Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT Division(s) MPO(s) / RPO(s) County(s) TIP #

Size: px
Start display at page:

Download "Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT Division(s) MPO(s) / RPO(s) County(s) TIP #"

Transcription

1 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 1 B BikePed Needs Peters Creek Parkway Sidewalk Part I Brewer Road Southpark Boulevard Construct 2,925 LF of 5' Sidewalk along peters creek parkway, 625 ft sidewalk only 2300 curb and gutter and sidewalk, 730 ft of existing sidewalk $1,673, B BikePed Needs Silas Creek Parkway Sidewalk Bolton Street Hawthorne Road Construct 4,700 linear feet of five (5') foot sidewalk along Silas Creek Parkway $1,737, H Highway Needs SR 1120 (Clemmonsville Ebert Road Install left turn lane for southbound Ebert $2,900, H Highway NC 66 (Old Hollow US 158 NC 66 (Mountain Street) Widen Old Hollow Road to a 2-lane divided or 3 lane curb and gutter section $20,300, R Rail NS/NCRR Main Line Construction of grade separation at SR 2165 (Turner Street) and closure of existing at-grade crossing (Crossing # S) in Thomasville. $26,290, B BikePed Needs Southwin Dive Country Club Road Jonestown Road Construct a 3,900 linear feet Sidewalk connecting to existing sidewalk on Country club and to future sideway on Jonestown $2,402, H Highway Needs New Route - Baltimore Road Extension SR 1630 (Baltimore I-40 Extend Baltimore road from existing to I-40 constructing a trumpet interchange at I-40. $24,500, B BikePed Needs Harper Road Sidewalk Village Point Drive Harper Vallery Lane (YMCA) Construct 5000 linear feet of sidewalk from the Morgan Elementary School north to the YMCA entrance on Peacehaven Road $644, H A Highway US 52 Proposed Misenheimer Bypass Rockwell Bypass Widen to Multi-Lanes. $47,212, Cabarrus-Rowan Rowan R-5860 High Cost 10 R Rail NS/NCRR Main Line Construction of grade separation in vicinity of 5th Street and closure of existing 7th Avenue at-grade crossing (Crossing # Y) in Lexington. $10,950, P B BikePed Needs East Sprague Street Sidewalk Cline Street Cole Road Construct 2600 linear feet of five (5') foot sidewalk along Sprague Street $1,601, H Highway Needs SR 1969 (Piney Grove North of Nelson Street in Kernersville SR 2031 (Brown Piney Grove Road (SR 1969)-3 Lane W/Bikeand Sidewalk $10,362, H Highway NC 109 I-85 in Thomasville NC 47 in Denton Widen to Multi-Lanes. Sidewalks within Denton town Limits. $133,934, R-4734 High Cost 1

2 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 14 H Highway US 421, I-40 BUS SR 2662 (Linville Upgrade interchange to improve safety and capacity $41,400, U-6059 High Cost 15 H B Highway US 64 NC 801 US 52 in Lexington US 601 South of Mocksville to US 52 in Lexington. Widen to Multi-Lanes and Upgrade interchange at US 52. $106,881,000 09, Northwest Piedmont, R-5862B High Cost 16 H Highway Needs SR 1103 (Lewisville- Clemmons I-40 US 158 Convert to Four Lane with Median Section. $22,588, U B BikePed Needs Jonestown Road Sidewalk US 421 Ramp Country Club Road Construct approximately 4,000 linear feet of five (5') foot wide sidewalk along the west side of the road to be located within the existing right-of-way connecting existing sidewalk segments $400, EB H Highway US 52 South of Clemmonsville Road Winston-Salem Northern Beltway Add Additional Lanes. $513,500, U-2826 High Cost 19 B BikePed Needs Business 40 Multi-use Path Lockland Avenue Peters Creek Parkway Construct a 2,000 FT bicycle and pedestrian trail parallel to Business 40 through downtown Winston-Salem $2,162, H B Highway US 64 East of I-85 Business in Lexington NC 109 Widen to Multi-Lanes. $77,199, R-2220B High Cost 21 H Highway I-40 US 158 (Stratford Add Lanes to exit ramps to relieve congestion and back-ups on I-40 $18,500, H CA Highway US 64 NC 109 SR 1409 (Lake Park Widen to Multi-Lanes. $71,848,000 08, 09 Piedmont Triad, Randolph, R-2220CA High Cost 23 H Highway US 421 SR 1122 (Jonestown Upgrade interchange to improve safety and capacity $39,500, U-6074 High Cost 24 B BikePed Needs Peters Creek Parkway Sidewalk Part II Southpark Boulevard Side Road 4600 LF of 5 ft sidewalk and curb and gutter from southpark to clemmonsville rd and clemmonsville rd to sides rd. (Tie in to existing sidewalk on existing ramps on clemmonsville rd.) $2,398, H Highway NC 66 SR 1973 (Mountain View) Improve Intersection $800, Stokes 26 H Highway NC 109 I-40 SR 1756 (Old Greensboro Rd.) Widen Road to 3 lanes $77,200,000 09, Winston-Salem Urban, 27 B BikePed Needs Ogburn Avenue Sidewalk Part III Kapp Street Glenn Avenue constructing 5,200 linear feet of five (5') foot sidewalk connecting the community $3,203,

