1 I Construct weigh station on I-65 near the Kentucky state line, northbound only. Port of Entry near Kentucky state line. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $4,000,000 Estimated Open to Public Year: Deleted from Plan.

2 KY 1931 Greenwood Road 128 Widen KY 1931 (Greenwood Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 1934 (Greenbelt Highway) to US 31W (Dixi Highway), a total of 2.6 miles. Provide improved access between Dixie Highway and Greenbelt Highway. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $28,440,000 Estimated Open to Public Year: 2016 Changed open to public date from 2012 to 2016.

3 KY Relocate and widen KY 393 from 2 to 3 lanes (3rd lane will be a center turn lane) from I-71 to north of KY 146 (LaGrange Road). KY 393 reconstruct from northern ramp of I-71 to north of KY 146 (stations to Project length is 0.9 miles. Improve safety and reduce congestion by improving roadway geometry and adding a grade separated railroad crossing. Contact Agency: KYTC State ID #: County/Counties: Oldham Project Cost: $13,780,000 Estimated Open to Public Year: 2012 Changed open to public date from 2009 to Changed project description to "Relocate and widen KY 33 from2 to 3 lanes (3rd lane will be a center turn lane) from I-71 to north of KY 146 (LaGrange Road). KY 393 reconstruct from norther ramp of I-71 to north of KY 146 (statins to "

4 I-265 Gene Snyder Freeway 179 Reconstruct I-265 (Gene Snyder Freeway) interchange at I-64, including: NB to WB 2 lane flyover, SB to WB 2 lane ramp, and auxiliary lane t tie into #197; also includes WB auxiliary lane on I-64 from I-265 to Blankenbaker Pkwy. The purpose of this project is to eliminate the clover-leaf interchange, increase capacity, and reduce congestion. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $100,022,907 Estimated Open to Public Year: 2015 Changed open to public date from 2012 to 2015.

5 I- 64 / KY 1747 Interchange I- 64 / Hurstbourne Parkway Interchange 181 Reconstruct existing interchange including construct ramp 7 "flyover" from northbound KY 1747 (Hurstbourne Parkway) to westbound I-64 an re-time signals along KY 1747 (Hurstbourne Parkway). This project will reduce traffic congestion and delay by improving ramp and intersection operating conditions, improve vehicular safety by reducing potentially dangerous uncontrolled vehicle conflict points and providing safe access between local and regional highway systems, an will enhance the existing system to provide more efficient connections between local and regional highway systems and promote better use o Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $60,299,200 Estimated Open to Public Year: 2021 Changed open to public date from 2010 to 2021.

6 Crittenden Drive/ I Reconstruct Crittenden Drive intersection at Warnock Street, includes I-65 ramp modifications at Warnock Street. The KY 1631 intersection with Warnock is proposed as a safety improvement. Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $640,000 Estimated Open to Public Year: 2012 Changed open to public date from 2009 to 2012.

7 I-265 Gene Snyder Freeway 197 Reconstruct I-265 (Gene Snyder Freeway) interchange at US 60 (Shelbyville Road). Auxiliary lanes will be added to NB and SB I-265 from th US 60 interchange south to reduce congestion and improve safety. Lanes will be added at the base of the exit ramps. Turn lanes and other improvements will be made to US 60 between English Station Road and Beckley Woods Drive in order to improve safety and increase capac Project length is 0.5 miles. This project will reduce traffic congestion and improve safety. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $5,849,000 Estimated Open to Public Year: 2011 Plan cost decrease. TIP - Move FY 2007 ROW to FY 2009 and increase from $100,000 to $110,000; Move FY 2007 Utilities to FY 2009 and increase from $350,000 to $370,000; Move FY 2008 Construction to FY 2010 and increase from $3,000,000 to $4,000,000; delete FY 2009 Construction $12,480,000 and FY 2010 Construction $21,632,000; IM funds.

8 Cooper Chapel Road Phase Phase 1: Reconstruct Cooper Chapel Road from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 61 to Smyrna Parkway. Project len is 1.8 miles. The area south of I-265 (Gene Snyder Freeway) between KY 61 (Preston Highway) and US 31E (Bardstown Road) is experiencing rapid grow with the development of many new residential subdivisions. Cooper Chapel Roa is a heavily traveled collector road serving this area. The pro will add shoulders where there are none and improve existing poor geometrics to this rapidly growing residential area south of I-265. The proj Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $13,125,000 Estimated Open to Public Year: 2012 Changed open to public date from 2009 to 2012.

9 River Road 226 Reconstruct 1 lane bridge on River Road to 2 lanes over Harrods Creek. Reconstruction of the bridge will improve safety. Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $1,575,000 Estimated Open to Public Year: 2010 Changed open to public date from 2008 to 2010.

10 US Construct 2 way center turn lane on US 42 from Harrods Creek Bridge north to River Road. Project length is 1.0 miles. Add center turn lane to increase safety. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $7,980,000 Estimated Open to Public Year: 2012 Changed open to public date from 2007 to 2012.

11 KY 1819 Watterson Trail 233 Reconstruct and widen KY 1819 (Watterson Trail) from 2 to 3 lanes (3rd lane will be a center turn lane) from Plantside Drive to KY 913 (Blankenbaker Parkway). Approximately 2.0 miles in length. This project will improve roadway geometrics improving safety and will accommodate demands from local residential and industrial developm Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $13,500,000 Estimated Open to Public Year: 2012 Changed open to public date from 2007 to 2012.

12 KY 1819 Billtown Road 257 Widen KY 1819 (Billtown Road) from 2 to 3 lanes (3rd lane will be a center turn lane) from I-265 (Gene Snyder Freeway) to KY 1819 (Watters Trail). Project length is 3.8 miles. This project will improve road geometrics to improve safety and reduce traffic congestion. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $21,632,000 Estimated Open to Public Year: 2020 Changed open to public date from 2012 to 2020.

13 LaGrange Underpass West of LaGrange 321 Construct a 4 lane uninterrupted rail underpass west of LaGrange. Contact Agency: Oldham Co. State ID #: County/Counties: Oldham Project Cost: $5,408,000 Estimated Open to Public Year: 2014 Changed open to public date from 2012 to 2014.

14 KY 1747 Hurstbourne Parkway 359 Add 3rd travel lane southbound on KY 1747 (Hurstbourne Parkway) from US 60 (Shelbyville Road) to Linn Station Road 1.6 miles in length. Includes improvement to the US 60 and Hurstbourne Parkway intersection. This project is to improve safety and reduce congestion. Currently, intersection flow is poor; inadequate left-turn storage causes left turn traffic from both Hurstbourne and US 60 to back up into the thru lanes creating congestion and a safety hazard. Additionally, merging is a problem f traffic turning onto southbound Hurstbourne Lane from US 60. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $10,060,000 Estimated Open to Public Year: 2013 Changed open to public date from 2010 to 2013.

15 KY 1065 Outer Loop KY 1065 (Outer Loop) intersection improvement at KY 864 (Fegenbush Lane) and KY 864 (Beulah Church Road). 365 This project will improve traffic safety. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $11,810,000 Estimated Open to Public Year: 2012 Changed open to public date from 2008 to 2012.

16 Buechel Bank Road 381 Add center turn lane on Buechel Bank Road from GE Appliance Park to US 31E (Buechel Bypass). Project length is 0.9 miles. This project will reduce traffic congestion. Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $4,325,000 Estimated Open to Public Year: 2015 Changed open to public date from 2008 to 2015.

17 Hubbards Lane 384 Widen Hubbards Lane from 2 to 3 lanes (3rd lane will be a center turn lane) from US 60 (Shelbyville Road) to KY 1447 (Westport Road). Add bike lanes to Hubbards Lane from Kresge Way to KY Project length is 0.6 mi. Hubbards Lane is a heavily traveled collector which passes through residential development between US 60 and US 42. Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $2,050,000 Estimated Open to Public Year: 2015 Revise description to include "Add bike lanes to Hubbards Lane from Kresge Way to KY 1447" and decrease project cost $2,050,000

18 I Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safety and congestion issu The improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, additio auxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel. This project will help reduce traffic congestion. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $68,428,453 Estimated Open to Public Year: 2016 Changed description from "I-64 corridor improvements to consider alternative transportation modes as well as the addition one travel lane in each travel direction between I-71 and I-264. If additional lane is added, intent would be to widen to ins to ""Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing saf and congestion issues. The improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, addition of auxiliary and/or travel lanes, interchange modifications, and installation traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel."

19 I Improvements within the I-64 corridor from the Kennedy Interchange to I-264 (Watterson Expressway) addressing safety and congestion issu The improvements may include but are not limited to: consideration of alternative transportation modes, deployment of ITS technology, additio auxiliary and/or travel lanes, interchange modifications, and installation of traffic safety devices, signs and lighting. None of the potential improvements will involve expansion of the Cochran Hill Tunnel. This project will help reduce traffic congestion. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $68,428,453 Estimated Open to Public Year: 2016 Changed open to public date from 2012 to Increased project cost to $25,000,000.

20 KY 907 Southside Drive 465 Widen KY 907 (Southside Drive) from 2 to 5 lanes (5th lane will be a center turn lane) from KY 1865 (New Cut Road) to KY 1020 (National Turnpike). The design will include the consideration of bicycle and pedestrian facilities. Project length is 0.7 miles. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $3,858,284 Estimated Open to Public Year: 2020 Changed open to public date from 2011 to 2020.

21 I-264 Henry Watterson Expressway Construct new I-264 (Henry Watterson Expressway) interchange at KY 1931 (Manslick Road). 516 This project will provide interstate access to and from KY 1931 ( Manslick Road). Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $9,000,000 Estimated Open to Public Year: 2020 Added to Plan, $9,000,000.

