCC have cut back from footway in past PCC Village Regeneration, Village walks April/May 2017 Up dated 06 03 2018 Clerks comments 1 Area Needs Attention /PNP/StD CC Done Cardigan Rd Planter at entrance to the village (has been planted up) Allotments

More information

Appendix A Type of Traffic Calming Measures Engineering Solutions

Appendix A Type of Traffic Calming Measures Engineering Solutions Appendix A Type of Traffic Calming Measures Engineering Solutions PHYSICAL MEASURES Central Hatching The major consideration of this feature is that, these markings can only be laid down the centre of

More information

Cuddington Traffic Calming

Cuddington Traffic Calming Buckinghamshire County Council Cuddington Traffic Calming PRIV18003 / FEA / DOC / 01 June 2018 Ringway Jacobs Ltd Harling House 47-51 Great Suffolk Street London SE1 0BS Tel: 02079604040 Fax: 02079604051

More information

NORTH HIGHLAND LAKE ROAD PROJECT

NORTH HIGHLAND LAKE ROAD PROJECT NORTH HIGHLAND LAKE ROAD PROJECT The purpose of this special newsletter is to inform the residents of Flat Rock about the facts concerning the proposed N. Highland Lake Road Project and clarify some misconceptions.

More information

The Mendip Way. Route Directions and Maps Wells to Frome

The Mendip Way. Route Directions and Maps Wells to Frome The Mendip Way Route Directions and Maps Wells to Frome Website: www.mendiphillsaonb.org.uk Email: mendip@mendiphillsaonb.org.uk Facebook & Twitter: @MendipHillsAONB Phone: 01761462338 1 Wells to Shepton

More information

Kings Road, Herne Bay: Proposed Crash Remedial Measure

Kings Road, Herne Bay: Proposed Crash Remedial Measure Kings Road, Herne Bay: Proposed Crash Remedial Measure To: Canterbury Joint Transportation Board 17 February 2015 By: Classification: Ward: Tim Read - Head of Transportation Unrestricted Herne Bay Summary:

More information

sessions. The opinions of local people will help decide which of these two options is taken forward to be built.

sessions. The opinions of local people will help decide which of these two options is taken forward to be built. A4018 FAQs Why are no bus lanes proposed north of Crow Lane? Inbound and outbound bus lanes were considered north of the Crow Lane junction, but they took away capacity from other traffic on the approach

More information

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager

Cabinet Member for Highways & Streetscene. Highway Infrastructure Manager LONDON BOROUGH OF RICHMOND UPON THAMES DATE: AUGUST 2015 DECISION MAKER: LEAD OFFICER: SUBJECT: WARDS: Cabinet Member for Highways & Streetscene Highway Infrastructure Manager PROPOSED CYCLING IMPROVEMENTS

More information

FONTMELL MAGNA. Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014

FONTMELL MAGNA. Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014 FONTMELL MAGNA Village Traffic Management Scheme (TMS) Presented to and adopted by Fontmell Magna PC September 2014 Why do we need a Village Traffic Management Scheme? 1. Because of the impact the A350

More information

MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ

MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ MEETING CHIPPING BARNET AREA ENVIRONMENT SUB-COMMITTEE DATE AND TIME WEDNESDAY 13 MARCH, 2013 AT 7.00 PM VENUE 1255 HIGH ROAD, WHETSTONE, N20 0EJ Dear Councillors, Please find enclosed additional papers

More information

HISTON ROAD Have your say on better public transport, cycling and walking journeys

HISTON ROAD Have your say on better public transport, cycling and walking journeys HISTON ROAD Have your say on better public transport, cycling and walking journeys Have your say: Please complete the survey inside this leaflet or online at www.greatercambridge.org.uk/histonconsultation

More information

NETTLESTEAD & YALDING

NETTLESTEAD & YALDING NETTLESTEAD & YALDING ULL CIRCUIT - Sheet 1 (first and last sections) Open fields (see 'Introductory Notes') 88 Direction label (as in the walk notes) ROADS: 81 10m Significant roads Redhill arm North

More information

connectivity through walking and cycling

connectivity through walking and cycling active design case study the national forest: connectivity through walking and cycling active design principles in action: 1. ACTIVITY FOR ALL 2. WALKABLE COMMUNITIES 3. CONNECTED WALKING & CYCLING ROUTES

More information

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign

E4 Cycle Route Exeter University to Redhayes Bridge. - Recommendations from Exeter Cycling Campaign E4 Cycle Route Exeter University to Redhayes Bridge - Recommendations from Exeter Cycling Campaign 1.0 Introduction Exeter Cycling Campaign has prepared this report to provide recommendations for Devon

More information

THE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED. Walking

THE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED. Walking THE STRATEGY: PROPOSED PROJECTS TO BE DELIVERED alking The following walking and public rights of way projects will improve the attractiveness of walking both within March itself and out into the countryside.