3 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 28 H A Highway US 64 US 601 South of Mocksville NC 801 US 601 South of Mocksville to US 52 in Lexington. Widen to Multi-Lanes and Upgrade interchange at US 52. $95,559, R-5862A High Cost 29 H B Highway US 421 SR 2662 (Linville in County West of SR 1850 (Sandy Ridge in Guilford County 30 B BikePed Needs Motor Road Part III Patterson Avenue Indiana Avenue Rehabilitate Pavement $144,100,000 09, 07 Construct 4,500 linear feet of five (5') foot sidewalk along Motor Road $2,772,000 09, Greensboro Urban, High Point Urban, Guilford 31 H Highway Needs SR 2377 (West Mountain Street) Old Greensboro Road Old Hollow Road West Mountain Street - Widen to a 3- Lane Road from Old Greensboro Road to Old Hollow Road. $26,648, H Highway NC 801 US 158 Redland Road NC Widen to Multi-Lanes. 3 Lanes from US 158 to Redland Road. $22,800, H Highway Needs New Route- Stratford- Ebert Connector Pope Road Somerset Drive Construct new road from pope Road to somerset drive. $23,700, H Highway Needs SR 1001 (Country Club Peace Haven Road Western Beltway Multi-Lane facility with BikePed accommodation $36,800, H Highway I-40 US 52 Upgrade interchange to improve safety and capacity $234,000, I-5988 High Cost 36 H Highway Needs SR 4309 (Mountain Street) NC 66 (Bodenhamer) SR 2662 (Linville Widen to 3 lane C&G and sidewalks $43,500, H Highway US 158 Lewisville-Clemmons Road Baltimore Road Widen to a 3 Lanes with Wide Paved Shoulders Transitioning to 3 Lanes with Curb & Gutter with Wide Outside Lanes & Sidewalks from Baltimore Road to NC 801. Widen to 3 Lanes with Curb & Gutter with Wide Outside Lanes & Sidewalks from NC 801 to Yadkin River. Widen to 3 Lanes with Curb & Gutter with Wide Outside Lanes & Sidewalks from Harper Rd to Lewisville Clemmons Rd. $31,500,000 09, U-6076 High Cost 38 B BikePed Needs Motor Road Part I Old Rural Hall Road Ogburn Avenue Construct 2,500 linear feet of five (5') foot sidewalk along Motor Road $1,540, A Aviation Needs EXX - County Airport EXX - Taxiway and Apron strengthening N/A Upgrade and strengthen the existing apron and taxiway due to excessive cracking and an increase of the number of requests for large private aircraft for landings. The PCI in 2014 was 74; however the airport has contractors making regular trips for crack sealing. In 2016 the pavement will be 17 years old and in need of rehab. PC # 2518 & 2520 $3,057,

4 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 40 H Highway NC 8 (Cotton Grove SR 2412 (Rothrock SR 1115 (Wrenn rnize Roadway $22,900, H Highway Needs SR 1156 (Lewisville- Clemmons SR 1156 (Styers Ferry SR 1101 (Shallowford Widen to 3 lane C&G Sidewalks and Bike Lanes $25,800, B BikePed Needs Thomasville Road Sidewalk Part I Charles Street Baden Road Construct 2900 linear feet of five (5') foot sidewalk along Thomasville Road $1,786, R Rail NS/NCRR Main Line Construction of grade separation at SR 2120 (Long Ferry and closure of existing at-grade crossing (Crossing # N) in Spencer. $17,290, Cabarrus-Rowan Rowan 44 H Highway I-74, US 52 NC 65 in Winston-Salem I-74 in Surry County NC 65 in Winston-Salem to I-74 in Surry County. Upgrade to interstate Standards $161,300,000 09, 11, Northwest Piedmont Surry, Stokes, 45 B BikePed Needs Lewisville Clemmons Road Eastern Gateway and Sidewalks Leons Way Arbor Run Drve Construct 3,800 FT of new sidewalks on one side that begins at Leons Way at the Lewisville Commons shopping center to Arbor Run Dr on Lewisville Clemmons Road $396, H C Highway US 52 (New Route - Granite Quarry Bypass) US 52 South of Granite Quarry Existing Multi-Lanes on US 52 North of Granite Quarry Construct Multi-Lanes on New Location. $81,885, Cabarrus-Rowan Rowan U-6075 High Cost 47 H A Highway NC 150 SR 1493 (Frye Bridge / Welcome Arcadia US 64 Widen to Multi-Lanes. $123,593,000 09, Winston-Salem Urban U-5902A High Cost 48 B BikePed Needs Old Winston Road Sidewalk Hopkins Road 2648 (Old Winston Construct approximately 600 linear feet of 5' Sidewalk along one side of the road connecting Hopkins Road sidewalk in front of Kerner Ridge Assisted Living and Robinwood Senior Living to the existing sidewalk on Old Winston Road $212, H Highway Needs SR 1410 (Farmington I-40 Westbound Ramp Construct roundabout. $1,400, H Highway Needs SR 4315 (Kernersville Harmon Creek Road SR 2632 (Sedge Garden Widen roadway to 4 lane divided with Curb and Gutter, wide outside lanes, and sidewalks. $24,600, U