22 15th Street East 523 Reconstruct 15th Street East CSX Railroad crossing, adding flashers and gates. This project will improve the safety at this railroad crossing. Contact Agency: New Albany PC State ID #: County/Counties: Floyd Project Cost: $200,000 Estimated Open to Public Year: 2020 Deleted from Plan.

23 Goshen Lane 908 Install sidewalks on Goshen Lane from Valley Drive southeast to US 42 (Brownsboro Road). Contact Agency: NA State ID #: County/Counties: Oldham Project Cost: Estimated Open to Public Year: Changed open to public date to 2013.

24 Saint John Road 964 Reconstruct and realign Saint John Road as a 2 lane (no additional lanes) road 0.5 miles of existing road approximately 2 miles west of IN 60 (improved geometrics on section up and down hillside). Major horizontal alignment problems-current design speed less than 20 mph. Realignment will improve design speed to 30 mph. Contact Agency: Clark Co. State ID #: County/Counties: Clark Project Cost: $2,525,000 Estimated Open to Public Year: 2012 Move ROW to 2011, change open date to 2012

25 IN Widen IN 111 from 2 to 5 lanes (5th lane will be a center turn lane) from Klerner Lane to Chapel Road (2.26 miles). Widen from 2 to 3 lanes from Chapel Road to Fairview Knob Road (0.36 miles). Reconstruct as 2-lane road from Fairview Knob Road to IN 60 (3.08 miles). Includes bridge, signals and signs. The need for improvement is based on the facilities substandard geometrics, lack of traffic capacity along the corridor and accident history. Existing LOS has fallen to substandard levels along the corridor. The purpose of the project is to improve the traffic flow/mobility and safety by adding capacity and improving geometrics along the corridor. INDOT database shows 129 accidents from 1996 to 1999 along IN 111from IUS Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: $30,613,045 Estimated Open to Public Year: 2013 Move Open to Public date to 2013 TIP - Move FY 2006 ROW to FY 2010 $2,500,000; Move FY 2009 Const. to FY 2011 STP-State.

26 IN Intersection improvement at IN 62 and Salem Noble Road Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $110,000 Estimated Open to Public Year: Deleted from Plan.

27 IN Intersection improvement on IN 60 at Saint Joe Road (west junction). Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $530,000 Estimated Open to Public Year: 2010 Deleted from Plan.

28 I Bridge replacement on I-65 over Muddy Fork Creek miles north of Charlestown Road. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $1,030,000 Estimated Open to Public Year: Deleted from Plan.

29 IN Intersection improvement on IN 60 at Saint Joe Road (east junction). Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $330,000 Estimated Open to Public Year: Deleted from Plan.

30 KY Widen KY 61 from 2 to 4 lanes from existing 4 lane section to Shepherdsville. Section 3 - from south of Brooks Run to existing four lane (Construction Sequence 1). Project length is 1.7 mi. Improve safety and reduce congestion Contact Agency: KYTC State ID #: County/Counties: Bullitt Project Cost: Estimated Open to Public Year: 2012 TIP - Change OTP from 2009 to 2012; Move FY 2009 Construction to FY 2010 and increase from $10,175,000 to $10,930,000.

31 Broadway & 18th Street 1192 Align intersection of Broadway and 18th Street by moving the south leg of 18th Street to the east. Improve operation of signal by eliminating offset intersection. Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $500,000 Estimated Open to Public Year: 2010 Changed open to public date from 2008 to 2010.

32 I Interchange modification on I-64 at IN 62 and IN 64, adding turn lanes. The essential purpose for this project is to modify the existing interchange to accommodate the IN 64 movements and to coordinate or cluster closely spaced signals (West Knable Rd. North (westbound) ramp terminus and South (eastbound ramp terminus) to optimize the flow of traff The primary need for this improvement is based on congestion and geometric deficiencies at the interchange and the closely spaced Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $7,534,000 Estimated Open to Public Year: 2009 Moved open to public date from 2013 to Changed project cost from $16,480,000 to $7,534,000.

33 Olmsted Parkways Multi-Use Path System 1273 Construct a multi-use path system connecting Algonquin, Southwestern, Southern and Eastern Parkways with existing trails to create a continuous 30 miles of connected paths for pedestrians and bicyclists. Change from 4 lanes to 3 lanes (3rd lane will be a center turn lane) on Southwestern Parkway from Shawnee Park to I-264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from New Cut Road to Sou 3rd Street, and Eastern Parkway from I-65 to Cherokee Park. Contact Agency: Lou. Metro Parks State ID #: County/Counties: Jefferson Project Cost: $8,189,010 Estimated Open to Public Year: 2012 Changed project description to include, "Change from 4 lanes to 3 lanes (3rd lane will be a center turn lane) on Southwestern Parkway from Shawnee Park to I-264, Algonquin Parkway from I-264 to Winkler, Southern Parkway from N Cut Road to South 3rd Street, and Eastern Parkway from I-65 to Cherokee Park". Changed open to public date to 2012.

34 Downtown Two-Way Street Conversion 1337 Convert the following north/south streets to two-way from the river to Broadway: Preston, Jackson, 3rd, 5th, 6th, 7th and 8th streets. In additi convert the following east/west streets to two-way: Liberty and Jefferson streets. Retailers usually experience a positive impact from the conversion to two-way streets that allow for more visibility and the possibility of a grow sales. Contact Agency: Metro. Dev. Auth. State ID #: County/Counties: Jefferson Project Cost: Estimated Open to Public Year: 2007 Deleted from Plan, $2,550,000. Replace with new projects - One-Way Street Conversion to Two-Way Phase 1 #1809 an Phase 2 #1810.

35 I-265 Lee Hamilton Highway I-265 (Lee Hamilton Highway) interchange modification at State Street. Add lanes on ramps To alleviate congestion (back ups) on State Street. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alon has not addressed this issue. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $880,000 Estimated Open to Public Year: 2017 Changed open to public date from 2012 to Increased project cost to $880,000.

36 I I-265 interchange modification at IN 111. Add lanes on ramps. To alleviate congestion (back ups) on ramps to IN 111. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alone has not addressed this issue. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $880,000 Estimated Open to Public Year: 2017 Changed open to public date from 2012 to Increased project cost to $880,000.

37 I I-265 interchange modification at Charlestown Road. Add lanes on ramps. To alleviate congestion (back ups) on ramps to IN 311. Traffic volumes exceed maximum capacity for one lane. Adjustments to signalization alone has not addressed this issue. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $880,000 Estimated Open to Public Year: 2017 Changed open to public date from 2012 to Increased project cost to $880,000.

38 Blackiston Mill Road 1394 Intersection improvements at Blackiston Mill Road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB Blackist Mill Road, and left and right turn lanes at WB Potters Lane, including sidewalks, curb, gutters and landscaping. Contact Agency: Clarksville PW State ID #: County/Counties: Clark Project Cost: $900,000 Estimated Open to Public Year: Change description from "Intersection improvements at Blackiston Mill Road and Potters Lane including the installation of traffic signal and add left turn lanes on SB approach of Blackiston Mill Road and right turn lane on Potters Lane." to "Intersection improvements at Blackiston Mill road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB Blackiston Mill Rd., and left and right turn lanes at WB Potters ln., including sidewalks, curb, gutters and landscaping."

39 Blackiston Mill Road 1394 Intersection improvements at Blackiston Mill Road and Potters Lane, including the installation of a traffic signal, a left turn lane on SB Blackist Mill Road, and left and right turn lanes at WB Potters Lane, including sidewalks, curb, gutters and landscaping. Contact Agency: Clarksville PW State ID #: County/Counties: Clark Project Cost: $900,000 Estimated Open to Public Year: 2012 Increased cost to $900,000. Changed open to public date to 2012.

40 KY 2053 Mt. Washington Road 1396 Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes (3rd lane is center turn lane): Phase 1 - from KY 61 (Preston Highway) to Penn Run Creek (Open to public date is 2012); Phase 2 - from Penn Run Creek to KY 864 (Cedar Creek Road) (Open to public date is 2020). Project length: Phase mi; Phase mi.; total mi. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $4,000,000 Estimated Open to Public Year: 2020 Changed project description from "Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes from KY 61 (Preston Highway to KY 864 (Cedar Creek Road)" to "Widen KY 2053 (Mt. Washington Road) from 2 to 3 lanes (3rd lane is center turn lane) Phase 1 - from KY 61 (Preston Highway) to Penn Run Creek (Open to public date is 2012); Phase 2 - from Penn Run Cre to KY 864 (Cedar Creek Road) (Open to public date is 2020)." Changed open to public date from 2009 to dates indicated description.

41 Wilson Switch Road 1431 Railroad grade crossing improvements at Ebenezer Church Road and CSX Railroad near Borden. Maintenance and safety improvements at railroad crossing. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $225,000 Estimated Open to Public Year: 2010 Changed open to public date from 2008 to Increased plan project cost from $210,000 to $225,000.

42 Ebenezer Church Road 1433 Railroad grade crossing improvement at Ebenezer Church Road and CSX Railroad near Borden. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $225,000 Estimated Open to Public Year: 2010 Changed open to public date from 2008 to 2010.

43 KY Reconstruct intersection of KY 22 at Goose Creek Road. Project will improve the safety, operation, and congestion of the roadway as sited in the KY 22 Scoping Study in Jefferson and Oldham Count prepared by HNTB Corporation, October, Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $2,710,000 Estimated Open to Public Year: 2012 Changed open to public date from 2009 to 2012.

44 KY 2055 Manslick Road/Mt. Holly Road 1451 Widen existing lanes (no new travel lanes), improve, and realign west KY 2055 (Manslick Road and Mt. Holly Road) at the intersections of Fairdale Road and Mitchell Road. To improve traffic conditions. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $3,000,000 Estimated Open to Public Year: 2010 Changed open to public date from 2008 to 2010.

