Appendix I Street Cross-Sections

Size: px
Start display at page:

Download "Appendix I Street Cross-Sections"

Transcription

1 Appendix I Street Cro-Section Undertanding Rolyn Street Cro-Section Tenty-five treet cro-ection ere created for the Rolyn Multimodal Tranportation Study. In ome cae, alternative cro-ection have been prepared for a particular treet. The location of each treet cro-ection can be found on the adjacent map. ach propoed treet cro-ection i made up of a combination of the folloing element: Width of idealk Street tree Location of parking lane / Width of parking lane Location of bike lane / Width of bike lane umber and direction of travel lane Width of travel lane Location of median / Width of median Total idth beteen back-of-idealk and back-of-idealk Total treet idth (curb-to-curb) The folloing guideline ere ued to determine the appropriate idth of variou tranportation facilitie: Minimum 6-feet ide idealk clear-idth. Mot hould be 8- to 12-feet ide, 5 to 6-feet ide bicycle lane 10 to 11-feet ide travel lane. Curb lane ith bu or ignificant volume of truck traffic hould generally be 11-feet ide (12.5 feet if you include curb and gutter) 7-to 8-feet ide parallel parking lane Median pedetrian refuge (minimum ix-feet in idth) Pleae note that a majority of the propoed treet cro-ection ere deigned to ork ithin exiting right-of-ay contraint (back-of-idealk to back-of-idealk). Adjutment to total idth of the right-of-ay (backof-idealk to back-of-idealk) ere generally only made here redevelopment of adjacent development a conidered likely to occur. Some cro-ection may require ignificant land redevelopment or other phyical change in order to permit full implementation. Therefore it i likely that improvement ould need to be made on ome treet in an incremental manner.

2 Street Cro-Section 2: B lee Highay (Beteen Fort Myer Drive and Lynn Street) Reduce idth of travel lane Add bike lane and parking lane along the outh ide of Lee Highay Remove median and ervice road aociated ith Rolyn Gateay development Increae idth of idealk along the outh ide of Lee Highay Reduce idth of right-of-ay ith redevelopment of Rolyn Gateay 16.0' 13.0' 13.0' 13.0' 22.5' Sidealk j Travel Travel Travel Median Travel Travel Panting 99.5' 125.5' Bad of ldeak to bad< of idealt xiting lit- ARLI G T 0 vir G I I A DPARTMT OF VIROMTAl. SRVICS 48.5' 6.0' Bike Parting I Sidealk W/ 1-- ;,:;82.;.::,_,.5' ~1 Back of idealk to bad< of idealk "«a xte'lkln jantldpated Redevelcpnent AST BOUD L HWY Street Cro Section From Fort Myer Drive to Lynn Street 2

3 Street Cro-Section 3 & 3A: orth Moore Street (Beteen 19th Street and B Lee Highay) Option A - Bu Focu Reduce idth of travel lane Increae idth of back-of-idealk to back-of-idealk ith redevelopment of Rolyn Gateay Increae idth of idealk on bo.th ide of. Moore Street Increae idth of parking lane on both ide of. Moore Street to accommodate bu top 14.5' I 14.5' I J Sidealk ParU'lg Travel I Travel I Parking Sidealk I 45.0' Back S~Width 64.0' of idealk to bild< r:t idealk xiting 12.0' 12.0' ~ ARLI G T 0 VIRGIIA Arm Reductla1 /Antldpated DPARTMT OF VIROMTAL SRVICS ---Fe:-- ~ flllllil :IIGI A*IIIoo. VA ZIIDI Sidealk / Bu Slllp Travel lane Travel lane %.0' 82.0' Bad: of idealk to bac:x ct ldeat Bu Step Sidealk / Arm Reductla1 / Antidpated ORTH MOOR STRT Street Cro Section From 19th Street to Lee Hy (Bu Focu) 3&3A

4 Street Cro-Section 38 & 3C: orth Moore Street (Beteen 19th Street and B lee Highay) Option B -Fetival Street Without Parking - Reduce idth of travel lane Increae idth of idealk on both ide of. Moore Street Remove on-treet parking Option C - Fetival Street With Parking Reduce idth of travel lane Increae idth of back-of-idealk to back-of-idealk ith redevelopment of Rolyn Gateay Increae idth of idealk on both ide of. Moore Street Provide parking on both ide of. Moore Street 20.0" Sldealk/ u Travel U!ne 12.5' Travel 25.0' 64.0' Back cl ldealc to back rl lclealk 19.0" Sidealk / I 18.0" Preia Reduction W/Antldpated Sldealk/ Sidealk / Preia Reduction /Antlclpated 1ffLL A R L I G T 0 vir G I la DPARTMT OF VIROMTAL SRVICS ---Ftoc-- - ~-Cillllll tiDa....,a.~vAmrn 74.0' Back cl idealk to back rl XIealk ORTH MOOR STRT 3B&3C Street Cro Section (W/out Parking + W/Parking) From 19th Street to Lee Hy (Fetival Street)