5 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 51 H Highway NC 109 NC 24/27 NC 47 NC 24/27 in Troy to NC 47 in Denton. Widen Existing Two-Lane Cross Section; Improve Shoulders; Add Turn Lanes at Traffic Generators; Improve Signalization. Provide Bicycle Accomodation $23,600, (64%), 09 (36%) Piedmont Triad, Montgomery,, Randolph R-5844A Lack of Support 52 B BikePed Needs S. Main Street / Emergency Drive East of Harrington Avenue Hospital Construct consists of: > miles of sidewalk additions on SR# 3346 S Main St, SR# 3158 Anna Lewis Dr, and Emergency Dr. > Curb & Gutter (one side), Drainage improvements on SR# 3158 Anna Lewis Dr. > Intersection improvements: SR# 3346 South Main St and SR# 3158 Anna Lewis Drive. $816, B BikePed Needs Ogburn Avenue Sidewalk Part I Oak Summit Road Motor Road Construct 2,100 linear feet of five (5') foot sidewalk along Ogburn Avenue $1,293, B BikePed Needs Motor Road Part II Ogburn Avenue Patterson Avenue Construct 4,500 linear feet of five (5') foot sidewalk along Motor Road $2,772, H C Highway NC 109 North of SR 1756 (Old Greensboro I-40/US 311 Bypass of Wallburg on New Location $153,600,000 09, High Point Urban, R-2568C High Cost 56 B BikePed Needs Ogburn Avenue Part II Motor Road Kapp Street Construct 2,600 linear feet of five (5') foot sidewalk connecting the community $1,601, H Highway SR 1410 (Farmington I-40 Eastbound Ramp US-158 Construct roundabouts at both I-40 E Ramp and US-158 $2,600, R H Highway Needs SR 3210 (Transou Balsom Road Construct Roundabout $1,700, R Rail Needs NS/NCRR Main Line Upgrade existing Salisbury station building and waiting space expansion and surface parking. $2,900, Cabarrus-Rowan Rowan P H Highway Needs New Route SR 1103 (Lewisville- Clemmons SR 1891 (Peace Haven Peace Haven/Styers Ferry Rd.Conn.- New 2 Lane with Bike and sidewalk (This section includes a bridge over the Northern Beltway) $31,574, H Highway Needs SR 1410 (Farmington US-158 Rocky Dale Lane Widen existing roadway and improve intersections at 158 and I-40 ramps with roundabouts. $15,000, H Highway NC 8 (Winston Biesecker Road US 52 widen Existing road to a multi-lane facility with sidewalks and bike lanes $26,000, H Highway Needs New Route - Airport Parkway Harrison Road at Jake Alexander Boulevard US 29/Peach Orchard Road Construct Two Lanes on Multi- Lane Right of Way, $34,135, Cabarrus-Rowan Rowan U

6 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 64 B BikePed Needs Town Creek Greenway Correll Street Andrews Street Overpass Construct a greenway connecting Royal Giants Park with the Town of Spencer and Correll Street $2,400, Cabarrus-Rowan Rowan 65 R Rail Needs NS/NCRR Main Line Construction of final passenger station, pedestrian access, and second & third main tracks in Lexington. $14,500, P B BikePed Needs Yadkinville Road Valley Road Senior Center Construct a sidewalk on the north side of Yadkinville Rd/Wilkesboro St/Meroney St (total length 3,500 feet) $827, H Highway Needs SR 1348 (Robinhood Norman Road SR 1308 (Lewisville- Vienna Widen to 3 lane C&G Sidewalks and Bike Lanes $52,900, B BikePed Needs Muddy Creek Greenway Phase II Jefferson School Lane Yadkinville Road Construct approximately 8,810 linear feet of ten (10') foot wide greenway connecting the existing Muddy Creek Greenway to Yadkinville Road. Part of the Mountains to Sea proposed urban route through County $2,257, H Highway Needs New Route - Martin Luther King, Jr., Extension Marshall Street Northwest Boulevard Martin Luther King Jr. Drive Extension - New 2-Lane Median Divided Road from Marshall Street to Northwest Boulevard. $10,500, U B BikePed Needs N. Main Street Sidewalk 12th Street 22nd Street Construct N. Main Street sidewalk Phase I (12th Street to 22nd Street) $2,240, Cabarrus-Rowan Rowan EB H Highway NC 150 (Mooresville SR 1516 (Airport West of Grants Creek Widen to Multi-Lanes. $57,196, Cabarrus-Rowan Rowan U-5900 High Cost 72 H B Highway US 52 (New Route - Rockwell Bypass) US 52 South of Rockwell US 52 North of Rockwell at Granite Quarry Bypass Construct Multi-Lanes on New Location. $71,405, Cabarrus-Rowan Rowan 73 H Highway Needs SR 2739 (Main St.) Jackson Park Road / Loop Road Kimball Rd. SR 1211 in Rowan County Improve Roadway incorporating bike lanes and sidewalks $39,400, Cabarrus-Rowan Rowan U H Highway Needs SR 4000 (University Parkway) Cherry Street SR 1672 (Hanes Mill Add Additional Lanes. $29,423, H Highway Needs SR 1210 (Old Beatty Ford Rd.) N. Upright St. (non-sys) SR 1221 (Bostian Rd.) Widen to 3 lane shoulder section $9,000, Cabarrus-Rowan Rowan 76 R Rail NS/NCRR Main Line Construct track improvements, second platform, pedestrian underpass, sitework, retaining wall, and signalling equipment for Salisbury station. $7,320, Cabarrus-Rowan Rowan P