45 River Ridge Commerce Center IN Intersection improvements to IN 62 and Salem Noble Road, including widening EB and WB approaches of Salem Noble Road, additions and modifications of turn lanes, and installation of traffic signal. Addition of turn lanes on IN 62 and connection to Patrol Road at 3 intersections n of Salem Noble Road ending at Avenue D. Also includes the closing of 3 median openings on IN 62 between River Ridge Circle and Salem Noble Road, and the addition of right turn deceleration lanes on the east side of IN 62 at these intersections. Contact Agency: River Ridge Dev. Auth. State ID #: County/Counties: Clark Project Cost: Estimated Open to Public Year: Move FY 2009 Const to Fy 2010 and Change desctiption from "Reconstruct existing 2 lane road (no additional lanes) in th River Ridge Commerce Center (Phase 2)." to " "Intersection improvements to IN 62 and Salem Noble Road, including widening EB approach of Salem Noble Road, addition and modification of turn lanes, and installation of traffic signal. Also includes the closing of 3 median openings on IN 62 between River Ridge Circle and Salem Noble Road, and the addition right turn deceleration lanes on the east side of IN 62 at these intersections."

46 I Bridge inspection of I-64 over the Ohio River. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $50,000 Estimated Open to Public Year: Deleted from Plan.

47 I- 64/I Reconstruct the I-264 (Shawnee Expressway) northbound ramp to westbound I-64. Replace inferior and deteriorating bridge. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $3,700,000 Estimated Open to Public Year: 2012 Changed open to public date from 2008 to 2012.

48 I Reconstruct I-71/I-264 interchange including the addition of north and southbound auxiliary lanes on I-71 and I-264. Project length is 2.2 miles Reduce congestion and improve safety at I-71/I-264 and I-264/US 42 interchanges. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $26,577,134 Estimated Open to Public Year: 2014 Changed open to public date from 2020 to Changed description to "Reconstruct I-71/I-264 interchange including th addition of north and southbound auxiliary lanes on I-71 and I-264."

49 I Improve the I-265 / KY 146 (LaGrange Road) interchange by: (1) extending 1 NB travel lane on KY 146 from Kroger to Springs Station Road (2) extending 1 SB KY 146 left-turn lane for access to SB I-265. Project length is 0.2 miles. Safety concerns and traffic flow improvements Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $3,620,000 Estimated Open to Public Year: 2011 Changed open to public date from 2009 to 2011.

50 KY Reconstruct KY 22 widening it from 2 to 3 lanes (3rd lane will be a center-turn lane) from KY 329 to KY 329B and from 2 to 5 lanes (5th lane w be a center-turn lane) from KY 329B to Abbott Lane. Project will update the facility to meet existing and future capacity needs and transportation demands, and address safety issues along KY 14 and KY 22 between Pryor Ave. and Abbott Ln. The realignment of KY 22 in the vicinity of Currys fork will address some safety concerns. Contact Agency: KYTC State ID #: County/Counties: Oldham Project Cost: $15,910,076 Estimated Open to Public Year: 2013 Changed open to public date from 2012 to 2013.

51 KY Reconstruct 22 widening it from 2 to 3 lanes (3rd lane will be a center turn lane) from KY 329 to KY 329B; and from 2 to 5 lanes (5th lane will a center turn lane) from KY 329B to Abbott Lane. Total project length is 2.4 mi. Project will update the facility to meet existing and future capacity needs and transportgation demands, and address safety issues along KY 1 and KY 22 between Abbott Lane and (existing) KY 393. Contact Agency: KYTC State ID #: County/Counties: Oldham Project Cost: $15,910,076 Estimated Open to Public Year: 2015 Changed open to public date from 2012 to 2015.

52 KY Widen travel lanes (no additional travel lanes) on KY 1494 in Bullitt County, and relocate road from 2000 feet west of KY 61 to KY 61. Minor widening project to improve traffic flow. Contact Agency: KYTC State ID #: County/Counties: Bullitt Project Cost: $2,000,000 Estimated Open to Public Year: 2010 Changed open to public date from 2008 to 2012.

53 I- 64 Sherman Minton Bridge Inspection of I-64 bridge over the Ohio River Bridge maintenance. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $560,000 Estimated Open to Public Year: 2013 Changed open to public date from 2008 to Increased total project cost from $50,000 to $560,000.

54 I Pavement of I-265 from I-64 to I-65. Roadway maintenance. Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: $6,000,000 Estimated Open to Public Year: Changed open to public date to 2014.

55 Bicycle Priority Corridor 1513 Improvements for bicycling on River Road between Zorn Avenue and Blankenbaker Lane Contact Agency: Lou. Metro PW State ID #: County/Counties: Jefferson Project Cost: $845,520 Estimated Open to Public Year: 2011 Description changed to "Improvements for bicycling on River Road between Zorn Avenue and Blankenbaker Lane." Changed open to public date to 2011.

56 I Landscaping the interchange of I-65 and IN 311. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $420,000 Estimated Open to Public Year: Deleted from Plan.

57 I Paint I-64 bridge over the Ohio River (Main Bridge). Maintenance of bridge over the Ohio River. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $15,000,000 Estimated Open to Public Year: Changed open to public date to 2018.

58 I Paint I-64 WBL Bridge (Indiana WBL approach bridge - upper level). Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: Estimated Open to Public Year: Changed open to public date to 2017.

59 I Paint I-64 east bound bridge (Indiana longer east bound approach bridge - lower level). Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: Estimated Open to Public Year: Changed open to public date to 2017.

60 I Paint I-64 east bound bridge (Indiana shorter east bound approach bridge - lower level). Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: Estimated Open to Public Year: Changed open to public date to 2017.

61 I I-65 bridge maintenance and rehabilitation (Indiana approach bridge) over the Ohio River. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $500,000 Estimated Open to Public Year: Changed open to public date to 2012.

62 IN Pavement rehabilitation on IN 62 from I-65 to E junction of IN 62/IN 265. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: Estimated Open to Public Year: Deleted from Plan.

63 I Pavement resurfacing on I-65 from IN 62 to 0.26 mi south of IN 311. Project length is 2.9 miles. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $1,272,279 Estimated Open to Public Year: 2015 Added to the Plan.

64 IN Roadside maintenance on IN 62 at Fourteen Mile Creek. Contact Agency: INDOT State ID #: County/Counties: Project Cost: $100,000 Estimated Open to Public Year: Deleted from Plan.

65 I- 64 Guardrails 1535 Install guardrails on I-64 at various locations. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $560,000 Estimated Open to Public Year: 2010 Cannot be mapped. Changed open to public date from 2009 to Changed total project cost from $346,500 to $560,000.

66 I-265 Guardrails Lee Hamilton Highway Add guardrails at various location on I-265 (Lee Hamilton Highway) Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: $931,000 Estimated Open to Public Year: 2010 Cannot be mapped. Changed open to public date from 2009 to Increased total project cost from $651,000 to $931,000.

67 I Bridge maintenance and repair of I-64 bridge over the Ohio River. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $2,575,000 Estimated Open to Public Year: Changed open to public date to 2013, total cost $2,575,000.

68 I Bridge maintenance and repair of I-64 approach bridges to the Ohio River Bridge and over IN 111. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $1,350,000 Estimated Open to Public Year: Changed open to public date to 2013, total cost $1,350,000.

69 IN Replace bridge over Persimmon Run, 4.93 miles west of IN 111. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $575,000 Estimated Open to Public Year: Move FY 2009 ROW and FY 2011 Construction to future, Bridge funds.

70 IN Replace bridge over Persimmon Run, 4.93 miles west of IN 111. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $575,000 Estimated Open to Public Year: Changed open to public date to 2016.

71 IN Replace bridge over Persimmon Run, 4.93 miles west of IN 111. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $575,000 Estimated Open to Public Year: 2016 Increased plan project cost from $195,000 to $575,000, changed open to public date from 2011 to 2016.

72 Incident Management (Hoosier Helper Program) 1546 Purchase TMC vehicles for Falls City (Hoosier Helpers). Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: Estimated Open to Public Year: 2011 Cannot be mapped. Project deleted from Plan and TIP

73 Market Street/Spring Street 1556 Upgrade and designate Market Street and Spring Street as two-way streets from IN 111 to State Street; also includes the two-way conversion Elm Street, Pearl Street, and Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvemen well as traffic calming devices and sidewalks. This project would upgrade portions of Market Street and Spring Street between State Street and Vincennes Street to modify the street as tw way. The change would enhance traffic flow and alleviate traffic congestion associated with New Albany's current one way street system in th Downtown district. Contact Agency: New Albany PC State ID #: County/Counties: Project Cost: Floyd Estimated Open to Public Year: 2012 Revised project description to "Upgrade and designate Spring Street as two-way streets from IN 111 to State Street; also includes the two-way conversion of Elm Street, Pearl Street, and Bank Street, as well as the installation of landscaped medians, bicycle lanes, and railroad crossing improvement as well as traffic calming devices and sidewalks."

74 IN Reconstruct and widen the bridge deck on IN 60, 1.97 miles west of IN 311. Lane will be added to the bridge deck to connect with the added lanes at intersections on each end of the bridge, Saint Joe Road East and Saintt Joe Road West. Saintt Joe Road East and Saint Joe Road West intersections are located approx. 1,580 ft apart. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $256,000 Estimated Open to Public Year: 2011 Deleted from Plan.

75 IN Small structure maintenance (pipe lining) at various locations on IN 60 Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $507,865 Estimated Open to Public Year: 2012 Cannot be mapped. Added to Plan.

76 West Street 1597 Railroad protection improvement at CSX railroad at West Street in Borden, Indiana. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $265,000 Estimated Open to Public Year: 2010 Decreased plan project cost from $1,875,000 to $265,000.