5 Street Cro-Section 5: Fort Myer Drive (Beteen B Lee Highay and 19th Street) Provide to-ay operation of Fort Myer Drive Reduce idth of parking lane Add bike lane along et ide of Fort Myer Drive Remove median and ervice road aociated ith Rolyn Gateay development Increae idth of idealk along the eat ide of Fort Myer Drive Reduce idth of right-of-ay ith redevelopment of Rolyn Gateay 13.0' Median Travel lane Parlcilg ~~I Sidealk 107.0' Back of Sidealk to back of Sidealk xiting - - -t---1-'-- 6.0_',..,t-...,:,7.5'~-6;..,;.0'-t '-ll los 10.5' Sidealk / Pariclng Bike Travel lane Travel lane Travel -- ~ ' Sln!et Width Sidealk W/ eij xtension /Antldpated lf!tt- A R L I G T 0 vi I. G I I A DPARTMT OF VIROMTAL SRVICS 9 Back of idealk to back ~ Sidealk FORT MYR DRIV Street Cro Section From 19th Street to Lee Hy 5

6 Street Cro-Section 17: 19th Street (Beteen Fort Myer Drive and orth Moore Street) Increae idth of idealk along the north ide of 19th Street and add treet tree Add planting trip along the outh ide of 19th Street Add bike lane on both ide of 19th Street Remove left turn lane Reduce idth of travel lane Increae idth of back-of-idealk.to back-of-idealk ith redevelopment of Rolyn Gateay 13.5' Sidealk Travel Left Tum 61.0' Sidealk / Sln!et Tree I &1.0' Back of idealk to bad ot Sidealk I xiting 12.0' 1!)_ A R L I G T 0 VIRGIIA,_ DPARTMT OF _ VIROMTAL SRVICS... Colilll...,._ a.. :r111da.---iii,... VA 2DII ea Sidealk W/ Reductloo W/ Antlclpated S3.0' 8 Back ot idealk to bad ot Sidealk Sldeal< I Moore St 19TH STRT ORTH Street Cro Section Fort Myer Drive to. Moore Street 17

REIMAGINING YONGE STREET SHEPPARD AVENUE TO FINCH AVENUE

REIMAGINING YONGE STREET SHEPPARD AVENUE TO FINCH AVENUE REIMAGINING YONGE TREET HEPPARD AVENUE TO FINCH AVENUE ource: Bing Maps ENVIRONMENTAL AEMENT TUDY PUBLIC DROP IN EVENT 4 OCTOBER 10, 2017 REimagining Yonge treet 1 INTRODUCTION This study began in 2016.

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for:

DEPARTMENT OF ENVIRONMENTAL SERVICES. North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis. Prepared for: DEPARTMENT OF ENVIRONMENTAL SERVICES North Harrison Street (Lee Highway to Little Falls Road) Comparative Analysis Prepared for: Arlington County Department of Environmental Services 2100 Clarendon Boulevard,

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Validation of the Time-Space Corner and Crosswalk Analysis Method

Validation of the Time-Space Corner and Crosswalk Analysis Method TRANSPORTATION RESEARCH RECORD 1168 39 Validation of the Time-Space Corner and Crossalk Analysis Method JOHN J. FRUIN, BRIANT. KETCHAM, AND PETER HECHT Time-space analysis is a ne method for evaluating

More information

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

Agenda. Overview PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

DART Bus Crash Analysis. typical scenarios associated with selected crash types

DART Bus Crash Analysis. typical scenarios associated with selected crash types DART Bus Crash Analysis typical scenarios associated with selected crash types Crash Types Studied in Detail Analysis Methodology 5 Categories 70% of all crashes 500 Crashes Proportionally sampled Matrix