7 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 77 B BikePed Needs Little Creek Greenway Phase IIA Atwood Road Somerset Drive Construct approximately 3,535 linear feet of ten (10') foot wide greenway connecting the end of an existing greenway to Somerset Drive $955, H Highway Needs SR 1755 (West Lexington Avenue) Kensington Drive The High Point City Limits just east of Pinewood Lane Widen the existing road way to a three lane facility with bike lanes and sidewalks on both sides. $11,700, (59%), 07 (41%), Guilford 79 H Highway Needs New Route I-85 Business/US 29/52/70 SR 2212 (Fairview Construct Multi-Lanes on New Location $52,534, U H Highway I-85 Business, US 29, US 70 US 64, SR 3346 (N. Main Street) Re-Construct interchange at intersection of I-85 Business/US 29/70 & US 64 East of Lexington $35,100, H Highway NC 8 SR 1652 (Sheppard Mill Construct roundabout. $1,400, Stokes 82 H Highway NC 152 Bypass (New Route - NC 152/Church Street Bypass) Goodman Road Menius Road New Alignment of NC 152/Church Street. Bypass of Downtown China Grove. $82,740, Cabarrus-Rowan Rowan 83 T Transit Vanpool Fleet Expansion of Vanpool Fleet for employee/employer rideshare program $90, (40%), 07 (35%), 08 (25%) H A Highway Needs New Route - Julian Avenue Extension SR 2067 (Lambeth NC 62 (Cloninger Drive) Widen to Multi-Lanes, Part on New Location $43,796, H B Highway NC 109 NC 62 (Cloninger Drive) SR 2123 (Main Street) Widen to Multi-Lanes, Part on New Location $27,380, H C Highway NC 109 SR 2123 (Main Street) I-85 Business/US 29/US 70 Widen to Multi-Lanes, Part on New Location $28,194, A Aviation Needs INT - Smith Reynolds Airport INT - Terminal improvement with hangar development N/A Make improvements to existing terminal building, entrance road, and construction of a new hangar. would also include the demolition of old hangar, old cargo building and office building. After improvements are made, the fixed based operator (FBO) would relocate to terminal which would become the front door to the community. included on pen and ink change to Airport Layout Plan (ALP). $15,000, H Highway I-85 Business US 29 (Old US Hwy 29 (Lexington Ave) Improve Interchange $10,200, H Highway Needs SR 2313 (Peeler Street) Main Street, Old 80 US 52 would extend Peeler Street from the current intersection with Main Street to a new intersection with US 52. Sidewalk would be included on one side of road. $3,700, Cabarrus-Rowan Rowan 90 H Highway Needs US 29 Alternate US 29 Airport Road Construct a new connector road with grade separation of the railroad. $13,600, Cabarrus-Rowan Rowan 7

8 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 91 H B Highway NC 150 SR 1508 (Hickory Tree SR 1493 Frye Bridge/Welcome Arcadia Road Widen to Multi-Lanes. $56,309, U-5902B High Cost 92 T Transit PART Express Route 1 Service will operate from 7AM to 7PM Saturdays in I-40 corridor between Winston-Salem and regional terminal. $1,173, H Highway Needs SR 2045 (East Mountain Street) Macy Grove Road SR 2007 (South Bunker Hill Widen existing to Multi-Lanes $21,640, (81%), 09 (19%) Greensboro Urban Area, Winston-Salem Urban Guilford, 94 H Highway Needs SR 2165 (Turner Street, Liberty Street), SR 2055 NC 62 (Cloniger Street) SR 2123 (National Highway) NC 62 (Cloniger Street) to SR 2123 (National Highway). Widen to Multi- Lanes. $41,322, B BikePed Needs Main Street Sheppards Mill Bridge Government Center Construct sidewalk on the south side of Main Street. $430, Stokes 96 H Highway NC 109 Old Greensboro Road I-40 Widen existing NC 109 to a multi-lane median divided facility $125,700,000 09, Winston-Salem Urban, 97 H Highway NC 8 (Cotton Grove Rothrock Road Hunt Road rnize Roadway $44,600, T Transit Needs Bus Shelters throughout the WSTA system Bus Shelter Solar Panels $114, H Highway NC 65 (Bethania-Rural Hall SR 1647 (Glade St) NC 66 in Rural Hall Widen to three lanes. $8,500, H Highway Needs SR 2528 (Heilig I-85 Faith Road Construct a 4 lane median divided road with curb and gutter and sidewalk cross section. $26,000, Cabarrus-Rowan Rowan 101 B BikePed Needs Lewisville Clemmons Road Streetscape Improvements Shallowford Road Jack Warren Park Construct streetscape improvements along Lewisville Clemons Road between Shallowford Road and the entrance at Jack Warren Park (Approx. 3,500 FT). The project will include repairs to existing sidewalks and curb and gutter, add street trees, street lighting, landscaping, add pedestrian amenities (such as street furniture, benches, trash receptacles), wayfinding signs, and public art $253, H Highway Needs New Route SR 1103, SR 1100 (Lewisville-Clemmons SR 1100 (Lasater Peace Haven/Styers Ferry Roadconn. - New 2 Lane w/bike and sidewalk $18,218,