77 Georgetown-Lanesville Road 1601 Pavement Resurfacing on Georgetown-Lanesville Road for approximately 2.0 miles. Maintenance Contact Agency: Floyd Co. State ID #: County/Counties: Floyd Project Cost: $257,000 Estimated Open to Public Year: Deleted from Plan.

78 Jeffersontown ADA Ramp/Sidewalk Replacements 1605 Replace or upgrade approximately 1443 handicap ramps and 1570 linear feet of sidewalks within the City of Jeffersontown, Kentucky The City of Jeffersontown needs to reconstruct and replace various sidewalks throughout the City as well as reconstruct older ADA-accessibl ramps in order to meet current ADA standards. Contact Agency: Jeffersontown State ID #: County/Counties: Jefferson Project Cost: $742,500 Estimated Open to Public Year: 2010 Cannot be mapped. Changed open to public date from 2009 to 2010.

79 8th Street Rehabilitation 1619 Mill, grind, and rehabilitate pavement on 8th Street from Main Street to Perrin Lane. Contact Agency: Jeffersonville PW State ID #: County/Counties: Bullitt, Clark Project Cost: Estimated Open to Public Year: Deleted from Plan.

80 Bullitt County Signage 1624 Add or replace signs on functionally classified roads in Bullitt County. Contact Agency: Bullitt Co. State ID #: County/Counties: Bullitt Project Cost: Estimated Open to Public Year: 2011 Cannot be mapped Deleted from Plan.

81 A.B. Sawyer Shared Use Path 1662 Construct a 2,800' long, 10' wide multiuse path through A.B. Sawyer Park and connecting to surrounding neighborhoods includes an underpa bridge, and site amenities. Contact Agency: Lou. Metro Parks State ID #: 0 County/Counties: Jefferson Project Cost: $616,000 Estimated Open to Public Year: Added to Plan.

82 TARC Jeffersonville Riverfront Transit 1664 New express bus service from downtown Louisville to Jeffersonville for employees who work along Jeffersonville's riverfront. Project provides transit service to people who work along Jeffersonville's riverfront. Contact Agency: TARC State ID #: 0 County/Counties: Clark Project Cost: $395,314 Estimated Open to Public Year: 2009 Cannot be mapped Added to Plan.

83 Brown Station Way 1666 Pavement resurfacing of Brown Station Way from Randolph Avenue to Lewis & Clark Parkway. Maintenance of roadway to preserve infrastructure. Contact Agency: Clarksville PW State ID #: County/Counties: Clark Project Cost: $1,000,000 Estimated Open to Public Year: Added to Plan, $1,000,000.

84 Ohio River Scenic Byways National Scenic Byway Grant for Implementation of the Corridor Management Plan of the Ohio River Scenic Byway in Indiana Preservation of Ohio River Scenic Byway. Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: $31,840 Estimated Open to Public Year: 2010 Cannot be mapped Added to Plan, $31,840.

85 Ohio River Scenic Byways 1758 Ohio River Scenic Byways interpretive panels Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: $179,000 Estimated Open to Public Year: 2010 Cannot be mapped Added to Plan, $179,000.

86 I Perform in-depth inspection of I-64 bridge (Sherman Minton) over Ohio River at Louisville Bridge maintenance Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $160,000 Estimated Open to Public Year: Added to Plan, $160,000.

87 I Spot improvements and pavement rehabilitation on I-71 Roadway maintenance Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $6,000,000 Estimated Open to Public Year: 2010 Cannot be mapped Added to Plan.

88 I Design and construct a sound barrier between Bardstown Road and Newburg Road Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $1,000,000 Estimated Open to Public Year: Added to Plan.

89 I-264 Shawnee Expressway Landscaping I-264 (Shawnee Expressway) at Dixie Highway 1762 Landscaping Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $1,020,000 Estimated Open to Public Year: Added to Plan, $1,020,000.

90 I Install new guardrail on I-65 at various locations on I-65 Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $4,658,000 Estimated Open to Public Year: 2012 Cannot be mapped. Added to Plan.

91 IN Install signs, signals, and markings on IN 111 from Beechwood Avenue to Mt. Tabor Road. Project length is 1.7 miles. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $500,000 Estimated Open to Public Year: 2012 Added to Plan.

92 I Install lighting at the I-64/US 150 Interchange Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $500,000 Estimated Open to Public Year: 2011 Added to Plan.

93 I Replace pipe lining at various locations on I-64 Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $1,077,750 Estimated Open to Public Year: 2012 Cannot be mapped. Added to Plan.

94 I Install signs, lighting, and markings on I-64 from I-265 to IN 111. Project length is 1.8 mi. Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $350,000 Estimated Open to Public Year: 2012 Added to Plan.

95 I Purchase Hoosier Helper Vehicles for the Jeffersonville/New Albany Area Contact Agency: INDOT State ID #: County/Counties: Clark, Floyd Project Cost: $115,000 Estimated Open to Public Year: 2011 Cannot be mapped. Added to Plan.

96 IN Replace traffic signal at IN 62 and Salem Noble Road Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $250,000 Estimated Open to Public Year: 2011 Added to Plan.

97 IN Replace pipe lining at various locations on IN 160. Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $527,480 Estimated Open to Public Year: 2011 Cannot be mapped. Added to Plan.

98 Spring Street 1775 Railroad crossing improvement on Spring Street at CSX Railroad crossing Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $100,000 Estimated Open to Public Year: 2012 Added to Plan.

99 New Albany Ohio River Greenway 1779 Construct a pedestrian/bicycle path along Water Street and the floodwall from East 8th Street to the Silver Creek Bridge. Project length is 1.7 miles. Project will provide for alternate form of transportation and provide a safe way for bicyclists and pedestrians to travel to and from Clarksville a Jeffersonville. Contact Agency: New Albany PC State ID #: County/Counties: Floyd Project Cost: $1,062,500 Estimated Open to Public Year: Added to Plan, $1,062,500.

100 Second Street Streetscape Project 1783 Improvements to traffic intersections, sidewalks, accessibility/mobility, landscaping, lighting, architectural enhancements, utilities and the creating of a public gathering space along Second Street between Main Street and River Road as well as a portion of Washington Street in th block east of Second Street in downtown Louisville. Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $2,400,000 Estimated Open to Public Year: 2010 Added to Plan.

101 Bicycle Facility Improvements - Striping, Signage & Signalization Provide signage for the expanding bicycle facility network and enhance the safety of existing roadways by installing shared-lane markings and other bike/ped signage and markings. The project will also retrofit existing roadways without changing the curb to curb width. Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $187,500 Estimated Open to Public Year: 2010 Cannot be mapped. Added to Plan.

102 Bicycle Sharing System 1787 Pilot system for the installation of four bike kiosks to be located at: (1) SW corner of W. Jefferson St and S. 8th St. (2) SE corner of W. Liberty St. and S. 6th. St. (3) NW corner of W. Muhammad Ali Blvd and S. 5th St. and (4) SE corner of E. Gray St. and S. Preston St. Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $225,000 Estimated Open to Public Year: 2012 Added to Plan.

103 I-264 Fairgrounds & Airport Exits Landscaping Project 1788 Install landscaping at the following areas along I-264 near the KY State Fairground and the Louisville International Airport: (1) Area bounded by the ramp from Freedom Way (CS-1508G) to I-264 West (2) Area bounded by the ramp from I-264 East to Freedom Way (CS-1508G) (3) Area bounded by Lower Terminal Drive (CS-1212G), Standiford Field NC (CS ), and I-264 West (4) Area bounded by I-264West,therampfromI-65 South to Terminal Drive (CS-1073G)/Louisville International Airport Entrance Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $870,793 Estimated Open to Public Year: 2011 Added to Plan.

104 ITS Activities on Various NHS Routes 1789 Provide message signs (DMS)/ cameras on I-265 on either side of I-64 and I-65 interchanges, and I-71 NB in Oldham County, as part of the TRIMARC system. This will be part of a larger ITS project in Highway District's 4, 5, and 6. Contact Agency: KYTC State ID #: 0 County/Counties: Jefferson, Oldham Project Cost: $850,000 Estimated Open to Public Year: 2011 Cannot be mapped. Added to Plan.

105 KY Minor widening of KY 245 (no additional travel lanes) from Bernheim Forest to the Community College. Project length is 1.2 mi. Contact Agency: KYTC State ID #: County/Counties: Bullitt Project Cost: $4,310,000 Estimated Open to Public Year: 2015 Added to Plan.

106 LaGrange Road Pedestrian Facilities Project 1791 (1) Construction of sidewalks along Lagrange Road from Lyndon Lane to Bowen Elementary School. (2) Narrow the travel lanes from 12 ft. to 11 ft. and remove the rumbles from the shoulders to provide two 4-foot on-street bicycle lanes along New Lagrange Road (KY-146) from Lyndon Lane to Whipps Mill Road. Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $1,695,500 Estimated Open to Public Year: 2012 Added to Plan.

107 Louisville Metro Hybrid Fleet Vehicles Purchase of 25 Ford Escape Hybrids Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $204,611 Estimated Open to Public Year: 2011 Cannot be mapped. Added to Plan.

108 Northeast Louisville Loop Multi-Use Path 1794 Construct a shared-use path along US 60 (Shelbyville Road) from Old Shelbyville Road to North English Station Road and from English Statio Way to North Beckley Station Road. Contact Agency: Lou. Metro Parks State ID #: 0 County/Counties: Jefferson Project Cost: $937,500 Estimated Open to Public Year: 2012 Added to Plan.

109 Portland Elementary Safe Routes to School 1795 Pedestrian and bicycle improvements around the Portland Elementary School campus including the following locations: (1) Northwestern Pkw the intersection of 33rd, 34th, and 35th Streets. (2) 35th Street between Northwestern Pkwy and Pflanz Ave. (3) Intersection of Northwestern Pkwy and Portland Ave Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $56,811 Estimated Open to Public Year: 2012 Added to Plan.