More information

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017

Downtown Naples Mobility and Connectivity Study. Naples City Council Presentation January 2017 Downtown Naples Mobility and Connectivity Study Naples City Council Presentation January 2017 Agenda 1. Introduction 2. Scope Review 3. Project Schedule 4. Existing Conditions 5. Public Charrette 6. Mobility

More information

Fleur Drive Reconstruction

Fleur Drive Reconstruction Fleur Drive Reconstruction October 29, 2018 1 Agenda: Fleur Drive Reconstruction Project Scope & Cost Overview Fleur Drive Cross Section Elements - Travel Lane Widths - Sidewalk Widths - Parkway Widths

More information

Optimization for Bus Stop Design Based on Cellular Automaton Traffic Model

Optimization for Bus Stop Design Based on Cellular Automaton Traffic Model Modern Tranportation Volume 6, 2017, PP.1-7 Optimization for Bu Stop Deign Baed on Cellular Automaton Traffic Model Liankui Zhang 1, Chengyou Cui 1 1. Department of Technology Economic and Management,

More information

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1

Project Development & Environment (PD&E) Study JUNE 22, SR 90 (SW 8th Street and SW 7th Street) SW 8 th Street/SW 7 th Street PD&E Study 1 Financial Management Number: 432639-6-22-01 Federal Aid Project Number: 0202-054-P Efficient Transportation Decision Making Number: 14230 Project Development & Environment (PD&E) tudy R 90 (W 8th treet

More information

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc.

TECHNICAL MEMORANDUM. Kevin Even, P.E. Village Engineer and Public Works Director Village of Waunakee. From: Kevin Wehner, P.E. KL Engineering, Inc. TEHIL MEMORUM To: Kevin Even, P.E. Village Engineer and Public Works irector Village of Waunakee 400 King James Way, uite 200 Madison, Wisconsin 3719 608-663-1218 www.klengineering.com From: Kevin Wehner,

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-22 Effective: December 16, 2009 Subject: References: Purpose: This Directive Applies to: Considerations for Bicycle

More information

Development of Guidelines for Bicycle Use of Controlled Access Facilities in Virginia

Development of Guidelines for Bicycle Use of Controlled Access Facilities in Virginia Development of Guidelines for Bicycle Use of Controlled Access Facilities in Virginia VDOT Statewide Bicycle and Pedestrian Advisory Committee Fall Working Group Meeting October 30, 2013 Young-Jun Kweon,

More information

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN

PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN PRINCE GEORGE S PLAZA METRO AREA PEDESTRIAN PLAN May 28, 2008 Agenda Welcome and introductions Project overview and issue identification Planning context and strengths Design challenges and initial recommendations

More information

Improving Bicycle/Pedestrian Access at Select Rail Stations

Improving Bicycle/Pedestrian Access at Select Rail Stations Improving Bicycle/Pedestrian Access at Select Rail Stations Wheaton Station, Montgomery County This document is part of a Transportation Planning Board project focused on identifying and documenting specific,

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION

GEOMETRIC DESIGN STANDARDS FOR NEW RESIDENTIAL SUBDIVISION STREETS TABLE 1A CG-6 CURB AND GUTTER SECTION TABLE 1A CG-6 CURB AND GUTTER SECTION HORIZONTAL AND VERTICAL CONTROLS CURB AND GUTTER ROADWAYS MAXIMUM 3:1 CUT OR FILL SLOPE CURVE DATA MIN. SIGHT DISTANCE PROJECTED TRAFFIC VOLUME (ADT) MIN. DESIGN SPEED

More information

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for:

INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW. Prepared for: INDUSTRIAL BUILDING 1660 COMSTOCK ROAD CITY OF OTTAWA TRANSPORTATION OVERVIEW Prepared for: Simluc Contractors Limited 2550 Blackwell Street, Ottawa K1B 5R1 October 18, 2013 113-584 Overview_1.doc D. J.

More information

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting

Multimodal Design Guidance. October 23, 2018 ITE Fall Meeting Multimodal Design Guidance October 23, 2018 ITE Fall Meeting Introductions Jessica Wilson TDOT Multimodal Division Office of Multimodal Planning Program Supervisor Jessica.L.Wilson@tn.gov Ali Hangul TDOT

More information

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016

APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 APPENDIX A: Complete Streets Checklist DRAFT NOVEMBER 2016 Complete Streets Checklist MetroPlan Orlando s Complete Streets Checklist is an internal planning tool for staff to further implementation of

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, November 10, 2016 5:30 to 7 P.M. Festival Foods 810 E. Washington