9 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 103 H Highway Needs SR 1116 (Junction Road, Marginal Street) SR 1170 (Main Street) Construct roundabout $1,350, B BikePed Needs Thomasville Road Part II Baden Road Teague Road Construct 4100 linear feet of five (5') foot sidewalk along Thomasville Road $2,525, H Highway NC 801 SR 1650 at Advance US 158 South of I-40 SR 1650 at Advance to US 158 South of I-40. Upgrade Roadway, SR 1650 to SR 1624 and Multi-Lane Roadway, SR 1624 to US 158, with Multi-Use Path $62,000, H A Highway Needs SR 1003 (Skeet Club, SR 1820 US 311 East of SR 1818 (Johnson Street) Widen to Multi-Lanes $26,100,000 07, 09 Guilford, U-3615A 107 H Highway NC 8 NC 89 Virginia State Line Widen NC 8 from NC 89 to VA Line $95,000, Stokes 108 H Highway Needs SR 1138 (Old Salisbury Rd.), SR 1213 (Tyro Rd.) SR 1138 (Old Salisbury SR 1222 (Old Hargrave Construct Road on new location and add roundabout at new road and Old Salisbury Rd and Tyro Rd. Cul-de-sac Old Hargrave Rd at Old Salisbury Road. $3,400, R Rail Needs NS/NCRR Main Line Improve existing track and signals to provide future passenger station. $13,900, H Highway Needs I-85 Business, US 29 MLK Drive, Jacob Street Construct an interchange at the existing grade separation of Bus 85 and MLK/Jacob Street $7,000, H Highway Needs New Route - High Point Airport Connector NC 66 /N Main St./High Point Road Johnson Street / Sandy Ridge Road Construct Multi-Lane Facility, part on new location (FS-0707B) $84,500,000 07, 09, Winston-Salem Urban Guilford, 112 H Highway Needs US 52 Trinity Church Road North of Trinity Church Road Convert Existing Grade Separation to Full interchange $18,500, Stokes I H Highway Needs New Route - Jake Alexander Boulevard Extension Long Ferry Road US 601 Construct an extension of Jake Alexander Blvd on the northwest side of Salisbury and Spencer. $76,000, Cabarrus-Rowan Rowan 114 H Highway Needs SR 2140 (St. Matthews Church SR 2260 (N. Fisherman's Lane) Approxmately 0.15 miles west of Roy Miller Park Road (Non-System) Widen existing one lane road on causeway to two lane road. $2,500, Cabarrus-Rowan Rowan 115 H Highway Needs SR 2528 (Heilig Faith Road Main Street, Old 80 would extend Heilig Road from the current intersection with Faith Road to a new intersection with Main Street/Old 80. Sidewalk would be included on one side of road. $19,402, Cabarrus-Rowan Rowan 116 H Highway Needs Broad Street Connector 4th Street Peters Creek Parkway New Route - Connector from Broad Street to Peters Creek Parkway, tie into Broad at 4th Street and connect to Peters Creek Parkway at Brookstown Ave. $19,600, U

10 9 Route / Facility Name From / Cross Street To / Cross Street Description Cost to NCDOT (s) (s) / (s) County(s) TIP # Draft 9 Input Points 117 H Highway Needs SR 2264 (Akron Drive) Indiana Avenue Reynolds Boulevard / Shorefair Drive Construction of a new 2 lane facility from the intersection of Akron and Indiana to the intersection of Shorefair and Reynolds. $6,600, T Transit Needs Clark Campbell Multimodal Transportation Center Camera and Security System Upgrades; Facility Improvements: Gas Packs, Carpet and Tile Replacement, Data Room Mini Split Units, Interior Painting and HVAC Replacement; Facility Improvements: Computers, Printers, Software and Network Securities $420, H Highway Needs SR 1267 (Ebenezer Ridge Avenue Old Beatty Ford Road Widen Ebenezer Road and extend to the relocated Old Beatty Ford Road $42,300, Cabarrus-Rowan Rowan 120 H Highway Needs I-40 SR 1442 (Redland Convert grade separation at I-40 and Redland Road to modified diamond interchange (3 ramps and 1 loop) $28,400,

U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0

U-4918A Research Park Boulevard Transportation Improvements from Rams Drive to Third Street 1.0 Winston-Salem Urban Area Metropolitan Planning Organization 2035 Fiscally Constrained Long Range Transportation Plan 2015 Street and Highway Project List Mileage Existing Proposed Regional Federal STIP

More information

Recommendations. Implementation

Recommendations. Implementation Recommendations This report documents the development of the Winston-Salem MPO CTP as shown in Figure 2-1. This chapter presents recommendations for each mode of transportation in the MPO. Implementation

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

chapter four implementation

chapter four implementation chapter four implementation 4.1 Overview Photo by Christine Rucker Photography. The text and images in this chapter describe how the City of Winston-Salem and its partners can turn the vision of a connected

More information

Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter

Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter Driving directions during the closure of Business 40 for the Downtown Health Plaza in Innovation Quarter BUSINESS 40 IMPROVEMENT PROJECT AUGUST 31, 2018 DRIVING TO THE DOWNTOWN HEALTH PLAZA DURING BUSINESS

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

chapter three new bike network

chapter three new bike network chapter three new bike network 3.1 Overview Based on an examination of the existing conditions (Chapter 2) and an understanding of the communityʼs vision and goals for improved cycling opportunities (Chapter