110 Rangeland Elementary Safe Routes to School 1796 Pedestrian and bicycle improvements in and around the Rangeland Elementary School campus including the following locations: (1) intersect at Ridgecrest Road and Rangeland Road. (2) from the school grounds through Rosalind Court to Runic Way. (3) various areas along Runic Way. (4) from the school grounds to Ridgecrest Road Contact Agency: JCPS State ID #: 0 County/Counties: Jefferson Project Cost: $39,473 Estimated Open to Public Year: 2012 Added to Plan.

111 Middletown Streetscape Project Phase IV 1797 Streetscape improvements to Main Street from Watterson Trail to Blankenbaker Parkway in Middletown (final phase of the project). Various improvements include: ADA accessibility, improved parking, improved sidewalks, street lights, drainage, curbs and gutters, and landscaping Contact Agency: Middletown State ID #: 0 County/Counties: Jefferson Project Cost: $262,875 Estimated Open to Public Year: 2012 Added to Plan.

112 Third Street and Eastern Parkway Bikeway and Safety Improvement Project 1798 (1) Construction of new University of Louisville entrance and more direct access to classroom buildings at the intersection of Third Street and Eastern Parkway. (2) Construction of bicycle/pedestrian safety improvements along Third Street from Eastern Parkway to Grawemeyer Hall a along Eastern Parkway from Third Street to Ernst Hall. (3) Reconstruction of the bus pull-off area at the intersection of Third Street and Easte Parkway. Contact Agency: Univ. of Louisville State ID #: 0 County/Counties: Jefferson Project Cost: $2,500,000 Estimated Open to Public Year: 2012 Added to Plan.

113 University Corridor Fourth Street Intersection Improvements 1799 Reconstruct intersections on Fourth Street at Industry Rd. and Central Ave. (no additional travel lanes); includes restriping Fourth St. from no of Norfolk-Southern viaduct to Central Ave. Contact Agency: Univ. of Louisville State ID #: 0 County/Counties: Jefferson Project Cost: $1,600,000 Estimated Open to Public Year: 2012 Added to Plan, $1,600,000.

114 University of Louisville - Campus Bikeway & Safety Improvement 1800 Completion of the U of L Master Plan for campus biking/walking improvements along: (1) Lee Street from the CSX railroad line to Third Street Third Street from Lee Street to Cardinal Blvd. (3) Cardinal Blvd. from CSX railroad line to Floyd Street (4) Floyd Street from Cardinal Blvd. to Cardinal Stadium (5) Eastern Pkwy from Floyd Street to Second Street Contact Agency: Univ. of Louisville State ID #: 0 County/Counties: Jefferson Project Cost: $2,110,500 Estimated Open to Public Year: 2012 Added to Plan.

115 Crittenden Drive 1801 Relocate Crittenden Drive at the Louisville Regional Airport Authority to allow for construction of a taxiway to accommodate Group 6 Aircraft. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $2,000,000 Estimated Open to Public Year: 2012 Added to Plan, $2,000,000. Open to public date is 2012.

116 Greenwood Road/Terry Road 1802 Construct a right turn lane on Terry Road at Greenwood Road. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $300,000 Estimated Open to Public Year: 2012 Added to Plan, $300,000.

117 I Construction of I-64 WB auxiliary lane from Hurstbourne Pkwy. To I-264, restripe gore area on I-264 WB at I-64 and extend left turn storage lanes on KY 1932 (Breckenridge Ln.). Initial phase of ultimate project Project length is 1.7 mi. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $5,600,000 Estimated Open to Public Year: 2012 Added to Plan, $5,600,000.

118 I- 64 / KY 1747 Interchange 1804 Reconstruct existing interchange including construct a triple left turn movement from WB Linn Station Rd. to SB Hurstbourne Pkwy.; additiona SB lane for Hurstbourne Pkwy from Linn Station Rd. to Ramp 1 (I-64 EB off ramp); provide right turn lane for NB Hurstbourne to EB Linn Stat Rd.; provide dual left turn lanes from Ramp 5 (I-64 WB off ramp) to SB Hurstbourne. Widen Ramp 5 to 3 lanes approaching the terminal; Wid Ramp 6 (I-64 WB on ramp) for dual right turn lanes from SB Hurstbourne Pkwy.; provide dual left turn lanes from SB Hurstbourne Pkwy to Ramp 4 (I-64 EB on ramp). Widen Ramp 4 for dual lanes turning to ramp; Align Ramp 2 (I-64 EB off ramp for local traffic) to the new lane to S Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $32,620,000 Estimated Open to Public Year: 2013 Added to Plan. Open to public date is 2013.

119 I Various roadside maintenance (mowing) on I-64 Contact Agency: INDOT State ID #: County/Counties: Floyd Project Cost: $250,000 Estimated Open to Public Year: 2012 Cannot be mapped Added to Plan, $250,000.

120 I Various roadside maintenance (mowing) for miles on I-65 Contact Agency: INDOT State ID #: County/Counties: Clark Project Cost: $90,000 Estimated Open to Public Year: 2011 Cannot be mapped Added to Plan, $90,000.

121 Buckner Connector 1808 Construct new connection from Old LaGrange Road to KY 393 Project length is 0.8 miles. Contact Agency: Oldham Co. State ID #: 0 County/Counties: Oldham Project Cost: $1,300,000 Estimated Open to Public Year: 2012 Added to Plan.

122 One-Way Street Conversion to Two-Way Phase Conversion of one-way streets in downtown Louisville to two-way traffic (Main, Jefferson, Liberty, Muhammad Ali, Chestnut, 3rd Streets). Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $2,606,500 Estimated Open to Public Year: 2010 Added to Plan, $2,606,500. Open to public date is 2010.

123 One-Way Street Conversion to Two-Way Phase Conversion of one-way streets in downtown Louisville to two-way traffic (8th, 7th, Shelby, Campbell Streets). Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $935,000 Estimated Open to Public Year: 2011 Added to Plan, $935,000. Open to public date is 2011.

124 Metro-wide Traffic Signal Synchronization - Phase Upgrade and expand the Metro-wide traffic signal program to reduce vehicle emissions, reduce overall vehicle delays and travel times, reduc fuel consumption, reduce vehicle operating costs and increase traffic safety. The proposed project would provide upgrades and communications to approximately 106 traffic signals along critical suburban corridors. Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $1,000,000 Estimated Open to Public Year: 2012 Cannot be mapped. Added to Plan.

125 KY Widen from 2 to 3 lanes (3rd lane is center turn lane) from Cedar Grove Elementary to Valley View Drive. Project length is 0.6 mi. Contact Agency: KYTC State ID #: County/Counties: Bullitt Project Cost: $2,500,000 Estimated Open to Public Year: 2010 Breakout this section from Plan Parent Project #1490. Added this section to Plan. Open to public date changed from 2009 to 2010.

126 KY 1020 National Turnpike 1817 Widen KY 1020 (National Turnpike) from 2 to 3 lanes (3rd lanes will be a center turn lane) from Fairdale Road (MP 0.615) to South Park Road (MP 2.669). Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $1,350,000 Estimated Open to Public Year: 2018 Added to Plan, $1,350,000.

127 KY Construct a new access road beginning where Moorman Road crosses KY 1230 (Lower River Road) and traveling NW into Farnsley-Moorma Landing. Contact Agency: KYTC State ID #: 0 County/Counties: Jefferson Project Cost: $680,000 Estimated Open to Public Year: 2012 Added to Plan, $680,000.

128 KY 1931 St. Andrews Church Road Construct a left turn lane at KY 1931 (St. Andrews Church Road) and St. Anthony Road Project will provide intersection congestion relief and safety improvements. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $150,000 Estimated Open to Public Year: 2011 Added to Plan, $150,000.

129 KY 1934 Cane Run Road Construct a new access road at the entrance to Farnsley-Kaufman House from KY 1934 (Cane Run Road) Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $80,000 Estimated Open to Public Year: 2011 Added to Plan, $80,000.

130 KY 2053/KY 864 McNeely Lake Park Road 1823 Design and construct (phase 1) of a new North/South Park Road west of McNeely Lake from Cooper Chapel Rd. to Mt. Washington Rd. Proj length is 2.0 mi. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $6,200,000 Estimated Open to Public Year: 2012 Added to Plan, $6,200,000. Open to public date is 2012.

131 KY 2055 Mt. Holly Road 1824 Widen KY 2055 (Mt. Holly Rd.) from 2 to 3 lanes from KY 1020 (National Turnpike) to Fairdale Road. Project length is 1.4 mi. Contact Agency: KYTC State ID #: County/Counties: Jefferson Project Cost: $2,000,000 Estimated Open to Public Year: 2016 Added to Plan. Open to public date is 2016.

132 TARC High Capacity Corridors 1825 Add TARC service along two high capacity corridors: Broadway - Bardstown Road - Taylorsville Road Corridor and the Preston Highway-Dix Highway Corridor. Contact Agency: TARC State ID #: 0 County/Counties: Jefferson Project Cost: $1,274,000 Estimated Open to Public Year: 2011 Added to Plan.

133 The Park and Ride at Apple Patch 1826 Construction of a park and ride facility including a parking lot, shelter, playground, bike lockers, walkways, and a 1000' access road located o Apple Patch Way off of KY-329 near I-71 Exit 14 in Crestwood. Contact Agency: Oldham Co. State ID #: 0 County/Counties: Oldham Project Cost: $1,241,939 Estimated Open to Public Year: 2011 Added to Plan.