More information

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010

THE ALAMEDA CONCEPT DESIGN COMMUNITY MEETING 3. A Plan for The Beautiful Way JANUARY 28, 2010 CONCEPT DESIGN COMMUNITY MEETING 3 JANUARY 28, 2010 AGENDA INTRODUCTION COMMUNITY INPUT ROADWAY STUDIES STREETSCAPE DESIGN STATIONS DISCUSSION SUMMARY AND DISCUSSION NEXT STEPS CLOSE INTRODUCTION SCHEDULE

More information

Exposition Corridor Transit Neighborhood Plan

Exposition Corridor Transit Neighborhood Plan Potntial Strtscap Sgmnts ra to Mo d tson l na tio Na B s Ro 5 s lm Pa d V PALMS 7 on gt rin Cla 6 CULVER CITY d A B nic vd Bl n to ng hi as Cu l r nal tio Na d ra to Mo DR Exposition Light Rail Lin 7 l

More information

If a person walks within this focus area, these are examples of the places he or she could walk to or from:

If a person walks within this focus area, these are examples of the places he or she could walk to or from: Portland Hillsdale Hillsdale Portland The Hillsdale focus area is located in the City of Portland. It is situated approximately three miles from the City of Portland s downtown, 5.5 miles from the City

More information

Road Diets FDOT Process

Road Diets FDOT Process Florida Department of TRANSPORTATION Road Diets FDOT Process Humberto Castillero, PE, PTOE Roadway Design Office Purpose of Guide Develop a statewide lane elimination review process Balance state & local

More information

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015

Implementing Complete Streets in Ottawa. Project Delivery Process and Tools Complete Streets Forum 2015 October 1, 2015 Implementing Complete Streets in Ottawa October 1, 2015 The Essentials Complete Streets Implementation Framework will become part of the routine delivery of City transportation projects Approach uses every

More information

Montgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015

Montgomery County Life Sciences Center. LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015 Montgomery County Life Sciences Center LOOP TRAIL GSSC Implementation Advisory Committee Meeting #2 March 26, 2015 Trail Alternatives GENERAL ASSUMPTIONS Where separated bicycle and pedestrian facilities

More information

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting

Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Merrick and Memorial Neighborhood Study 5/14/2014 Public Meeting Study Area April 9 Public Meeting Comments Summary Pedestrian Safety - A Walking Neighborhood Pedestrian traffic is very difficult A need

More information

Cold Formed Steel Tension Members with Two and Three Staggered Bolts

Cold Formed Steel Tension Members with Two and Three Staggered Bolts Miouri Univerity of Science and Technoloy Scholar' Mine International Specialty Conference on Cold- Formed Steel Structure (2010) - 20th International Specialty Conference on Cold-Formed Steel Structure

More information

Appendix B - Street Sections

Appendix B - Street Sections Appendix B - Street Sections 6TH STREET CORRIDOR PLAN STREET SECTIONS The street sections in Appendix B include recommended improvements to streets for North Glenwood. They include existing conditions

More information

ACCESS MANAGEMENT STANDARDS FOR COUNTY ROADS ON THE THOROUGHFARE RIGHT OF WAY IDENTIFICATION MAP

ACCESS MANAGEMENT STANDARDS FOR COUNTY ROADS ON THE THOROUGHFARE RIGHT OF WAY IDENTIFICATION MAP ACCESS MANAGEMENT STANDARDS FOR COUNTY ROADS ON THE THOROUGHFARE RIGHT OF WAY IDENTIFICATION MAP PRODUCED BY: PALM BEACH COUNTY ENGINEERING AND PUBLIC WORKS DEPARTMENT October 2004 Updated September 2016

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Business US 190 in Copperas Cove From Avenue D to Constitution Drive What is access management? A. Access Management is a growing effort by government agencies to improve how

More information

complete streets design and construction standards public primer City of Edmonton

complete streets design and construction standards public primer City of Edmonton complete streets design and construction standards public primer City of Edmonton introduction Complete Streets are streets for everyone: people who walk, wheel, bike, take transit, or drive. They are

More information

What Is a Complete Street?