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary

North Carolina Department of Transportation American Recovery and Reinvestment Act of 2009 Division One Highway Infrastructure Program Summary Division One Highway Infrastructure Program Summary 1 Hyde NC 12 Northern Ferry Dock Ocracoke Village R-5149 Resurface and Widening to Accommodate Bicycling 13.3 $3,310,000 $0 $3,310,000 Jul-09 1 Dare

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017

Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Institute for Real Estate Management Chapter (IREM) 77 VDOT Northern Virginia Megaprojects September 13, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Northern Virginia

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Southwestern RPO Prioritization Local Input Points for Division Needs Funding

Southwestern RPO Prioritization Local Input Points for Division Needs Funding H172327 US 19 Business paved shoulders; include bicycle lanes and sidewalks. Location: extends 0.9 miles from Junaluska Road in Andrews to US 19/74. $ 6,100,000 9.20 H090251-AC R-3622AC NC 294 (southern

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Winston Salem MPO Transportation Update Thursday, February 15, 2018

Winston Salem MPO Transportation Update Thursday, February 15, 2018 s Under 17BP.9.C.2 (DI00174) Replace Culvert No. 133 on Ellison Creek at SR 1170 (Dull Rd) in Forsyth County Oct. 25, 2017 March 23, 2018 (observation period for vegetation until Oct. 12, 2018) Availability

More information

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009

ATTACHMENT A Transportation Improvement Program TCC-Recommended TIP Amendments March 5, 2009 Road Projects Project Project Description TIP # Location NC 51 SC state line to Downs Circle U-3447 Pineville NC 218 I-485 to US 74 R-5114 Meck/Union/Anson Little Rock Road Intersection improvement U-5116

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns

Poor pavement condition Substandard Intersections. / Substandard bike/pedestrian/transit accommodations. Driveway access Environmental concerns Public Informational Meeting University Avenue (Allen Boulevard Segoe Road) March 23, 2011 City of Madison City of Middleton Village of Shorewood Hills Dane County Existing Roadway Conditions Poor pavement

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

Review of DRAFT STIP. January 18, 2017 MPO Meeting

Review of DRAFT STIP. January 18, 2017 MPO Meeting Review of DRAFT 2018-2027 STIP January 18, 2017 MPO Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a

More information

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects

FY Transportation Improvement Program - DRAFT Alphabetical Listing of Roadway, Bicycle, Pedestrian and Rideshare Projects -2022 Transportation Improvement Program - DRAFT Project Number Alamo Area Commute Solutions Pgm - FY 2017 5101.0 0915-12-547 AACOG Alamo Area Commute Solutions Pgm - FY 2018 5102.0 0915-12-543 AACOG Alamo

More information

Winston Salem MPO Transportation Update Thursday, September 20, 2018

Winston Salem MPO Transportation Update Thursday, September 20, 2018 Thursday, September 20, 2018 17BP.9.R.99 (Old B-5152) (DI00181) 2018CPT.09.01.10291.1 2018CPT.09.02.20291.3 2018CPT.09.05.10341 2018CPT.09.06.20341 (C204140) 2020CPT.09.13.20342 (DI00209) B-4746 38518.3.1

More information

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018

WELCOME. Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 WELCOME Stakeholder Involvement Group Meeting #2 Round Lake Public Works October 24, 2018 MEETING AGENDA 1. Welcome and Introductions 2. Study Progress Update 3. Problem Statement 4. Technical Analysis

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 13, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 13 through July 20, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Short and Long Term Needs

Short and Long Term Needs Short and Long Term Needs The short- and long-term programs of proposed projects listed below have been designed to address the mobility issues in South Montgomery County. These improvements to the transportation

More information

Review of DRAFT STIP. January 5, 2017 TCC Meeting

Review of DRAFT STIP. January 5, 2017 TCC Meeting Review of DRAFT 2018-2027 STIP January 5, 2017 TCC Meeting Presentation Notes Initial staff review since STIP was released on January 4 Not a complete assessment of all projects and programs will be a

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation

Dulles Area Transportation Association. October 11, Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Dulles Area Transportation Association October 11, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation Transform 66: Outside the Beltway 2 Project Overview Multimodal improvements

More information

Winston Salem MPO Transportation Update Thursday, January 18, 2018

Winston Salem MPO Transportation Update Thursday, January 18, 2018 Winston Salem MPO Transportation Update Thursday, January 18, 2018 TIP / WBS No. Description Let Date Completion Date Status Cost Projects Under Contractor Project Administrator Comments 17BP.9.C.2 (DI00174)

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

DEKALB COUNTY. 22. Priority Projects for DeKalb County

DEKALB COUNTY. 22. Priority Projects for DeKalb County DEKALB COUNTY 2 0 1 4 T R A N S P O R T A T I O N P L A N 22. Priority s for DeKalb County Following the completion of the project prioritization metrics, each project was able to be compared to other

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016

Sarasota/Manatee MPO Project Priorities 2016 Adopted April 25, 2016 All projects on the following priority lists should be implemented in the priority sequence listed, as consistent with the fiscal constraints identified in the MPO s adopted Long Range Transportation Plan

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS

ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS RT 81 Corridor Study CLINTON ROUTE 81 CORRIDOR STUDY DESIGN CONCEPTS View north on High Street, with potential improvements to the streetscape Draft Recommendations November 8 th, 2018 TOWN OF CLINTON