More information

Green Streets and Urban Greenways

Green Streets and Urban Greenways 127 11 Green Streets and Urban Greenways 11. Green Streets and Urban Greenways 128 11 Green Streets and Urban Greenways Once the traffic-free section of a route has come to an end, then comes the remaining

More information

Hitchin Nomads Cycling Club

Hitchin Nomads Cycling Club Hitchin Nomads Cycling Club Risk Assessment of Course Course Identification 1U/10 10 Miles - Southill / Old / Warden / Ireland Circuit Reviewed By Nick Hickman Reviewed On 13/01/2018 Course Details START

More information

Local Highway Panels Members Guide 11 Quiet Lanes

Local Highway Panels Members Guide 11 Quiet Lanes Local Highway Panels Members Guide 11 Image courtesy of Ian Dunster 2 Local Highway Panels (LHP) Members Guide 2018./19 1. Introduction Local authorities are able to designate country lanes as in rural

More information

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation

Frascati Road and Temple Hill Route Improvements. Outline Design Report to Accompany Public consultation Frascati Road and Temple Hill Route Improvements Outline Design Report to Accompany Public consultation September 2013 Background: Dún Laoghaire-Rathdown is committed to providing high quality pedestrian

More information

Proposed Development by Cala Homes in Dollicott - Report o n Roads and Traffic

Proposed Development by Cala Homes in Dollicott - Report o n Roads and Traffic Proposed Development by Cala Homes in Dollicott - Report o n Roads and Traffic Dolicott Development - Traffic report v1.0 compressed.docx Page 1 of 10 Proposed Development by Cala Homes in Dollicott Report

More information

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group

Guide to the Cycle Enfield Public Consultation on Enfield Town. Produced by the Save Our Enfield Town Campaign Group Guide to the Cycle Enfield Public Consultation on Enfield Town Produced by the Save Our Enfield Town Campaign Group What s in this guide? Introduction Page 3 What Enfield Council says about Option 1 Page

More information

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL

ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL ADOPTED BISHOPS LYDEARD & COTHELSTONE PARISH COUNCIL Clerk to the Council: Mrs M Rousseau, West View, West Bagborough, TA4 3EG Phone: 01823 432 658 Email: clerk@bishopslydeard.org http://www.bishopslydeard.org.uk/

More information

LOCAL CIRCUIT EM1: EAST MALLING & BARMING HEATH. N 2m ROADS: Significant roads PATHS: Starting direction Barming Longsole Mission Church

LOCAL CIRCUIT EM1: EAST MALLING & BARMING HEATH. N 2m ROADS: Significant roads PATHS: Starting direction Barming Longsole Mission Church Ditton Church Scott Close LOCAL CIRCUIT EM1: EAST MALLING & BARMING HEATH 6 Community Centre F Open fields (see 'Introductory Notes') 1m 88 Direction label (as in the walk notes) East Malling Church -

More information

Improving Thetford Cycling Provision. In and Around Thetford

Improving Thetford Cycling Provision. In and Around Thetford Improving Cycling Provision In and Around Thetford Presentation to Thetford Town Council July 2015 About Me Lecturer in Mathematics at the University of East Anglia Keen recreational cyclist Volunteer

More information

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE

14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE 165 14. PROPOSED PEDESTRIAN CROSSING IMPROVEMENTS IN MOORHOUSE AVENUE General Manager responsible: General Manager City Environment, DDI 941-8528 Officer responsible: Transport and Greenspace Unit Manager

More information

Walk Description. Directions

Walk Description. Directions Title: East Hanningfield Distance: 8 miles / 9 miles Time taken: 3-3½ hours Location: 5 miles south east of Chelmsford Parking: Free car park off The Tye, East Hanningfield, next to the primary school

More information

M A L D O N DISTRICT SPORTS DIRECTORY

M A L D O N DISTRICT SPORTS DIRECTORY M A L D O N DISTRICT SPORTS DIRECTORY Whether your goal is to improve your health and wellbeing or to find a sporting club to join, this directory contains the information you need to take the first steps

More information

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJ/148/W 003 H05 PATTENS CROSSING THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER PUBLIC INQUIRY, 18 OCTOBER 2017 DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05 OBJECTION

More information

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services

TRANSPORT PUBLIC SAFETY SERVICES THAT SUPPORT COMMUNITIES. Provide access to, from and for emergency services Transport - 128 - Road Network KEY FACTS Council operates and maintains a network of some 2,53 km which includes: o 864 km of sealed roads o 1,666 km of unsealed roads o 7 bridges and large culverts o