134 US 42 Brownsboro Road 1827 Modification of US 42 (Brownsboro Rd.) between Ewing Ave. and Lindsay Ave., includes reduce the existing 4 lane road to 3 lanes and provid sidewalk on the north side of road between Lindsay and Dresher Bridge Ave. Project length is 0.4 mi. Contact Agency: Lou. Metro PW State ID #: 0 County/Counties: Jefferson Project Cost: $357,610 Estimated Open to Public Year: 2010 Added to Plan, $357,610. Open to public date is 2010.

A: PLANNED P ROJECTS PROJECTS

A: PLANNED P ROJECTS PROJECTS Appendix A: PLANNED PROJECTS Programming Study Sound Barrier along south side of for approx. 2100 feet. Construction Complete $850,000 5 8613.00 Y Y Y Sound Barrier along south side of for 500' west of

More information

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek,

Replace Bridge 51 on Blackiston Mill Dr. over Silver Creek, INDIANA PROJECTS 1558 Bridge 51 1601823 1601971 I 64 Blackiston Mill Road Phase II Charlestown Rd. Clark State Forest Road Maintenance E. Main Street Improvements to Blackiston Mill Road from just north

More information

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County.

Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. I-64 KIPDA ID # 350 Project Type: ROADWAY CAPACITY Description: Widen I-64 to 6 lanes from I-265 to the KY 53 interchange in Shelby County. Purpose: Project will improve capacity and address safety concerns.

More information

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY

Multi Modal Transit Access Plan KIPDA ID # 239. Project Type: STUDY Multi Modal Transit Access Plan KIPDA ID # 239 Project Type: STUDY Description: In conjunction with the results from Project Gobility and the Transit LOS Analysis, TARC seeks to examine the possibilities

More information

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles.

Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles. I-71 KIPDA ID # 130 Project Type: ROADWAY CAPACITY Description: Improve I-71 corridor from I-64 to I-265. Approximately 9.1 miles. Purpose: Improve capacity and level of service along I-71 in the project

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects ROUTE/ Project ID No. TIP No. Electrical Load Center Replacement - North 04324 04324 This project will provide for the betterment of the existing highway lighting facilities located along Routes 3, 17

More information

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY

City of Gainesville Transportation/Roadway Needs PROJECT SUMMARY A1 Roadway Resurfacing $23,846,000 TYPE: Preservation of existing system Roadway resurfacing A2 Signal Replacement $6,000,000 TYPE: Preservation of existing system Replace traffic signals. B1 W 6th St

More information

Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA. Fiscal Year 2016 (October 1, September 30, 2016)

Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA. Fiscal Year 2016 (October 1, September 30, 2016) Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA Fiscal Year 2016 (October 1, 2015 - September 30, 2016) December 2016 Fiscal Year 2016 List of Obligated Federally Funded

More information

FY 2006 TRANSPORTATION CAPITAL PROGRAM

FY 2006 TRANSPORTATION CAPITAL PROGRAM Eden Lane Bridge over Whippany River NS9908 The existing structure was built in 1972 as a temporary single-span structure. The bridge consists of simply supported steel acrow panel trusses and is supported

More information

Bluffdale/ UDOT South High-T Intersection Project Type Operations

Bluffdale/ UDOT South High-T Intersection Project Type Operations Bluffdale/ UDOT 14600 South High-T Intersection Project Type Operations 14600 South and Redwood Road $ 600,000 $ 550,000 This project is to install a new High-T intersection at Redwood Road and 14600 South

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects Barclay Street Viaduct NS9807 NS9807 This project will provide for the rehabilitation of the Barclay Street Viaduct, from Route 19 to Marshall Street, in order to increase the weight load of the structure.

More information

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY

ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY ARTINSVILLE ENRY OUNTY REA RANSPORTATION TUDY DEVELOPED BY THE TRANSPORTATION AND MOBILITY PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION,

More information

Project Description Form 8EE

Project Description Form 8EE Project Description Form 8EE Basic Project Information Submitting Jurisdiction/Agency: Town of Dumfries Project Title: Route 1 (Fraley Blvd) Widening: Brady's Hill Road to Dumfries Road Project Location:

More information

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station

Appendix C. NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Appendix C NORTH METRO STATION AREA TRAFFIC IMPACT STATEMENT 88th Avenue Station Prepared for: Regional Transportation Department and URS Corporation as part of the North Metro EIS David Evans and Associates,

More information

Freeway System Considerations

Freeway System Considerations Session 11 Jack Broz, PE, HR Green May 5-7, 2010 Freeway System Considerations Mainline Transit: Shoulder Operations, BRT, Stations HOV, HOT, UPA Interchanges Exit Ramps Entrance Ramps Bridges Local Crossings

More information

Duwamish Way-finding and CTR Report

Duwamish Way-finding and CTR Report V. North Tukwila When the North Tukwila Manufacturing and Industrial Center was designated in 1992 as part of the region s land use and transportation plan, the plan called for the area to set a light-rail

More information

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage

2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2011 Capital Projects University Area - Community Council Priority List Municipality of Anchorage 2 Project Management and Engineering Projects on 40th Ave Extension - Lake Otis Pkwy to Dale St $18,103,000

More information

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Avenue P Bridge 03315 This project will address potential construction in the vicinity of the Avenue P Bridge. SPONSOR: City of Newark Bridge Preservation - Local Bridges NJTPA 288 DES STATE $400,000 CARGOMATE

More information

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC

4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4. ENVIRONMENTAL IMPACT ANALYSIS 9. TRANSPORTATION AND TRAFFIC 4.9.1 INTRODUCTION The following section addresses the Proposed Project s impact on transportation and traffic based on the Traffic Study

More information

TRASBURG RANSPORTATION

TRASBURG RANSPORTATION TRASBURG RANSPORTATION LAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION

More information

Oldham County Major Thoroughfare Plan

Oldham County Major Thoroughfare Plan Prepared for: Oldham County Planning & Zoning Commission Prepared by: December 2003 Table of Contents I. INTRODUCTION...1 A. Contents of Report...1 B. Purpose of Study...2 C. Related Project Documents...2

More information

Chapter 5 Future Transportation

Chapter 5 Future Transportation Chapter 5 Future Transportation The Future Land Use Plan identifies the desired land use designations. The land uses desired for Crozet depend, in large part, on the success of the transportation system,

More information

Access Routes from US 101 to the Richmond San Rafael Bridge

Access Routes from US 101 to the Richmond San Rafael Bridge Access Routes from US 101 to the Richmond San Rafael Bridge TAM Board Meeting January 28, 2016 RSRB Project Elements Eastbound Third Lane: Sir Francis Drake Blvd. to Marine Street 10 ft Barrier Separated

More information

APPENDIX D COST SUMMARY TABLES

APPENDIX D COST SUMMARY TABLES APPENDIX D COST SUMMARY TABLES Section 1 Between Route 50 and Evergreen Mills Road 3850 linear feet of one 12 foot wide additional lane in southbound direction of Rte 606; from north side of Rte 50 to

More information

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them?

Overview. Illinois Bike Summit IDOT Complete Streets Policy Presentation. What is a Complete Street? And why build them? And why build them? Overview Illinois Bike Summit IDOT Complete Streets Policy Presentation Aren Kriks, P.E. District One Bicycle Coordinator and Bureau of Programming Project Engineer History of Complete Streets IDOT Policy

More information

FY 2013 Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA

FY 2013 Annual Listing of Obligated Projects In the Louisville/Jefferson County, KY-IN MPA FY 2013 Annual Listing of Obligated Projects In the Louisville/ County, KY-IN MPA December 2013 FY 2013 List of Obligated Federally Funded Projects Moving Ahead for Progress in the 21 st Century (MAP 21)

More information

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN

Bikeway action plan. Bicycle Friendly Community Workshop March 5, 2007 Rochester, MN Bikeway action plan Summary The was held on March 5, 2007 at the Rochester Mayo Civic Center. The workshop was hosted by Rochester-Olmsted County Planning Department in collaboration with the League of

More information

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects Camden County Bus Purchase Project ID Numbers: D0601 / 068082 In the DVRPC region, a combination of fixed route, subscription, and demand responsive transit services are provided in Camden County by Senior

More information

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES

APPENDIX D: SACRAMENTO URBAN AREA TRANSPORTATION PRIORITIES 1 County County County County 2 Yolo Arterial Roadway Collector Roadway Urban Residential Street Rural Residential Roadway I-80 / U.S. 50 Bus/Carpool Lanes in both directions Richards Blvd PM Yol 80 0.237

More information

3.0 PROJECT DESCRIPTION

3.0 PROJECT DESCRIPTION The following section of the Draft EIR contains a description of the proposed Elk Grove Boulevard/SR 99 Interchange Modification project, consistent with the requirements of CEQA Guidelines Section 15124.