What Is a Complete Street? Session 5 Charleen Zimmer, AICP, Zan Associates May 5-7, 2010 What Is a Complete Street? May 2010 5-1 Not a Complete Street More of a Complete Street May 2010 5-2 Benefits of Complete Streets Safety for

More information

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY

BETHEL ROAD AND SEDGWICK ROAD CORRIDOR STUDY DRAFT PLAN City Council Meeting August 14, 2017 STUDY AREA Sedgwick Corridor State Route 160, principal arterial with Class 3 access management designation, commuter and freight route, connection to SR

More information

Section 7 Complete Green Street Guidelines DRAFT

Section 7 Complete Green Street Guidelines DRAFT Section 7 Complete Green Street Guidelines DRAFT 1 Section: 7.0 COMPLETE GREEN STREET GUIDELINES These guidelines serve as options to mitigate the environmental impact of a project as well as guide the

More information

Lawrence Avenue Streetscape Concepts August 30, 2011

Lawrence Avenue Streetscape Concepts August 30, 2011 Lawrence Avenue Streetscape Concepts August 30, 2011 Neighborhood Context Phase II: River to Western Ave. Phase I: Western Ave. to Clark St. Key Map Lawrence Ave. Existing Streetscape Conditions East of

More information

McLean Main Street Public Forum Follow-up

McLean Main Street Public Forum Follow-up McLean Main Street Public Forum Follow-up Sponsored & Hosted by John W. Foust, Dranesville District Supervisor McLean Planning Committee Fairfax County Office of Community Revitalization and Reinvestment

More information

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee

MEMORANDUM. Earl Haugen and UND Transportation and Traffic Coordination Committee SRF No. 7766 MEMORANDUM TO: FROM: Earl Haugen and UND Transportation and Traffic Coordination Committee Rick Lane, P.E. DATE: November 26, 2013 SUBJECT: UNIVERSITY AVE REVIEW Our review of the University

More information

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets.

CURRENT ORIGINAL REFERENCE SECTIONS. (Typical Section) (Typical Section) The Parade Island Bay : Concept Option Summary Sheets. ORIGINAL (Typical Section) CURRENT (Typical Section) 3,900 3,000 2,000 1,500 3,100 1,600 3,100 1,500 2,000 2,500 3,900 3,000 1,800 600 2,000 3,000 3,000 2,000 600 1,800 2,500 Existing Planting Traffic

More information

UDC Street Cross Sections

UDC Street Cross Sections UDC Street Cross Sections Local Street - Downtown Local Street Mountable Curb Local Street Vertical Curb Alley Major Arterial Minor Arterial Residential Lane Residential Collector Residential Collector

More information

6.4 RECOMMENDED IMPROVEMENTS

6.4 RECOMMENDED IMPROVEMENTS 6.4 RECOMMENDED IMPROVEMENTS 6.4.1 Williston Road Recommendations While all alternatives would be an improvement over existing conditions, Alternative 3B is recommended over the others because it provides

More information

MASTER BICYCLE AND PEDESTRIAN PLAN

MASTER BICYCLE AND PEDESTRIAN PLAN VILLAGE OF NORTHBROOK MASTER BICYCLE AND PEDESTRIAN PLAN DRAFT PLAN OPEN HOUSE May 2, 2018 AGENDA 1. Community Engagement 2. Vision and Goals 3. General Structure of Plan 4. Recommendations Overview 5.

More information

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE

UNIVERSITY AVENUE CORRIDOR REDESIGN. January 8, 2017 PUBLIC OPEN HOUSE January 8, 2017 PUBLIC OPEN HOUSE COLLABORATIVE COMMUNITY-BASED DESIGN IS THE FOUNDATION TO A SUCCESSFUL PROJECT AGENDA FOR TONIGHT 1 INTRODUCTIONS 2 WHY ARE WE HERE PROJECT NEED 3 SCHEDULE & GOALS 4 OPEN

More information

122 Avenue: 107 Street to Fort Road

122 Avenue: 107 Street to Fort Road : 107 Street to Fort Road November 24, 2015 4:30 8:00 p.m. Meeting Purpose Summarize project work completed to date Share results of public input from Phase 1 Share the draft concept plan and proposed

More information

Active Transportation Facility Glossary

Active Transportation Facility Glossary Active Transportation Facility Glossary This document defines different active transportation facilities and suggests appropriate corridor types. Click on a facility type to jump to its definition. Bike

More information

City of Richmond Bicycle Master Plan

City of Richmond Bicycle Master Plan City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with Eisen Letunic City of Richmond Bicycle Master Plan October 2011 Prepared by Fehr & Peers In association with