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

TITLE VI AND ENVIRONMENTAL JUSTICE PLAN

TITLE VI AND ENVIRONMENTAL JUSTICE PLAN WINSTON-SALEM URBAN AREA TITLE VI AND ENVIRONMENTAL JUSTICE PLAN APPENDIX Prepared by: The Winston-Salem Department of Transportation DRAFT 2008 Winston-Salem Urban Area Environmental Justice Plan Winston-Salem

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018

Public Information Meeting. Orange Camp Road. Dr. Martin Luther King Jr. Beltway to I-4. Presented by: Volusia County August 2, 2018 Public Information Meeting Orange Camp Road Dr. Martin Luther King Jr. Beltway to I-4 Presented by: Volusia County August 2, 2018 1 Project Goals To improve the operations and safety for Orange Camp Road

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

APPENDIX L: COST ESTIMATING TOOLS

APPENDIX L: COST ESTIMATING TOOLS APPENDIX L: COST ESTIMATING TOOLS Rural Arterial From LRE MOT * Mobilization * Subtotal Scope Contingency (25%) Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

Route 7 Corridor Study

Route 7 Corridor Study Route 7 Corridor Study Executive Summary Study Area The following report analyzes a segment of the Virginia State Route 7 corridor. The corridor study area, spanning over 5 miles in length, is a multi

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

Transportation Committee Project Priority List

Transportation Committee Project Priority List Transportation Committee Project Priority List Funded Priorities PRIORITY 1 - Interstate 81, Exit 310 Improvements Description: Construct improvements to Exit 310 interchange. Capital Cost: $54,200,000

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

Columbia Pike Implementation Team (CPIT) Meeting

Columbia Pike Implementation Team (CPIT) Meeting Columbia Pike Implementation Team (CPIT) Meeting November 30, 2010 Agenda Introductions / Purpose of Meeting Review of project goals Multimodal project: 10% street design between the curbs Discussion Multimodal

More information

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ %

EXHIBIT B. Bass Lake Rd US 50 to Hollow Oak Rd 2 Lanes with unimproved median and 4 foot paved shoulders. $ % Fee Program Project List - 2004 General Plan Cost Estimate 2004 Alternative Route Study West Valley Condition 27 Alternative connection between, Feasibility study. Included in /White Rock Connector. south

More information

WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM. Greg Errett City of Winston-Salem DOT September 14, 2011

WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM. Greg Errett City of Winston-Salem DOT September 14, 2011 WINSTON-SALEM URBAN AREA MPO BICYCLE & PEDESTRIAN PROGRAM Greg Errett City of Winston-Salem DOT September 14, 2011 Presentation Outline History MPO Expansion/Changes Current Plans State of Active Transportation

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016

SR-203 Sidewalks and Town-Wide Mobility Improvements. Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town-Wide Mobility Improvements Town Council Presentation September 7, 2016 SR-203 Sidewalks and Town- Wide Mobility Improvements SR-203 Sidewalks and Appurtenances Town-Wide Mobility

More information

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7.

TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN. Analysis of Future Conditions Thoroughfare Plan Proposed Cross-Sections.. 7. TABLE OF CONTENTS 7.0 THOROUGHFARE PLAN Analysis of Future Conditions.. 7.2 Thoroughfare Plan.. 7.3 Proposed Cross-Sections.. 7.4 Arterials Minor Arterials Collectors Local Streets Thoroughfare Plan Map

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP

ROAD PROJECTS. Primary and Interstate Roads LRTP; Southern- Western Neighborhoods MP Desktop > Trans Priorities 0 >TRANPSORTATION PRIORITIES > new priority list format.doc ALBEMARLE COUNTY TRANSPORTATION PRIORITIES (DRAFT) April, 0: The following are the counties strategies priorities

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation

Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation Main-McVay Transit Study: Phase 2 Options Definition and High Level Constraints Evaluation APRIL 2016 A collaborative study between: For Additional Information or to Comment If you would like additional

More information

Atwood Avenue Fair Oaks Avenue Cottage Grove Road

Atwood Avenue Fair Oaks Avenue Cottage Grove Road Atwood Avenue Fair Oaks Avenue Cottage Grove Road Agenda Purpose Review project scope & goals Present design alternatives Gather feedback Answer Questions Format Open House Presentation Q&A Open House

More information

Project Description Form 6V

Project Description Form 6V Project Description Form 6V Basic Project Information Submitting Jurisdiction/Agency: Prince William County Project Title: Route 15 Widening: Route 55 to south of RR tracks & Construct RR Overpass Project

More information

Implementation Plan. 5.1 Improvement Program

Implementation Plan. 5.1 Improvement Program 5 Implementation Plan Section 4 presented detailed recommendations for transportation improvements and land use strategies in the Route 6 Hop River corridor. This section outlines how the transportation

More information

Lincoln Highway Streetscape Plan Concept Plan

Lincoln Highway Streetscape Plan Concept Plan Lincoln Highway Streetscape Plan Concept Plan November 14, 2014 Introduction This report provides a summary of conceptual transportation, land use, and design recommendations in the Lincoln Highway Streetscape