More information

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk

IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE. for WONERSH PARISH COUNCIL. March V3.0 stilwell-ltd.co.uk IMPROVEMENT OPTIONS REPORT - WONERSH VILLAGE for WONERSH PARISH COUNCIL March 2016 V3.0 stilwell-ltd.co.uk Improvement Options Report Wonersh Village, Wonersh Date of Prepared Checked Revision Comments

More information

Cycling Safety Review. (April 2017)

Cycling Safety Review. (April 2017) Cycling Safety Review (April 2017) Background Analysis of STATS19 database: - Only includes incidents where police were in attendance, or where the crash was subsequently reported to the police - Significantly

More information

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48

Traffic Assets Section Proposed Removal of Street Lighting Road Safety Review Report No 48 Street Lighting Section Unique Reference: o. 48 Traffic Assets Section Report o 48 Reviewer: Ellie Briggs, BEng (Hons) CEng MICE Highway Classification / umber Road / Street ame: District / Settlement:

More information

Chelmsford City Growth Package

Chelmsford City Growth Package Chelmsford City Growth Package Public Consultation Document Volume 1 North Chelmsford July - August 2017 Chelmsford City Growth Package Public Consultation Document - Volume 1 - North Chelmsford Contents

More information

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017

A52. Nottingham Junctions. Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Nottingham Junctions Construction at Nottingham Road and Cropwell Road junctions commencing early January 2017 Introduction The is the key east-west link across the East Midlands. The route is subject

More information

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm

IAN WHITE ASSOCIATES. Crawley Station Gateway Public Realm IAN WHITE ASSOCIATES Crawley Station Gateway Public Realm contents 1. objectives & client brief 2. site appraisal 3. best practice guidance 4. design concept 1. objectives & client brief Crawley Train

More information

Footpaths and walks in the Leckhampton Fields

Footpaths and walks in the Leckhampton Fields APPENDIX 5 Footpaths and walks in the Leckhampton Fields Because of its network of footpaths, the Leckhampton Fields have many different walks. The rich diversity of landscape, hedgerows, trees, streams,

More information

Maldon District Cycling Action Plan Highways/Transport Planning January 2018

Maldon District Cycling Action Plan Highways/Transport Planning January 2018 Cycling Action Plan Highways/Transport Planning January 2018 Contents 1 Introduction... 1 1.1 Preamble... 1 1.2 Background... 2 1.3 Aims of the Action Plan... 3 1.4 Report Structure... 4 2 Policy Review...

More information

The Hundred Parishes

The Hundred Parishes The Hundred Parishes Walks from railway stations number 9 6.4 miles (10kms) from Bishop s Stortford to Stansted Mountfitchet Start: Bishop s Stortford station (Grid Reference TL492209) (ample parking and

More information

There are toilets at Manningtree Station, Flatford (close to the hump back bridge) and in Dedham.

There are toilets at Manningtree Station, Flatford (close to the hump back bridge) and in Dedham. Arriving by Train Main Features of the Walk Outline Route Employs particularly attractive paths, many of which offer impressive views across Dedham Vale. Includes a section along the tidal section of the

More information

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail.

EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. TRANSPORT AND ACCESS EXECUTIVE SUMMARY Callan Park accommodates travel from a wide range of transport modes, including walking, cycling, bus and light rail. Whilst there are some walking facilities within

More information

Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RAG. Waltham Abbey/Nazeing

Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments RAG. Waltham Abbey/Nazeing Speed Surveys do not indicate a speeding issue. Two surveys were completed in January 2018 1 Woodside, Thornwood - Traffic calming equest for traffic calming along Woodside Concerns that vehicles are travelling

More information

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT

6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT 6. BREENS/GARDINERS/HAREWOOD INTERSECTION - SAFETY IMPROVEMENT PROJECT General Manager responsible: Officer responsible: Author: Jane Parfitt General Manager City Environment DDI 941 8656 Michael Aitken

More information

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road)

Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Sandyford Cycle Route (Kilgobbin / Drummartin Link Road) Public Consultation Report on Submissions Client: Dun Laoghaire-Rathdown County Council Date: May 2018 Job Number: 15_116B Clifton Scannell Emerson

More information

Introduction. Prince Street Cycling Ambition Fund Public Realm Project

Introduction. Prince Street Cycling Ambition Fund Public Realm Project Introduction The (CAF) project will create a high quality, 8-80 s cycle route up the west side of Prince Street from Cumberland Road, over Prince Street bridge to the Centre. This is part of the City Centre

More information