More information

Report. Typical Sections. City of Middleton, WI

Report. Typical Sections. City of Middleton, WI Report Typical Sections City of Middleton, WI December 2006 Report for City of Middleton, Wisconsin Typical Sections repared by: Traffic Associates LLC and STRAND ASSOCIATES, INC. 910 West Wingra Drive

More information

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07

25th Avenue Road Diet Project A One Year Evaluation. Transportation Fund for Clean Air Project #05R07 25th Avenue Road Diet Project A One Year Evaluation Transportation Fund for Clean Air Project #05R07 Submitted by: The San Francisco Municipal Transportation Agency Dan Provence May 22, 2009 EXECUTIVE

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines

Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Passaic County Complete Streets Checklist - Concept Development Project Name Item to be Addressed Checklist Consideration YES NO N/A Required Description Complete Streets Guidelines Existing Plans Have

More information

2.0 LANE WIDTHS GUIDELINE

2.0 LANE WIDTHS GUIDELINE 2.0 LANE WIDTHS GUIDELINE Road Engineering Design Guidelines Version 2.0.1 May 2018 City of Toronto, Transportation Services City of Toronto Page 0 Background In early 2014, Transportation Services initiated

More information

DUPAGE COUNTY ON-ROAD BICYCLE CONNECTION GUIDELINES

DUPAGE COUNTY ON-ROAD BICYCLE CONNECTION GUIDELINES DUPAGE COUNTY ON-ROAD BICYCLE CONNECTION GUIDELINES (DRAFT) Prepared For: DuPage County Division of Transportation Jack T. Knuepfer Administration Building 421 North County Farm Road Wheaton, Illinois

More information

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018

Lakeside Green Street Project Improvement. Public Works Committee February 27, 2018 Lakeside Green Street Improvement Public Works Committee February 27, 2018 Construction of Lakeside Green Streets is currently underway Photo: Sergio Ruiz Photo: Sergio Ruiz 100% Do people biking on the

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

COMPLETE STREETS CHECKLIST City of Philadelphia The City of Philadelphia's Complete Streets policies are designed ensure that city streets are safe, comfortable and convenient for people of all ages and

More information

Operational Effectiveness of Truck Lane Restrictions

Operational Effectiveness of Truck Lane Restrictions TRANSPORTATION RESEARCH RECORD 1281 119 Operational Effectiveness of Truck Lane Restrictions FRED R. HANSCOM The operational erfectivenes of restricring trucks from designated lanes on multilane roadays

More information

Utilities Technical Report Oregon Department of Transportation. Appendix E. Figure Descriptions

Utilities Technical Report Oregon Department of Transportation. Appendix E. Figure Descriptions Appendix E. Descriptions Appendix E. Descriptions This appendix includes written descriptions of all figures included in this Technical Report. If needed, additional figure interpretation is available

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

TRANSPORTATION STANDARDS

TRANSPORTATION STANDARDS INTRODUCTION LOCAL STREETS ON-STREET PARKING SIDEWALKS STREET LIGHTING STREET FURNISHINGS TRAFFIC CALMING STREET TREES MEDIAN PLANTING BOULEVARD LOCATIONS VILLAGE CENTER STREET LOCATIONS RESIDENTIAL STREET

More information

Committee of the Whole Report For the Meeting of October 6, 2016

Committee of the Whole Report For the Meeting of October 6, 2016 CITY OF VICTORIA For the Meeting of October 6, 2016 To: Committee of the Whole Date: September 29,2016 From: Subject: Fraser Work, Director of Engineering and Public Works RECOMMENDATION That Council direct

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018

Transform I-66. Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform I-66 Chief Engineer Garrett W. Moore, P.E. July 12, 2018 Transform 66: Program Goals Improve multimodal mobility by providing diverse travel choices in a cost-effective manner Enhance transportation

More information

City of Seattle Edward B. Murray, Mayor

City of Seattle Edward B. Murray, Mayor City of Seattle Edward B. Murray, Mayor Department of Transportation Scott Kubly, Director Eastlake Community Council 117 E Louisa St. #1 Seattle, WA 98102-3278 January 28, 2016 RE: Roosevelt to Downtown

More information

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for:

COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF. Prepared for: COMMERCIAL DEVELOPMENT 2015 ROBERTSON ROAD OTTAWA, ONTARIO TRANSPORTATION BRIEF Prepared for: First Bay Properties Inc. 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 August 8, 2017 117-663 Brief_1.doc