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners

Transportation Investment Act Gwinnett County. Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners Transportation Investment Act Gwinnett County Charlotte J. Nash, Chairman Gwinnett County Board of Commissioners April 25, 2012 Transportation Investment Act Gwinnett County Gwinnett County Transportation

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist

Pedestrian and Bicycle Safety Program Leg Agency Title of Project Project Description Dist 2015-17 and Bicycle Safety Program Leg Lummi Nation 42 Kennewick 8 Lummi Nation 42 Jamestown S'Klallam 24 WSDOT-- NW 32 Port of Vancouver 49 Spokane 3 Seattle 46 Shoreline 32 Lummi Shore Drive Columbia

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017

Watertown Complete Streets Prioritization Plan. Public Meeting #1 December 14, 2017 Watertown Complete Streets Prioritization Plan Public Meeting #1 December 14, 2017 Goals for Public Meeting Overview of MassDOT Complete Streets Funding Program Educate the community on Complete Streets

More information

Project Description Tier Goal Previous SPOT Rank

Project Description Tier Goal Previous SPOT Rank Durham City and County Adopted FY 2014-2020 Transportation Improvement Program Local Priority List TCC 5/25/2011 Attachment 7A Highway Project Description Tier Goal Previous SPOT Rank A B C D E F G H I

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Information Item. Date: February 13, 2018 To: The City Manager Gregory M. Turner, Assistant City Manager/ Toneq McCullough, Director of Transportation

Information Item. Date: February 13, 2018 To: The City Manager Gregory M. Turner, Assistant City Manager/ Toneq McCullough, Director of Transportation Information Item Date: February 13, 2018 To: From: Subject: The City Manager Gregory M. Turner, Assistant City Manager/ Toneq McCullough, Director of Transportation Winston-Salem Transit Authority Services

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement

Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. Project Type Capital Improvement Cottonwood Heights HAWK Pedestrian Crossing on Fort Union Blvd. At West Side of Mountview Park Entrance (Approx. 1600 East) $ 206,800 $ 192,800 Install a HAWK Pedestrian Crossing System on Fort Union Boulevard,

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS

CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS CHAPTER 16 PEDESTRIAN FACILITIES DESIGN AND TECHNICAL CRITERIA TABLE OF CONTENTS Section Title Page 16.1 General... 16-1 16.1.1 AASHTO Reference... 16-1 16.1.2 ADA Requirements... 16-1 16.2 Sidewalks...

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors.

Make Lincoln Highway an economically vibrant corridor that is safe, efficient, and beautiful for local residents and visitors. Lincoln Highway Streetscape Plan Stakeholder Workshop #2 Handout Contents Introduction and Project Vision Planning Principles Specific Recommendations including a Proposed Typical Roadway Section Renderings

More information

Fulton Market Streetscape

Fulton Market Streetscape Fulton Market Streetscape Ogden Avenue to Halsted Street Public Meeting Recommended Improvements December 10th, 2014 Meeting Purpose and Goals Present Existing Conditions Community Input and Charrette

More information

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20)

US 20 Feasibility Study. Village Board Meeting. Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) US 20 Feasibility Study Shales Parkway to IL Route 390 IL Route 390 Extension (North Ave to US 20) Village Board Meeting Bartlett Village Hall February 16, 2016 1 Background 1991 IDOT Study Recommendations

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan

DRAFT. System Components. Greenway Trails. Introduction. Trail Types. Zebulon Greenway Master Plan 5 System Components Wakefield Street Photo Simulation showing Sharrows Introduction The Master Plan identifies various system components that, together, create a comprehensive greenway system. These components

More information

FDOT Treasure Coast Traffic Impact Report

FDOT Treasure Coast Traffic Impact Report February 10, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report February 10 through February 17, 2017 TREASURE COAST Construction and maintenance

More information

Lynchburg District Update

Lynchburg District Update Lynchburg District Update Virginia Statewide Bicycle and Pedestrian Advisory Committee Spring Meeting May 16 th, 2017 David Cook Transportation Planner, VDOT Lynchburg District Table of Contents Active

More information

WalkShop. Highland Creek Village

WalkShop. Highland Creek Village On June 5, 2014, 15 people participated in a for the Transportation Master Plan. The purpose of the was to receive feedback from a diverse range of local stakeholders and document existing transportation

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: December 16, 2014 Department Director Approval: Check all that apply: consent old business new business public hearing information admin.

More information

STUDY ADVISORY COMMITTEE. October 8, 2015

STUDY ADVISORY COMMITTEE. October 8, 2015 STUDY ADVISORY COMMITTEE October 8, 2015 Study Purpose evaluate the long-term transportation strategies and investments needed to sustain the county s economic health and quality of life in the coming

More information

McLEAN CITIZENS ASSOCIATION

McLEAN CITIZENS ASSOCIATION McLEAN CITIZENS ASSOCIATION RESOLUTION DULLES RAIL SUPPLEMENTAL EIS With ATTACHMENT A - PEDESTRIAN AND BICYCLE ACCESS ISSUES DULLES CORRIDOR RAIL STATIONS IN TYSONS CORNER (Charts - 7 pages) Approved by

More information

3.1.1 Area Land Uses. Downtown Winston-Salem Area

3.1.1 Area Land Uses. Downtown Winston-Salem Area 3.0 Existing Conditions This section of the report provides an overview of the existing conditions within the Phase 2 study area regarding land use and development patters, transportation facilities and

More information