More information

FDOT Treasure Coast Traffic Report

FDOT Treasure Coast Traffic Report July 6, 2018 Barbara Kelleher, 954 777 4090 Barbara.Kelleher@dot.state.fl.us FDOT Treasure Coast Traffic Report July 6 through July 13, 2018 TREASURE COAST Construction and maintenance related lane closures

More information

Project Fact Sheet. August 1,

Project Fact Sheet. August 1, Fact Sheet City of Gainesville Transportation Master Plan In December 2012, the Mayor and City Council selected a consultant team of Pond & Company and Arcadis to prepare the City of Gainesville Transportation

More information

INDEX. Geometric Design Guide for Canadian Roads INDEX

INDEX. Geometric Design Guide for Canadian Roads INDEX Acceleration lane, see Lanes, Acceleration Access, 8.1 Access Management and Functional Classification 8.2 Access Management by Design Classification 8.3 Access Configuration 8.4 Building Set-Back Guidelines

More information

Figure 1: East West Connector Alignment Alternatives Concept Drawing

Figure 1: East West Connector Alignment Alternatives Concept Drawing Page 2 of 9 Figure 1: East West Connector Alignment Alternatives Concept Drawing The Montebello Drive extension will run north south and connect Wilsonville Road to the Boones Ferry Road to Brown Road

More information

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study

CITY OF WEST LAKE HILLS. Forest View Neighborhood Traffic Calming Study CITY OF WEST LAKE HILLS 901 South Mopac Expressway Building V, Suite 220 Austin, Texas 78746 Texas P.E. Firm Registration No. F-929 Klotz Associates Final Report Submittal: March 20, 2015 Revised Final

More information

Transportation Corridor Studies: Summary of Recommendations

Transportation Corridor Studies: Summary of Recommendations Transportation Corridor Studies: Summary of Recommendations Route 4 Corridor Study: Route 10 Corridor Study: Route 44 Corridor Study: Route 175 Corridor Study: Route 5/15 Corridor Study: Rentschler Field

More information

2040 Long Range Plan Projects Draft October 2011

2040 Long Range Plan Projects Draft October 2011 Inflated to 2007 Expenditure Year IR70 (SR72) Interchange Modification Study; IR70 (US68) Interchange Interchange Modification Study for modifications to interchanges Modification R1 None Study at SR72

More information

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension

Legislative Update. Frederick County Fall Staunton District. Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Interstate 81 - Exit 300 at Interstate 66 Southbound Acceleration Lane Extension Application ID 1643 Northern Shenandoah Valley Regional Commission (NSVRC) $3,437,423 This project extends the Interstate

More information

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements

Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Americans with Disabilities Act Transition Plan for Public Right-of-Way Improvements Prepared by: Public Works Department Engineering Division October 2015 Table of Contents Section I Introduction.. 3

More information

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report

July 5, Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report July 5, 2017 Arthur R. Ware, Jr. Elementary School 2017 Safe Routes to School Walkabout Report 1 Walkabout Report Introduction On April 28, 2017, City, School, and SAWMPO staff met to conduct a Safe Routes

More information

Welcome to the Sellwood Bridge Project Open House!

Welcome to the Sellwood Bridge Project Open House! Welcome to the Sellwood Bridge Project Open House! 5:30 7:30 pm Please sign in here Information stations and project staff are located throughout the room. Goals for Tonight s Meeting: Learn how the Preferred

More information

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010

City of Hyattsville. Citywide Traffic Study and Transportation Plan. Sabra, Wang & Associates. February, 2010 City of Hyattsville Citywide Traffic Study and Transportation Plan February, 2010 Outline Existing Conditions Recommendations Future Conditions Traffic Growth Development Capacity and Level of Service

More information

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION

Houma-Thibodaux Metropolitan Planning Organization STP<200K Funding Application APPLICATION APPLICATION HOUMA-THIBODAUX METROPOLITAN PLANNING ORGANIZATION (HTMPO) FOR SURFACE TRANSPORTATION PROGRAM (STP

More information

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY

SECTION 7 INVENTORY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY SECTION 7 INVEY OF SELECTED INTERSECTIONS AND RECOMMENDATIONS FOR FURTHER STUDY The study corridor includes a total of 19 signalized intersections. Through consultation with Campbell County and the KYTC,

More information

Legislative Update Williamsburg Residency

Legislative Update Williamsburg Residency Hampton Roads District Legislative Update Williamsburg Residency Jim Brewer, Resident Administrator 757-253-5140 Projects Under Way Warwick Boulevard Project http://www.warwickboulevard.org/ Contractors:

More information

TRANSPORTATION TRAINING TOPICS. April 6, 2010

TRANSPORTATION TRAINING TOPICS. April 6, 2010 TRANSPORTATION TRAINING TOPICS April 6, 2010 Roles of Transportation Providers Context and Policy Makers Division of Transportation and Traffic Other City Operations Other Transportation Operators CMA

More information

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways

WYDOT DESIGN GUIDES. Guide for. Non-NHS State Highways WYDOT DESIGN GUIDES Guide for Non-NHS State Highways 2014 GUIDE FOR Non-NATIONAL HIGHWAY SYSTEM (Non-NHS) STATE HIGHWAYS PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION This Guide is directed to

More information

Harrah s Station Square Casino

Harrah s Station Square Casino Transportation Analysis Harrah s Station Square Casino Pittsburgh, Pennsylvania Submitted To: City of Pittsburgh and Pennsylvania Gaming Control Board Prepared By: DKS Associates GAI Consultants December

More information

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017

FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 April 7, 2017 Chuck McGinness, 954 777 4302 chuck.mcginness@dot.state.fl.us FDOT Treasure Coast Traffic Impact Report April 7 through April 14, 2017 TREASURE COAST Construction and maintenance related

More information

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study

Welcome. Thank you for your interest in the Lewis & Clark Viaduct Concept Study Welcome Thank you for your interest in the Lewis & Clark Viaduct Concept Study Please use the arrows in the upper left hand corner to navigate through the presentation. Use the envelope icon to ask a question

More information

5. RUNNINGWAY GUIDELINES

5. RUNNINGWAY GUIDELINES 5. RUNNINGWAY GUIDELINES These guidelines should be considered collectively when making runningway decisions. A runningway is the linear component of the transit system that forms the right-of-way reserved

More information

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STIP. Austin District. November Quarterly Revisions HIGHWAY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2011-2014 STIP STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM HIGHWAY Austin District November Quarterly Revisions November 2011 FY 2011-2014 Transportation Improvement Program Amendments October 10,

More information

STREET AND HIGHWAY PLAN

STREET AND HIGHWAY PLAN STREET AND HIGHWAY PLAN Introduction The street and highway system in the Winston-Salem Urban Area consists of thousands of miles of traffic carrying facilities, ranging from short local residential streets

More information

2012 PRIORITY TRANSPORTATION PROJECTS

2012 PRIORITY TRANSPORTATION PROJECTS 0 PRIORITY TRANSPORTATION PROJECTS The 0 Priority Transportation Projects include candidate road, congestion management, multi-use trail, transit, transportation regional incentive program (TRIP), county

More information

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2.

Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary January 19 LPT ATTACHMENT 2. Southwest Bus Rapid Transit (SW BRT) Functional Planning Study - Executive Summary 2011 January 19 1 of 19 Introduction This executive summary presents the results of the Southwest Bus Rapid Transit (SW

More information

Bay to Bay Boulevard Complete Streets Project

Bay to Bay Boulevard Complete Streets Project Bay to Bay Boulevard Complete Streets Project Dale Mabry Highway to Bayshore Boulevard February 08, 2018 Photo Source: Tampa Bay Times Alessandra Da Pra Meeting Format Introduction Resurfacing Information

More information

Non-Motorized Transportation 7-1

Non-Motorized Transportation 7-1 Non-Motorized Transportation 7-1 Transportation facilities no longer mean just accommodating a vehicle powered by a combustion engine. Pedestrian and non-motorized facilities are important modes of travel

More information

Station 1: Street & Sidewalk Upgrades

Station 1: Street & Sidewalk Upgrades Station 1: Street & Sidewalk Upgrades Existing no left turn; Potential left turn arrow, see Circulation Study boards for more information Thru-lane guidance Improved lead-in green bike lane 17TH ST CASTRO

More information

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017

DES MOINES AREA MPO. Presentation to Iowa Commercial Real Estate Association. April 6, 2017 DES MOINES AREA MPO Presentation to Iowa Commercial Real Estate Association April 6, 2017 Presentation Outline MPO Overview Trends We re Watching Plans, Projects, Initiatives, Regional Transportation Priorities

More information

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS

TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS ITEM #9: TRANSPORTATION ALTERNATIVES PROGRAM: SELECTED PROJECTS AND FUNDING ALLOCATIONS The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by

More information

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative

EXHIBIT B-1 PROJECT DESCRIPTION. Phase 1 of the Preferred Alternative EXHIBIT B-1 PROJECT DESCRIPTION Phase 1 of the Preferred Alternative The Transform 66 Public-Private Partnership (P3) Project (the Project ) means the Phase 1 of the Preferred Alternative components of

More information

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017

Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I. OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Reconstruction Project Phase I OPEN HOUSE June 20, 2017 Brooklyn Boulevard (County Road 152) Phase I Project Partners Project Lead Other Project Partners include Brooklyn

More information

Route 29 Solutions Projects

Route 29 Solutions Projects Route 29 Solutions Route 29 Solutions Projects www.route29solutions.org October 10, 2014 Route 29 Widening to Six Lanes Albemarle County This project will widen a 1.8-mile segment of Route 29 from four

More information

Draft North Industrial Area-Wide Traffic Plan

Draft North Industrial Area-Wide Traffic Plan Summary of North Industrial and Hudson Bay Industrial Recommended Improvements Table 1. Summary of s Item Location 1 2 3 4 5 6 7 8 9 10 11 12 Millar Ave north of 51st St Super 8 Motel back lane 400 Block

More information

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN

DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DRAFT BUENA VISTA 2020 TRANSPORTATION PLAN DEVELOPED BY THE TRANSPORTATION PLANNING DIVISION OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION IN COOPERATION WITH THE U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL

More information

City of Moorhead Committee of the Whole Meeting

City of Moorhead Committee of the Whole Meeting City of Moorhead Committee of the Whole Meeting Corridor Study Limits Center Avenue (Red River to 8th Street) TH 10 (Red River to TH 336) TH 75 (20th Ave S to Main Avenue) 2 Study Need: Project Overview

More information

Comments EXECUTIVE SUMMARY

Comments EXECUTIVE SUMMARY Comments 1. Under any Alternatives, MCDOT should provide better at-grade pedestrian crossing of Georgia Avenue and Forest Glen Road, including improved crosswalks with wider medians and adequate signal

More information

Transportation. Final Report June Submitted to The New Albany Board of Public Works and Safety. Submitted by ENTRAN, PLC