More information

Safe Routes to School Engineering Study

Safe Routes to School Engineering Study Safe Route to School Brunwick Local School Ditrict Safe Route to School Plan City of Brunwick, Medina County, Ohio Hickory Ridge Elementary School Viintainer Middle School Edward Middle School Saint Ambroe

More information

MOVING PASSAIC COUNTY

MOVING PASSAIC COUNTY MOVING PASSAIC COUNTY COMPLETE STREETS GUIDELINES OCTOBER 2012 Prepared By: Passaic County Department of Planning and Economic Development with assistance from Parsons Brinckerhoff PASSAIC COUNTY COMPLETE

More information

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County

City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County City of Madison, East Johnson Street North Baldwin Street to First Street Local Street Dane County Public Involvement Meeting Thursday, April 28, 2016 6 to 8 P.M. Lapham Elementary School 1045 E. Dayton

More information

ROUNDABOUTS/TRAFFIC CIRCLES

ROUNDABOUTS/TRAFFIC CIRCLES GENERAL 1. Description This standard identifies minimum requirements that shall be met for Roundabouts and Neighborhood Traffic Circles in the design and construction of elements for Arlington County Horizontal

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

Welcome. If you have any questions or comments on the project, please contact:

Welcome. If you have any questions or comments on the project, please contact: Welcome This drop-in public open house is intended to provide information about the Bay Street bike lanes project. This project proposes a dedicated cycling facility along Bay Street between Aberdeen Avenue

More information

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN

PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN CHAPTER 4 Chapter 4 Pedestrian Circulation & Trails PEDESTRIAN CIRCULATION & STREETSCAPE DESIGN In recent years, the City has constructed new sidewalks and enhanced existing ones in the downtown with brick

More information

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach

CONNECTIVITY PLAN. Adopted December 5, 2017 City of Virginia Beach CONNECTIVITY PLAN Adopted December 5, 2017 City of Virginia Beach CONTENTS 1.0 Background & Purpose... 2 2.0 Existing Inventory & Analysis... 3 ViBe District Existing Walking Conditions... 4 3.0 ViBe District

More information

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX

Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX Appendix C. TRAFFIC CALMING PROGRAM TOOLBOX PHASE I...2 Do Not Enter Sign...3 One-Way Sign...4 Turn Prohibition...5 Pavement Markings...6 Speed Monitoring Trailer...7 Neighborhood Speed Watch...8 Police

More information

City of Margate, Florida. Neighborhood Traffic Management Manual

City of Margate, Florida. Neighborhood Traffic Management Manual City of Margate, Florida Neighborhood Traffic Management Manual Table of Contents Page No. I. INTRODUCTION... 1 II. TRAFFIC CALMING REQUEST AND PROCESSING PROCEDURES... 2 1. COMPLETE AND SUBMIT PROJECT

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

The DC Pedestrian Master Plan

The DC Pedestrian Master Plan The DC Pedestrian Master Plan September 28, 2010 George Branyan Pedestrian Program Coordinator District Department of Transportation Presentation Agenda Scope of the Plan Methodology Recommendations Implementation

More information

Appendix 3 Roadway and Bike/Ped Design Standards

Appendix 3 Roadway and Bike/Ped Design Standards Appendix 3 Roadway and Bike/Ped Design Standards OTO Transportation Plan 2040 4/20/2017 Page A3-1 Adopted Standards The adopted OTO Design Standards and Major Thoroughfare Plan are contained herein.

More information

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A

City of Wayzata Comprehensive Plan 2030 Transportation Chapter: Appendix A A1. Functional Classification Table A-1 illustrates the Metropolitan Council s detailed criteria established for the functional classification of roadways within the Twin Cities Metropolitan Area. Table

More information

Design Guidelines. Overview. Design Vision for Yellow Brick Road

Design Guidelines. Overview. Design Vision for Yellow Brick Road Design Guidelines Overview This section presents the design vision for the Yellow Brick Road network. The Yellow Brick Road is envisioned to be an interconnected network of safe and secure roadways where

More information

COWETA HIGH SCHOOL AND EAST HIGHWAY 51

COWETA HIGH SCHOOL AND EAST HIGHWAY 51 COWETA HIGH SCHOOL AND EAST HIGHWAY 51 Lack of sidewalks along Ben Lumpkin Rd. Lack of crosswalks and ramps at intersection. Hwy 51 is wide to cross as a pedestrian. No ADA compliance or connection to

More information

CURBSIDE ACTIVITY DESIGN

CURBSIDE ACTIVITY DESIGN 5 CURBSIDE ACTIVITY DESIGN This chapter provides design guidance for separated bike lanes adjacent to curbside activities including parking, loading and bus stops. Typical configurations are presented

More information

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018

Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 Dr. M.L. King, Jr. Street North Complete Streets Resurfacing Opportunities HOUSING, LAND USE, AND TRANSPORTATION COMMITTEE MARCH 22, 2018 What s Happening The City plans to mill and resurface Dr. M.L.