Transportation. Final Report June Submitted to The New Albany Board of Public Works and Safety. Submitted by ENTRAN, PLC Inner-City Grid Transportation Final Report June 2007 Study Submitted to The New Albany Board of Public Works and Safety Submitted by ENTRAN, PLC Inner-City Grid Transportation Study Final Report June

More information

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations

Roads and Vehicular Traffic Design Principles. Roads and Vehicular Traffic Recommendations CIRCULATION AND PARKING roads and vehicular traffic The Campus Master Plan updates the campus transportation network through a multi-modal approach that encourages walking and biking while improving vehicular

More information

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION

FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION AGENDA ITEM #8: FY 2016 TRANSPORTATION ALTERNATIVES PROGRAM PROJECT SELECTION The Transportation Alternatives Program (TAP) created by MAP-21 requires that 50% of the program funds received by the state

More information

PRESS RELEASE San Joaquin Council of Governments

PRESS RELEASE San Joaquin Council of Governments PRESS RELEASE San Joaquin Council of Governments For Immediate Release February 23, 2018 Contact: Nicole Gorham, 235-0582 gorham@sjcog.org SJCOG Board Awards $19.63 Million in Measure K Bicycle, Pedestrian,

More information

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016

M-58 HIGHWAY ACCESS MANAGEMENT STUDY Mullen Road to Bel-Ray Boulevard. Prepared for CITY OF BELTON. May 2016 M-58 HIGHWAY ACCESS MANAGEMENT STUDY Prepared for CITY OF BELTON By May 2016 Introduction Missouri State Highway 58 (M-58 Highway) is a major commercial corridor in the City of Belton. As development has

More information

Transportation and General Civil Engineering Projects

Transportation and General Civil Engineering Projects Continuing Engineering Services for Transportation and General Civil Engineering Projects Broward County, Florida Why Atkins 2 Existing and Past Clients 3 25+ years Experienced in Civil Engineering PM

More information

FY 2005 TRANSPORTATION CAPITAL PROGRAM

FY 2005 TRANSPORTATION CAPITAL PROGRAM Avenue P Bridge 03315 This project will provide for the replacement of the existing two-track Conrail Railroad Bridge over Avenue P, a local urban street. The bridge and approaches will be built on the

More information

Traffic Impact Memorandum. May 22, 2018

Traffic Impact Memorandum. May 22, 2018 BISHOP PROFESSIONAL DEVELOPMENT BUILDING Proposed Land-use Change & Parking Modification 3601 SW 31st Street Topeka, Kansas 66614 CFS Project No. 185077 Traffic Impact Memorandum May 22, 2018 Prepared

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) has continued the efforts started through the Intermodal Surface Transportation Efficiency

More information

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate)

WYDOT DESIGN GUIDES. Guide for. NHS Arterial (Non-Interstate) WYDOT DESIGN GUIDES Guide for NHS Arterial (Non-Interstate) 2014 GUIDE FOR NATIONAL HIGHWAY SYSTEM (NHS) HIGHWAYS (NHS ARTERIALS, Non-Interstate) PRESERVATION REHABILITATION RECONSTRUCTION INTRODUCTION

More information

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd.

Modal Interrelationships: A bicycle lane is proposed between Harrington Ave and Swanns Station Rd. DRAFT PROJECT PAGE July 12, 2007 Main St / Broadway Rd (SR 1579) Project Statement Project Recommendation: From Avent Ferry Rd (NC 42) to the Harnett County line, Broadway Rd/Main St is recommended to

More information

Basalt Creek Transportation Refinement Plan Recommendations

Basalt Creek Transportation Refinement Plan Recommendations Basalt Creek Transportation Refinement Plan Recommendations Introduction The Basalt Creek transportation planning effort analyzed future transportation conditions and evaluated alternative strategies for

More information

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013)

MUMPO TIP Amendments The MPO has adopted the following amendments to the TIP (as of July 2013) B-4579 Oakdale Bridge Replace bridge-mcintyre Creek Additional time needed for design and to acquire ROW November 16, 2011 2011 2012 $300,000 B-4651 Poplin Bridge Replace bridge-south Fork Crooked Creek

More information

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD

APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD APPENDIX G: INTERSECTION NEEDS AT OKEECHOBEE BOULEVARD INTERSECTION NEEDS AT SR 7 and OKEECHOBEE BOULEVARD SR 7 Extension Project Development and Environment (PD&E) Study From Okeechobee Boulevard (SR

More information

Orange Center Elementary School

Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete this text box) Orange Center Elementary School Drag and drop pic and stretch/crop to the limits of the blue rectangle (delete

More information

Long Island Rail Road Expansion Project Floral Park to Hicksville

Long Island Rail Road Expansion Project Floral Park to Hicksville Long Island Rail Road Expansion Project Floral Park to Hicksville Final Environmental Impact Statement Appendix 1-D Complete Streets Policy Checklist April 2017 0902ML PIN: Project Location: 18A-4 Floral

More information

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway

FI-2 I-66 Between Route 29, Lee Highway and Route 15, James Madison Highway TRANSPORTATION PLAN INTENT Transportation is the key to the economic and social development of Prince William County and especially to the I 66/Route 29 Sector Plan area. This includes transportation for

More information

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I)

Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Northwest Corridor Project Interchange Modification, Interchange Justification and System Analysis Report Reassessment (Phase I) Introduction The Georgia Department of Transportation (GDOT) prepared a

More information

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE

FI N A N C I A L RESOURCER S REVIEW AND UPDATE M I A M I-DADE LO N G R A N G E TRANSPORT T ATION PLAN UPDATE TO THE YE Appendix B: Miami-Dade LRTP Cost Feasible Projects (Fully Funded and Partially Funded Projects) Fully Funded Projects Existing County roads O&M $317.9 $316.7 $811.5 Non Motorized set aside $27.9 $24.7

More information

Proposed White Flint Separated Bike Lane Network September 2015

Proposed White Flint Separated Bike Lane Network September 2015 Proposed White Flint Separated Bike Lane Network September 2015 Abstract This report includes a proposed separated bike lane network for the White Flint Sector Plan area. Separated bike lanes create a

More information

PEDESTRIAN / BIKE PROJECTS

PEDESTRIAN / BIKE PROJECTS PEDESTRIAN / BIKE PROJECTS BP-1. SOUTH WATERFRONT WILLAMETTE GREENWAY TRAIL Need/Purpose The South Waterfront Greenway Trail will stretch from the Marquam Bridge south to the River Forum Building, providing

More information

Cascade Bicycle Club Recommendations

Cascade Bicycle Club Recommendations Cascade Bicycle Club Recommendations The following recommendations are focused on improving bicycle commuting in the Duwamish (South Park, South Downtown, Georgetown and North Tukwila). The recommendations

More information

5 CIRCULATION AND STREET DESIGN

5 CIRCULATION AND STREET DESIGN 5 CIRCULATION AND STREET DESIGN This chapter describes circulation and streetscape improvements proposed for the Northwest Chico Specific Plan Area. It includes detailed design specifications for existing

More information

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan

Southbend to Prima Vista. October 30, Floresta Corridor Master Plan Application of a Complete Street initiative and how it might function operationally 8 8 Southbend to Prima Vista October 30, 2017 Presentation Agenda 2 Perspective and History Traffic projections, Levels

More information

C C C

C C C C-012-001 Thank you for your support for the creation of new public space and nonmotorized access between downtown and the waterfront through the Overlook Walk, the East-West Connections, and the Promenade.

More information

Project Application. Project Location: Salem Drive (Federal Route 1101)

Project Application. Project Location: Salem Drive (Federal Route 1101) Project Application General Information Municipality/Lead Agency: Hoffman Estates 1. Contact Person: Michael Hankey 2. Contact Phone: 847 252-5801 3. Contact Email: mike.hankey@hoffmanestates.org Project

More information

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations)

II. Identification of Opportunities and Solutions. A. Short-term action plan (Summary of Recommendations) II. Identification of Opportunities and Solutions Upon completion of the planning process for this report, a wide range of recommendations were developed throughout the City. The list of proposed recommendations

More information

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66.

Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. 28 VIRGINIA DEPARTMENT OF TRANSPORTATION \\ CULPEPER DISTRICT Route 245 over Broad Run. The recently replaced bridge links The Plains and other communities in northern Fauquier to Interstate 66. PROJECT

More information

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY

JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 JONESBORO HIGHWAY 63 HIGHWAY 18 CONNECTOR STUDY Craighead County May 2007 Prepared by Planning and Research Division Arkansas State

More information

CITY OF LANCASTER PROPOSED NEW PROJECTS

CITY OF LANCASTER PROPOSED NEW PROJECTS CITY OF LANCASTER 2013-2014 PROPOSED NEW PROJECTS Project Code 11 Facilities and Fixtures Project Title 1 11BS018 Main. Yard Storage Bldg, Phase 2 2 11GS007 Parks Improvements 3 11GS008 Dog Park AHP 4

More information

Design Criteria. Design Criteria

Design Criteria. Design Criteria F Design Criteria Design Criteria Ministry of Transportation Ministère des Transports DESIGN CRITERIA Page: 1 of 13 WORK PROJECT NO. N/A GO Bloomington Station TYPE OF PROJECT LOCATION Bloomington Road

More information

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No

Operations -- Transit From: N/A To: N/A. Improvement Type: Regionally Significant: No Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-08 County: King List of 17-08 Amendment Projects:

More information

OKI Awards More Than $41 Million to Transportation Projects Across the Region

OKI Awards More Than $41 Million to Transportation Projects Across the Region FOR IMMEDIATE RELEASE October 11, 2018 Contact: Ashley Patrick apatrick@oki.org (330) 573-4932 m. OKI Awards More Than $41 Million to Transportation Projects Across the Region Cincinnati, Ohio Ohio-Kentucky-Indiana

More information