More information

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION

GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION GWINNETT COUNTY DEPARTMENT OF TRANSPORTATION 1 of 7 June 20, 2007 GENERAL: The following guidelines shall be used in the determination of the requirement for left turn lanes for development projects and

More information

The Bike Lanes on Weaver Dairy Road Extension. Wayne Pein

The Bike Lanes on Weaver Dairy Road Extension. Wayne Pein The Bike Lanes on Weaver Dairy Road Extension. Pein wpein@nc.rr.com July 2013 Before Prior to late 2012, Weaver Dairy Road Extension near Homestead Road had a bike lane on the northbound side of the road

More information

Peter Kremer, WSP/Parsons Brinckerhoff

Peter Kremer, WSP/Parsons Brinckerhoff Peter Kremer, WSP/Parsons Brinckerhoff COMPLETE STREETS IMPLEMENTATION OVERVIEW Level-of-Traffic-Stress Analysis Somers Point Regional Trail Network Atlantic County Technical Assistance Outreach, Training

More information

GENERAL. 1. Description

GENERAL. 1. Description GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Bus Stops in the design and construction of elements for Arlington County Horizontal Design Standards. This

More information

83 AVENUE PRE-CONSTRUCTION MEETING

83 AVENUE PRE-CONSTRUCTION MEETING 83 AVENUE PRE-CONSTRUCTION MEETING April 6, 2017 5-8PM Please visit displays for project information Talk to staff, ask questions, visit website at: www.edmonton.ca/bike83avenue Pre-Construction Meeting

More information

Chapter 6 Transportation Plan

Chapter 6 Transportation Plan Chapter 6 Transportation Plan Transportation Plan Introduction Chapter 6 Transportation Plan Transportation Plan Introduction This chapter describes the components of Arvada s transportation system, comprised

More information

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses

Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Lee s Summit Road Improvement Study Public Open House June 7, 2007 Summary of Comment Card Responses Introduction At the Lee s Summit Road Improvement Study Public Open House held Thursday, June 7, 2007

More information

Winter Sports. An Interest Project for Cadette and Senior Girl Scouts

Winter Sports. An Interest Project for Cadette and Senior Girl Scouts Winter Sports An Interest Project for Cadette and Senior Girl Scouts Cold eather offers onderful opportunities for outdoor activities. When you re ell prepared, the crisp, cold air can be refreshing and

More information

TECHNICAL MEMORANDUM. Introduction

TECHNICAL MEMORANDUM. Introduction TECHNICAL MEMORANDUM To: From: John M. Welsh Chris Furlong AHC, Inc. Andrew T. Smith, P.E. Edward Y. Papazian, P.E. Kimley-Horn and Associates, Inc. Date: July 6, 2017 Subject: 200 9 th reet South Redevelopment

More information

2. TRANSPORTATION ELEMENT.

2. TRANSPORTATION ELEMENT. 2. TRANSPORTATION ELEMENT. The purpose of this element is to assist in establishing an adequate transportation system within the City and to plan for future motorized and non-motorized traffic circulation

More information

Completing the Street: Denning Drive

Completing the Street: Denning Drive Completing the Street: Denning Drive Public Workshop and Walking Audit Winter Park Civic Center May 12, 2016 Completing the Street What Makes This a Complete Street? Completing the Street Complete Streets

More information

Richmond Connects Visioning Update

Richmond Connects Visioning Update Richmond Connects Visioning Update To date there have been four elements of the visioning process: Vision20 Night at Byrd Theatre on May 3rd Advisory Committee Meeting on May 12 th Public Visioning Workshop

More information

Secondary System Albemarle County Construction Program Estimated Allocations

Secondary System Albemarle County Construction Program Estimated Allocations econdary ystem Albemarle County Construction Program Estimated Allocations Fund FY29 FY21 FY211 FY212 FY213 FY214 econdary Unpaved Roads $642,951 $545,67 $596,222 $519,924 $44,932 $44,932 $3,186,28 TeleFee

More information